Bojun Education Company Limited 博駿教育有限公司 (Incorporated in the Cayman Islands with Limited Liability) (Stock Code: 1758)

Total Page:16

File Type:pdf, Size:1020Kb

Bojun Education Company Limited 博駿教育有限公司 (Incorporated in the Cayman Islands with Limited Liability) (Stock Code: 1758) Hong Kong Exchanges and Clearing Limited and The Stock Exchange of Hong Kong Limited take no responsibility for the contents of this announcement, make no representation as to its accuracy or completeness and expressly disclaim any liability whatsoever for any loss howsoever arising from or in reliance upon the whole or any part of the contents of this announcement. Bojun Education Company Limited 博駿教育有限公司 (Incorporated in the Cayman Islands with limited liability) (Stock Code: 1758) VOLUNTARY ANNOUNCEMENT BUSINESS UPDATE This announcement is made by Bojun Education Company Limited (the “Company”, together with its subsidiaries, the “Group”) on a voluntary basis. Reference is made to (i) the announcement of the Company dated 2 October 2018 relating to an education project of Chengdu Mingxian Education Investment Company Limited* (成都銘 賢教育投資有限公司) (“Chengdu Mingxian”) in Zhongjiang County (中江縣), Deyang City (德陽市), Sichuan Province (the “Zhongjiang Project”) and (ii) the announcement of the Company dated 7 November 2018 relating to an education project of Chengdu Mingxian in Neijiang City (內江市), Sichuan Province (the “Neijiang Project”). The Zhongjiang Project The board (the “Board”) of directors (the “Directors”, each a “Director”) of the Company announces that the Zhongjiang Project has been terminated by Chengdu Mingxian and the local government of Zhongjiang County of Deyang City (the “Zhongjiang Local Government”) on 7 August 2019 based on a mutual agreement after having considered, among others, the adjustment in business strategies of the Group, the recent development in government policy in the education industry and other business plans of the Group. Chengdu Mingxian and the Zhongjiang Local Government had no claim against each other in respect of the termination of the Zhongjiang Project. The Board confirms that the Zhongjiang Project had not proceeded to a material stage, no construction work of the school had been commenced and the Group had not incurred any capital expenses in connection with the Zhongjiang Project. The Board considers that the termination of the Zhongjiang Project has no material adverse impact on the existing business operation and financial position of the Group. – 1 – The Neijiang Project The Board announces that the first phrase construction work of the school under the Neijiang Project has not been commenced as the construction planning work has not been completed as at the date of the announcement. The Board confirms that the Group has not incurred any capital expenses in connection with the Neijiang Project. Due to the delay in construction work, the Board expects that the middle school and primary school will commence operation on 1 September 2021 instead of 1 September 2020. Shareholders and potential investors of the Company are advised to exercise caution when dealing in the securities of the Company. By Order of the Board Bojun Education Company Limited Xiong Tao Chairman of the Board Hong Kong, 18 November 2019 As at the date of this announcement, the executive Directors are Mr. Xiong Tao, Mr. Ran Tao and Ms. Liao Rong; the non-executive Director is Mr. Wu Jiwei; and the independent non- executive Directors are Mr. Cheng Tai Kwan Sunny, Mr. Mao Daowei, Ms. Luo Yunping and Mr. Yang Yuan. – 2 –.
Recommended publications
  • Annual Report 2019 CORPORATE INFORMATION
    CONTENTS 2 Company Profile 3 Corporate Information 5 Financial Highlights 7 Chairman’s Statement 8 Management Discussion and Analysis 29 Report of Directors 55 Directors and Senior Management 59 Corporate Governance Report 69 Environmental, Social and Governance (ESG) Report 97 Independent Auditor’s Report 101 Consolidated Statement of Profit or Loss and Other Comprehensive Income 102 Consolidated Statement of Financial Position 104 Consolidated Statement of Changes in Equity 105 Consolidated Statement of Cash Flows 107 Notes to the Consolidated Financial Statements 167 Definitions MANAGEMENT DISCUSSION AND ANALYSIS Company Profile We are one of the leading private education service groups in Chengdu, Sichuan Province, the PRC with a track record of more than 18 years in the provision of private education services. Through our schools, we provide education services to students of different age groups from kindergarten to high school. As at 1 September 2019, we operated a total 11 schools, comprising six kindergartens, one primary and middle school, two middle schools and one middle and high school in Chengdu, as well as one primary and middle school in each of Bazhong, Guangyuan and Ziyang, Sichuan Province. As at 1 September 2019, we had an enrollment of 12,082 students supported by 1,709 employees, including 986 teachers. Since 2001, we have built the foundation of our business We aim to provide quality education services with a strong upon private preschool education and expanded our emphasis on the all-round development of students. footprints to the private primary and middle school With increasing demand for quality private education education industry. In June 2001, we established Chengdu from parents in the PRC, we have undergone significant Youshi Experimental Kindergarten, our first kindergarten development since the opening of our first school in 2001.
    [Show full text]
  • World Bank Document
    CONFORMED COPY Public Disclosure Authorized LOAN NUMBER 7616-CN Loan Agreement Public Disclosure Authorized (Wenchuan Earthquake Recovery Project) between PEOPLE’S REPUBLIC OF CHINA Public Disclosure Authorized and INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT Dated March 20, 2009 Public Disclosure Authorized LOAN AGREEMENT AGREEMENT dated March 20, 2009, between PEOPLE’S REPUBLIC OF CHINA (“Borrower”) and INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT (“Bank”). The Borrower and the Bank hereby agree as follows: ARTICLE I – GENERAL CONDITIONS; DEFINITIONS 1.01. The General Conditions (as defined in the Appendix to this Agreement) constitute an integral part of this Agreement. 1.02. Unless the context requires otherwise, the capitalized terms used in the Loan Agreement have the meanings ascribed to them in the General Conditions or in the Appendix to this Agreement. ARTICLE II – LOAN 2.01. The Bank agrees to lend to the Borrower, on the terms and conditions set forth or referred to in this Agreement, an amount equal to seven hundred ten million Dollars ($710,000,000), as such amount may be converted from time to time through a Currency Conversion in accordance with the provisions of Section 2.07 of this Agreement (“Loan”), to assist in financing the project described in Schedule 1 to this Agreement (“Project”). 2.02. The Borrower may withdraw the proceeds of the Loan in accordance with Section IV of Schedule 2 to this Agreement. 2.03. The Front-end Fee payable by the Borrower shall be equal to one quarter of one percent (0.25%) of the Loan amount. The Borrower shall pay the Front-end Fee not later than sixty (60) days after the Effective Date.
    [Show full text]
  • 212 BERICHTE UND MITTEILUNGEN a Comparison with G . W . SKINNER's Central Place Model Introduction the Foundations of the Now Wi
    212 Erdkunde Band 47/1993 BERICHTE UND MITTEILUNGEN DISTRIBUTIONS OF RURAL CENTERS NEAR CHENGDU IN SOUTHWEST CHINA A comparison with G. W. SKINNER'S central place model With 2 figures and 2 tables HONGLIANG JIANG Zusammenfassung: Das räumliche System ländlicher Zen- tions to its surrounding rural area. This paper, which tren in der Nähe von Chengdu in Südwestchina - ein was integrated into the Academic Research Project: Vergleich mit G. W. SKINNERS zentralörtlichem Modell "Application of the Central Place Theory in China", In der Volksrepublik China wurde die zentralörtliche sponsored by Shao Qingyu, tentatively studies the Theorie CHRISTALLERS erst in der jüngeren Vergangen- rural center system near Chengdu. heit nachhaltig rezipiert. Das Geographische Institut der Chinesischen Akademie der Wissenschaft initiierte in den G. WILLIAM SKINNER adopted the central place 1980er Jahren ein Forschungsprojekt „Die Anwendung der theory to analyze the marketing mechanism in rural zentralörtlichen Theorie in China", an dem Geographen China and categorized marketing places into three aus ganz China beteiligt waren. In diesem Rahmen ist die classes. In order to verify CHRISTALLER'S models, he vorliegende Studie entstanden, die 1987 ein Gebiet in particularly studied in 1949/50 a part of the periodic Sichuan bearbeitete, das schon SKINNER 1949/50 untersucht markets in Jintang, Zhongjiang counties and und in seinem berühmten Aufsatz von 1964/65 als em- Qingbaijiang district (according to the present ad- pirisches Beispiel für ein K = 4 System präsentiert hatte. ministrative regions in Sichuan province) and map- Zur quantitativen Erfassung der Umlandbedeutung der ped their distribution which he thought complied with ländlichen Zentren werden in der vorliegenden Arbeit nicht aK = 4hierarchical system (SKINNER 1964/65, p.
    [Show full text]
  • Table of Codes for Each Court of Each Level
    Table of Codes for Each Court of Each Level Corresponding Type Chinese Court Region Court Name Administrative Name Code Code Area Supreme People’s Court 最高人民法院 最高法 Higher People's Court of 北京市高级人民 Beijing 京 110000 1 Beijing Municipality 法院 Municipality No. 1 Intermediate People's 北京市第一中级 京 01 2 Court of Beijing Municipality 人民法院 Shijingshan Shijingshan District People’s 北京市石景山区 京 0107 110107 District of Beijing 1 Court of Beijing Municipality 人民法院 Municipality Haidian District of Haidian District People’s 北京市海淀区人 京 0108 110108 Beijing 1 Court of Beijing Municipality 民法院 Municipality Mentougou Mentougou District People’s 北京市门头沟区 京 0109 110109 District of Beijing 1 Court of Beijing Municipality 人民法院 Municipality Changping Changping District People’s 北京市昌平区人 京 0114 110114 District of Beijing 1 Court of Beijing Municipality 民法院 Municipality Yanqing County People’s 延庆县人民法院 京 0229 110229 Yanqing County 1 Court No. 2 Intermediate People's 北京市第二中级 京 02 2 Court of Beijing Municipality 人民法院 Dongcheng Dongcheng District People’s 北京市东城区人 京 0101 110101 District of Beijing 1 Court of Beijing Municipality 民法院 Municipality Xicheng District Xicheng District People’s 北京市西城区人 京 0102 110102 of Beijing 1 Court of Beijing Municipality 民法院 Municipality Fengtai District of Fengtai District People’s 北京市丰台区人 京 0106 110106 Beijing 1 Court of Beijing Municipality 民法院 Municipality 1 Fangshan District Fangshan District People’s 北京市房山区人 京 0111 110111 of Beijing 1 Court of Beijing Municipality 民法院 Municipality Daxing District of Daxing District People’s 北京市大兴区人 京 0115
    [Show full text]
  • Addition of Clopidogrel to Aspirin in 45 852 Patients with Acute Myocardial Infarction: Randomised Placebo-Controlled Trial
    Articles Addition of clopidogrel to aspirin in 45 852 patients with acute myocardial infarction: randomised placebo-controlled trial COMMIT (ClOpidogrel and Metoprolol in Myocardial Infarction Trial) collaborative group* Summary Background Despite improvements in the emergency treatment of myocardial infarction (MI), early mortality and Lancet 2005; 366: 1607–21 morbidity remain high. The antiplatelet agent clopidogrel adds to the benefit of aspirin in acute coronary See Comment page 1587 syndromes without ST-segment elevation, but its effects in patients with ST-elevation MI were unclear. *Collaborators and participating hospitals listed at end of paper Methods 45 852 patients admitted to 1250 hospitals within 24 h of suspected acute MI onset were randomly Correspondence to: allocated clopidogrel 75 mg daily (n=22 961) or matching placebo (n=22 891) in addition to aspirin 162 mg daily. Dr Zhengming Chen, Clinical Trial 93% had ST-segment elevation or bundle branch block, and 7% had ST-segment depression. Treatment was to Service Unit and Epidemiological Studies Unit (CTSU), Richard Doll continue until discharge or up to 4 weeks in hospital (mean 15 days in survivors) and 93% of patients completed Building, Old Road Campus, it. The two prespecified co-primary outcomes were: (1) the composite of death, reinfarction, or stroke; and Oxford OX3 7LF, UK (2) death from any cause during the scheduled treatment period. Comparisons were by intention to treat, and [email protected] used the log-rank method. This trial is registered with ClinicalTrials.gov, number NCT00222573. or Dr Lixin Jiang, Fuwai Hospital, Findings Allocation to clopidogrel produced a highly significant 9% (95% CI 3–14) proportional reduction in death, Beijing 100037, P R China [email protected] reinfarction, or stroke (2121 [9·2%] clopidogrel vs 2310 [10·1%] placebo; p=0·002), corresponding to nine (SE 3) fewer events per 1000 patients treated for about 2 weeks.
    [Show full text]
  • Earthquake and Poverty with Chinese Characteristics Wenchuan Earthquake Affected Communities Ten Years After the Disaster
    UNIVERSITY OF OSLO Earthquake and poverty with Chinese characteristics Wenchuan earthquake affected communities ten years after the disaster Dragana Grulovic Asia and Middle East Studies/Chinese Society and Politics KIN4593 – Master’s Thesis in Chinese Society and Politics (30 credits) Department of Culture Studies and Oriental Languages Spring 2019 Earthquake and poverty with Chinese characteristics Wenchuan earthquake affected communities ten years after the disaster © Dragana Grulovic 2019 Earthquake and poverty with Chinese characteristics - Wenchuan earthquake affected communities ten years after the disaster Dragana Grulovic https://www.duo.uio.no Print: Webergs Print Abstract In May 2008, China was struck by a massive earthquake that killed closed to 70,000 people. Communities were torn to the ground, and the economic losses were enormous. Ten years have passed since the massive forces took place, and communities and lives have been rebuilt, with some preceding their pre-disaster economic levels. This study applies survey data to estimate the poverty rates in the Wenchuan earthquake affected communities ten years after the disaster. I find that in 2018, the poverty incidence was 3% in the overall area, as compared to 9% before the earthquake. Of the total of 198 sampled communities, 27 reported having no government- designated poor people. However, 23 communities have a poverty prevalence of 10% or higher. These communities have few characteristics in common in terms of demographic structure and access to public services. About half of the communities are located in government-designated poor counties, while the rest are not. Altogether, the poverty situation in the Wenchuan earthquake affected area reflects the complexity of poverty in China.
    [Show full text]
  • CHENGDU-NANCHONG EXPRESSWAY PROJECT (Loan 1638-PRC)
    ASIAN DEVELOPMENT BANK PCR: PRC 30082 PROJECT COMPLETION REPORT ON THE CHENGDU-NANCHONG EXPRESSWAY PROJECT (Loan 1638-PRC) IN THE PEOPLE’S REPUBLIC OF CHINA December 2004 CURRENCY EQUIVALENTS Currency Unit – yuan (CNY) At Appraisal At Project Completion (19 July 1998) (20 August 2004) CNY1.00 = $0.1208 $0.1208 $1.00 = CNY8.2768 CNY8.2768 ABBREVIATIONS AADT – annual average daily traffic ADB – Asian Development Bank BME – benefit monitoring and evaluation EIA – environmental impact assessment EIRR – economic internal rate of return FIRR – financial internal rate of return GDP – gross domestic product ha – hectare ICB – international competitive bidding km – kilometer LCB – local competitive bidding LIBOR – London interbank offered rate MTE – medium truck equivalent MOC – Ministry of Communications NTHS – national trunk highway system O&M – operation and maintenance PCR – project completion report PRC – The People’s Republic of China PRCM – Asian Development Bank Resident Mission in the People’s Republic of China SCELLC – Sichuan Chengnan Expressway Limited Liability Company SPCD – Sichuan Provincial Communications Department SPG – Sichuan Provincial Government TA – technical assistance VOC – vehicle operating cost WACC – weighted average cost of capital NOTE In this report, "$" refers to US dollars. CONTENTS Page BASIC DATA ii MAPS vii I. PROJECT DESCRIPTION 1 II. EVALUATION OF DESIGN AND IMPLEMENTATION 2 A. Relevance of Design and Formulation 2 B. Project Outputs 2 C. Project Costs and Financing Plan 4 D. Disbursements 5 E. Project Schedule 5 F. Implementation Arrangements 6 G. Conditions and Covenants 6 H. Consultant Recruitment and Procurement 6 I. Performance of Consultants, Contractors, and Suppliers 7 J. Performance of the Borrower and the Executing Agency 7 K.
    [Show full text]
  • E2491 Public Disclosure Authorized
    E2491 Public Disclosure Authorized Sichuan Small Towns Development Project by WB Loans Summary of EIA Reports (Draft) Public Disclosure Authorized Public Disclosure Authorized China Railway Eryuan Engineering Group Co., Ltd. National Environmental Impact Assessment Certificate Jia No. 3210 May 2010 Public Disclosure Authorized Contents Chapter I General ...........................................................................................................................................1 1.1 Background ................................................................................................................................................. 1 1.1.1 Project origin..................................................................................................................................1 1.1.2 Necessity of construction ...............................................................................................................1 1.2 Basis for EA Report Preparation ................................................................................................................. 1 1.2.1 PRC Laws and Regulations............................................................................................................1 1.2.2 WB Requirements ..........................................................................................................................2 1.2.3 Industry systems of the State..........................................................................................................2 1.2.4 Main technical Guides....................................................................................................................3
    [Show full text]
  • World Bank Document
    50678 Project Name: Wenchuan Earthquake Resconstruction Project (Sichuan Component) 6.800 Component: Health Component TTL: Mara. K. Wrick Subject: Tentative Procurement Plan for Good, Works and Consultancy Services Date: 30-Jun-09 12356 7 8 9 10 12 13 14 15 16 Prior / District / Batch Building Reforcing Pre.Design Bidding Const. Start Const. End Ref. No. Municipal Con. No. Contract Description Estimated Cost Proc. Method Post Remark Public Disclosure Authorized Public Disclosure Authorized County Number Complete Complete Date Date Area Area Review Sqm (RMB million) (US$ million) (mm/dd/yy) (mm/dd/yy) (mm/dd/yy) (mm/dd/yy) A) Construction of Works for Hospital, MCH Center and THC 326.40 48.00 1 CD DY One DY-C1 Dayi No.2 People's Hospital Buidling 2500.00 0.00 8.98 1.32 NCB/Works Prior 2009/04/01 2009/09/09 2009/09/29 2010/02/08 2 MY FC One FC-C1 Fucheng MCH Center and Fenggu THC 2800 6276 14.04 2.06 NCB/Works Prior 2009/03/20 2009/09/09 2009/09/29 2010/01/08 3 MY YX One YX-C1 Youxian MCH Center and Youxian THC 4800 2409 12.46 1.83 NCB/Works Prior 2009/03/21 2009/08/20 2009/09/09 2010/01/08 4 MY ST One ST-C1 Santai County People's Hospital 12974 0 36.12 5.31 NCB/Works Prior 2009/04/05 2009/08/20 2009/09/09 2010/02/07 5 MY ZT One ZT-C1 Wenchang THC 2430 1026 4.30 0.63 NCB/Works Prior 2009/03/28 2009/08/20 2009/09/09 2010/01/08 6 MY YT One YT-C1 Yanting County MCH Center 3500 0 10.88 1.60 NCB/Works Prior 2009/03/26 2009/08/20 2009/09/09 2010/01/08 7 NC LZ One LZ-C1 Lanzhong City People's Hospital, and four THCs 5072 3732 15.34 2.26 NCB/Works
    [Show full text]
  • Letter of Intent on Hong Kong Special Administrative Region's Second
    Letter of Intent on Hong Kong Special Administrative Region’s Second Stage Work in Support of Restoration and Reconstruction in the Sichuan Earthquake Stricken Areas Between the Hong Kong Special Administrative Region Government and the Sichuan Provincial People’s Government (Translation) 1. Preamble 1.1. To take forward the Hong Kong Special Administrative Region (HKSAR)’s work in support of restoration and reconstruction in the Sichuan Earthquake, the HKSAR Government (the Hong Kong side) and Sichuan Provincial People’s Government (the Sichuan side), after deliberations, reached consensus on the basic principles, the list of 20 first stage reconstruction support projects, project management and funding arrangements, as well as communication and coordination mechanism, and signed the “Cooperation Arrangement on HKSAR’s Support for Restoration and Reconstruction in the Sichuan Earthquake Stricken Areas between the HKSAR Government and Sichuan Provincial People’s Government (the Cooperation Arrangement). 1.2. Since the signing of the Cooperation Arrangement, the Hong Kong and Sichuan sides have maintained close contact and communication to take forward the 20 confirmed first stage reconstruction support projects, and conducted a series of studies, site visits and discussions for the second stage reconstruction support projects. After deliberations, both sides agreed on 103 projects selected from Sichuan side’s recommended list for implementation at the second stage. To take forward the initiative, on the basis of the Cooperation Arrangement, both sides agreed to sign this “Letter of Intent on HKSAR’s Second Stage Work in Support of Restoration and Reconstruction in the Sichuan Earthquake Stricken Areas Between the HKSAR Government and the Sichuan Provincial People’s Government” (the Letter of Intent), which sets out both sides’ initial agreement and the Hong Kong side’s intent on the second stage reconstruction support work.
    [Show full text]
  • Title of the Paper
    Iqbal et al.: Soybean (Glycine max L.) germplasm screening and geographical determination based on targeted isoflavone metabolomics - 3933 - SOYBEAN (GLYCINE MAX L.) GERMPLASM SCREENING AND GEOGRAPHICAL DETERMINATION BASED ON TARGETED ISOFLAVONE METABOLOMICS IQBAL, N.1# – ZHANG, Q.1# – WU, H.1 – YANG, C.1 – DENG, J.1 – QIN, W.1 – ZHANG, J.1 – YANG, W.1* – LIU, J.1,2* 1Key Laboratory of Crop Ecophysiology and Farming System in Southwest, Ministry of Agriculture, 611130 Chengdu, P. R. China 2Institute of Ecological Agriculture, Sichuan Agricultural University 611130 Chengdu, P. R. China *Corresponding authors e-mail: [email protected] (W. Yang), [email protected] (J. Liu); phone: +86-28-8629-0960; fax: +86-28-8629-0870 #These authors contributed equally to this work. (Received 16th Mar 2018; accepted 25th May 2018) Abstract. In this study, the combination of high-performance liquid chromatography (HPLC) based isoflavone profiling with multivariate analysis was used to screen specific soybean germplasms from Southwestern China, and simultaneously to investigate the influence of genotype, the geographical environment and the germplasm community size on isoflavone biosynthesis. A total of 144 soybean germplasms were evaluated for 12 isoflavones, which varied markedly due to genotypes and locations. Partial least squares analysis (PLS) results exhibited little variability among the 144 samples of four different locations. Five samples were separated from other genotypes based on the first PLS principal component that had high isoflavones. Daidzin, genistin, malonyldaidzin, malonylgenistin and acetylgenistin were the discriminating metabolites. Later the bidirectional orthogonal projection to latent structures- discriminant analysis (O2PLS-DA) was applied for geographical determination of five specific germplasms samples.
    [Show full text]
  • The Debris Flow Hazard Assessment of Wenchuan Earthquake-Stricken Area Based on Watershed Unit
    The Debris Flow Hazard Assessment of Wenchuan Earthquake-stricken Area Based on Watershed Unit Dr Xiong Junnan1, Sun Ming1, Liu Shan2, Peng Chao1 School of Civil Engineering and Architecture, SWPU,Chengdu Sichuan,610500 Dean’s Office of SouthWest Petroleum University, Chengdu Sichuan,610500 ABSTRACT Since the "5.12" Wenchuan earthquake in 2008, Massive debris flow led by the heavy rainfalls has broken out each summer, which causes serious damage to people's lives and property. Given the destructiveness of debris flow, it’s necessary to carry out hazard assessment and prevention work of debris flow in the Earthquake-stricken areas immediately. This article take where earthquake intensity above 7 degrees in Wenchuan as study area, after analyzing the characteristic of debris flow in Whenchuan, we take small watershed unit which debris flow formation as assessment unit, extracts watershed from GDEM data, and established hazard assessment index system with the energy condition, physical condition, as well as rainfall triggering conditions of the debris flow formation. On this basis, we establish debris flow hazard assessment model use extension matter- element theory, carrying out spatial analysis and valuation of each index factor by GIS, and completes debris flow hazard assessment of each watershed in the study area and marking different zones of the debris flow hazard. The experiment shows that the results in good agreement with actual situation of occurred debris flow, the result can offering scientific basis for government to formulate disaster prevention and mitigation decisions. KEYWORDS: debris flow, Wenchuan earthquake-stricken areas, hazard assessment, small watershed unit, GIS INTRODUCTION Debris flow is a sudden disaster which occurring in a mountainous area, and often occurs in small watershed unit in mountain area, which is the combined effects result of geology, geomorphology, hydrology, meteorology, vegetation and other natural factors.
    [Show full text]