Eastman Falls Certification Review Report 2019
FRANC LOGIC April 2019 Low Impact Hydropower Institute’s (LIHI) Certification Review for Eastman Falls Hydroelectric Project 1. BACKGROUND The Eastman Falls Hydroelectric Project (Project) is located in central New Hampshire in Merrimack and Belknap Counties, and in the city of Franklin and towns of Hill, Sanbornton, and New Hampton. The Project is located on the Pemigewasset River, approximately 1.5 miles downstream of the U.S. Army Corps of Engineers (USACE) Franklin Falls Flood Control Dam, and about one mile upstream of its confluence with the Winnipesaukee River. The Project was originally constructed by the Pemigewasset Power Company in 1903, redeveloped by the Boston and Maine Railroad in 1910-1911, and further redeveloped by Public Service of New Hampshire (PSNH) in 1937 and 1983. The Project’s prior 30-year license was issued on August 25, 1987, with an effective date of January 1, 1988, expiring on December 31, 2017. The Project was issued a new license on April 20, 20171, by the Federal Energy Regulatory Commission (FERC) as Project #2457, effective January 1, 2018, one day after the termination of the prior license. The new 30-year license expires on December 31, 2047. On July 7, 20182, FERC filed notice of approval of license transfer from PSNH to Hull Street Energy (HSE)3. The Project’s hydroelectric facilities are operated by HSE’s affiliate, Central Rivers Power NH, LLC (CRPNH)4. On January 16, 2019, FERC was notified that the Project changed its name from HSE Hydro NH Eastman Falls, LLC to CRP NH Eastman Falls, LLC. The general Project area includes the Pemigewasset River from Sumner Island in the north to the Pemigewasset-Winnipesaukee River confluence in the south, and the lands immediately adjacent to the Pemigewasset River.
[Show full text]