Specifications and Scope of Work

Total Page:16

File Type:pdf, Size:1020Kb

Specifications and Scope of Work Scopes of Work – Backfill PERFORMANCE REQUIREMENTS: • The backfill process shall result in positive drainage away from the structure and an absence of decomposable materials or materials which could damage the structure or services below grade. Backfill areas shall not settle over 8" during the first year. Backfill against structures must meet applicable codes for the area. Settlement of two (2) inch depth in 9 square feet in area of settlement will be the maximum allowed in years two through five. • Trade Partner shall furnish all labor, materials, supervision, tools and equipment as required to perform all the work and services necessary to complete this contract with Smith Douglas Homes. All work performed by Trade Partner shall meet all local codes and requirements of governmental agencies having jurisdiction. • Trade Partner will begin services per the Smith Douglas Homes schedule. Homes operate on a schedule and have allocated a certain number of days for the Trade Partner to complete his work. In the event Trade Partner is unable to meet the scheduled job dates as agreed with the Construction Manager, Trade Partner is required to notify the Construction Manager. Failure to do so could result in loss of contract or back charge. • Trade Partner is responsible for inspecting the job and completing any deficiencies before requesting payment. The Construction Manager will not approve the work order for payment until Construction Manager has approved the work via onsite inspection. Any defect found by the Construction Manager will be noticed to the Trade Partner and payment for the job will not be made until all defects have been corrected. Final payment does not constitute final Construction Manager acceptance. NON-PERFORMANCE REMEDY: • BACKFILL o Trade Partner is responsible for any costs associated with an irregular excavation or over dig that is excessive or ill advised for the soil conditions. If an issue arises a soils engineer must be contacted to make that determination. Trade Partner is responsible for costs associated with determining remedial actions. o Trade Partner shall take corrective actions whenever the conditions of the requirements have not been met and result in settlement over 8” within the first year. Problems arising from the drainage to the structure or service because of improper backfill materials shall be the responsibility of the Trade Partner. Final determination on any remedial action will be made by a Smith Douglas Homes Representative. MATERIALS: SUB-BASE MATERIAL: • No topsoil allowed. Naturally or artificially graded mixture of compacted earth, gravel, or crushed stone. No topsoil allowed. SATISFACTORY SOIL MATERIALS: • Comply with ASTM D-2487 soil classification groups GW, GP, GM, SW, SP, and SM. Materials not complying with listed soil classification groups are prohibited unless requested by geotechnical engineer and approved by Smith Douglas Homes in writing. TESTING AND INSPECTION SERVICES: • Soil testing and inspection service for quality control may be conducted at Smith Douglas Homes expense at any time. Trade Partner shall comply with geotechnical engineering Wednesday, September 26, 2018 Smith Douglas Homes Page 1 of 3 Scopes of Work – Backfill recommendations for each pad or phase of construction. Would require third party testing if any fill greater than 1’ is needed. Would also require proof of any existing grade prior to fill placement, to be conducted by third party Geotech. Geotechnical engineer is to inspect all fill areas at the Smith Douglas Homes expense. The Trade Partner is responsible for scheduling the inspections at proper times. Geotechnical engineering recommendations take precedence over the specifications of this section. SITE INFORMATION: • Data on subsurface conditions provided for convenience of Trade Partner only. Smith Douglas Homes assumes no responsibility for accuracy of data or interpretations or conclusions drawn there from by Trade Partner. Trade Partner may make exploratory operations as necessary at his own expense. EXECUTION SCOPE OF WORK: • All work must comply with HUD data sheet 79g. Contract for grading shall include but not be limited to handling and placement of fill dirt; placement of surge stone; mat and drain lines provided by Smith Douglas Homes and required by engineer; removal of logs and debris; and any other activity required to fully complete backfill. EXISTING UTILITIES: • Locate existing utilities in area of Work; provide means of support and protection during operation. Trade Partner shall repair all utility lines damaged by Trade Partner. BASEMENT HOMESITES • The Trade Partner will be responsible for backfill of exterior poured basement walls, garage area and basement slab. Only clean, suitable fill are allowed in slabs. • Prior to backfill of any area Trade Partner will inspect walls for any cracks or damage to poured concrete. If damage is found Trade Partner will report such damage to the Smith Douglas Homes. If damage is discovered after backfilling and it was not reported to the Smith Douglas Homes, Trade Partner will assume liability for damage. • Under no circumstance will Trade Partner backfill exterior poured wall area before moister proofing and foundation drains have been installed and inspected where required. • Trade Partner will use only good clean fill to backfill any area adjacent to a poured wall. • Backfill garage area even with the grade of the slab ledge in the garage area. • Backfill basement slab area to 1" below the top of the poured wall footing. • Backfill the exterior area of the poured wall to final grade. The grade in the first 10 feet from the wall will be graded with 6 inches of fall away from the foundation. At no time will the grade be left so that water will flow to the foundation or pool at the foundation. • Where required, material used to backfill area under driveway and front/side yards must be compacted 95%. SLAB HOME SITES • Trade Partner will be responsible for backfill of form boards prior to installation of slab plumbing. • Forms will be filled to within 4" of the top of the form boards. • Only clean compactable fill will be used inside form boards. • Trade Partner is to notify Construction Manager immediately if form boards are damaged during backfill. • Trade Partner is responsible for assuring that lot will drain after backfilling is complete. CLEAN UP: • Trade Partner will be responsible for the clean up of any debris caused by his operation including oil cans and filters. Wednesday, September 26, 2018 Smith Douglas Homes Page 2 of 3 Scopes of Work – Backfill Approval of Specifications For Company: ________________________ ______________________________ ________________ Print Name Signature Date For Trade Partner: ________________________ _______________________________ ________________ Print Name Signature Date Wednesday, September 26, 2018 Smith Douglas Homes Page 3 of 3 .
Recommended publications
  • Tennessee Erosion & Sediment Control Handbook
    TENNESSEE EROSION & SEDIMENT CONTROL HANDBOOK A Stormwater Planning and Design Manual for Construction Activities Fourth Edition AUGUST 2012 Acknowledgements This handbook has been prepared by the Division of Water Resources, (formerly the Division of Water Pollution Control), of the Tennessee Department of Environment and Conservation (TDEC). Many resources were consulted during the development of this handbook, and when possible, permission has been granted to reproduce the information. Any omission is unintentional, and should be brought to the attention of the Division. We are very grateful to the following agencies and organizations for their direct and indirect contributions to the development of this handbook: TDEC Environmental Field Office staff Tennessee Division of Natural Heritage University of Tennessee, Tennessee Water Resources Research Center University of Tennessee, Department of Biosystems Engineering and Soil Science Civil and Environmental Consultants, Inc. North Carolina Department of Environment and Natural Resources Virginia Department of Conservation and Recreation Georgia Department of Natural Resources California Stormwater Quality Association ~ ii ~ Preface Disturbed soil, if not managed properly, can be washed off-site during storms. Unless proper erosion prevention and sediment control Best Management Practices (BMP’s) are used for construction activities, silt transport to a local waterbody is likely. Excessive silt causes adverse impacts due to biological alterations, reduced passage in rivers and streams, higher drinking water treatment costs for removing the sediment, and the alteration of water’s physical/chemical properties, resulting in degradation of its quality. This degradation process is known as “siltation”. Silt is one of the most frequently cited pollutants in Tennessee waterways. The division has experimented with multiple ways to determine if a stream, river, or reservoir is impaired due to silt.
    [Show full text]
  • Definitions of "Soil" and "Mineral"
    OFFICE OF SURFACE MINING RECLAMATION AND ENFORCEMENT U.S. Department of the Interior COALEX STATE COMPARISON REPORT - 113 June 12, 1989 William O. Roller Division of Mineral Mining P.O. Box 4499 Lynchburg, Virginia 24502 TOPIC: DEFINITIONS OF SOIL AND MINERAL INQUIRY: A permit is required for an operator to extract minerals from the earth. Is clay which is excavated from a borrow pit and used for fill dirt in construction considered a "mineral", requiring a permit, or "dirt" which would not require a permit, for removal? Locate state laws which define "minerals", "soil", or "dirt". SEARCH RESULTS: Research was conducted using the state code files on LEXIS. At the time the research was performed, codes for 32 states were available. Summaries of the identified state code sections are listed in table format below. Excerpts from the identified sections and the list of states searched on LEXIS are included as appendices. Research was also conducted using the state and federal case law files on LEXIS. The decisions identified as a result of the research and the topics they discuss are listed below. Copies of the decisions are enclosed as appendices. STATUTES AND CODES FINDINGS 1. Many mining- or natural resource-related sections include "clay" in the definition of "mineral". In some cases, the definition of mineral is qualified by the phrase "in this Act". 2. Many mining and natural resource sections use the words "soil" and "earth" almost interchangeably; the word "dirt" is virtually never used. 3. When used in state codes, the word "dirt" usually means "foreign substance", "filth", or "stain" and appears in codes dealing with food, agricultural products and dry cleaning.
    [Show full text]
  • 2021 Retail Price List
    GRASS SEED FIREWOOD 2021 Retail Price List LB BAG Cord (4' x 4' x 8' - 128 Cubic Ft.) $374.99 50/50 (Full/Partial Sun) $4.89 $208.00 2/3 Cord (32" x 4' x 8') $269.95 50% Bluegrass, 50% Rye; Fast establishment with good mix of 1/3 Cord (16" x 4' x 8') $159.95 both types of seed for residential use. For full to partial sun Double Trunk Stack (16" x 4' x 4') $89.95 areas. Trunk Stack (16" x 4' x 2') $49.95 Great Lakes P&A (Sun/Shade Mix) $4.79 $204.00 Camping Bundle (16" x 2' x 2') $29.95 35% Rye, 30% Blue, 35% Fescue; Great all around performer with the ability to be planted in any area from shade to full sun BAGGED ORGANICS Moo-Nure 25 LB $3.49 8997 Columbia Rd, Olmsted Falls, OH 44138 Premium Athletic Mix (Sun) $5.29 $225.00 Compost/Manure 40 LB $4.99 Phone: 440-235-2358 Fax: 440-235-2359 70% Bluegrass, 30% Rye; Slowest to establish, but nicest Peat Moss 3.8 CF $19.99 email: [email protected] residential lawn seed. Full sun. Soil Magic PLUS 1.2 CF $8.95 web: www.mryardoh.com Shade Mix (Shade) $4.79 $204.00 Topsoil 40 LB $4.99 90% Fescue, 10% Bluegrass; good for light to heavy shade areas. YOU PICK UP OR WE DELIVER All prices listed are for pickup at our yard. LAWN/GARDEN CARE There is an additional charge for delivery which varies by 18-24-12 Starter Fertilizer 50LB Bag $29.95 city - see our delivery price list or call for pricing.
    [Show full text]
  • Regulatory Review Committee Meeting Minutes, 2016 03 03
    Kingm County Department of Permitting and Environmental Review 35030 SE Douglas St., Ste. 210 Snoqualmie, WA 98065-9266 206-296-6600 TTY Relay: 711 www.kingcounty.gov REGULATORY REVIEW COMMITTEE - MINUTES - MEETING DATE: March 3, 2016 Minutes finalized December 9, 2016 TO: Jim Chan Steve Bottheim Wally Archuleta Chris Ricketts Sheryl Lux Steve Roberge Ty Peterson Scott Smith John Starbard, Director Lisa Verner, Legislative Coordinator and RRC Co-Chair Devon Shannon, Prosecuting Attorney’s Office FM: Randy Sandin, Resource Product Line Manager and RRC Co-Chair Present: Ty Peterson, Devon Shannon, Wally Archuleta, Randy Sandin, Chris Ricketts, Sheryl Lux, Steve Roberge 1. Is topsoil mixing permitted in the Mining (M) zone? Background This question was reviewed by the RRC on May 30, 1997. Topsoil screening or mixing includes importing sand, sawdust, finish compost, peat, and dirt and mixing and blending of the materials into topsoil mixtures. Standard Industrial Code (SIC) Major Group 14 is allowed in the M zone. (K.C.C. 21A.08.090) Major Group 14 includes peat screening and fill dirt pits, (SIC 1499) The group therefore concluded that topsoil mixing is allowed in the M zone. There were two subsequent RRC decisions from 2000 that, when taken together, would suggest a different conclusion. RRC Minutes 10-27-16 Discussion Topsoil production involves a variety of activities that, when not being done in conjunction with a mine or quarry, are more closely related to industries categorized under Major Group 32: Stone, Clay, Glass, and Concrete Produces. For example, SIC 3295: Minerals and Earth, Ground or Otherwise Treated covers “establishments operating without a mine or quarry and primarily engaged in crushing, grinding, pulverizing, or otherwise preparing clary, ceramic, and refractory minerals; barite; and miscellaneous nonmetallic minerals…” This activity falls under Division D: Manufacturing.
    [Show full text]
  • Excavation of a Fort Fisher Bombproof
    Underwater Archaeology Branch North Carolina Division of Archives & History Department of Cultural Resources Kure Beach, NC 1981 Excavation of a Fort Fisher Bombproof By Gordon P. Watts, Jr. Mark Wilde-Ramsing Richard W. Lawrence Dina B. Hill Underwater Archaeology Branch North Carolina Division of Archives and History 1981 TABLE OF CONTENTS TABLE OF FIGURES___________________________________________________iii ACKNOWLEDGEMENTS _______________________________________________ iv INTRODUCTION ______________________________________________________ 1 HISTORICAL BACKGROUND ___________________________________________ 2 DESCRIPTION OF THE WORK __________________________________________ 4 METHODS____________________________________________________________ 5 CONDITION OF STRUCTURAL REMAINS ________________________________ 9 ARCHITECTURAL AND CONSTRUCTION FEATURES ____________________ 21 ARTIFACTS__________________________________________________________ 26 CONCLUSIONS ______________________________________________________ 27 UAB 1981 Watts, Wilde-Ramsing, Lawrence, Hill ii TABLE OF FIGURES Figure 1: Location of excavation site______________________________________________________ 1 Figure 2: Excavation site in 1971 ________________________________________________________ 7 Figure 3: Cave-in at the excavation site____________________________________________________ 7 Figure 4: Overburden being removed by hand ______________________________________________ 8 Figure 5: Mobile crane utilized during excavation ___________________________________________
    [Show full text]
  • The Puget Lowland Earthquakes of 1949 and 1965
    THE PUGET LOWLAND EARTHQUAKES OF 1949 AND 1965 REPRODUCTIONS OF SELECTED ARTICLES DESCRIBING DAMAGE Compiled by GERALD W. THORSEN WASHINGTON DIVISION OF GEOLOGY AND EARTH RESOURCES INFORMATION CIRCULAR 81 1986 • •~.__.•• WASHINGTONNatural STATE Resources DEPARTMENT OF Brian Boyle - Commissioner ol Public Lands -- Ar1 Stearns • Supervuor • J I·' • F ront oove r : Falling parapets and ornamentation, rooftop water tanks, chimneys, and other heavy objects caused widespread damage during both the 1949 and 1965 events. Such falling debris commonly damaged or destroyed fire escapes, such as the one in the upper left. This Seattle Times photo shows Yesler Way on April 13, 1949. (Photo reproduced by permission of Seattle Times) Back cover: A. Earthquake-triggered landslides cut rail lines in both the 1949 and 1965 events. This slide occurred between Olympia and Tumwater. (1965 Daily Olympian photo by Greg Gilbert) B. "Sand boils" were created by geysers of muddy water escaping from saturated sediments along Capitol Lake. Soil liquefaction, such as occurred here, was a common source of damage in low-lying areas of fill underlain by flood plain, tide flat, or delta deposits. Sidewalk slabs in this 1965 Oivision staff photo provide scale. C. Suspended fluorescent light fixtures, such as this one in an Olympia school, commonly sustained damage du ring the 1965 quake . Three mail sorters were injured in the newly completed Olympia post office when similar fixtures fell. (Daily Olymp ian photo by Del Ogden) WASHINGTON DIVISION Of GEOLOGY AND EARTH RESOURCES Raymond Lasmanis. State Geologist THE PUGET LOWLAND EARTHQUAKES OF 1949 AND 1965 REPRODUCTIONS OF SELECTED ARTICLES DESCRIBING DAMAGE Compiled by GERALD W.
    [Show full text]
  • Raised Wood Floor Foundations Design & Construction Guide
    RAISED WOOD FLOOR FOUNDATIONS DESIGN & CONSTRUCTION GUIDE RaisedFloorLiving.com Building to a Higher Standard Satisfying the higher expectations of today’s The Raised Wood Floor Process homebuyer presents new challenges. Meeting these challenges begins with a raised wood ING S TT TA floor foundation that enhances curb appeal E R G T and provides many other benefits. E D With raised wood floor foundations, P building professionals stay… A GE1 3 SITE CONDITIONS SOIL PROPERTIES Noticed. Builders of raised wood floor homes distinguish themselves from the competition PIER AND BEAM NDATIO by establishing a reputation for being green OU N and progressive. F S Competitive. The aesthetics and amenities of raised floor P A homes make a positive impression on G2E homebuyers, which may result in faster, 4 WOOD PILING MASONRY PIER more profitable sales. A raised wood floor CONTINUOUS STEMWALL foundation can also be the cost-competitive solution, especially in locations with elevation requirements, problematic soils, sloping terrain or where extensive site preparation is needed. On Schedule. WOOD MASONRY Lengthy concrete slab delays – due to poor weather, time-consuming forming and curing, trade scheduling problems, extra inspections, R F GIRDERS or hauling and compacting of fill dirt – can be OO RA FL M avoided with raised wood floor foundations. I N G On The Upgrade. Homebuyers appreciate features of a raised P A foundation – a front porch, screened back G E3 porch or sunroom, or a backyard deck. 9 GLULAM LUMBER Building professionals who elevate with raised JOISTS floors framed with strong, renewable wood products create value for themselves and their clients.
    [Show full text]
  • Bartlesville Skate Park at Lee Lake Bid # 2019-2020-026
    Bartlesville Skate Park at Lee Lake Bid # 2019-2020-026 ADDENDUM NO. 1 14 APR 2020 ISSUED TO ALL BID DOCUMENT HOLDERS OF RECORD: This Addendum forms a part of the Contract Documents and Specifications described above. The original Contract Documents and Specifications remain in full force and effect, except as modified by the following, which shall take precedence over any contrary provisions in the prior documents. I. ADDENDUM ACKNOWLEDGEMENT: The Addendum Acknowledgement included at the back of this Addendum must be signed and returned with your bid proposal. Failure to return this form acknowledging receipt of the addendum shall be grounds to reject the bid proposal. II. SPECIFICATION REVISIONS: A. Section: Summary of Work For Bid Packages: 1. ADDED Bid Package 1 Bid Alternate 2 for the Diamond Grind Coping, DG-50 in lieu of Steel Coping as shown on Sheet SP-7. 2. MODIFIED Bid Package 2 General Scope of Work Note 8 to include estimated earthwork quantities for the Base Bid and also an Alternate Bid for the Peanut Bowl earthwork. 3. DIVIDED Bid Package 2 into a Base Bid item and an Alternate Bid Item. The Base Bid item covers Clearing, Grubbing, Earthwork & Drainage for the Bid Package 1 Base Bid Item (Skate Park Fish Bowl and Street Section). The Alternate Bid Item covers Clearing, Grubbing, Earthwork & Drainage for the Bid Package 1 Alternate Bid Item (Peanut Bowl). 4. Pages BPF-1 thru BPF-9 have been included with this Addendum and shall replace BPF-1 thru BPF-8 that were included with the original documents.
    [Show full text]
  • 2017 Landscape Construction Standards
    City of Charlotte Engineering & Property Management Landscape Management Division 2017 Landscape Construction Standards Landscape Construction Standards to be used on all city-funded construction (Capital Improvement and/or Maintenance Funding). City of Charlotte Landscape Management living life green Tree Save, 2005: Willow Oak at VMF Revision 11, June 2017 Table of Contents Table of Contents STANDARD SPECIFICATION …………………………………………………………………………………….. Pages 1-7 SECTION 01000 – TREE PRESERVATION AND PROTECTION ……………………………………. Pages 1-9 SECTION 02000 – LANDSCAPE GRADING AND DRAINAGE ……………………………………… Pages 1-8 SECTION 02100 – SOILS …………………………………………………………………………………………. Pages 1-6 SECTION 03000 – LANDSCAPE IRRIGATION SYSTEM ……………………………………………… Pages 1-11 SECTION 04000 – SHRUB AND GROUNDCOVER PLANTING …………………………………… Pages 1-13 SECTION 04100 – TREE PLANTING ………………………………………………………………………… Pages 1-15 SECTION 04200 – SEEDING AND SODDING TURFGRASS ……………………………………….. Pages 1-10 SECTION 04300 – PRUNING AND REMOVAL OF ESTABLISHED TREES ……………………. Pages 1-8 SECTION 04400 – FERTILIZATION OF ESTABLISHED TREES ……………………………………. Pages 1-5 Table of Contents Page 1 Standard Specifications and Guidelines STANDARD SPECIFICATIONS AND GUIDELINES Revision 11, June 2017 Introduction Page 1 Standard Specifications and Guidelines Table of Contents Page 3 List of Referenced Professional Organizations Page 4 Referenced Professional Organizations’ Acronyms Definition of Terms Page 7 Use of Street Right-Of-Ways Revision 11, June 2017 Introduction Page 2 Standard Specifications
    [Show full text]
  • Abandonment of Wells and Boreholes
    ROCKYFLATS ENVIRONMENTALTECHNOLOGY SITE PRO-1620-AW B REVISION0 ABANDONMENT OF WELLS AND BOREHOLES Environmental Media Responsible K-H Organization: Management Effective Date: May 27,2002 Approved By: MANAGER, WATER PROGRAMS Title Stephen Singer / Print Name Not Applicable Print Name of Responsible Manager (N/A if RM is Approval Authority) "be Responsible Manager Has Determined "he Following Organiutions' Review Is Required. Review Documentation Is Contained In The Document History File: K-H EnvironmentalMedia Management I IMPORTANT NOTES Periodic Review Frequency: 4 years from Effcctive Date I -FOR CLASSIFICATION/ urn (If Required) By: Al,c h,J, ,w JQwlwc: ADMlN RECORD SW-A-006149 ABANDONMENT OF Wl S AND BOREHOLES PRO-1620-AWB Revision 0 Dak Effective: 5/27/02 Page 2 of 22 LIST OF EFFECTIVE PAGES Page Effective Date Page Effective Date 1-22 5/27/02 Total number of pages: 22 The following changes are active for this document None ABANDONMENT OF W1 S AND BOREHOLES PRO-1620-AWB Revision 0 Date Effective: 5/27/02 Page 3 of22 TABLE OF CONTENTS Section Page No. 1 .0 PURPOSE ..................................................................................................................................4 2.0 SCOPE ....................................................................................................................................... 4 3.0 REQUIREMENTS..................................................................................................................... 5 3.1 Personnel Qualifications..............................................................................................
    [Show full text]
  • Archaeological Investigations of the Mcmartin Preschool Site E. Gary
    McMartin Preschool site Archaeological Investigations of the McMartin Preschool site , Manhattan Beach, California by E. Gary Stickel, Ph.D. Executive Summary BACKGROUND METHOD HYPOTHESES AND TEST EXPECTATIONS Part II FINDINGS CONCLUSIONS SUMMATION Executive Summary During the month of May 1990 an archaeological project was conducted at the McMartin Preschool site to determine, once and for all, whether or not there had ever been tunnels under the building, as described by various children. Excavation was carried out according to established scientific conventions with a careful research design defining what might prove or disprove the existence of "an underground feature that would connect to the surface of the site and extend underground for some distance..(with) dimensions large enough to accomodate adult human movement through it." (p 24) The project unearthed not one but two tunnel complexes as well as previously unrecognized structural features which defied logical explanation. Both tunnel complexes conformed to locations and functional descriptions established by children's reports. One had been described as providing undetected access to an adjacent building on the east. The other provided outside access under the west wall of the building and contained within it an enlarged, cavernous artifact corresponding to children's descriptions of a "secret room". Both the contour signature of the walls and the nature of recovered artifacts indicated that the tunnels had been dug by hand under the concrete slab floor after the construction of the building. Whatever the purpose of this elaborate enterprise, even more effort must have been devoted to filling the tunnels back in and trying to conceal any evidence of their existence.
    [Show full text]
  • Elevating Your House
    CHAPTER 5 Elevating Your House Introduction One of the most common retrofitting methods is elevating a house to a required or desired Flood Protection Elevation (FPE). When a house is properly elevated, the living area will be above all but the most severe floods (such as the 500-year flood). Several elevation techniques are available. In general, they involve (1) lifting the house and building a new, or extending the existing, foundation below it or (2) leaving the house in place and either building an elevated floor within the house or adding a new upper story. During the elevation process, most frame, masonry veneer, and masonry houses are separated from their foundations, raised on hydraulic jacks, and held by temporary supports while a new or extended foundation is constructed below. The living area is raised and only the foundation remains exposed to flooding. This technique works well for houses originally built on basement, crawlspace, and open foundations. When houses are lifted with this technique, the new or extended foundation can consist of either continuous walls or separate piers, posts, columns, or pilings. Masonry houses are more difficult to lift, primarily because of their design, construction, and weight, but lifting these homes is possible. In fact, numerous contractors throughout the United States regularly perform this work. A variation of this technique is used for frame, masonry veneer, and masonry houses on slab-on-grade foundations. In these houses, the slab forms both the floor of the house and either all or a major part of the foundation. Elevating these houses is easier if the house is left attached to the slab and both are lifted together.
    [Show full text]