TOWONG PLANNING SCHEME

21/06/2012 SCHEDULE TO THE RESTRUCTURE OVERLAY C23

Part A

Dwellings, other buildings and subdivision

Part A of this schedule applies to any proposal for: . a dwelling or dwelling extension, . any other building or building extension where the use of that building will generate wastewater; and . subdivision for land in the Restructure Overlay. Buildings that are for uses that do not generate wastewater or impact on the existing primary and reserve wastewater disposal areas will not be required to be in accordance with the Restructure Plan. Any proposal must be in accordance with Restructure Plan for the land unless supported by a Land Capability Assessment undertaken in accordance with the methodology of: . Australian Standard AS/NZS1547:2000; . Environment Protection Authority Publication No. 746.1 Land Capability Assessment for On Site Domestic Wastewater Management.(March 2003) as updated or amended; and . Municipal Association of Victoria Model Land Capability Assessment Report (February 2006) as updated or amended. Before the Restructure Plan requirements are waived the Land Capability Assessment must clearly demonstrate that: . Wastewater will not be discharged off site; and . The constraints identified in LWMP Consultants Publication Land Capability Report (June 2002) will be managed: and . Wastewater can be managed in accordance with the requirements of the EPA Publication 891.2 Code of Practice – Onsite Wastewater Management. Publication 891.2 (December 2008) as updated or amended.

Part B

PS Map Land Title of restructure plan reference RO1 Beetoomba area Beetoomba Area Restructure Plan, Map 1, Drawing No. S5119A, Revision A. RO2 area Berringama Area Restructure Plan, Map 1, Drawing No. S5119B, Revision A. RO3 Bethanga township & Bethanga Township & Environs Restructure Plan, environs Maps 1-3, Drawing No. S4950A, Revision D. RO4 Cudgewatownship Cudgewa Township Restructure Plan, Maps 1-2, Drawing No. S5119C, Revision A. RO5 Eskdale township Eskdale Township Restructure Plan, Maps 1-2, Drawing No. S4950B, Revision C.

RESTRUCTURE OVERLAY - SCHEDULE PAGE 1 OF 29 TOWONG PLANNING SCHEME

PS Map Land Title of restructure plan reference RO6 township Granya Township and Environs Restructure Plan, Maps 1-2, Drawing No. S5119D, Revision A. RO7 MittaMittatownship Mitta Mitta Township Restructure Plan, Maps 1-2, Drawing No. S4950C, Revisions D/F. RO8 Nariel area Nariel Area Restructure Plan, Maps 1-2, Drawing No. S5119E. RO9 OldTallangattatownship Old Township Restructure Plan, Maps 1- 2, Drawing No. S5119F, Revision A. RO10 TallangattaValleyarea Tallangatta Valley Area Restructure Plan, Maps 1-2, Drawing No. S5119G. RO11 ThowglaUpperarea Thowgla Upper area Restructure Plan, Maps 1-2, Drawing No. S5119H, Revision A. RO12 Tintaldratownship Township Restructure Plan, Maps 1-2, Drawing No. S5119J, Revision A. RO13 Towongtownship Towong Township Restructure Plan, Maps 1-2, Drawing No. S5119K, Revision B. RO14 Walwa township Walwa Township Restructure Plan, Maps 1-2, Drawing No. S5119L, Revision A

RESTRUCTURE OVERLAY - SCHEDULE PAGE 2 OF 29 TOWONG PLANNING SCHEME

BEETOOMBA AREA RESTRUCTURE PLAN (MAP 1 OF 1)

RESTRUCTURE OVERLAY - SCHEDULE PAGE 3 OF 29 TOWONG PLANNING SCHEME

BERRINGAMA AREA RESTRUCTURE PLAN (MAP 1 OF 1)

RESTRUCTURE OVERLAY - SCHEDULE PAGE 4 OF 29 TOWONG PLANNING SCHEME

BETHANGA TOWNSHIP & ENVIRONS RESTRUCTURE PLAN (MAP 1 OF 3)

RESTRUCTURE OVERLAY - SCHEDULE PAGE 5 OF 29 TOWONG PLANNING SCHEME

BETHANGA TOWNSHIP & ENVIRONS RESTRUCTURE PLAN (MAP 2 OF 3)

RESTRUCTURE OVERLAY - SCHEDULE PAGE 6 OF 29 TOWONG PLANNING SCHEME

BETHANGA TOWNSHIP & ENVIRONS RESTRUCTURE PLAN (MAP 3 OF 3)

RESTRUCTURE OVERLAY - SCHEDULE PAGE 7 OF 29 TOWONG PLANNING SCHEME

CUDGEWA TOWNSHIP RESTRUCTURE PLAN (MAP 1 OF 2)

RESTRUCTURE OVERLAY - SCHEDULE PAGE 8 OF 29 TOWONG PLANNING SCHEME

CUDGEWA TOWNSHIP RESTRUCTURE PLAN (MAP 2 OF 2)

RESTRUCTURE OVERLAY - SCHEDULE PAGE 9 OF 29 TOWONG PLANNING SCHEME

ESKDALE TOWNSHIP RESTRUCTURE PLAN (MAP 1 OF 2)

RESTRUCTURE OVERLAY - SCHEDULE PAGE 10 OF 29 TOWONG PLANNING SCHEME

ESKDALE TOWNSHIP RESTRUCTURE PLAN (MAP 2 OF 2)

RESTRUCTURE OVERLAY - SCHEDULE PAGE 11 OF 29 TOWONG PLANNING SCHEME

GRANYA TOWNSHIP AND ENVIRONS RESTRUCTURE PLAN (MAP 1 OF 2)

RESTRUCTURE OVERLAY - SCHEDULE PAGE 12 OF 29 TOWONG PLANNING SCHEME

GRANYA TOWNSHIP AND ENVIRONS RESTRUCTURE PLAN (MAP 2 OF 2)

RESTRUCTURE OVERLAY - SCHEDULE PAGE 13 OF 29 TOWONG PLANNING SCHEME

MITTA MITTA TOWNSHIP RESTRUCTURE PLAN (MAP 1 OF 2)

RESTRUCTURE OVERLAY - SCHEDULE PAGE 14 OF 29 TOWONG PLANNING SCHEME

MITTA MITTA TOWNSHIP RESTRUCTURE PLAN (MAP 2 OF 2)

RESTRUCTURE OVERLAY - SCHEDULE PAGE 15 OF 29 TOWONG PLANNING SCHEME

NARIEL AREA RESTRUCTURE PLAN (MAP 1 OF 2)

RESTRUCTURE OVERLAY - SCHEDULE PAGE 16 OF 29 TOWONG PLANNING SCHEME

NARIEL AREA RESTRUCTURE PLAN (MAP 2 OF 2)

RESTRUCTURE OVERLAY - SCHEDULE PAGE 17 OF 29 TOWONG PLANNING SCHEME

OLD TALLANGATTA TOWNSHIP RESTRUCTURE PLAN (MAP 1 OF 2)

RESTRUCTURE OVERLAY - SCHEDULE PAGE 18 OF 29 TOWONG PLANNING SCHEME

OLD TALLANGATTA TOWNSHIP RESTRUCTURE PLAN (MAP 2 OF 2)

RESTRUCTURE OVERLAY - SCHEDULE PAGE 19 OF 29 TOWONG PLANNING SCHEME

TALLANGATTA VALLEY AREA RESTRUCTURE PLAN (MAP 1 OF 2)

RESTRUCTURE OVERLAY - SCHEDULE PAGE 20 OF 29 TOWONG PLANNING SCHEME

TALLANGATTA VALLEY AREA RESTRUCTURE PLAN (MAP 2 OF 2)

RESTRUCTURE OVERLAY - SCHEDULE PAGE 21 OF 29 TOWONG PLANNING SCHEME

THOWGLA UPPER AREA RESTRUCTURE PLAN (MAP 1 OF 2)

RESTRUCTURE OVERLAY - SCHEDULE PAGE 22 OF 29 TOWONG PLANNING SCHEME

THOWGLA UPPER AREA RESTRUCTURE PLAN (MAP 2 OF 2)

RESTRUCTURE OVERLAY - SCHEDULE PAGE 23 OF 29 TOWONG PLANNING SCHEME

TINTALDRA TOWNSHIP RESTRUCTURE PLAN (MAP 1 OF 2)

RESTRUCTURE OVERLAY - SCHEDULE PAGE 24 OF 29 TOWONG PLANNING SCHEME

TINTALDRA TOWNSHIP RESTRUCTURE PLAN (MAP 2 OF 2)

RESTRUCTURE OVERLAY - SCHEDULE PAGE 25 OF 29 TOWONG PLANNING SCHEME

TOWONG TOWNSHIP RESTRUCTURE PLAN (MAP 1 OF 2)

RESTRUCTURE OVERLAY - SCHEDULE PAGE 26 OF 29 TOWONG PLANNING SCHEME

TOWONG TOWNSHIP RESTRUCTURE PLAN (MAP 2 OF 2)

RESTRUCTURE OVERLAY - SCHEDULE PAGE 27 OF 29 TOWONG PLANNING SCHEME

WALWA TOWNSHIP RESTRUCTURE PLAN (MAP 1 OF 2)

RESTRUCTURE OVERLAY - SCHEDULE PAGE 28 OF 29 TOWONG PLANNING SCHEME

WALWA TOWNSHIP RESTRUCTURE PLAN (MAP 2 OF 2)

RESTRUCTURE OVERLAY - SCHEDULE PAGE 29 OF 29