Sai Kung District Council Traffic and Transport Committee Working Group on Illegal Parking in Sai Kung District Agenda of the Second Meeting in 2020

Total Page:16

File Type:pdf, Size:1020Kb

Sai Kung District Council Traffic and Transport Committee Working Group on Illegal Parking in Sai Kung District Agenda of the Second Meeting in 2020 Sai Kung District Council Traffic and Transport Committee Working Group on Illegal Parking in Sai Kung District Agenda of the Second Meeting in 2020 Date: 20 October 2020 (Tuesday) Time: Immediately following the second meeting of the Working Group on Bus and Minibus Routes in Sai Kung District in 2020 Venue: Conference Room of the Sai Kung District Council 3/F, Sai Kung Tseung Kwan O Government Complex 38 Pui Shing Road, Hang Hau, Tseung Kwan O Agenda I. Confirmation of Minutes of the 1st Working Group on Illegal Parking in Sai Kung District (IPWG) Meeting held on 4 May 2020 (about 5 minutes) II. Matters Arising (about 15 minutes) (A) Explore the possibility of opening up some road sections for designation as temporary night-time parking places to tackle the existing problem of insufficient parking spaces (B) Request the Government to review the existing traffic and transport facilities near the junction of Po Tung Road and Mei Yu Street and to provide a public car park, so as to reduce the traffic flow in Sai Kung Town Centre (SKDC(IPWG) Paper No. 2/20) (C) Request for improving the problem of illegal parking at Kan Hok Lane roundabout near Ming Yu House Request for stepping up efforts in tackling illegal parking at Tong Tak Street and Tong Yin Street Request for inter-departmental efforts to holistically combat illegal parking at Tong Tak Street roundabout near Beverly Garden Request for inter-departmental efforts to holistically combat illegal parking outside Sheung Tak Bus Terminus Request for improving the problem of illegal parking and road safety at Mau Tai Road and Yuk Nga Lane in Po Lam as soon as possible Question on how the Police and Transport Department would tackle the problem of illegal parking in Tseung Kwan O South (SKDC(IPWG) Paper No. 3/20) III. Items referred by the Traffic and Transport Committee (about 30 minutes) (A) Request for reviewing the parking space ratios set out in the Hong Kong Planning Standards and Guidelines to increase the number of parking spaces in Sai Kung and Tseung Kwan O as soon as possible by fully adhering to the principle of “single site, multiple use” and adopting the multi-pronged approach, as well as reviewing transport policies in parallel to contain vehicle growth and parking demand Request the Government to introduce “smart car parks” and adopt all practicable measures to solve the problems of insufficient parking spaces and illegal parking given the current inadequate supply of car parking spaces in Sai Kung, Hang Hau and Tseung Kwan O (B) Issue about illegal parking in Tseung Kwan O South (C) Enquiry about the situation of illegal parking in Sai Kung Central (D) Enquiry about the usage of metered parking spaces in Sai Kung Central (E) Request the relevant departments to handle abandoned vehicles as soon as possible (F) Question about how the Hong Kong Police Force assesses the effectiveness of various measures for tackling illegal parking Issues of “e-Ticketing Pilot Scheme” launched by the Police IV. Report Item (about 5 minutes) (A) Statistics on illegal parking (SKDC(IPWG) Paper No. 4/20) V. Any Other Business (about 5 minutes) VI. Date of Next Meeting (Remarks: (1) Each member may participate for a maximum of two times in the discussion of every single item and the duration for each speech is limited to two minutes. (2) The time allotted for the Agenda items is based on estimate only and the actual time will depend on the progress of the meeting.) 2 c.c. Representatives of government departments in attendance at the meeting Working Group on Illegal Parking in Sai Kung District Traffic and Transport Committee Sai Kung District Council 12 October 2020 Ref: ( ) in HAD SK DC 13/35/53 3 .
Recommended publications
  • Sai Kung Community Care Fund
    Community Care Fund "Pilot Scheme on Support for Elderly Persons Discharged from Public Hospitals After Treatment" Approved Service Providers - List of Service Units (Transitional Community Care and Support Services) (Updated on 1 August 2019) Sai Kung District Home Care Day Care (location of S/N Agency Name Service Unit Name Address (Home Care Office) Serving District(s) Address (Day Care Centre) Serving District(s) Tel Fax Service Service service unit) Room 306A, 311-312 and 330-335, Room 311-312 and 330-335, Hong Haven of Hope Christian Haven of Hope Tsui Lam Day Training Kwun Tong, 1 Hong Lam House, Tsui Lam Estate, Lam House, Tsui Lam Estate, Tseung Kwun Tong, Sai Kung 5281 6325 2704 9282 Service Centre for the Elderly Sai Kung Tseung Kwan O, New Territories Kwan O, New Territories Sai Kung District Community Centre Sai Kung District Community Centre Sai Kung District Sai Kung District Community Centre Limited Jockey Club Integrated Limited Jockey Club Integrated Sai Kung 2 Sai Kung Sai Kung 2792 1762 2791 0247 Community Centre Limited Limited Services Centre, 8 Mei Yuen Street, Services Centre, 8 Mei Yuen Street, Sai Kung, New Territories Sai Kung, New Territories The Hong Kong Society for SAGE Tung Lin Kok Yuen Home for the 4/F, On Lam House. Tsui Lam Estate, 3 Sai Kung 2702 0066 2174 8043 the Aged Elderly / / Tseung Kwan O, New Territories Kwun Tong, Christian Family Service Shop 4, G/F, Choi Sing House, Choi Wong Tai Sin, 4 Mind Delight & Cognitive Training Centre / / 2793 2138 3572 0634 Centre Ha Estate, Kowloon Bay, Kowloon Sai Kung, Kowloon City Kwun Tong, Tung Wah Group of Henry G.
    [Show full text]
  • Geodiversity, Geoconservation and Geotourism in Hong Kong Global
    Proceedings of the Geologists’ Association 126 (2015) 426–437 Contents lists available at ScienceDirect Proceedings of the Geologists’ Association jo urnal homepage: www.elsevier.com/locate/pgeola Geodiversity, geoconservation and geotourism in Hong Kong Global Geopark of China Lulin Wang *, Mingzhong Tian, Lei Wang School of Earth Science and Resources, China University of Geosciences, Beijing 100083, China A R T I C L E I N F O A B S T R A C T Article history: In addition to being an international financial center, Hong Kong has rich geodiversity, in terms of a Received 22 November 2014 representative and comprehensive system of coastal landscapes, with scientific value in the study of Received in revised form 20 February 2015 Quaternary global sea-level changes, and esthetic, recreational and cultural value for tourism. The value Accepted 26 February 2015 of the coastal landscapes in Hong Kong was globally recognized when Hong Kong Global Geopark Available online 14 April 2015 (HKGG), which was developed under the well-established framework of Hong Kong Country Parks and Marine Parks, was accepted in the Global Geoparks Network (GGN) in 2011. With over 30 years of Keywords: experience gained from managing protected areas and a concerted effort to develop geoconservation and Coastal landscape geotourism, HKGG has reached a mature stage of development and can provide a well-developed Hong Kong Global Geopark Geodiversity example of successful geoconservation and geotourism in China. This paper analyzes the geodiversity, Geoconservation geoconservation and geotourism of HKGG. The main accomplishments summarized in this paper are Geotourism efficient conservation management, an optimized tourism infrastructure, a strong scientific interpretation system, mass promotion and education materials, active exchange with other geoparks, continuous training, and effective collaboration with local communities.
    [Show full text]
  • PWSC(2021-22)5 on 21 April 2021
    For discussion PWSC(2021-22)5 on 21 April 2021 ITEM FOR PUBLIC WORKS SUBCOMMITTEE OF FINANCE COMMITTEE HEAD 705 – CIVIL ENGINEERING Transport – Ferry Piers 58TF – Improvement works at Kau Sai Village Pier 59TF – Improvement works at Lai Chi Chong Pier Members are invited to recommend to the Finance Committee – (a) the upgrading of 58TF to Category A at an estimated cost of $77.8 million in money-of-the-day (MOD) prices; and (b) the upgrading of 59TF to Category A at an estimated cost of $108.8 million in MOD prices. PROBLEM We need to carry out the following works – (a) 58TF for reconstruction of Kau Sai Village Pier to improve the berthing condition and facilities of the pier; and (b) 59TF for reconstruction of Lai Chi Chong Pier to improve the structural condition and facilities of the pier. /PROPOSAL ….. PWSC(2021-22)5 Page 2 PROPOSAL 2. The Director of Civil Engineering and Development, with the support of the Secretary for Development, proposes to upgrade the following projects to Category A – (a) 58TF at an estimated cost of $77.8 million in MOD prices for the reconstruction of Kau Sai Village Pier; and (b) 59TF at an estimated cost of $108.8 million in MOD prices for the reconstruction of Lai Chi Chong Pier. PROJECT SCOPE 3. Details of the above two projects are provided at Enclosures 1 and 2 respectively. -------------------------------------- Development Bureau April 2021 Enclosure 1 to PWSC(2021-22)5 58TF – Improvement works at Kau Sai Village Pier PROJECT SCOPE We propose to upgrade 58TF to Category A and the scope of works comprises – (a) reconstruction of the existing pier, including provision of ancillary facilities such as roof cover, lighting system, benches, solar panels, Wi-Fi device, etc.; and (b) environmental monitoring and mitigation measures for the proposed works.
    [Show full text]
  • Annual Report on Capital Works Reserve Fund Block Allocations for the 2006-07 Financial Year
    For information PWSCI(2007-08)13 NOTE FOR PUBLIC WORKS SUBCOMMITTEE OF FINANCE COMMITTEE Annual Report on Capital Works Reserve Fund Block Allocations for the 2006-07 Financial Year We have been compiling exception reports on block allocations under the Capital Works Reserve Fund (CWRF) to account for the difference between the actual programme and the indicative one which we presented to Members for approving the funding allocation. This report covers the 2006-07 financial year. Enclosures 1 to 11 provide details on each block allocation under the 11 CWRF Heads of Expenditure and include – (a) a comparison of the approved provision and actual expenditure in 2006-07 and the reasons for those items with variations greater than 15%; (b) a list of minor works projects which were implemented in 2006-07 as planned, including those which had had the works contracts awarded but had not started incurring spending (as compared with the indicative list in PWSC(2005-06)33), and those which were shelved or withdrawn; and (c) a list of new injection items (i.e. items not shown in the indicative list in PWSC(2005-06)33) approved in 2006-07. 2. In overall terms, the approved allocation for CWRF block allocations in 2006-07 totalled $7,952 million. The actual expenditure was $6,044 million. ------------------------- Financial Services and the Treasury Bureau October 2007 PWSCI(2007-08)13 Index of Enclosures and Annexes Head/Subhead Reference Page Head 701 - Land Acquisition ......................... Enclosure 1 1 Subhead 1004CA Annex 1A 2 - 4 Subhead 1100CA Annex 1B 5 - 9 Head 702 - Port and Airport Development ..
    [Show full text]
  • Cameron Dueck Explored Beyond the Beaten Track
    a tale of two cities CAMERON DUECK EXPLORED BEYOND THE BEATEN TRACK AROUND THE WATERS OF HIS HOMETOWN, HONG KONG Baona/Getty The old and the new: a traditional junk crosses the glassy waters of Hong Kong Harbour 52 53 ‘Hong Kong is so much more than just a glittering metropolis’ We had just dropped the anchor in a small bay, and I was standing on the deck of our Hallberg-Rassy, surveying the turquoise water and shore that rose steep and green around us. At one end of the bay stood a ramshackle cluster of old British military buildings and an abandoned pearl farm, now covered in vines that were reclaiming the land, while through the mouth of the bay I could see a few high- prowed fishing boats working the South China Sea. I felt drunk with the thrill of new discovery, even though we were in our home waters. I was surprised that I’d never seen this gem of a spot before, and it made me wonder what else I’d find. Hong Kong has been my home for nearly 15 years, during which I’ve hiked from its lush valleys to the tops of its mountain peaks and paddled miles of its rocky shoreline in a sea kayak. I pride myself in having seen Lui/EyeEm/Getty Siu Kwan many of the far-flung corners of this territory. The little-known beauty of Hong Kong’s Sai Kung district I’ve also been an active weekend sailor, crewing on racing yachts and sailing out of every local club.
    [Show full text]
  • GEO REPORT No. 282
    EXPERT REPORT ON THE GEOLOGY OF THE PROPOSED GEOPARK IN HONG KONG GEO REPORT No. 282 R.J. Sewell & D.L.K. Tang GEOTECHNICAL ENGINEERING OFFICE CIVIL ENGINEERING AND DEVELOPMENT DEPARTMENT THE GOVERNMENT OF THE HONG KONG SPECIAL ADMINISTRATIVE REGION EXPERT REPORT ON THE GEOLOGY OF THE PROPOSED GEOPARK IN HONG KONG GEO REPORT No. 282 R.J. Sewell & D.L.K. Tang This report was originally produced in June 2009 as GEO Geological Report No. GR 2/2009 2 © The Government of the Hong Kong Special Administrative Region First published, July 2013 Prepared by: Geotechnical Engineering Office, Civil Engineering and Development Department, Civil Engineering and Development Building, 101 Princess Margaret Road, Homantin, Kowloon, Hong Kong. - 3 - PREFACE In keeping with our policy of releasing information which may be of general interest to the geotechnical profession and the public, we make available selected internal reports in a series of publications termed the GEO Report series. The GEO Reports can be downloaded from the website of the Civil Engineering and Development Department (http://www.cedd.gov.hk) on the Internet. Printed copies are also available for some GEO Reports. For printed copies, a charge is made to cover the cost of printing. The Geotechnical Engineering Office also produces documents specifically for publication in print. These include guidance documents and results of comprehensive reviews. They can also be downloaded from the above website. The publications and the printed GEO Reports may be obtained from the Government’s Information Services Department. Information on how to purchase these documents is given on the second last page of this report.
    [Show full text]
  • List of Abbreviations
    MJ T`Wbb_b] M^c_Y[f 0;BC ?: +66A9E;5C;?> Q_fg c\ KXXe[i_Wg_cb List of Abbreviation Name/Organization Abbreviation Paragraph Index Advisory Council on the Environment ACE A3-1, A4-21, B1-24, C1-54, C4-13, C7-3, C7-18, C9-8, D4-1, D5-3 Advisory Council on the Environment – ACE-EIA Subcom B1-1, B2-5, C4-50, C7-6, C7-9, Environmental Impact Assessment C7-16, D3-2, D6-32, D9-9 Subcommittee Antiquities Advisory Board AAB A4-22, A4-33, B1-1, D5-13, D5-18, D5-33 Apple Daily Apple C4-30, D2-1, D3-1, D3-10, D10-32 Au, Joanlin Chung Leung J. Au B2-19, D10-10 Best Galaxy Ltd. BG Ltd. C4-19, C4-27, C4-49 Charter Rank Ltd. CR Ltd. Brown, Stephen S. Brown B1-1, B1-2, B1-16, B1-17, B1-23, D2-1, D2-9, D2-14, D5-15, D5-20, D8-1 Central & Western District Council C&W DC A2-12, B1-1, C3-3, C3-17, C3-20, C4-65, D2-1, D2-3, D2-4, D2-16, D3-14, D5-19, D5-29, D5-31, D9-1, D9-8, D10-21 Chan, Albert W.Y. A. Chan D2-14 Chan, Ho Kai* H.K. Chan C3-13, C4-1, D5-37, D5-39 Chan, Ling* L. Chan A4-25, D10-4 Chan, Raymond R. Chan A4-9, B1-7, C2-15, C2-19, C2-50, Cheng, Samuel S. Cheng C3-10, D6-4, D6-7, D6-19, D6-29, Kwok, Sam S.
    [Show full text]
  • Ϊᄂ൳ढ۝Җੑ Historyhiisttory Andand Developmentdevellopmentt Ofoff Saisaii Kungkung
    ፡Ϊᄂ൳ढ۝җੑ HistoryHiisttory andand DevelopmentDevellopmentt ofoff SaiSaii KungKung ࠗಋɁ Situated in southeastern New Territories, Sai Kung܃ᅕɊα੡˞Ӿ஠ೕࢄcၤኝٶכ஫cͅΛ࠯˸ࢌ՗ȼɊΛ࠯ Ϲ঳ڲ׭ވϹ঳Ͻ୮ณ .eݯ৉΋ comprises several peninsulas and over 70 islands of various sizesڝɣؿᗐ۾ჱᄈ˱՗຤ዃடαؿߕҠτ܈ɣɩࢌᎯୂιeɊȼ˖޵۪ࡼଫ̵඀նԷϹ঳ȹ੓ց ɟ Since the 17th Century, the Hakka people began migrating to Sai ֚ܧͲಋ௖ɣؿ᎝ˋ࢒ི߮cɀɊ˖޵ȼɊαˤۺֈcΕ؜ֶࣵ،ӱɐಌ඀ኊ१Δcၙֈι൰ҦeҦ̵ ጙ Kung and engaging in agricultural cultivation in the valley and the ϹۺੀϹ঳ᄇடઅɣ၉ˠؿ༞༏Њ֝ϭຒփᜪcԎጙ כΛ˞৻༛ֶࢰேݯ́c͛τʭᅕҦ̵ႇАᜤጅeͅ coastal area. Rural settlements gradually appeared. Early settlers ࣵپɣஃᅡؿᄇ̟cྦྷ͚̔஝͛ ҳʔ༏ட஑Ɋ̒൰ϭҳ̈́eՇˋ࢒ɮೡᄧᚊcւ͓ۺʑɁɟ༖ʭcӀτਂ primarily made their living by farming or fishing, while a few τ༎൙ɬᎰؿɩࢗc஝֡Ⱦ᎘ֶҳ̈́ؿᕳ฻೩Δe̋ ༟ΕϹ঳ᄇʨ engaged in manufacturing sugar or salt. As the population could֚ܧࢇԭ֌Λૈ൰ҦؿҦ̵჏߬ሰӶc ʒɊαˤࠗಋԹˋ౨ංc̵̟ረ࠰ࠕˋؿߕؗ Long queue of people fetching water during the ΍ᄢྦྷ඀ؿΔʿc൬Ϸිࣵɮೡ˞ԜሰҦɾ͂eϹ঳ not sustain a marketplace, villagers had to travel through winding water restriction period in 1960s ຒփˋ࢒c˞໬Һࠕˋɺӷۺࣵࢇጙپ1971αϭ1978αΕւ ɮೡϤྵ֛ trackways to Kowloon, Lik Yuen of Shatin or other destinations. ਐᕀۺᄇȹ੓ؿࠍႜc͛፭㠥ිࣵʥΛඖਥ The Kwun Mun Strait where the High Island Reservoir was built for fresh water supply from 1971 to 1978 ҝᛰe Sai Kung has experienced rapid development in recent decades due to speedy population growth and severe droughts after the Second World War. To complement the largest reservoir construction project of Hong Kong in the 1970s, the road connecting Sai Kung Town and Tai Mong Tsai was extended to Man Yee Wan, while the Sai Sha Road was paved to link Shap Sze Heung with Shatin.
    [Show full text]
  • Duration & Year
    Hong Kong – Spring 2013 IAP Program Handbook The Hong Kong Exchange program is offered by International Academic Programs (IAP) at the University of Wisconsin-Madison in conjunction with the Hong Kong University of Science and Technology (HKUST). This IAP Program Handbook supplements handbook(s) or materials you receive from HKUST as well as the IAP Study Abroad Handbook and provides you with the most up-to-date information and advice available at the time of printing. Changes may occur before your departure or while you are abroad. Questions about your program abroad (housing options, facilities abroad, etc.) as well as questions relating to your relationship with your host university or academics (e.g. course credit and equivalents, registration deadlines, etc.) should be directed to International Academic Programs at UW-Madison. This program handbook contains the following information: Contact Information ...................................................................................................................... 1 Program Dates ............................................................................................................................... 2 Preparation Before Leaving ........................................................................................................... 3 Travel and Arrival Information ...................................................................................................... 4 The Academic Program ................................................................................................................
    [Show full text]
  • 1171 20180510 AM Final Draft-Clean
    Minutes of 1171st Meeting of the Town Planning Board held on 10.5.2018 Present Permanent Secretary for Development Chairperson (Planning and Lands) Ms Bernadette H.H. Linn Professor S.C. Wong Vice-Chairperson Mr Ivan C.S. Fu Mr Sunny L.K. Ho Mr Stephen H.B. Yau Mr David Y.T. Lui Dr Frankie W.C. Yeung Mr Peter K.T. Yuen Dr Lawrence W.C. Poon Mr Wilson Y.W. Fung Mr Thomas O.S. Ho Mr Alex T.H. Lai Professor T.S. Liu Ms Sandy H.Y. Wong Mr Franklin Yu Mr L.T. Kwok - 2 - Mr Daniel K.S. Lau Mr K.W. Leung Professor John C.Y. Ng Professor Jonathan W.C. Wong Assistant Director (Environmental Assessment) Environmental Protection Department Mr C.F. Wong Assistant Director (Regional 1) Lands Department Mr Simon S.W. Wang Chief Engineer (Works) Home Affairs Department Mr Martin W.C. Kwan Chief Traffic Engineer (New Territories East) Transport Department Mr Ricky W.K. Ho Deputy Director of Planning/District Secretary Ms Jacinta K.C. Woo Absent with Apologies Mr Lincoln L.H. Huang Mr H.W. Cheung Dr F.C. Chan Mr Philip S.L. Kan Mr K.K. Cheung Dr C.H. Hau Dr Lawrence K.C. Li Mr Stephen L.H. Liu Miss Winnie W.M. Ng - 3 - Mr Stanley T.S. Choi Ms Lilian S.K. Law Dr Jeanne C.Y. Ng Mr Ricky W.Y. Yu Director of Planning Mr Raymond K.W. Lee In Attendance Assistant Director of Planning/Board Ms April K.Y.
    [Show full text]
  • Report on the Management of Recreation and Sports Facilities in Sai Kung District in May and June 2020 by the Leisure and Cultural Services Department
    Sai Kung District Council District Facilities Management Committee Committee Paper for 14.7.2020 SKDC(DFMC) Paper No. 70/20 (Revised) Report on the Management of Recreation and Sports Facilities in Sai Kung District in May and June 2020 by the Leisure and Cultural Services Department Purpose This paper briefs Members on the management of recreation and sports facilities by the Leisure and Cultural Services Department (LCSD) in Sai Kung District in May and June 2020. Background 2. To give Members a better understanding of the services provided by the LCSD, the LCSD makes regular submissions on the management and the usage of recreation and sports facilities in Sai Kung District. Management of Recreation and Sports Facilities 3. In view of the alleviation of COVID-19 recently, the LCSD had reopened the facilities in phases from 6 May 2020 onwards for public use. Details of the usage of recreation and sports facilities in Sai Kung District in May and June 2020 are tabulated in Annex I. 4. The major services provided by the LCSD’s contractors in Sai Kung District are cleansing, horticultural maintenance and security guard services and their performances were satisfactory. The LCSD carries out regular inspections to monitor the work and performance of the contractors. Improvement Projects 5. Please refer to Annex II for information on facility improvement project conducted in Sai Kung District in May and June 2020. 6. The maintenance contractor of Tiu Keng Leng Sports Centre accidentally damaged a fire services sprinkler head when undergoing routine maintenance of lighting fittings in the arena in December last year.
    [Show full text]
  • Legco Panel on Transport Public Transport Interchanges at Hang Hau Station, Tseung Kwan O Station and Tiu Keng Leng Station of T
    LegCo Panel on Transport Public Transport Interchanges at Hang Hau Station, Tseung Kwan O Station and Tiu Keng Leng Station of the MTR Tseung Kwan O Extension PURPOSE This paper briefs Member on the plan of the Administration to make a submission to the Public Works Subcommittee of the Legislative Council for the upgrading of the proposed public transport interchanges (PTIs) at Hang Hau (HAH) Station, Tseung Kwan O (TKO) Station and Tiu Keng Leng (TKL) Station of the MTR Tseung Kwan O Extension (TKE) to Category A of the Public Works Programme. BACKGROUND INFORMATION 2. The population of Hang Hau, TKO Town Centre (in the vicinity of Area 56) and Tiu Keng Leng in TKO is forecast to increase to about 84,000, 142,000 and 80,000 respectively by 2011. To meet the increase in demand for public transport interchange in these areas, we need to construct the three proposed PTIs to provide sufficient facilities for passengers to change between the MTR TKE and buses and green minibuses, and for loading/unloading for taxis and general vehicles. 3. The Government authorized the MTR TKE project in October 1998 and the MTR Corporation Limited (MTRCL) subsequently started construction in end 1998. The first phase of MTR TKE including the HAH, TKO and TKL Stations will be commissioned in end 2002. We need to provide the three proposed PTIs in time for the opening the MTR TKE. 4. To avoid interface problems and to ensure timely completion of the proposed PTIs, we will entrust the design and construction of the PTIs to MTRCL as part of the land grant for the associated property developments at HAH, TKO and TKL Stations.
    [Show full text]