Campgrounds Are Located Around the Lake

Total Page:16

File Type:pdf, Size:1020Kb

Campgrounds Are Located Around the Lake MileByMile.com Personal Road Trip Guide Oregon State Highway #58 Miles ITEM SUMMARY 0.0 Junction: Goshen, OR Junction Oregon Route #58 with Interstate Highway #5/Oregon Route #99, near Goshen, Oregon, a community in Lane County, Oregon, This is where Oregon Route #58 begins its southeasterly journey, having two designated scenic byways on its way, terminates at an intersection with United States Highway #97. Altitude: 492 feet 3.9 S Ridgeway: Recreation S. Ridgeway, to Howard Buford County Park, Buford Recreation Area, Area Mt. Pisgah County Park, Mount Pisgah Arboretum, an arboretum and botanical garden located within the Howard Buford Recreation Area, located on the Coast Fork of Willamette River, off Oregon Route #58, Altitude: 643 feet 5.2 Pleasant Hill, OR N Enterprise Road, Morningstar Road, Pleasant Hill, Oregon, a community in Lane County, Oregon, Altitude: 659 feet 5.7 Junction Junction Oregon Route #222/Parkway Road, Jasper, Oregon, a community in Lane County, Oregon, located at the confluence of Hills Creek and the Middle Fork Willamette River. South of Jasper, Oregon, is Jasper State Recreation Site. within Jasper State Park, Altitude: 659 feet 9.4 Wheeler Road Wheeler Road, Elijah Bristow State Park, a state park located on the western bank of the Middle Fork Willamette River, Altitude: 633 feet 9.6 Access Road: State Park Access Road, to Elijah Bristow State Park, Dexter Road, to Dexter, Oregon, a community in Lane County, Oregon, Altitude: 627 feet 11.1 Oak Drive: Dexter, OR Oak Drive, to, Dexter, Oregon, a community in Lane County, Oregon, located near Dexter Lake, a reservoir of the Willamette River along Oregon Route #58. The Parvin Bridge, a covered bridge near Dexter, listed on the National Register of Historic Places, Altitude: 692 feet 11.1 Access Road: State Access Road, to, Dexter State Park, Dexter Dam, a dam on Middle Fork Park/Dam Willamette River, Dexter Reservoir, Lookout Point Lake, Access to Dexter Lake, a popular fishing and boating site, is available at Dexter State Recreation Site. Altitude: 702 feet 13.2 Pioneer Road Pioneer Road, Lowell Covered Bridge, a road bridge across Dexter Lake, connecting Oregon Route #58 with North Shore Drive, at Lowell, Oregon, a city located on the northern shore of Dexter Reservoir, in Lane County, Oregon, Altitude: 722 feet 14.3 Access: Dam Access, to, Lookout Point Dam, a earth-type dam on the Middle Fork Willamette River in Lane County, Oregon. Altitude: 883 feet 17.0 Forest Route Forest Route, Minnow Creek Road, Clause Road, These forest routes wind into the Willamette National Forest, Altitude: 974 feet 20.6 NFD Road 5833: Creek NFD Road 5833, Goodman Creek Road, NFD Road 504/509, wind deep into Willamette National Forest, Altitude: 965 feet 31.3 Old Willamette Old Willamette Highway/Westfir Road, Deception Creek Road, The Highway/Westfir Road North Fork Middle Fork Willamette River, Westfir, Oregon, a city in Lane County, Oregon, The North Fork Willamette River has Oregon's longest covered bridge crossing it at Westfir, Oregon called the Office Bridge. Altitude: 1033 feet 33.6 W Airport Road: Airport W Airport Road, Oakridge State Airport, a public airport located west of Oakridge, in Lane County, Oregon, along Oregon Route #58, within Willamette National Forest, Altitude: 1112 feet Page 1/4 PDF Document Generated on 2020-Aug-11 Copyright 2020, Mile By Mile Media MileByMile.com Personal Road Trip Guide 35.4 Oakridge, Oregon Oakridge, Oregon, a city in Lane County, Oregon, located west of Westfir, Oregon, on Oregon Route #58, near the Middle Fork Willamette River in the Cascade Range. Altitude: 1175 feet 36.2 Rest Area Green Waters Rest Area, located on the Middle Fork Willamette River, Altitude: 1171 feet 37.1 Fish Hatchery Road Fish Hatchery Road, Roberts Ranch Road, Dunning Road, Aubrey Mountain Airstrip, a private Airport located east of Oakridge, Oregon in Lane County, Oregon, Altitude: 1299 feet 37.2 Hills Creek Road: Lake Hills Creek Road, Kitson Springs Road, Hills Creek Lake, located in Willamette National Forest, south of Oregon Route #58, Kitson Hot Springs, turned a Boy Scout Camp, Altitude: 1286 feet 42.8 NFD Road 5870 NFD Road 5870, US Forest Service Road 543, Altitude: 1732 feet 43.6 NFD Road 5871 NFD Road 5871 / 321/327, Willamette National Forest, Altitude: 1864 feet 45.2 NFD Road 5874: Hot NFD Road 5874, McCreedie Hot Springs, a hot spring located just off Spring Oregon Route #58, in the Willamette National Forest, Oregon Altitude: 1985 feet 50.7 Eagle Creek Road Eagle Creek Road, NFD Road 5883/ 373, goes around Mt. David Douglas, in the Willamette National Forest, off Oregon Route #58, Altitude: 2602 feet 57.0 NFD Road 5893: Waterfalls NFD Road 5893, Salt Creek Falls, A waterfall located along the Oregon Route #58, in the Willamette National Forest, nearby in the forest lies, Too much Bear Lake, Altitude: 4196 feet 58.8 NFD Road 5897 NFD Road 5897, to, Mount Ray, which has elevation over 7000 ft. Lower Belly Lake, Belly Lake, Waldo Lake, a lake in the Cascade Mountains of Oregon. It is the second largest natural non-alkali lake in Oregon. The Waldo Lake Area provides oppotunities for Fishing, Boating, Hiking, A number of Campgrounds are located around the lake. There are 205 designated campsites total among the campgrounds and an additional 50 primitive tent sites around the lake. Altitude: 4396 feet 61.3 NFD Road 500 NFD Road 500, NFD Road 5890, Lower Marilyn Lake, Upper Marilyn Lake, Gold Lake, Waldo Lake, a lake in the Cascade Mountains of Oregon. It is the second largest natural non-alkali lake in Oregon. It is located in Waldo Lake Wilderness area, which surrounds Waldo Lake in the central Oregon Cascades, within the Willamette National Forest, off Oregon Route #58. Altitude: 5020 feet 62.1 Access: Ski Area Access, Willamette Pass, a ski area located in Klamath County, Oregon. Willamette Pass, a recreation provider located on both the Willamette and Deschutes National Forests, situated in the Central Cascade Mountain Range of Oregon. Altitude: 5121 feet 62.4 NFD Road 5810: Lake NFD Road 5810, NFD Road 100/101, Odell Lake, a lake located near Willamette Pass in Klamath County, Oregon, lies within Deschutes National Forest. Odell Lake offers recreational opportunities like sailing, wind surfing, water skiing and fishing. There are several campgrounds located around the Odell Lake. Altitude: 5079 feet 68.6 Access Road: Airport Access Road, to, Crescent Lake State Airport, a public airport located north of Crescent Lake, south of Odell Lake, in Klamath County, Oregon, along the Oregon Route #58, Altitude: 4797 feet Page 2/4 PDF Document Generated on 2020-Aug-11 Copyright 2020, Mile By Mile Media MileByMile.com Personal Road Trip Guide 69.3 Junction Junction of Oregon Route #429/NFD Road 60/Crescent Lake Highway Altitude: 4767 feet 72.8 Crescent Cutoff Road Crescent Cutoff Road / NFD Road 81, County Road 1351, runs into Deschutes National Forest, in Oregon. Altitude: 4646 feet 76.9 NFD Road 6020/5820 NFD Road 6020/5820, NFD Road 5814, Crescent Road, Altitude: 4577 feet 81.9 NFD Road 5825 NFD 5825 Road, Hemlock Creek, in Deschutes National Forest, Altitude: 4705 feet 85.9 Intersection Intersection United States Highway #97, within Deschutes National Forest in Oregon. This is where Oregon Route #58 ends. Altitude: 4656 feet Campground Big Pines RV Park 135151 Highway 97 North, Crescent, OR, 541-433-2785, [email protected] (Lat/Long = 43.449745, -121.705280) Bureau of Land Management, Eugene 2890 Chad Drive, Eugene, OR, 541-683-6600 (Lat/Long = District Office, Clay Creek Recreation Site 44.089599, -123.061700) Cottage Grove Ranger District, Umpqua 78405 Cedar Park Rd, Cottage Grove, OR, 541-942-5591 National Forest, Cedar Creek Campground (Lat/Long = 43.789864, -123.019109) Crown Villa RV Resort 60801 Brosterhous Rd.,, Bend, OR, 541-388-1131, [email protected] (Lat/Long = 44.017385, -121.294899) Deerwood RV Park 35059 Seavey Loop Rd, Eugene, OR, 541-988-1139, [email protected] (Lat/Long = 43.995368, -123.000519) Dexter Shores RV Park 39140 Dexter Road, Dexter, OR, 541-937-3711 (Lat/Long = 43.914316, -122.811446) Diamond Lake Ranger District, Umpqua 2020 Toketee RS Rd, Idleyld Park, OR, 541-498-2531 (Lat/Long National Forest, Broken Arrow Campground = 43.256507, -122.404804) Elk Haven RV Resort 22020 North Umpqua Hwy, Idleyld Park, OR, 541-496-3090, [email protected] (Lat/Long = 43.322874, -123.048141) Mc Kenzie Ranger District, Willamette 57600 McKenzie Hwy, McKenzie Bridge, OR, 541-822-3381 National Forest, Big Lake Campground (Lat/Long = 44.179741, -122.125705) Metolius River 1645 U.S. 20 East, Bend, OR, 541-383-5300 (Lat/Long = 44.066234, -121.302510) Middle Fork Ranger District, Broken Bowl 60 South Pioneer St., Lowell, OR, 541-937-2129 (Lat/Long = Campground 43.917232, -122.780509) Middle Fork Ranger District, Willamette Lowell Office/ 60 South Pioneer St., Lowell, OR, 541-937-2129 National Forest, Bedrock Campground (Lat/Long = 43.918629, -122.784203) Middle Fork Ranger District, Willamette Lowell Office/60 South Pioneer St., Lowell, OR, 541-937-2129 National Forest, Campers Flat Campground (Lat/Long = 43.918629, -122.784203) Millpond Campground 777 NW Garden Valley Blvd., Roseburg, OR, 541-440-4930 (Lat/Long = 43.227626, -123.364375) North Umpqua Ranger District, Apple Creek 18782 N. Umpqua Hwy, Glide, OR, 541-496-3532 (Lat/Long = Campground 43.298210, -123.098618) Supervisors Office, Deschutes National 1645 Highway 20 East, Bend, OR, 541-383-5300 (Lat/Long = Forest, Cascade Lakes Scenic Byway 44.058861,
Recommended publications
  • Status and Trends of Predator Species in Lookout Point Reservoir
    Work Completed for Compliance with the 2008 Willamette Project Biological Opinion, USACE funding: 2014-2015 Status and Trends of Predator Species in Lookout Point Reservoir Prepared for U. S. ARMY CORPS OF ENGINEERS PORTAND DISTRICT – WILLAMETTE VALLEY PROJECT 333 S.W. First Ave. Portland, Oregon 97204 Prepared by Jason R. Brandt Fred R. Monzyk Jeremy D. Romer Ryan Emig Oregon Department of Fish and Wildlife Upper Willamette Research, Monitoring and Evaluation Program Corvallis Research Lab 28655 Highway 34 Corvallis, Oregon 97333 Cooperative Agreement: W9127N-10-2-0008 Task Order Number: 0028 March 2016 Table of Contents Summary ....................................................................................................................................................... 1 Introduction ................................................................................................................................................... 3 SECTION 1: BASELINE MONITORING OF PREDATOR POPULATIONS IN LOOKOUT POINT RESERVOIR ................................................................................................................................................ 6 Background ............................................................................................................................................... 6 Methods ........................................................................................................................................................ 7 Statistical Analysis .................................................................................................................................
    [Show full text]
  • Analyzing Dam Feasibility in the Willamette River Watershed
    Portland State University PDXScholar Dissertations and Theses Dissertations and Theses Spring 6-8-2017 Analyzing Dam Feasibility in the Willamette River Watershed Alexander Cameron Nagel Portland State University Follow this and additional works at: https://pdxscholar.library.pdx.edu/open_access_etds Part of the Geography Commons, Hydrology Commons, and the Water Resource Management Commons Let us know how access to this document benefits ou.y Recommended Citation Nagel, Alexander Cameron, "Analyzing Dam Feasibility in the Willamette River Watershed" (2017). Dissertations and Theses. Paper 4012. https://doi.org/10.15760/etd.5896 This Thesis is brought to you for free and open access. It has been accepted for inclusion in Dissertations and Theses by an authorized administrator of PDXScholar. Please contact us if we can make this document more accessible: [email protected]. Analyzing Dam Feasibility in the Willamette River Watershed by Alexander Cameron Nagel A thesis submitted in partial fulfillment of the requirements for the degree of Master of Science in Geography Thesis Committee: Heejun Chang, Chair Geoffrey Duh Paul Loikith Portland State University 2017 i Abstract This study conducts a dam-scale cost versus benefit analysis in order to explore the feasibility of each the 13 U.S. Army Corps of Engineers (USACE) commissioned dams in Oregon’s Willamette River network. Constructed between 1941 and 1969, these structures function in collaboration to comprise the Willamette River Basin Reservoir System (WRBRS). The motivation for this project derives from a growing awareness of the biophysical impacts that dam structures can have on riparian habitats. This project compares each of the 13 dams being assessed, to prioritize their level of utility within the system.
    [Show full text]
  • Development of a Study Design and Implementation Plan to Estimate Juvenile Salmon Survival in Lookout Point Reservoir and Other
    Prepared in cooperation with the U.S. Army Corps of Engineers and the Oregon Department of Fish and Wildlife Development of a Study Design and Implementation Plan to Estimate Juvenile Salmon Survival in Lookout Point Reservoir and Other Reservoirs of the Willamette Project, Western Oregon Open-File Report 2016–1211 U.S. Department of the Interior U.S. Geological Survey Cover: Background: Photograph of Lookout Point Reservoir, Oregon, July 22, 2010. Insets: Floating box trap (left) and (right) a juvenile Chinook salmon (right). Photographs by Fred Monzyk, Oregon Department of Fish and Wildlife, May 12 and May 17, 2012, respectively. Development of a Study Design and Implementation Plan to Estimate Juvenile Salmon Survival in Lookout Point Reservoir and Other Reservoirs of the Willamette Project, Western Oregon By Tobias J. Kock, Russell W. Perry, Fred R. Monzyk, Adam C. Pope, and John M. Plumb Prepared in cooperation with the U.S. Army Corps of Engineers and the Oregon Department of Fish and Wildlife Open-File Report 2016–1211 U.S. Department of the Interior U.S. Geological Survey U.S. Department of the Interior SALLY JEWELL, Secretary U.S. Geological Survey Suzette M. Kimball, Director U.S. Geological Survey, Reston, Virginia: 2016 For more information on the USGS—the Federal source for science about the Earth, its natural and living resources, natural hazards, and the environment—visit http://www.usgs.gov/ or call 1–888–ASK–USGS (1–888–275–8747). For an overview of USGS information products, including maps, imagery, and publications, visit http://store.usgs.gov/. Any use of trade, firm, or product names is for descriptive purposes only and does not imply endorsement by the U.S.
    [Show full text]
  • Lookout Point Watershed Analysis Update
    Lookout Point Watershed Analysis Update August, 2012 Introduction The Lookout Point Watershed Analysis was prepared by personnel of the old Lowell Ranger District in 1997, so this analysis is now about 15 years old. In that time considerable new information has come to light and some conditions have changed. Additionally, the original WA contained some misinformation, or the watershed conditions are better understood now. There is also a new land management project proposed in this watershed (the Outlook Landscape Diversity Project) the analysis of which would be facilitated by this watershed update. In addition to updating current conditions, this reanalysis updates the list of recommendations. Specific conditions or occurrences creating the need for this update include: • vegetation growth which has changed the conditions of the 28% of the watershed consisting of young stands created by past regeneration harvest, • a better understanding of the fire history of the area, • the presence of a new invasive plant species, false brome, • reintroduction of Chinook salmon and bull trout into upstream watersheds, • construction of additional infrastructure elements such as cell phone towers and fiber optic lines, and • continuing deterioration of road conditions. The 1997 “Lookout Pont Watershed Analysis Area” document covered only the 49,638 acres of federally owned lands within the 100,000+ acre Lookout Point Reservoir Fifth Field watershed, which is one of nine within the Fourth-Field Middle Fork of the Willamette River watershed. This update will also address only the National Forest portion of this watershed. Some 60,000 acres of BLM and privately owned lands occur in the lower portions of the full 5th Field watershed, which include the Lookout Point dam and the lower half of the associated reservoir, the Dexter dam and reservoir, the Lost Creek drainage, and the communities of Dexter and Lowell.
    [Show full text]
  • Willamette Valley Projects Configuration/Operation Plan (COP)
    Phase II Report Willamette Valley Projects Configuration/Operation Plan (COP) October 2015 Final Report Willamette Valley Projects Configuration/Operation Plan, Phase II Report EXECUTIVE SUMMARY The Configuration/Operation Plan (COP), Phase II Report, for the Willamette Valley system provides recommendations to address the Reasonable and Prudent Alternative (RPA) contained in the National Oceanic and Atmospheric Administration’s National Marine Fisheries Service (NOAA Fisheries or NMFS) 2008 Biological Opinion (BiOp) for the Willamette System (WS) operated and maintained by the US Army Corps of Engineers (USACE or Corps). The RPA listed actions to be implemented to avoid jeopardy to Upper Willamette River (UWR) spring Chinook salmon (Oncorhynchus tshawytscha) and UWR winter steelhead (O. mykiss) from continued operations and maintenance of the WS. This COP Phase II report was guided by the development of alternatives documented in the 2009 COP Phase I Report. Although this document does not meet the EC 11-2-208 (dated 31 Mar 2015) definition as a “Decision Document”, it is being used to document the long-term plan for implementing the 2008 Willamette Biological Opinion. BACKGROUND The WS system consists of 13 multipurpose dams and reservoirs, and approximately 92 miles of riverbank protection projects in the Willamette River Basin in Oregon. Each project contributes to the overall water resources management in the basin which is designed to provide flood risk management, hydropower generation, irrigation, navigation, recreation, fish and wildlife, and improved water quality on the Willamette River and many of its tributaries. The fish species listed under the Endangered Species Act (ESA) affected by operation of the WS1 include UWR spring Chinook salmon, UWR winter steelhead, and bull trout (Salvelinus confluentus, threatened).
    [Show full text]
  • SALMON and TROUT ENHANCEMENT PROGRAM
    SALMON and TROUT ENHANCEMENT PROGRAM Annual Progress Report 2003 Edited by: Gary Galovich, STEP Coordinator Oregon Department of Fish and Wildlife 3406 Cherry Avenue NE Salem, OR 97303 This project was partially financed with funds obtained through the Federal Aid in Sport Fish Restoration Program. CONTENTS Page Executive Summary.........................................................................................................................3 STEP District Descriptions..............................................................................................................6 Development of the Salmon and Trout Enhancement Program (STEP) .......................................13 Introduction........................................................................................................................13 District Summaries.............................................................................................................13 Characterization of Fish Populations and Their Habitat in Streams..............................................23 Introduction........................................................................................................................23 District Summaries.............................................................................................................23 Habitat Improvement .....................................................................................................................33 Introduction........................................................................................................................33
    [Show full text]
  • Planning Commission Packet
    AGENDA PLANNING COMMISSION MEETING WEDNESDAY, JANUARY 15, 2020 7:00 PM Maggie Osgood Library 70 N. Pioneer Street, Lowell, Oregon 1. CALL TO ORDER/ROLL CALL 2. ADMINISTER OATH OF OFFICE 3. APPROVAL OF AGENDA 4. SELECTION OF PLANNING COMMISSION CHAIR AND VICE-CHAIR 5. APPROVAL OF MINUTES a. November 6, 2019 6. OLD BUSINESS 7. NEW BUSINESS a. Ordinance 300 – Adoption of the Parks and Recreation Master Plan and Comprehensive Plan Amendments • Public Hearing • Commission Deliberation • Commission Decision 8. OTHER BUSINESS 9. ADJOURN The meeting location is accessible to persons with disabilities. A request for an interpreter for the hearing impaired or for other accommodations for persons with disabilities should be made at least 48 hours before the meeting to the City Clerk, Joyce Donnell, at 541-937-2157. City of Lowell, Oregon Minutes of the Planning Commission Meeting November 6, 2019 The meeting was called to order at 7:00 PM by Commissioner Vice-Chair Wallace. Members Present: Mary Wallace Members Present Via Teleconference: Lon Dragt, John Myers Staff Present: CA Cobb, City Planner - Henry Hearley of LCOG Approval of Planning Commission Minutes: Commissioner Dragt moved to approve minutes from Sept. 4, 2019, second by Commissioner Myers. PASS 3:0 Old Business: None New Business: a. Land Use File 2019-07 – Partition of Map and Tax Lot #19011421400 for Mark and Cheryl Kelley Close Public Meeting: 7:07 PM Open Public Hearing: 7:07 PM Land Use File 2019-07 – Partition of Map and Tax Lot #19011421400 for Mark and Cheryl Kelley • Staff Report – Henry Hearley Assistant Planner for Lane Council of Governments, presented report on partition of property located at Assessor’s Map 19-01-14-21, Tax Lot 400.
    [Show full text]
  • Middle Fork Willamette Subbasin Fish Operations Plan MFW-I 2017
    Middle Fork Willamette Subbasin Fish Operations Plan 2017 Chapter 5 – Middle Fork Willamette Subbasin Table of Contents 1. MIDDLE FORK WILLAMETTE SUB-BASIN OVERVIEW ...................................................................... 1 2. FACILITIES ........................................................................................................................................ 8 2.1. Hills Creek Dam .............................................................................................................................. 8 2.2. Lookout Point Dam .......................................................................................................................... 9 2.3. Dexter Dam ...................................................................................................................................... 9 2.4. Fall Creek Dam .............................................................................................................................. 10 2.5. Dexter Fish Facility ........................................................................................................................ 10 2.6. Fall Creek Fish Facility .................................................................................................................. 10 3. DAM OPERATIONS .......................................................................................................................... 11 3.1. Flow Management ........................................................................................................................
    [Show full text]
  • Lost Creek Watershed Analysis Table 18
    TABLE OF CONTENTS Page INTRODUCTION .................................................. 1 1.0 CHARACTERIZATION - STEP 1 ................................ 3 1.1 Human Use Characteristics ........................................ 3 1.2 Physical Characteristics ........................................... 6 1.3 Biological Characteristics ......................................... 9 2.0 ISSUES AND KEY QUESTIONS - STEP 2 ........................ 13 2.1 Human Uses 13 2.1.1 Recreation Uses/Access ................................... 13 2.1.2 Community Values/Aesthetics .............................. 14 2.1.3 Commodity Production .................................... 14 2.1.4 Miscellaneous Forest Products .............................. 14 2.2 Water Quantity And Quality ...................................... 15 2.2.1 Water Quantity .......................................... 15 2.2.2 Water Quality ........................................... 15 2.2.3 Soils and Erosion Processes ................................ 15 2.2.4 Road-related Sedimentation ................................ 15 2.3 Habitat Diversity ............................................... 16 2.3.1 Vegetation .............................................. 16 2.3.2 Forest Fragmentation ..................................... 16 2.3.3 Rare plants .............................................. 16 2.3.4 Noxious Weeds .......................................... 16 2.4 Terrestrial Wildlife ............................................. 16 2.4.1 Spotted Owl Habitat .....................................
    [Show full text]
  • THIS PUBLICATION IS out of DATE. for Most Current Information
    DATE. OF OUT IS information: / PUBLICATIONcurrent most THIS For http://extension.oregonstate.edu/catalog I TMLE -MAPS OFP. THE RIVERI. AND ITS RECRkATINALLI L RESOURCESI; U HITICAL' AND WILDLIFE INFeRMMIONI- STAI'E f'ARKS GUIDE SUGESTED'.I. II EXCURSI6)NI. LI U I £ATING SAFETY TIPS 30 WILLAMETIE RIVER MAP PAGE GUIDE Governor's S CA P PG 0 S E Message ri 1 t 27 Oregon is known to people worldwide for its beauty, natural resources and PORTLAND recreational opportunities. The Willamette River, flowing from MILWAUKEE one of the world's most beautiful LAKE 25 OSWEC mountain ranges and through GLADSTONE one of its richest valleys, is a WEST LINN EREGON CITY DATE. resource befitting this image. NEWBERG One can find everything along its shores from a graceful great 23 bluel:::r:: heron to aa';.':- swooping bald-I- eagle. OF Its w lers are h Cime to salmon, sturgeon, native cutthroat trout and many other species. It supports varied recreational Contents opportunij:ji: tiesfrom boating and water- 22 skiing toL' fishingii1Lc and nature viewing. OUTIntroduction 1 Beyond its natural beauty, the SALEM Willarnette is steeped in the history IS History of the Willamette 2-3 of OregC) n territor. Pi neers by the Plant and Animal Life 4-5 thousands in the mid-1800s ended 21 their long journeys on the Oregon Willamette-area wildlife refuges Trail at Oregon City. For them, the Boating on the Willamette 6-7 Willamette meant new hope River characteristics and hazards and opportunity. 19 ALBANY Today;cca' tLi this living SftLiaLLiOImuseum of information:Navigation aids our naturalLa:x1 a:ttand culturalJc2:J history CORVALLI is a vearound recreati nal Excursions and Outings 8-11 resource for::J all Oregonians'i River mileage and float times as wellwJ as for our visitors.
    [Show full text]
  • 65 Places to Go Fishing in Lane County
    62. Munsel Landing County Park, Munsel Lake Trout, yellow perch, bass If you have more time and a boat… Common Fish Popular for boating, swimming and fishing, this shore dune These trips are appropriate for drift boats, pontoons or lake offers varied fishing opportunities. Shoreline is mostly kayaks. Boaters are always responsible for knowing their privately owned; access at boat ramp. $ craft, the nature of the river and their own abilities. Scout 65 places before you go! 63. Siltcoos Lake 1. Middle Fork Willamette River-Pengra to Jasper Salmon, trout, yellow perch, catfish, crappie, bass or Clearwater: A few technical spots keep boaters alert to go fishing This large, somewhat shallow lake is well-used and has a wide on this classic fish-and-float for trout and the occasional Rainbow trout Brook trout Cutthroat variety of fish available, including coho salmon. salmon or steelhead. A close-in trip that feels like a in Lane County remote getaway. LANE COUNTY OFFERS SO MUCH TO EXPLORE — from coastal lakes and rivers to mountain lakes and 64. South Jetty County Park Crab, surf perch, rockfish 2. Willamette River-The Town Run: Put in at Island streams. The Willamette River runs through the Eugene-Springfield metro area and is fed by three major While you can fish for salmon or rockfish, the big draw here is Park in Springfield or Alton Baker Park in Eugene and rivers: the McKenzie, Middle Fork Willamette and Coast Fork Willamette. Florence is surrounded by large crabbing. Also provides beach and OHV access. Many local float to Beltline.
    [Show full text]
  • Willamette Valley System Operations and Maintenance Environmental Impact Statement (EIS) Scoping Informational Brochure
    ions a rat nd pe Ma O in m t e e t n s a y n S c e E n t v n i e r o m n e m a t e n S t t a l I m p a c t Willamette Valley System Operations and Maintenance Environmental Impact Statement (EIS) Scoping Informational Brochure June 2019 This page is intentionally left blank National Environmental Policy Act (NEPA) Overview The Corps is initiating the preparation of an Environmental Impact Statement (EIS) to address the continued operations and maintenance of the Willamette Valley System (WVS). The WVS consists of 13 multipurpose dams and reservoirs, riverbank protection projects, and hatchery programs in the Willamette River Basin in Oregon. The EIS will be prepared in accordance with the National Environmental Policy Act (NEPA). NEPA requires federal agencies to prepare an EIS for any major federal action that may significantly affect the human environment. The most recent system-wide evaluation for the operations and maintenance of the WVS was an EIS completed in 1980. Since 1980: Operations have been modified and structural improvements for fish passage and temperature control have been implemented to address effects of the WVS on Endangered Species Act (ESA) listed species. There is new information relevant to the environmental impacts of operating the WVS, specifically information related to impacts to ESA-listed species. We are Here: Scoping Scoping is the earliest opportunity for the public Project Initiation to provide input regarding the “scope” of the issues to be evaluated in the EIS. The Corps is seeking input on: Scoping (April- June 2019) • How does the system impact you? • What challenges do you see with system Alternatives Development operations? • What opportunities/solutions are there for improvement? Effects Analysis • What resources are you concerned about: natural, cultural, socioeconomic…? Draft EIS Public Comment Period (Winter 2021) Comments received during scoping will help the Corps focus the scope of issues evaluated Final EIS ( Spring 2023) in the EIS and define/refine action alternatives to be evaluated in the EIS.
    [Show full text]