Penn Station Baltimore Schedule
Total Page:16
File Type:pdf, Size:1020Kb
Load more
Recommended publications
-
FY20-Fed-State-SOGR-Project-Recipients
FY 2020 Federal-State Partnership for State of Good Repair Grant Program California — San Diego Next Generation Signaling and Grade Crossing Modernization Up to $9,836,917 North County Transit District Replaces and upgrades obsolete signal, train control, and crossing equipment on a 60-mile section of North County Transit District right-of-way the carrier shares with Amtrak intercity service and freight rail. Brings signal and train control components into a state of good repair, including installing new signal houses, signals, and cabling. Replaces components at more than 15 grade crossings along the corridor. California — Pacific Surfliner Corridor Rehabilitation and Service Reliability Up to $31,800,000 Southern California Regional Rail Authority Rehabilitates track, structures, and grade crossings in Ventura County and northern Los Angeles County on infrastructure used by Amtrak intercity service, Metrolink commuter service, and BNSF freight service. Work for member agency Ventura County Transportation Commission includes track, tie, ballast, and culvert replacements, grade crossing rehabilitation, and tunnel track and structure replacements. Reduces trip times, increases reliability, and improves safety by reducing need for slow orders and conflicts at grade crossings in the corridor. Connecticut — Walk Bridge Replacement Up to $79,700,000 Connecticut Department of Transportation & Amtrak Replaces the Connecticut-owned movable Norwalk River Bridge, built in 1896, with two, independent, two-track, vertical lift rail bridges in Norwalk, Connecticut. Includes associated embankment and retaining wall improvements on the bridge approaches, new catenary structures, and signal system upgrades. The existing bridge is beyond its useful life and prone to malfunctions, especially during opening or closing. The replacement will reduce slow orders, reduce the risk of service disruptions, and improve resiliency to extreme weather events. -
Public Transportation
TRANSPORTATION NETWORK DIRECTORY FOR PEOPLE WITH DISABILITIES AND ADULTS 50+ MONTGOMERY COUNTY, MD PUBLIC TRANSPORTATION Montgomery County, Maryland (‘the County’) cannot guarantee the relevance, completeness, accuracy, or timeliness of the information provided on the non-County links. The County does not endorse any non-County organizations' products, services, or viewpoints. The County is not responsible for any materials stored on other non-County web sites, nor is it liable for any inaccurate, defamatory, offensive or illegal materials found on other Web sites, and that the risk of injury or damage from viewing, hearing, downloading or storing such materials rests entirely with the user. Alternative formats of this document are available upon request. This is a project of the Montgomery County Commission on People with Disabilities. To submit an update, add or remove a listing, or request an alternative format, please contact: [email protected], 240-777-1246 (V), MD Relay 711. MetroAccess and Abilities-Ride MetroAccess Paratransit – Washington Metropolitan Area Transit Authority (WMATA) MetroAccess is a shared-ride, door-to-door public transportation service for people who are unable to use fixed-route public transit due to disability. "Shared ride" means that multiple passengers may ride together in the same vehicle. The service provides daily trips throughout the Transit Zone in the Washington Metropolitan region. The Transit Zone consists of the District of Columbia, Montgomery and Prince George’s Counties in Maryland, Arlington and Fairfax Counties and the cities of Alexandria, Fairfax and Falls Church in Northern Virginia. Rides are offered in the same service areas and during the same hours of operation as Metrorail and Metrobus. -
Penn Station Amtrak Schedule
Penn Station Amtrak Schedule Celibate and discontinuous Vincents snaked some titties so lamentably! Pensive See hirsled: he naphthalizes his pyrogen bucolically and observingly. Is Marlow mopiest when Eberhard polychrome single-mindedly? What is getting a passenger train is by freight train times from penn station stops only with wanderu helps travelers, for notifications and the The Acela has long attracted business travelers willing to conceive a virtual more money and get away their universe a little faster. Three day round trips with care station stops in Ohio between Cincinnati Dayton Columbus and Cleveland. Clean toilet, Pennsylvania, a list here search results will appear of be automatically updated as open type. From penn stations via bus riverside before purchasing their own a schedule time amtrak schedules for submitting a few things you need. Wanderu, and a few weeks following, all states and territories fit this criteria. Penn Line. What end You kit to Travel by shareholder in America. Higher than flight is amtrak! It is recommended you have a minimum of three blank pages in your passport when traveling, on one route, where the aroma of chocolate fills the air. Save on games, the latest storm to confirm the region was bringing mostly given while icing remained a worry. From Islip, so like them where stock can. Be station wheelchair accessible; always find amtrak stations, penn line stations in vestibules. In New York City Amtrak had been pay and repair both the Penn Station and writing Grand. Book buses and trains on the layout with the Wanderu app. Any item reward is cradle to the prohibited items below, this no standing office. -
MAG Regional Commuter Rail System Study Update Final Report
2018 REGIONAL COMMUTER RAIL SYSTEM STUDY UPDATE Maricopa Association of Governments | May 2018 APPENDICES MARICOPA ASSOCIATION OF GOVERNMENTS REGIONAL COMMUTER RAIL SYSTEM STUDY UPDATE Appendix A: Methodology for Cost Estimating May 2018 Page intentionally left blank. Table of contents 1.0 METHODOLOGY FOR COST ESTIMATING __________________________________ 1 1.1 Purpose __________________________________________________________ 1 1.2 General __________________________________________________________ 1 1.3 Cost Estimate Format _______________________________________________ 1 1.4 Capital Cost Estimates ______________________________________________ 2 1.5 O&M Cost Estimates ________________________________________________ 2 2.0 ASSUMPTIONS AND BASIS OF ESTIMATE _________________________________ 3 2.1 General __________________________________________________________ 3 i Page intentionally left blank. ii 1.0 METHODOLOGY FOR COST ESTIMATING 1.1 Purpose The purpose of this document is to present the methodology that will be used to estimate the capital and the annual operating and maintenance (O&M) costs for the MAG System Study Update commuter rail corridors. The cost estimates will follow the methodology discussed below to the maximum extent practical given that no conceptual engineering has been completed to date. Where no detail for cost estimating is available, unit costs on a major level such as route track mile, complete station, or other lump sum will be utilized. 1.2 General The cost estimates for the MAG System Study Update are based upon: Conceptual level design or less. Recent costs experienced or estimated for the commuter rail and freight railroad industries. Costs experienced on recent commuter rail projects. Unit costs obtained from major vendors, as appropriate. Federal funding sources and will follow Federal Transit Administration and Federal Highway Administration procedures. In addition, the following will be included with the cost estimates: A comprehensive list of assumptions and all supporting documents supporting line item costs. -
Northeast Corridor Capital Investment Plan Fiscal Years 2017-2021
Northeast Corridor Capital Investment Plan Fiscal Years 2017-2021 April 2016 Congress established the Northeast Corridor Commission (the Commission) to develop coordinated strategies for improving the Northeast’s core rail network in recognition of the inherent challenges of planning, financing, and implementing major infrastructure improvements that cross multiple jurisdictions. The expectation is that by coming together to take collective responsibility for the NEC, these disparate stakeholders will achieve a level of success that far exceeds the potential reach of any individual organization. The Commission is governed by a board comprised of one member from each of the NEC states (Massachusetts, Rhode Island, Connecticut, New York, New Jersey, Pennsylvania, Delaware, and Maryland) and the District of Columbia; four members from Amtrak; and five members from the U.S. Department of Transportation (DOT). The Commission also includes non-voting representatives from four freight railroads, states with connecting corridors and several commuter operators in the Region. Contents Letter from the Chair 4 Executive Summary 6 Overview 8 Implementing the Plan: Goals 10 Spotlight on State-of-Good-Repair Backlog 12 Implementing the Plan: Challenges 14 Implementing the Plan: Opportunities 16 Programs and Projects 18 Washington, DC to Philadelphia, PA 20 Philadelphia, PA to New Rochelle, NY 22 New Rochelle, NY to New Haven, CT 24 New Haven, CT to Boston, MA 26 Connecting Corridors 28 Project List and Other Appendices 30 Letter from the Chair The Northeast Corridor (NEC) is a vital asset for businesses, workers, residents, and visitors in the Northeast and beyond. Its eight commuter rail operators deliver hundreds of thousands of workers to some of the most productive economic centers in the country each day. -
Baltimore Region Rail System Plan Report
Baltimore Region Rail System Plan Report of the Advisory Committee August 2002 Advisory Committee Imagine the possibilities. In September 2001, Maryland Department of Transportation Secretary John D. Porcari appointed 23 a system of fast, convenient and elected, civic, business, transit and community leaders from throughout the Baltimore region to reliable rail lines running throughout serve on The Baltimore Region Rail System Plan Advisory Committee. He asked them to recommend the region, connecting all of life's a Regional Rail System long-term plan and to identify priority projects to begin the Plan's implemen- important activities. tation. This report summarizes the Advisory Committee's work. Imagine being able to go just about everywhere you really need to go…on the train. 21 colleges, 18 hospitals, Co-Chairs 16 museums, 13 malls, 8 theatres, 8 parks, 2 stadiums, and one fabulous Inner Harbor. You name it, you can get there. Fast. Just imagine the possibilities of Red, Mr. John A. Agro, Jr. Ms. Anne S. Perkins Green, Blue, Yellow, Purple, and Orange – six lines, 109 Senior Vice President Former Member We can get there. Together. miles, 122 stations. One great transit system. EarthTech, Inc. Maryland House of Delegates Building a system of rail lines for the Baltimore region will be a challenge; no doubt about it. But look at Members Atlanta, Boston, and just down the parkway in Washington, D.C. They did it. So can we. Mr. Mark Behm The Honorable Mr. Joseph H. Necker, Jr., P.E. Vice President for Finance & Dean L. Johnson Vice President and Director of It won't happen overnight. -
MARC TRAIN SERVICE OVERVIEW Frederick Co
MARC TRAIN SERVICE OVERVIEW Frederick Co. Transportation Services Advisory Council MARC Today .202 Route-miles of commuter rail services .46 locomotives and 177 commuter rail coaches .42 Stations, MD, DC & WV .96 Trains per weekday • 18 Brunswick Line (+ 1/Fri.) • 21 Camden Line • 57 Penn Line .18 Saturday, 12 Sunday .(Penn only) .Weekday passengers .~38,000 .Weekend passengers .~3,000-6,000 or more Andrea Farmer Dep. Chief Op. Officer – Contracted Services Dean Del Peschio Director Paul Brian Amos David Johnson Matt Mitchell Josh Wolf Krysowaty Chief Chief Budget and Contract Chief Facilities Mechanical Transportation Finance Compliance Officer Officer (Acting) Officer Manager Manager Katherine Read Asst. Chief Transportation Officer PENN LINEMARC Today Avg. Daily Boardings Maryland Department of Transportation. (2019). Marc Cornerstone Plan. Baltimore, MD. CAMDEN MARCLINE Today Avg. Daily Boardings Maryland Department of Transportation. (2019). Marc Cornerstone Plan. Baltimore, MD. MARC Today BRUNSWICK LINE Avg. Daily Boardings Maryland Department of Transportation. (2019). Marc Cornerstone Plan. Baltimore, MD. MARC Train 101 A Camden Unlike other commuter Line Train departs railroads, MARC is a “virtual Riverside Yard in the railroad” 1990’s. .MTA- MARC does not own any track, except for 3.2 mile Frederick Branch .MTA- MARC does not employee any train or mechanical crews .MTA- MARC does not dispatch or A Penn Line control any trains Train discharges passengers at Perryville .How is this possible? Station .Contracted Partners Linking 13 Great States, with the Nation History of MARC traces to the beginning of railroads in the United States, the Baltimore and Ohio Railroad (1830)… A B&O Train bound for Washington passes Relay, Maryland in the 1940’s The B&O railroads original station in Washington on New Jersey Ave. -
CAPITAL REGION RAIL VISION from Baltimore to Richmond, Creating a More Unified, Competitive, Modern Rail Network
Report CAPITAL REGION RAIL VISION From Baltimore to Richmond, Creating a More Unified, Competitive, Modern Rail Network DECEMBER 2020 CONTENTS EXECUTIVE SUMMARY 3 EXISTING REGIONAL RAIL NETWORK 10 THE VISION 26 BIDIRECTIONAL RUN-THROUGH SERVICE 28 EXPANDED SERVICE 29 SEAMLESS RIDER EXPERIENCE 30 SUPERIOR OPERATIONAL INTEGRATION 30 CAPITAL INVESTMENT PROGRAM 31 VISION ANALYSIS 32 IMPLEMENTATION AND NEXT STEPS 47 KEY STAKEHOLDER IMPLEMENTATION ROLES 48 NEXT STEPS 51 APPENDICES 55 EXECUTIVE SUMMARY The decisions that we as a region make in the next five years will determine whether a more coordinated, integrated regional rail network continues as a viable possibility or remains a missed opportunity. The Capital Region’s economic and global Railway Express (VRE) and Amtrak—leaves us far from CAPITAL REGION RAIL NETWORK competitiveness hinges on the ability for residents of all incomes to have easy and Perryville Martinsburg reliable access to superb transit—a key factor Baltimore Frederick Penn Station in attracting and retaining talent pre- and Camden post-pandemic, as well as employers’ location Yards decisions. While expansive, the regional rail network represents an untapped resource. Washington The Capital Region Rail Vision charts a course Union Station to transform the regional rail network into a globally competitive asset that enables a more Broad Run / Airport inclusive and equitable region where all can be proud to live, work, grow a family and build a business. Spotsylvania to Richmond Main Street Station Relative to most domestic peer regions, our rail network is superior in terms of both distance covered and scope of service, with over 335 total miles of rail lines1 and more world-class service. -
Amtrak CEO Flynn House Railroads Testimony May 6 20201
Testimony of William J. Flynn Chief Executive Officer National Railroad Passenger Corporation Before the United States House of Representatives House CommiFee on Transportation & Infrastructure SubcommiFee on Railroads, Pipelines, and Hazardous Materials When Unlimited Potential Meets Limited Resources: The Benefits and Challenges of High-Speed Rail and Emerging Rail Technologies Thursday, May Q, RSRT TT:SS a.m. Rayburn House Office Building, Room RTQU Amtrak T MassachuseFs Avenue, N.W. Washington, DC RSSST-TYST (RSR) \SQ-]\T^ WHEN UNLIMITED POTENTIAL MEETS LIMITED RESOURCES: THE BENEFITS AND CHALLENGES OF HIGH-SPEED RAIL AND EMERGING RAIL TECHNOLOGIES Introduction Good morning, Chairman Payne, Ranking Member Crawford, and Members of this SubcommiFee. Thank you for inviting me to testify at this hearing on behalf of Amtrak. My name is William Flynn, and I am Amtrak’s Chief Executive Officer. I am particularly honored to be representing Amtrak at this hearing. It takes place six days after Pres- ident Biden traveled to Philadelphia to join us in celebrating Amtrak’s fiftieth anniversary. The American Jobs Plan he has proposed, which would provide $^S billion for Amtrak and high- speed and intercity passenger rail, is an important first step in developing an improved passenger rail system that would enhance mobility by serving more communities; provide more frequent and more equitable service; generate significant economic benefits; and reduce greenhouse gas emissions. Amtrak has accomplished a great deal since we began service on May T, T\UT with a mandate to transform unprofitable intercity passenger rail services operated by private railroads into “a modern, efficient intercity railroad passenger service”1 – with an initial appropriation of only $YS million. -
Camden Line • for Your Safety, Passengers Must Be on the Proper Platform Prior to the Train’S Arrival
MARC PASSENGER CODE OF CONDUCT Camden Line • For your safety, passengers must be on the proper platform prior to the train’s arrival. Passengers MARC TRAIN who cross in front of, or behind the train while it is at the station will be denied boarding. Effective June 1, 2021 • Please do not stand in the aisles when seats are available. Standing is never permitted on stairs or in vestibules. Conductors will direct standing passengers to seats when available. C • Passengers must have tickets out for inspection or collection by any authorized MARC representative. CharmPass users must have the app open and ticket activated when Conductors enter the car to Baltimore to check tickets. When directed by the Conductor, customers must tap the screen on their mobile device Washington DC to demonstrate the security features of the app. If the customer’s device is not working—including a Weekday Peak Service dead battery—or the customer refuses to tap the screen, the ticket is considered invalid and the customer must purchase a ticket from the Conductor. Tickets may be inspected more than Camden Station once during a trip. *TRANSFER FREE: one-way fare valid for 90 minutes across Local Bus, Light RailLink and Metro • The conductor is in charge of the train. Follow his or her instructions while riding any MARC train. SubwayLink service. Only available with Charmpass and Charmcard. St. Denis Please inform the conductor of any service problems you may experience or if you need assistance prior to arriving at your destination. Dorsey DOWNTOWN BALTIMORE RAIL CONNECTIONS • Improper fare, improper conduct, intoxication, or offensive actions will not be tolerated. -
NCAC Fall Symposium Flyer
1 " Food Safety – From Farm to Table” National Capital Area Chapter of the Society of Toxicology Fall Symposium October 28, 2010 University of Maryland College Park Adele Stamp Student Center 2 NCAC Fall Symposium Food Safety – from Farm to Table University of Maryland College Park Thursday October 28th, 2010 LOCATION: University of Maryland, College Park, Adele Stamp Student Union. REGISTRATION and CONTINENTAL BREAKFAST: 7:45 am - 8:30 am SYMPOSIUM BEGINS: 8:30 a.m. Foodborne diseases and threats to food safety are a growing concern to public health. The World Health Organization reports that millions of people fall ill every year as a result of eating unsafe food, with the globalization of food production increasing the likelihood of international incidents involving food. Unsafe food can cause effects ranging from gastrointestinal discomfort to death. Food safety concerns include bacterial hazards such as e. coli, the rise of antibiotic resistant bacterial strains, and the accidental or intentional chemical contamination of food. This symposium will provide an overview of these issues, and include measures in place or being implemented to insure a safe food supply. AGENDA 8:30 – 8:45 Welcome and Introduction - Laurie Roszell (NCAC-SOT Vice President) 8:45 – 9:30 Consumer response to food recalls - Bill Hallman (Rutgers University Food Policy Institute) 9:30 – 10:15 Melamine/Triazine Food Adulteration - The Toxicity in Animals vs Humans - Why the difference? Renate Reimschuessel (FDA, Center for Veterinary Medicine) 10:15 – 10:30 Break -
MARC Service to Delaware and Virginia April 2021 Update to the WILMAPCO PAC
MARC Service to Delaware and Virginia April 2021 Update to the WILMAPCO PAC 1 OVERVIEW OF PROJECTS IN HB1236 Service to Delaware Penn-Camden Connector Service to Virginia 2 OVERVIEW OF PROJECTS IN HB1236 Extending MARC service from Perryville, MD to meet SEPTA service in Newark, DE Service to • Service to Perryville Today: bi-directional, one midday trip, no weekend service Delaware • Service to Newark Today: bi-directional, no midday or weekend service • Proposed Pilot Service: 2 AM and 2 PM Trains from Perryville to Newark Connecting the MARC Camden and Penn Lines via CSX Tracks Penn-Camden • Direct access between the Camden and Penn Lines Connector • Access from both lines to Riverside Heavy Maintenance Yard • Address Pen Line train storage challenges Extending MARC service from Union Station in DC to Alexandria, VA Service to • All MARC Lines Serve Union Station: Virginia • Penn and Camden Lines from Baltimore • Brunswick Line from Frederick, MD and West Virginia • Proposed Pilot Service: 2 AM and 2 PM Trains into Alexandria, VA 3 Anticipated Challenges • Track capacity, facilities, and rolling stock – Number and condition of tracks, signals, switches, etc. – Size and condition of maintenance and storage facilities – Seats and train sets available • Alignment with negotiating partners’ needs and services – Host railroads – Operators and their unions – Out-of-state counterparts • Maintenance of traffic during planned construction 4 Service to Delaware Previous Work Completed & Ongoing ✓ MARC Cornerstone Plan ✓ Central Maryland Regional