FY 2021-22 City – Submitted Proposed Project List

Total Page:16

File Type:pdf, Size:1020Kb

FY 2021-22 City – Submitted Proposed Project List Draft City Submitted - Fiscal Year 2021-22 Local Streets and Roads List of Projects *Projects listed are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1) August 19, 2021 Fiscal Year Initially Proposed Project Est Assembly Senate City County Project Type Title Description Location Components Est Start Est Useful Life Proposed Status Completion Districts Districts For this year, staff will focus on selecting streets from the West Road Maintenance & 2021 Pavement Management This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Alameda Alameda 21/22 New End zone, which is located between the western limits of the City Construction 07/2021 06/2022 4-20 18 9 Rehabilitation Project Pavement Rehab/Repair (Existing), Bicycle Lane Rehab/Repair (Existing) of Alameda and Grand Street. *Browning Street from Addison Street to Dwight Way *Colusa Avenue from North City Limit to Solano Avenue *Delaware Street from Acton Street to Sacramento Street This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), *Ellsworth Street from Stuart Street to Ashby Avenue Road Maintenance & Sidewalk and/or Crosswalk Rehab/Repair (Existing), Pavement Rehab/Repair Berkeley Alameda 21/22 New FY 2022 Street Rehabilitation *Fulton Street from Dwight Way to Stuart Street Construction 06/2022 12/2022 10-20 15 9 Rehabilitation (Existing), Storm Drain and/or Culvert Rehab/Repair (Existing), ADA Curb Ramp *Heinz Avenue from Seventh Street to San Pablo Avenue Rehab/Repair (Existing), Bicycle Lane Rehab/Repair (Existing) *Stuart Street from Fulton Street to Ellsworth Street *Stuart Street from Benvenue Avenue to College Avenue Locations are estimates not yet final/complete. 48TH STREET(SAN PABLO AVENUE - CITY LIMITS ) SALEM STREET(48TH STREET - 47TH STREET ) 47TH STREET(SAN PABLO AVENUE - ADELINE STREET) This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), 45TH STREET(SAN PABLO AVENUE - ADELINE STREET) FY2021/2022 Annual Street Sidewalk and/or Crosswalk Rehab/Repair (Existing), Pavement Rehab/Repair SALEM STREET(45TH STREET - 43RD STREET) Road Maintenance & Emeryville Alameda 20/21 Carried Over Rehabilitation and Preventive (Existing), Bicycle Lane (New), Traffic Signals, Lights, and/or Signage Rehab/Repair ESSEX STREET(45TH STREET - 43RD STREET) Construction 03/2022 06/2022 5-10 15 9 Rehabilitation Maintenance Project (Existing Safety), Paving and/or Striping Installation (New Safety), ADA Curb Ramp 43RD STREET(SAN PABLO AVENUE - ADELINE STREET) Rehab/Repair (Existing), Bicycle Lane Rehab/Repair (Existing) 41ST STREET(SAN PABLO AVENUE - ADELINE STREET) DOYLE STREET(47TH STREET - 45TH STREET) 45TH STREET(HORTON STREET - SAN PABLO AVENUE) 53RD STREET(HORTON STREET - SAN PABLO AVENUE) The locations are as follows: Road Maintenance & This project will include: Curb and Gutter Repair Livermore Alameda 19/20 Carried Over 2020 Street Resurfacing Airway Blvd (Kitty Hawk Road to North Canyon Parkway) Construction 09/2021 05/2022 20-25 16 7 Rehabilitation Adjust Utility Boxes to Finished Grade First Street (Las Positas Road to Springtown Blvd) All preliminary street locations are subject to change and will be selected based on priority need and resources throughout the This project will include: Sidewalk and/or Crosswalk Installation (New), Paving and/or year. Striping Rehab/Repair (Existing Safety), Sidewalk and/or Crosswalk Rehab/Repair Springtown Blvd at Oleander St, S. Vasco Rd (Naylor Ave to Road Maintenance & (Existing), ADA Curb Ramp Installation (New), Pavement Rehab/Repair (Existing), Livermore Alameda 20/21 In Progress 2021 Slurry Seal Preston Rd), S. Vasco Rd (East Ave to Mesquite Wy), S. Vasco Construction 07/2022 06/2023 10-15 16 7 Rehabilitation Bicycle Lane (New), Paving and/or Striping Installation (New Safety), Bicycle Lane Rd (Patterson Pass to Daphne Dr), N. Vasco Rd (Northfront Rd Rehab/Repair (Existing), ADA Curb Ramp Rehab/Repair (Existing) | Adjust Utility Box to Scenic Ave), Portola Ave (Woodhaven Cmmn to Murrieta to Finished Grade Blvd), Murdell Ln (E. Stanley Blvd to Cinnabar Dr), Third St (S. M St to S. Livermore Ave) This project will include: Active Transportation Plan, Cost Estimating, Document Preparation, Preliminary Design, Environmental Study/Documents | ADA curb Ramp Installation/Rehab/Repair Bicycle Lane Installation/Rehab/Repair Road Maintenance & Collier Canyon Creek Culvert, Livermore Alameda 21/22 New Pavement Rehab/Repair Collier Canyon Road at North Canyons Pkwy Pre-Construction 07/2021 06/2023 20-30 16 7 Rehabilitation Drainage and Road Improvements Paving and/or Striping Installation/Rehab/Repair Storm Drain and/or Culvert Installation/Rehab/Repair Curb and Gutter Installation/Rehab/Repair Adjust Utility Boxes to grade *This list is subject to change and will be finalized upon the adoption of any jurisdiction that meets subsequent eligibility at the October 2021 Commission Meeting. Draft City Submitted - Fiscal Year 2021-22 Local Streets and Roads List of Projects *Projects listed are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1) August 19, 2021 Fiscal Year Initially Proposed Project Est Assembly Senate City County Project Type Title Description Location Components Est Start Est Useful Life Proposed Status Completion Districts Districts All preliminary street locations are subject to change and will be This project will include: Sidewalk and/or Crosswalk Installation (New), Paving and/or selected based on priority need and resources throughout the Striping Rehab/Repair (Existing Safety), Sidewalk and/or Crosswalk Rehab/Repair year. (Existing), ADA Curb Ramp Installation (New), Pavement Rehab/Repair (Existing), First St(Q St to M St), N. Livermore Ave (Railroad Underpass to Road Maintenance & Traffic Signals, Lights, and/or Signage Installation (New Safety), Bicycle Lane (New), Livermore Alameda 21/22 New 2022 Street Resurfacing Railroad Ave), S. Livermore Ave (Fifth St to Pacific Ave), N. Construction 07/2023 12/2023 20-25 16 7 Rehabilitation Paving and/or Striping Installation (New Safety), Traffic Signals, Lights, and/or Greenville Rd (580 Overpass to Southfront Rd), Las Positas Rd Signage Rehab/Repair (Existing Safety), ADA Curb Ramp Rehab/Repair (Existing), (N. Livermore Ave to Hiliker Pl), N. Livermore Ave (Chestnut St Bicycle Lane Rehab/Repair (Existing) | Curb and Gutter Repair to Railroad Underpass), N Greenville Rd (Southfront Rd to Las Adjust Utility Boxes to Finished Grade Positas Rd), Maple St (Railroad Ave to First St) All preliminary street locations are subject to change and will be selected based on priority need and resources throughout the This project will include: Sidewalk and/or Crosswalk Installation (New), Paving and/or year. Striping Rehab/Repair (Existing Safety), Sidewalk and/or Crosswalk Rehab/Repair Holmes St(Alden Ln to Concannon Blvd), Springtown Blvd at Road Maintenance & (Existing), Pavement Rehab/Repair (Existing), ADA Curb Ramp Installation (New), Livermore Alameda 21/22 New 2022 Slurry Seal Oleander St, First St (Bridge deck E/Inman to Scott St), E. Construction 07/2023 12/2023 10-15 16 7 Rehabilitation Bicycle Lane (New), Paving and/or Striping Installation (New Safety), Bicycle Lane Stanley Blvd (Wall St to Murrieta Blvd), E. Stanley Blvd (Fenton Rehab/Repair (Existing), ADA Curb Ramp Rehab/Repair (Existing) | Adjust Utility Box St to Railroad Ave), Fourth St at Holmes St, Holmes St to Finished Grade (Concannon Blvd to Vancouver Wy), Portola Ave (N. Livermore Ave to Yorkshire Dr), Holmes St (Lexington Wy to Alden Ln) Grand Avenue - Wildwood to Fairview Hampton Rd. - Glen Alpine to St. James This project will include: Sidewalk and/or Crosswalk Installation (New), Pavement Hill Lane - Jerome to end Road Maintenance & Piedmont Alameda 20/21 Carried Over 2021 Street Rehabilitation Project Rehab/Repair (Existing), ADA Curb Ramp Rehab/Repair (Existing), Bicycle Lane Wildwood - Grand to Nova; and Prospect to Highland Construction 09/2021 11/2021 20-25 15 9 Rehabilitation Rehab/Repair (Existing) Requa Rd. - Hazel to Wildwood Manor Dr. - Arroyo to Cambridge Dudley Ave. - Blair to Mountain This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Sidewalk and/or Crosswalk Rehab/Repair (Existing), Pavement Rehab/Repair (Existing), Bicycle Lane (New), Landscape Safety Rehab/Repair (Existing), Storm Road Maintenance & Washington Avenue Pavement Drain and/or Culvert Rehab/Repair (Existing), Paving and/or Striping Installation (New Washington Avenue between Cornell Ave and Masonic Ave in Albany Alameda 19/20 In Progress Construction 09/2021 11/2021 10-20 15 9 Rehabilitation Restoration Project Safety), ADA Curb Ramp Rehab/Repair (Existing), Bicycle Lane Rehab/Repair Albany (Existing) | Project construction Phase I was substantially completed in Spring 2021. Utility conflicts with EBMUD necessitated phasing of construction. Phase II is scheduled for construction in late summer/fall 2021. This project will include: Traffic Signals, Lights, and/or Signage Installation (New Safety), Cost Estimating, Document Preparation, Preliminary Design, Traffic Signals, Citywide Signal Communications Along Dublin Blvd. from the Civic Plaza/Sierra Court intersection Pre-Construction and 12/2019 09/2021 Dublin Alameda 19/20 In Progress Traffic Control Devices Lights, and/or Signage Rehab/Repair (Existing Safety) | Upgrade of the traffic signal 10-20 16 7 Upgrade to the San Ramon Road intersection. Construction 11/2021 06/2022 communication system and replace existing
Recommended publications
  • Metro Bus and Metro Rail System
    Approximate frequency in minutes Approximate frequency in minutes Approximate frequency in minutes Approximate frequency in minutes Metro Bus Lines East/West Local Service in other areas Weekdays Saturdays Sundays North/South Local Service in other areas Weekdays Saturdays Sundays Limited Stop Service Weekdays Saturdays Sundays Special Service Weekdays Saturdays Sundays Approximate frequency in minutes Line Route Name Peaks Day Eve Day Eve Day Eve Line Route Name Peaks Day Eve Day Eve Day Eve Line Route Name Peaks Day Eve Day Eve Day Eve Line Route Name Peaks Day Eve Day Eve Day Eve Weekdays Saturdays Sundays 102 Walnut Park-Florence-East Jefferson Bl- 200 Alvarado St 5-8 11 12-30 10 12-30 12 12-30 302 Sunset Bl Limited 6-20—————— 603 Rampart Bl-Hoover St-Allesandro St- Local Service To/From Downtown LA 29-4038-4531-4545454545 10-12123020-303020-3030 Exposition Bl-Coliseum St 201 Silverlake Bl-Atwater-Glendale 40 40 40 60 60a 60 60a 305 Crosstown Bus:UCLA/Westwood- Colorado St Line Route Name Peaks Day Eve Day Eve Day Eve 3045-60————— NEWHALL 105 202 Imperial/Wilmington Station Limited 605 SANTA CLARITA 2 Sunset Bl 3-8 9-10 15-30 12-14 15-30 15-25 20-30 Vernon Av-La Cienega Bl 15-18 18-20 20-60 15 20-60 20 40-60 Willowbrook-Compton-Wilmington 30-60 — 60* — 60* — —60* Grande Vista Av-Boyle Heights- 5 10 15-20 30a 30 30a 30 30a PRINCESSA 4 Santa Monica Bl 7-14 8-14 15-18 12-18 12-15 15-30 15 108 Marina del Rey-Slauson Av-Pico Rivera 4-8 15 18-60 14-17 18-60 15-20 25-60 204 Vermont Av 6-10 10-15 20-30 15-20 15-30 12-15 15-30 312 La Brea
    [Show full text]
  • In for Inclusion, Justice, and Prosperity October 27–29, Los Angeles
    All in for inclusion, justice, and prosperity October 27–29, Los Angeles www.equity2015.org 1 Dear Friends and Colleagues, On behalf of the board and staf of PolicyLink, welcome to Los Angeles and to Equity Summit 2015: All in for inclusion, justice, and prosperity. Your time is valuable and we’re honored you’ve chosen to spend some of it with us. We hope you will have an uplifting experience that ofers opportunities to reconnect with colleagues, meet new people, learn, share, stretch, and strength- en your commitment to building an equitable society in which all reach their full potential. The PolicyLink team will do all we can to make your experience meaningful. If you need assistance, let us know. If you don’t know us yet, look for badges with “staf” on them. We’re pleased that you’re here and excited about the program ahead of us. Angela Glover Blackwell President and CEO 2 Equity Summit 2015 All in for inclusion, justice, and prosperity Our Partners and Sponsors For tHeir generous support of Equity Leading Partners Summit 2015, we tHank: • The Kresge Foundation • W.K. Kellogg Foundation • Citi Community Development Partners • The Annie E. Casey Foundation • The California Endowment • The California Wellness Foundation • The Convergence Partnership • Ford Foundation • John D. and Catherine T. MacArthur Foundation Sponsors • The James Irvine Foundation • JP Morgan Chase & Co. • Marguerite Casey Foundation • Prudential • Robert Wood Johnson Foundation • The Rockefeller Foundation • Surdna Foundation • Walter and Elise Haas Fund 3 Delegation
    [Show full text]
  • To December 31, 2021 the Los Angeles Acting Conservatory
    *Catalog effective: March 1, 2020 (TBD by approval) to December 31, 2021 The Los Angeles Acting Conservatory (LAAC) is a private institution and is seeking approval for operation by the Bureau of Private Postsecondary Education (BPPE). Approval to operate means the institution is compliant with the minimum standards contained in the California Private Postsecondary Education Act of 2009 (as amended) and Division 7.5 of Title 5 of the California Code of Regulations. www.bppe.ca.gov This catalog is reviewed and updated each school year. As a prospective student, you are encouraged to review this catalog prior to signing an enrollment agreement. You are also encouraged to review the School Performance Fact Sheet, which must be provided to you prior to signing an enrollment agreement. You may request a copy of the catalog and SPFS by emailing [email protected] 1 Location & Contact Info 3 History 4 Purpose 4 Mission 4 Objectives 4 Educational Programs 5 Associate Degree in Acting 5 Associate Degree in Filmmaking 16 Admission Requirements 22 Financial Aid Policy 25 Return & Cancellation Policies 26 Notice Concerning Transferability of Units Earned at Our School 28 Attendance & Scheduling Policy 29 Student Services 31 Academic & Grading Policy 33 Licensing & Approvals 37 Facility & Equipment 39 Library Resources 40 Disciplinary Policy 43 Code of Conduct 47 International Student Information 53 Faculty 57 Academic Calendar 65 2 Location & Contact Info Nestled between a café, salon, retail shops, and a popular restaurant, Edgemar Center for the Arts is the anchor of the Edgemar complex on Main Street in Santa Monica. A couple blocks away from the beach, near the 10 freeway, the Los Angeles Acting Conservatory (LAAC) is housed in its own state-of-the-art building design by renowned architect Frank Gehry, which includes two theater spaces and an art gallery.
    [Show full text]
  • March 1, 2020 (TBD by Approval) to December 31, 2021
    *Catalog effective: March 1, 2020 (TBD by approval) to December 31, 2021 The Los Angeles Acting Conservatory (LAAC) is a private institution approved for operation by the Bureau of Private Postsecondary Education (BPPE). Approval to operate means the institution is compliant with the minimum standards contained in the California Private Postsecondary Education Act of 2009 (as amended) and Division 7.5 of Title 5 of the California Code of Regulations. www.bppe.ca.gov This catalog is reviewed and updated each school year. As a prospective student, you are encouraged to review this catalog prior to signing an enrollment agreement. You are also encouraged to review the School Performance Fact Sheet, which must be provided to you prior to signing an enrollment agreement. You may request a copy of the catalog and SPFS by emailing [email protected] 1 Location & Contact Info 3 History 4 Purpose 4 Mission 4 Objectives 4 Educational Programs 5 Associate Degree in Acting 5 Associate Degree in Filmmaking 16 Admission Requirements 22 Financial Aid Policy 25 Return & Cancellation Policies 26 Notice Concerning Transferability of Units Earned at Our School 28 Attendance & Scheduling Policy 29 Student Services 31 Academic & Grading Policy 33 Licensing & Approvals 37 Facility & Equipment 39 Library Resources 40 Disciplinary Policy 43 Code of Conduct 47 International Student Information 53 Faculty 57 Academic Calendar 65 2 Location & Contact Info Nestled between a café, salon, retail shops, and a popular restaurant, Edgemar Center for the Arts is the anchor of the Edgemar complex on Main Street in Santa Monica. A couple blocks away from the beach, near the 10 freeway, the Los Angeles Acting Conservatory (LAAC) is housed in its own state-of-the-art building design by renowned architect Frank Gehry, which includes two theater spaces and an art gallery.
    [Show full text]
  • 884-5 111 Places in LA That You Must Not Miss.Pdf
    © Emons Verlag GmbH All rights reserved All photos © Lyudmila Zotova, except: Boone Children’s Gallery (p. 31) – Photo © Museum Associates/LACMA; Kayaking on LA River (p. 123) – LA River Kayak Safari; L.A. Derby Dolls (p. 125) – Photo by Marc Campos, L.A. Derby Dolls; Machine Project (p. 133, top image) – Photo of Josh Beckman’s Sea Nymph courtesy of Machine Project; Museum of Broken Relationships (p. 141) – Courtesy of the Museum of Broken Relationships; Norton Simon Museum (p. 157) – Norton Simon Art Foundation; Te Source Restaurant (p. 195, top image) – Te Source Family after morning meditation, photo by Isis Aquarian courtesy of Isis Aquarian Source Archives; Wildlife Waystation (p. 227) – Photo by Billy V Vaughn, Wildlife Waystation Art credits: Machine Project (p. 133, top image) – Sea Nymph by the artist Josh Beckman; Velveteria (p. 217) – artwork pictured reprinted by permission of the artists: Caren Anderson (Liberace in blue vest); Caren Anderson & Cenon (center Liberace); Jennifer Kenworth aka Juanita’s Velvets (Liberace with red cape); CeCe Rodriguez (poodle in square frame, left of center Liberace) © Cover icon Montage: iStockphoto.com/bebecom98, iStockphoto.com/Davel5957 Design: Eva Kraskes, based on a design by Lübbeke | Naumann | Toben Edited by Katrina Fried Maps: altancicek.design, www.altancicek.de Printing and binding: B.O.S.S Medien GmbH, Goch Printed in Germany 2016 ISBN 978-3-95451-884-5 First edition Did you enjoy it? Do you want more? Join us in uncovering new places around the world on: www.111places.com Foreword Dear Los Angeles, So often you are misunderstood, viewed by the world through the narrow lenses of the media and outsiders.
    [Show full text]
  • Chapter 11 Case No. 21-10632 (MBK)
    Case 21-10632-MBK Doc 249 Filed 04/06/21 Entered 04/06/21 16:21:35 Desc Main Document Page 1 of 92 UNITED STATES BANKRUPTCY COURT DISTRICT OF NEW JERSEY In re: Chapter 11 L’OCCITANE, INC., Case No. 21-10632 (MBK) Debtor. Judge: Hon. Michael B. Kaplan CERTIFICATE OF SERVICE I, Ana M. Galvan, depose and say that I am employed by Stretto, the claims and noticing agent for the Debtors in the above-captioned case. On April 2, 2021, at my direction and under my supervision, employees of Stretto caused the following documents to be served via first-class mail on the service list attached hereto as Exhibit A, and via electronic mail on the service list attached hereto as Exhibit B: Notice of Deadline for Filing Proofs of Claim Against the Debtor L’Occitane, Inc. (attached hereto as Exhibit C) [Customized] Official Form 410 Proof of Claim (attached hereto as Exhibit D) Official Form 410 Instructions for Proof of Claim (attached hereto as Exhibit E) Dated: April 6, 2021 /s/ Ana M. Galvan Ana M. Galvan STRETTO 410 Exchange, Suite 100 Irvine, CA 92602 Telephone: 855-434-5886 Email: [email protected] Case 21-10632-MBK Doc 249 Filed 04/06/21 Entered 04/06/21 16:21:35 Desc Main Document Page 2 of 92 Exhibit A Case 21-10632-MBK Doc 249 Filed 04/06/21 Entered 04/06/21 16:21:35 Desc Main Document Page 3 of 92 Exhibit A Served via First-Class Mail Name Attention Address 1 Address 2 Address 3 City State Zip Country 1046 Madison Ave LLC c/o HMH Realty Co., Inc., Rexton Realty Co.
    [Show full text]
  • Regionl Connector Transit Corridor Draft DEIS/DEIR
    Regional Connector Transit Corridor Cultural Resources – Built Environment Technical Memorandum were designed to legally and financially assist cities to address problems of decay and neglect within their communities. In response to this new legislation, the Community Redevelopment Agency of the City of Los Angeles (CRA) was established in 1948, in part to cure economic "blight" by funding and overseeing redevelopment. As its first major project, the CRA sought to improve the Bunker Hill area, which had been one of the more exclusive residential neighborhoods at the turn of the twentieth century but had deteriorated and fallen out of fashion. Despite many proposals, plans to redevelop Bunker Hill were rejected, and ultimately not begun until the 1960s, when large hotels and Victorian-era homes were bulldozed and the landforms were rearranged. Slowly, over the past 50 years, a community of high-rises has been constructed in their place (Kawaratani 2008). When the Harbor Freeway (Interstate-110) was completed in 1952, it was hopefully called “downtown’s new Main Street” by noted local architect A. C. Martin, Jr. (Los Angeles Times 1967). Construction of the freeway and the repeal of the building height ordinance in 1954 created a significant new concentration of high- and midrise buildings, eventually concentrated on Figueroa and 7th Streets. The downtown civic center began to take shape in the post-war era. As discussed in California: A Land of Contrast: Business blocks of the late nineteenth century have been replaced by the Civic Center, whose buildings, most of contemporary design, are flanked by multi-acre parking lots. The Civic Center has encroached westward upon Bunker Hill, once occupied by the city’s wealthier residents and now experiencing impressive [redevelopment] (Lantis, et al.
    [Show full text]
  • Draft Plan Bay Area 2050 Air Quality Conformity Analysis
    DRAFT AIR QUALITY CONFORMITY AND CONSISTENCY REPORT JULY 2021 PBA2050 COMMISH BOARD DRAFT 06.14.21 Metropolitan Transportation Association of City Representatives Commission Bay Area Governments Susan Adams Alfredo Pedroza, Chair Jesse Arreguín, President Councilmember, City of Rohnert Park Napa County and Cities Mayor, City of Berkeley Nikki Fortunato Bas Nick Josefowitz, Vice Chair Belia Ramos, Vice President Councilmember, City of Oakland San Francisco Mayor's Appointee Supervisor, County of Napa London Breed Margaret Abe-Koga David Rabbitt, Mayor, City and County of San Francisco Cities of Santa Clara County Immediate Past President Tom Butt Supervisor, County of Sonoma Eddie H. Ahn Mayor, City of Richmond San Francisco Bay Conservation Pat Eklund and Development Commission County Representatives Mayor, City of Novato David Canepa Candace Andersen Maya Esparza San Mateo County Supervisor, County of Contra Costa Councilmember, City of San José Cindy Chavez David Canepa Carroll Fife Santa Clara County Supervisor, County of San Mateo Councilmember, City of Oakland Damon Connolly Keith Carson Neysa Fligor Marin County and Cities Supervisor, County of Alameda Mayor, City of Los Altos Carol Dutra-Vernaci Cindy Chavez Leon Garcia Cities of Alameda County Supervisor, County of Santa Clara Mayor, City of American Canyon Dina El-Tawansy Otto Lee Liz Gibbons California State Transportation Agency Supervisor, County of Santa Clara Mayor, City of Campbell (CalSTA) Gordon Mar Giselle Hale Victoria Fleming Supervisor, City and County Vice Mayor, City of Redwood City Sonoma County and Cities of San Francisco Barbara Halliday Dorene M. Giacopini Rafael Mandelman Mayor, City of Hayward U.S. Department of Transportation Supervisor, City and County Rich Hillis Federal D.
    [Show full text]
  • Los Angeles Event Center
    OV,\l'l.\l&Hf YI' t ITV ,iAN'YINot: C ITY OF LOS ANGELES ~1, .. '-• ...~ '-~~•111... u, ' "'""'" • 1: ) .w..111 :A,:tM:l<:t.c:A 11'1.1~ CAu-'<>MMA :O •Jto\"' .....:a n • '-l4JV•" "'Mli",O\ ... JJ> t••~••'~'' ,V,.. ►flt..AC• """"\M~,'- ' ,.,, Cff\l!'l'OUC:"~ t c;r;y " ,.. ..... N( ,"!0... Wli~ 1J•f.Jltt, : ,, Wl,,l~Yi(,11t!lt,V_. ... 1,t.... M \\I r :/11 11,-'( ,' __ I-':"... ~ 1«Jl't,. "'- l lltt• 111(..,_,.,,. vo1, , .......... IVN ;; ,, ,.. t ... n.~ v.. ~t"r. 01.:::oc,icao ):f-hL~ 1,1UC J 1ifN,,r.J.,MH­ u,,;.,.-..•~!J '., \(N ~~ ,:.......~hi ... ·~, 1fl,,\f\- 1.#ttl!H~ WJ~lltl l,Wtl .,.,. ::•"'"'"'"' 1.-.i... _ .-j,ui._ , -.....,. ~., ...,, ........,~ .. f\,11:t:,.•~ oJ • )it:11,.1.)« H~ Antooo R Volara,g0$,i! Mayor Ci1y ot l.os ~oles City Han, Room 300 Los Angele~. CA 90012 Attcnti<>n: Ms. Gaye Willams c.. ar M;rJ<)( Vllar'"9Q'x!' MAYOR'S EXECUTIVE DIRECTIVE NO. 22 DOWNTOWN EVENT carre:R PLANNING Th-e Executive Oirective V'3S issued dJe :O 3le- ~ifalnce of tt.~ Cofl\-ention and Event Center Project Jo, Los An9e.'es. The goal ls to n-.a,omiza the con,.-t>Jtion ol lh9 Fannor's F,eld pn,j~ lo U-.e economic ~rowth. CMC ife and tvabiliy ol Downtown Los Angel9s- The Execurvo Dtrw.-ve ~ up the coordrnle<I actions ol Uie Depar.menl$ of City f'lanning, Tr~ooo. f'\Jbic Works, Conventior. Cen,e, arid CulllJ'at Affo>h. The Cty Oepar.me.'l1S -ed together 10 M!Ue that thoughtful design, axh~eclure, :iro ptaruw,g aro efll)loyed in Ole review ol tile project.
    [Show full text]
  • ESRI's Guide to Redlands
    ESRI’s Guide to Redlands A Unique and Livable Community Join a World-Leading Software Company ESRI has more to offer than just a great career. ESRI is best known for its cutting edge geographic information system (GIS) technology, but it’s also a great place to work. Our employees—technical and nontechnical alike— find that ESRI offers a challenging work environment that promotes autonomy and fosters leadership. We Subscribe to the ESRI Careers Blog to offer an outstanding benefits package. The workplace is stay up to date on hot jobs, recruiting friendly and welcoming; it is a place where employees events, and other career-related news. collaborate with coworkers in a team-oriented, creative Visit www.esri.com/careersblog. environment. Ideally located in Southern California, Redlands is a town known for embracing family, culture, history, and recreation. We are seeking talented professionals in all areas to come grow with us. Discover who we are and why we’re so excited about what we do at www.esri.com/careers. Copyright © 2008 ESRI. All rights reserved. The ESRI globe logo, ESRI, and www.esri.com are trademarks, registered trademarks, or service marks of ESRI in the United States, the European Community, or certain other jurisdictions. ESRI is an Equal Opportunity Emplyer. Inside the Guide 2 WELCOME TO REDLANDS 2 ESRI’s Guide to Redlands 3 A Rich Heritage 5 Historic Redlands 6 ESSENTIAL INFORMATION Photo courtesy of A.K. Smiley Public Library 6 Tourist and New Resident Information 9 Getting Around 10 Getting to Redlands 11 Map of Redlands 12 RESTAURANT GUIDE 12 Where to Eat 15 PLACES TO GO, THINGS TO DO 15 Redlands for Free 16 Parks and Open Spaces 17 Exercise and Recreation 18 Performing Arts 19 Shopping 19 Museums 1 20 DAY TRIPS 20 Visit with Nature in the Local Mountains 20 Areas of Interest Produced by ESRI, Redlands, California Copyright © 2008 ESRI.
    [Show full text]
  • Santa Monica
    SINGLE - STORY WITH 3 AUTO BAYS :: PRIME PICO BOULEVARD :: SANTA MONICA Term 85% SBA Financing for an Owner/User WSJ Prime + 1.5%-2.5 depending on Buyer SBA Financing Description experience, financial strength & Resume. Down Payment 15% Down Payment to a Qualified Borrower $18,725-$20,515 per month depending on Monthly Payment Buyer Qualification Property Address 3317 W. Pico Boulevard City State Zip Los Angeles, CA 90405 APN 4274-036-027 Zoning SMC2 Year Built 1974 Building Size Approx. 2,040sf Parcel Size Approx. 6,777 sf Topography Flat (Minimal Slope) Single Story with 3 Auto Bays & abundant on-site parking with terrific visibility. The property has access from both Pico Blvd and the Alley in the rear. The subject property is also visible from the 10 Freeway. Located in Santa Monica just West of Centinela on Pico Boulevard. SINGLE - STORY WITH 3 AUTO BAYS PRIME PICO BOULEVARD IN SANTA MONICA SINGLE - STORY WITH 3 AUTO BAYS PRIME PICO BOULEVARD IN SANTA MONICA ❖ Single Story with 3 Auto Bays & abundant on-site parking with terrific visibility ❖ Prime Pico Blvd in the City of Santa Monica. ❖ 2,040sq.ft. Auto with 3 bays and a huge lot of 6,777sq.ft. ❖ Access to both Pico Blvd and the alley behind. ❖ The Property is being sold AS IS, WHERE IS. ❖ Bring your investors, developers and perfect for an Owner/User. SINGLE - STORY WITH 3 AUTO BAYS PRIME PICO BOULEVARD IN SANTA MONICA SINGLE - STORY WITH 3 AUTO BAYS PRIME PICO BOULEVARD IN SANTA MONICA SINGLE - STORY WITH 3 AUTO BAYS PRIME PICO BOULEVARD IN SANTA MONICA 1 9080 W Pico Blvd Los
    [Show full text]
  • Budget & Finance Agenda
    BOARD OF DIRECTORS MOBILE SOURCE COMMITTEE COMMITTEE MEMBERS TIM SMITH - CHAIR JAKE McGOLDRICK – VICE CHAIR TOM BATES SCOTT HAGGERTY YORIKO KISHIMOTO CAROL KLATT MARK ROSS JOHN SILVA GAYLE B. UILKEMA WEDNESDAY NOVEMBER 19, 2008 4TH FLOOR CONFERENCE ROOM Immediately following Board Meeting DISTRICT OFFICES AGENDA 1. CALL TO ORDER - ROLL CALL 2. PUBLIC COMMENT PERIOD (Public Comment on Non-Agenda Items Pursuant to Government Code § 54954.3) Members of the public are afforded the opportunity to speak on any agenda item. All agendas for regular meetings are posted at District headquarters, 939 Ellis Street, San Francisco, CA, at least 72 hours in advance of a regular meeting. At the beginning of the regular meeting agenda, an opportunity is also provided for the public to speak on any subject within the Committee’s subject matter jurisdiction. Speakers will be limited to three (3) minutes each. 3. APPROVAL OF MINUTES OF OCTOBER 23, 2008 4. CONSIDERATION OF CONTRACTOR SELECTION FOR THE VEHICLE BUY-BACK PROGRAM J. Colbourn/5192 [email protected] The Committee will consider recommending Board of Directors’ approval of one or more contractors to provide dismantling services for the Vehicle Buy Back Program. 5. CONSIDERATION OF $41,498,594 IN CALIFORNIA GOODS MOVEMENT BOND FUNDING PROJECTS J. Broadbent/5052 [email protected] The Committee will consider recommending Board of Directors’ approval of staff recommendations for $41,498,594 in funding for eligible projects under the California Goods Movement Bond Program and authorize the Executive Officer/APCO to enter into all necessary contracts to expend the requested funds. 6. AUDIT OF THE TRANSPORTATION FUND FOR CLEAN AIR (TFCA) REGIONAL FUND J.
    [Show full text]