Draft City Submitted - Fiscal Year 2021-22 Local Streets and Roads List of Projects *Projects listed are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1) August 19, 2021

Fiscal Year Initially Proposed Project Est Assembly Senate City County Project Type Title Description Location Components Est Start Est Useful Life Proposed Status Completion Districts Districts

For this year, staff will focus on selecting streets from the West Road Maintenance & 2021 Pavement Management This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Alameda Alameda 21/22 New End zone, which is located between the western limits of the City Construction 07/2021 06/2022 4-20 18 9 Rehabilitation Project Pavement Rehab/Repair (Existing), Bicycle Lane Rehab/Repair (Existing) of Alameda and Grand Street.

*Browning Street from Addison Street to Dwight Way *Colusa Avenue from North City Limit to *Delaware Street from Acton Street to Sacramento Street This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), *Ellsworth Street from Stuart Street to Ashby Avenue Road Maintenance & Sidewalk and/or Crosswalk Rehab/Repair (Existing), Pavement Rehab/Repair Berkeley Alameda 21/22 New FY 2022 Street Rehabilitation *Fulton Street from Dwight Way to Stuart Street Construction 06/2022 12/2022 10-20 15 9 Rehabilitation (Existing), Storm Drain and/or Culvert Rehab/Repair (Existing), ADA Curb Ramp *Heinz Avenue from Seventh Street to San Pablo Avenue Rehab/Repair (Existing), Bicycle Lane Rehab/Repair (Existing) *Stuart Street from Fulton Street to Ellsworth Street *Stuart Street from Benvenue Avenue to College Avenue Locations are estimates not yet final/complete.

48TH STREET(SAN PABLO AVENUE - CITY LIMITS ) SALEM STREET(48TH STREET - 47TH STREET ) 47TH STREET(SAN PABLO AVENUE - ADELINE STREET) This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), 45TH STREET(SAN PABLO AVENUE - ADELINE STREET) FY2021/2022 Annual Street Sidewalk and/or Crosswalk Rehab/Repair (Existing), Pavement Rehab/Repair SALEM STREET(45TH STREET - 43RD STREET) Road Maintenance & Emeryville Alameda 20/21 Carried Over Rehabilitation and Preventive (Existing), Bicycle Lane (New), Traffic Signals, Lights, and/or Signage Rehab/Repair ESSEX STREET(45TH STREET - 43RD STREET) Construction 03/2022 06/2022 5-10 15 9 Rehabilitation Maintenance Project (Existing Safety), Paving and/or Striping Installation (New Safety), ADA Curb Ramp 43RD STREET(SAN PABLO AVENUE - ADELINE STREET) Rehab/Repair (Existing), Bicycle Lane Rehab/Repair (Existing) 41ST STREET(SAN PABLO AVENUE - ADELINE STREET) DOYLE STREET(47TH STREET - 45TH STREET) 45TH STREET(HORTON STREET - SAN PABLO AVENUE) 53RD STREET(HORTON STREET - SAN PABLO AVENUE)

The locations are as follows: Road Maintenance & This project will include: Curb and Gutter Repair Livermore Alameda 19/20 Carried Over 2020 Street Resurfacing Airway Blvd (Kitty Hawk Road to North Canyon Parkway) Construction 09/2021 05/2022 20-25 16 7 Rehabilitation Adjust Utility Boxes to Finished Grade First Street (Las Positas Road to Springtown Blvd)

All preliminary street locations are subject to change and will be selected based on priority need and resources throughout the This project will include: Sidewalk and/or Crosswalk Installation (New), Paving and/or year. Striping Rehab/Repair (Existing Safety), Sidewalk and/or Crosswalk Rehab/Repair Springtown Blvd at Oleander St, S. Vasco Rd (Naylor Ave to Road Maintenance & (Existing), ADA Curb Ramp Installation (New), Pavement Rehab/Repair (Existing), Livermore Alameda 20/21 In Progress 2021 Slurry Seal Preston Rd), S. Vasco Rd (East Ave to Mesquite Wy), S. Vasco Construction 07/2022 06/2023 10-15 16 7 Rehabilitation Bicycle Lane (New), Paving and/or Striping Installation (New Safety), Bicycle Lane Rd (Patterson Pass to Daphne Dr), N. Vasco Rd (Northfront Rd Rehab/Repair (Existing), ADA Curb Ramp Rehab/Repair (Existing) | Adjust Utility Box to Scenic Ave), Portola Ave (Woodhaven Cmmn to Murrieta to Finished Grade Blvd), Murdell Ln (E. Stanley Blvd to Cinnabar Dr), Third St (S. M St to S. Livermore Ave)

This project will include: Active Transportation Plan, Cost Estimating, Document Preparation, Preliminary Design, Environmental Study/Documents | ADA curb Ramp Installation/Rehab/Repair Bicycle Lane Installation/Rehab/Repair Road Maintenance & Collier Canyon Creek Culvert, Livermore Alameda 21/22 New Pavement Rehab/Repair Collier Canyon Road at North Canyons Pkwy Pre-Construction 07/2021 06/2023 20-30 16 7 Rehabilitation Drainage and Road Improvements Paving and/or Striping Installation/Rehab/Repair Storm Drain and/or Culvert Installation/Rehab/Repair Curb and Gutter Installation/Rehab/Repair Adjust Utility Boxes to grade

*This list is subject to change and will be finalized upon the adoption of any jurisdiction that meets subsequent eligibility at the October 2021 Commission Meeting. Draft City Submitted - Fiscal Year 2021-22 Local Streets and Roads List of Projects *Projects listed are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1) August 19, 2021

Fiscal Year Initially Proposed Project Est Assembly Senate City County Project Type Title Description Location Components Est Start Est Useful Life Proposed Status Completion Districts Districts

All preliminary street locations are subject to change and will be This project will include: Sidewalk and/or Crosswalk Installation (New), Paving and/or selected based on priority need and resources throughout the Striping Rehab/Repair (Existing Safety), Sidewalk and/or Crosswalk Rehab/Repair year. (Existing), ADA Curb Ramp Installation (New), Pavement Rehab/Repair (Existing), First St(Q St to M St), N. Livermore Ave (Railroad Underpass to Road Maintenance & Traffic Signals, Lights, and/or Signage Installation (New Safety), Bicycle Lane (New), Livermore Alameda 21/22 New 2022 Street Resurfacing Railroad Ave), S. Livermore Ave (Fifth St to Pacific Ave), N. Construction 07/2023 12/2023 20-25 16 7 Rehabilitation Paving and/or Striping Installation (New Safety), Traffic Signals, Lights, and/or Greenville Rd (580 Overpass to Southfront Rd), Las Positas Rd Signage Rehab/Repair (Existing Safety), ADA Curb Ramp Rehab/Repair (Existing), (N. Livermore Ave to Hiliker Pl), N. Livermore Ave (Chestnut St Bicycle Lane Rehab/Repair (Existing) | Curb and Gutter Repair to Railroad Underpass), N Greenville Rd (Southfront Rd to Las Adjust Utility Boxes to Finished Grade Positas Rd), Maple St (Railroad Ave to First St)

All preliminary street locations are subject to change and will be selected based on priority need and resources throughout the This project will include: Sidewalk and/or Crosswalk Installation (New), Paving and/or year. Striping Rehab/Repair (Existing Safety), Sidewalk and/or Crosswalk Rehab/Repair Holmes St(Alden Ln to Concannon Blvd), Springtown Blvd at Road Maintenance & (Existing), Pavement Rehab/Repair (Existing), ADA Curb Ramp Installation (New), Livermore Alameda 21/22 New 2022 Slurry Seal Oleander St, First St (Bridge deck E/Inman to Scott St), E. Construction 07/2023 12/2023 10-15 16 7 Rehabilitation Bicycle Lane (New), Paving and/or Striping Installation (New Safety), Bicycle Lane Stanley Blvd (Wall St to Murrieta Blvd), E. Stanley Blvd (Fenton Rehab/Repair (Existing), ADA Curb Ramp Rehab/Repair (Existing) | Adjust Utility Box St to Railroad Ave), Fourth St at Holmes St, Holmes St to Finished Grade (Concannon Blvd to Vancouver Wy), Portola Ave (N. Livermore Ave to Yorkshire Dr), Holmes St (Lexington Wy to Alden Ln)

Grand Avenue - Wildwood to Fairview Hampton Rd. - Glen Alpine to St. James This project will include: Sidewalk and/or Crosswalk Installation (New), Pavement Hill Lane - Jerome to end Road Maintenance & Piedmont Alameda 20/21 Carried Over 2021 Street Rehabilitation Project Rehab/Repair (Existing), ADA Curb Ramp Rehab/Repair (Existing), Bicycle Lane Wildwood - Grand to Nova; and Prospect to Highland Construction 09/2021 11/2021 20-25 15 9 Rehabilitation Rehab/Repair (Existing) Requa Rd. - Hazel to Wildwood Manor Dr. - Arroyo to Cambridge Dudley Ave. - Blair to Mountain

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Sidewalk and/or Crosswalk Rehab/Repair (Existing), Pavement Rehab/Repair (Existing), Bicycle Lane (New), Landscape Safety Rehab/Repair (Existing), Storm Road Maintenance & Washington Avenue Pavement Drain and/or Culvert Rehab/Repair (Existing), Paving and/or Striping Installation (New Washington Avenue between Cornell Ave and Masonic Ave in Albany Alameda 19/20 In Progress Construction 09/2021 11/2021 10-20 15 9 Rehabilitation Restoration Project Safety), ADA Curb Ramp Rehab/Repair (Existing), Bicycle Lane Rehab/Repair Albany (Existing) | Project construction Phase I was substantially completed in Spring 2021. Utility conflicts with EBMUD necessitated phasing of construction. Phase II is scheduled for construction in late summer/fall 2021.

This project will include: Traffic Signals, Lights, and/or Signage Installation (New Safety), Cost Estimating, Document Preparation, Preliminary Design, Traffic Signals, Citywide Signal Communications Along Dublin Blvd. from the Civic Plaza/Sierra Court intersection Pre-Construction and 12/2019 09/2021 Dublin Alameda 19/20 In Progress Traffic Control Devices Lights, and/or Signage Rehab/Repair (Existing Safety) | Upgrade of the traffic signal 10-20 16 7 Upgrade to the San Ramon Road intersection. Construction 11/2021 06/2022 communication system and replace existing copper communication cables with fiber optic cables.

Road Maintenance & Annual Street Resurfacing for This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Majority of the streets are located on the eastern side of the City Dublin Alameda 21/22 New Construction 07/2021 10/2021 7-20 16 7 Rehabilitation Fiscal Year 2021-22. Pavement Rehab/Repair (Existing) including Alta Terra road, Araldi Lane, Avery Way

This project will include: Sidewalk and/or Crosswalk Rehab/Repair (Existing), Traffic Complete Streets Washington & Osgood Protected Fremont Alameda 21/22 New Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Bicycle Lane Intersection of Washington Blvd and Osgood Rd Construction 03/2022 10/2022 20-30 25 10 Components Intersection Rehab/Repair (Existing), ADA Curb Ramp Rehab/Repair (Existing)

*This list is subject to change and will be finalized upon the adoption of any jurisdiction that meets subsequent eligibility at the October 2021 Commission Meeting. Draft City Submitted - Fiscal Year 2021-22 Local Streets and Roads List of Projects *Projects listed are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1) August 19, 2021

Fiscal Year Initially Proposed Project Est Assembly Senate City County Project Type Title Description Location Components Est Start Est Useful Life Proposed Status Completion Districts Districts

Select segments of Niles Blvd, Alvarado Blvd, Paseo Padre Road Maintenance & 2021 Pavement Rehabilitation Pkwy, Blacow Rd, Durham Rd, South Grimmer Blvd, West Fremont Alameda 21/22 New This project will include: Pavement Rehab/Repair (Existing) Construction 06/2021 09/2021 10-15 20, 25 10 Rehabilitation Project Warren Ave, Warm Springs Blvd, Peralta Blvd, Farwell Dr, Sundale Dr, and Papazian Wy.

Select segments of Fremont Blvd, Farwell Dr, Kato Rd, Bayside Road Maintenance & This project will include: Pavement Improvement (New), Paving and/or Striping Parkway, Niles Blvd, and other collector and residential streets Fremont Alameda 21/22 New 2021 Cape and Slurry Seal Project Construction 06/2021 09/2021 5-10 20, 25 10 Rehabilitation Rehab/Repair (Existing Safety) located in the Districts of Ardenwood, Centerville, Niles, Irvington, Mission San Jose, and Warm Springs.

Complete Streets This project will include: ADA Curb Ramp Installation (New), ADA Curb Ramp The Districts of Ardenwood, Centerville, Niles, Irvington, Mission Fremont Alameda 21/22 New Citywide Intersection Ramps Construction 11/2021 06/2022 20-30 20, 25 10 Components Rehab/Repair (Existing) San Jose, and Warm Springs.

This project will include: Pavement Improvement (New), Paving and/or Striping Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing), ADA Curb Ramp Road Maintenance & FY22 Pavement Improvement Within the limits of: Tennyson Rd, Hesperian, Winton Rd, & I- Hayward Alameda 21/22 New Installation (New), Bicycle Lane (New), Paving and/or Striping Installation (New Construction 05/2022 10/2022 5-15 20 10 Rehabilitation Project 880. Safety), Bicycle Lane Rehab/Repair (Existing), ADA Curb Ramp Rehab/Repair (Existing)

This project will include: Sidewalk and/or Crosswalk Installation (New), Storm Drain/Culvert Installation (New), Sidewalk and/or Crosswalk Rehab/Repair (Existing), Pavement Rehab/Repair (Existing), ADA Curb Ramp Installation (New), Document George Avenue west of Cherry Street; Mulberry Street north of Complete Streets Lindsay Tract Street and Storm Preparation, Cost Estimating, Storm Drain and/or Culvert Rehab/Repair (Existing), Dairy Avenue; Olive Street north of Dairy Avenue; Magnolia Pre-Construction and 04/2021 04/2022 Newark Alameda 19/20 In Progress 20-30 25 10 Components Drain Improvements Preliminary Design | Design development began in April 2021. Start of construction is Street between Dairy Avenue and Sycamore Street; Birch Street Construction 05/2022 11/2022 projected for the 2022 construction season. The City of Newark plans to use its between Thornton Avenue and Baine Avenue current RMRA fund balance towards the design and construction of the Lindsay Tract Street and Storm Drain Improvement Project.

Benecia Ave - entire length Ebbetts St - entire length Truckee Ct - entire length This project will include: Maintenance Program Plan Development | Roadway Quartz Pl - entire length Road Maintenance & 2022 Asphalt Concrete Overlay pavement rehabilitation on various streets located throughout the City. Pavement Levi St - entire length Newark Alameda 21/22 New Pre-Construction 06/2022 08/2022 15-20 25 10 Rehabilitation Program rehabilitation typically involves removal of 2" of existing pavement and replacement Alpine St - entire length with an asphalt concrete pavement overlay. Carter Ave - entire length Burdick St - entire length Street list will be finalized in 2022 and may change based on needs

This project will include: Maintenance Program Plan Development | Other checked to explain that City's maintenance staff perform the following activities with RMRA City Wide. West Oakland, Eastlake/San Antonio, Fruitvale and funding: filling potholes, performing major and minor base repair, crack sealing, Elmhurst/East Oakland. Locations listed are estimates and Road Maintenance & FY 2021-22 Local Street Oakland Alameda 21/22 New sidewalk repairs, curb and gutter repairs, and cross culvert repairs. Citywide, subject to change. Additional factors for prioritization include Pre-Construction 07/2021 06/2022 5-5 18 9 Rehabilitation Maintenance according to a prioritized comprehensive maintenance program. Oakland maintains a locations near schools, community facilities and transit, as well work management system that inventories, catalogs and geolocates assets; assets as locations in high priority neighborhoods. are placed on a cyclical maintenance program.

*This list is subject to change and will be finalized upon the adoption of any jurisdiction that meets subsequent eligibility at the October 2021 Commission Meeting. Draft City Submitted - Fiscal Year 2021-22 Local Streets and Roads List of Projects *Projects listed are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1) August 19, 2021

Fiscal Year Initially Proposed Project Est Assembly Senate City County Project Type Title Description Location Components Est Start Est Useful Life Proposed Status Completion Districts Districts

The project will resurface 1.0 million square feet of various streets throughout the City during the summer of 2022, including: Stoneridge Mall Drive; Laurel Creek Way; McWilliams Place; Owens Drive – Jonson Drive to Hopyard Road; Johnson Court; Road Maintenance & Annual Resurfacing and This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Pleasanton Alameda 21/22 New Commerce Drive – Johnson Drive to Commerce Circle; Construction 07/2021 11/2022 10-15 16 7 Rehabilitation Reconstruction of Various Streets Pavement Rehab/Repair (Existing) Commerce Circle; Addison Way – Inglewood Drive to Alvoro Way; Chapman Way – Homer Way to Inglewood Drive; Pecan Court; Elmwood Circle; Ginger Court; Laurel Court; Fernwood Court; Arrowwood Court; Aster C

Road Maintenance & San Leandro Alameda 20/21 Carried Over Wicks Blvd. This project will include: Pavement Rehab/Repair (Existing) Wicks Blvd., from Merced St. to Lewelling Blvd. Construction 08/2021 09/2021 3-5 18 9 Rehabilitation

Road Maintenance & San Leandro Alameda 21/22 New Ruth Court This project will include: Paving and/or Striping Rehab/Repair (Existing Safety) Ruth Court, from Hesperian Blvd. to terminus Construction 03/2022 04/2022 5-20 18 9 Rehabilitation

Road Maintenance & San Leandro Alameda 21/22 New Fremont Ave. This project will include: Paving and/or Striping Rehab/Repair (Existing Safety) Fremont Ave., from Floresta Blvd. south to terminus Construction 03/2022 04/2022 5-20 18 9 Rehabilitation

Road Maintenance & San Leandro Alameda 21/22 New Harte Ct. This project will include: Paving and/or Striping Rehab/Repair (Existing Safety) Harte Court Construction 05/2022 06/2022 5-20 18 9 Rehabilitation

Road Maintenance & San Leandro Alameda 21/22 New Warden Ave. This project will include: Paving and/or Striping Rehab/Repair (Existing Safety) Crack-seal Warden Ave., from Davis Street to Melcher Construction 10/2021 11/2021 5-10 18 9 Rehabilitation

Road Maintenance & San Leandro Alameda 21/22 New Beecher St. This project will include: Paving and/or Striping Rehab/Repair (Existing Safety) Crack seal Beecher St., from Davis St. frontage to terminus Construction 10/2021 11/2022 5-10 18 9 Rehabilitation

This project will include: Pavement Improvement (New), Paving and/or Striping Rehab/Repair (Existing Safety), Sidewalk and/or Crosswalk Rehab/Repair (Existing), Union City Boulevard Pavement Pavement Rehab/Repair (Existing), Bicycle Lane (New), Traffic Signals, Lights, and/or Complete Streets Rehabilitation (Union City Union City Boulevard between Smith Street and southern City Union City Alameda 20/21 Carried Over Signage Rehab/Repair (Existing Safety), Paving and/or Striping Installation (New Construction 03/2022 06/2023 10-10 20 10 Components Boulevard Bicycle Lane limits. Safety), Bicycle Lane Rehab/Repair (Existing), ADA Curb Ramp Rehab/Repair Improvement) (Existing) | When completed, will serve as Union City's segment of the Bay Trail.

*This list is subject to change and will be finalized upon the adoption of any jurisdiction that meets subsequent eligibility at the October 2021 Commission Meeting. Draft City Submitted - Fiscal Year 2021-22 Local Streets and Roads List of Projects *Projects listed are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1) August 19, 2021

Fiscal Year Initially Proposed Project Est Assembly Senate City County Project Type Title Description Location Components Est Start Est Useful Life Proposed Status Completion Districts Districts

Road Maintenance & Mattley Street Hillside Repair This project will include: Pavement Rehab/Repair (Existing), Preliminary Design | Pre-Construction and 07/2022 08/2022 Jackson Amador 21/22 New Mattley Street above the City's Highway 49/88 parking lot. 50-80 5 8 Rehabilitation Project Slope stabilization below the road to keep the road from failing. Construction 08/2022 09/2022

This project will include: Project Scope Development, Maintenance Program Plan Mills Street and Locus and the public schools residential Plymouth Amador 21/22 New Safety Traffic Calming Crosswalks Pre-Construction 08/2021 05/2022 5-5 5 8 Development, Cost Estimating streets.

Road Maintenance & Striping, Painting Signage on all Amador City Amador 19/20 Carried Over This project will include: Striping, painting, signage Downtown Main Street and all residential area streets Construction 07/2021 11/2022 10-20 5 8 Rehabilitation Roadways

Install solar speed signs at both This project will include: Traffic Signals, Lights, and/or Signage Rehab/Repair South end of City on east side of Highway 49 at City Limit and Amador City Amador 20/21 Carried Over Safety ends of City on Main Street Construction 07/2021 11/2022 10-20 5 8 (Existing Safety) north end of City on south side of Highway 49 City Limit Highway 49

Road Maintenance & 2022 Pavement Rehabilitation W. Marlette Street between Sacramento and Dave Brubeck Ione Amador 20/21 Carried Over This project will include: Pavement Rehab/Repair (Existing) Construction 05/2022 06/2022 7-20 5 8 Rehabilitation Project Road

This project will include: Project Scope Development, Paving and/or Striping Road Maintenance & Rehab/Repair (Existing Safety), Storm Drain/Culvert Installation (New), Cost Pre-Construction and 08/2021 04/2022 Sutter Creek Amador 21/22 New Old Sutter Hill Road Old Sutter Hill Road, Ridge Road to Main Street 50-80 5 8 Rehabilitation Estimating, Document Preparation, Preliminary Design, Storm Drain and/or Culvert Construction 06/2022 10/2022 Rehab/Repair (Existing)

Road Maintenance & Sutter Creek Amador 21/22 New Gopher Flat Road This project will include: Cost Estimating, Preliminary Design Gopher Flat from Main Street to Golden Hills Drive. Pre-Construction 08/2021 11/2021 50-80 13 8 Rehabilitation

This project will include: This project will include: Procurement of street maintenance Road Maintenance & Street Pavement Maintenance & Procurement/Operatio Biggs Butte 21/22 New materials, Public Works Department labor for street maintenance, Pavement pothole & All City Streets - as needed annually 05/2021 05/2022 1-5 3 4 Rehabilitation Repairs nal Needs dig out Repairs (Existing)

This project will include: Procurement of Road Maintenance and Rehab Materials, Road Maintenance & Public Works Staffing | This project will include: Procurement of street maintenance Procurement/Operatio Gridley Butte 21/22 New Annual Repair & Improve Program All City Streets - as needed annually 05/2021 05/2022 5-10 3 4 Rehabilitation materials, Public Works Department labor for street maintenance, Pavement pothole & nal Needs dig out Repairs (Existing).

This project will include: Pavement Rehab/Repair (Existing), Cost Estimating, Mulberry St.-20th street to 12th street Road Maintenance & Pre-Construction and 07/2021 12/2021 Chico Butte 21/22 New 2022 Road Rehabilitation Document Preparation, Preliminary Design, Paving and/or Striping Installation (New Pine St. - 12th street to 9th street 20-20 3 4 Rehabilitation Construction 02/2022 06/2022 Safety), Environmental Study/Documents Cypress St. - 12th street to 9th street

*This list is subject to change and will be finalized upon the adoption of any jurisdiction that meets subsequent eligibility at the October 2021 Commission Meeting. Draft City Submitted - Fiscal Year 2021-22 Local Streets and Roads List of Projects *Projects listed are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1) August 19, 2021

Fiscal Year Initially Proposed Project Est Assembly Senate City County Project Type Title Description Location Components Est Start Est Useful Life Proposed Status Completion Districts Districts

This project will include: Procurement of Public Works Systems/Databases, Procurement of Public Works Safety Materials and Gear, Procurement of Public Works Equipment, Procurement of Road Maintenance and Rehab Materials, Public Works Staffing, Repair and Servicing of Public Works Systems/Databases, Repair Town Transportation Related Road Maintenance & and Servicing of Public Works Equipment | Due to the Camp Fire, the fiscal year 2021- Procurement/Operatio Paradise Butte 21/22 In Progress Infastructure Repair and Townwide 07/2021 06/2022 5-20 3 4 Rehabilitation 222 revenues from SB 1 are proposed to be used for ongoing maintenance of public nal Needs Rehabilitation roadways with majority of funds to be held indefinitely due to the uncertain future of the Town’s transportation network. The recommended strategy for the Town is to hold all transportation funding revenues until the Town’s repair efforts can be properly planned.

Road Maintenance & Dogtown Road Pavement This project will include: Pavement Rehab/Repair (Existing), Cost Estimating, Pre-Construction and 08/2021 01/2022 Angels Camp Calaveras 20/21 Carried Over Dogtown Road from Main Street (SR-49) to Gardner Lane 10-15 4 8 Rehabilitation Rehabilitation Preliminary Design, Environmental Study/Documents Construction 02/2022 05/2022

This project will include: Pavement Improvement (New), Paving and/or Striping Road Maintenance & Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing), Paving and/or Colusa Colusa 20/21 Carried Over 5th Street Reconstruction Levee Rd - Market; Oak - Webster; Lafayette - South City Limits Construction 09/2021 11/2022 25-30 3 4 Rehabilitation Striping Installation (New Safety) | Grind existing asphalt, install geo fab, repave with 4 inch new asphalt concrete.

Road Maintenance & This project will include: Grind existing asphalt, install geo fab, repave with 4 inch new Colusa Colusa 19/20 Carried Over 3rd Street Reconstruction Jay Street - Webster Construction 07/2021 12/2021 25-30 3 4 Rehabilitation asphalt concrete.

"Clay Street between 11th and 12th Street; Main Street between Road Maintenance & This project will include: The Pre-Construciton/Design activities for this project that will 6th and 8th Street; Fremont Street between 3rd and 5th St; 9th- Colusa Colusa 19/20 Carried Over Citywide Cape Seal Construction 11/2021 11/2023 15-20 3 4 Rehabilitation Resurface 8th Street From Sioc to Harris Street is in progress. 10th St; and B St to Bridge St; 11th St between Oak and Parkhill St; Lafayette Between 5th and

Road Maintenance & Procurement/Operatio Colusa Colusa 21/22 New Sweeper This project will include: Procurement of Public Works Equipment Corp Yard but will be used on Streets. 07/2021 08/2021 5-10 3 4 Rehabilitation nal Needs

Carson and Sioc Streets (from 7th - 5th Street and 10th - 9th Road Maintenance & This project will include: Segmented reconstruction of several alley ways by grinding Colusa Colusa 19/20 Carried Over Alley Ways (Various) Street). Fremont and Carson Streets (from 13th - 12th St). Construction 10/2021 12/2023 20-30 3 4 Rehabilitation existing asphalt, installing geo fab, repaving with 4 inch new asphalt concrete. Between Market and Jay Streets (from 12th - 10th St).

Road Maintenance & Street Maintenance & Pavement This project will include: Procurement of street maintenance materials, Public Works Procurement/Operatio Williams Colusa 21/22 New Various City street Location as needed annually 05/2021 05/2022 1-5 4 4 Rehabilitation Repairs labor for street maintenance, pavement pothole & digout repairs (Existing). nal Needs

This project will include: Pavement Improvement (New), Sidewalk and/or Crosswalk Installation (New), Storm Drain/Culvert Installation (New), Pavement Rehab/Repair Complete Streets (Existing), ADA Curb Ramp Installation (New), Bicycle Lane (New), Right of Way Antioch Contra Costa 19/20 Forecasted L St Improvements L St north of Hwy 4 Construction 10/2022 10/2023 15-30 11 7 Components Acquisition, Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Paving and/or Striping Installation (New Safety) | Preliminary design completed. Proceeding with design and environmental studies.

*This list is subject to change and will be finalized upon the adoption of any jurisdiction that meets subsequent eligibility at the October 2021 Commission Meeting. Draft City Submitted - Fiscal Year 2021-22 Local Streets and Roads List of Projects *Projects listed are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1) August 19, 2021

Fiscal Year Initially Proposed Project Est Assembly Senate City County Project Type Title Description Location Components Est Start Est Useful Life Proposed Status Completion Districts Districts

Various Locations: Cache Peak Way, Cougar Peak Way, Cougar Peak Ct., Belford Peak, Sheffels Peak Ct., Massive Peak Way, Way, Hunter Peak Ct., Blackburn Peak, Matterhorn Ct., Matterhorn Way, Ct., Wexler Road Maintenance & Pavement Surface Treatments Antioch Contra Costa 20/21 Carried Over This project will include: Pavement Improvement (New) Peak, Snowmass Peak Ct., Shavano Peak Ct., Ct., Construction 06/2022 08/2022 10-15 11 7 Rehabilitation 2022 Belford Peak Ct., Burwood Way, Wildflower, Hastings Ct, Eastbourne Ct, Barmouth Dr, Basalt Ct, Barmouth Ct, Myrtlewood Ct, Laurelwood Ct, Coyote Ct, Badger Way, Halite Way, Serpentine Dr, and other streets.

2022 Clayton Neighborhood Road Maintenance & This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Clayton Contra Costa 20/21 Carried Over Streets Pavement Preservation Clayton Neighborhood. Streets Selected from StreetSaver Construction 08/2021 01/2022 15-20 14 7 Rehabilitation Pavement Rehab/Repair (Existing) Project

This project will include: Pavement Improvement (New), Paving and/or Striping Road Maintenance & North Larwin Avenue, South Larwin Concord Contra Costa 21/22 New Pavement Maintenance – Zone 4 Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing), Paving and/or Construction 07/2021 11/2021 10-15 7 14 Rehabilitation Avenue, and related side streets. Striping Installation (New Safety)

Road Maintenance & Sycamore Avenue Roadway This project will include: Pavement Rehab/Repair (Existing), ADA Curb Ramp Hercules Contra Costa 21/22 New Sycamore Ave from Civic Drive to Palm Ave Construction 06/2022 08/2022 15-20 15 9 Rehabilitation Rehabilitation Project Rehab/Repair (Existing), Bicycle Lane Rehab/Repair (Existing)

The project includes surface sealing 58 streets or portions of streets located throughout Lafayette. All of the street names and Road Maintenance & This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), the limits of maintenance work are included on the Table 1 Lafayette Contra Costa 21/22 New 2022 Surface Seal Project Construction 05/2022 09/2022 7-10 16 7 Rehabilitation Pavement Rehab/Repair (Existing), ADA Curb Ramp Rehab/Repair (Existing) attached to Resolution 2021-23 that has been uploaded as support for Lafayette's proposed RMRA project. Locations include Risa, Arrowhead, Beaumont, Del Mar, Del Rey

This project will include: Pavement Rehab/Repair (Existing) | 2-inch HMA inlay; Road Maintenance & Three Cities Pavement Morello Avenue; Center Avenue between Glacier Drive and Martinez Contra Costa 21/22 New Improvements on Morello Ave are part of the larger project Three Cities Pavement Construction 08/2021 06/2022 15-20 12 3 Rehabilitation Preservation Project Hidden Lakes Drive Project C1068

See resolution for specific limits of these streets: Altarinda Rd; Brookwood Rd; Bryant Way; Cam. Sobrante ; Cami Pablo; Road Maintenance & This project will include: Pavement Rehab/Repair (Existing), ADA Curb Ramp Orinda Contra Costa 21/22 New 2021 Annual Pavement Project Charles Hill Rd ; Hidden Valley Rd. ; Las Piedras ; Lomas Construction 07/2021 12/2021 10-15 16 7 Rehabilitation Rehab/Repair (Existing) Cantadas ; Lombardy Ln ; Rheem Blvd; Santa Maria Way ; St. Stephens ; Vista Del Orinda; Wilder Road

Crestview Drive Pavement and Crestview Drive from West Leland Road to West Buchanan Pittsburg Contra Costa 21/22 New Match Funds This project will include: Preliminary Design Pre-Construction 12/2021 06/2022 5-20 14 7 Pedestrian Improvement Project Road.

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Road Maintenance & Sidewalk and/or Crosswalk Rehab/Repair (Existing), Pavement Rehab/Repair Richmond Contra Costa 19/20 In Progress 37th Street 37th Street from Chanslor Avenue to Cerrito Avenue Construction 07/2021 12/2021 20-20 15 9 Rehabilitation (Existing), Bicycle Lane (New), Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), ADA Curb Ramp Rehab/Repair (Existing)

*This list is subject to change and will be finalized upon the adoption of any jurisdiction that meets subsequent eligibility at the October 2021 Commission Meeting. Draft City Submitted - Fiscal Year 2021-22 Local Streets and Roads List of Projects *Projects listed are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1) August 19, 2021

Fiscal Year Initially Proposed Project Est Assembly Senate City County Project Type Title Description Location Components Est Start Est Useful Life Proposed Status Completion Districts Districts

Road Maintenance & This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Richmond Contra Costa 19/20 In Progress Richmond Parkway Richmond Parkway from HWY I-580 to West Gertrude Avenue Construction 07/2021 06/2022 20-20 15 9 Rehabilitation Pavement Rehab/Repair (Existing)

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Complete Streets Sidewalk and/or Crosswalk Rehab/Repair (Existing), Traffic Signals, Lights, and/or Richmond Contra Costa 21/22 New Carlson Crosstown Connection Carlson Boulevard from Tehama Avenue to Construction 07/2021 12/2021 20-20 15 9 Components Signage Rehab/Repair (Existing Safety), ADA Curb Ramp Rehab/Repair (Existing), Bicycle Lane Rehab/Repair (Existing)

Cutting Boulevard from Garrard Boulevard to Hoffman This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Complete Streets Boulelvard; Hoffman Boulevard from to Richmond Contra Costa 21/22 New Cutting-Hoffman Bikeways Sidewalk and/or Crosswalk Rehab/Repair (Existing), Traffic Signals, Lights, and/or Construction 07/2021 12/2021 20-20 15 9 Components Harbour Way South; Harbour Way South from Hoffman Signage Rehab/Repair (Existing Safety), Bicycle Lane Rehab/Repair (Existing) Boulevard to South End

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Road Maintenance & Pavement Management Program - Various street sections in Area 4 (Sand Creek Rd-Fairview Ave- Brentwood Contra Costa 21/22 New Sidewalk and/or Crosswalk Rehab/Repair (Existing), ADA Curb Ramp Rehab/Repair Construction 03/2022 09/2022 2-20 11 7 Rehabilitation 2022 Balfour Rd-Minnesota Ave) (Existing)

Neighborhood streets east of Fairview Avenue, west of Road Maintenance & Pavement Management Program - This project will include: Pavement Rehab/Repair (Existing), Bicycle Lane Brentwood Contra Costa 20/21 In Progress Minnesota Avenue, north of Balfour Road, and south of Sand Construction 04/2021 08/2021 7-15 11 7 Rehabilitation 2021 Rehab/Repair (Existing), ADA Curb Ramp Rehab/Repair (Existing) Creek Road.

Various residential streets in the Town of Danville including the Road Maintenance & 2021/22 Pavement Management This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), ADA following neighborhood locations: Woodranch, Anderson Ranch, Danville Contra Costa 21/22 New Construction 07/2021 12/2021 10-20 16 7 Rehabilitation Project Curb Ramp Rehab/Repair (Existing) Danville Station and Greentree/Silverwood

Locations are on major Pedestrian and Bicycle Routes as identified in the City's Active Transportation Plan including BART This project will include: Project Scope Development, Cost Estimating, Preliminary to Bay Trail connection along Fairmount Avenue-Carlson Blvd- Design | Implement the Active Transportation Plan, adopted by the City Council in Complete Streets path-Lassen St- Street-Belmont Ave- El Cerrito Contra Costa 19/20 In Progress Active Transportation Program April 2016, and includes access, safety and other enhancements to pedestrian and Pre-Construction 07/2018 12/2023 7-25 15 9 Components Central Ave, Richmond St, Fairmount Ave, Key Blvd and bicycle infrastructure. | This component is specifically for preliminary engineering and Arlington Blvd. Locations have yet to be finalized and will be design needed to leverage grant and other external funding opportunities. selected based on grant funding criteria and prioritization criteria in the Active Transportation Plan.

This project will include: Project Scope Development, Cost Estimating, Document Preparation, Preliminary Design, Environmental Study/Documents | Access, circulation, safety and congestion relief improvements for bicyclists, pedestrians, bus San Pablo Avenue from Ohlone Greenway to Potrero Avenue, transit, and automobiles to support BART and TOD/PDA development; accessibility Eastshore Boulevard from Potrero Avenue to San Pablo Avenue, Complete Streets Del Norte TOD Complete Streets improvements; and lighting, street tree and landscaping improvements. This includes El Cerrito Contra Costa 19/20 In Progress Hill Street from San Pablo Avenue to Liberty Street, Cutting Pre-Construction 12/2019 12/2022 7-25 15 9 Components Improvements new signalized pedestrian crossings, new bicycle lanes, reduction in turning Boulevard from I-80 to Key Boulevard, and Knott Avenue from lanes/auxiliary lanes and conversion of one-way to two-way streets for improved San Pablo Avenue to Key Boulevard. vehicle flow, and signal changes. May also include Green Infrastructure. | Began Caltrans project development process for improvements on a state highway in Fiscal Year 2019-20

*This list is subject to change and will be finalized upon the adoption of any jurisdiction that meets subsequent eligibility at the October 2021 Commission Meeting. Draft City Submitted - Fiscal Year 2021-22 Local Streets and Roads List of Projects *Projects listed are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1) August 19, 2021

Fiscal Year Initially Proposed Project Est Assembly Senate City County Project Type Title Description Location Components Est Start Est Useful Life Proposed Status Completion Districts Districts

On major Pedestrian Routes or serving public/ transportation This project will include: Sidewalk and/or Crosswalk Installation (New), Project Scope facilities and Title III entities: Moeser Ln & Pomona Av next to Development, Sidewalk and/or Crosswalk Rehab/Repair (Existing), ADA Curb Ramp the Civic Theater and connecting to Community Center/Swim Installation (New), Cost Estimating, Document Preparation, ADA Curb Ramp Center; additionally, Arlington Blvd, Ashbury Ave, Barrett Ave, Access Modifications - Streets & Pre-Construction and 07/2020 12/2021 El Cerrito Contra Costa 20/21 Carried Over Safety Rehab/Repair (Existing) | Remove physical barriers to accessibility along the street Central Ave, Colusa Ave, Cutting Blvd, Fairmount Ave, Hill St, 10-25 15 9 Sidewalks Construction 01/2022 09/2022 right-of-way including at intersections and mid-block. Work includes installation and Navellier St, Moeser Ln, Potrero Ave, Richmond St, San Pablo reconstruction of curb ramps, sidewalk removal and replacement including street tree Ave, Schmidt Ln, Stockton Ave. Locations have yet to be removal and replacement, and related access modifications. finalized and will be selected based on ADA Transition Plan methodology.

Arterials: Carlson Bl, Central Av, Fairmount Av, San Pablo Av, Ashbury Av, Arlington Bl, Barrett Av, Colusa Av, Cutting Bl, Elm St, Hill St, Key Bl, Moeser Ln, Potrero Av, Richmond St; and This project will include: Procurement of Public Works Equipment, Repair and Collectors: Alta Punta, Ashbury Av, Avis Dr, Buckingham Dr, Street Light, Traffic Signal & Street Servicing of Public Works Equipment | Replacement, repair and upgrades of street Procurement/Operatio El Cerrito Contra Costa 20/21 Carried Over Traffic Control Devices Colusa Av, Edwards Av, Eureka Av, Fairview Dr, Ganges Av, 07/2021 06/2022 10-20 15 9 Sign Replacement and Upgrades light equipment, traffic signal equipment and street signs includes procurement of nal Needs Jordan Av, King Dr, Macdonald Av, Manila Av, Navellier St, San supplies and materials. Mateo St, Sea View Dr, Shevlin Dr, South 55th St, Terrace Dr, and Tulare Av. All locations are to be finalized on an annual basis.

Citywide for on-going maintenance of 12 traffic signalized intersections on San Pablo Ave, Central Ave, Moeser Ln, Fairmount Ave, Richmond St, and Key Blvd; 526 City-owned Street Light & Traffic Signal This project will include: Repair and Servicing of Public Works Equipment | Street light street and pedestrian lights on all city streets, and 19 flashing Procurement/Operatio El Cerrito Contra Costa 20/21 Carried Over Traffic Control Devices 07/2021 06/2022 10-20 15 9 Maintenance and traffic signal on-going maintenance service and response. beacons/in-roadway lights/radar speed feedback signs locations nal Needs on Moeser Ln, Cutting Blvd, Arlington Blvd, San Pablo Ave, Central Ave, Stockton Ave, Potrero Ave, Barrett Ave, Hill St and Fairmount Ave.

Locations are on major pedestrian routes: San Pablo Ave, Central Ave, Potrero Ave, and Cutting Blvd. Locations will be This project will include: Project Scope Development, Sidewalk and/or Crosswalk finalized based on a methodology that prioritizes locations on Sidewalk Infrastructure Rehab/Repair (Existing) | Repair sidewalk displacement to remove tripping hazards by Pre-Construction and 07/2021 12/2021 El Cerrito Contra Costa 20/21 Carried Over Safety major Pedestrian Routes designated in the City’s Active 20-25 15 9 Maintenance concrete cutting and other methods that not requiring sidewalk removal and Construction 01/2022 06/2022 Transportation Plan, and based on their proximity to schools, the replacement. severity of the sidewalk damage and repair method, and other factors (e.g. requests received).

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing), Paving and/or Striping Installation (New Safety) | As identified in the City's PMP: San Pablo Ave, MacDonald Ave, Installation of a variety of roadway treatments including slurry seal, microsurface, Contra Costa Dr, Everett St, Gladys Ave, Lexington Ave, Zara micropave, cape seal, asphalt inlay & overlay of various thicknesses, crack sealing Ave, Noble Ct, Blake St, Central Ave, Colusa Ave, King Dr, Road Maintenance & Annual Street Improvement and repairs of failed sections, and replacement and upgrades to traffic control and El Cerrito Contra Costa 20/21 Carried Over Thors Bay Rd, Moeser Ln, Yuba St, Wildcat Dr, Belmont Ave, Construction 03/2022 09/2022 7-25 15 9 Rehabilitation Program safety systems that pertain to pavement work (striping, crosswalks, bike facilities, and Liberty St, Victoria St, Coronado Ave, Alva Ave, Charles Ave, associated signage). | The scope may include installation of curb ramps in compliance Kensington Rd, Nason Ave, Seaview Pl, Key Blvd and Peerless with the ADA for all streets that receive an any treatment within a crosswalk area, curb, Ave gutter, and sidewalk upgrades as needed, and upgrades to road-related storm drainage facilities.

This project will include: Document Preparation | Develop Local Roadway Safety Plan per Caltrans guidance, use data-driven approach to identify, analyze, and prioritize roadway safety improvements on local roads including (1) hot spot/reactive multimodal collision analysis (2) infrastructure data inventory of key safety countermeasures (3) El Cerrito Contra Costa 20/21 Carried Over Safety Local Roadway Safety Plan Citywide Pre-Construction 09/2021 09/2022 7-25 15 9 collision profile development (4) systemic countermeasure project list (5) prioritization of list based on severity and community input and (6) Enforcement, Education & Engineering recommendations. | Mostly funded by state Highway Safety Improvement Program grant. SB1 funds are leveraging these grant funds.

*This list is subject to change and will be finalized upon the adoption of any jurisdiction that meets subsequent eligibility at the October 2021 Commission Meeting. Draft City Submitted - Fiscal Year 2021-22 Local Streets and Roads List of Projects *Projects listed are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1) August 19, 2021

Fiscal Year Initially Proposed Project Est Assembly Senate City County Project Type Title Description Location Components Est Start Est Useful Life Proposed Status Completion Districts Districts

This project will include: Project Scope Development, Cost Estimating, Document Preparation, Preliminary Design | Rehabilitate and maintain street pavement; retrofit Road Maintenance & and install new curb ramps; install traffic signing, pavement markings and signs to Richmond Street between Fairmount Avenue and Blake Street. El Cerrito Contra Costa 21/22 New Richmond Street Improvements Pre-Construction 10/2021 12/2022 7-25 15 9 Rehabilitation enhance crosswalks and existing Class III bike facility; replace vehicle signal loop The project limits are estimated and yet to be finalized. detection enhancing bike detection; and make minor utility adjustments to grade. Also, repair sidewalk and replace street trees as needed.

Amberwood Court, Archer Circle, Ashford Place, August Drive, Road Maintenance & This project will include: Sidewalk and/or Crosswalk Rehab/Repair (Existing), Moraga Contra Costa 21/22 New 2021 Street Repair Project Selborne Way East, Fernwood Drive, Cypress Point way, Corliss Construction 07/2021 12/2021 4-15 16 7 Rehabilitation Pavement Rehab/Repair (Existing) Drive, Country Club Drive (EB), Fleuti Drive and Via Granada.

Road Maintenance & FY 2020-21 Street Repoair and This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Gardenia Neighborhood between Main Street and West Cypress Oakley Contra Costa 20/21 Carried Over Construction 04/2022 06/2022 15-18 11 7 Rehabilitation Resurfacing Project Pavement Rehab/Repair (Existing) Road.

CIP 250 - Laurel Road Resurfacing This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Road Maintenance & Project is located on Laurel Road between Empire Avenue and Oakley Contra Costa 21/22 New Project (Empire Avenue to O'Hara Pavement Rehab/Repair (Existing), Paving and/or Striping Installation (New Safety), Construction 08/2021 10/2021 15-20 11 7 Rehabilitation O'Hara Avenue Avenue) Bicycle Lane Rehab/Repair (Existing)

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Road Maintenance & Pinole Contra Costa 21/22 New Tennent Avenue Rehabilitation Sidewalk and/or Crosswalk Rehab/Repair (Existing), Pavement Rehab/Repair On Tennent Avenue from San Pablo Avenue to Railroad Avenue Construction 07/2021 07/2022 12-30 15 9 Rehabilitation (Existing), ADA Curb Ramp Rehab/Repair (Existing)

Road Maintenance & STP/OBAG II Pavement Pittsburg Contra Costa 20/21 Carried Over This project will include: Document Preparation, Preliminary Design West Leland Road & Loveridge Road Pre-Construction 04/2022 06/2022 10-20 14 7 Rehabilitation Improvement Project

FY 21/22 Traffic Signal Signalized intersections Citywide. Locations to be reported in Pittsburg Contra Costa 21/22 New Traffic Control Devices This project will include: Cost Estimating, Document Preparation Pre-Construction 07/2021 06/2022 1-10 14 7 Modification completion.

West Leland Road between San Marco and Railroad Avenue Road Maintenance & SB1 2021/22 Pavement Pittsburg Contra Costa 21/22 New This project will include: Pavement Rehab/Repair (Existing) and Loverdige Road between SR4 and Pittsburg Antioch Construction 05/2021 06/2021 10-20 14 7 Rehabilitation Maintenance Project Highway.

Lislin Court, Baja Court, El Seco Way, Sugartree Drive, Road Maintenance & FY 2021/22 Pavement Pittsburg Contra Costa 21/22 New This project will include: Pavement Rehab/Repair (Existing) Peachtree Circle, Jaqueline Drive, Rancho Way, Oaktree Court, Construction 08/2021 06/2022 5-20 14 7 Rehabilitation Maintenance Project and Rosewood Court.

*This list is subject to change and will be finalized upon the adoption of any jurisdiction that meets subsequent eligibility at the October 2021 Commission Meeting. Draft City Submitted - Fiscal Year 2021-22 Local Streets and Roads List of Projects *Projects listed are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1) August 19, 2021

Fiscal Year Initially Proposed Project Est Assembly Senate City County Project Type Title Description Location Components Est Start Est Useful Life Proposed Status Completion Districts Districts

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), ADA Road Maintenance & FY 2022-2023 Street Resurfacing Various streets located in Pleasant Hill included in Residential Pleasant Hill Contra Costa 21/22 New Curb Ramp Installation (New), Pavement Rehab/Repair (Existing), Paving and/or Construction 04/2023 10/2023 12-20 14 3 Rehabilitation Project Zones 20 and 14 Striping Installation (New Safety), ADA Curb Ramp Rehab/Repair (Existing)

This will be a citywide slurry seal pavement rehabilitation project and it will cover street segments east of San Pablo and south of This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), San Pablo Dam Road. Streets include segments of: 13th Street Road Maintenance & Citywide Slurry Seal Pavement Sidewalk and/or Crosswalk Rehab/Repair (Existing), Pavement Rehab/Repair through 26th Street, Acapulco Drive, Alan Ct, Austin Ct, Casino San Pablo Contra Costa 20/21 Carried Over Construction 03/2022 06/2022 5-8 15 9 Rehabilitation Rehabilitation Project (Existing), ADA Curb Ramp Rehab/Repair (Existing), Bicycle Lane Rehab/Repair Ave, Castro Rd, Cherrywood Ct, Coalport St, Conneticut Ave, (Existing) Contra Costa Ave, Crucero Ct, Espanillo Ct, Espano Ct, Espanola Dr, Fillmore Ave, Gerald Ave, and others as described in City Resolution 2021-078

Varios locations in the City of San Ramon, including but not limited to: ADRIATIC CT, ALBION RD, ARLEWOOD CT, ASHBROOK LN, AVALON CT, AVALON WAY, BETHANY RD, This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), BOLLINGER CYN RD, BOWEN CT, CULLENS CT, DROMANA Sidewalk and/or Crosswalk Rehab/Repair (Existing), Pavement Rehab/Repair CT, DURLINGTON CT, HARCOURT WAY, JASPER HILL CT, Road Maintenance & Pavement Management 2022 San Ramon Contra Costa 21/22 New (Existing), ADA Curb Ramp Installation (New), Bicycle Lane (New), Paving and/or JASPER HILL DR, KARINA CT, KELLYBROOK WAY, Construction 07/2022 12/2022 3-20 16 7 Rehabilitation Project Striping Installation (New Safety), ADA Curb Ramp Rehab/Repair (Existing), Bicycle KENWICK DR, KINVARRA CT, KIRKSTONE CT, LANGHORNE Lane Rehab/Repair (Existing) DR, LANGTON CT, LANGTON DR, LATERA CT, LONGLEAF CIR, MACEDON CT, MIDDLEBROOKE WAY, MINTARO CT, PEMBERTON DR, PIPERS BROOK CT, RIVENELL WAY, AND MORE

This project will include: This project will include: The 2021 OBAG2 Ygnacio Valley Road Rehabilitation Project will repave Ygnacio Valley Road from Civic Drive to San Carlos Drive. This section of Ygnacio Valley Road was last repaved in 1989 and has a 2021 OBAG2 YGNACIO VALLEY The 2021 OBAG2 Ygnacio Valley Road Rehabilitation Project will Road Maintenance & PCI rating of 70. The project will perform required ADA upgrades and traffic signal Walnut Creek Contra Costa 19/20 Carried Over ROAD REHABILITATION repave Ygnacio Valley Road from Civic Drive to San Carlos Construction 07/2021 10/2021 10-20 14, 16 7 Rehabilitation upgrades as needed. PROJECT Drive.

The roadway area to be repaved on Ygnacio Valley Road is estimated to be 575,000 S.F.

This project will include: Pavement Rehab/Repair (Existing), ADA Curb Ramp Road Maintenance & SOUTH MAIN REHABILITATION Rehab/Repair (Existing) | The 2021 South Main Street Rehabilitation Project will Walnut Creek Contra Costa 20/21 Carried Over South Main Street between Newell Avenue and Creekside Drive Construction 06/2022 10/2022 10-20 16 7 Rehabilitation PROJECT repave South Main Street from Newell Avenue to Creekside Drive. This section of roadway was last repaved in 1989 and has a PCI rating of 58.

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), ADA Curb Ramp Rehab/Repair (Existing) | The 2021 Cape Seal Project will resurface 18 Project will resurface 18 residential streets located within the Road Maintenance & residential streets located within the Rudgear Estates and Joaquin Heights Walnut Creek Contra Costa 21/22 New 2021 Cape Seal Project Rudgear Estates and Joaquin Heights neighborhoods and Construction 06/2021 08/2021 5-10 16 7 Rehabilitation neighborhoods and Youngs Ct. These streets were last resurfaced between 2009 and Youngs Ct. 2010, and has a PCI rating ranging from 60 to 70. The project will perform required ADA upgrades within the project area.

K Street Drainage Improvement Road Maintenance & Crescent City Del Norte 19/20 In Progress and Roadway Rehabilitation This project will include: Document Preparation, Cost Estimating, Preliminary Design K Street Between Front Street & 2nd Street Pre-Construction 07/2024 09/2024 20-30 2 2 Rehabilitation Project

Front Street Storm Drain and This project will include: Document Preparation, Cost Estimating, Preliminary Design | Road Maintenance & Crescent City Del Norte 21/22 In Progress Roadway Rehabilitation Project Design drainage improvements, roadway improvements, ADA compliant access Front street between G and L streets Pre-Construction 04/2023 10/2023 20-30 2 2 Rehabilitation Design ramps and pedestrian improvements.

*This list is subject to change and will be finalized upon the adoption of any jurisdiction that meets subsequent eligibility at the October 2021 Commission Meeting. Draft City Submitted - Fiscal Year 2021-22 Local Streets and Roads List of Projects *Projects listed are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1) August 19, 2021

Fiscal Year Initially Proposed Project Est Assembly Senate City County Project Type Title Description Location Components Est Start Est Useful Life Proposed Status Completion Districts Districts

This project will include: Cost Estimating, Document Preparation, Preliminary Design | Road Maintenance & Crescent City Del Norte 21/22 In Progress A Street Rehabilitation Design Design drainage improvements, roadway improvements, ADA compliant access A Street between Pacific street and Essex street Pre-Construction 07/2024 10/2024 20-30 2 2 Rehabilitation ramps and pedestrian improvements.

This project will include: Cost Estimating, Document Preparation, Preliminary Design | Road Maintenance & Crescent City Del Norte 21/22 In Progress F Street Rehabilitation Design Design drainage improvements, roadway improvements, ADA compliant access F street between Front street and 5th street Pre-Construction 06/2022 10/2022 20-30 2 2 Rehabilitation ramps and pedestrian improvements.

Road Maintenance & Placerville El Dorado 20/21 Carried Over Asphalt Patch Paving This project will include: Pavement Rehab/Repair (Existing) | asphalt repair Bear Rock Rd, Spanish Ravine Rd, James Dr., and Kenneth Ct. Construction 07/2021 06/2022 10-15 5 1 Rehabilitation

Road Maintenance & Placerville El Dorado 21/22 New Annual Street Striping This project will include: Project Scope Development, Document Preparation Citywide Pre-Construction 07/2021 09/2021 2-5 5 1 Rehabilitation

This project will include: Project Scope Development, Feasibility Study, Cost Placerville El Dorado 21/22 New Other Corp Yard Revitalization Project 3231 Big Cut Rd Pre-Construction 07/2021 07/2022 25-30 5 1 Estimating, Preliminary Design

Road Maintenance & Placerville El Dorado 21/22 New Morrene Drive Paving This project will include: Pavement Rehab/Repair (Existing) Morrene Drive Construction 07/2021 06/2022 15-20 5 1 Rehabilitation

Third Street (Lake Tahoe Boulevard to Washington Avenue), This project will include: Sidewalk and/or Crosswalk Rehab/Repair (Existing), Road Maintenance & Washington Avenue (Tahoe Island to Tahoe Keys Boulevard), South Lake Tahoe El Dorado 21/22 New 2022 Road Rehabilitation Project Pavement Rehab/Repair (Existing), Bicycle Lane Rehab/Repair (Existing), ADA Curb Construction 05/2022 10/2022 20-20 5 1 Rehabilitation Tahoe Keys Boulevard (Lake Tahoe Boulevard to Venice Ramp Rehab/Repair (Existing) Avenue)

Barstow and Palm Traffic Signal This project will include: Traffic Signals, Lights, and/or Signage Rehab/Repair Fresno Fresno 20/21 In Progress Traffic Control Devices Left Turn Phasing (18/19 Barstow Ave & Palm Ave Construction 01/2019 06/2022 20-50 23 8 (Existing Safety) | Traffic Signal Modification carryover)

Armstrong and Lane Traffic Signal This project will include: Traffic Signals, Lights, and/or Signage Installation (New Fresno Fresno 20/21 In Progress Traffic Control Devices Armstrong Ave & Lane Ave Construction 01/2019 01/2022 20-50 23 8 (18/19 carryover) Safety) | New Traffic Signal

*This list is subject to change and will be finalized upon the adoption of any jurisdiction that meets subsequent eligibility at the October 2021 Commission Meeting. Draft City Submitted - Fiscal Year 2021-22 Local Streets and Roads List of Projects *Projects listed are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1) August 19, 2021

Fiscal Year Initially Proposed Project Est Assembly Senate City County Project Type Title Description Location Components Est Start Est Useful Life Proposed Status Completion Districts Districts

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Road Maintenance & Chestnut Overlay, Bullard to Fresno Fresno 20/21 In Progress Sidewalk and/or Crosswalk Rehab/Repair (Existing), Pavement Rehab/Repair Chestnut Ave - Bullard to Herndon Construction 01/2019 10/2021 10-20 23 8 Rehabilitation Herndon (18/19 carryover) (Existing) | Pavement overlay

This project will include: Traffic Signals, Lights, and/or Signage Installation (New Fresno Fresno 20/21 In Progress Traffic Control Devices Traffic Signal Clinton and Angus Intersection of Clinton Ave and Angus St Construction 01/2020 03/2022 20-50 31 8 Safety)

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Fresno Street Corridor Sidewalk and/or Crosswalk Rehab/Repair (Existing), Pavement Rehab/Repair Fresno Fresno 20/21 In Progress Match Funds Fresno Street from B Street to Friant Road Construction 07/2019 12/2022 15-30 23, 31 8, 14 Improvements (Existing), ADA Curb Ramp Rehab/Repair (Existing), Bicycle Lane Rehab/Repair (Existing)

Traffic Signal Left Turn Phasing This project will include: Traffic Signals, Lights, and/or Signage Installation (New Fresno Fresno 20/21 In Progress Traffic Control Devices Butler and Cedar Avenues Construction 07/2019 02/2022 20-50 31 14 Butler & Cedar Safety)

Traffic Signal Left Turn Phasing This project will include: Traffic Signals, Lights, and/or Signage Installation (New Fresno Fresno 20/21 In Progress Traffic Control Devices Intersection of Tulare Avenue and "U" Street Construction 07/2019 01/2022 20-50 31 14 Tulare and "U" Street Safety)

Muir Elementary School - Safe This project will include: Sidewalk and/or Crosswalk Installation (New), ADA Curb Fresno Fresno 20/21 In Progress Other Palm-Olive-Broadway-Belmont Neighborhood Construction 07/2019 06/2023 7-20 31 14 Routes to School Ramp Installation (New)

This project will include: Traffic Signals, Lights, and/or Signage Installation (New Fresno Fresno 20/21 In Progress Traffic Control Devices Traffic Signal Blythe and Gates Intersection of Blythe Avenue and Gates Avenue Construction 07/2020 10/2022 20-50 23 8 Safety)

Barton and Florence Sidewalks & This project will include: Project Scope Development, Right of Way, Cost Estimating, Fresno Fresno 20/21 In Progress Match Funds Barton Ave from Florence Ave to Church Ave Pre-Construction 01/2020 07/2022 7-20 31 14 Paving Preliminary Design

Traffic Signal Left Turn Phasing This project will include: Traffic Signals, Lights, and/or Signage Installation (New Fresno Fresno 20/21 In Progress Traffic Control Devices Intersection of Hughes and Shields Avenues Construction 07/2020 09/2022 20-50 23 8 Hughes and Shields Safety)

*This list is subject to change and will be finalized upon the adoption of any jurisdiction that meets subsequent eligibility at the October 2021 Commission Meeting. Draft City Submitted - Fiscal Year 2021-22 Local Streets and Roads List of Projects *Projects listed are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1) August 19, 2021

Fiscal Year Initially Proposed Project Est Assembly Senate City County Project Type Title Description Location Components Est Start Est Useful Life Proposed Status Completion Districts Districts

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Sidewalk and/or Crosswalk Rehab/Repair (Existing), Pavement Rehab/Repair Browning-Bullard-Millbrook-Ninth Concrete repairs & paving; NB (Existing), Storm Drain and/or Culvert Rehab/Repair (Existing), ADA Curb Ramp Clovis Ave, Fancher Creek Bridge-Belmont paving; Lowe-Peach Rehab/Repair (Existing), Bicycle Lane Rehab/Repair (Existing) | All Project ID's to Villa paving; Butler-Chestnut-Dwight-Maple concrete repairs; starting with SB in Resolution 2021-174 are listed under the FY 21-22 Annual Street Warner/Herndon Frontage First-Millbrook; Audubon repaving Road Maintenance & FY 21-22 Annual Street Maintenance Program. | Santa Fe-Indianapolis-West-Tielman paving; Dakota,Hughes - Fresno Fresno 21/22 New Friant-Cole; Cedar & Shepherd Intersection repairs; Lakeview- Construction 07/2021 06/2022 7-20 23, 31 8, 14 Rehabilitation Maintenance Program Marks paving; Maroa, Sierra-Herndon paving; Alluvial-Marks-Van Ness Concrete Westshore-Eastshore Neigh concrete repairs; repair;Browning-Bullard-Prospect-Marks Concrete repair; Atchison-Delno- Bremer,Blackstone-Abby paving; Clark,McKinley-Floradora Neighborhood paving;Blythe,Weldon to Clinton paving; Jensen-Grove-Fruit-Arthur paving & concrete; First-41-Belmont-McKenzie concrete repair; Concrete repair;Jensen-Grove-Walnut-Knight Concrete repair;Blythe,McKinley - Fresno St Clinton-Shields paving Weldon paving;Sierra Vista, Dakota-Shields paving;Garland-Fedora-Sierra Vista Concrete repairs

Traffic Signals Butler/8th and This project will include: Project Scope Development, Cost Estimating, Preliminary Fresno Fresno 21/22 New Match Funds Butler and Eight; Orange and Lowe Pre-Construction 07/2019 01/2023 20-50 31 14 Orange/Lowe Design

Traffic Signal Gettysburg & Polk - This project will include: Project Scope Development, Right of Way, Cost Estimating, Fresno Fresno 21/22 New Traffic Control Devices Intersection of Gettysburg and Polk; Sidewalks Inspiration Park Pre-Construction 01/2020 09/2022 20-50 23 8 sidewalks Document Preparation, Preliminary Design

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), First St Repaving & Cycle Track, Sidewalk and/or Crosswalk Rehab/Repair (Existing), Pavement Rehab/Repair Fresno Fresno 21/22 New Match Funds First Street from Tulare to Ventura Construction 01/2020 07/2022 7-20 31 14 Tulare to Ventura (Existing), Bicycle Lane (New), Storm Drain and/or Culvert Rehab/Repair (Existing), ADA Curb Ramp Rehab/Repair (Existing)

This project will include: Traffic Signals, Lights, and/or Signage Installation (New Fresno Fresno 21/22 New Match Funds Traffic Signal Fresno & Browning Intersection of Fresno and Browning Construction 01/2019 03/2023 20-50 23 8 Safety)

Maroa/Shields/BNSF Safety This project will include: Project Scope Development, Right of Way, Cost Estimating, Fresno Fresno 21/22 New Safety Maroa and Shields near BNSF crossings Pre-Construction 07/2020 12/2023 20-50 23, 31 8 Improvements Document Preparation, Preliminary Design

Traffic Signal West & Sierra, Left This project will include: Project Scope Development, Cost Estimating, Document Fresno Fresno 21/22 New Traffic Control Devices Intersection of West and Sierra Pre-Construction 07/2020 09/2022 20-50 23 8 turn Phasing Preparation, Preliminary Design

Road Maintenance & Audubon/Lexington Intersection This project will include: Project Scope Development, Cost Estimating, Document Fresno Fresno 21/22 New Intersection of Audubon and Lexington Pre-Construction 07/2021 06/2023 20-50 23 8 Rehabilitation Improvements Preparation, Preliminary Design

*This list is subject to change and will be finalized upon the adoption of any jurisdiction that meets subsequent eligibility at the October 2021 Commission Meeting. Draft City Submitted - Fiscal Year 2021-22 Local Streets and Roads List of Projects *Projects listed are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1) August 19, 2021

Fiscal Year Initially Proposed Project Est Assembly Senate City County Project Type Title Description Location Components Est Start Est Useful Life Proposed Status Completion Districts Districts

Complete Streets Orange Ave Sidewalks, Hamilton This project will include: Project Scope Development, Document Preparation, Cost Fresno Fresno 21/22 New Orange Ave between Hamilton and Butler Pre-Construction 07/2021 06/2023 20-50 31 14 Components to Butler Estimating, Preliminary Design

Road Maintenance & M Street 2" Mill and HMA Overlay This project will include: Project Scope Development, Cost Estimating, Document Huron Fresno 19/20 In Progress M St from 9th St to 11th St Pre-Construction 01/2021 06/2021 20-25 31 12 Rehabilitation with Base Repairs Preparation, Preliminary Design, Environmental Study/Documents

This project will include: Sidewalk and/or Crosswalk Installation (New), Pavement Road Maintenance & M Street 2" Mill and HMA Overlay Huron Fresno 19/20 Carried Over Rehab/Repair (Existing), ADA Curb Ramp Installation (New), ADA Curb Ramp M St from 9th St to 11th St Construction 06/2021 12/2021 20-25 31 12 Rehabilitation with Base Repairs Rehab/Repair (Existing)

This project will include: Project Scope Development, Feasibility Study, Maintenance Road Maintenance & Second Street from California to G Street; Third Street from Kerman Fresno 21/22 New Street Rehabilitation Project 21/22 Program Plan Development, Cost Estimating, Document Preparation, Preliminary Pre-Construction 03/2022 06/2022 20-35 31 12 Rehabilitation California to Kearney Design

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), ADA Local Streets: 8TH from Stanislaus to Sunset; Middleton & Road Maintenance & Kerman Fresno 19/20 Carried Over Street overlay Project 20/21 Curb Ramp Installation (New), Paving and/or Striping Installation (New Safety), ADA Sunset from 6th to 8th; C Street from 9th to 11th; 10th South of C Construction 07/2021 10/2021 20-35 31 12 Rehabilitation Curb Ramp Rehab/Repair (Existing) Street; 11th South of D; 12th from D to California.

Road Maintenance & This project will include: Pavement Rehab/Repair (Existing), Document Preparation, Pre-Construction and 07/2021 12/2021 Kingsburg Fresno 21/22 New Nevada Street Reconstruction Nevada Street - 6th to 10th 10-15 31 12 Rehabilitation Cost Estimating, Preliminary Design Construction 03/2022 06/2022

This project will include: Sidewalk and/or Crosswalk Rehab/Repair (Existing), Pavement Rehab/Repair (Existing), Paving and/or Striping Installation (New Safety), ADA Curb Ramp Rehab/Repair (Existing) | In general, the project consists of Road Maintenance & Fleming & McCabe Avenue reconstruction of the three streets between Rowe Avenue and Sorensen Avenue, Flemming Avenue from Rowe Avenue to Sorensen Avenue, and Mendota Fresno 19/20 Forecasted Construction 07/2024 11/2024 15-30 31 12 Rehabilitation Reconstruction including demolition of existing asphalt and concrete pavements, Full Depth McCabe Avenue from Rowe Avenue to Sorensen Avenue Reclamation soil-cement treatment, new HMA pavement, curbs, gutters, ramps, driveway approaches, and traffic striping and markings to add center lane lines, parking/bike lanes and high visibility school zone cross walks.

This project will include: Sidewalk and/or Crosswalk Installation (New) | Improving the 1) SR33 between Bass Avenue and SR 180; 2) 9th Street Citywide Railroad Corridor railroad corridor within the city by adding concrete panels to at-grade crossings, Mendota Fresno 20/21 Carried Over Safety between Marie St and Naples St; and 3) W Belmont Ave between Construction 06/2022 09/2022 15-50 31 12 Crossing Improvements installing medians or channelizers, and reconstruction of the roadway adjacent to Marie St and SR 180. crossings at all three crossings within the City

*This list is subject to change and will be finalized upon the adoption of any jurisdiction that meets subsequent eligibility at the October 2021 Commission Meeting. Draft City Submitted - Fiscal Year 2021-22 Local Streets and Roads List of Projects *Projects listed are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1) August 19, 2021

Fiscal Year Initially Proposed Project Est Assembly Senate City County Project Type Title Description Location Components Est Start Est Useful Life Proposed Status Completion Districts Districts

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Road Maintenance & Mendota Fresno 19/20 Forecasted Pavement Rehab/Repair (Existing) | In general, the project consists of grind and 7th Street from Stamoules Street to Tule Street Construction 07/2023 11/2023 10-20 32 12 Rehabilitation overlay of 7th Street between Stamoules Street and Rio Frio Street

This project will include: Sidewalk and/or Crosswalk Rehab/Repair (Existing), ADA Curb Ramp Installation (New), Pavement Rehab/Repair (Existing), ADA Curb Ramp Rehab/Repair (Existing) | In general, the project consists of reconstruction of 5th Road Maintenance & 5th Street and Quince Street Street from Quince to Derrick Avenue (State Route 33) and Quince Street from 5th 5th Street Derrick Avenue (SR 33), and Quince Street from 5th Mendota Fresno 20/21 Forecasted Construction 07/2023 11/2023 15-30 31 12 Rehabilitation Reconstruction Street to 6th Street, including demolition of existing asphalt and concrete pavements, Street to 6th Street Full Depth Reclamation soil-cement treatment, new HMA pavement, curbs, gutters, ramps, driveway and alley approaches, and traffic striping and markings to add two way left turn lanes, parking/bike lanes and high visibility school zone cross walks.

This project will include: Sidewalk and/or Crosswalk Rehab/Repair (Existing), Pavement Rehab/Repair (Existing), ADA Curb Ramp Installation (New), ADA Curb Ramp Rehab/Repair (Existing) | In general, the project consists of reconstruction of Road Maintenance & Marie Street & 5th Street Marie Street between Divisadero Street and 5th Street and 5th Street betwee Marie Marie Street from Divisadero Street to 5th Street, and 5th Street Mendota Fresno 19/20 Forecasted Construction 07/2025 11/2025 15-30 31 12 Rehabilitation Reconstruction Street and Lolita Street, including demolition of existing asphalt and concrete from Marie Street to Lolita Street pavements, Full Depth Reclamation soil-cement treatment, new HMA pavement, curbs, gutters, ramps, and traffic striping and markings to add center lane line and parking/bike lanes.

This project will include: Pavement Rehab/Repair (Existing) | In general, the project consists of reconstruction of Rio Frio Street between 7th Street and 8th Street, Road Maintenance & Mendota Fresno 19/20 Forecasted Rio Frio Street Reconstruction including demolition of existing asphalt and concrete pavements, Full Depth Rio Frio Street from 7th Street to 8th Street Construction 07/2022 11/2022 15-30 31 12 Rehabilitation Reclamation soil-cement treatment, new HMA pavement, curbs, gutters, ramps, and traffic striping and markings to add two way left turn lanes and parking/bike lanes.

This project will include: Storm Drain/Culvert Installation (New), Pavement Rehab/Repair (Existing), Paving and/or Striping Installation (New Safety) | In general, the project consists of reconstruction of Naples Street between 2nd Street and 9th Road Maintenance & Mendota Fresno 19/20 Forecasted Naples Street Reconstruction Street, including demolition of existing asphalt and concrete pavements, storm drain Naples Street from 2nd Street to 9th Street Construction 06/2025 11/2025 15-30 31 12 Rehabilitation inlets, manholes and pipes, Full Depth Reclamation soil-cement treatment, new HMA pavement, curbs, gutters, ramps, and traffic striping and markings to add two way left turn lanes and parking/bike lanes.

This project will include: Pavement Rehab/Repair (Existing), Paving and/or Striping Installation (New Safety), ADA Curb Ramp Rehab/Repair (Existing) | In general, the Road Maintenance & project consists of reconstruction of North Kate Street between Divisadero Street and I Mendota Fresno 19/20 Forecasted Kate Street Reconstruction North Kate Street between Divisadero Street and I Street Construction 07/2025 11/2025 15-30 31 12 Rehabilitation Street, including demolition of existing asphalt and concrete pavements, Full Depth Reclamation soil-cement treatment, new HMA pavement, curbs, gutters, ramps, and traffic striping and markings to add center lane line and parking/bike lanes.

This project will include: Sidewalk and/or Crosswalk Rehab/Repair (Existing), Pavement Rehab/Repair (Existing), Paving and/or Striping Installation (New Safety), ADA Curb Ramp Rehab/Repair (Existing) | In general, the project consists of Road Maintenance & Mendota Fresno 19/20 Forecasted Stamoules Street Reconstruction reconstruction of Stamoules Street between 7th Street and 9th Street, including Stamoules Street from 7th Street to 9th Street Construction 07/2022 11/2022 15-30 31 12 Rehabilitation demolition of existing asphalt and concrete pavements, Full Depth Reclamation soil- cement treatment, new HMA pavement, curbs, gutters, ramps, and traffic striping and markings to add two way left turn lanes and parking/bike lanes.

This project will include: Pavement Rehab/Repair (Existing), ADA Curb Ramp Road Maintenance & Parlier Fresno 21/22 New Tuolumne Street Reconstruction Rehab/Repair (Existing) | Reconstruction of asphalt pavement, construction of Tuolumne Street between K Street and Bigger Street Construction 02/2022 08/2022 25-30 31 14 Rehabilitation compliant curb ramps and associated infrastructure.

*This list is subject to change and will be finalized upon the adoption of any jurisdiction that meets subsequent eligibility at the October 2021 Commission Meeting. Draft City Submitted - Fiscal Year 2021-22 Local Streets and Roads List of Projects *Projects listed are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1) August 19, 2021

Fiscal Year Initially Proposed Project Est Assembly Senate City County Project Type Title Description Location Components Est Start Est Useful Life Proposed Status Completion Districts Districts

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Sidewalk and/or Crosswalk Rehab/Repair (Existing), Pavement Rehab/Repair Road Maintenance & Alphabet Streets (A & E) Alphabet Streets (A through E) Floral Avenue to Rose Avenue in Pre-Construction and 06/2021 01/2022 Selma Fresno 19/20 Carried Over (Existing), Cost Estimating, Storm Drain and/or Culvert Rehab/Repair (Existing), ADA 20-25 31 14 Rehabilitation Reconstruction Project Selma, CA Construction 02/2022 06/2022 Curb Ramp Rehab/Repair (Existing) | Reconstruct and rehabilitate, upgrade ramps to current ADA standards, replace/add sidewalk where missing

Clovis Avenue Street Road Maintenance & This project will include: Pavement Rehab/Repair (Existing), Document Preparation, Pre-Construction and 06/2021 05/2022 Clovis Fresno 21/22 New Improvements from Shepherd to Clovis Avenue from Shepherd Avenue to Teague Avenue 7-20 23 8 Rehabilitation Preliminary Design Construction 06/2022 08/2022 Teague Avenue

Ashlan Avenue Street Road Maintenance & This project will include: Pavement Rehab/Repair (Existing), Document Preparation, Pre-Construction and 06/2021 08/2022 Clovis Fresno 21/22 New Improvements from DeWolf to Ashlan Avenue from DeWolf Avenue to Locan Avenue 7-20 23 8 Rehabilitation Preliminary Design Construction 06/2023 08/2023 Locan Avenue

Barstow Avenue Street Road Maintenance & This project will include: Pavement Rehab/Repair (Existing), Document Preparation, Pre-Construction and 06/2021 08/2022 Clovis Fresno 21/22 New Improvements from Villa to Barstow Avenue from Villa Avenue to Minnewawa Avenue 7-20 23 8 Rehabilitation Preliminary Design Construction 07/2023 09/2023 Minnewawa Avenue

Armstrong Avenue Street Road Maintenance & Clovis Fresno 19/20 In Progress Improvements from Tollhouse to This project will include: Document Preparation Armstrong Avenue from Tollhouse Avenue to Sierra Avenue Pre-Construction 09/2019 10/2021 7-20 23 8 Rehabilitation Sierra Avenues

Armstrong Avenue Street Road Maintenance & Clovis Fresno 19/20 Carried Over Improvements from Tollhouse to This project will include: Pavement Rehab/Repair (Existing) Armstrong Avenue from Tollhouse Avenue to Sierra Avenue Construction 10/2021 11/2021 7-20 23 8 Rehabilitation Sierra Avenues

Gettysburg Avenue Street Road Maintenance & Clovis Fresno 19/20 In Progress Improvements from Sierra Vista This project will include: Document Preparation Gettysburg Avenue from Sierra Vista Parkway to Clovis Avenue Pre-Construction 09/2019 10/2021 7-20 23 8 Rehabilitation Parkway to Clovis Avenue

Gettysburg Avenue Street Road Maintenance & Clovis Fresno 19/20 Carried Over Improvements from Sierra Vista This project will include: Pavement Rehab/Repair (Existing) Gettysburg Avenue from Sierra Vista Parkway to Clovis Avenue Construction 10/2021 11/2021 7-20 23 8 Rehabilitation Parkway to Clovis Avenue

Bullard Avenue Street Road Maintenance & Clovis Fresno 19/20 In Progress Improvements from Armstrong to This project will include: Document Preparation Bullard Avenue from Armstrong Avenue to Temperance Avenue Pre-Construction 09/2019 10/2021 7-20 23 8 Rehabilitation Temperance Avenues

*This list is subject to change and will be finalized upon the adoption of any jurisdiction that meets subsequent eligibility at the October 2021 Commission Meeting. Draft City Submitted - Fiscal Year 2021-22 Local Streets and Roads List of Projects *Projects listed are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1) August 19, 2021

Fiscal Year Initially Proposed Project Est Assembly Senate City County Project Type Title Description Location Components Est Start Est Useful Life Proposed Status Completion Districts Districts

Bullard Avenue Street Road Maintenance & Clovis Fresno 19/20 Carried Over Improvements from Armstrong to This project will include: Pavement Rehab/Repair (Existing) Bullard Avenue from Armstrong Avenue to Temperance Avenue Construction 05/2022 07/2022 7-20 23 8 Rehabilitation Temperance Avenues

This project will include: Sidewalk and/or Crosswalk Installation (New), Paving and/or Striping Rehab/Repair (Existing Safety), Sidewalk and/or Crosswalk Rehab/Repair (Existing), ADA Curb Ramp Installation (New), Bicycle Lane (New), Storm Drain and/or Culvert Rehab/Repair (Existing) | Installation of curb and gutter, sidewalks, curb ramps Road Maintenance & Sunset Street Rehabilitation Coalinga Fresno 19/20 In Progress to comply with Americans with Disabilities Act requirements, driveway approaches, Sunset Street from Polk Street to Washington Street Construction 03/2020 07/2021 15-20 31 12 Rehabilitation Project (Phase 1) alley approaches, valley gutters, A.C. pavement, aggregate base, storm drain laterals, storm drain inlets, LED street lights, electrical conduit, electrical wire, pull boxes, crosswalks, traffic striping and markings, traffic signage, bike lane striping, existing utility lid adjustment, street tree removal or trimming and construction surveying

This project will include: Pavement Improvement (New), Sidewalk and/or Crosswalk Rehab/Repair (Existing), Landscape Safety Rehab/Repair (Existing), ADA Curb Ramp Road Maintenance & Rehab/Repair (Existing) | Installation of curb and gutter, sidewalks, curb ramps to Coalinga Fresno 21/22 New Fresno Street Reconstruction Fresno Street Between Washington and Harvard Street Construction 09/2021 12/2021 15-20 31 12 Rehabilitation comply with Americans with Disabilities Act requirements, driveway approaches, alley approaches, A.C. pavement, aggregate base, existing utility lid adjustment, street tree removal/installation or trimming, construction surveying and landscaping.

This project will include: Sidewalk and/or Crosswalk Rehab/Repair (Existing), Pavement Rehab/Repair (Existing), Landscape Safety Rehab/Repair (Existing), Paving and/or Striping Installation (New Safety), ADA Curb Ramp Rehab/Repair Road Maintenance & (Existing) | Installation of curb and gutter, sidewalks, curb ramps to comply with Coalinga Fresno 21/22 New 7th Street Reconstruction 7th Street between Forest and Elm Ave/SR198 Construction 05/2021 08/2021 15-25 31 12 Rehabilitation Americans with Disabilities Act requirements, driveway approaches, street tree installation, irrigation, alley approaches, A.C. pavement, aggregate base, traffic striping and markings, traffic signage, existing utility lid adjustment, street tree removal or trimming, construction surveying and landscaping.

Road Maintenance & This project will include: Pavement Rehab/Repair (Existing), Document Preparation, In the City of Firebaugh between O Street and Bridge over the Pre-Construction and 07/2021 08/2021 Firebaugh Fresno 21/22 New 13th Street Rehabilitation 10-20 31 12 Rehabilitation Preliminary Design | Roadway rehabilitation San Joaquin River Construction 09/2021 08/2022

Road Maintenance & This project will include: Pavement Rehab/Repair (Existing), Document Preparation, Pre-Construction and 07/2021 08/2021 Firebaugh Fresno 21/22 New 12th Street Rehabilitation In the City of Firebaugh between Washoe Ave and M Street 10-20 31 12 Rehabilitation Preliminary Design | Roadway rehabilitation Construction 09/2021 08/2022

Road Maintenance & Fowler Fresno 21/22 New Fresno Street Rehabilitation This project will include: Pavement Rehab/Repair (Existing) Fresno Street - 5th to 7th Construction 03/2022 06/2022 10-15 31 12 Rehabilitation

Citywide Street Sweeper Program Road Maintenance & This project will include: Public Works Staffing, Repair and Servicing of Public Works Citywide, the street sweeper services all streets within the City's Procurement/Operatio Orange Cove Fresno 21/22 New Annual Operation and 07/2021 06/2022 1-5 31 14 Rehabilitation Equipment | Includes the cost of gas that will be used to operate the street sweeper. service area nal Needs Maintenance

*This list is subject to change and will be finalized upon the adoption of any jurisdiction that meets subsequent eligibility at the October 2021 Commission Meeting. Draft City Submitted - Fiscal Year 2021-22 Local Streets and Roads List of Projects *Projects listed are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1) August 19, 2021

Fiscal Year Initially Proposed Project Est Assembly Senate City County Project Type Title Description Location Components Est Start Est Useful Life Proposed Status Completion Districts Districts

This project will include: Sidewalk and/or Crosswalk Installation (New), ADA Curb G Street Pedestrian Sidewalk and Ramp Installation (New), Document Preparation, Cost Estimating, Traffic Signals, Pre-Construction and 08/2021 02/2022 Orange Cove Fresno 21/22 New Safety North side of G Street, between 6th Street and 5th Street. 20-30 31 14 Curb and Gutter Lights, and/or Signage Rehab/Repair (Existing Safety) | Construction of curb and Construction 03/2022 06/2022 gutter, and concrete driveway approaches.

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Sidewalk and/or Crosswalk Rehab/Repair (Existing), Pavement Rehab/Repair Road Maintenance & (Existing), Cost Estimating, Document Preparation, Storm Drain and/or Culvert In the City of Reedley on 11th Street between Reed Avenue and Pre-Construction and 02/2022 02/2023 Reedley Fresno 21/22 New 11th Street Improvements 10-15 31 14 Rehabilitation Rehab/Repair (Existing), Preliminary Design, Traffic Signals, Lights, and/or Signage East Avenue Construction 04/2023 08/2023 Rehab/Repair (Existing Safety), Environmental Study/Documents, ADA Curb Ramp Rehab/Repair (Existing)

Road Maintenance & This project will include: Document Preparation, Preliminary Design | Roadway Pre-Construction and 07/2023 08/2023 San Joaquin Fresno 19/20 Forecasted Idaho Avenue Reconstruction In the City of San Joaquin between 9th Street and Main Street. 10-20 31 12 Rehabilitation reconstruction Construction 09/2023 08/2024

Road Maintenance & This project will include: Pavement Rehab/Repair (Existing), Document Preparation, In the City of San Joaquin between 9th Pre-Construction and 07/2022 08/2022 San Joaquin Fresno 20/21 Forecasted Nevada Avenue Overlay 10-20 31 12 Rehabilitation Preliminary Design | Roadway overlay Street and Main Street. Construction 09/2022 08/2023

Road Maintenance & This project will include: Pavement Rehab/Repair (Existing), Document Preparation, In the City of San Joaquin between 5th Pre-Construction and 07/2022 08/2022 San Joaquin Fresno 20/21 Forecasted Nevada Avenue Overlay 10-20 31 12 Rehabilitation Preliminary Design | Roadway overlay Street and 8th Street. Construction 09/2022 08/2023

At various locations in the City of San Joaquin; First St from to Annabella Annabella from Helm to 4th St Helm from Colorado to California Road Maintenance & This project will include: Document Preparation, Preliminary Design | Roadway crack Pre-Construction and 07/2021 08/2021 San Joaquin Fresno 19/20 Carried Over Roadway Sealing Project 2nd St from Annabella to Helm 5-10 31 12 Rehabilitation sealing and slurry sealing. Construction 09/2021 08/2022 3rd St from Annabella to Helm 1st St Court 2nd St Court 4th St from Annabella to West Nevada

Road Maintenance & This project will include: Pavement Rehab/Repair (Existing), Document Preparation, In the City of San Joaquin Between Colorado Avenue and Pre-Construction and 07/2022 08/2022 San Joaquin Fresno 19/20 Forecasted 6th Street Repairs Project 10-20 31 12 Rehabilitation Preliminary Design | Roadway reconstruction Nevada Avenue. Construction 09/2021 08/2023

Road Maintenance & This project will include: Pavement Rehab/Repair (Existing), Document Preparation, Pre-Construction and 07/2025 08/2025 San Joaquin Fresno 19/20 Forecasted Oregon Avenue Reconstruction In the City of San Joaquin Between 9th Street and Pine Street. 10-20 31 12 Rehabilitation Preliminary Design | Roadway reconstruction Construction 09/2025 08/2026

Road Maintenance & This project will include: Pavement Rehab/Repair (Existing), Document Preparation, In the City of San Joaquin between Manning Ave and Railroad Pre-Construction and 07/2021 08/2021 San Joaquin Fresno 21/22 New Sutter Avenue Reconstruction 10-20 31 12 Rehabilitation Preliminary Design | Roadway reconstruction Street Construction 09/2021 08/2022

*This list is subject to change and will be finalized upon the adoption of any jurisdiction that meets subsequent eligibility at the October 2021 Commission Meeting. Draft City Submitted - Fiscal Year 2021-22 Local Streets and Roads List of Projects *Projects listed are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1) August 19, 2021

Fiscal Year Initially Proposed Project Est Assembly Senate City County Project Type Title Description Location Components Est Start Est Useful Life Proposed Status Completion Districts Districts

Road Maintenance & Lyon Ave Reconstruction - 9th St Sanger Fresno 20/21 Carried Over This project will include: Pavement Rehab/Repair (Existing) 9th Street to Webster Ave. Construction 07/2021 10/2021 25-30 31 14 Rehabilitation to Webster Ave

Various locations which will be determined during the engineering design phase which is what is being funded by Road Maintenance & Sanger Fresno 20/21 Carried Over 2021 Street Sealing Project This project will include: Cost Estimating RMRA . Only certain streets qualify for this type of preventative Pre-Construction 08/2021 10/2021 10-15 31 14 Rehabilitation maintenance, and the City will expend its typical allocation of street revenues for this project.

Road Maintenance & Cherry Avenue Reconstruction - This project will include: Pavement Rehab/Repair (Existing), ADA Curb Ramp Sanger Fresno 20/21 Carried Over Cherry Avenue between Bethel and Greenwood Construction 06/2021 10/2021 25-30 31 14 Rehabilitation Bethel to Greenwood Rehab/Repair (Existing)

Road Maintenance & North Avenue Reconstruction - This project will include: Right of Way, Cost Estimating, Document Preparation, Sanger Fresno 20/21 Carried Over North Avenue between Academy and Faller Avenues Pre-Construction 06/2021 04/2022 25-30 31 14 Rehabilitation Academy to Faller Environmental Study/Documents

Road Maintenance & O Street Reconstruction - 10th This project will include: Cost Estimating, Document Preparation, Environmental Sanger Fresno 20/21 Carried Over O Street between 10th Street and North Avenue Pre-Construction 07/2021 04/2022 25-30 31 14 Rehabilitation Street to North Avenue Study/Documents

Downtown area bordered by Walker Street to the north, Colusa Road Maintenance & Downtown Commerical Routes This project will include: Pavement Rehab/Repair (Existing), ADA Curb Ramp Orland Glenn 19/20 Completed Street to the south, Sixth Street to the west and Third Street to Construction 08/2020 12/2020 15-20 3 4 Rehabilitation Repair Rehab/Repair (Existing) the east

Road Maintenance & Plans for Rehabilitation of Road This project will include: Project Scope Development, Cost Estimating, Document Orland Glenn 21/22 New Road M1/2 from State Route 32 to Bryant Street Pre-Construction 08/2021 12/2022 1-1 3 4 Rehabilitation M1/2 Preparation

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Road Maintenance & Sidewalk and/or Crosswalk Rehab/Repair (Existing), Pavement Rehab/Repair Orland Glenn 20/21 Forecasted Shasta Street Improvements Portion of Shasta Street between Papst Avenue and Sixth Street. Construction 10/2021 10/2022 15-20 3 4 Rehabilitation (Existing), ADA Curb Ramp Installation (New), ADA Curb Ramp Rehab/Repair (Existing)

This project will include: Sidewalk and/or Crosswalk Rehab/Repair (Existing), ADA Road Maintenance & North Lassen Street Rehabilitation Willows Glenn 20/21 Carried Over Curb Ramp Installation (New), Pavement Rehab/Repair (Existing), ADA Curb Ramp Lassen Street from Sycamore Street to Wood Street Construction 04/2022 07/2022 20-30 3 4 Rehabilitation Project Rehab/Repair (Existing)

*This list is subject to change and will be finalized upon the adoption of any jurisdiction that meets subsequent eligibility at the October 2021 Commission Meeting. Draft City Submitted - Fiscal Year 2021-22 Local Streets and Roads List of Projects *Projects listed are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1) August 19, 2021

Fiscal Year Initially Proposed Project Est Assembly Senate City County Project Type Title Description Location Components Est Start Est Useful Life Proposed Status Completion Districts Districts

Road Maintenance & 2022 Trinidad Pavement This project will include: Pavement Rehab/Repair (Existing) | Replace asphalt Edwards Street from Galindo Street to Bay Street; Trinity Street, Trinidad Humboldt 21/22 New Construction 06/2022 10/2022 10-20 2 2 Rehabilitation Rehabilitation Project concrete surfacing, slurry seal, pavement markings and striping. Main Street.

This project will purchase a CMS sign that will be used Changeable Message Sign Safety This project will include: Procurement of Public Works Equipment | Purchasing a CMS Procurement/Operatio Arcata Humboldt 21/22 New Traffic Control Devices throughout the City. Use will include setting up the CMS during 07/2021 12/2022 8-10 2 2 Improvement sign that can be used to improve safety nal Needs construction or events that may impact traffic.

Road Maintenance & Paving G Street between 12th and Arcata Humboldt 21/22 New This project will include: Pavement Rehab/Repair (Existing) Portion of G Street between 12th Street and 18th Street Construction 07/2021 10/2022 18-20 2 2 Rehabilitation 18th Street (Thin AC Overlay)

Road Maintenance & This project will include: Public Works Staffing | General Maintenance. Repair various Procurement/Operatio Blue Lake Humboldt 21/22 New North Field Terrace Project Acacia Drive and Park Avenue 09/2021 06/2022 2-3 2 2 Rehabilitation sections of roadway along Acacia Drive and Park Ave. nal Needs

Road Maintenance & This project will include: Public Works Staffing | General Maintenance. Painting of Procurement/Operatio Blue Lake Humboldt 21/22 New FY 2021-22 Street Painting H Street, Greenwood Road, 1st Street, Railroad Avenue 08/2021 06/2022 2-3 2 2 Rehabilitation various streets, curbs, and stop bars. nal Needs

Road Maintenance & This project will include: Public Works Staffing | General Maintenance. Fill potholes in Procurement/Operatio Blue Lake Humboldt 21/22 New FY 2021-22 Pothole Repair C Street, South Railroad, Railroad Avenue, Raymar Avenue 09/2021 06/2022 2-3 2 2 Rehabilitation various locations. nal Needs

Road Maintenance & FY 2021-22 Drainage This project will include: Public Works Staffing | General Maintenance. Scrape and Procurement/Operatio Blue Lake Humboldt 21/22 New Railroad Avenue, Park Avenue and Acacia Drive 09/2021 06/2022 2-3 2 2 Rehabilitation Improvements repair various drainage gutters. nal Needs

Road Maintenance & This project will include: Sidewalk and/or Crosswalk Rehab/Repair (Existing), Including Washington Street from Waterfront Drive to Broadway, Eureka Humboldt 21/22 New Pavement Rehabilitation 2022 Construction 05/2022 10/2022 15-20 2 2 Rehabilitation Pavement Rehab/Repair (Existing), ADA Curb Ramp Rehab/Repair (Existing) and E Street from Harris Street to City Limits South.

Road Maintenance & Washington and Berding Street This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Intersection of Washington Street and Berding Street in Ferndale Ferndale Humboldt 21/22 Carried Over Construction 07/2021 06/2022 20-100 2 2 Rehabilitation Intersection Improvements Pavement Rehab/Repair (Existing) CA

*This list is subject to change and will be finalized upon the adoption of any jurisdiction that meets subsequent eligibility at the October 2021 Commission Meeting. Draft City Submitted - Fiscal Year 2021-22 Local Streets and Roads List of Projects *Projects listed are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1) August 19, 2021

Fiscal Year Initially Proposed Project Est Assembly Senate City County Project Type Title Description Location Components Est Start Est Useful Life Proposed Status Completion Districts Districts

Road Maintenance & Brown and Berding Street This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Ferndale Humboldt 21/22 New Intersection of Brown and Berding in Ferndale CA Construction 07/2021 06/2022 20-100 2 2 Rehabilitation Intersection Improvements Pavement Rehab/Repair (Existing)

Road Maintenance & Riverwalk Drive Rehabilitation This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Riverwalk Drive between Dinsmore Drive and overlook at "S" Fortuna Humboldt 19/20 Carried Over Construction 07/2021 06/2022 10-20 2 2 Rehabilitation Project Pavement Rehab/Repair (Existing) curve

This project will include: Procurement of Public Works Safety Materials and Gear, Rio Dell General Road City wide maintenance and rehab on portions of Eeloa Ave, Road Maintenance & Procurement of Public Works Equipment, Procurement of Road Maintenance and Procurement/Operatio Rio Dell Humboldt 21/22 New Maintenance and Repairs FY 2021- Dixie, Butcher, Painter, Townsend, Spring and River Streets, Rio 07/2021 06/2022 3-10 2 2 Rehabilitation Rehab Materials, Public Works Staffing, Repair and Servicing of Public Works nal Needs 22 Dell Ave, Ogle Ave and Miller Court Equipment | May include contracted road maintenance

Road Maintenance & This project will include: Pavement Rehab/Repair (Existing), Traffic Signals, Lights, Pre-Construction and 07/2021 10/2021 Calipatria Imperial 21/22 New Delta Street Rehabilitation Project Delta Street between Industrial Avenue and North Brown Avenue 10-20 56 40 Rehabilitation and/or Signage Installation (New Safety), Preliminary Design Construction 11/2021 06/2022

Road Maintenance & This project will include: Sidewalk and/or Crosswalk Installation (New), Pavement Holtville Imperial 21/22 New Ninth Street Improvements Project Ninth Street between Olive and Melon Avenues Construction 12/2021 08/2022 20-25 56 40 Rehabilitation Rehab/Repair (Existing)

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing), ADA Curb Ramp Rehab/Repair (Existing) | City of Westmorland is proceeding with a project for the design and installation of Road Maintenance & Streets Rehabilitation Program C Street from Main Street to 7th Street, D Street from 5th St to Westmorland Imperial 19/20 Completed conventional asphalt with an asphaltic rubberized aggregate membrane. The selected Construction 10/2018 12/2018 12-15 56 40 Rehabilitation Phase 2 6th St and J Street from 7th St to 8th St. streets have been in conjunction with the Pavement Management Study. The City of Westmorland has completed construction and installation of asphaltic rubberized aggregate membrane on the selected streets. Signage.

Road Maintenance & 3rd Street from A Street to River Brawley Imperial 21/22 New This project will include: Pavement Rehab/Repair (Existing) 3rd Street from A Street to River Drive Construction 05/2022 06/2022 10-15 56 40 Rehabilitation Drive

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing) | The project will consist of grinding of existing Road Maintenance & asphalt concrete pavement, installation of conventional asphalt concrete leveling Calexico Imperial 20/21 Carried Over Scaroni Road Improvement Project Scaroni Road between Highway 98 and Cole Blvd. Construction 10/2021 09/2022 10-20 56 40 Rehabilitation course, asphalt-rubber aggregate membrane, gap graded asphalt-rubber hot mix, installation of conventional asphalt concrete surface course, slurry seal, installation of curb, gutter and sidewalk, traffic striping, utility adjustments and traffic control

*This list is subject to change and will be finalized upon the adoption of any jurisdiction that meets subsequent eligibility at the October 2021 Commission Meeting. Draft City Submitted - Fiscal Year 2021-22 Local Streets and Roads List of Projects *Projects listed are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1) August 19, 2021

Fiscal Year Initially Proposed Project Est Assembly Senate City County Project Type Title Description Location Components Est Start Est Useful Life Proposed Status Completion Districts Districts

Road Maintenance & Calexico Imperial 20/21 Carried Over Weakley Road Improvements This project will include: Pavement Improvement (New) Weakley Road between Scaroni Road and Portico Boulevard Construction 06/2021 09/2022 10-20 56 40 Rehabilitation

Road Maintenance & Purchase of Aggregate/Asphalt Procurement/Operatio Calexico Imperial 21/22 New This project will include: Procurement of Road Maintenance and Rehab Materials Various locations within City limits 07/2021 06/2022 5-10 56 40 Rehabilitation Material for Miscellaneous Repairs nal Needs

Miscellaneous Concrete/ADA Curb Procurement/Operatio Calexico Imperial 21/22 New Safety This project will include: Procurement of Road Maintenance and Rehab Materials Various locations within City limits 07/2021 06/2022 20-30 56 40 Repair nal Needs

Road Maintenance & Pothole Patching and Road Procurement/Operatio Calexico Imperial 21/22 New This project will include: Procurement of Road Maintenance and Rehab Materials Various locations within City limits 07/2021 06/2022 5-10 56 40 Rehabilitation Repairs nal Needs

Road Maintenance & This project will include: Pavement Rehab/Repair (Existing) | The project will consist of Calexico Imperial 19/20 Carried Over Second Street Bridge Widening Second Street Bridge Construction 01/2022 09/2022 20-30 56 40 Rehabilitation widening and improving Second Street bridge

Ross Ave. from La Brucherie Ave. to Imperial Ave. & from 8th St. Ross Avenue & Euclid Avenue Road Maintenance & to 4th St. El Centro Imperial 21/22 New Rehabilitation and Maintenance This project will include: Pavement Rehab/Repair (Existing) Construction 03/2022 09/2022 15-25 56 40 Rehabilitation Euclid Avenue from La Brucherie Avenue to Imperial Avenue Project and from 4th St. to 5th St.

This project will include: Pavement Improvement (New), Sidewalk and/or Crosswalk Installation (New), Paving and/or Striping Rehab/Repair (Existing Safety), Storm Drain/Culvert Installation (New), Sidewalk and/or Crosswalk Rehab/Repair (Existing), Road Maintenance & La Brucherie Road Widening Imperial Imperial 20/21 Carried Over ADA Curb Ramp Installation (New), Pavement Rehab/Repair (Existing), Paving and/or La Brucherie Road from Aten Boulevard to South City Limits Construction 10/2021 01/2022 25-30 56 40 Rehabilitation Project Striping Installation (New Safety), Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), ADA Curb Ramp Rehab/Repair (Existing) | Increasing from a 2-lane to a 4-lane Roadway configuration.

Bishop Inyo 21/22 Carried Over Safety Park Avenue Sidewalk This project will include: Sidewalk and/or Crosswalk Installation (New) Park Avenue, adjacent to ball field Construction 10/2021 12/2021 50-100 26 8

This project will include: Sidewalk and/or Crosswalk Installation (New), ADA Curb City of Bishop Downtown Streets Bishop Inyo 21/22 New Safety Ramp Installation (New), Pavement Rehab/Repair (Existing), Bicycle Lane (New), South Warren Street and Lagoon Streets Construction 11/2021 05/2022 50-100 26 8 and Sidewalk Improvements Landscape Safety Installation (New)

*This list is subject to change and will be finalized upon the adoption of any jurisdiction that meets subsequent eligibility at the October 2021 Commission Meeting. Draft City Submitted - Fiscal Year 2021-22 Local Streets and Roads List of Projects *Projects listed are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1) August 19, 2021

Fiscal Year Initially Proposed Project Est Assembly Senate City County Project Type Title Description Location Components Est Start Est Useful Life Proposed Status Completion Districts Districts

Road Maintenance & This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Plumtree Drive between SR-223(Bear Mountain Blvd.) and Arvin Kern 21/22 New Plumtree Street Microsurfacing Construction 01/2022 08/2022 5-10 32 21 Rehabilitation Pavement Rehab/Repair (Existing) Orchard Drive

17th Avenue between Ellington and Belmont; 19th Ave between High St and Inyo; 18th Ave between Ellington St and Belmont; W 19th Ave between Alley way and Belmont; Borel St between This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Cecil and W 15th; Dover Place between Cecil and 14th Ave; Road Maintenance & 2021-22 SB1 LSR Pavement Delano Kern 21/22 New Sidewalk and/or Crosswalk Rehab/Repair (Existing), Pavement Rehab/Repair Dover between 17th and 20th Ave; Dover between Cecil and Construction 10/2021 11/2022 5-10 32 14 Rehabilitation Repair Project (Existing) 14th Ave; Inyo St between Cecil and 19th Ave; Kalibo between 23rd and Co. Ln Rd; Madison between Cecil & 18th; Princeton St between 9th & Tokay; Rounds St between 20th & Cul-de-sac; W 19th Ave & W 19th Pl

This project will include: Pavement Rehab/Repair (Existing) | Crack Fill and Slurry Seal Road Maintenance & Street Improvement Project FY South Kern Street, Thornton Street, Union Street, Adeline Street, Maricopa Kern 19/20 Carried Over 8800 +/- square yards of residential streets within the city of Maricopa. Construction Construction 09/2022 10/2022 5-10 34 16 Rehabilitation 2021-22 Mary Street, Broadway Street, Helen Street, and Bush Street. may start and end in 10/2022.

Road Maintenance & 2nd Street from W. Kern Avenue to This project will include: Street improvments including, curb, gutter, sidewalk, curb McFarland Kern 20/21 Carried Over 2nd Street from W. Kern Avenue to California Avenuw Construction 12/2021 12/2022 10-20 32 18 Rehabilitation California Avenue ramps, drive approaches, street lights, benches, and trash recepticales

This project will include: ADA Curb Ramp Installation (New), Preliminary Design, Road Maintenance & W. Kern Avenue from 5th Street to Pre-Construction and 11/2021 02/2022 McFarland Kern 20/21 Carried Over Paving and/or Striping Installation (New Safety) | Road Repavement and Pedestrian W. Kern Avenue from 5th Street to Garzoli Road 10-20 32 18 Rehabilitation Garzoli Road Construction 05/2022 08/2022 Improvements.

Road Maintenance & Davis Road from Elmo Hwy to W. This project will include: Project Scope Development, Pavement Rehab/Repair Pre-Construction and 03/2022 06/2022 McFarland Kern 20/21 Carried Over Davis Road from Elmo Hwy to W. Perkins Avenue 10-20 32 18 Rehabilitation Perkins Avenue (Existing), Preliminary Design | Road Repavement and Pedestriam Improvements Construction 06/2022 08/2022

Road Maintenance & 6th Street From West Sherwood This project will include: Project Scope Development, Pavement Rehab/Repair Pre-Construction and 09/2021 12/2021 McFarland Kern 21/22 New 6th Street From West Sherwood to Robertson 10-20 32 14 Rehabilitation Ave. to Robertson Ave. (Existing), Preliminary Design, ADA Curb Ramp Rehab/Repair (Existing) Construction 02/2022 07/2022

Road Maintenance & Ebell Street From Mast Avenue to This project will include: ADA Curb Ramp Installation (New), Pavement Rehab/Repair Pre-Construction and 12/2021 02/2022 McFarland Kern 21/22 New Ebell Street From Mast Ave to Woodruff Ave 10-20 32 14 Rehabilitation Woodruff Avenue (Existing), Preliminary Design Construction 06/2022 09/2022

*This list is subject to change and will be finalized upon the adoption of any jurisdiction that meets subsequent eligibility at the October 2021 Commission Meeting. Draft City Submitted - Fiscal Year 2021-22 Local Streets and Roads List of Projects *Projects listed are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1) August 19, 2021

Fiscal Year Initially Proposed Project Est Assembly Senate City County Project Type Title Description Location Components Est Start Est Useful Life Proposed Status Completion Districts Districts

This project will include: Sidewalk and/or Crosswalk Installation (New), Paving and/or Road Maintenance & East Euclid Avenue Street Striping Rehab/Repair (Existing Safety), Sidewalk and/or Crosswalk Rehab/Repair Shafter Kern 21/22 New East Euclid Avenue between James Street and Nickel Construction 08/2021 11/2021 20-30 32 14 Rehabilitation Improvements (Existing), Pavement Rehab/Repair (Existing), ADA Curb Ramp Installation (New), ADA Curb Ramp Rehab/Repair (Existing)

Road Maintenance & This project will include: Project Scope Development, Document Preparation, Cost Wasco Kern 21/22 New Poplar Avenue SB1 Project Poplar Avenue from HWY 46 to Filburn Avenue Pre-Construction 02/2022 08/2022 15-20 32 14 Rehabilitation Estimating, Preliminary Design, Environmental Study/Documents

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Pavement Rehabilitation Union Complete Streets Pavement Rehab/Repair (Existing), Storm Drain and/or Culvert Rehab/Repair Bakersfield Kern 21/22 New Avenue from SR 58 to Belle Union Avenue from SR 58 to Belle Terrace Construction 06/2022 09/2022 20-25 32 14 Components (Existing), ADA Curb Ramp Rehab/Repair (Existing), Bicycle Lane Rehab/Repair Terrace (Existing) | Installation of Traffic Detector Loops.

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Pavement Rehabilitation White Complete Streets Pavement Rehab/Repair (Existing), Storm Drain and/or Culvert Rehab/Repair Bakersfield Kern 21/22 New Lane from Gosford Road to Old White Lane from Gosford Road to Old River Road Construction 06/2022 10/2022 20-25 34 16 Components (Existing), Bicycle Lane Rehab/Repair (Existing), ADA Curb Ramp Rehab/Repair River Road (Existing) | Installation of traffic detector loops.

Pavement Rehabilitation California This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Avenue from Union Avenue and Pavement Rehab/Repair (Existing), Storm Drain and/or Culvert Rehab/Repair Bakersfield Kern 21/22 New Match Funds California Avenue from Union Avenue and Washington Street Construction 05/2022 09/2022 20-25 32 14 Washington Street (Local match (Existing), ADA Curb Ramp Rehab/Repair (Existing), Bicycle Lane Rehab/Repair for Federal Project) (Existing) | Local Match for federal RSTP Pavement Rehabilitation Project.

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Pavement Rehabilitation Complete Streets Sidewalk and/or Crosswalk Rehab/Repair (Existing), Pavement Rehab/Repair Bakersfield Kern 21/22 New Panorama Drive from Fairfax Road Panorama Drive from Fairfax Road to Morning Drive Construction 08/2021 09/2021 10-15 34 16 Components (Existing), Storm Drain and/or Culvert Rehab/Repair (Existing), ADA Curb Ramp to Morning Drive Rehab/Repair (Existing), Bicycle Lane Rehab/Repair (Existing)

Hallisey Street Area. Hallisey Street Area from Marilyn Place to This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Barbara Avenue, Marilyn Place from Akers Complete Streets Pavement Rehabilitation Hallisey Sidewalk and/or Crosswalk Rehab/Repair (Existing), Pavement Rehab/Repair Bakersfield Kern 21/22 New Road to west end, Barbara Avenue from Akers to west end, Construction 07/2021 09/2021 15-20 34 16 Components Street Area (Existing), Storm Drain and/or Culvert Rehab/Repair (Existing), ADA Curb Ramp Thoreson Court from Hallisey Street to west end, Hallisey Court Rehab/Repair (Existing) from Hallisey Street to west end.

Road Maintenance & This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Pre-Construction and 02/2022 04/2022 California City Kern 21/22 New Catalpa Ave Road Rehabilitation On Catalpa Ave from 87th St to 94th St 10-15 34 18 Rehabilitation Pavement Rehab/Repair (Existing), Preliminary Design Construction 02/2022 08/2022

*This list is subject to change and will be finalized upon the adoption of any jurisdiction that meets subsequent eligibility at the October 2021 Commission Meeting. Draft City Submitted - Fiscal Year 2021-22 Local Streets and Roads List of Projects *Projects listed are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1) August 19, 2021

Fiscal Year Initially Proposed Project Est Assembly Senate City County Project Type Title Description Location Components Est Start Est Useful Life Proposed Status Completion Districts Districts

Segments of: Sonja Ave, Randall St, Howell Ave, Bryann St, Scott St, Jessica St, Sonja Ct, Sherri St, Peg, St, Trisha Ct, Kevin Ct, Mary Ann Ave, Kevin Way, Randall St, Scott St, Mamie Road Maintenance & 2021-2022 City of Ridgecrest Ave, Helena St, Laurkris Ct, Warner St, Felspar Ave, Palo Verde Ridgecrest Kern 21/22 New This project will include: Pavement Rehab/Repair (Existing) Construction 07/2021 06/2022 6-6 23 16 Rehabilitation Slurry Program Dr, Mesquite Ave, Sage Ct, Wayne St, Alene Ave, Perdew Ave, Graaf Ave, Atkins Ave, Griffin St, Erwin St, Rio Bravo Dr, Mono Ct, Las Posas Ct, Faith Ct, Amie Ct, Vicki Ave, Cimarron Ct, Sol Ct, Scott St, Shelby Ct, Krista Ct, and several others.

Road Maintenance & 10th Street Asphalt Overlay Pre-Construction and 01/2022 07/2022 Taft Kern 21/22 New This project will include: Pavement Rehab/Repair (Existing) 10th Street: limits- Kern Street to A Street 5-10 34 16 Rehabilitation Project: Grind and Replace Construction 07/2022 07/2023

Road Maintenance & Surface Treatment of Local Street Boundaries: C Street north to Tehachapi Blvd, Mill Street east to Tehachapi Kern 19/20 Carried Over This project will include: Paving and/or Striping Rehab/Repair (Existing Safety) Construction 04/2022 12/2022 3-5 34 16 Rehabilitation Phase II Robinson Street; 9 streets

On Davis Street between Tehachapi Blvd and E Street, on North Road Maintenance & Davis Street & Green Street Road Tehachapi Kern 21/22 New This project will include: Paving and/or Striping Rehab/Repair (Existing Safety) Green Street between H Street and municipal airport, and on Construction 07/2021 12/2021 5-15 34 16 Rehabilitation Rehabilitation South Green Street between F Street and E Street.

Skid-steer loader with cold planer, All roads within the city limits of Tehachapi, approximately 6 Procurement/Operatio Tehachapi Kern 21/22 New Other This project will include: Procurement of Public Works Equipment 09/2022 10/2022 20-20 34 16 flair mower and asphalt saw square miles. nal Needs

Letts Avenue (Sherman to Oregon); Sherman Avenue (Dairy Avenue to 7th); Sherman Avenue (Flory Avenue to Dairy Avenue); Dairy Avenue (Whitley Avenue to Oregon Avenue); Road Maintenance & This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Oregon Avenue (King Avenue to Dairy Avenue); Whitley Avenue Corcoran Kings 21/22 In Progress SB1 Road Maintenance Project Construction 07/2021 06/2022 5-10 32 14 Rehabilitation Pavement Rehab/Repair (Existing), Bicycle Lane Rehab/Repair (Existing) (Dairy Avenue to 6 1/2 Ave); Otis Avenue (Orange Avenue to Banium); Whitley Avenue (Otis Avenue to City Limits); Jepson Ave (King to Letts); Yoder Ave (Brokaw to Pickerell); 6 1/2 Ave (Whitely to Sherman); Pueblo Ave (King to Dairy)

This project will include: Sidewalk and/or Crosswalk Rehab/Repair (Existing), Road Maintenance & Lemoore Kings 21/22 New D Street Reconstruction Pavement Rehab/Repair (Existing), ADA Curb Ramp Rehab/Repair (Existing), Bicycle D Street from Lemoore Ave to Smith Street Construction 07/2022 10/2022 15-30 32 14 Rehabilitation Lane Rehab/Repair (Existing) | Signage

This project will include: Surveying, soil sampling, project design and related engineering needed. Encroachment permits if needed. Grind, remove and install Road Maintenance & 45,000 square yards of 2 1/2" Asphaltic Concrete. Install 60,000 square yards of 2 Avenal Cutoff Rd. from SR 269 east to the California Aqueduct Avenal Kings 19/20 Carried Over Avenal Cutoff Road Project Construction 03/2022 06/2027 15-25 32 14 Rehabilitation 1/2" Aspaltic Concrete. Haul, place and compact 45,000 square yards of Aspaltic overcrossing Concrete Grindings on the shoulder of the road. Install roadway striping. Furnish traffic controls. | We are banking funds to be able to do this project

*This list is subject to change and will be finalized upon the adoption of any jurisdiction that meets subsequent eligibility at the October 2021 Commission Meeting. Draft City Submitted - Fiscal Year 2021-22 Local Streets and Roads List of Projects *Projects listed are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1) August 19, 2021

Fiscal Year Initially Proposed Project Est Assembly Senate City County Project Type Title Description Location Components Est Start Est Useful Life Proposed Status Completion Districts Districts

This project will include: Sidewalk and/or Crosswalk Installation (New), Pavement Road Maintenance & Grangeville Blvd. Widening, Hanford Kings 21/22 New Improvement (New), Right of Way Acquisition, ADA Curb Ramp Rehab/Repair Grangeville Blvd. Widening, Centennial Dr. to 13th Ave. Construction 06/2022 08/2022 15-20 32 14 Rehabilitation Centennial Dr. to 13th Ave. (Existing)

Road Maintenance & FY 21/22 Pavement Resurfacing Hanford Kings 21/22 New This project will include: Cost Estimating, Preliminary Design Various City Streets Pre-Construction 06/2021 07/2021 5-10 32 14 Rehabilitation Treatment

This project will include: This project is in Design using RMRA funding in support of Complete Streets Highlands Park Frontage Clearlake Lake 19/20 Carried Over the Construction: Frontage/parking lot and pedestrian sidewalk improvements, 14335 Lakeshore Drive - Highlands Park Pre-Construction 04/2022 09/2022 20-25 4 2 Components Improvements approximately 515 linear feet. | Project is being completed with City funds.

Complete Streets This project will include: Regional shopping center connector road from 18th Avenue Clearlake Lake 19/20 Forecasted Airport Road Improvements Airport Road. 18th Avenue at State Road 53 Pre-Construction 04/2023 09/2023 20-25 4 2 Components east to west.

This project will include: Sidewalk and/or Crosswalk Installation (New), Paving and/or Road Maintenance & Lakeshore Drive Corridor Clearlake Lake 21/22 New Striping Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing), Bicycle Lakeshore Drive from Austin Park to Highlands Park. Construction 04/2023 08/2023 20-20 4 2 Rehabilitation Improvements Lane Rehab/Repair (Existing)

Road Maintenance & Miscelleneous roadway This project will include: Pavement Rehab/Repair (Existing) | Mill and Fill, dig-outs, pot- Project boundaries will be Lakeport Blvd. to 20th Street. This Lakeport Lake 20/21 Carried Over Construction 07/2021 06/2022 4-8 4 2 Rehabilitation maintenance activities hole repairs and thin lift overlays area has approximately 52 City maintained Streets within it.

This project will include: Sidewalk and/or Crosswalk Rehab/Repair (Existing), Pre-Construction and 06/2021 07/2021 Lakeport Lake 21/22 New Other North Main Sidewalk North Main St, 80' S of 7th St to 240' N of 7th St 20-30 4 2 Preliminary Design, ADA Curb Ramp Rehab/Repair (Existing) Construction 10/2021 11/2021

Road Maintenance & Pre-Construction and 06/2021 07/2021 Lakeport Lake 21/22 New North Main Repaving This project will include: Pavement Rehab/Repair (Existing), Preliminary Design North Main St, from 5th St to 11th St 8-15 4 2 Rehabilitation Construction 11/2021 12/2021

Foss, S. Gay, Maple, Adaline, Adella, Martha, Arnold, N. Road Maintenance & This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Susanville Lassen 21/22 New SC 2, SC3 & FC Fog Seal Coats Sacramento, N. Spring, Park, Paiute, Weatherlow, Mill, Construction 04/2022 05/2022 3-5 3 1 Rehabilitation Pavement Rehab/Repair (Existing) | Maintenance Alexander, Parkdale

*This list is subject to change and will be finalized upon the adoption of any jurisdiction that meets subsequent eligibility at the October 2021 Commission Meeting. Draft City Submitted - Fiscal Year 2021-22 Local Streets and Roads List of Projects *Projects listed are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1) August 19, 2021

Fiscal Year Initially Proposed Project Est Assembly Senate City County Project Type Title Description Location Components Est Start Est Useful Life Proposed Status Completion Districts Districts

This project will include: Sidewalk and/or Crosswalk Rehab/Repair (Existing), Paving Road Maintenance & HMA Overlay and ADA Curb Ramp Susanville Lassen 21/22 New and/or Striping Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing), Monte Vista Way, Valley Vista Way, Heater Way Construction 07/2021 08/2021 15-20 3 1 Rehabilitation Upgrades on local streets ADA Curb Ramp Rehab/Repair (Existing)

This project will include: Maintenance Program Plan Development | Culvert cleaning, Road Maintenance & Maintenance Activities to be Susanville Lassen 21/22 New alley repair, right of way clearing, street sign upgrading, stop bar and crosswalk Various city streets Pre-Construction 07/2021 06/2022 2-4 3 1 Rehabilitation Performed by City Forces striping.

Road Maintenance & Pavement Striping Including Susanville Lassen 21/22 New This project will include: Maintenance Program Plan Development Various city streets Pre-Construction 08/2021 09/2021 2-4 3 1 Rehabilitation Center Line and Fog Line

Elevado Avenue (from Grand View Avenue to Virginia Drive); Ontare Road (from Santa Anita Avenue to End of Cul De Sac); Road Maintenance & FY 2021-22 Pavement This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Arcadia 21/22 New Old Ranch Road (from Colorado Street to Vaquero Road); El Construction 07/2022 12/2022 20-25 49 22 Rehabilitation Rehabilitation Program Pavement Rehab/Repair (Existing) Monte Avenue (from Campus Road to Duarte Road); and Wistaria Avenue (from Holly Avenue to El Monte Avenue)

This project will include: Pavement Improvement (New), Pavement Rehab/Repair Road Maintenance & Hibbing, Ely Ave. to Norwalk Blvd.; Meadow Dr., Ely Ave. to Artesia Los Angeles 19/20 Carried Over Residential Street Improvements (Existing) | Resurfacing pavement, and/or removal and replacement of asphalt, and/or Construction 09/2021 06/2022 25-30 58 32 Rehabilitation Norwalk Blvd.; 181st St., Roseton; 188th St., Jersey to Pioneer cape sealing and striping

This project will include: Reconstruct a 5-way intersection utilizing complete streets Complete Streets Five Corner Complete Street Intersection of Tremont, Avalon Canyon, Country Club and Avalon Los Angeles 19/20 In Progress concepts by installing two mini roundabouts, new sidewalks, lighting, improved transit Pre-Construction 05/2019 07/2022 20-30 70 26 Components Project Sumner roadways facilities and shared bicycle facilities.

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Road Maintenance & Residential Resurfacing Project Various Residental Streets as Described in the resolution. Azusa Los Angeles 21/22 New Sidewalk and/or Crosswalk Rehab/Repair (Existing), ADA Curb Ramp Installation Construction 04/2022 07/2022 10-15 48 22 Rehabilitation 2022 Louise, Lemon Ave., Lime Street, Angelina Ave. (New), Pavement Rehab/Repair (Existing), ADA Curb Ramp Rehab/Repair (Existing)

River Dr - Gage Frontage Rd to Florence Frontage Rd; Bell Ave - King Ave to Vinevale Ave; Carmelita Ave - Gage Ave to Road Maintenance & Street Improvements Project FY 21-This project will include: Pavement Rehab/Repair (Existing), ADA Curb Ramp Bell Los Angeles 21/22 New Randolph Pl; Lindbergh Ln - Amelia Earhart Way to West End; Construction 01/2022 03/2022 15-20 63 33 Rehabilitation 22 Rehab/Repair (Existing) Weik Ave - King Ave to Woodward Ave; Salt Lake Ave - Gage Ave to Bell Ave

Road Maintenance & Bradbury Road/Wild Rose Avenue Bradbury Los Angeles 21/22 New This project will include: Pavement Improvement (New) Bradbury Road from Winding Oak Lane to Oak Leaf Avenue. Construction 01/2022 06/2022 75-100 48 25 Rehabilitation Widening Project

*This list is subject to change and will be finalized upon the adoption of any jurisdiction that meets subsequent eligibility at the October 2021 Commission Meeting. Draft City Submitted - Fiscal Year 2021-22 Local Streets and Roads List of Projects *Projects listed are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1) August 19, 2021

Fiscal Year Initially Proposed Project Est Assembly Senate City County Project Type Title Description Location Components Est Start Est Useful Life Proposed Status Completion Districts Districts

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Road Maintenance & Sidewalk and/or Crosswalk Rehab/Repair (Existing), ADA Curb Ramp Installation Carson Los Angeles 21/22 New Gardena Boulevard Rehabilitation. Gardena Ave from Figueroa to Avalon Construction 02/2022 06/2022 20-25 64 35 Rehabilitation (New), Pavement Rehab/Repair (Existing), Bicycle Lane (New), ADA Curb Ramp Rehab/Repair (Existing)

This project will include: Pavement Improvement (New), Paving and/or Striping East Carson Street Rehabilitation Rehab/Repair (Existing Safety), Sidewalk and/or Crosswalk Rehab/Repair (Existing), Complete Streets Carson Los Angeles 20/21 In Progress from recreation RD. to East city Pavement Rehab/Repair (Existing), ADA Curb Ramp Installation (New), Bicycle Lane Recreation RD. to East City Limit Construction 09/2021 12/2021 15-20 64 35 Components Limit (New), Paving and/or Striping Installation (New Safety), ADA Curb Ramp Rehab/Repair (Existing)

Avery Circle, Bader Circle, Bayberry Circle, Cassia Court, Christina Circle, Christina Way, Christopher Lane, Claretta Avenue, Corellian Court, This project will include: Pavement Improvement (New), Sidewalk and/or Crosswalk Creekwood Avenue, Eckleson Street, Falcon Circle, Hawaiian Installation (New), Paving and/or Striping Rehab/Repair (Existing Safety), Storm Avenue, Inglenook Lane, Drain/Culvert Installation (New), Sidewalk and/or Crosswalk Rehab/Repair (Existing), Road Maintenance & Residential Street Rehabilitation Kenobi Court, Meadows Circle, Meadows Court, Miguel Avenue, Cerritos Los Angeles 21/22 New Pavement Rehab/Repair (Existing), ADA Curb Ramp Installation (New), Landscape Construction 04/2021 07/2022 5-5 58 32 Rehabilitation Project Miles Street, Noel Circle, Safety Rehab/Repair (Existing), Landscape Safety Installation (New), Storm Drain Paseo Drive, Rainbow Court, Rainbow Way, Rhoda Circle, and/or Culvert Rehab/Repair (Existing), Paving and/or Striping Installation (New Sequoia Avenue, Star Circle, Star Safety), ADA Curb Ramp Rehab/Repair (Existing) Way, Teresa Court, Teresa Way, Thornlake Avenue, Valencia Street, Viarna Street, Wendy Drive.

This project will include: Pavement Improvement (New), Sidewalk and/or Crosswalk Installation (New), Sidewalk and/or Crosswalk Rehab/Repair (Existing), Traffic Signals, Lights, and/or Signage Installation (New Safety), Bicycle Lane (New), Bicycle Lane Rehab/Repair (Existing), ADA Curb Ramp Rehab/Repair (Existing), Paving and/or Complete Streets Claremont Boulevard Complete Claremont Los Angeles 21/22 New Striping Rehab/Repair (Existing Safety), ADA Curb Ramp Installation (New), Claremont Boulevard from Foothill Boulevard to Sixth Street Construction 12/2021 06/2022 10-20 41 25 Components Streets Improvements Pavement Rehab/Repair (Existing), Landscape Safety Rehab/Repair (Existing), Landscape Safety Installation (New), Paving and/or Striping Installation (New Safety) | Will include green streets components if feasible. This will be studied to determine during the design phase.

This project will include: Pavement Rehab/Repair (Existing) | The project will provide Road Maintenance & FY 2020/21 Pavement for the pavement rehabilitation of selected streets throughout the City. The selected Commerce Los Angeles 20/21 Carried Over Gage Ave. from Stauson Ave to Greenwood Ave. Construction 03/2020 06/2021 20-25 58 32 Rehabilitation Rehabilitation Project streets were based on the recommendations identified within the City's Pavement Management System (PMS).

This project will include: Pavement Rehab/Repair (Existing) | The Project will provide Road Maintenance & FY 2020/21 Pavement for the pavement rehabilitation of selected streets throughout the City. The selected Commerce Los Angeles 20/21 Carried Over Garfield Ave from Telegraph Rd to S City limit Construction 01/2020 06/2021 15-25 58 32 Rehabilitation Rehabilitation Project streets were based on the recommendations identified within the City's Pavement Management System (PMS).

This project will include: Pavement Rehab/Repair (Existing) | The project will provide Road Maintenance & FY 2020/21 Pavement for the pavement rehabilitation of selected streets throughout the City. The selected Commerce Los Angeles 20/21 Carried Over Triggs Street from Eastern Ave. to Telegraph/Atlantic Construction 03/2020 06/2021 5-15 58 32 Rehabilitation Rehabilitation Project streets were based on the recommendations identified within the City's Pavement Management System (PMS).

Road Maintenance & FY 2021-22 Pavement Bristow, Bandini, Village, Rosewood and Veterans Commerce Los Angeles 21/22 New This project will include: Document Preparation, Cost Estimating, Preliminary Design Pre-Construction 09/2021 03/2022 7-15 58 32 Rehabilitation Rehabilitation Project neighborhood

*This list is subject to change and will be finalized upon the adoption of any jurisdiction that meets subsequent eligibility at the October 2021 Commission Meeting. Draft City Submitted - Fiscal Year 2021-22 Local Streets and Roads List of Projects *Projects listed are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1) August 19, 2021

Fiscal Year Initially Proposed Project Est Assembly Senate City County Project Type Title Description Location Components Est Start Est Useful Life Proposed Status Completion Districts Districts

Tajauta Avenue - Rosecrans Avenue to Compton Boulevard Myrrh St - Santa Fe to East City Limit This project will include: Remove and replace ADA ramps, curb, gutter, sidewalk; Bradfield Avenue - Pixley Street to Compton Boulevard Road Maintenance & Compton Los Angeles 19/20 In Progress Residential Streets Resurfacing grind/overlay asphalt; replace all traffic markings, linework. | Project is currently under Elva Avenue - Parmelee to 138th Street Construction 06/2021 08/2021 10-20 64 35 Rehabilitation construction. Grandee Avenue - El Segundo to 138th Street Caldwell Street - Oleander to West City Limit Alondra Boulevard - Lime Avenue to East City Limits

Alondra Blvd (City Limit West to Lime St); Parmelee Ave (City Road Maintenance & This project will include: Remove and replace locations of ADA ramps, curb, gutter, Limit North to 138th St); Stockwell St (Parmelee Ave to Elva Compton Los Angeles 19/20 Carried Over Residential Street Rehabilitation Construction 08/2021 02/2022 10-20 64 35 Rehabilitation sidewalk; grind/overlay asphalt; replace all traffic markings, and linework. Ave); Bullis Rd (City Limit North to City Limit South); Palmer St (Alameda St to Long Beach Blvd)

Rosecrans Ave (City Limit East to Alameda St); Compton Ave Road Maintenance & This project will include: Remove and replace locations of ADA ramps, curb, gutter, Compton Los Angeles 20/21 Carried Over Residential Street Rehabilitation (130th St to 134th Place); Slater Ave (133rd St to Wilmington Construction 12/2021 05/2022 10-20 64 35 Rehabilitation sidewalk; grind/overlay asphalt; replace all traffic markings, and linework. Ave); Santa Fe Ave (City Limit North to City Limit South)

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Sidewalk and/or Crosswalk Rehab/Repair (Existing), Pavement Rehab/Repair Alameda St East & West (City Limit North to City Limit South); Road Maintenance & (Existing), Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Walnut St (Central Ave to Acacia Ct); Walnut Parkway (Cul De Compton Los Angeles 20/21 Carried Over Residential Streets Resurfacing Construction 04/2022 09/2022 10-20 64 35 Rehabilitation Storm Drain and/or Culvert Rehab/Repair (Existing), ADA Curb Ramp Rehab/Repair Sac to Cul De Sac); Walnut Park Dr (Walnut Park Way to Walnut (Existing) | Remove and replace ADA ramps, curb, gutter, sidewalk; grind/overlay St) asphalt; replace all traffic markings, linework. | project is currently in design

This project will include: Install bike lanes and lighting along the corridor; enhance Road Maintenance & pedestrian crossing at 15 intersections. Remove and replace locations for ADA ramps, Compton Boulevard from Willowbrook Avenue to eastern city Compton Los Angeles 20/21 Forecasted Compton Boulevard Project - East Construction 09/2023 09/2024 10-20 64 35 Rehabilitation curb, gutter, sidewalk: grind/overlay asphalt; replace all traffic markings, linework limits traffic detector loops

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Bradfield Ave (Compton Blvd to Alondra Blvd); Greenleaf Blvd Road Maintenance & Annual Residential Rehabilitation Sidewalk and/or Crosswalk Rehab/Repair (Existing), Pavement Rehab/Repair Compton Los Angeles 20/21 Forecasted (Central Ave to Whitemarsh Ave and City Limit East to Alameda Construction 08/2022 09/2023 10-20 64 35 Rehabilitation Project (Existing), Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), ADA St) Curb Ramp Rehab/Repair (Existing)

This project will include: Installation of raised medians and Class II bicycle lanes; Road Maintenance & Compton Boulevard from Willowbrook Avenue to western city Compton Los Angeles 20/21 Forecasted Compton Boulevard Project - West Remove and replace locations for ADA ramps, curb gutters, sidewalk; grind/overlay; Construction 03/2022 09/2023 10-20 64 35 Rehabilitation limits replace all traffic markings, linework; traffic loops

*This list is subject to change and will be finalized upon the adoption of any jurisdiction that meets subsequent eligibility at the October 2021 Commission Meeting. Draft City Submitted - Fiscal Year 2021-22 Local Streets and Roads List of Projects *Projects listed are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1) August 19, 2021

Fiscal Year Initially Proposed Project Est Assembly Senate City County Project Type Title Description Location Components Est Start Est Useful Life Proposed Status Completion Districts Districts

This project will include: Pavement Improvement (New), Sidewalk and/or Crosswalk Installation (New), Sidewalk and/or Crosswalk Rehab/Repair (Existing), Traffic Signals, Lights, and/or Signage Installation (New Safety), Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), ADA Curb Ramp Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety), ADA Curb Ramp Installation (New), Pavement Rehab/Repair (Existing), Landscape Safety Installation (New), Road Maintenance & Santa Ana Street Improvement Cudahy Los Angeles 20/21 Carried Over Paving and/or Striping Installation (New Safety) | construction of concrete medians | Santa Ana Street from Atlantic Avenue to Salt Lake Avenue Construction 02/2022 12/2022 10-20 63 33 Rehabilitation Project The project scope of work consists of the street rehabilitation, which may include one or more of the following items: asphalt concrete restoration (grind & cap and/or surface treatment application such as microsurfacing or slurry seal); construction of concrete medians and pedestrian crosswalks; removal and replacement of damaged sidewalks, driveways, curb & gutters, as well as ADA and traffic safety improvements; and traffic striping.

Road Maintenance & Lawford Street, Cossack Place and This project will include: Sidewalk and/or Crosswalk Rehab/Repair (Existing), St. Vladimir, Lawford Street and Cossacks Place - West of Valley Glendora Los Angeles 21/22 New Construction 08/2021 12/2021 20-30 48 25 Rehabilitation St. Vladimir Street Reconstruction Pavement Rehab/Repair (Existing), ADA Curb Ramp Installation (New) Center Avenue and north of Route 66.

Candlewood St between Fidler Ave and 400 feet west of Road Maintenance & Lakewood Los Angeles 19/20 Carried Over Pavement Rehab Phase I This project will include: Overlay with ARMH Lakewood Blvd Construction 07/2021 06/2022 12-15 63 32, 33 Rehabilitation Harvey Way between Bellflower and Woodruff

Road Maintenance & Alley West of Lakewood Blvd This project will include: Project Scope Development | Remove existing asphalt and Alley west of Lakewood Blvd between Candlewood St and Lakewood Los Angeles 20/21 Carried Over Pre-Construction 07/2021 06/2022 25-30 63 32, 33 Rehabilitation Reconstruction base. Reconstruct with new base and Portland Cement Concrete (PCC) Hardwick Ave

Road Maintenance & Del Amo Blvd between Paramount Blvd and Cherry Ave Lakewood Los Angeles 20/21 Carried Over Del Amo Blvd Rehab This project will include: Overlay with ARHM Pre-Construction 07/2021 06/2022 12-15 63 32, 33 Rehabilitation Del Amo Blvd between Paramount Blvd and Downey Ave

Road Maintenance & Lakewood Los Angeles 20/21 Carried Over Harvey Way Rehab This project will include: Project Scope Development | Overlay with ARHM Harvey Way between Bellflower Blvd and Woodruff Ave Pre-Construction 07/2021 06/2022 12-15 63 32, 33 Rehabilitation

Locations Currently Identified: 6123Graywood 5824Faust 5512Bonfair 5526Bonfair Road Maintenance & This project will include: Procurement of Road Maintenance and Rehab Materials, Procurement/Operatio Lakewood Los Angeles 21/22 New Sidewalk Repairs 5632Bonfair 07/2021 06/2022 25-50 63 32, 33 Rehabilitation Public Works Staffing nal Needs 5533Graywood 5513Briercrest 5314Montair 6714Eberle

Locations identified by staff inspections and resident reporting Road Maintenance & This project will include: Procurement of Road Maintenance and Rehab Materials, Procurement/Operatio Lakewood Los Angeles 21/22 New Street Pavement Maintenace focused in the area bordered with Bloomfield, Del Amo, Pioneer, 07/2021 06/2022 25-30 63 32, 33 Rehabilitation Public Works Staffing nal Needs & Centralia.

*This list is subject to change and will be finalized upon the adoption of any jurisdiction that meets subsequent eligibility at the October 2021 Commission Meeting. Draft City Submitted - Fiscal Year 2021-22 Local Streets and Roads List of Projects *Projects listed are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1) August 19, 2021

Fiscal Year Initially Proposed Project Est Assembly Senate City County Project Type Title Description Location Components Est Start Est Useful Life Proposed Status Completion Districts Districts

Locations identified by staff inspections and resident reporting This project will include: Procurement of Road Maintenance and Rehab Materials, Procurement/Operatio Lakewood Los Angeles 21/22 New Traffic Control Devices Traffic Control focused in the area bordered with Bloomfield, Del Amo, Pioneer, 07/2021 06/2022 10-20 63 32, 33 Public Works Staffing nal Needs & Centralia.

Road Maintenance & Pre-Construction and 07/2021 06/2022 Lakewood Los Angeles 21/22 New Ashworth St Overlay This project will include: Pavement Rehab/Repair (Existing) | ARHM Overlay On Ashworth from Clark to Woodruff 12-15 63 32, 33 Rehabilitation Construction 07/2021 06/2022

This project will include: Sidewalk and/or Crosswalk Installation (New), Paving and/or (1) 15th Street West from Avenue J-8 to Youngblood Place Striping Rehab/Repair (Existing Safety), Sidewalk and/or Crosswalk Rehab/Repair (2) 25th Street West from Avenue K to Avenue L Road Maintenance & 2021 Summer Pavement Lancaster Los Angeles 21/22 New (Existing), Pavement Rehab/Repair (Existing), Bicycle Lane (New), Paving and/or (3) Avenue J from 10th Street West to Beech Avenue Construction 08/2021 12/2021 7-30 36 21 Rehabilitation Management Program Striping Installation (New Safety), ADA Curb Ramp Rehab/Repair (Existing), Bicycle (4) Avenue J from Trevor Avenue to Challenger Way Lane Rehab/Repair (Existing) (5) Avenue M from 3rd Street East to 4th Street East

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), -167th Street from Hawthorne Blvd. to West End Road Maintenance & FY 2021-22 Street Improvement Lawndale Los Angeles 21/22 New Sidewalk and/or Crosswalk Rehab/Repair (Existing), Pavement Rehab/Repair -167th Street from Osage Ave. to Prairie Ave. Construction 12/2021 04/2022 15-20 62 35 Rehabilitation Project- SB 1 (Existing), ADA Curb Ramp Rehab/Repair (Existing) - Alley Manhattan Beach from Alley Hawthorne to Freeman Ave.

Zones C (north of 250th St to Lomita Blvd.) and F (NW corner of This project will include: Project Scope Development, Paving and/or Striping the City) (streets and portions of streets not included in slurry Road Maintenance & Rehab/Repair (Existing Safety), Sidewalk and/or Crosswalk Rehab/Repair (Existing), seal project: 240th, 245th St., 247th St., 248th St., Aldona Dr., Pre-Construction and 07/2020 08/2021 Lomita Los Angeles 20/21 In Progress Street Rehabilitation Project 10-20 66 26 Rehabilitation Pavement Rehab/Repair (Existing), Cost Estimating, Document Preparation, Allbrook St., Alliene Ave, Bani Ave., Benhill Ave., Cadiz Dr., Construction 09/2021 06/2022 Preliminary Design, ADA Curb Ramp Rehab/Repair (Existing) Cypress St., Eshelman Ave. cul-de-sac, Hendricks Ave., Lomita Park Pl., Lucille Ave., and Moon Ave.)

This project will include: Project Scope Development, Sidewalk and/or Crosswalk Rehab/Repair (Existing), Feasibility Study, Bicycle Lane (New), Cost Estimating, Lomita/Narbonne Intersection - Pre-Construction and 05/2021 08/2021 Lomita Los Angeles 21/22 New Safety Document Preparation, Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Intersection of Lomita Boulevard and Narbonne Avenue 10-20 66 26 ADA Construction 09/2021 06/2022 Safety), Storm Drain and/or Culvert Rehab/Repair (Existing), Environmental Study/Documents, ADA Curb Ramp Rehab/Repair (Existing)

Zones G - east of Eshelman Ave; north & south of Lomita Blvd.: This project will include: Project Scope Development, Pavement Rehab/Repair (240th, 241st St., April Ct, Callison St., Stanhurst Ave., Turrell Road Maintenance & Street Rehabilitation Project – Pre-Construction and 06/2021 08/2021 Lomita Los Angeles 21/22 New (Existing), Cost Estimating, Preliminary Design, Environmental Study/Documents, St., Nordman St., Eshelman Ave., Alcor St., Ebony Ln, 252nd 10-20 66 26 Rehabilitation Zone G Construction 09/2021 06/2022 ADA Curb Ramp Rehab/Repair (Existing) St., Walnut St., Falena Ave., Abita Ave., 246th St., 247th St., 247th Pl, 248th St.)

Lomita Los Angeles 21/22 New Safety ADA Project This project will include: Project Scope Development, Document Preparation throughout city Pre-Construction 09/2021 06/2022 10-20 66 26

*This list is subject to change and will be finalized upon the adoption of any jurisdiction that meets subsequent eligibility at the October 2021 Commission Meeting. Draft City Submitted - Fiscal Year 2021-22 Local Streets and Roads List of Projects *Projects listed are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1) August 19, 2021

Fiscal Year Initially Proposed Project Est Assembly Senate City County Project Type Title Description Location Components Est Start Est Useful Life Proposed Status Completion Districts Districts

Alexander Avenue from Imperial Highway to Abbott Road; Louise Alexander Avenue, Louise Street, Street from Fir Street to Gertrude Drive; Louise Street from This project will include: Sidewalk and/or Crosswalk Rehab/Repair (Existing), Pope Avenue, Pendleton Avenue, Long Beach Boulevard to School Street; Pope Avenue from Road Maintenance & Pavement Rehab/Repair (Existing), Paving and/or Striping Installation (New Safety) | Lynwood Los Angeles 21/22 Carried Over Seminole Avenue, and Shirley Lavinia Avenue to Josephine Street; Pendleton Avenue from Construction 06/2020 06/2022 20-30 63 33 Rehabilitation This project also includes water and sewer improvements funded from other sources Avenue Street, Water and Sewer Colyer Avenue to Atlantic Avenue; Seminole Avenue from Long of funds. Improvements Beach Boulevard to Mariposa Lane and Shirley Avenue from Beechwood Avenue to Harris Avenue.

Alberta Street; from Beechwood Avenue to Harris Avenue; First Alberta Street, First Avenue, Avenue; from Fernwood Avenue to Brewster Avenue; Franklin Franklin Street, Lindberg Avenue, Street; from Lynwood Road to North End; Lindberg Avenue; from This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Road Maintenance & Lewis Street, Peach Street, Pine Banning Avenue to Josephine Street; Lewis Street; from Louise Lynwood Los Angeles 21/22 Carried Over Sidewalk and/or Crosswalk Rehab/Repair (Existing), Pavement Rehab/Repair Construction 03/2021 06/2022 20-30 63 33 Rehabilitation Avenue, and Second Avenue, Street to Lynwood Road; Peach Street; from Imperial Highway to (Existing) Pavement Rehabilitation at Various Poplar Drive; Pine Avenue; from Los Flores Boulevard to Locations Imperial Highway; and Second Avenue; from Lavinia Avenue to Agnes Avenue

South of Abbott Road/Century Boulevard; west of Wright Road, Road Maintenance & This project will include: Sidewalk and/or Crosswalk Rehab/Repair (Existing), north of McMillan Street, North of Palm Avenue, North of Lynwood Los Angeles 21/22 New Street Maintenance Construction 07/2021 06/2022 2-3 63 33 Rehabilitation Pavement Rehab/Repair (Existing) Orchard Street; east of Santa Fe Avenue; east of Mona Boulevard and east of Alameda Street.

Maintain traffic signals at 47 locations along Imperial Highway, This project will include: Traffic Signals, Lights, and/or Signage Installation (New Atlantic Avenue, Alameda Street, Santa Fe Avenue, State Street, Lynwood Los Angeles 21/22 New Traffic Control Devices Traffic Signals Construction 07/2021 06/2022 2-3 63 33 Safety), Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety) Long Beach Boulevard, Bullis Road, and Martin Luther King Boulevard.

Alvada Street from Virginia Avenue to Duncan Avenue; San Alvada Street, San Carlos Avenue, Carlos Avenue from alley to Abbott Street; San Juan Avenue San Juan Avenue, San Luis This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Road Maintenance & from City Limit to Abbott Rd; San Luis Avenue from City Limit to Lynwood Los Angeles 21/22 New Avenue, San Vicente Avenue and Sidewalk and/or Crosswalk Rehab/Repair (Existing), Pavement Rehab/Repair Construction 07/2021 06/2023 20-30 63 33 Rehabilitation Abbot Rd; San Vicente from City limit to Abbott Rd; Thorson Thorson Avenue Street and (Existing), Paving and/or Striping Installation (New Safety) Avenue from Carlin Avenue to City Limit and Atlantic Avenue Sidewalk Improvement Project from Lavinia Avenue to Clark Street.

San Luis Avenue from Abbott Road to Alma Avenue; San Miguel Avenue from Abbott Road to Norton Avenue; Shirley Avenue from Thorson Avenue to Harris Avenue; Thorson Avenue from This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Traffic Safety Enhancement Alberta Street to Shirley Avenue; Thorson Avenue from Cortland Lynwood Los Angeles 21/22 New Traffic Control Devices Sidewalk and/or Crosswalk Rehab/Repair (Existing), Traffic Signals, Lights, and/or Construction 07/2021 06/2023 15-20 63 33 Project Street to Fernwood Avenue; Thorson Avenue from E.O.P to Signage Rehab/Repair (Existing Safety), ADA Curb Ramp Rehab/Repair (Existing) Josephine Street; Thorson Avenue from Agnes Avenue to Lavinia Avenue; and Thorson Avenue from Lavinia Avenue to Magnolia Avenue.

San Luis Avenue from Abbott Road to Alma Avenue; San Miguel Avenue from Abbott Road to Norton Avenue; Shirley Avenue from Thorson Avenue to Harris Avenue; Thorson Avenue from Road Maintenance & This project will include: Sidewalk and/or Crosswalk Rehab/Repair (Existing), Alberta Street to Shirley Avenue; Thorson Avenue from Cortland Lynwood Los Angeles 21/22 New Priority 2 Streets Construction 07/2021 06/2023 20-30 63 33 Rehabilitation Pavement Rehab/Repair (Existing) Street to Fernwood Avenue; Thorson Avenue from E.O.P to Josephine Street; Thorson Avenue from Agnes Avenue to Lavinia Avenue; and Thorson Avenue from Lavinia Avenue to Magnolia Avenue.

*This list is subject to change and will be finalized upon the adoption of any jurisdiction that meets subsequent eligibility at the October 2021 Commission Meeting. Draft City Submitted - Fiscal Year 2021-22 Local Streets and Roads List of Projects *Projects listed are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1) August 19, 2021

Fiscal Year Initially Proposed Project Est Assembly Senate City County Project Type Title Description Location Components Est Start Est Useful Life Proposed Status Completion Districts Districts

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Maintenance to be performed on the following streets: Malibu Rd, Road Maintenance & Pre-Construction and 08/2021 09/2021 Malibu Los Angeles 21/22 New Annual Street Maintenance Pavement Rehab/Repair (Existing), Cost Estimating, Document Preparation, Broad Beach Rd, Latigo Canyon Rd, Corral Canyon Rd, Webb 10-20 50 27 Rehabilitation Construction 08/2021 10/2021 Preliminary Design Way, Rambla Pacifico St and Vista Pacifica

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Road Maintenance & Street Rehabilitation Project FY Maywood Ave, 57th St, 58th St, 60th St, 61st St, Cudahy Ave, Maywood Los Angeles 19/20 In Progress Sidewalk and/or Crosswalk Rehab/Repair (Existing), Pavement Rehab/Repair Construction 11/2020 06/2021 7-13 63 33 Rehabilitation 2019-20 Palm Ave, Alamo Ave (Existing), ADA Curb Ramp Rehab/Repair (Existing)

57th St ,58th St, Alamo Ave, This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Atlantic Blvd, Fruitland Ave, Road Maintenance & FY 20-21 Pavement Rehabilitation Pre-Construction and 08/2021 12/2021 Maywood Los Angeles 21/22 New Project Scope Development, Pavement Rehab/Repair (Existing), Document Palm Ave, Fruitland Ave, 7-15 63 33 Rehabilitation Project Construction 01/2022 06/2022 Preparation, Preliminary Design, ADA Curb Ramp Rehab/Repair (Existing) Randolph St, Slauson Ave, 52nd Pl, 53rd St, 55th St, 56th St, 60th St, Everett Ave, Heliotrope Ave, Pine Ave, Walker Ave

This project will include: Project Scope Development | The Highway Safety Improvement Program (HSIP) is a project that aims at adding additional traffic signals, The project impacts three identified intersections within the City: Monrovia Los Angeles 19/20 Carried Over Safety HSIP Project - Huntington & 5th roadway striping, and traffic signage to enhance pedestrian safety. This specific Pre-Construction 07/2021 06/2022 5-25 41 25 Foothill/California; Foothill/Sunset; and Huntington/5th. expense is for the City's share of inspection and project management costs. | No project costs occurred in FY 20-21, and project has been carried over to FY 21-22.

This project will include: Project Scope Development, Preliminary Design | Pedestrian Bradoaks/Santa Fe - Safe Routes Lemon Avenue adjacent to Bradoaks Elementary School and El Monrovia Los Angeles 19/20 Carried Over Safety improvements adjacent to two schools within the City. The project includes installation Pre-Construction 07/2021 06/2022 5-10 41 25 to School (SRTS) Norte/Peck Road adjacent to Santa Fe Middle School. of new signage, raised crosswalks, and new striping.

This project will include: Project Scope Development, Preliminary Design | Pedestrian improvements and public safety enhancements through the addition of bollards, EV Comprehensive Old Town Monrovia Los Angeles 19/20 Carried Over Safety charging stations, re-painting of all street lights, installation of in-pavement LED Myrtle Avenue between Palm Avenue and Olive Avenue. Pre-Construction 07/2021 06/2022 5-10 41 25 Upgrades lighted crosswalks with raised finishes, improvements to the alleyways and walkways, and installation of enhanced landscaping.

This project will include: Project Scope Development, Document Preparation, Cost Road Maintenance & Mountain Avenue Road Estimating, Preliminary Design | This project involves conducting an asphalt overlay Monrovia Los Angeles 20/21 Carried Over Mountain Avenue from Foothill Boulevard to Duarte Road Pre-Construction 07/2021 06/2022 5-15 41 25 Rehabilitation Resurfacing Project on Mountain Avenue to rehabilitate the roadway surface and extend the useful life of the road.

This project will include: Project Scope Development, Feasibility Study | Parking study Monrovia Los Angeles 19/20 Carried Over Safety Parking Lot Study From Myrtle Avenue to Mayflower Avenue Pre-Construction 07/2021 06/2022 1-25 41 25 of the areas immediately adjacent to the Gold Line Station.

This project will include: Project Scope Development, Preliminary Design | Traffic Monrovia Los Angeles 19/20 Carried Over Safety Myrtle/I210 Entrance Study Myrtle Avenue at the I-210 off-ramp and Evergreen Avenue. Pre-Construction 07/2021 06/2022 1-25 41 25 study for increased pedestrian and vehicular safety at the Myrtle/I-210 entrance.

*This list is subject to change and will be finalized upon the adoption of any jurisdiction that meets subsequent eligibility at the October 2021 Commission Meeting. Draft City Submitted - Fiscal Year 2021-22 Local Streets and Roads List of Projects *Projects listed are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1) August 19, 2021

Fiscal Year Initially Proposed Project Est Assembly Senate City County Project Type Title Description Location Components Est Start Est Useful Life Proposed Status Completion Districts Districts

This project will include: Traffic Signals, Lights, and/or Signage Rehab/Repair Rancho Vista Blvd and Armfield (Existing Safety) | Signal modification to remove permissive left-turns and implement Palmdale Los Angeles 21/22 New Safety Signal & Intersection Safety protected left -turn signal phasing. Replace existing signal poles, upgrade signal Rancho Vista Blvd and Armfield Construction 07/2021 06/2022 20-25 36 21 Improvements heads, implement vehicle detection capable of red extension, ADA features, Roadway drainage, and landscaping.

Road Maintenance & Overlay and Grinding Pavement This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Palmdale Blvd (47th - 80th East); Avenue N (40th East - 45th Palmdale Los Angeles 21/22 New Construction 04/2022 07/2022 5-10 36 21 Rehabilitation Resurfacing Program 2021-2022 Pavement Rehab/Repair (Existing) East); and 40th East (Avenue N-Avenue N-8)

This project will resurface approximately 7 miles of asphalt paved roads along 74 roadway stretches throughout the City. Segments of Afton St, Autumn Ln, Glen Oaks Blvd, Bonnie Ave, Annual Citywide Street This project will include: Sidewalk and/or Crosswalk Rehab/Repair (Existing), Road Maintenance & California Blvd, Carriage House Rd, Chester Ave, Corona Dr, De Pasadena Los Angeles 21/22 New Resurfacing and ADA Pavement Rehab/Repair (Existing), ADA Curb Ramp Installation (New), ADA Curb Construction 07/2021 06/2023 15-20 41 25 Rehabilitation Lacey Ave, Encino Dr, Harkness Ave, Hill Ave, Holliston Ave, Improvement Program FY 2022 Ramp Rehab/Repair (Existing) Lundy Ave, Michigan Ave, Orange Grove Blvd, Orange Pl, Robincroft Dr, Robinson Rd, San Pasqual St, Startouch Dr, Steuben St, Valley St, and Wilson Ave.

This project will include: Sidewalk and/or Crosswalk Installation (New), Paving and/or Pedestrian Safety Enhancements Lake Avenue at Mountain Street, and Colorado Boulevard at Fair Pasadena Los Angeles 21/22 New Safety Striping Rehab/Repair (Existing Safety), Sidewalk and/or Crosswalk Rehab/Repair Construction 07/2021 02/2022 20-20 41 25 at Signalized Inersections Oaks Avenue (Existing), ADA Curb Ramp Rehab/Repair (Existing)

Phase I of the project will provide maintenance on Garvey Ave Road Maintenance & Maintenance of Traffic Control This project will include: The project involves the maintenance of City-owned traffic East to West to the southerly City limit. Phase II of the project will Procurement/Operatio Rosemead Los Angeles 19/20 In Progress 09/2021 12/2022 10-20 49 22 Rehabilitation Signs, Striping, and Markings control signs, striping, and markings to be performed by City Maintenance staff. provide maintenance north of Garvey Ave East to West to the nal Needs northerly City limit.

Locations identified on City's pavement management system. This project will include: Project Scope Development, Cost Estimating | The annual Road Maintenance & (Various city streets throughout Quadrant 1 of the jurisdiction. Rosemead Los Angeles 21/22 New Annual Slurry Seal (FY 2021-22) slurry seal is an on-going project to slurry seal designated areas on a 5-7 year cycle to Pre-Construction 09/2021 03/2022 5-7 49 22 Rehabilitation Quadrant 1 consists of the area north of the I-10 freeway and preserve and extend the life of the City street pavement. west of Rosemead Blvd.)

This project will include: Cost Estimating, Document Preparation, Preliminary Design | Road Maintenance & Citywide Arterial Street The proposed project includes improvements to various major and minor arterial Various streets throughout the City have been identified as Rosemead Los Angeles 21/22 New Pre-Construction 09/2021 06/2022 15-20 49 22 Rehabilitation Improvements (FY 2021-22) streets. Pavement rehabilitation, pavement preventative maintenance, and project locations. miscellaneous concrete improvements.

Road Maintenance & Walnut Grove Resurfacing Project This project will include: Paving and/or Striping Rehab/Repair (Existing Safety) | Rosemead Los Angeles 19/20 Carried Over Walnut Grove Avenue between Valley and North City Limit Construction 09/2021 03/2022 10-15 49 22 Rehabilitation (Phase I) Rehabilitation (asphalt coldmill & overlay) and colored crosswalk installation.

This project will include: Project Scope Development, Document Preparation, Cost Road Maintenance & Area south of La Puente Road and west of Lemon Avenue to Walnut Los Angeles 20/21 In Progress Slurry Seal Area 1 Estimating | Engineering, contract administration, and slurry seal of various streets in Pre-Construction 07/2021 12/2021 5-7 55 29 Rehabilitation City limits. Area 1.

*This list is subject to change and will be finalized upon the adoption of any jurisdiction that meets subsequent eligibility at the October 2021 Commission Meeting. Draft City Submitted - Fiscal Year 2021-22 Local Streets and Roads List of Projects *Projects listed are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1) August 19, 2021

Fiscal Year Initially Proposed Project Est Assembly Senate City County Project Type Title Description Location Components Est Start Est Useful Life Proposed Status Completion Districts Districts

Cedarhaven Drive ; Davey Jones Drive ; Dunegal Court; Emerson Court; Fairgrange Drive; Jon Dodson Drive; Lake Crest Road Maintenance & FY2021-22 Pavement This project will include: Pavement Rehab/Repair (Existing), ADA Curb Ramp Agoura Hills Los Angeles 21/22 New Drive;Liberty Canyon Road; Mainmast Place; Modena Place; Old Construction 07/2021 08/2021 10-20 50 27 Rehabilitation Rehabilitation Project Rehab/Repair (Existing) Salt Lane; Passageway Place; Rainbow Crest Drive; Whale Boat Place; Woodbrook Drive

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Sidewalk and/or Crosswalk Rehab/Repair (Existing), Pavement Rehab/Repair Road Maintenance & FY 2021-22 RMRA Street (Existing), ADA Curb Ramp Installation (New), Cost Estimating, Document various streets bounded by Hellman Avenue and the I-10 within Pre-Construction and 08/2021 12/2021 Alhambra Los Angeles 21/22 New 10-30 49 22 Rehabilitation Rehabilitation Project Preparation, Preliminary Design, Storm Drain and/or Culvert Rehab/Repair (Existing), the City of Alhambra. Construction 03/2022 09/2022 Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), ADA Curb Ramp Rehab/Repair (Existing)

Garvey Avenue Street This project will include: Preparation of plans, specifications and estimates for the Road Maintenance & Improvements between construction of a new Traffic Signal at Garvey Avenue and Vineland Avenue. Baldwin Park Los Angeles 21/22 New Garvey Avenue between Francisquito Ave and Vineland Avenue Construction 09/2022 12/2022 20-40 48 22 Rehabilitation Francisquito Ave and Vineland Installation of Hawk System and 2” AC overlay on Garvey Ave. | Project will be Avenue supplemented with additional local funds.

This project will include: Cost Estimating, Preliminary Design | Plans, Specifications, Road Maintenance & and estimates for pavement reconstruction including surface preparation, sub grade Baldwin Park Los Angeles 21/22 New Major Street Rehabilitation Project Various Location Pre-Construction 09/2022 12/2022 25-30 48 22 Rehabilitation and constructing pavement sections including sidewalk, construction of accessible ramps and curb and gutter repairs. | Project will be supplemented with local funds.

City Public Works Department, Citywide Sidewalks, Curb/ Gutter, This project will include: This project will include: Paving and/or Striping Rehab/Repair Road Maintenance & Street Signage, Pavement (existing safety), Sidewalk and/or Crosswalk Rehab/Repair (existing), Storm Drain Bell Gardens Los Angeles 20/21 In Progress Citywide Pre-Construction 07/2021 06/2022 10-15 40 33 Rehabilitation Striping/Marking, and Pothole and/or Culvert Rehab/Repair (existing), Traffic Signals, Lights and/or Signage Repair and AC Overlay Rehab/Repair (existing). Maintenance Program

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Lanto Street - Ajax St to El Selinda Ave Sidewalk and/or Crosswalk Rehab/Repair (Existing), Pavement Rehab/Repair Lanto Street - El Seleinda Ave to Colmar St (Existing), ADA Curb Ramp Rehab/Repair (Existing) | This project will include: ADA Road Maintenance & Agra Street - Jabonera Rd to Darwell St Bell Gardens Los Angeles 21/22 New Residential Rehab Curb Ramp Installation (New), Paving and/or Striping Installation (New Safety), Construction 07/2021 06/2022 10-15 40 33 Rehabilitation Darwell Street - Gage Ave to Agra St Pavement Rehab/Repair (Existing), Storm Drain and/or Culvert Rehab/Repair Darwell Street - Agra St to Watcher St (Existing), Sidewalk and/or Crosswalk Rehab/Repair (Existing), Traffic Signals, Lights, Darwell Street - Florence Ave to Lubec St and/or Signage Rehab/Repair (Existing Safety)

Road Maintenance & Bellflower Boulevard between Bellflower Los Angeles 19/20 In Progress This project will include: Pavement Rehab/Repair (Existing) Bellflower Boulevard between Flower Street and Beach Street Construction 07/2021 09/2021 10-15 58 32 Rehabilitation Flower Street and Beach Street

Resurfacing of Clark Avenue Road Maintenance & Bellflower Los Angeles 19/20 In Progress between Foster Road and Alondra This project will include: Pavement Rehab/Repair (Existing) Clark Avenue between Foster Road and Alondra Boulevard Construction 07/2021 09/2021 10-15 58 32 Rehabilitation Boulevard

Resurfacing of Alondra Boulevard Road Maintenance & Bellflower Los Angeles 20/21 Carried Over from Hayter Avenue to Bellflower This project will include: Pavement Rehab/Repair (Existing) Alondra Boulevard from Hayter Avenue to Bellflower Boulevard Construction 06/2022 09/2022 10-15 58 32 Rehabilitation Boulevard

*This list is subject to change and will be finalized upon the adoption of any jurisdiction that meets subsequent eligibility at the October 2021 Commission Meeting. Draft City Submitted - Fiscal Year 2021-22 Local Streets and Roads List of Projects *Projects listed are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1) August 19, 2021

Fiscal Year Initially Proposed Project Est Assembly Senate City County Project Type Title Description Location Components Est Start Est Useful Life Proposed Status Completion Districts Districts

Linden Drive between Whittier Drive and North Santa Monica Blvd; Burton Way (North side) between Rexford Drive and This project will include: Pavement Rehab/Repair (Existing) | This project is slated for Oakhurst Drive; Rexford Dr. bet. Whitworth & Pico Bl; Crescent Design and may be using RMRA funding in support of the Construction. The design Dr bet. Sunset Blvd. and Lexington Rd.; Copley Place near Road Maintenance & Beverly Hills - Road Repair and construction related rehabilitation of roadway paving for multiple locations Beverly Hills Los Angeles 20/21 Carried Over Sunset Blvd.; Linden Drive between S. Santa Monica Blvd and Construction 06/2021 06/2024 15-20 50 26 Rehabilitation Improvements throughout the City that will include the use of recycled rubberized asphalt, whenever Charleville Blvd.; Rexford Dr. between Olympic Blvd. and feasible. All project details are an estimate and are subject to change throughout the Wilshire Blvd.; Almont Dr. between Charleville Blvd. and Olympic year based on priority need and resources available to the City. Blvd.; Burton Way (South side) between N. Rexford Drive and N. Robertson Blvd.

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Road Maintenance & Street Restoration Zones 5, 6, 7, Zones 5, 6, 7, and 8. Please see Exhibit 1 in the FY 21/22 Burbank Los Angeles 21/22 New Sidewalk and/or Crosswalk Rehab/Repair (Existing), Pavement Rehab/Repair Construction 06/2022 11/2022 20-20 43 25 Rehabilitation and 8 Resolution for the full street listing (Existing), ADA Curb Ramp Rehab/Repair (Existing)

This project will include: The improvements on Mulholland Hwy adjacent to the Calabasas High School include sidewalk connecting between the eastern high school driveway on Mulholland Highway and an access road to the high school on Old Mulholland Hwy between Old Topanga Cyn Rd and 770 feet east Complete Streets Calabasas Los Angeles 19/20 In Progress Mulholland Hwy Gap Closure Topanga Canyon Rd, and will also include extending the existing Class II bike facility of Old Topanga Cyn Rd and Old Topanga Cyn Rd between Construction 06/2021 12/2021 20-25 45 27 Components to Old Topanga Canyon Rd. The pedestrian and bicycle facilities will end on Mulholland Hwy and 810 feet north of Mulholland Hwy Mulholland Highway, in front of Calabasas High School, approximately 770 feet east of the intersection.

This project will include: Repair and Servicing of Public Works Systems/Databases | Ten Locations - Parkway Calabasas @Park Entrada, @Paseo Traffic Control Devices -Advanced Advanced traffic controllers allow the City to preset various green intervals and cycle Primario; Calabasas Rd @ Parkway Calabasas, @Civic Center Procurement/Operatio Calabasas Los Angeles 20/21 Carried Over Traffic Control Devices Traffic Controllers at traffic lengths in response to traffic demand. Replacement of the controllers will occur Way, @Common Ways, @Park Granada; Park Granada @Park 09/2021 03/2022 12-15 45 27 nal Needs signalized intersections primarily at the signals on Parkway Calabasas, Lost Hills Rd and Calabasas Rd. Sorrento, @Park Capri; Lost Hills Rd @Agoura Rd, @Canwood These are the major thoroughfares in the City. St.

This project will include: This project would upgrade the existing outdated traffic signal system hardware and software to the latest version which would allow for more efficient performance and reliability. The work would include installation of a new Traffic Signal System Upgrade and 100 Civic Center Way an other traffic signals located around the Procurement/Operatio Calabasas Los Angeles 21/22 New Traffic Control Devices system server, system software upgrades, new traffic operations center equipment 04/2021 08/2022 12-15 45 27 Synchronization Project City nal Needs replacement and upgrades, installation of communications equipment at four traffic signals, and new signals, and new signal timing modeling and synchronization changes.

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Malibu Hills Road and various other City streets including but not Road Maintenance & Calabasas Los Angeles 21/22 New Annual Street Resurfacing Project Paving and/or Striping Installation (New Safety), ADA Curb Ramp Rehab/Repair limited to Founders Dr, Lemans Dr, Belleau Ct, Park Hermosa, Construction 07/2021 10/2021 8-15 45 27 Rehabilitation (Existing) Park Melinda

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Road Maintenance & West Rowland Avenue Covina Los Angeles 21/22 New Sidewalk and/or Crosswalk Rehab/Repair (Existing), Pavement Rehab/Repair West Rowland Avenue, from westerly City limit to Citrus Avenue Construction 07/2021 12/2021 10-15 48 22 Rehabilitation Rehabilitation Project (Existing), ADA Curb Ramp Rehab/Repair (Existing)

Road Maintenance & Higuera Street Bridge Higuera Street over Ballona Creek between Jefferson Boulevard Culver City Los Angeles 21/22 New This project will include: Bridge Structure Rehab/Repair (Existing), Bicycle Lane (New) Construction 09/2021 01/2023 60-100 54 30 Rehabilitation Replacement Project and Eastham Drive.

*This list is subject to change and will be finalized upon the adoption of any jurisdiction that meets subsequent eligibility at the October 2021 Commission Meeting. Draft City Submitted - Fiscal Year 2021-22 Local Streets and Roads List of Projects *Projects listed are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1) August 19, 2021

Fiscal Year Initially Proposed Project Est Assembly Senate City County Project Type Title Description Location Components Est Start Est Useful Life Proposed Status Completion Districts Districts

This project will include: Sidewalk and/or Crosswalk Installation (New), Pavement Improvement (New), Sidewalk and/or Crosswalk Rehab/Repair (Existing), Storm Drain and/or Culvert Rehab/Repair (Existing), Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), ADA Curb Ramp Rehab/Repair (Existing), Paving Grand Ave/Golden Springs Drive and/or Striping Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing), Diamond Bar Los Angeles 19/20 In Progress Other Intersection of Grand Ave. and Golden Springs Drive Construction 02/2021 02/2023 10-20 55 29 Intersection Enhancement ADA Curb Ramp Installation (New), Landscape Safety Rehab/Repair (Existing), Landscape Safety Installation (New), Paving and/or Striping Installation (New Safety) | As a result of the widening of the Grand/Golden Springs Drive intersection being performed by the City of Industry, pedestrian hardscape and landscape enhancements associated with crosswalks, sidewalks and parkways are being implemented.

Arterial Street Rehab (Diamond This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Road Maintenance & Diamond Bar Blvd. between Mountain Laurel Way and Pathfinder Diamond Bar Los Angeles 19/20 In Progress Bar Blvd from Pathfinder Road to Pavement Rehab/Repair (Existing), ADA Curb Ramp Rehab/Repair (Existing), Bicycle Construction 05/2021 06/2021 10-20 55 29 Rehabilitation Road Mountain Laurel Way) Lane Rehab/Repair (Existing)

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Arterial Street Rehab (Golden Pavement Rehab/Repair (Existing), Bicycle Lane Rehab/Repair (Existing), ADA Curb Road Maintenance & Diamond Bar Los Angeles 21/22 New Springs from Brea Canyon to Ramp Rehab/Repair (Existing) | As part of the City's ongoing pavement rehabilitation Golden Springs from Brea Canyon to Lemon Ave. Construction 10/2021 11/2021 10-20 55 29 Rehabilitation Lemon Ave.) program, the entire width of Golden Springs Drive from Brea Canyon Road to Lemon Avenue. 0.6 Centerline Miles will be rehabilitated.

This project will include: Sidewalk and/or Crosswalk Installation (New), Sidewalk and/or Crosswalk Rehab/Repair (Existing), Active Transportation Plan, Traffic Signals, Lights, and/or Signage Installation (New Safety), Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), ADA Curb Ramp Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety), Project Scope Development, ADA South Downey Safe Routes to Blodgett Ave: Adoree St., Airport Ave., Lankin St., Quoit St., Pre-Construction and 07/2020 06/2021 Downey Los Angeles 20/21 In Progress Safety Curb Ramp Installation (New), Pavement Rehab/Repair (Existing), Document 25-50 58 32 School Project Nada St., Julius St., Pomering Rd. & Laura St. Construction 07/2021 10/2021 Preparation, Preliminary Design, Paving and/or Striping Installation (New Safety) | Construction of sidewalks and curb ramps, signage, replacement of striping, pavement markings, install vehicle speed feedback signs along the project limit and school safety education program | The project was in the design phase during throughout 2017-2019. The project is expected to start construction in July 2020.

This project will include: Sidewalk and/or Crosswalk Rehab/Repair (Existing), Pavement Rehab/Repair (Existing), Storm Drain and/or Culvert Rehab/Repair Road Maintenance & FY 2020/2021 Residential Streets (Existing), ADA Curb Ramp Rehab/Repair (Existing) | Rehabilitation of pavement on Council Districts 3 and 4 (Northwest and Northeast Quadrants). Downey Los Angeles 20/21 Carried Over Construction 08/2021 12/2021 5-7 58 32 Rehabilitation Pavement Rehabilitation various residential streets in Council Districts 3 and 4 (Northwest and Northeast Exact locations to be determined. Quadrants) and replacement of damaged sidewalk and curb and gutter and reconstruction of curb access ramps to comply with current ADA requirements.

This project will include: Sidewalk and/or Crosswalk Rehab/Repair (Existing), ADA Curb Ramp Installation (New) | Annual miscellaneous FY 2021 /2022 Miscellaneous concrete construction and Concrete Repairs (Council District Downey Los Angeles 21/22 New Safety repairs of concrete surfaces in Council District 3 and Northwest Quadrant Construction 09/2021 04/2022 20-50 58 32 3) and ADA Improvements construction of ADA-compliant curb access ramps, drive (Citywide) approaches and sidewalks Citywide.

This project will include: Pavement Rehab/Repair (Existing), ADA Curb Ramp Rehab/Repair (Existing) | Rehabilitation of pavement on various residential streets in Residential streets in the neighborhood generally bounded by FY 2021/2022 Annual Residential Road Maintenance & Council District 2 and Imperial Highway to the north, Lakewood Boulevard to the east, Downey Los Angeles 21/22 New Streets Pavement Rehabilitation Construction 07/2021 12/2021 15-20 58 32 Rehabilitation replacement of damaged Century Boulevard to the south and Old River School Road to (Council District 2, Area 10) sidewalk and curb and gutter and reconstruction of curb the west access ramps to comply with current ADA requirements.

*This list is subject to change and will be finalized upon the adoption of any jurisdiction that meets subsequent eligibility at the October 2021 Commission Meeting. Draft City Submitted - Fiscal Year 2021-22 Local Streets and Roads List of Projects *Projects listed are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1) August 19, 2021

Fiscal Year Initially Proposed Project Est Assembly Senate City County Project Type Title Description Location Components Est Start Est Useful Life Proposed Status Completion Districts Districts

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing), Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety) | Construction of raised center median islands, Telegraph Road (West City Limit to Lakewood rehabilitation of existing asphalt pavement, new construction and repair of Telegraph Road Traffic Throughput Boulevard and Downey Los Angeles 21/22 New Safety miscellaneous concrete Construction 06/2020 10/2021 15-20 58 32 & Safety Enhancements, Phase 2 Passons surfaces, traffic signal Boulevard to East City Limit) upgrades and incidental signage, striping and pavement markings

1. Melcanyon Rd. from Royal Oaks Dr. to Brookridge Rd. 2. Opal Canyon Rd. from Melcanyon Rd. to Brookridge Rd. Road Maintenance & Fiscal Year 2021-22 Street This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Duarte Los Angeles 21/22 New 3. Brookridge Rd. from Melcanyon Rd. to Tannen Crest Rd. Construction 01/2022 05/2022 20-25 48 25 Rehabilitation Rehabilitation Project Pavement Rehab/Repair (Existing) 4. Bettyhill Ave. from Deerlane Dr. to End of Street 5. Deerlane Dr. from Greenbank Ave. to Melcanyon Rd.

This project will include: Sidewalk and/or Crosswalk Installation (New), Sidewalk and/or Crosswalk Rehab/Repair (Existing), Bicycle Lane (New), Cost Estimating, ADA Curb Merced Ave - Garvey Ave to Rio Ramp Rehab/Repair (Existing), ADA Curb Ramp Installation (New), Pavement Complete Streets Pre-Construction and 06/2021 12/2021 El Monte Los Angeles 19/20 Forecasted Hondo Parkway Road diet (Traffic Rehab/Repair (Existing), Landscape Safety Installation (New), Document Preparation, Merced Ave from Garvey Ave to Rio Hondo Parkway 5-15 48, 49 22 Components Construction 12/2022 12/2023 Calming) Preliminary Design, Paving and/or Striping Installation (New Safety), Environmental Study/Documents | Traffic Calming and Road Diet; linear park within landscaped median

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Zone 3 - Pavement Rehab and Sidewalk and/or Crosswalk Rehab/Repair (Existing), Pavement Rehab/Repair Road Maintenance & Area encompassing east of Arden, south of Lower Azusa, west Pre-Construction and 06/2021 03/2022 El Monte Los Angeles 21/22 New Reconstruction of ADA Curb (Existing), Bicycle Lane (New), Document Preparation, Cost Estimating, Traffic 10-20 48, 49 22 Rehabilitation of Rio Hondo Channel, and north of UPRR Construction 07/2022 12/2022 Ramps Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Preliminary Design, Environmental Study/Documents, ADA Curb Ramp Rehab/Repair (Existing)

El Segundo Blvd. from Main St. to Road Maintenance & El Segundo Los Angeles 21/22 New Illinois St. Pavement Rehabilitation This project will include: Pavement Rehab/Repair (Existing) El Segundo Blvd. from Main St. to Illinois St. Construction 04/2022 06/2022 10-15 62 26 Rehabilitation Project

Road Maintenance & Local Streets Improvement 2021- This project will include: Project Scope Development, Document Preparation, Cost Gardena Los Angeles 21/22 New Various Pre-Construction 01/2022 12/2022 5-10 51 25 Rehabilitation 2022 Estimating, Preliminary Design | Anticipated year of construction: 2023

Road Maintenance & This project will include: Project Scope Development, Cost Estimating, Document West Broadway between San Fernando Road and South Central Glendale Los Angeles 21/22 New Broadway Rehabilitation Project Pre-Construction 07/2021 06/2022 10-25 43 25 Rehabilitation Preparation, Preliminary Design Avenue

South Verdugo Road between East Colorado and Southerly City Road Maintenance & South Verdugo Road Street This project will include: Project Scope Development, Document Preparation, Cost Boundary, Maple Street between Verdugo Road and Zinnia Lane, Glendale Los Angeles 21/22 New Pre-Construction 07/2021 06/2022 10-25 43 25 Rehabilitation Improvement Project Estimating, Preliminary Design Zinnia Lane between Maple Street and Rockglen Avenue, Rockglen Avenue between Zinnia Lane and Easterly Terminus

*This list is subject to change and will be finalized upon the adoption of any jurisdiction that meets subsequent eligibility at the October 2021 Commission Meeting. Draft City Submitted - Fiscal Year 2021-22 Local Streets and Roads List of Projects *Projects listed are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1) August 19, 2021

Fiscal Year Initially Proposed Project Est Assembly Senate City County Project Type Title Description Location Components Est Start Est Useful Life Proposed Status Completion Districts Districts

Road Maintenance & Cullen Avenue Street Cullen Avenue from Bennett Avenue to Foothill Blvd. North of Glendora Los Angeles 19/20 Carried Over This project will include: Pavement Rehab/Repair (Existing) Construction 12/2021 03/2022 15-30 48 25 Rehabilitation Rehabilitation Little Dalton Wash.

Annual Citywide Sidewalk Citywide - remove and replace sidewalk for Pedestrian safe Glendora Los Angeles 21/22 New Safety This project will include: Maintenance Program Plan Development Pre-Construction 09/2021 06/2022 10-20 48 25 Improvements movement

Citywide ADA compliant Curb Glendora Los Angeles 21/22 New Safety This project will include: Maintenance Program Plan Development Citywide - provide ADA compliant path of travel Pre-Construction 09/2021 06/2022 10-20 48 25 Ramps Improvements

Road Maintenance & Glendora Los Angeles 21/22 New Annual Citywide Slurry Seal Project This project will include: Maintenance Program Plan Development Citywide - to be done in different Council Districts Pre-Construction 09/2021 06/2022 5-15 48 25 Rehabilitation

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), 1- 221st Street from Norwalk Boulevard to Wardham Avenue 2- Sidewalk and/or Crosswalk Rehab/Repair (Existing), Pavement Rehab/Repair Arline Avenue from 223rd Street to 226th Street 3- Clarkdale (Existing), ADA Curb Ramp Rehab/Repair (Existing) | The street improvements Avenue from 223rd Street to 226th Street 4- Joliet Avenue from Road Maintenance & Various Streets Rehabilitation Hawaiian Gardens Los Angeles 21/22 New include grinding existing asphalt concrete; overlaying the full street width with Asphalt 223rd Street to 226th Street 5- 221st Street from Arline Avenue Construction 11/2021 09/2022 10-13 63 32 Rehabilitation Project FY 2021-22 Rubber Hot Mix (ARHM); crack and slurry sealing, removing and replacing damaged to Seine Avenue 6- 224th Street from Belshire Avenue to curbs and gutters, sidewalks; installing new ADA compliant curb ramps; restriping and Wardham Avenue 7- Ibex Avenue from 221st Street to 223rd upgrading existing crosswalks with thermoplastic paint. Street

This project will include: Project Scope Development, Paving and/or Striping Rehab/Repair (Existing Safety), Right of Way, Sidewalk and/or Crosswalk Rehab/Repair (Existing), Pavement Rehab/Repair (Existing), Cost Estimating, Road Maintenance & 120th St Improvements-Crenshaw Document Preparation, Preliminary Design, Traffic Signals, Lights, and/or Signage Pre-Construction and 07/2021 06/2022 Hawthorne Los Angeles 21/22 New 120th St between Crenshaw Blvd to Felton Ave 10-20 62 35 Rehabilitation Blvd to Felton Ave Rehab/Repair (Existing Safety), Environmental Study/Documents, ADA Curb Ramp Construction 07/2021 06/2022 Rehab/Repair (Existing) | This project includes traffic signal upgrades (upgrade signals, controllers, and detection) and coordination at eight signalized intersections and improve crossings and signage at spot locations in the coordinator.

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Sidewalk and/or Crosswalk Rehab/Repair (Existing), Pavement Rehab/Repair (Existing), Landscape Safety Rehab/Repair (Existing), ADA Curb Ramp Rehab/Repair The following neighborhoods may be subject to the proposed Road Maintenance & Local Street Improvement Project (Existing) | This project will reconstruct selected streets at various locations. The Pre-Construction and 07/2021 06/2022 Hawthorne Los Angeles 21/22 New improvements described: Northeast, Northwest, Bodger Park, 10-20 62 35 Rehabilitation 2022 project will rehabilitate streets in these areas using rubber hot mix over asphalt Construction 07/2021 06/2022 Burleigh, Del Aire, and Moneta Gardens. concrete leveling course to improve safety and drive-ability. This will include full depth reconstruction of specific failed areas as well as grinding, excavation, and removal of existing pavement, new pavement, and traffic striping and markings.

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Sidewalk and/or Crosswalk Rehab/Repair (Existing), Pavement Rehab/Repair The following neighborhoods may be subject to improvements Road Maintenance & Ongoing Maintenance (Per (Existing), Landscape Safety Rehab/Repair (Existing), Traffic Signals, Lights, and/or described: Northeast, Bodger Park, Burleigh, Del Aire, Moneta Hawthorne Los Angeles 21/22 New Construction 07/2021 06/2022 3-3 62 35 Rehabilitation attachment B) Signage Rehab/Repair (Existing Safety), ADA Curb Ramp Rehab/Repair (Existing) | Gardens, and Northwest. Alley ways throughout will also be Staff performs general maintenance on ADA curb ramps, landscape, pavement rehab, addressed. striping, sidewalk, traffic signals, lights, and or signage repair.

*This list is subject to change and will be finalized upon the adoption of any jurisdiction that meets subsequent eligibility at the October 2021 Commission Meeting. Draft City Submitted - Fiscal Year 2021-22 Local Streets and Roads List of Projects *Projects listed are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1) August 19, 2021

Fiscal Year Initially Proposed Project Est Assembly Senate City County Project Type Title Description Location Components Est Start Est Useful Life Proposed Status Completion Districts Districts

6th Street from Valley Drive to Loma Drive This project will include: Right of Way, Sidewalk and/or Crosswalk Rehab/Repair 22nd Street from Hermosa Ave to Manhattan Ave Road Maintenance & CIP 192 Annual Striping Pre-Construction and 05/2021 06/2021 Hermosa Beach Los Angeles 21/22 New (Existing), Maintenance Program Plan Development, Traffic Signals, Lights, and/or Greenwhich Village from Hermosa Ave to 27th Street 7-10 66 26 Rehabilitation Improvements Construction 06/2021 07/2021 Signage Rehab/Repair (Existing Safety) Manhattan Ave. from 27th Street to Longfellow Ave Monterey Blvd. from Pier Ave. to 6th Street

Segments of Harper Ave, 19th St, 20th St, 20th Pl, 21st St, 24th Road Maintenance & CIP 186 Street Improvements - This project will include: Sidewalk and/or Crosswalk Installation (New), Pavement Pre-Construction and 06/2021 07/2021 Hermosa Beach Los Angeles 19/20 In Progress St, Montgomery Dr, Aubrey Park Ct, Aubrey Ct, Ocean Dr, 11th 10-20 66 26 Rehabilitation Various Locations Rehab/Repair (Existing) | Curb and gutter, curb ramps, and drainage deficiencies. Construction 08/2021 12/2021 Place, Palm Dr , Gould Terrace, and Ardmore.

This project will include: Sidewalk and/or Crosswalk Installation (New), Sidewalk and/or Segments of Harper Ave, 19th St, 20th St, 20th Pl, 21st St, 24th Road Maintenance & CIP 190 Annual Street Crosswalk Rehab/Repair (Existing), Pavement Rehab/Repair (Existing), Maintenance St, Springfield Ave, 24th St, Montgomery Dr, Aubrey Park Ct, Pre-Construction and 06/2021 07/2021 Hermosa Beach Los Angeles 19/20 Carried Over 10-20 66 26 Rehabilitation Improvements Program Plan Development | The project will also address limited quantities of Aubrey Ct, Ocean Dr, 11th Place, Plam Dr, Gould Terrace, and Construction 07/2021 12/2021 deteriorated concrete sidewalk, curb and gutter, curb ramps and drainage deficiencies. Ardmore.

This project will include: Renovation to existing landscaping & irrigation, pedestrian and bicycle rest area pathways and furniture at the Round Meadow Road and Mureau Round Meadow Road/Mureau Road intersection. Proposed improvements will provide better traffic site distances and Road Maintenance & Pre-Construction and 10/2020 10/2021 Hidden Hills Los Angeles 20/21 Carried Over Road Entry Intersection will improve and enhance the existing bicycle and pedestrian pathways and rest area. Round Meadow Road and Mureau Road intersection 15-25 45 27 Rehabilitation Construction 11/2021 02/2022 Improvements Major portions of the improvements will increase safety by improving site distances and protecting street shoulders and parkways while providing complete street components.

This project will include: The improvement and construction of a right turn pocket on Valley Circle Boulevard; an additional traffic lane on the Long Valley Corridor ramp from Valley Circle Boulevard to Long Valley Road Intersection; ADA compliant Long Valley Road in the City of Hidden Hills, the Long Valley Complete Streets Long Valley Road/Valley Circle/US- Pre-Construction and 04/2016 10/2021 Hidden Hills Los Angeles 19/20 Carried Over sidewalk from Long Valley Road security gate in the City of Hidden Hills to the Valley Road corridor/US-101 on-ramp in the City of Los Angeles, and 40-50 45 27 Components 101 On-Ramp Improvements Construction 12/2021 08/2022 Circle Boulevard/Ventura Boulevard intersection; the purchase and improvement of a Valley Circle Boulevard in the City of Los Angeles. parking/staging area on Long Valley Road in the City of Hidden Hills to alleviate traffic congestion; and the reconfiguration of the security gatehouse.

This project will include: Pavement Improvement (New), Paving and/or Striping Malabar St from Zoe Ave to Gage Ave, Gentry St from Gage Ave Rehab/Repair (Existing Safety), ADA Curb Ramp Installation (New), Pavement to Clarendon Ave, Otis St from Santa Ana St to Salt Lake Ave, Road Maintenance & FY 2020-01 SB 1 Street Huntington Park Los Angeles 20/21 Carried Over Rehab/Repair (Existing), Traffic Signals, Lights, and/or Signage Installation (New Marbrisa Ave from Florence Ave to Mortimer Ave, Cedar St from Construction 11/2021 06/2022 10-20 53, 59 33 Rehabilitation Enhancement Projects Safety), Paving and/or Striping Installation (New Safety), Traffic Signals, Lights, and/or Florence Ave to Saturn Ave, Regent St from Gage Ave to Zoe Signage Rehab/Repair (Existing Safety), ADA Curb Ramp Rehab/Repair (Existing) Ave

Road Maintenance & 2021-01 SB1 Street Enhancement This project will include: Project Scope Development, Right of Way, Cost Estimating, Miles Ave between Florence Ave and Slauson Ave and Santa Fe Huntington Park Los Angeles 21/22 New Pre-Construction 11/2021 06/2022 10-25 53, 59 33 Rehabilitation Project FY 21/22 Document Preparation, Preliminary Design, Environmental Study/Documents Ave between Florence and just north of Slauson

Road Maintenance & This project will include: Cold Mill Overlay, driveway approaches, improved hydrology Industry Los Angeles 19/20 In Progress Arenth Avenue Reconstruction Arenth Avenue from Puente Road to Nogales Street Construction 05/2021 12/2021 15-25 48, 55, 57 22, 29 Rehabilitation pattern, ADA improvements, striping, streetlights

*This list is subject to change and will be finalized upon the adoption of any jurisdiction that meets subsequent eligibility at the October 2021 Commission Meeting. Draft City Submitted - Fiscal Year 2021-22 Local Streets and Roads List of Projects *Projects listed are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1) August 19, 2021

Fiscal Year Initially Proposed Project Est Assembly Senate City County Project Type Title Description Location Components Est Start Est Useful Life Proposed Status Completion Districts Districts

This project will include: Sidewalk and/or Crosswalk Rehab/Repair (Existing), ADA Curb Ramp Installation (New), Pavement Rehab/Repair (Existing), Landscape Safety Installation (New), Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Road Maintenance & Inglewood Los Angeles 19/20 In Progress Centinela Avenue Improvements Safety), ADA Curb Ramp Rehab/Repair (Existing) | 1.5 miles of design of street Centinela from La Cienega to Florence Construction 08/2021 10/2022 10-20 62 35 Rehabilitation resurfacing, curb, gutter and sidewalk repairs, ADA ramp upgrades and related activates | The project is currently is 100% design complete. Final design is expected in December 2020 and bidding in January 2021.

Road Maintenance & Crenshaw Boulevard Improvement Inglewood Los Angeles 20/21 Carried Over This project will include: Cost Estimating, Document Preparation, Preliminary Design Crenshaw Boulevard I-105 to Manchester Boulevard Pre-Construction 05/2022 07/2023 10-20 62 35 Rehabilitation Project

Road Maintenance & Manchester Boulevard From Aviation Boulevard to Van Ness Inglewood Los Angeles 20/21 Carried Over Manchester Boulevard This project will include: Cost Estimating, Document Preparation, Preliminary Design Pre-Construction 02/2024 03/2025 10-20 62 35 Rehabilitation Avenue

Road Maintenance & Inglewood Los Angeles 20/21 Carried Over Aviation Boulevard Improvements This project will include: Document Preparation, Cost Estimating, Preliminary Design Aviation Boulevard from Arbor Vitae to Manchester Boulevard Pre-Construction 01/2022 12/2022 10-20 62 35 Rehabilitation

Road Maintenance & Inglewood Los Angeles 21/22 New South Prairie Improvement Project This project will include: Document Preparation, Cost Estimating, Preliminary Design Manchester Boulevard to Florence Boulevard Pre-Construction 03/2023 02/2024 10-20 62 35 Rehabilitation

Ayon Avenue, Calle Del Norte, Pat Miranda Lane, Juarez Street, This project will include: Sidewalk and/or Crosswalk Rehab/Repair (Existing), Road Maintenance & Calle De Paseo, Allen Drive, Progress Lane, Central Street, Irwindale Los Angeles 21/22 New 2021/2022 Resurfacing Project Pavement Rehab/Repair (Existing) | Resurfacing: 2" grind and overlay of AC Construction 12/2021 06/2022 10-15 48 22 Rehabilitation Peppertree Lane, Martinez Street, Baca Avenue, Sabre Lane, pavement, restriping, structural repairs when needed Calle Del Sur and Calle Breceda

The project includes the following streets within the City Limits: Bay Tree Rd; Briartree Dr; Summit Crest Dr; Catherwood Dr; Alder Ridge Dr;Lone Grove Way; Bramblewood Rd; Vista This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), La Canada Road Maintenance & FY 2021-22 City Street Canada Place; Big Briar Way; Noren St; Starlight Crest Dr; Los Angeles 21/22 New Sidewalk and/or Crosswalk Rehab/Repair (Existing), Pavement Rehab/Repair Construction 11/2021 05/2022 15-20 43 25 Flintridge Rehabilitation Resurfacing Program Madison Rd; Stardust Rd; Gleneagles Pl; Los AMogos St; (Existing), ADA Curb Ramp Rehab/Repair (Existing) Baptiste Way; Alveo Rd; Roanoke Pl; Keswick Rd; CountrymanLn; Belair Dr; Chevy Chase Dr; Inverness Dr; Berwick Dr; and Earlmont Ave.

Amate Dr.(Solejar Dr to End), Angola Ave.(West Rd to End), Cancho Dr.(West Rd to End), El Terraza D.(1,335' W/O Le Flore Dr. to Le Flore Dr.), La Riata Dr.(End to West Rd), Solejar This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Road Maintenance & FY 20/21 Street Improvement Dr.(Vista Del Llano Dr. to Le Flore Dr.), Solejar Dr. (Avocado La Habra Heights Los Angeles 20/21 In Progress Pavement Rehab/Repair (Existing), Storm Drain and/or Culvert Rehab/Repair Construction 09/2020 07/2021 6-20 57 32 Rehabilitation Project Crest Rd to Corella Ave), West Rd.(Arbela Dr to Las Palomas (Existing), Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety) Dr), Arbela Dr. (West Rd to City Limit), Calle Juca Rd(West Rd to End), Las Palomas Dr(West Rd to El Cajonita Dr), Vista Del Llano Dr(Solejar Dr to End)

*This list is subject to change and will be finalized upon the adoption of any jurisdiction that meets subsequent eligibility at the October 2021 Commission Meeting. Draft City Submitted - Fiscal Year 2021-22 Local Streets and Roads List of Projects *Projects listed are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1) August 19, 2021

Fiscal Year Initially Proposed Project Est Assembly Senate City County Project Type Title Description Location Components Est Start Est Useful Life Proposed Status Completion Districts Districts

Encanada Dr. From Hacienda Rd. to Subtropic Dr., Las Palomas This project will include: Pavement Rehab/Repair (Existing), Storm Drain and/or Dr. From El Cajonita Dr. to Lupin Hill Rd., Subtropic Dr. From Road Maintenance & FY 2021-022 Street Improvement La Habra Heights Los Angeles 21/22 New Culvert Rehab/Repair (Existing), Traffic Signals, Lights, and/or Signage Rehab/Repair West Rd. to Canonita Dr., Hacienda Rd. From Skyline Dr. to Construction 09/2021 06/2022 10-20 57 32 Rehabilitation Project (Existing Safety) North City Limit, Shawnan Ln. From El Travesia Dr. to End, West Rd. From Las Palomas Dr. to Hacienda Rd./

This project will include: Sidewalk and/or Crosswalk Rehab/Repair (Existing), Road Maintenance & Residential Street Rehabilitation Pavement Rehab/Repair (Existing), Traffic Signals, Lights, and/or Signage Imperial Highway, La Mirada Blvd, Calpella Street and Biola La Mirada Los Angeles 21/22 New Construction 09/2021 03/2022 20-25 57 32 Rehabilitation Phase VI B Rehab/Repair (Existing Safety), Storm Drain and/or Culvert Rehab/Repair (Existing), Avenue. Bicycle Lane Rehab/Repair (Existing), ADA Curb Ramp Rehab/Repair (Existing)

Old Valley Blvd - Glendora Ave to Common Ave; Wickford Ave - Road Maintenance & FY 21-22 Street Improvements This project will include: Storm Drain/Culvert Installation (New), Pavement La Puente Los Angeles 21/22 New Main Street to Inyo Street; Elliott Ave - Amar Road to Hacienda Construction 04/2022 06/2022 20-25 57 22 Rehabilitation Project Rehab/Repair (Existing) Blvd; Las Vecinas Drive - Stimson Ave to East End

Rehabilitation of 5th 6th 7th C 5th 6th 7th Street from C to D Street and C Street from Bonita to Road Maintenance & Streets and Peyton Street ET AL La Verne Los Angeles 21/22 New This project will include: Right of Way, Maintenance Program Plan Development the northern terminus, as well as Peyton Road from D Street to Pre-Construction 08/2021 10/2021 10-15 41 25 Rehabilitation GRIND A-RAM AND OVERLAY the western cul de sac. IMPROVEMENT PROJECT

Road Maintenance & Lakewood Los Angeles 20/21 Carried Over Carson St. ARHM Overlay This project will include: Pavement Rehab/Repair (Existing) 1,300 LF west of Paramount to 3,050 LF east of Paramount Construction 07/2021 06/2022 10-15 63 32, 33 Rehabilitation

This project will include: Sidewalk and/or Crosswalk Installation (New), Sidewalk and/or Crosswalk Rehab/Repair (Existing), Traffic Signals, Lights, and/or Signage Installation (New Safety), Bicycle Lane (New), Storm Drain and/or Culvert Rehab/Repair Road Maintenance & 10th Street West and Avenue J (Existing), Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), ADA 10th Street West from Lancaster Boulevard to Avenue J, Avenue Pre-Construction and 07/2021 08/2021 Lancaster Los Angeles 20/21 Carried Over 7-30 36 21 Rehabilitation Improvements Curb Ramp Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing J from 10th Street West to Challenger Way Construction 08/2021 11/2021 Safety), Pavement Rehab/Repair (Existing), ADA Curb Ramp Installation (New), Right of Way Acquisition, Paving and/or Striping Installation (New Safety), Preliminary Design

This project will include: Right of Way, Cost Estimating, Preliminary Design, Environmental Study/Documents | The Lancaster Health District involves construction of two (2) miles of new roadway to alleviate burden to the existing arterial network, while still providing necessary access to existing and proposed medical facilities. The project area is bounded by 12th Street West on the east, Road Maintenance & Lancaster Health District (formerly Includes approx. 700, 000 SF of Rehabilitation, Restoration and Resurfacing (3R) Lancaster Los Angeles 20/21 Carried Over Avenue J on the north, 20th Street West on the west, and SR-14 Pre-Construction 12/2020 03/2022 20-50 36 21 Rehabilitation Medical Main Street) Improvements on 15th Street West, Avenue J to Avenue J-8; and Avenue J-8, 20th and Avenue J-8 on the south. Street West to 12th street West. Road diet measures throughout the project area. | Installation of roundabouts in lieu of traditional signalized intersections; Pedestrian Amenities, Bicycle Detection and Bicycle Amenities; Half Mile Jogging Path; 3R Improvements; and Transit Access Amenities.

Road Maintenance & FY22 CD1 Residential Street This project will include: Sidewalk and/or Crosswalk Rehab/Repair (Existing), Elm Avenue (6th Street to 8th Street) and 16th Street (Pacific Long Beach Los Angeles 21/22 New Construction 10/2021 10/2022 10-15 70 33 Rehabilitation Repair Pavement Rehab/Repair (Existing) | Maintenance/Rehabilitation of 0.51 miles of road Avenue to Elm Avenue)

*This list is subject to change and will be finalized upon the adoption of any jurisdiction that meets subsequent eligibility at the October 2021 Commission Meeting. Draft City Submitted - Fiscal Year 2021-22 Local Streets and Roads List of Projects *Projects listed are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1) August 19, 2021

Fiscal Year Initially Proposed Project Est Assembly Senate City County Project Type Title Description Location Components Est Start Est Useful Life Proposed Status Completion Districts Districts

Road Maintenance & FY22 CD2 Residential Street This project will include: Sidewalk and/or Crosswalk Rehab/Repair (Existing), Hoffman Ave (10th St to 11th St) Long Beach Los Angeles 21/22 New Construction 10/2021 10/2022 10-15 70 33 Rehabilitation Repair Pavement Rehab/Repair (Existing) | Maintenance/Rehabilitation of 0.7 miles of road 11th St (Orange Ave to Gardenia Ave)/South Half of street

Costa Del Sol Way (South End to Loynes Dr) Road Maintenance & FY22 CD3 Residential Street This project will include: Sidewalk and/or Crosswalk Rehab/Repair (Existing), Bixby Village Dr (Loynes Dr to Channel Dr) Long Beach Los Angeles 21/22 New Construction 10/2021 10/2022 10-15 70 34 Rehabilitation Repair Pavement Rehab/Repair (Existing) | Maintenance/Rehabilitation of 1.39 miles of road 5th St ( Margo Ave to East End) Margo Ave (6th St to 7th St)

Grand Ave (10th St to 11th St) 17th St (Cherry Ave to Junipero Ave) Road Maintenance & FY22 CD4 Residential Street This project will include: Sidewalk and/or Crosswalk Rehab/Repair (Existing), Long Beach Los Angeles 21/22 New Reservoir Dr (Pacific Coast Highway to Northwest End) Construction 10/2021 10/2022 10-15 70 33, 34 Rehabilitation Repair Pavement Rehab/Repair (Existing) | Maintenance/Rehabilitation of 0.88 miles of road Outer Traffic Circle (PCH to Ximeno Way) Woodruff Ave (Palo Verde Ave to Conquista Ave)

Monlaco Rd (Clark Ave to Tulane Ave Monlaco Rd (Woodruff Ave to Palo Verde Ave Svc Rd) Coralite St (Gondar Ave to Los Coyotes Diagonal Svc Rd) Gondar Ave (Wardlow Rd to Conant St) Road Maintenance & FY22 CD5 Residential Street This project will include: Sidewalk and/or Crosswalk Rehab/Repair (Existing), Long Beach Los Angeles 21/22 New Peabody St (Bellflower Bl Svc. Rd to San Anseline Ave) Construction 10/2021 10/2022 10-15 70 33, 34 Rehabilitation Repair Pavement Rehab/Repair (Existing) | Maintenance/Rehabilitation of 2.33 miles of road Ebel St (Greenbrier Rd to Charlemagne Ave) Osler Ave (Hanbury St to Parkcrest St) Parkcrest St (Osler Ave to Bellflower Bl) Albury Ave (Conant Ave to Parkcrest St)

Road Maintenance & FY22 CD6 Residential Street This project will include: Sidewalk and/or Crosswalk Rehab/Repair (Existing), 11th St (Martin Luther King Jr Ave to Orange Ave) Long Beach Los Angeles 21/22 New Construction 10/2021 10/2022 10-15 70 33 Rehabilitation Repair Pavement Rehab/Repair (Existing) | Maintenance/Rehabilitation of 0.82 miles of road 11th St (Orange Ave to Gardenia Ave)/North Half of street

19th St (Technology Pl to Santa Fe Ave) Road Maintenance & FY22 CD7 Residential Street This project will include: Sidewalk and/or Crosswalk Rehab/Repair (Existing), Cota Ave (25th St to Willow St) Long Beach Los Angeles 21/22 New Construction 10/2021 10/2022 7-15 70 33, 35 Rehabilitation Repair Pavement Rehab/Repair (Existing) | Maintenance/Rehabilitation of 0.50 miles of road 27th St (Delta Ave to Gale Ave) 37th St (Country Club Dr to Pacifica Ave)

Road Maintenance & FY22 CD8 Residential Street This project will include: Sidewalk and/or Crosswalk Rehab/Repair (Existing), Country Club Dr (San Antono Dr to Pacifica Ave) Long Beach Los Angeles 21/22 New Construction 10/2021 10/2022 10-15 63, 64, 70 33, 35 Rehabilitation Repair Pavement Rehab/Repair (Existing) | Maintenance/Rehabilitation of 1.15 miles of road Pacifica Ave (Bixby Rd to Country Club Dr)

California Ave (South St to 60th St) Road Maintenance & FY22 CD9 Residential Street This project will include: Sidewalk and/or Crosswalk Rehab/Repair (Existing), Long Beach Los Angeles 21/22 New 60th St (Atlantic Ave to Orange Ave) Construction 10/2021 10/2022 10-15 63, 64 33, 35 Rehabilitation Repair Pavement Rehab/Repair (Existing) | Maintenance/Rehabilitation of 0.92 miles of road 72nd St (Atlantic Pl to Myrtle Ave)

This project will include: Storm Drain and/or Culvert Rehab/Repair (Existing) | For the construction of 450 linear feet of 24-inch diameter storm drain, maintenance holes, Beverlywood St, from Holt Ave to Corning Street; Council District Los Angeles Los Angeles 19/20 Carried Over Safety Beverlywood Street Storm Drain catch basins, junction structures, and laterals along Beverlywood St, from Holt Ave Construction 07/2021 12/2022 30-100 54 30 10 and Corning St. This project will alleviate flooding and improve safety of vehicle and pedestrian traffic.

*This list is subject to change and will be finalized upon the adoption of any jurisdiction that meets subsequent eligibility at the October 2021 Commission Meeting. Draft City Submitted - Fiscal Year 2021-22 Local Streets and Roads List of Projects *Projects listed are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1) August 19, 2021

Fiscal Year Initially Proposed Project Est Assembly Senate City County Project Type Title Description Location Components Est Start Est Useful Life Proposed Status Completion Districts Districts

This project will include: Storm Drain and/or Culvert Rehab/Repair (Existing) | Repair roadway to reduce flooding and promote safety: This project consists of constructing 600’ of 36”storm drain in Branford Street from the outlet at the Pacoima Wash Branford Street - Arleta Ave to . Council District 6: Branford Street - Arleta Los Angeles Los Angeles 19/20 Carried Over Safety Diversion Channel, northeasterly to Arleta Avenue. Branford Street is a heavily Construction 03/2022 01/2024 30-100 39 18 Pacoima Wash Ave to Pacoima Wash traveled secondary highway. The intersection of Arleta and Branford becomes flooded during even minor rainfall events, seriously impeding vehicular and pedestrian traffic. This can contribute to traffic accidents, increasing the City’s liability.

This project will include: Storm Drain and/or Culvert Rehab/Repair (Existing) | For the construction of 300 linear feet of 48-inch storm drain, catch basins, maintenance Collier Street from Quakertown Ave to Winnetka Ave; in Council Los Angeles Los Angeles 19/20 Carried Over Safety Collier Winnetka Storm Drain holes, laterals and associated improvements at Collier and Winnetka. This project will Construction 10/2021 06/2023 30-100 45 27 District 3 alleviate frequent flooding of the road and will improve safety of vehicle and pedestrian traffic by preventing the accumulation of water.

This project will include: Cost Estimating, Document Preparation, Environmental Study/Documents | Design Document only for the removal of the existing tiles and 2nd St. Tunnel between Figueroa St. and Hill St., Council District Los Angeles Los Angeles 21/22 New Safety 2nd Street Tunnel Rehabilitation Pre-Construction 07/2021 07/2023 1-5 53 24 replacement of the existing drainage system to ensure safety of traffic within the 14 tunnel.

This project will include: Maintenance Program Plan Development | To maintain 2nd Street Tunnel Safety Los Angeles Los Angeles 21/22 New Safety various safety mechanisms within the tunnel in order to ensure its safe and efficient 2nd St between Hill St and Figueroa St, Council District 14 Pre-Construction 07/2021 06/2022 1-5 53 24 Maintenance and Cleaning operation.

This project will include: Maintenance Program Plan Development | To maintain 3rd Street Tunnel Safety Los Angeles Los Angeles 21/22 New Safety various safety mechanisms within the tunnel in order to ensure its safe and efficient 3rd St Tunnel between Hill St and Flower St Pre-Construction 07/2021 06/2022 1-5 53 24 Maintenance and Cleaning operation.

Citywide - in the Valley, West LA,South LA, East LA, and Central 29, 38, 43, 45, This project will include: Public Works Staffing, Repair and Servicing of Public Works Bridge and Tunnel Maintenance City. Specific locations have yet to be finalized. Locations will be Procurement/Operatio 46, 50, 51, 53, 18, 24, 25, 26, Los Angeles Los Angeles 21/22 New Safety Equipment | For maintenance of City bridges and tunnels as identified by the City and 07/2021 06/2022 1-10 Program selected based upon priority needs and resources throughout the nal Needs 54, 59, 62, 64, 27, 30, 33, 35 Caltrans bridge inspectors to ensure public safety. year. 66, 70

Citywide - in the Valley, West LA,South LA, East LA, and Central 29, 38, 43, 45, This project will include: Public Works Staffing | Funds will be used to correct drainage City. Specific locations have yet to be finalized. Locations will be Procurement/Operatio 46, 50, 51, 53, 18, 24, 25, 26, Los Angeles Los Angeles 21/22 New Safety Safety Related Drainage Projects problems in City streets primarily caused by aged and worn gutters, cross-gutters, and 07/2021 06/2022 5-10 selected based upon priority needs and resources throughout the nal Needs 54, 59, 62, 64, 27, 30, 33, 35 curbs. year. 66, 70

29, 38, 43, 45, This project will include: Use of this contingency funding for street improvement Specific location(s) have yet to be finalized. Locations will be 46, 50, 51, 53, 18, 24, 25, 26, Los Angeles Los Angeles 21/22 New Safety Contingency for Construction project(s) will be determined at a later date. The project(s) will be selected based upon selected based upon priority needs and resources throughout the Construction 07/2021 06/2022 1-10 54, 59, 62, 64, 27, 30, 33, 35 priority need. year. 66, 70

This project will include: Funds will be used to construct steel beam with concrete panel bulkhead with a maximum height of 12 feet and a length of approximately 32 Road Maintenance & Across the street from the property with an address of 645 Cross Los Angeles Los Angeles 21/22 New Cross Avenue (645) Bulkhead feet with a metal beam guardrail and replace a deteriorated AC berm and install new Construction 04/2022 09/2022 30-50 51 24 Rehabilitation Avenue, Council District 1 berm with a length of about 80 feet. This will restore lateral support and safety to the roadway.

*This list is subject to change and will be finalized upon the adoption of any jurisdiction that meets subsequent eligibility at the October 2021 Commission Meeting. Draft City Submitted - Fiscal Year 2021-22 Local Streets and Roads List of Projects *Projects listed are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1) August 19, 2021

Fiscal Year Initially Proposed Project Est Assembly Senate City County Project Type Title Description Location Components Est Start Est Useful Life Proposed Status Completion Districts Districts

This project will include: Constuct steel beam with concrete panel bulkhead with a Road Maintenance & maximum height of 6 feet and a length of approximately 240 feet with a metal beam Across the street from the property with an address of 2013 Los Angeles Los Angeles 21/22 New Glencoe Way (2013 N) Bulkhead Construction 04/2022 09/2022 30-50 46 26 Rehabilitation guardrail and replace a deteriorated AC berm with a new berm with a length of about Glencoe Way in Council District 4 240 feet. This project will restore lateral support and safety to the roadway.

This project will include: Construct steel beam with concrete panel bulkhead with a Road Maintenance & maximum height of 6 feet and a length of approximately 56 feet with a metal beam Along the west side of the property with an address of 2364 W Los Angeles Los Angeles 21/22 New Live Oak Drive (2374) Bulkhead Construction 01/2022 07/2022 30-50 43 25 Rehabilitation guardrail and concrete curb and gutter. The project will restore lateral support and Live Oak Drive in Council District 4 safety to the roadway.

This project will include: Constuct steel beam with concrete panel bulkhead with a maximum height of 6 feet and a length of approximately 115 feet, and a steel beam Road Maintenance & Pacific View Drive (7297-7300) Los Angeles Los Angeles 21/22 New and concrete lagging debris barrier approximately 13.5-ft in height and 115 ft in length, 7297-7300 Pacific View Drive in Council District 4 Construction 11/2021 07/2022 30-50 46 26 Rehabilitation Bulkhead Replacement including scaling and benching of slope. The project will restore lateral support and safety to the roadway.

This project will include: Storm Drain/Culvert Installation (New) | Construct new steel beam and pre-cast concrete lagging panel bulkhead with a maximum height of 10 feet and a length of approximately 210 feet to replace an existing timber bulkhead. Install Road Maintenance & Reservoir Street (1921 W.) Across the street from the property with an address of 1921 Los Angeles Los Angeles 21/22 New metal beam guardrail, fencing, new curb and gutter for upper portion of the roadway, Construction 10/2021 05/2022 30-50 51 24 Rehabilitation Bulkhead Replacement Reservoir Street in Council District 13 remove and replace approximately 10-ft wide section on the upper roadway. Removal of slough and debris on lower section of Reservoir St. Install new storm drain pipe and catch basin and connect to existing storm drain system.

This project will include: Procurement of Road Maintenance and Rehab Materials | Citywide - in the Valley, West LA,South LA, East LA, and Central 29, 38, 43, 45, High Voltage Conversion Program -Funds will be used to purchase materials for the conversion of 800 series high voltage City. Specific locations have yet to be finalized. Locations will be Procurement/Operatio 46, 50, 51, 53, 18, 24, 25, 26, Los Angeles Los Angeles 21/22 New Safety 07/2021 06/2022 10-23 Materials lighting units to low voltage LED, including circuit breakers as part of the Accelerated selected based upon priority needs and resources throughout the nal Needs 54, 59, 62, 64, 27, 30, 33, 35 High Voltage Conversion Program to lower voltage to provide public safety. year. 66, 70

This project will include: Public Works Staffing | Funds for the Bureau of Street Vision Zero Traffic Signals Support Procurement/Operatio Los Angeles Los Angeles 21/22 New Safety Lighting to support the traffic signal construction workload for new traffic signals 1149 S Broadway in Council District 14 07/2021 06/2022 1-1 53 30 (Bureau of Street Lighting) nal Needs citywide.

Board of Public Works (Accounting This project will include: Public Works Staffing | To provide accounting support for the Procurement/Operatio Los Angeles Los Angeles 21/22 New Other 200 N. Spring St in Council District 14 07/2021 06/2022 1-1 53 24 Support) RMRA Fund. nal Needs

Citywide - in the Valley, West LA,South LA, East LA, and Central 29, 38, 43, 45, This project will include: Procurement of Road Maintenance and Rehab Materials, Road Maintenance & City. Specific locations have yet to be finalized. Locations will be Procurement/Operatio 46, 50, 51, 53, 18, 24, 25, 26, Los Angeles Los Angeles 21/22 New Failed Street Reconstruction Public Works Staffing | Funds will be used for the reconstruction of failed pavement 07/2021 06/2022 15-35 Rehabilitation selected based upon priority needs and resources throughout the nal Needs 54, 59, 62, 64, 27, 30, 33, 35 streets across the City. year. 66, 70

*This list is subject to change and will be finalized upon the adoption of any jurisdiction that meets subsequent eligibility at the October 2021 Commission Meeting. Draft City Submitted - Fiscal Year 2021-22 Local Streets and Roads List of Projects *Projects listed are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1) August 19, 2021

Fiscal Year Initially Proposed Project Est Assembly Senate City County Project Type Title Description Location Components Est Start Est Useful Life Proposed Status Completion Districts Districts

Citywide - in the Valley, West LA,South LA, East LA, and Central 29, 38, 43, 45, This project will include: Public Works Staffing, Procurement of Road Maintenance Road Maintenance & City. Specific locations have yet to be finalized. Locations will be Procurement/Operatio 46, 50, 51, 53, 18, 24, 25, 26, Los Angeles Los Angeles 21/22 New Concrete Streets and Rehab Materials | Funds will be used for the repair or replacement of concrete 07/2020 06/2022 15-35 Rehabilitation selected based upon priority needs and resources throughout the nal Needs 54, 59, 62, 64, 27, 30, 33, 35 panels citywide by Public Works staff. year. 66, 70

29, 38, 43, 45, This project will include: Public Works Staffing, Procurement of Road Maintenance for the application of Cool Pavement treatments and sustainable Road Maintenance & Cool Pavement/Sustainable Procurement/Operatio 46, 50, 51, 53, 18, 24, 25, 26, Los Angeles Los Angeles 21/22 New and Rehab Materials | For the application of Cool Pavement treatments and pavement technologies to prevent further deterioration of the 07/2021 06/2022 5-5 Rehabilitation Pavement Projects nal Needs 54, 59, 62, 64, 27, 30, 33, 35 sustainable pavement technologies to prevent further deterioration of the roadway. roadway. 66, 70

This project will include: Maintenance Program Plan Development | Funds will be used Sepulveda Blvd (LAX) Tunnel Sepulveda Blvd btw the 105 Fwy and Century Blvd in Council Los Angeles Los Angeles 21/22 New Safety to maintain various safety mechanisms within the tunnel to ensure pedestrian and Pre-Construction 07/2021 06/2022 1-10 62 26 Safety Maintenance and Clean District 11 vehicular safety.

This project will include: Maintenance Program Plan Development | Funds will be used Sherman Way Tunnel Safety Sherman Way between Woodley Ave and Havenhurst Ave in Los Angeles Los Angeles 21/22 New Safety to maintain various safety mechanisms within the tunnel to ensure the safety of Pre-Construction 07/2021 06/2022 1-10 46 18 Maintenance and Cleaning Council District 6 pedestrians and vehicles.

Citywide - in the Valley, West LA,South LA, East LA, and Central 29, 38, 43, 45, This project will include: Repair and Servicing of Public Works Systems/Databases, Road Maintenance & Bicycle Lane Repair and City. Specific locations have yet to be finalized. Locations will be Procurement/Operatio 46, 50, 51, 53, 18, 24, 25, 26, Los Angeles Los Angeles 21/22 New Public Works Staffing | For Citywide bike lane repair and maintenance to ensure public 07/2021 06/2022 15-20 Rehabilitation Maintenance selected based upon priority needs and resources throughout the nal Needs 54, 59, 62, 64, 27, 30, 33, 35 safety. year. 66, 70

This project will include: Public Works Staffing, Repair and Servicing of Public Works Citywide - in the Valley, West LA,South LA, East LA, and Central 29, 38, 43, 45, Equipment | Procurement of contracctors and/or materials to install safety City. Specific locations have yet to be finalized. Locations will be Procurement/Operatio 46, 50, 51, 53, 18, 24, 25, 26, Los Angeles Los Angeles 21/22 New Traffic Control Devices Vision Zero Traffic Signal improvements at various traffic signal locations Citywide, especially along Vision Zero 07/2021 06/2023 5-10 selected based upon priority needs and resources throughout the nal Needs 54, 59, 62, 64, 27, 30, 33, 35 High Injury Network corridors. This includes any necessary repair or installation year. 66, 70 relating to the curb ramps, crosswalk, sidewalks, storm drains, signage, and lights.

Citywide - in the Valley, West LA,South LA, East LA, and Central 29, 38, 43, 45, This project will include: Public Works Staffing | Procurement of contractors to perform Road Maintenance & Sidewalk Repair Access Request City. Specific locations have yet to be finalized. Locations will be Procurement/Operatio 46, 50, 51, 53, 18, 24, 25, 26, Los Angeles Los Angeles 21/22 New sidewalk repairs to safety separate vehicular and pedestrian traffic in compliance with 07/2021 06/2023 10-30 Rehabilitation Acceleration selected based upon priority needs and resources throughout the nal Needs 54, 59, 62, 64, 27, 30, 33, 35 the Americans with Disabilities Act (ADA). year. 66, 70

This project will include: Pavement Rehab/Repair (Existing) | To reconstruct Road Maintenance & Intersection of Lassen St and Owensmouth St in Council District Los Angeles Los Angeles 21/22 New Lassen Street and Owensmouth approximately 110 linear feet of existing cross gutter to standard, including bringing Construction 10/2022 04/2023 10-20 45 27 Rehabilitation 12 two non-standard curb ramps to current standards conditions to ensure public safety.

Complete Streets Slauson Ave Improvements from This project will include: Project Scope Development, Right of Way, Document Slauson Ave from Crenshaw Blvd to Western in Council District Los Angeles Los Angeles 21/22 New Pre-Construction 07/2021 12/2023 10-30 50 30 Components Crenshaw Blvd to Western Preparation, Cost Estimating, Preliminary Design, Environmental Study/Documents 8

*This list is subject to change and will be finalized upon the adoption of any jurisdiction that meets subsequent eligibility at the October 2021 Commission Meeting. Draft City Submitted - Fiscal Year 2021-22 Local Streets and Roads List of Projects *Projects listed are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1) August 19, 2021

Fiscal Year Initially Proposed Project Est Assembly Senate City County Project Type Title Description Location Components Est Start Est Useful Life Proposed Status Completion Districts Districts

This project will include: Right of Way, Feasibility Study, Document Preparation, Cost Wonderland Ave and Crescent Estimating, Preliminary Design, Environmental Study/Documents | For the design of Wonderland Avenue from Crescent Drive to approximately 520-ft Los Angeles Los Angeles 21/22 New Safety Pre-Construction 07/2021 06/2022 5-20 50 26 Drive widening the roadway to 20-foot minimum drivable path with adjacent space for guard west of Crescent Drive in Council District 4 rails, curb and gutter, asphalt berm, and bulkhead.

This project will include: This project will construct approximately 200 linear feet of Verde Street (2401) Remedial Los Angeles Los Angeles 19/20 Carried Over Safety bulkhead to stabilize the slope and prevent further erosion into the City right-of-way. 2401 Verde Street in Council District 14 Construction 10/2021 05/2022 20-30 51 24 Slope Mitigation This project will restore safe passage to pedestrians.

Sunset Blvd Phase 2 and 3 - This project will include: This project will fund the design of a shotcrete and soil nail Sunset Blvd betw Coronado Terrace and Waterloo St, Los Los Angeles Los Angeles 20/21 Carried Over Safety Coronado Terrace to Waterloo St, wall to mitigate the over-steepened slope and to eliminate continuing erosion that Construction 09/2022 09/2023 30-50 50 26 Angeles, 90026 in Council District 13 Class 3 Remedial Slope Mitigation creates unsafe conditions on the sidewalk and curbside traffic lane.

Sunset Blvd Phase 4 - Coronado This project will include: Public Works Staffing | Design will be performed by in-house Across the street from the property with an address of 2723 Procurement/Operatio Los Angeles Los Angeles 21/22 New Safety 07/2021 06/2022 30-50 50 26 Terrace to Waterloo Street City staff. Sunset Blvd in Council District 14; nal Needs

This project will include: Procurement of Road Maintenance and Rehab Materials, Public Works Staffing | Design construction plans and install modern pedestrian Citywide - in the Valley, West LA,South LA, East LA, and Central 29, 38, 43, 45, lighting systems at select bus stop locations to meet lighting standards for pedestrian City. Specific locations have yet to be finalized. Locations will be Procurement/Operatio 46, 50, 51, 53, 18, 24, 25, 26, Los Angeles Los Angeles 21/22 New Safety Security Lighting Unit 21 07/2021 07/2022 10-30 traffic. Oversee construction of designed plans. This project improves lighting levels selected based upon priority needs and resources throughout the nal Needs 54, 59, 62, 64, 27, 30, 33, 35 at bus stop locations to increase security and safety for residents using transit year. 66, 70 facilities.

This project will include: Pavement Improvement (New), Sidewalk and/or Crosswalk Installation (New), Sidewalk and/or Crosswalk Rehab/Repair (Existing), Pavement Kinney St between Crestmoore Rehab/Repair (Existing), Paving and/or Striping Installation (New Safety), Storm Drain Road Maintenance & Place and Paseo Drive (aka Kinney Street between Crestmoore Pl and Paseo Dr in Council Los Angeles Los Angeles 19/20 Carried Over and/or Culvert Rehab/Repair (Existing) | Street improvement, retaining wall: Retaining Construction 04/2022 12/2023 10-25 51 24 Rehabilitation Kinney Street Improvement - District 1 walls and street improvement, including regrading street, new curb and gutter to make Crestmoore to Lavell) this hillside street a minimum of 20-foot wide and ensure vehicular safety as it will make the turn smoother for vehicles and fire trucks.

This project will include: Pavement Improvement (New), Sidewalk and/or Crosswalk Installation (New), Sidewalk and/or Crosswalk Rehab/Repair (Existing), Pavement Rehab/Repair (Existing), ADA Curb Ramp Installation (New), Traffic Signals, Lights, Citywide- in the Valley, West LA, South LA, East LA and Central 29, 38, 43, 45, and/or Signage Installation (New Safety), Bicycle Lane (New), Traffic Signals, Lights, City. Specific locations have yet to be finalized. Locations will be 46, 50, 51, 53, 18, 24, 25, 26, Los Angeles Los Angeles 21/22 New Safety Vision Zero Corridor Projects Construction 07/2022 06/2023 5-10 and/or Signage Rehab/Repair (Existing Safety), ADA Curb Ramp Rehab/Repair selected based upon priority needs and resources throughout the 54, 59, 62, 64, 27, 30, 33, 35 (Existing), Bicycle Lane Rehab/Repair (Existing) | For street safety projects along High year. 66, 70 Injury Network (HIN) corridors, including speed feedback sign installation and maintenance and pedestrian refuge island implementation as needed.

This project will include: Sidewalk and/or Crosswalk Installation (New), Paving and/or Striping Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing), National/Clarington Sidewalk Gap National Blvd between Jasmine Ave and Clarington Ave in Los Angeles Los Angeles 19/20 Carried Over Safety Landscape Safety Rehab/Repair (Existing), Right of Way Acquisition, Traffic Signals, Construction 07/2022 06/2024 20-30 54 30 Closure Council District 5 Lights, and/or Signage Rehab/Repair (Existing Safety), Bicycle Lane Rehab/Repair (Existing)

*This list is subject to change and will be finalized upon the adoption of any jurisdiction that meets subsequent eligibility at the October 2021 Commission Meeting. Draft City Submitted - Fiscal Year 2021-22 Local Streets and Roads List of Projects *Projects listed are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1) August 19, 2021

Fiscal Year Initially Proposed Project Est Assembly Senate City County Project Type Title Description Location Components Est Start Est Useful Life Proposed Status Completion Districts Districts

This project will include: Project Scope Development, Cost Estimating, Document Preparation, Preliminary Design, Environmental Study/Documents | Complete Street Project involving 3.9 lane miles of street reconstruction, 5.3 lane miles of resurfacing, Avalon from San Pedro to 120th Complete Streets and safety improvements. The project will include a street reconfiguration to one lane Avalon from San Pedro to 120th Los Angeles Los Angeles 19/20 In Progress (this is one of the Complete Streets Pre-Construction 09/2020 04/2022 15-20 64 30 Components each way with a center lane for turning, fully protected bike lanes from 56th to (Council Districts 8, 9, 15) projects) Manchester, speed feedback signs, leading pedestrian intervals, rectangular rapid flash beacons (RRFB), protected left turns, curb extensions, signal timing upgrades, intersection tightening, new crosswalks with RRFB, new traf

This project will include: Pavement Improvement (New), Paving and/or Striping Rehab/Repair (Existing Safety), Sidewalk and/or Crosswalk Rehab/Repair (Existing), Pavement Rehab/Repair (Existing), ADA Curb Ramp Installation (New), Traffic Signals, Lights, and/or Signage Installation (New Safety), Bicycle Lane (New), Traffic Reseda from Parthenia to Victory Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Paving and/or Striping Complete Streets Reseda from Parthenia to Victory Los Angeles Los Angeles 19/20 Carried Over (this is one of the Complete Streets Installation (New Safety), ADA Curb Ramp Rehab/Repair (Existing), Bicycle Lane Construction 01/2021 03/2023 20-30 45 18, 27 Components (Council District 3,12) Project) Rehab/Repair (Existing) | Complete Street Project Involving 6.2 lane miles of street reconstruction, 6.2 lane miles of resurfacing and safety improvements. The project will include crosswalk installation or upgrades, striping modifications, curb extensions, signal phasing and timing changes, and proposals for closing a gap in the existing bike lanes, between Valerio and Vanowen.

This project will include: Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety) | The project will convert the existing high voltage series street Olympic Blvd. - Lake St. to Olympic Blvd. from Lake St. to Western Ave in Council Districts Los Angeles Los Angeles 20/21 In Progress Safety lighting system to a low voltage system, including refurbishing existing poles and Construction 07/2021 06/2024 10-23 53 24 Western Ave. CIP/STP 1 and 10 installing new conduit, wires, and energy efficient LED lighting, to provide public safety.

This project will include: Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety) | The Project will convert the existing high voltage series street Wilshire Blvd. - Grand Ave. to Olympic Blvd. from Lake St. to Western Ave., in Council Districts Los Angeles Los Angeles 20/21 In Progress Safety lighting system to a low voltage system, refurbish existing poles, and install new Construction 07/2021 03/2024 10-23 53 30 Hoover St. STM/STP 1, 10, 14 conduit, wires, and energy efficient LED lighting to lower voltage and provide public safety.

27th Street from Laurel Avenue - Pacific Avenue; Flournoy Road Road Maintenance & Street Resurfacing Project - Cycle This project will include: Sidewalk and/or Crosswalk Rehab/Repair (Existing), from Ardmore Avenue - 19th Street; Flournoy Roadfrom Valley Manhattan Beach Los Angeles 20/21 Carried Over Construction 03/2022 07/2022 15-20 66 26 Rehabilitation 2 Pavement Rehab/Repair (Existing), ADA Curb Ramp Rehab/Repair (Existing) Drive – 33rd Street; Agnes Road from 29th Street - Marine Avenue; Marine Avenue from Blanche Road – Valley Drive

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Road Maintenance & Sidewalk and/or Crosswalk Rehab/Repair (Existing), Pavement Rehab/Repair Alpine Terrace, Bleackwood Avenue, Cesar E. Chavez Ave., Monterey Park Los Angeles 21/22 New Various Street Rehabilitation Construction 09/2021 06/2022 15-20 49 22 Rehabilitation (Existing), ADA Curb Ramp Installation (New), Storm Drain and/or Culvert Chalet Terrace Rehab/Repair (Existing), ADA Curb Ramp Rehab/Repair (Existing)

Palos Verdes Road Maintenance & Paseo Del Mar and Via Almar Los Angeles 21/22 Forecasted This project will include: Pavement Rehab/Repair (Existing) Sections of Paseo del Mar and Via Almar Construction 03/2022 04/2022 10-20 66 26 Estates Rehabilitation Street Improvements Project

Arthur Ave from St to Rose St, Laredo Ave from Howe St This project will include: Sidewalk and/or Crosswalk Rehab/Repair (Existing), Road Maintenance & Neighborhood Street Resurfacing to Rose St, McClure Ave from Denver to end of cul-de-sac, Paramount Los Angeles 21/22 New Pavement Rehab/Repair (Existing), Paving and/or Striping Installation (New Safety), Construction 04/2022 06/2022 20-20 63 33 Rehabilitation FY 21-22 Denver St from Arthur Ave to McClure Ave, Rose Street from ADA Curb Ramp Rehab/Repair (Existing) Arthur Ave to Paramount Blvd

*This list is subject to change and will be finalized upon the adoption of any jurisdiction that meets subsequent eligibility at the October 2021 Commission Meeting. Draft City Submitted - Fiscal Year 2021-22 Local Streets and Roads List of Projects *Projects listed are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1) August 19, 2021

Fiscal Year Initially Proposed Project Est Assembly Senate City County Project Type Title Description Location Components Est Start Est Useful Life Proposed Status Completion Districts Districts

This project will include: Procurement of Public Works Safety Materials and Gear, Road Maintenance & Procurement/Operational Needs Procurement of Public Works Equipment, Procurement of Road Maintenance and Procurement/Operatio Pico Rivera Los Angeles 19/20 Carried Over Citywide 07/2021 06/2022 1-10 58 32 Rehabilitation for Annual Road Resurfacing Work Rehab Materials, Public Works Staffing, Repair and Servicing of Public Works nal Needs Equipment

This project will include: Sidewalk and/or Crosswalk Rehab/Repair (Existing), Cost Estimating, Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Storm Drain and/or Culvert Rehab/Repair (Existing), Bicycle Lane Rehab/Repair Road Maintenance & Road Resurfacing Program - Chip (Existing), ADA Curb Ramp Rehab/Repair (Existing), Paving and/or Striping North of Whittier Boulevard, north of Washington Blvd, north of Pre-Construction and 07/2021 09/2022 Pico Rivera Los Angeles 21/22 New 10-15 58 32 Rehabilitation Seal Rehab/Repair (Existing Safety), Project Scope Development, Right of Way, ADA Curb Telegraph Road Construction 09/2021 06/2022 Ramp Installation (New), Pavement Rehab/Repair (Existing), Maintenance Program Plan Development, Landscape Safety Rehab/Repair (Existing), Document Preparation, Preliminary Design, Environmental Study/Documents

This project will include: Sidewalk and/or Crosswalk Rehab/Repair (Existing), Cost Estimating, Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Storm Drain and/or Culvert Rehab/Repair (Existing), Bicycle Lane Rehab/Repair Road Maintenance & Road Resurfacing Project - (Existing), ADA Curb Ramp Rehab/Repair (Existing), Project Scope Development, North of Whittier Blvd, north of Washington Blvd, north of Pre-Construction and 07/2021 09/2021 Pico Rivera Los Angeles 21/22 New 10-15 58 32 Rehabilitation Overlay and Reconstruction Paving and/or Striping Rehab/Repair (Existing Safety), Right of Way, ADA Curb Ramp Telegraph Road Construction 09/2021 06/2022 Installation (New), Pavement Rehab/Repair (Existing), Maintenance Program Plan Development, Landscape Safety Rehab/Repair (Existing), Document Preparation, Preliminary Design, Environmental Study/Documents

Road Maintenance & Street Maintenance On-Call Street This project will include: On-call as-needed asphalt, and concrete repairs for streets, Procurement/Operatio Pomona Los Angeles 19/20 Completed Citywide On-call street and sidewalk repairs 07/2021 06/2022 2-20 52 20 Rehabilitation and Sidewalk Repair sidewalks, curb and gutters) | 58,826 square feet of repaired sidewalk nal Needs

Road Maintenance & This project will include: Public Works Staffing | Provide for landscape maintenance to Procurement/Operatio Pomona Los Angeles 20/21 Carried Over Landscape Median Maintenance Citywide 07/2021 06/2022 1-1 52 20 Rehabilitation medians and tree wells to increase visibility for motorist and the safety of pedestrians. nal Needs

Road Maintenance & Procurement/Operatio Pomona Los Angeles 21/22 New Street Sweeping This project will include: Street Sweeping Citywide street sweeping 07/2021 06/2022 1-1 52 20 Rehabilitation nal Needs

Alley (Parcels St/11th Street) to (Rebecca St/10th Street) Major Street Rehabilitation - 2015 Alley (Parcels St/10th Street) to Rebecca St/ 9th Street); Orange Pomona Los Angeles 21/22 New Road Grade Separation This project will include: Pavement Rehab/Repair (Existing) Construction 07/2021 10/2021 10-12 52 20 Metro Call Grove Av (Fairplex Dr to Arrow Highway); Park Av (Olive St to Mission Blvd)

Gambier Dr (Park Av to Olive St); Gabriel Dr (Park Av to Olive St); Otis Ct (Gambier Dr to End St); Fremont St (Hamilton Bl to Archwood Dr); Friar Ln (End to Fernleaf Av); Fernleaf Av (Huntington St to Hamilton Blvd; Muir Av (Huntington St to Street Preservation - Local FY Pomona Los Angeles 21/22 New Road Grade Separation This project will include: Pavement Rehab/Repair (Existing) Hamilton Blvd); Huntington St (Fernleaf Av to Phillips Blvd); 6th Construction 07/2021 10/2022 3-12 52 20 2021-22 St (Garey Av to Palomares St; Blacksmit CI (Stagecoach Dr to End); Wild West Ci (Stagecoach Dr to End); Stagecoach Dr (Sundance Dr to End); Bear Valley Rd (Blacksmith Ci to Village Loop) etc.

*This list is subject to change and will be finalized upon the adoption of any jurisdiction that meets subsequent eligibility at the October 2021 Commission Meeting. Draft City Submitted - Fiscal Year 2021-22 Local Streets and Roads List of Projects *Projects listed are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1) August 19, 2021

Fiscal Year Initially Proposed Project Est Assembly Senate City County Project Type Title Description Location Components Est Start Est Useful Life Proposed Status Completion Districts Districts

Laurel Ave (Erie St to Currier St); Arthur Av (Gilbert St to Saed This project will include: Pavement Improvement (New), Sidewalk and/or Crosswalk St) Gilbert St (W. Orange Av to Arthur Av) Saed St (Arthur Av to Installation (New), Paving and/or Striping Rehab/Repair (Existing Safety), Sidewalk Arroyo Av); Densmore St (Edgehill Dr to Baywood Av); Baywood Road Maintenance & Street Preservation-Local Citywide and/or Crosswalk Rehab/Repair (Existing), Pavement Rehab/Repair (Existing), Paving Pomona Los Angeles 20/21 Carried Over Av (Densmore to Cantara St); Chelsea Dr (Cantara St to San Construction 07/2021 06/2022 10-12 52 20 Rehabilitation (FY20-21) and/or Striping Installation (New Safety) | Street Preservation of local streets Citywide, Bern Av); Baldwin Av(Ross St to Sheridan Av); Belfort Av(Ross according to pavement management program, focused primary on slurry seals, cape St to Delany St); Ross St (Lincoln Av to Belfort Av) Delany St seals, and thin overlays. Carry Over from FY 17/18. (Baldwin Av to Belfort Av); Deerbrook St, etc.

This project will include: Roadway maintenance and repairs including roadway crack Rancho Palos Road Maintenance & and patch filling, pothole repair, sidewalk grinding and patching, tree root removal, and Procurement/Operatio Los Angeles 21/22 New Street Pavement Maintenance Within the boundaries of the City of Rancho Palos Verdes. 07/2021 06/2022 1-8 66 26 Verdes Rehabilitation restoration of centerline survey and monumentation information. Work may be nal Needs accomplished by City Staff or Contractor.

This project will include: Procurement of Road Maintenance and Rehab Materials | The Traffic Signs Replacement Program replaces existing traffic signs and posts that have Rancho Palos Traffic Signs Replacement been determined to not meet current, applicable standards. Replacement signs meet Procurement/Operatio Los Angeles 21/22 New Safety Within the boundaries of the City of Rancho Palos Verdes. 07/2021 06/2022 10-12 66 26 Verdes Program Federal Highway Administration (FHWA), and State Manual on Uniform Traffic Control nal Needs Devices (MUTCD), and retro-reflectivity standards. Both City staff and contractors may perform the work.

This project will include: Document Preparation | The Pavement Management Plan is Rancho Palos Road Maintenance & Pavement Management Program Los Angeles 21/22 New updated every three years to evaluate the condition of the City's roadway system and Throughout the City of Rancho Palos Verdes. Pre-Construction 07/2021 01/2022 3-3 66 26 Verdes Rehabilitation Triennial Update identify Citywide Arterial and Residential Street Rehabilitation projects.

This project will include: Pavement Rehab/Repair (Existing) | The project will Pavement Management Program - rehabilitate the section of Silver Spur Road from Hawthorne Blvd. to the city limit and Rancho Palos Road Maintenance & Silver Spur Road south from Hawthorne Boulevard to the city Los Angeles 21/22 New Arterial Roadways, Silver Spur consist of: Resurfacing the existing asphalt; Replacing damaged asphalt; Replacing Construction 01/2022 06/2022 15-20 66 26 Verdes Rehabilitation limits. Road - South damaged curb, gutter, and sidewalk; Replacing pavement markings; Improving drainage (if needed).

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Sidewalk and/or Crosswalk Rehab/Repair (Existing), Pavement Rehab/Repair Manhattan Beach Boulevard (Existing), Bicycle Lane (New), ADA Curb Ramp Rehab/Repair (Existing) | This section Manhattan Beach Boulevard runs east-west and is located in Road Maintenance & Redondo Beach Los Angeles 20/21 Carried Over Resurfacing - Aviation Boulevard of Manhattan Beach Boulevard is approximately 1 mile long with a roadway width of north Redondo Beach. The project limits are Aviation Boulevard Construction 10/2021 05/2022 20-30 66 26 Rehabilitation to Inglewood Avenue 100 feet. This section is classified as a major arterial, carries approximately 38,000 on the west and Inglewood Avenue on the east. vehicles daily, and includes a transit route between Aviation Boulevard and Redondo Beach Avenue.

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Road Maintenance & Residential Street Rehabilitation Residential streets north of Diamond Street and south of Redondo Beach Los Angeles 21/22 New Sidewalk and/or Crosswalk Rehab/Repair (Existing), ADA Curb Ramp Installation Construction 10/2021 05/2022 15-25 66 26 Rehabilitation Project - Cycle 2, Phase 3 Harriman Lane (New), ADA Curb Ramp Rehab/Repair (Existing)

Road Maintenance & Silver Spur Rd. northwest of Crenshaw Blvd. to city limits; Pre-Construction and 12/2021 01/2022 Rolling Hills Estates Los Angeles 21/22 New 2021-22 Re-pavement project This project will include: Project Scope Development, Document Preparation 18-25 66 29 Rehabilitation Strawberry Ln, Dapplegray Ln., Buckskin Ln. and Sorrel Ln. Construction 01/2022 04/2022

*This list is subject to change and will be finalized upon the adoption of any jurisdiction that meets subsequent eligibility at the October 2021 Commission Meeting. Draft City Submitted - Fiscal Year 2021-22 Local Streets and Roads List of Projects *Projects listed are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1) August 19, 2021

Fiscal Year Initially Proposed Project Est Assembly Senate City County Project Type Title Description Location Components Est Start Est Useful Life Proposed Status Completion Districts Districts

This project will include: Project will use Full Depth Reclamation technology up to 15" Road Maintenance & deep and overlaid with asphalt concrete. Repair and reconstruction work will include San Dimas Los Angeles 19/20 Carried Over Covina Blvd Rehab Covina Blvd, Arrow Hwy to 57 Fwy Construction 08/2021 12/2021 20-30 41 25 Rehabilitation upgrade/replacement of ADA accessible ramps, minor curbs, gutter, sidewalk panels and striping. Project will require State and Railroad permits.

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Sidewalk and/or Crosswalk Rehab/Repair (Existing), ADA Curb Ramp Installation Road Maintenance & (New), Pavement Rehab/Repair (Existing), ADA Curb Ramp Rehab/Repair (Existing) | San Dimas Los Angeles 20/21 Carried Over Eaton Road Et Al Project Eaton Road and adjacent streets Construction 09/2021 06/2023 20-30 41 25 Rehabilitation Rehabilitation, resurfacing and restoration of existing street. The repair work will also include upgrade/replacement of the ADA accessible ramps, minor curb, gutter, sidewalk panels and striping.

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Sidewalk and/or Crosswalk Rehab/Repair (Existing), Pavement Rehab/Repair Road Maintenance & Lone Hill Ave (Cienega to Covina (Existing), ADA Curb Ramp Rehab/Repair (Existing) | Project will use Full Depth San Dimas Los Angeles 20/21 Carried Over Lone Hill Ave (Cienega to Covina Blvd) Construction 07/2021 06/2023 20-30 41 25 Rehabilitation Blvd) Reclamation technology up to 15" deep and overlay asphalt concrete . Repair and reconstruction of work will include upgrade/replacement of ADA accessible ramps, minor curb, gutter, and sidewalk panels, and striping.

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Sidewalk and/or Crosswalk Rehab/Repair (Existing), Pavement Rehab/Repair (Existing), ADA Curb Ramp Rehab/Repair (Existing) | Rehabilitate existing street by Road Maintenance & San Dimas Los Angeles 20/21 Forecasted Bonita Ave Corridor use of Full Depth Reclamation technology up to 15" deep and overlay asphalt concrete Bonita Ave from San Dimas Ave to eastern City Limits Construction 07/2022 06/2025 15-20 41 25 Rehabilitation base and cap. Will also include upgrade/replacement of ADA accessible ramps, minor curbs, gutter, sidewalk panels and striping. Project will include grind and overlay of short adjacent cul-de-sac.

This project will include: Removal and replacement of pavement sections and Road Maintenance & Via Vaquero and Adjacent streets Via Vaquero located to the west of San Dimas Ave south of San Dimas Los Angeles 21/22 New concrete repairs. The repair work will also include upgrade/replacement of the ADA Construction 07/2021 06/2022 20-30 41 25 Rehabilitation that are West of San Dimas Ave Arrow Hwy accessible ramps, minor curb, gutter, sidewalk panels and striping.

This project will include: Removal and replacement of pavement sections and Road Maintenance & Kent Drive and Derby Road located north of Covina Blvd and San Dimas Los Angeles 21/22 New Derby Road and Kent Drive concrete repairs. Repair and reconstruction of work will include upgrade/replacement Pre-Construction 03/2022 05/2022 20-30 41 25 Rehabilitation east of Lone Hill Ave of ADA accessible ramps, minor curb, gutter, and sidewalk panels and striping.

Arroyo Street between Glenoaks Boulevard and Eighth Street; This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Road Maintenance & FY 2021-22 Annual Street Fourth Street between Workman Street and Hubbard Avenue; San Fernando Los Angeles 21/22 New Sidewalk and/or Crosswalk Rehab/Repair (Existing), Pavement Rehab/Repair Construction 02/2022 10/2022 10-20 39 18 Rehabilitation Resurfacing Project Pico Street between Kalisher Street and San Fernando Mission (Existing), ADA Curb Ramp Rehab/Repair (Existing) | Curb and gutter repair. Boulevard

Lafayette Street (Grand to Fairview) ; California Street (Grand to Chestnut); Pine Street (Mission Road to Chestnut); Palm Avenue This project will include: Sidewalk and/or Crosswalk Installation (New), Pavement (Valley to Wells) ; Leslie Drive (Milton to the Alley); Adelyn Drive Improvement (New), Project Scope Development, Paving and/or Striping (N. Doyle to Rosemont) ; Duane Avenue (W. Sycamore to Road Maintenance & 2021-22 Street Repaving Project Rehab/Repair (Existing Safety), Sidewalk and/or Crosswalk Rehab/Repair (Existing), Pre-Construction and 07/2021 08/2021 San Gabriel Los Angeles 20/21 Carried Over Roses) ; Franklin Avenue (Las Tunas Dr. to Sycamore Dr.); 10-15 49 22 Rehabilitation #1-08-35 ADA Curb Ramp Installation (New), Pavement Rehab/Repair (Existing), Document Construction 08/2021 10/2021 Daroca Avenue (Leslie Drive to Longden Drive); E. Leslie Drive Preparation, Cost Estimating, Preliminary Design, Paving and/or Striping Installation (San Gabriel Boulevard to Del Loma Avenue); Country Club (New Safety), ADA Curb Ramp Rehab/Repair (Existing) Drive (Las Tunas Drive to Roses Road); West side of Duane Avenue;

Road Maintenance & Huntington Drive Street This project will include: Huntington Drive Street Rehabilitation; Deep mill & fill with San Marino Los Angeles 19/20 Forecasted Huntington Drive, San Marino, CA 91108 Construction 07/2021 06/2022 20-20 49 25 Rehabilitation Rehabilitation spot reconstruction

*This list is subject to change and will be finalized upon the adoption of any jurisdiction that meets subsequent eligibility at the October 2021 Commission Meeting. Draft City Submitted - Fiscal Year 2021-22 Local Streets and Roads List of Projects *Projects listed are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1) August 19, 2021

Fiscal Year Initially Proposed Project Est Assembly Senate City County Project Type Title Description Location Components Est Start Est Useful Life Proposed Status Completion Districts Districts

Resurfacing Virginia Road from Lorain Road to Shenandoah Road Maintenance & This project will include: Crack sealing, slurry sealing and reconstruction of local Road; Resurfacing Los Robles Avenue from Huntington Drive to San Marino Los Angeles 21/22 New Local Street Rehabilitation Project Construction 07/2021 06/2022 20-20 49 25 Rehabilitation streets and roads in the Locations area. Mission Street; Resurfacing North Granada Avenue from Roxbury Road to Huntington Drive

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing), Paving and/or Striping Installation (New Safety) | The annual Overlay & Slurry Seal Program reflects the City's commitment to roadway Road Maintenance & 2019-2020 Overlay and Slurry Seal infrastructure by resurfacing streets in need of attention. | M0137 awarded on June 8, Plum Canyon Road, Railroad Avenue, Lost Canyon Road, and Santa Clarita Los Angeles 19/20 Carried Over Construction 06/2021 12/2021 3-15 38 21, 27 Rehabilitation Program 2021 to the following: Soledad Canyon Road Overlay Area A Excel Paving Company east side of town residential Overlay Area B Excel Paving Company west side of town residential Slurry Seal All American Asphalt Soledad Cyn from Ruether to Langside.

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Road Maintenance & 2020-2021 Overlay & Slurry Seal Pavement Rehab/Repair (Existing), ADA Curb Ramp Rehab/Repair (Existing), Bicycle Overlay east and west, and Slurry Soledad between Langside Santa Clarita Los Angeles 20/21 In Progress Construction 06/2021 12/2021 3-15 38 21, 27 Rehabilitation Program Lane Rehab/Repair (Existing) | The annual Overlay & Slurry Seal Program reflects the and Ruether. City's commitment to roadway infrastructure by resurfacing streets in need of attention.

This project will include: Project Scope Development, Paving and/or Striping Copper Hill Drive: Newhall Ranch Road to Smyth Road Maintenance & 2021-22 Overlay and Slurry Seal Pre-Construction and 07/2021 01/2022 Santa Clarita Los Angeles 21/22 New Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing), Preliminary Magic Mountain Parkway: Railroad Ave to Tourney Road 3-15 38 21, 27 Rehabilitation Program Design and Construction Construction 06/2021 06/2023 Design Whites Canyon Road: Soledad Cyn Rd to Heller Circle

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Pioneer Boulevard Street Road Maintenance & Sidewalk and/or Crosswalk Rehab/Repair (Existing), Pavement Rehab/Repair Pioneer Boulevard Street Improvement (Charlesworth Road to Santa Fe Springs Los Angeles 21/22 New Improvements (Charlesworth Road Construction 04/2020 07/2022 15-20 57 32 Rehabilitation (Existing), Storm Drain and/or Culvert Rehab/Repair (Existing), ADA Curb Ramp Los Nietos Rd) to Los Nietos Road) Rehab/Repair (Existing)

Road Maintenance & Annual Paving and Sidewalk Project is located along various streets and roads in the Pico, Santa Monica Los Angeles 21/22 New This project will include: Paving and/or Striping Rehab/Repair (Existing Safety) Construction 05/2022 05/2023 20-27 50 26 Rehabilitation Repair Program (SP 2650) Sunset Park, and Wilshire Montana neighborhoods.

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Project Scope Development, Sidewalk and/or Crosswalk Rehab/Repair (Existing), Various locations in City of Sierra Madre. Sierra Madre Blvd to Road Maintenance & Pre-Construction and 07/2021 09/2021 Sierra Madre Los Angeles 21/22 New FY 2021-22 Street Rehabilitation ADA Curb Ramp Installation (New), Pavement Rehab/Repair (Existing), Cost Grad View Ave. E. Grand Ave, Fairview Ave., Sunnyside Ave., 10-20 41 25 Rehabilitation Construction 11/2021 03/2022 Estimating, Document Preparation, Preliminary Design, ADA Curb Ramp Algeria Rehab/Repair (Existing)

This project will include: Sidewalk and/or Crosswalk Installation (New), Pavement Road Maintenance & Improvement (New), Bicycle Lane (New), Paving and/or Striping Installation (New Signal Hill Los Angeles 19/20 Carried Over Spring Street Overlay Spring Street, Atlantic to Junipero Construction 10/2021 05/2022 25-30 70 33 Rehabilitation Safety) | Restore paved road surfaces to add structural capacity, riding comfort and skid resistance which add to the road's safety.

Road Maintenance & Signal Hill Los Angeles 20/21 In Progress Pavement Management This project will include: Cost Estimating, Document Preparation | Repair City Streets Citywide Pre-Construction 05/2021 12/2022 8-12 70 33 Rehabilitation

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Road Maintenance & Fern St (from 300 ft west of South El Monte Los Angeles 20/21 Carried Over Sidewalk and/or Crosswalk Rehab/Repair (Existing), Pavement Rehab/Repair 300 ft west of Seaman Ave to Continental Ave Construction 06/2021 03/2022 10-15 57 22 Rehabilitation Seaman Ave to Continental Ave) (Existing), ADA Curb Ramp Rehab/Repair (Existing)

Local residential streets located south of Central Ave, west of This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Road Maintenance & Pavement Rehabilitation Program, Santa Anita Ave, north of Hwy-60, west of Peck Rd. South El Monte Los Angeles 21/22 New Sidewalk and/or Crosswalk Rehab/Repair (Existing), Pavement Rehab/Repair Construction 01/2022 06/2022 10-20 57 22 Rehabilitation FY 2021-22 Project also includes Chico Ave between north city (Existing), ADA Curb Ramp Rehab/Repair (Existing) limit and south city limit.

*This list is subject to change and will be finalized upon the adoption of any jurisdiction that meets subsequent eligibility at the October 2021 Commission Meeting. Draft City Submitted - Fiscal Year 2021-22 Local Streets and Roads List of Projects *Projects listed are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1) August 19, 2021

Fiscal Year Initially Proposed Project Est Assembly Senate City County Project Type Title Description Location Components Est Start Est Useful Life Proposed Status Completion Districts Districts

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Strozier Ave. (Lerma Road to Rush St., Klingerman St. to north Road Maintenance & Lashbrook Ave/Strozier Ave South El Monte Los Angeles 19/20 Carried Over Sidewalk and/or Crosswalk Rehab/Repair (Existing), Pavement Rehab/Repair City limits); Lashbrook Ave. (Garvey Ave to south terminus of Construction 06/2021 03/2022 10-15 49, 57 22 Rehabilitation Rehabilitation (Existing) Lashbrook Ave, Garvey Ave to north City limits).

This project will include: Sidewalk and/or Crosswalk Installation (New), Preliminary Complete Streets Pre-Construction and 10/2020 07/2021 South Gate Los Angeles 20/21 In Progress Alameda Street Complete Streets Design | The project will add sidewalk to the east side of Alameda in order to improve Alameda Street, from Tweedy Boulevard ad Seminole Avenue 10-15 63 33 Components Construction 08/2021 10/2022 student safety when traveling to school.

This project will include: Sidewalk and/or Crosswalk Rehab/Repair (Existing), Pavement Rehab/Repair (Existing), Storm Drain and/or Culvert Rehab/Repair Complete Streets Garfield Avenue and Imperial South Gate Los Angeles 20/21 In Progress (Existing) | Rehabilitation of pavement, reconstruction of damaged curb and gutter, Garfield Avenue from Jefferson Avenue to South City Limits. Construction 11/2018 12/2021 30-30 63 33 Components Highway Street Rehabilitaition drive approaches, sidewalks, on Garfield Avenue from Jefferson Avenue to South City Limits.

Road Maintenance & Citywide Residential Resurfacing This project will include: Preliminary Design | Project was delayed to due covid impact, South Gate Los Angeles 19/20 In Progress Citywide residential streets rehabilitation Pre-Construction 01/2021 08/2021 5-10 63 33 Rehabilitation Cape-Seal Program but is now in design

Citywide Sidewalk Improvements South Gate Los Angeles 20/21 Carried Over Other This project will include: Cost Estimating, Preliminary Design The project will address locations City wide, within boundaries. Pre-Construction 10/2020 07/2021 30-30 63 33 Project Phase VII

Road Maintenance & Citywide Sidewalk Improvements Project will address locations throughout the CIty where sidewalk South Gate Los Angeles 21/22 New This project will include: Preliminary Design Pre-Construction 08/2021 06/2022 10-15 63 33 Rehabilitation Project Phase VIII has been deemed in need of repair

Complete Streets Long Beach Blvd Pedestrian and along Long Beach Blvd, between Tweedy Blvd and Santa Ana South Gate Los Angeles 21/22 New This project will include: Cost Estimating, Document Preparation Pre-Construction 07/2020 06/2022 10-15 63 33 Components Median Improvements Ave

Road Maintenance & Citywide Residential Resurfacing the locations will be selected per the City's Pavement South Gate Los Angeles 21/22 New This project will include: Cost Estimating, Preliminary Design Pre-Construction 07/2021 06/2022 10-15 63 33 Rehabilitation Program Phase III Management System

This project will include: Project Scope Development, Maintenance Program Plan Road Maintenance & Citywide Residential Resurfacing locations will be selected per the City's Pavement Management South Gate Los Angeles 21/22 In Progress Development | Citywide residential street rehabilitation and improvements to extend Pre-Construction 07/2020 06/2022 5-10 63 33 Rehabilitation Program Phase II System the life of aging roadway pavement

Citywide Residential Resurfacing Road Maintenance & Program Phase I- formerly titled Citywide residential streets rehabilitation. Staff is currently South Gate Los Angeles 21/22 Carried Over This project will include: Preliminary Design Pre-Construction 01/2021 08/2021 5-10 63 33 Rehabilitation Citywide Residential Resurfacing assessing locations. Cape Seal Program

*This list is subject to change and will be finalized upon the adoption of any jurisdiction that meets subsequent eligibility at the October 2021 Commission Meeting. Draft City Submitted - Fiscal Year 2021-22 Local Streets and Roads List of Projects *Projects listed are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1) August 19, 2021

Fiscal Year Initially Proposed Project Est Assembly Senate City County Project Type Title Description Location Components Est Start Est Useful Life Proposed Status Completion Districts Districts

Burton Ave (NCL to SCL), Worthington St (Burton to CDS), Roccus Ln (Burton to CDS), Haldeman St (Burton to CDS), Alessandro Ave (Garibaldi to Broadway), Oak Ave (Garibaldi to This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Live Oak), Cloverly Ave (Garibaldi to Live Oak), Primrose Ave Road Maintenance & Pavement Rehabilitation Program, Temple City Los Angeles 21/22 New Sidewalk and/or Crosswalk Rehab/Repair (Existing), Pavement Rehab/Repair (Garibaldi to Live Oak), Camellia Ave (Garibaldi to Live Oak), Construction 01/2022 06/2022 10-20 49 22 Rehabilitation FY 2021-22 (Existing), ADA Curb Ramp Rehab/Repair (Existing) Kauffman Ave (Longden to Live Oak), Agnes Ave (Garibaldi to Live Oak), Rowland Ave (Garibaldi to Live Oak), Golden West Ave (Longden to Olive), Woodruff Ave (Encinita to ECL), Workman Ave, Grand Ave

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Road Maintenance & Las Tunas Drive from western City boundary at Muscatel Avenue Temple City Los Angeles 19/20 Carried Over Las Tunas Drive Resurfacing Sidewalk and/or Crosswalk Rehab/Repair (Existing), Pavement Rehab/Repair Construction 10/2020 06/2021 10-20 49 22 Rehabilitation to eastern City boundary east of Rowland Avenue (Existing), ADA Curb Ramp Rehab/Repair (Existing)

•Residential streets: oCalle de Arboles oNewton Street from Calle Mayor to Hawthorne Boulevard. •Residential areas bounded by: oPaseo de la Playa, Calle Miramar, Camino de Encanto Road Maintenance & 2021 Residential and Arterial Torrance Los Angeles 21/22 New This project will include: Pavement Rehab/Repair (Existing) oNancy Lane, Pacific Coast Highway, Janet Lane, Newton Construction 10/2021 07/2022 25-50 66 26 Rehabilitation Improvement, I-159/I-139 Street oHawthorne Boulevard, Rolling Hills Road, Crenshaw Boulevard oCrenshaw Boulevard, south City limits oSusana Avenue, Riviera Way, Calle Mayor

The following streets within the City's boundary: 37th Street, Road Maintenance & Street Striping Project (Specific Vernon Los Angeles 21/22 New This project will include: Cost Estimating, Preliminary Design bandini Boulevard, District Boulevard, Leonis Boulevard, Santa Pre-Construction 07/2021 06/2022 5-10 53 33 Rehabilitation Streets) Fe Avenue, Soto Street, and Vernon Avenue.

Various residential streets as identified on City's Pavement This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Management Program for FY 20/21 Residential Street Road Maintenance & Residential Streets Rehabilitation West Covina Los Angeles 20/21 Carried Over Sidewalk and/or Crosswalk Rehab/Repair (Existing), Pavement Rehab/Repair Rehabilitation Improvements. The street segments are listed on Construction 05/2021 12/2021 10-15 48, 55 22, 29 Rehabilitation (FY 20/21) (Existing), ADA Curb Ramp Rehab/Repair (Existing) the approved resolution as Exhibit B. List begins at Alaska St. and ends at Wimbledon Ct.

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Street as identified in Exhibit A on the attached approved Road Maintenance & Residential Streets Rehabilitation Sidewalk and/or Crosswalk Rehab/Repair (Existing), Pavement Rehab/Repair Pre-Construction and 09/2021 12/2021 West Covina Los Angeles 21/22 New resolution. List begins at Bainbridge Ave. and ends at Wembly 10-15 48, 55 22, 29 Rehabilitation (FY 21/22) (Existing), Document Preparation, Preliminary Design, ADA Curb Ramp Rehab/Repair Construction 01/2022 06/2022 St. (Existing)

Ogden Dr between Fountain and Santa Monica Orange Grove Ave between Fountain and Santa Monica Blvd Flores St between Fountain and Santa Monica Blvd Kings Rd. between Fountain and Santa Monica Blvd Olive Dr. between Fountain and Santa Monica Blvd Road Maintenance & This project will include: Project Scope Development, Maintenance Program Plan Pre-Construction and 09/2021 10/2021 West Los Angeles 21/22 New Annual Paving Project FY21-22 Hacienda St. between Fountain and Santa Monica Blvd 15-25 50 26 Rehabilitation Development, Document Preparation, Cost Estimating, Preliminary Design Construction 10/2021 12/2021 La Cienega Blvd between Holloway & Santa Monica Blvd Holloway Dr. between La Cienega and Santa Monica Blvd West Knoll Dr. Between Hancock and Westmount Hancock between SMB and Holloway Dr. Santa Monica

*This list is subject to change and will be finalized upon the adoption of any jurisdiction that meets subsequent eligibility at the October 2021 Commission Meeting. Draft City Submitted - Fiscal Year 2021-22 Local Streets and Roads List of Projects *Projects listed are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1) August 19, 2021

Fiscal Year Initially Proposed Project Est Assembly Senate City County Project Type Title Description Location Components Est Start Est Useful Life Proposed Status Completion Districts Districts

This project will include: Pavement Improvement (New), Sidewalk and/or Crosswalk Installation (New), Traffic Signals, Lights, and/or Signage Installation (New Safety), Melrose Ave (Croft to Doheny) Complete Streets Design District Streetscape Bicycle Lane (New), Cost Estimating, ADA Curb Ramp Rehab/Repair (Existing), Pre-Construction and 01/2022 02/2022 West Hollywood Los Angeles 21/22 New Beverly Blvd (East to West City Limits) 40-50 50 26 Components Projects Project Scope Development, ADA Curb Ramp Installation (New), Maintenance Construction 02/2022 12/2025 Robertson Blvd (Melrose to S. City Limit) Program Plan Development, Landscape Safety Installation (New), Document Preparation, Preliminary Design, Paving and/or Striping Installation (New Safety)

Road Maintenance & Annual Street Improvement This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Westlake Village Los Angeles 21/22 New Lakeview Canyon Road, Watergate Road, Thousand Oaks Blvd Construction 07/2021 06/2022 15-20 44 27 Rehabilitation Program FY2021-22 Pavement Rehab/Repair (Existing)

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Road Maintenance & Pavement Rehab/Repair (Existing), Cost Estimating, Document Preparation, Colima Road within the City of Whittier from Lambert Road to Pre-Construction and 07/2020 05/2021 Whittier Los Angeles 20/21 In Progress Colima Road Rehabilitation Project 15-25 57 32 Rehabilitation Preliminary Design, Bicycle Lane Rehab/Repair (Existing), ADA Curb Ramp Mar Vista Street. Construction 07/2021 01/2022 Rehab/Repair (Existing)

Road Maintenance & Humboldt Storm Drainage and Chowchilla Madera 20/21 Carried Over This project will include: Storm Drain/Culvert Installation (New) Humboldt Ave from 3rd St to 5th St Construction 09/2021 12/2021 25-25 5 12 Rehabilitation Street Reconstruction Project

Austin Avenue from Adell Street to Clark Street, Cleveland Avenue from Tulare Street to Raymond Road, Raymond Road This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), from Cleveland Avenue to City Limits, Sherwood Way from Project Scope Development, Sidewalk and/or Crosswalk Rehab/Repair (Existing), Country Club to Davis Street, Sherwood Way from Davis to D Road Maintenance & Pre-Construction and 01/2022 06/2022 Madera Madera 21/22 New RMRA Seals /Overlays 2021/22 Pavement Rehab/Repair (Existing), Document Preparation, Cost Estimating, Street, D Street from Sheerwood Way to 4th Street, Sunset 5-15 5 12 Rehabilitation Construction 06/2022 12/2022 Preliminary Design, Environmental Study/Documents, ADA Curb Ramp Rehab/Repair Avenue from Linden Avenue to 4th Street, Howard Avenue from (Existing) Granada Drive to Amerine Avenue, Stadium Road from Pecan Avenue to Gamay Avenue, Olive Avenue from Mariposa Street to Tozer Street, etc.

Miscellaneous streets in the city per the project street list included in City Resolution 41/21, including segments of Holcomb, Magnolia Ave, Alexander Ave, Baltimore Ave, La Rosa Road Maintenance & Measure B Group 4 Pavement This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Way, Monte Vista Ave, Hazel Ave, Orange Ave, Tamalpais Ave, Larkspur Marin 21/22 New Construction 06/2022 09/2022 15-20 10 2 Rehabilitation Rehabilitation Pavement Rehab/Repair (Existing) Bridge Rd, Foley Ln, Coleman Ave, Olive Ave, King St, Corte Real, S Eliseo Dr, Chevy Chase Ct, Park Way, Piedmont Ct, Piedmont Rd, Shady Ln, W Baltimore Ave, Wiltshire Ave, Doherty Dr, Post St, and Redwood Hwy.

Various locations on streets throughout the City of Novato as Road Maintenance & 2022 Annual Pavement This project will include: Project Scope Development, Document Preparation, Cost Novato Marin 21/22 New recommended for resurfacing by the City's Pavement Pre-Construction 09/2021 05/2022 10-25 10 2 Rehabilitation Rehabilitation Project Estimating, Environmental Study/Documents Management Program.

Acacia Ave from San Rafael Ave to end, Bayview Ave from Road Maintenance & Golden Gate Ave to Laurel Ave, Bellevue Ave from Main Street Belvedere Marin 21/22 New 2021 Pavement Rehab Project This project will include: Pavement Rehab/Repair (Existing) Construction 06/2021 12/2021 5-7 10 2 Rehabilitation to Corinthian Overlook. Slurry Seal to prolong life of the roadway.

*This list is subject to change and will be finalized upon the adoption of any jurisdiction that meets subsequent eligibility at the October 2021 Commission Meeting. Draft City Submitted - Fiscal Year 2021-22 Local Streets and Roads List of Projects *Projects listed are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1) August 19, 2021

Fiscal Year Initially Proposed Project Est Assembly Senate City County Project Type Title Description Location Components Est Start Est Useful Life Proposed Status Completion Districts Districts

Various roads in Corte Madera including but not limited to San Road Maintenance & 2020 Preventative Maintenance Corte Madera Marin 20/21 In Progress This project will include: Cost Estimating Clemente Dr., Redwood Hwy., Madera Del Presidio Blvd., and Pre-Construction 08/2020 12/2021 5-10 10 2 Rehabilitation Project Koch Rd.

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Flying Cloud Course, Pacific Queen Passage, Echo Dr, Yolo St, Road Maintenance & Sidewalk and/or Crosswalk Rehab/Repair (Existing), ADA Curb Ramp Installation Corte Madera Marin 20/21 Carried Over 2021 Road Rehabilitation Project Harbor Dr, Way, Channel Dr, Baha Ct, Meadow Ridge Construction 08/2021 12/2021 15-20 10 2 Rehabilitation (New), Pavement Rehab/Repair (Existing), Traffic Signals, Lights, and/or Signage Dr, Ridge Ct Rehab/Repair (Existing Safety), Storm Drain and/or Culvert Rehab/Repair (Existing)

This project will include: Sidewalk and/or Crosswalk Rehab/Repair (Existing), Complete Streets Casa Buena Complete Streets Pavement Rehab/Repair (Existing), ADA Curb Ramp Installation (New), Bicycle Lane Corte Madera Marin 20/21 Forecasted Casa Buena Drive Construction 07/2022 12/2022 15-20 10 2 Components Project (New), Storm Drain and/or Culvert Rehab/Repair (Existing), Paving and/or Striping Installation (New Safety)

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Road Maintenance & Sidewalk and/or Crosswalk Rehab/Repair (Existing), Pavement Rehab/Repair Corte Madera Marin 21/22 New 2022 Road Rehabilitation Project Granada Park Neighborhood Construction 07/2022 12/2022 15-20 10 2 Rehabilitation (Existing), ADA Curb Ramp Installation (New), Storm Drain and/or Culvert Rehab/Repair (Existing), Paving and/or Striping Installation (New Safety)

This project will include: Sidewalk and/or Crosswalk Rehab/Repair (Existing), ADA Fairfax Marin 20/21 In Progress Safety Sidewalk replacement in downtown various locations on Bolinas Rd and Broadway in downtown Construction 01/2018 06/2022 20-30 10 2 Curb Ramp Installation (New), ADA Curb Ramp Rehab/Repair (Existing)

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Selected portions of Sir Francis Drake (approx. location west Road Maintenance & Sir Francis Drake and Bolinas Rd. Pre-Construction and 12/2021 06/2022 Fairfax Marin 21/22 New Pavement Rehab/Repair (Existing), Document Preparation, Preliminary Design, Oak Manor intersection) and selected portions of Bolinas Rd. 15-30 10 2 Rehabilitation repaving projects Construction 06/2022 12/2022 Bicycle Lane Rehab/Repair (Existing) between Broadway north to the Town Limits.

This project will include: Pavement Rehab/Repair (Existing) | We have completed Road Maintenance & repave of Scenic Rd Scenic Rd between Shapiro Ln and Bay Rd. between Tamalpais Fairfax Marin 20/21 Carried Over Scenic Road Repavement Construction 07/2018 12/2019 15-25 10 2 Rehabilitation between Shapiro and Bay; we completed the repaving of to Upper Scenic the upper scenic from Scenic/Ridge to 1,000 linear ft north on Upper Scenic

This project will include: Sidewalk and/or Crosswalk Rehab/Repair (Existing), ADA Curb Ramp Installation (New), Landscape Safety Installation (New), ADA Curb Ramp Parkade parking lot between Sir Francis Drake Blvd. and Fairfax Marin 19/20 Completed Safety Parkade Pedestrian Improvements Rehab/Repair (Existing) | Increase pedestrian safety and access including replacing Construction 07/2018 09/2019 15-20 10 2 Broadway in downtown ADA ramps to the lot, adding new RRFB system to crosswalk, and added ADA parking spaces

Road Maintenance & Canyon Rd Stablization and This project will include: retaining wall to support road; obtaining federal agency Fairfax Marin 20/21 In Progress portion of road at appox. 145 Canyon Construction 01/2019 12/2022 20-30 10 2 Rehabilitation Reconstruction permitting

*This list is subject to change and will be finalized upon the adoption of any jurisdiction that meets subsequent eligibility at the October 2021 Commission Meeting. Draft City Submitted - Fiscal Year 2021-22 Local Streets and Roads List of Projects *Projects listed are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1) August 19, 2021

Fiscal Year Initially Proposed Project Est Assembly Senate City County Project Type Title Description Location Components Est Start Est Useful Life Proposed Status Completion Districts Districts

E. Blithedale Ave - Camino Alto to Elm Ave This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Throckmorton Ave - Corte Madera Ave to Madrona St Road Maintenance & Sidewalk and/or Crosswalk Rehab/Repair (Existing), Pavement Rehab/Repair Mill Valley Marin 21/22 New 2021 Streets Rehabilitation Project Sunnyside Ave - E. Blithedale Ave to Miller Ave Construction 06/2022 09/2022 7-30 10 2 Rehabilitation (Existing), ADA Curb Ramp Installation (New), ADA Curb Ramp Rehab/Repair Sycamore Ave - Amicita Ave to E. Blithedale Ave (Existing) Camino Alto - Camino Alto Ct to City Limit

Redwood Drive: Ross Common to knuckle. Ross Common: Redwood Dr. to Lagunitas Rd. Road Maintenance & FY2021 Pavement Rehab Program This project will include: Pavement Rehab/Repair (Existing) | 2" grind and AC overlay Ross Marin 19/20 Carried Over Ross Post Office parking lot: Lagunitas Rd. to Frederick Allen Construction 07/2021 08/2021 5-20 10 2 Rehabilitation (PRP) of existing streets. Crack seal, minor dig-outs, slurry and micro seal. Park El Camino Bueno: Sir Francis Drake Blvd to end.

Kensington Road from Austin Ave to Ross Ave, Lincoln Park Road Maintenance & This project will include: Sidewalk and/or Crosswalk Rehab/Repair (Existing), from Bank St to Greenfield Ave, Barber Ave from Sir Francis San Anselmo Marin 21/22 New 2021 Street Resurfacing Phase B Construction 08/2021 12/2021 15-20 10 2 Rehabilitation Pavement Rehab/Repair (Existing), ADA Curb Ramp Installation (New) Drake Boulevard to Ross Town Limit, Gerlack Road from Oak Ave to Redwood Road

This project will include: Pavement Improvement (New), Paving and/or Striping Road Maintenance & San Rafael Marin 20/21 Carried Over Francisco Blvd East Resurfacing Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing), Paving and/or Francisco Blvd East from Vivian Street to Grand Avenue Construction 08/2021 10/2021 15-20 10 2 Rehabilitation Striping Installation (New Safety)

This project will include: Sidewalk and/or Crosswalk Installation (New), Paving and/or Striping Rehab/Repair (Existing Safety), Storm Drain/Culvert Installation (New), Sidewalk and/or Crosswalk Rehab/Repair (Existing), ADA Curb Ramp Installation Complete Streets (New), Pavement Rehab/Repair (Existing), Traffic Signals, Lights, and/or Signage Third Street between Union and Second Street. Second Street San Rafael Marin 21/22 New Third Street Rehabilitation Project Construction 09/2022 05/2023 15-20 10 2 Components Installation (New Safety), Bicycle Lane (New), Traffic Signals, Lights, and/or Signage between Shaver Street and West Street Rehab/Repair (Existing Safety), Paving and/or Striping Installation (New Safety), Storm Drain and/or Culvert Rehab/Repair (Existing), ADA Curb Ramp Rehab/Repair (Existing)

This project will include: Cost Estimating, Preliminary Design, Project Scope Road Maintenance & Development, Document Preparation | Initiate design for Girard Ave., from Johnson Girard Ave., from Johnson St. to Turney St. and Sausalito Marin 21/22 New Design Development 21/22 Pre-Construction 11/2021 04/2022 20-30 10 2 Rehabilitation St. to Turney St. , and Edwards Ave., from Marion Ave. to Alexander Ave. Develop Edwards Ave., from Marion Ave. to Alexander Ave. designs for construction in upcoming fiscal years.

This project will include: ADA Curb Ramp Rehab/Repair (Existing), Project Scope Development, Paving and/or Striping Rehab/Repair (Existing Safety), Paving and/or Complete Streets Safe Pathways to Schools Nevada Striping Installation (New Safety), Document Preparation, Pavement Rehab/Repair Pre-Construction and 01/2021 10/2021 Sausalito Marin 21/22 New Nevada Street, from Bridgeway to School Entrance. 2-5 10 2 Components Street Traffic Calming (Existing) | Traffic calming along Nevada St. between Bridgeway and school located Construction 10/2021 04/2022 on Buchanan to include road digouts and microseal, new pavement markings, making existing curb ramps compliant with current code.

This project will include: Cost Estimating, Preliminary Design, ADA Curb Ramp Installation (New), Sidewalk and/or Crosswalk Rehab/Repair (Existing), Document Road Maintenance & Pre-Construction and 10/2021 12/2021 Sausalito Marin 21/22 New Johnson St. Resurfacing Project Preparation, Pavement Rehab/Repair (Existing) | Resurface existing portion of street Johnson St. from Bridgeway to east end of Johnson. 20-30 10 2 Rehabilitation Construction 04/2022 06/2022 that is often used by fire apparatus and is in need of repair. There are existing non compliant driveway sidewalk connections that would be corrected as part of the work.

*This list is subject to change and will be finalized upon the adoption of any jurisdiction that meets subsequent eligibility at the October 2021 Commission Meeting. Draft City Submitted - Fiscal Year 2021-22 Local Streets and Roads List of Projects *Projects listed are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1) August 19, 2021

Fiscal Year Initially Proposed Project Est Assembly Senate City County Project Type Title Description Location Components Est Start Est Useful Life Proposed Status Completion Districts Districts

This project will include: Sidewalk and/or Crosswalk Rehab/Repair (Existing), Road Maintenance & Pavement Reconstruction of South Ukiah Mendocino 21/22 New Pavement Rehab/Repair (Existing), ADA Curb Ramp Rehab/Repair (Existing), Bicycle South Dora Street from Beacon Lane to Washington Avenue Construction 05/2021 08/2022 20-25 2 2 Rehabilitation Dora Street Lane Rehab/Repair (Existing)

This project will include: Procurement of Road Maintenance and Rehab Materials, Repair and Servicing of Public Works Equipment | When small localized areas of pavement are found to be in poor condition they are treated with small scale pavement repair. Small scale pavement repair must be done in a timely fashion; as potholes grow and allow water intrusion which leads to more large scale deterioration of the pavement. Surface patching and crack sealing are the two primary intermediary Road Maintenance & Street and Alley Pavement Procurement/Operatio Fort Bragg Mendocino 21/22 New actions taken to conserve the existing conditions of pavement. Pothole patching is the City Wide 07/2021 06/2022 2-10 2 2 Rehabilitation Maintenance 21-22 nal Needs most common local technique, done by milling a portion of the pavement to a depth that removes all deteriorated material and then the pothole is filled with asphalt and compacted. The goal of this project is to prevent the local/residential streets and alleys with low PCI’s from deteriorating into an un-usable state as these street categories often go unselected for full treatment due to the algorithm used to by the Pavement Management Program. | No Additional Information

This project will include: Procurement of Public Works Safety Materials and Gear, Procurement of Public Works Equipment, Procurement of Road Maintenance and Rehab Materials, Public Works Staffing | Procurement of RMRA Eligible Public Works Road Maintenance & Sub-Surface Storm Drain Repairs Equipment, Stormdrain Maintenance and Rehab Materials, and Public Works Staffing Procurement/Operatio Fort Bragg Mendocino 21/22 New City wide 07/2021 06/2022 10-30 2 2 Rehabilitation 21-22 to perform sub-surface drainage facilities and repair overlying pavement. The goal of nal Needs this project is to repair structural damage caused by storms or failures or damaged drainage facilities including curb and gutter, valley gutters, pipes, inlets, and outlets, which convey stormwater off and away from the roadways. | No Additional Information

Mill Street Reconstruction, Road Maintenance & This project will include: Sidewalk and/or Crosswalk Rehab/Repair (Existing), Storm Point Arena Mendocino 21/22 New Sidewalk, Drainage, and Asphalt Mill Street, Point Arena Construction 08/2021 10/2021 10-20 2 2 Rehabilitation Drain and/or Culvert Rehab/Repair (Existing), Pavement Rehab/Repair (Existing) Replacement Project

Road Maintenance & Mill Street Reconstruction Citywide Point Arena Mendocino 21/22 New This project will include: Preliminary Design, Cost Estimating citywide Pre-Construction 01/2021 12/2021 15-20 2 2 Rehabilitation Pothole and Street Spot Repairs

This project will include: Pavement Rehab/Repair (Existing), Storm Drain and/or Road Maintenance & Creekside Drive Stabilization Culvert Rehab/Repair (Existing) | Through this project we will repair drainage Willits Mendocino 20/21 Carried Over Creekside Drive, between Boscabell and South Lenore Streets Construction 06/2021 10/2023 10-15 2 2 Rehabilitation Project structures, regrade the roadway, replace approximately 80' of curb, gutter, and asphalt. | Project carried forward from previous year.

Various local streets throughout the City. Most streets in our city of 2.8 square miles are on a four-year rotation, with Road Maintenance & Willits Mendocino 20/21 Carried Over Annual Striping Program This project will include: Cost Estimating approximately 20-22 miles of paved roadway in total. All project Pre-Construction 06/2021 10/2023 2-4 2 2 Rehabilitation locations are within 1.5 miles of Lat 39.400528, Lon - 123.349698.

*This list is subject to change and will be finalized upon the adoption of any jurisdiction that meets subsequent eligibility at the October 2021 Commission Meeting. Draft City Submitted - Fiscal Year 2021-22 Local Streets and Roads List of Projects *Projects listed are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1) August 19, 2021

Fiscal Year Initially Proposed Project Est Assembly Senate City County Project Type Title Description Location Components Est Start Est Useful Life Proposed Status Completion Districts Districts

Road Maintenance & Atwater Merced 21/22 New Crack Seal/Slurry Seal Project This project will include: Pavement Improvement (New) Almador Terrace & Harbor Drive Construction 08/2021 12/2021 20-25 21 12 Rehabilitation

Road Maintenance & Atwater Merced 21/22 New City Wide Striping This project will include: Paving and/or Striping Rehab/Repair (Existing Safety) Shaffer Road and Atwater Boulevard Construction 08/2021 05/2022 20-25 21 12 Rehabilitation

This project will include: Project Scope Development, Feasibility Study, Cost Pre-Construction and 08/2021 12/2021 Atwater Merced 21/22 New Other Broadway Traffic Retasking Broadway Avenue 20-25 21 12 Estimating, Document Preparation, Preliminary Design Construction 01/2022 06/2022

This project will include: Intersection expansion and upgrade. Install intersection Gustine Merced 19/20 Carried Over Safety Hwy 33/140 Intersection Upgrade Hwy 33/140 Intersection Construction 08/2021 06/2022 20-25 21 12 signalization, widen, and install turn lanes.

Road Maintenance & Procurement/Operatio Merced Merced 21/22 New Concrete Light Pole Replacement This project will include: Procurement of Road Maintenance and Rehab Materials Various locations throughout Merced 06/2021 10/2021 15-20 21 12 Rehabilitation nal Needs

This project will include: Cost Estimating, Document Preparation, Preliminary Design, Pre-Construction and 12/2021 12/2022 Merced Merced 21/22 New Safety Traffic Signal Timing Various traffic signals throughout Merced 10-20 21 12 Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety) Construction 12/2022 02/2023

Santa Fe Strip Park Sidewalk This project will include: Sidewalk and/or Crosswalk Rehab/Repair (Existing), Cost Pre-Construction and 01/2022 05/2022 Merced Merced 21/22 New Safety Santa Fe Strip Park 10-20 21 12 Replacement Estimating, Document Preparation, Preliminary Design Construction 05/2022 10/2022

R Street Sidewalk Replacement This project will include: Sidewalk and/or Crosswalk Rehab/Repair (Existing), Cost Pre-Construction and 01/2022 05/2022 Merced Merced 21/22 New Safety R St. Childs to 13th 10-20 21 12 (Childs to 13th) Estimating, Document Preparation, Preliminary Design Construction 05/2022 10/2022

This project will include: Cost Estimating, Document Preparation, Traffic Signals, Pre-Construction and 01/2022 05/2022 Merced Merced 21/22 New Traffic Control Devices Loop Replacement FY 2021 Various locations throughout Merced 10-20 21 12 Lights, and/or Signage Rehab/Repair (Existing Safety) Construction 05/2022 10/2022

*This list is subject to change and will be finalized upon the adoption of any jurisdiction that meets subsequent eligibility at the October 2021 Commission Meeting. Draft City Submitted - Fiscal Year 2021-22 Local Streets and Roads List of Projects *Projects listed are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1) August 19, 2021

Fiscal Year Initially Proposed Project Est Assembly Senate City County Project Type Title Description Location Components Est Start Est Useful Life Proposed Status Completion Districts Districts

Road Improvement - Childs Merced Merced 20/21 Carried Over Other This project will include: Road widening, sidewalk, curb and gutter. Childs Avenue (Parsons Avenue to Campus Parkway) Pre-Construction 06/2022 07/2022 20-25 21 12 Avenue

This project will include: Procurement of Public Works Systems/Databases, Procurement of Public Works Safety Materials and Gear, Procurement of Public Road Maintenance & Road Maintenance & Rehabilitation Procurement/Operatio Merced Merced 21/22 New Works Equipment, Public Works Staffing, Procurement of Road Maintenance and Various locations throughout Merced 07/2021 06/2022 5-7 21 12 Rehabilitation Programs and Material Purchase nal Needs Rehab Materials, Repair and Servicing of Public Works Systems/Databases, Repair and Servicing of Public Works Equipment

Road Maintenance & 1251 Cedar Avenue, Tamarack Avenue, Redwood Avenue, Atwater Merced 21/22 New Sidewalk Repairs This project will include: Pavement Rehab/Repair (Existing) Construction 08/2021 02/2022 20-25 21 12 Rehabilitation Spruce Avenue, between Third and Seventh Street

This project will include: Sidewalk and/or Crosswalk Installation (New), Paving and/or Striping Rehab/Repair (Existing Safety), Storm Drain/Culvert Installation (New), Sidewalk and/or Crosswalk Rehab/Repair (Existing), Pavement Rehab/Repair In the City of Dos Palos: Center Avenue between Marguerite Road Maintenance & Center Avenue North in the City of (Existing), Paving and/or Striping Installation (New Safety), Storm Drain and/or Culvert Dos Palos Merced 20/21 Carried Over Street and Loraine Street; Loraine Street between Center Construction 11/2020 08/2021 30-40 21 12 Rehabilitation Dos Palos Rehab/Repair (Existing), Traffic Signals, Lights, and/or Signage Rehab/Repair Avenue and Dos Palos Avenue. (Existing Safety), Bicycle Lane Rehab/Repair (Existing) | Rehab Streets, Sidewalks, Replace Storm Drainage, Create Bike Path & Pedestrian Walkway, Improve Safety at 7 Intersections, link to parks, multimodal transit center, senior center.

Thomas Street between Palm Avenue and Lynn Avenue Road Maintenance & Dos Palos Merced 21/22 New Thomas Street Reconstruction This project will include: Document Preparation, Cost Estimating (approximately 1100' in length) and Leonard Avenue between Pre-Construction 08/2021 06/2022 30-40 21 12 Rehabilitation Thomas Street and Colony Canal.

Complete Streets Sidewalks and public street near the entrance of mobile-home Gustine Merced 19/20 In Progress Greenacres Project This project will include: Eliminate high curbs and install ADA-compliant ramps. Construction 06/2021 12/2021 15-20 21 12 Components located in the 1400 block of Meredith Avenue near Linden.

This project will include: Replace two-way stop with Roundabout to correct site Gustine Merced 19/20 Carried Over Traffic Control Devices Downtown Roundabout Intersection of 5th Street and 4th Avenue. Construction 01/2022 06/2022 10-20 21 12 obscurement and ADA compliance issues. Roadway Improvement.

Road Maintenance & This project will include: Document Preparation, Preliminary Design | Reconstruction In the City of Livingston between Davis Street and Campbell Livingston Merced 19/20 Forecasted Stefani Avenue Rehabilitation Pre-Construction 07/2024 08/2024 10-20 21 12 Rehabilitation of the roadway structural section. Boulevard.

Road Maintenance & This project will include: Pavement Rehab/Repair (Existing) | Reconstruction of the In the City of Livingston between Davis Street and Campbell Livingston Merced 19/20 Forecasted Stefani Avenue Rehabilitation Construction 09/2024 08/2025 10-20 21 12 Rehabilitation roadway structural section. Boulevard.

*This list is subject to change and will be finalized upon the adoption of any jurisdiction that meets subsequent eligibility at the October 2021 Commission Meeting. Draft City Submitted - Fiscal Year 2021-22 Local Streets and Roads List of Projects *Projects listed are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1) August 19, 2021

Fiscal Year Initially Proposed Project Est Assembly Senate City County Project Type Title Description Location Components Est Start Est Useful Life Proposed Status Completion Districts Districts

Road Maintenance & This project will include: Document Preparation, Preliminary Design | Pavement In the City of Livingston between Joseph Gallo Drive and State Livingston Merced 19/20 Forecasted Winton Parkway Rehabilitation Pre-Construction 07/2022 08/2022 10-20 21 12 Rehabilitation rehabilitation Route 99

Road Maintenance & In the City of Livingston between Joseph Gallo Drive and State Livingston Merced 19/20 Forecasted Winton Parkway Rehabilitation This project will include: Pavement Rehab/Repair (Existing) | Pavement rehabilitation Construction 09/2022 08/2023 10-20 21 12 Rehabilitation Route 99

Road Maintenance & This project will include: Document Preparation, Preliminary Design | Pavement In the City of Livingston between Campbell Boulevard and State Livingston Merced 19/20 Forecasted Hammatt Avenue Rehabilitation Pre-Construction 07/2022 08/2022 10-20 21 12 Rehabilitation rehabilitation Route 99

Road Maintenance & In the City of Livingston between Campbell Boulevard and State Livingston Merced 19/20 Forecasted Hammatt Avenue Rehabilitation This project will include: Pavement Rehab/Repair (Existing) | Pavement rehabilitation Construction 09/2022 08/2023 10-20 21 12 Rehabilitation Route 99

At various locations in the City of Livingston: Park St from Main to 8th, 5th St from Park to F St, 6th St from Park to F St, 7th St Road Maintenance & This project will include: Pavement Rehab/Repair (Existing), Document Preparation, Pre-Construction and 07/2021 08/2021 Livingston Merced 21/22 New 2021 Slurry Seals from Peach to H St, Joseph St from Peach to H St, 8th St from 5-10 21 12 Rehabilitation Preliminary Design | Roadway crack sealing and slurry sealing Construction 09/2021 08/2022 Virginia to H St, H St from 7th to 8th St, Virginia from 7th to 9th, Peach from 7th to Hammatt, and 9th from Peach to Virginia

Vineyards area, Snowgoose area, Skylark area, College Greens Road Maintenance & area, Ranchwood area, and City Center area of the city. Please Los Banos Merced 20/21 Carried Over Crack Seal 2020 This project will include: Pavement Rehab/Repair (Existing) Construction 07/2021 06/2022 5-7 21 12 Rehabilitation refer to Attachment A in Resolution No. 6193 for a full list of streets.

Road Maintenance & San Luis Street, Fourth Street, Monte Vista Avenue, Eleventh Los Banos Merced 21/22 New Hot Mix Overlays This project will include: Pavement Rehab/Repair (Existing) Construction 07/2021 11/2021 10-15 21 12 Rehabilitation Street, and Second Street

Road Maintenance & Center of City, Meadowlands area, Gardens area, Vineyards Los Banos Merced 21/22 New Crack Seal 2021 This project will include: Pavement Rehab/Repair (Existing) Construction 07/2021 06/2022 5-7 21 12 Rehabilitation area, Citus area, and Ranchwood area

Road Maintenance & Grind and Overlay (Yosemite Pre-Construction and 01/2022 05/2022 Merced Merced 20/21 Carried Over This project will include: Pavement Rehab/Repair (Existing) Yosemite Avenue (Parsons to Masionette) 8-12 21 12 Rehabilitation Avenue) Construction 05/2022 10/2022

*This list is subject to change and will be finalized upon the adoption of any jurisdiction that meets subsequent eligibility at the October 2021 Commission Meeting. Draft City Submitted - Fiscal Year 2021-22 Local Streets and Roads List of Projects *Projects listed are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1) August 19, 2021

Fiscal Year Initially Proposed Project Est Assembly Senate City County Project Type Title Description Location Components Est Start Est Useful Life Proposed Status Completion Districts Districts

Road Maintenance & Pre-Construction and 01/2022 05/2022 Merced Merced 20/21 Carried Over Road Improvement - 18th Street This project will include: Pavement Rehab/Repair (Existing) 18th Street (R Street to V Street) 20-25 21 12 Rehabilitation Construction 05/2022 10/2022

Road Maintenance & Pre-Construction and 01/2022 05/2022 Merced Merced 20/21 Carried Over Road Improvement - R Street This project will include: Pavement Rehab/Repair (Existing) R Street (Olive Avenue to Northwood Drive) 20-25 21 12 Rehabilitation Construction 05/2022 10/2022

Road Maintenance & Olive Avenue (Highway 59 to G Street); G Street (16th to 22nd); Pre-Construction and 09/2020 10/2021 Merced Merced 20/21 Completed Crack Filling Projects This project will include: Pavement Rehab/Repair (Existing) 5-7 21 12 Rehabilitation 16th Street (V to G Street); Yosemite (West of R Street) Construction 12/2020 03/2021

Road Maintenance & Grind and Overlay (M Street, Merced Merced 20/21 Completed This project will include: Pavement Rehab/Repair (Existing) M Street (Childs to 8th Street) Construction 04/2020 07/2020 8-12 21 12 Rehabilitation Childs to 8th)

Road Maintenance & Grind and Overlay (M Street, 8th to Pre-Construction and 05/2020 07/2020 Merced Merced 20/21 Completed This project will include: Pavement Rehab/Repair (Existing) M Street ( 8th to 13th Street) 8-12 21 12 Rehabilitation 13th St) Construction 09/2020 12/2020

Road Improvement - R Street Road Maintenance & Pre-Construction and 08/2020 11/2020 Merced Merced 20/21 Completed (Loughborough to Buena Vista; This project will include: Pavement Rehab/Repair (Existing) R Street (Loughborough Drive to Buena Vista Avenue) 20-25 21 12 Rehabilitation Construction 01/2021 05/2021 Phase 1)

Road Maintenance & Alturas Modoc 21/22 New Water Street This project will include: Pavement Rehab/Repair (Existing) Water Street Alturas, CA 96101 Construction 07/2022 08/2022 15-20 1 1 Rehabilitation

Road Maintenance & Alturas Modoc 20/21 Carried Over Third Street This project will include: Pavement Rehab/Repair (Existing) Third Street between Court and East Street Construction 08/2021 10/2021 15-20 1 1 Rehabilitation

Road Maintenance & Meridian Blvd Curb and Gutter Mammoth Lakes Mono 20/21 Carried Over This project will include: Curb and gutter replacement Meridian Blvd west of Minaret Rd Construction 04/2022 05/2022 20-30 25 1 Rehabilitation replacement project Phase 3

*This list is subject to change and will be finalized upon the adoption of any jurisdiction that meets subsequent eligibility at the October 2021 Commission Meeting. Draft City Submitted - Fiscal Year 2021-22 Local Streets and Roads List of Projects *Projects listed are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1) August 19, 2021

Fiscal Year Initially Proposed Project Est Assembly Senate City County Project Type Title Description Location Components Est Start Est Useful Life Proposed Status Completion Districts Districts

2.Transit Shelter Replacement Two of the shelters are located along SR203, the third on Old Mammoth Lakes Mono 20/21 Carried Over Other This project will include: ADA compliant transit shelters Construction 05/2021 07/2021 20-30 25 1 Project Mammoth Road near the intersection of Meridian Blvd.

Mammoth Lakes Mono 21/22 New Other Woodman Minor Mobility Hub This project will include: Transit Shelter and Turnout SW corner of Old Mammoth Road and Woodman Street Construction 06/2021 08/2021 20-25 25 1

This project will include: Salaries, wages, fringe benefits, and related costs of Public Works employees assigned to the Streets Division and providing local street and road Road Maintenance & maintenance and repair services. Included are equipment, material and program Procurement/Operatio Greenfield Monterey 19/20 Completed Administrative Costs City of Greenfield 07/2021 06/2022 1-1 30 12 Rehabilitation related costs. This contribution will enhance the ability of the City to perform a greater nal Needs amount of its own pothole repairs, concrete repairs, striping and other maintenance functions.

This project will include: Sidewalk and/or Crosswalk Installation (New), Paving and/or Striping Rehab/Repair (Existing Safety), Sidewalk and/or Crosswalk Rehab/Repair Pedestrian safety and accessibility (Existing), Pavement Rehab/Repair (Existing), Traffic Signals, Lights, and/or Signage City Wide Greenfield Monterey 19/20 Carried Over Other Construction 07/2021 06/2022 1-1 30 12 improvements Installation (New Safety), Bicycle Lane (New), Paving and/or Striping Installation (New Downtown and surrounding areas will be assessed. Safety), Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Bicycle Lane Rehab/Repair (Existing)

Talbot St from Canal St to S Mildred St, Monte Vista Place from Talbot St to Reich St, Reich St from Canal St to S San Lorenzo Road Maintenance & King Monterey 21/22 New 2022 King City Street Project This project will include: Paving and/or Striping Rehab/Repair (Existing Safety) Ave, Luckett St from S Mildred Ave to S San Lorenzo Ave, Construction 04/2022 06/2022 25-30 30 12 Rehabilitation Seventh St from Bassett St to Division St, and S San Lorenzo Ave from Pearl St to Division St

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Belle Dr, Berney Ct, Bostick Ave, Bradley Cir, Cardoza Ave, Road Maintenance & Annual Street Resurfacing - Phase Project Scope Development, Pavement Rehab/Repair (Existing), Maintenance Drew St, Dx Dr, Fitzgerald Cir, Huntington Pl, Kona Cir, Lelia Pl, Pre-Construction and 06/2021 02/2022 Marina Monterey 21/22 New 10-15 29 17 Rehabilitation 1, HMA Overlay Program Plan Development, Document Preparation, Cost Estimating, Preliminary McCulloch Cir, Melanie Rd, Messinger Dr, Peninsula Dr, Construction 03/2022 06/2022 Design, Environmental Study/Documents, ADA Curb Ramp Rehab/Repair (Existing) Rendondo Ct, Seaside Ct, Sunrise Cir, Westwood Ct

Beach Rd, California Ave, Del Monte Blvd, Hillcrest Ave, Patton Pkwy, Reservation Rd, 2nd Ave, Aaron Wy, Abdy Wy, Bayer Dr, Brostrom Dr, Charlie St, Costa Del Mar Rd, Cove Wy, Diana Pl, This project will include: Project Scope Development, Pavement Rehab/Repair Ellis Ct, ELm Ave, Estrella Del Mar Wy, Ferris Ave, Gary Cir, Road Maintenance & Annual Street Resurfacing - Phase (Existing), Maintenance Program Plan Development, Feasibility Study, Cost Pre-Construction and 06/2021 02/2022 Marina Monterey 21/22 New George Wy, Grant St, Harris Ct, Healy Ave, Hilo Ave, Isla Del Sol 5-10 29 17 Rehabilitation 2, Microsurfacing & Slurry Seal Estimating, Document Preparation, Preliminary Design, Environmental Construction 04/2022 06/2022 Way, Lake Ct, Lexington Ct, Lynscott Dr, Marina Dr, Martin Cir, Study/Documents MBest Dr, Melville Ave, Michael Dr, Michelle Ct, Morse Ct, Neeson Rd, Owen Ave, Peninsula Dr, Quebrada Del Mar Rd, Rendova

This project will include: Project Scope Development, Paving and/or Striping Rehab/Repair (Existing Safety), Sidewalk and/or Crosswalk Rehab/Repair (Existing), N Davis Rd; Williams Rd; E Boronda Rd; Harden Pkwy; N Main Road Maintenance & Preventative Maintenance for Pavement Rehab/Repair (Existing), Maintenance Program Plan Development, Bicycle Pre-Construction and 07/2021 01/2022 Salinas Monterey 20/21 In Progress St; San Juan Grade Rd; Nantucket Blvd; McKinnon St; El Dorado 5-10 30 12 Rehabilitation Asphalt Pavement Lane (New), Cost Estimating, Document Preparation, Preliminary Design, Traffic Construction 04/2022 06/2022 Dr; Independence Blvd Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Bicycle Lane Rehab/Repair (Existing)

*This list is subject to change and will be finalized upon the adoption of any jurisdiction that meets subsequent eligibility at the October 2021 Commission Meeting. Draft City Submitted - Fiscal Year 2021-22 Local Streets and Roads List of Projects *Projects listed are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1) August 19, 2021

Fiscal Year Initially Proposed Project Est Assembly Senate City County Project Type Title Description Location Components Est Start Est Useful Life Proposed Status Completion Districts Districts

This project will include: Project Scope Development, Paving and/or Striping E Alisal St; Williams Rd; Work St; E Romie Ln; Pajaro St; Road Maintenance & Patch and Repair Program on City Rehab/Repair (Existing Safety), Sidewalk and/or Crosswalk Rehab/Repair (Existing), Hartnell St; Nacional St; N Davis Rd; E Boronda Rd; Harden Pre-Construction and 10/2021 02/2022 Salinas Monterey 20/21 In Progress 10-12 30 12 Rehabilitation Streets Pavement Rehab/Repair (Existing), Cost Estimating, Document Preparation, Pkwy; N Main St; San Juan Grade Rd; Nantucket Blvd; Construction 04/2022 09/2022 Preliminary Design, Bicycle Lane Rehab/Repair (Existing) McKinnon St; El Dorado Dr; Independence Blvd

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), North and south ends of Fremont Blvd., Kimball Avenue, Road Maintenance & Arterial and Collector Resurfacing Pre-Construction and 08/2021 01/2022 Seaside Monterey 21/22 New Pavement Rehab/Repair (Existing), Cost Estimating, Document Preparation, Traffic Wheeler Street, and various residential roadway sections 5-30 29 17 Rehabilitation Project Construction 03/2022 07/2022 Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Preliminary Design throughout the City

This project will include: Cost Estimating | Repair of failed roadway sections (dig-out Road Maintenance & Southwest area of the City, from North st to front street, and from Soledad Monterey 19/20 In Progress 2018 Streets Maintenance Project and replace with new asphalt concrete), slurry and re-striping of various roadways Pre-Construction 10/2021 12/2021 10-20 30 12 Rehabilitation Moranda Rd to Nest les Rd. throughout City.

1. San Carlos Street, from Eighth Avenue to Thirteenth Avenue,

2. Northbound Junipero Street, from Fifth Avenue to Fourth Avenue 3. Junipero Street, from Ocean Avenue to Sixth Avenue 4. Southbound Junipero Street, from Fourth Avenue to Ocean Complete Streets FY 2021/2022 Streets and Roads This project will include: Sidewalk and/or Crosswalk Rehab/Repair (Existing), Carmel-by-the-Sea Monterey 21/22 New Avenue 5. Northbound Junipero Street, from Fourth Avenue to Construction 09/2021 11/2021 10-20 29 17 Components Projects Pavement Rehab/Repair (Existing), ADA Curb Ramp Installation (New) Third Avenue 6. Northbound Junipero Street, from Sixth Avenue to Fifth Avenue 7. Southbound Junipero Street, from Third Avenue to Fourth Avenue 8. San Antonio Avenue, from Fourth Av

This project will include: Pavement Rehab/Repair (Existing) | Rehabilitate and Maintain City walking pathway between two very popular streets, Portola Drive and Work Ave to help remove pedestrian traffic off of two heavily traveled roadways with no sidewalks Portola Drive and Work Ave City walking pathway between two very popular streets, Portola Del Rey Oaks Monterey 21/22 New Safety available, and facilitate safe pedestrian travel to the City’s park and busiest shopping Construction 08/2021 10/2021 15-20 29 12 Pedestrian Pathway Drive and Work Ave. district in an effort to improve traffic safety in the City for approximately half of the City’s residents. This area will be rehabilitated with newly rebuilt stairways, handrails, and retaining walls.

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Sidewalk and/or Crosswalk Rehab/Repair (Existing), Pavement Rehab/Repair Road Maintenance & (Existing), Storm Drain and/or Culvert Rehab/Repair (Existing) | Construction of Monterey Park Monterey 21/22 New Reconstruction of Lighthouse Lighthouse Avenue Construction 01/2022 12/2022 20-20 29 17 Rehabilitation concrete curbs, gutters, sidewalks, sidewalk crossings (driveway approach)and curb ramps, storm drainage, signage and striping, isolated street and driveway surface repairs, pavement grinding, street reconstruction and hot mix asphalt pavement.

This project will include: Project Scope Development, Pavement Rehab/Repair Road Maintenance & Ocean View Blvd from 2nd to Carmel & Ocean View Blvd from Pre-Construction and 07/2021 03/2022 Pacific Grove Monterey 21/22 New Street Rehab on Ocean View Blvd (Existing), Document Preparation, Preliminary Design, Storm Drain and/or Culvert 15-20 29 20 Rehabilitation 17th to Sea Palm Construction 04/2021 06/2021 Rehab/Repair (Existing), ADA Curb Ramp Rehab/Repair (Existing)

This project will include: Pavement Improvement (New), Sidewalk and/or Crosswalk Road Maintenance & Contra Costa Street and Sidewalk Installation (New), Pavement Rehab/Repair (Existing), ADA Curb Ramp Rehab/Repair Contra Costa Street between Elder Avenue and Shasta Avenue Sand City Monterey 19/20 Carried Over Construction 04/2022 09/2022 20-30 29 17 Rehabilitation Improvement Project (Existing) | Curb, gutter, and sidewalk improvements; and adjacent street rehabilitation in Sand City, California with new crosswalk. (funds to be banked and combined with other funding sources).

*This list is subject to change and will be finalized upon the adoption of any jurisdiction that meets subsequent eligibility at the October 2021 Commission Meeting. Draft City Submitted - Fiscal Year 2021-22 Local Streets and Roads List of Projects *Projects listed are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1) August 19, 2021

Fiscal Year Initially Proposed Project Est Assembly Senate City County Project Type Title Description Location Components Est Start Est Useful Life Proposed Status Completion Districts Districts

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Sidewalk and/or Crosswalk Rehab/Repair (Existing), Pavement Rehab/Repair Road Maintenance & (Existing), Storm Drain and/or Culvert Rehab/Repair (Existing) | Construction of Monterey Monterey 21/22 New Reconstruction of Lighthouse Lighthouse Avenue Construction 01/2022 12/2022 20-20 29 17 Rehabilitation concrete curbs, gutters, sidewalks, sidewalk crossings (driveway approach)and curb ramps, storm drainage, signage and striping, isolated street and driveway surface repairs, pavement grinding, street reconstruction and hot mix asphalt pavement.

This project will include: Sidewalk and/or Crosswalk Installation (New), Paving and/or Striping Rehab/Repair (Existing Safety), Sidewalk and/or Crosswalk Rehab/Repair Road Maintenance & Lake Street Pavement Calistoga Napa 20/21 Carried Over (Existing), ADA Curb Ramp Installation (New), Pavement Rehab/Repair (Existing), Lake Street between Grant Street and Lincoln Avenue Construction 07/2021 06/2022 20-30 4 3 Rehabilitation Rehabilitation Storm Drain and/or Culvert Rehab/Repair (Existing), ADA Curb Ramp Rehab/Repair (Existing)

Road Maintenance & Silverado Trail Pavement This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Calistoga Napa 20/21 Carried Over Silverado Trail Within the City limits Construction 07/2021 06/2022 20-30 4 3 Rehabilitation Rehabilitation Pavement Rehab/Repair (Existing), Bicycle Lane Rehab/Repair (Existing)

This project will include: Project Scope Development, Right of Way, Feasibility Study, Calistoga Napa 21/22 New Other FY 22/23 Project Design Maintenance Program Plan Development, Active Transportation Plan, Document Citywide Pre-Construction 07/2021 06/2022 20-30 4 3 Preparation, Cost Estimating, Preliminary Design, Environmental Study/Documents

This project will include: Sidewalk and/or Crosswalk Installation (New), Traffic Signals, Silverado Trail Croswalk and Calistoga Napa 21/22 New Traffic Control Devices Lights, and/or Signage Installation (New Safety), Paving and/or Striping Installation Silverado Trail, East of Rosedale Intersection Construction 07/2021 06/2022 30-40 4 3 HAWK Signal (New Safety)

This project will include: Sidewalk and/or Crosswalk Installation (New), Paving and/or Striping Rehab/Repair (Existing Safety), Sidewalk and/or Crosswalk Rehab/Repair (Existing), Pavement Rehab/Repair (Existing), ADA Curb Ramp Installation (New), Road Maintenance & Washington Street Pavement Calistoga Napa 21/22 New Traffic Signals, Lights, and/or Signage Installation (New Safety), Paving and/or Washington Street from North Oak Street to Berry Street Construction 07/2021 06/2022 20-30 4 3 Rehabilitation Repair Striping Installation (New Safety), Storm Drain and/or Culvert Rehab/Repair (Existing), Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), ADA Curb Ramp Rehab/Repair (Existing)

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Road Maintenance & Calistoga Napa 21/22 New Berry Street Pavement Repair Sidewalk and/or Crosswalk Rehab/Repair (Existing), Pavement Rehab/Repair Berry Street from Berry Bridge to Foothill Blvd Construction 07/2021 06/2022 5-7 4 3 Rehabilitation (Existing), ADA Curb Ramp Rehab/Repair (Existing)

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Storm Drain/Culvert Installation (New), Sidewalk and/or Crosswalk Rehab/Repair (Existing), Road Maintenance & Calistoga Napa 21/22 New Cedar Street Pavement Rehab/Repair (Existing), Storm Drain and/or Culvert Rehab/Repair Spring Street to Lincoln Avenue Construction 07/2021 06/2022 20-30 4 3 Rehabilitation (Existing), Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), ADA Curb Ramp Rehab/Repair (Existing)

*This list is subject to change and will be finalized upon the adoption of any jurisdiction that meets subsequent eligibility at the October 2021 Commission Meeting. Draft City Submitted - Fiscal Year 2021-22 Local Streets and Roads List of Projects *Projects listed are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1) August 19, 2021

Fiscal Year Initially Proposed Project Est Assembly Senate City County Project Type Title Description Location Components Est Start Est Useful Life Proposed Status Completion Districts Districts

This project will include: Sidewalk and/or Crosswalk Installation (New), Paving and/or Striping Rehab/Repair (Existing Safety), Storm Drain/Culvert Installation (New), Sidewalk and/or Crosswalk Rehab/Repair (Existing), Pavement Rehab/Repair Road Maintenance & Calistoga Napa 21/22 New Grant Street (Existing), Bridge Structure Rehab/Repair (Existing), Traffic Signals, Lights, and/or Garnett Creek Court to City Limits Construction 07/2021 06/2022 20-30 4 3 Rehabilitation Signage Installation (New Safety), Bicycle Lane (New), Storm Drain and/or Culvert Rehab/Repair (Existing), Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Bicycle Lane Rehab/Repair (Existing)

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Petrified Forest Rd. and Foothill Sidewalk and/or Crosswalk Rehab/Repair (Existing), Traffic Signals, Lights, and/or Calistoga Napa 21/22 New Traffic Control Devices Blvd. Intersection Signalization Petrified Forest Rd. and Foothill Blvd. Intersection Construction 07/2021 06/2022 30-40 4 3 Signage Installation (New Safety), Traffic Signals, Lights, and/or Signage Project Rehab/Repair (Existing Safety), ADA Curb Ramp Rehab/Repair (Existing)

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Various local streets: Arden Court, Kensington Way, Road Maintenance & 2021 Annual Pavement Sidewalk and/or Crosswalk Rehab/Repair (Existing), Pavement Rehab/Repair American Canyon Napa 21/22 New Knightsbridge Way, Lansford Court, Linwood Lane, Park Lane, Construction 04/2022 07/2022 10-10 4 3 Rehabilitation Preservation Project (Existing), Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), ADA Regent Court, Strand Court Curb Ramp Rehab/Repair (Existing)

This project will include: Sidewalk and/or Crosswalk Installation (New), Pavement Complete Streets Improvement (New), Sidewalk and/or Crosswalk Rehab/Repair (Existing), Pavement Napa Napa 21/22 New Complete Streets Concrete South Franklin and Stonehouse neighborhoods Construction 07/2021 12/2021 50-50 4 3 Components Rehab/Repair (Existing), ADA Curb Ramp Installation (New), Bicycle Lane (New), Bicycle Lane Rehab/Repair (Existing)

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Road Maintenance & Road Maintenance- Oak Street Sidewalk and/or Crosswalk Rehab/Repair (Existing), Pavement Rehab/Repair Pre-Construction and 07/2021 09/2021 Napa Napa 21/22 New Oak Street between Brown Street and Franklin Street 50-50 4 3 Rehabilitation Emergency Repair (Existing), Cost Estimating, Document Preparation, Preliminary Design, Storm Drain Construction 09/2021 12/2021 and/or Culvert Rehab/Repair (Existing), ADA Curb Ramp Rehab/Repair (Existing)

This project will include: Preliminary Design | Currently designing the downtown Complete Streets Downtown Sidewalk and St Helena Napa 19/20 In Progress sidewalk and pedestrian improvements: sidewalk, curb ramps, bulb outs, landscape, Main Street (Highway 29) from Mitchell Drive to Pine Street Pre-Construction 04/2019 06/2023 15-30 7 2 Components Pedestrian Project furnishing, utilities. OBAG II Grant (2 year design with construction in FY22/23)

Complete Streets Curb, Gutter & Sidewalk This project will include: Sidewalk and/or Crosswalk Rehab/Repair (Existing), ADA Yountville Napa 21/22 New Toyon Terrace & Vista neighborhoods, Washington Street Construction 07/2021 06/2022 20-40 4 3 Components Replacement Curb Ramp Rehab/Repair (Existing)

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Road Maintenance & 2021/22 Annual Street Grass Valley Nevada 21/22 New Pavement Rehab/Repair (Existing), ADA Curb Ramp Rehab/Repair (Existing), Bicycle Clark St, Clipper Ln, Lucas Ln, Miners Trail Construction 06/2022 07/2022 5-20 1 1 Rehabilitation Rehabilitation Project Lane Rehab/Repair (Existing)

This project will include: Sidewalk and/or Crosswalk Installation (New), Storm Complete Streets West River Street Streetscape Truckee Nevada 20/21 Carried Over Drain/Culvert Installation (New), ADA Curb Ramp Installation (New), Pavement West River Street between Bridge Street and Mill Street Construction 06/2022 10/2023 30-30 1 1 Components Improvement Project Rehab/Repair (Existing)

*This list is subject to change and will be finalized upon the adoption of any jurisdiction that meets subsequent eligibility at the October 2021 Commission Meeting. Draft City Submitted - Fiscal Year 2021-22 Local Streets and Roads List of Projects *Projects listed are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1) August 19, 2021

Fiscal Year Initially Proposed Project Est Assembly Senate City County Project Type Title Description Location Components Est Start Est Useful Life Proposed Status Completion Districts Districts

Within the Glenshire and Tahoe Donner neighborhoods. The Road Maintenance & Annual Paving and Drainage This project will include: Pavement Rehab/Repair (Existing) | Project includes paving Truckee Nevada 21/22 New project scope may be modified depending on available funding Construction 07/2021 10/2021 20-30 1 1 Rehabilitation Project approximately 11 miles of roadway (and 20 roads). for the project.

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing), Document Preparation, Cost Estimating, Road Maintenance & Valencia Drive Rehabilitation Preliminary Design, ADA Curb Ramp Rehab/Repair (Existing) | The work includes Pre-Construction and 04/2022 06/2022 Fullerton Orange 21/22 New Valencia Drive from Magnolia Ave to Gilbert Street 10-20 65 29 Rehabilitation Project pavement rehab/reconstruction to extend the roadway service life and to reconstruct Construction 07/2022 12/2022 curb and gutter, access ramps, cross gutter, traffic striping and signing, and all related work.

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing), Document Preparation, Cost Estimating, Road Maintenance & Rosecrans Avenue - City Limits to Pre-Construction and 07/2021 01/2022 Fullerton Orange 21/22 New Preliminary Design, ADA Curb Ramp Rehab/Repair (Existing) | The work includes Rosecrans Avenue - City Limits to Sunny Ridge 10-20 65 29 Rehabilitation Sunny Ridge Drive Construction 02/2021 06/2022 pavement rehabilitation to extend the roadway service life and to reconstruct curb and gutter, access ramps, cross gutter, traffic striping and signing, and all related work.

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Sidewalk and/or Crosswalk Rehab/Repair (Existing), Pavement Rehab/Repair (Existing), ADA Curb Ramp Rehab/Repair (Existing) | Preconstruction will include Cost Road Maintenance & Irvine Center Drive Pavement Irvine Orange 20/21 Carried Over Estimating, Document Preparation, Preliminary Design. | Design was allocated in FY Irvine Center Drive Pavement Rehab - (Pacifica to Lake Forest) Construction 01/2022 06/2022 17-20 74 37 Rehabilitation Rehab - (Pacifica to Lake Forest) 20-21 RMRA funds. Construction funds to be allocated with FY 21-22 funds. Design/preconstruction anticipated 07/2021-12/2021. Construction anticipated 01/2022 - 06/2022.

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Road Maintenance & Slurry Seal and Local Streets Neighborhood Areas : El Camino Real, Deerfield, Oak Creek, Irvine Orange 21/22 New Sidewalk and/or Crosswalk Rehab/Repair (Existing), Pavement Rehab/Repair Construction 07/2021 06/2022 7-20 68, 74 37 Rehabilitation Rehabilitation and Pavilion Park (Existing), ADA Curb Ramp Rehab/Repair (Existing)

Trabuco Road Pavement Road Maintenance & This project will include: Project Scope Development, Cost Estimating, Preliminary Irvine Orange 21/22 New Rehabilitation- Jeffrey to Sand Trabuco Road Pavement Rehabilitation: Jeffrey to Sand Canyon Pre-Construction 07/2021 06/2022 17-20 68 37 Rehabilitation Design Canyon

This project will include: In partnership with the Orange County Transportation Authority, the City is constructing a 246 space parking structure and the newest Metrolink Station & Parking Metrolink Train Station to be built in Orange County in 15 years. The parking structure 321 S. Main Street, Placentia, CA 92870 - See Attachment 3 for Placentia Orange 20/21 In Progress Other Construction 10/2020 08/2023 50-100 55 29 Structure will support the Metrolink station along with two existing public parking lots. a project site map. Construction of the underground utilities started in January 2020. The construction of the train station and parking structure is anticipated to begin in January 2021.

This project will repave approximately 2.3 million streets in the Road Maintenance & FY 2021/22 Roadway This project will include: Pavement Rehab/Repair (Existing), Document Preparation, City of Placentia including residential and arterial streets. The Pre-Construction and 07/2021 06/2022 Placentia Orange 21/22 New 15-21 55 29 Rehabilitation Rehabilitation Project Preliminary Design project includes the following arterial streets Kraemer Boulevard Construction 07/2022 11/2022 and Orangethorpe Avenue.

This project is a large-scale preventative maintenance slurry Road Maintenance & This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Placentia Orange 21/22 New FY 2021/22 Slurry Seal Project application on 2.2 million square feet of residential streets within Construction 07/2021 09/2022 5-7 55 29 Rehabilitation Pavement Rehab/Repair (Existing) the City to further extend the pavement life of those streets.

*This list is subject to change and will be finalized upon the adoption of any jurisdiction that meets subsequent eligibility at the October 2021 Commission Meeting. Draft City Submitted - Fiscal Year 2021-22 Local Streets and Roads List of Projects *Projects listed are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1) August 19, 2021

Fiscal Year Initially Proposed Project Est Assembly Senate City County Project Type Title Description Location Components Est Start Est Useful Life Proposed Status Completion Districts Districts

The Golden Avenue Bridge is located over Carbon Canyon Road Maintenance & Golden Avenue Replacement Placentia Orange 21/22 New This project will include: Bridge Structure Rehab/Repair (Existing) Channel on Golden Avenue near Rose Drive in the City of Construction 11/2022 11/2023 75-100 55 29 Rehabilitation Bridget Placentia.

This project will include: Pavement Improvement (New), Sidewalk and/or Crosswalk Installation (New), ADA Curb Ramp Installation (New), Paving and/or Striping Road Maintenance & Hazard Avenue Improvement Installation (New Safety) | Remove existing pavement and place new asphalt concrete Westminster Orange 21/22 New Hazard Avenue from Brookhurst Street and Ward Street Construction 04/2022 08/2022 15-20 72 34 Rehabilitation Project overlay; remove and replace damaged curb, gutter, cross gutter, spandrel, sidewalk, ADA ramps, driveway approach, bus pad; adjust mnahole and water valve to grade; install signing and striping.

Road Maintenance & Deerhurst/Wolverine/Foxborough This project will include: Sidewalk and/or Crosswalk Rehab/Repair (Existing), Aliso Viejo Orange 21/22 New Deerhurst, Foxborough and Wolverine Construction 06/2021 10/2021 10-20 73 36 Rehabilitation Rehabilitation Pavement Rehab/Repair (Existing), ADA Curb Ramp Rehab/Repair (Existing)

This project will include: Cost Estimating, Document Preparation | Street patching, Road Maintenance & Aliso Viejo Orange 21/22 New Aliso Creek Road Rehabilitation asphalt overlay, utility structure adjustments and sidewalk improvements. Construction Aliso Creek Road - Aliso Viejo Parkway to City Limit Pre-Construction 07/2021 06/2022 10-20 73 36 Rehabilitation is anticipated to take place in 2022-23

Road Maintenance & Aliso Viejo Orange 21/22 New FY 2021-22 Slurry Seal Program This project will include: Pavement Rehab/Repair (Existing) Various streets within Slurry Area 4 Construction 06/2021 12/2021 5-7 73 36 Rehabilitation

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), (District 5) - Torry Neighborhood bordered by South Street to the Road Maintenance & Sidewalk and/or Crosswalk Rehab/Repair (Existing), Pavement Rehab/Repair north, SR-57 Freeway to the east, Ball Road/Carl Street End of Anaheim Orange 20/21 In Progress Torry Neighborhood Rehabilitation Construction 05/2021 10/2021 7-20 69 34 Rehabilitation (Existing), Storm Drain and/or Culvert Rehab/Repair (Existing), ADA Curb Ramp Cul-De-Sac to the south, and State College Boulevard/Sunkist Rehab/Repair (Existing) Street to the west

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), (District 2) - Lotus Neighborhood bordered by Coronet Avenue to Road Maintenance & Sidewalk and/or Crosswalk Rehab/Repair (Existing), Pavement Rehab/Repair Anaheim Orange 20/21 In Progress Lotus Neighborhood Rehabilitation the north, Holly Street to the east, La Palma Avenue to the south, Construction 05/2021 10/2021 7-20 65 29 Rehabilitation (Existing), Storm Drain and/or Culvert Rehab/Repair (Existing), ADA Curb Ramp and Brookhurst Street to the west Rehab/Repair (Existing)

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), (District 6) - Avenida Bernardo Neighborhood bordered by Santa Road Maintenance & Avenida Bernardo Neighborhood Sidewalk and/or Crosswalk Rehab/Repair (Existing), Pavement Rehab/Repair Ana Canyon Road to the north, Imperial Highway to the east, Anaheim Orange 20/21 In Progress Construction 03/2022 10/2022 7-20 68 37 Rehabilitation Rehabilitation (Existing), Storm Drain and/or Culvert Rehab/Repair (Existing), ADA Curb Ramp Nantucket Lane/Tisbury Court to the south, and Andover Rehab/Repair (Existing) Drive/Fairlee Court to the west

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), (District 6) - Riverdale Neighborhood bordered by Alderdale Road Maintenance & Riverdale Neighborhood Sidewalk and/or Crosswalk Rehab/Repair (Existing), Pavement Rehab/Repair Anaheim Orange 20/21 In Progress Avenue to the north, Lakeview Avenue to the east, Santa Ana Construction 07/2022 10/2022 7-20 68 37 Rehabilitation Rehabilitation (Existing), Storm Drain and/or Culvert Rehab/Repair (Existing), ADA Curb Ramp Canyon Road to the south, and SR-91 Freeway to the west. Rehab/Repair (Existing)

*This list is subject to change and will be finalized upon the adoption of any jurisdiction that meets subsequent eligibility at the October 2021 Commission Meeting. Draft City Submitted - Fiscal Year 2021-22 Local Streets and Roads List of Projects *Projects listed are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1) August 19, 2021

Fiscal Year Initially Proposed Project Est Assembly Senate City County Project Type Title Description Location Components Est Start Est Useful Life Proposed Status Completion Districts Districts

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Storm Northeast Anaheim Colony (District 3) - Sabina Neighborhood (Project - B) - bordered by La Road Maintenance & Drain/Culvert Installation (New), Sidewalk and/or Crosswalk Rehab/Repair (Existing), Anaheim Orange 21/22 New (Sabina) Neighborhood Palma Avenue to the north, Pauline Street to the east, Sycamore Construction 09/2021 10/2022 7-20 69 29 Rehabilitation ADA Curb Ramp Installation (New), Pavement Rehab/Repair (Existing), Storm Drain Rehabilitation (Phase - 3) Street to the south, and Anaheim Boulevard to the west and/or Culvert Rehab/Repair (Existing), ADA Curb Ramp Rehab/Repair (Existing)

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Storm Northeast Anaheim Colony Drain/Culvert Installation (New), Sidewalk and/or Crosswalk Rehab/Repair (Existing), (District 3) - Sabina Neighborhood (Project - D) - bordered by Road Maintenance & Pre-Construction and 07/2021 07/2022 Anaheim Orange 21/22 New (Sabina) Neighborhood Pavement Rehab/Repair (Existing), ADA Curb Ramp Installation (New), Storm Drain Sycamore Street to the north, Pauline Street to the east, Lincoln 7-20 69 29 Rehabilitation Construction 07/2022 03/2023 Rehabilitation (Phase - 4) and/or Culvert Rehab/Repair (Existing), Preliminary Design, ADA Curb Ramp Avenue to the south, and Harbor Boulevard to the west Rehab/Repair (Existing)

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Road Maintenance & Anaheim Orange 21/22 New East Street Pavement Rehabilation Sidewalk and/or Crosswalk Rehab/Repair (Existing), Pavement Rehab/Repair (Districts 3 & 5) - East Street from Cypress to La Palma Avenue Construction 03/2022 06/2022 10-15 69 29 Rehabilitation (Existing), ADA Curb Ramp Rehab/Repair (Existing) | Traffic signal loops

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Road Maintenance & Anaheim Orange 21/22 New Harbor Boulevard Rehabilitation Sidewalk and/or Crosswalk Rehab/Repair (Existing), Pavement Rehab/Repair (District 4) - Harbor Boulevard from Ball Road to South Street Construction 03/2022 06/2022 10-15 69 34 Rehabilitation (Existing), ADA Curb Ramp Rehab/Repair (Existing) | Traffic signal loops

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Road Maintenance & Sidewalk and/or Crosswalk Rehab/Repair (Existing), Pavement Rehab/Repair (District 6) - Miraloma Avenue from Miller Street to Etchandy Pre-Construction and 07/2021 07/2022 Anaheim Orange 21/22 New Miraloma Avenue Rehabilitation 10-15 68 37 Rehabilitation (Existing), Storm Drain and/or Culvert Rehab/Repair (Existing), Preliminary Design, Lane Construction 02/2023 06/2023 ADA Curb Ramp Rehab/Repair (Existing) | Traffic signal loops

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Road Maintenance & Sidewalk and/or Crosswalk Rehab/Repair (Existing), Pavement Rehab/Repair Pre-Construction and 07/2021 07/2022 Anaheim Orange 21/22 New Dale Avenue Rehabilitation (District 1) - Dale Avenue from Ball Road to Bella Court 10-15 65 29 Rehabilitation (Existing), Storm Drain and/or Culvert Rehab/Repair (Existing), Preliminary Design, Construction 02/2023 06/2023 ADA Curb Ramp Rehab/Repair (Existing) | Traffic signal loops

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Sidewalk and/or Crosswalk Rehab/Repair (Existing), Pavement Rehab/Repair Road Maintenance & (District 5) - South Street from State College Boulevard to Pre-Construction and 07/2021 07/2022 Anaheim Orange 21/22 New South Street Rehabilitation (Existing), Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), 10-15 69 34 Rehabilitation Sunkist Street Construction 02/2023 06/2023 Storm Drain and/or Culvert Rehab/Repair (Existing), Preliminary Design, ADA Curb Ramp Rehab/Repair (Existing) | Traffic signal loops

Road Maintenance & Central Avenue and State College Central Avenue from west city limits to Brea Boulevard and on Brea Orange 21/22 New This project will include: Pavement Rehab/Repair (Existing) Construction 10/2022 12/2022 20-25 55 29 Rehabilitation Boulevard Street Improvements State College Boulevard from Brea Boulevard to lambert Road

*This list is subject to change and will be finalized upon the adoption of any jurisdiction that meets subsequent eligibility at the October 2021 Commission Meeting. Draft City Submitted - Fiscal Year 2021-22 Local Streets and Roads List of Projects *Projects listed are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1) August 19, 2021

Fiscal Year Initially Proposed Project Est Assembly Senate City County Project Type Title Description Location Components Est Start Est Useful Life Proposed Status Completion Districts Districts

Tulare St from Western Ave to Beach Blvd, Western Avenue from Tulare St to Pacific Ave, Pacific Avenue from Western Ave This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), to Beach Blvd, Kingman Ave from Pacific Ave to Brea Creek, Sidewalk and/or Crosswalk Rehab/Repair (Existing), ADA Curb Ramp Installation Fullerton Ave from Tulare St to Craig Avenue, Craig Ave from Road Maintenance & 2021-2022 Annual Pavement Buena Park Orange 21/22 New (New), Pavement Rehab/Repair (Existing), ADA Curb Ramp Rehab/Repair (Existing) | Fullerton Ave to Beach Blvd, McComber Road, Arrohead Ave, Construction 03/2022 05/2022 10-15 65 32 Rehabilitation Rehabilitation Rehabilitation and replacement of curb & gutter, sidewalk, accessible ramps, driveway Cachuma Cir, Big Bear Cir, Crowley Cir, Baldwin Cir, Havasu Cir, approaches, signing and striping, and other incidentals for various residential streets. Gregory Cir, Mammoth Cir, Henshaw Cir, Owens St, Elsinore Cir, Tahoe Cir, Los Coyotes Dr from Country Club Dr to golf course entrance

El Cerro Dr from El Viento Way to Western Ave, El Chino Cir, El Campo Cir, El Cedro Cir, El Cortez Cir, McNeil Way, El Camino This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Road Maintenance & Cir, El Centro Way, El Verano Dr, El Prado Way, El Tomaso Buena Park Orange 21/22 New 2021-2022 Annual Slurry Seal Pavement Rehab/Repair (Existing) | Applying slurry to preserve the pavement for Construction 04/2022 06/2022 7-10 65 32 Rehabilitation Way, El Verano Dr, El Veloz Way, El Viento way, El Vino Way, El residential streets. Redondo Cir, El Rovia Cir, El Diablo Cir, El Monte Dr from El Prado Way to El Redondo Cir

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Road Maintenance & Pavement Rehab/Repair (Existing), ADA Curb Ramp Rehab/Repair (Existing) | 0.75 Buena Park Orange 21/22 New Malvern Avenue Rehabilitation Malvern Avenue from Beach Blvd to Dale St Construction 03/2022 05/2022 10-15 65 32 Rehabilitation mile AC arterial roadway rehabilitation and replacement of curb & gutter, sidewalk, accessible ramps, driveway approaches, signing & striping, and other incidentals.

Adams Avenue Improvements This project will include: Project Scope Development, Right of Way, Active Road Maintenance & Adams Avenue from Royal Palm Drive to the Santa Ana River in Costa Mesa Orange 21/22 New Project (from Royal Palm Dr. to the Transportation Plan, Cost Estimating, Document Preparation, Preliminary Design | For Pre-Construction 03/2022 08/2022 5-10 74 37 Rehabilitation the City of Costa Mesa, CA Santa Ana River) street rehabilitation.

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing), Bicycle Lane Rehab/Repair (Existing) | The scope Crescent Avenue (city limits to city limits) , Valley View Road Maintenance & FY 2021-22 Arterial Street Cypress Orange 21/22 New of work consists of slurry sealing and/or overlaying various residential and arterial (Orangewood to Katella), and Orange Avenue (Valley View to Construction 01/2021 05/2022 7-20 65 29 Rehabilitation Rehabilitation Project streets throughout the City. The proposed project also includes incidental items of Holder) work, such as traffic striping, traffic loops, manhole adjustments, etc.

The project location includes residential, residential collector and Road Maintenance & FY21/22 Annual Residential Dana Point Orange 21/22 New This project will include: Pavement Rehab/Repair (Existing) collector streets in the Lantern District, Lantern Village and Construction 07/2022 10/2022 20-25 73 36 Rehabilitation Roadway Resurfacing Capistrano Beach areas.

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Rehabilitation and Resurfacing of Road Maintenance & Sidewalk and/or Crosswalk Rehab/Repair (Existing), Pavement Rehab/Repair Fountain Valley Orange 21/22 New Euclid Street from Edinger Avenue Euclid Street from Edinger Avenue to Warner Avenue Construction 08/2021 09/2021 10-15 72 34 Rehabilitation (Existing), ADA Curb Ramp Installation (New), ADA Curb Ramp Rehab/Repair to Warner Avenue (Existing)

Road Maintenance & Orangewood Avenue Garden Grove Orange 21/22 New This project will include: Paving and/or Striping Rehab/Repair (Existing Safety) Orangewood Ave. from Brookhurst St. to Euclid St. Construction 06/2021 10/2021 15-20 72 34 Rehabilitation Rehabilitation

*This list is subject to change and will be finalized upon the adoption of any jurisdiction that meets subsequent eligibility at the October 2021 Commission Meeting. Draft City Submitted - Fiscal Year 2021-22 Local Streets and Roads List of Projects *Projects listed are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1) August 19, 2021

Fiscal Year Initially Proposed Project Est Assembly Senate City County Project Type Title Description Location Components Est Start Est Useful Life Proposed Status Completion Districts Districts

Road Maintenance & Garden Grove Orange 21/22 New Lampson Avenue Rehabilitation This project will include: Paving and/or Striping Rehab/Repair (Existing Safety) Lampson Ave. from Dale St. to Magnolia St. Construction 06/2021 10/2021 15-20 72 34 Rehabilitation

Road Maintenance & Garden Grove Boulevard Garden Grove Orange 21/22 New This project will include: Paving and/or Striping Rehab/Repair (Existing Safety) Garden Grove Blvd. from Dale St. to Magnolia St. Construction 06/2021 10/2021 15-20 72 34 Rehabilitation Rehabilitation

Road Maintenance & Lampson Avenue Sidewalk Garden Grove Orange 21/22 New This project will include: Sidewalk and/or Crosswalk Installation (New) Lampson Ave. from Haster St. to Jetty St. Construction 06/2021 10/2021 25-50 72 34 Rehabilitation Installation

Road Maintenance & Garden Grove Orange 21/22 New Chapman Avenue Rehabilitation This project will include: Preliminary Design Chapman Ave. from Springdale St. to Western Ave. Pre-Construction 06/2022 10/2022 15-20 72 34 Rehabilitation

Road Maintenance & The Project will rehabilitate Lampson Avenue from Springdale Garden Grove Orange 21/22 New Lampson Avenue Rehabilitation This project will include: Preliminary Design Pre-Construction 06/2022 10/2022 15-20 72 34 Rehabilitation Street to Knott Street.

Road Maintenance & Garden Grove Orange 21/22 New Lampson Avenue Rehabilitation This project will include: Preliminary Design Lampson Ave. from Harbor Blvd. to Haster St. Pre-Construction 06/2022 10/2022 15-20 72 34 Rehabilitation

Road Maintenance & Garden Grove Boulevard Garden Grove Orange 21/22 New This project will include: Preliminary Design Garden Grove Blvd. from Harbor Blvd. to Fairview St. Pre-Construction 06/2021 10/2022 15-20 72 34 Rehabilitation Rehabilitation

Road Maintenance & Acacia Neighborhood Street This project will include: Sidewalk and/or Crosswalk Installation (New), Pavement Residential streets bounded by Dale Street, Stanford Avenue, Pre-Construction and 06/2022 10/2022 Garden Grove Orange 21/22 New 15-20 72 34 Rehabilitation Improvements Rehab/Repair (Existing), ADA Curb Ramp Installation (New), Preliminary Design Josephine Street and Garden Grove Boulevard. Construction 07/2022 10/2022

This project will include: The Project consists of installing an underground 60 inch Garden Grove Orange 21/22 New Other Acacia Storm Drain Project diameter pipe that will join to an existing 63 inch reinforce concrete pipe in Dale Street Dale St. / Acacia - Acacia / Josephine Construction 09/2021 02/2022 50-100 72 34 and Acacia Avenue and extend easterly along Acacia Ave. at Josephine.

*This list is subject to change and will be finalized upon the adoption of any jurisdiction that meets subsequent eligibility at the October 2021 Commission Meeting. Draft City Submitted - Fiscal Year 2021-22 Local Streets and Roads List of Projects *Projects listed are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1) August 19, 2021

Fiscal Year Initially Proposed Project Est Assembly Senate City County Project Type Title Description Location Components Est Start Est Useful Life Proposed Status Completion Districts Districts

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Sidewalk and/or Crosswalk Rehab/Repair (Existing), Pavement Rehab/Repair Euclid Street Pavement from Road Maintenance & (Existing), ADA Curb Ramp Rehab/Repair (Existing) | The project consists of grind and Euclid Street from Whittier Boulevard to North City Limits in the La Habra Orange 20/21 In Progress Whittier Boulevard to North City Construction 10/2020 02/2022 15-15 55 29 Rehabilitation overlay the full width of the street, construct concrete curb barriers, dikes, cross City of La Habra, CA Limits gutters, reconstruction of the full depth pavement, damaged curb ramps, sidewalk, curb and gutter, and pavement striping.

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Sidewalk and/or Crosswalk Rehab/Repair (Existing), Pavement Rehab/Repair La Habra Blvd. from Valley Home (Existing), ADA Curb Ramp Rehab/Repair (Existing) | La Habra Boulevard from Valley Ave. to Beach Blvd.; Cypress St. Home to Beach Boulevard consists of slurry sealing the full width of the street, La Habra Boulevard from Valley Home to Beach Boulevard; Road Maintenance & La Habra Orange 20/21 In Progress from La Habra Blvd. to Whittier reconstruction of full depth pavement, damaged curb ramps, sidewalk, and curb and Cypress Street from La Habra Boulevard to Whittier Boulevard & Construction 10/2019 10/2021 5-15 55 29 Rehabilitation Blvd. & Palm St. from La Habra gutter. Cypress Street from La Habra Boulevard to Whittier Boulevard and Palm Palm Street from La Habra Boulevard to North City Limits Blvd. to North City Limits Street from La Habra Blvd. to North City Limits consisting of grind and overlay the full width of the street, reconstruction of damaged curb ramps, sidewalk, and curb and gutter. | This project is re-listed as project 3 in Resolution No. 5999.

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Sidewalk and/or Crosswalk Rehab/Repair (Existing), Pavement Rehab/Repair Monte Vista Street Rehabilitation Road Maintenance & (Existing), ADA Curb Ramp Rehab/Repair (Existing) | The project will reconstruct the Monte Vista Street between Lambert Road and La Habra La Habra Orange 21/22 New between Lambert Road and La Construction 08/2021 06/2022 15-15 55 29 Rehabilitation asphalt section and new asphalt placed within the full width of the street, reconstruct Boulevard. Habra Boulevard concrete curb and gutter, reconstruct cross gutter, reconstruct curb ramps, reconstruct sidewalks and alley returns, and place new pavement striping.

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Sidewalk and/or Crosswalk Rehab/Repair (Existing), Pavement Rehab/Repair (Existing), Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Road Maintenance & Orangethorpe Avenue La Palma Orange 20/21 Carried Over Bicycle Lane Rehab/Repair (Existing), ADA Curb Ramp Rehab/Repair (Existing) | Walker Street to Valley View street Construction 05/2021 07/2021 7-10 65 29 Rehabilitation Rehabilitation Rehabilitation including grinding, paving, and thermal striping (PW Contract). | The bid opening and award of contract are scheduled for May/June 2020. Construction begins July/August 2020 and completed in October 2020.

Road Maintenance & This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), La Palma Orange 20/21 In Progress Moody Street Rehabilitation The south city limits to the north city limits Construction 09/2021 12/2021 7-10 65 29 Rehabilitation Bicycle Lane Rehab/Repair (Existing)

Road Maintenance & Crescent Avenue Maintenance This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Traffic La Palma Orange 21/22 New Crescent Avenue - West City limits to East City limits Construction 01/2022 06/2022 7-9 65 29 Rehabilitation Project Signals, Lights, and/or Signage Rehab/Repair (Existing Safety)

Road Maintenance & Houston Avenue Maintenance This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Traffic La Palma Orange 21/22 New Houston Avenue - Walker Street to Moody Street Construction 01/2022 06/2022 7-10 65 29 Rehabilitation Project Signals, Lights, and/or Signage Rehab/Repair (Existing Safety)

Road Maintenance & Residential Pavement Zone 3 This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Traffic La Palma Orange 21/22 New Residential Pavement Zone 3 - Area north of Walker Street Construction 01/2021 09/2021 7-10 65 29 Rehabilitation Maintenance Project Signals, Lights, and/or Signage Rehab/Repair (Existing Safety)

*This list is subject to change and will be finalized upon the adoption of any jurisdiction that meets subsequent eligibility at the October 2021 Commission Meeting. Draft City Submitted - Fiscal Year 2021-22 Local Streets and Roads List of Projects *Projects listed are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1) August 19, 2021

Fiscal Year Initially Proposed Project Est Assembly Senate City County Project Type Title Description Location Components Est Start Est Useful Life Proposed Status Completion Districts Districts

Road Maintenance & Residential Pavement Zone 5 This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Traffic La Palma Orange 21/22 New Residential Pavement Zone 5 - Area South of Moody Creek Construction 01/2022 05/2022 7-10 65 29 Rehabilitation Maintenance Project Signals, Lights, and/or Signage Rehab/Repair (Existing Safety)

Road Maintenance & Zone 2 (Top of the World) Street Laguna Beach Orange 20/21 In Progress This project will include: Pavement Rehab/Repair (Existing) Top of the World neighborhood Construction 07/2021 10/2021 7-12 74 37 Rehabilitation Slurry Seal and Rehabilitation

Road Maintenance & Zone 4 Street Concrete This project will include: Cost Estimating, Document Preparation, Preliminary Design | Downtown Specific Plan Area (area bounded by Cliff Drive, Third Laguna Beach Orange 20/21 Carried Over Pre-Construction 09/2023 02/2024 20-30 74 37 Rehabilitation Rehabilitation Project would repair damaged concrete improvements on City maintained streets. Street, Park Avenue and Coast Highway)

APPALOOSA: LA PAZ TO MUSTANG, BOOTSTRAP: GALLUP TO END, BUCKSKIN: NELLIE GAIL TO BUCKBOARD, BUCKSKIN: NELLIE GAIL TO 235' NORTH, BUCKBOARD: BUCKSKIN TO NELLIE GAIL, BUCKLESTONE: NELLIE GAIL TO END, BROKEN BIT: BUCKSKIN TO END, BRIDLEWOOD: Road Maintenance & Street Maintenance in Zones B and Laguna Hills Orange 20/21 Forecasted This project will include: Pavement Rehab/Repair (Existing) OSO TO SADDLEROCK, BRIDLEWOOD: SADDLEROCK TO Construction 09/2021 02/2022 10-10 74 36 Rehabilitation F FLINTLOCK, BRIDLEWOOD: FLINTLOCK TO NELLIE GAIL, CHAPARRAL: NELLIE GAIL TO END, DAPPLE GRAY: NELLIE GAIL TO END, DESERT TRAIL: NELLIE GAIL TO END, FLINTLOCK: BRIDLEWOOD TO END, GALLUP: 500' E/O LA PAZ TO LA PAZ,

Alicia Parkway Resurfacing Road Maintenance & Laguna Niguel Orange 21/22 New (Highlands Avenue to Crown This project will include: Cost Estimating, Preliminary Design Alicia Parkway from Highlands Avenue to Crown Valley Parkway Pre-Construction 12/2021 06/2022 7-15 73 36 Rehabilitation Valley Parkway) - Design Phase

Marina Hills Drive Resurfacing Road Maintenance & Laguna Niguel Orange 21/22 New (Niguel Road to Golden Lantern) - This project will include: Cost Estimating, Preliminary Design Marina Hills Drive from Niguel Road to Golden Lantern Pre-Construction 12/2021 06/2022 7-15 73 36 Rehabilitation Design Phase

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Sidewalk and/or Crosswalk Rehab/Repair (Existing), Pavement Rehab/Repair (Existing), Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Niguel Road Resurfacing Road Maintenance & Bicycle Lane Rehab/Repair (Existing), ADA Curb Ramp Rehab/Repair (Existing) | Laguna Niguel Orange 21/22 New (Highlands Avenue to Alta Terra) - Niguel Road from Highlands Avenue to Alta Terra Construction 04/2022 10/2022 7-15 73 36 Rehabilitation Roadway maintenance and repair including the repair of isolated areas of pavement, Construction Phase pavement grinding and removal, asphalt pavement overlay, associated concrete improvements including access ramps, adjustment of surface utilities to final pavement grade, and roadway marking and striping.

Pacific Island Drive Drainage and Pacific Island Drive approximately 2,500 feet south of Ocean Laguna Niguel Orange 21/22 New Safety Wall Improvements - Design This project will include: Cost Estimating, Preliminary Design Pre-Construction 12/2021 06/2022 20-30 73 36 Way Phase

*This list is subject to change and will be finalized upon the adoption of any jurisdiction that meets subsequent eligibility at the October 2021 Commission Meeting. Draft City Submitted - Fiscal Year 2021-22 Local Streets and Roads List of Projects *Projects listed are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1) August 19, 2021

Fiscal Year Initially Proposed Project Est Assembly Senate City County Project Type Title Description Location Components Est Start Est Useful Life Proposed Status Completion Districts Districts

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Zones 3 and 4 of the City's Residential Annual Resurfacing Project Scope Development, Pavement Rehab/Repair (Existing), Cost Estimating, Road Maintenance & Program. Specific sections and limits of roadways will be Pre-Construction and 01/2022 06/2022 Laguna Niguel Orange 21/22 New Residential Overlay Program Document Preparation | Roadway maintenance and repair including the repair of 7-15 73 36 Rehabilitation prioritized and selected during development of construction plans Construction 06/2022 11/2022 isolated areas of pavement, pavement grinding and removal, asphalt based on identified needs. pavement overlay to final pavement grade, and roadway marking and striping.

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Pavement Management Plan Pavement Rehab/Repair (Existing), Document Preparation, Cost Estimating | This Road Maintenance & Project (Southbound Moulton Southbound Moulton Parkway between Via Campo Verde and Pre-Construction and 07/2021 11/2021 Laguna Woods Orange 21/22 New project involves the rehabilitation of approximately 2,200 linear feet of pavement on 15-15 74 37 Rehabilitation Parkway between Via Campo Calle Cortez Construction 02/2022 06/2022 southbound Moulton Parkway between Via Campo Verde and Calle Cortez, including Verde and Calle Cortez) asphalt concrete pavement cold milling and repaving.

Non-Arterial Streets Zone F, known as Foothill Ranch, the Road Maintenance & Lake Forest Orange 21/22 New Annual Slurry Seal, Zone F This project will include: Pavement Rehab/Repair (Existing) neighborhoods surrounding streets Paloma/Alton and Rue De Construction 09/2021 11/2021 7-10 68 37 Rehabilitation Fortuna/Rue De Valore.

Road Maintenance & Road Rehabilitation and Slurry Jeronimo Road from Los Alisos to Bake Parkway and Muirlands Lake Forest Orange 21/22 New This project will include: Pavement Rehab/Repair (Existing) Construction 09/2021 11/2021 10-15 68 37 Rehabilitation Seal, Jeronimo and Muirlands Road from Los Alisos to Bake Parkway

Road Maintenance & Street Resurfacing: Trabuco Road Pre-Construction and 09/2021 01/2022 Lake Forest Orange 21/22 New This project will include: Pavement Rehab/Repair (Existing) Trabuco Raod from Peachwood to Bake Parkway 10-15 68 37 Rehabilitation from Peachwood to Bake Parkway Construction 04/2022 06/2022

Street Resurfacing: portions of Road Maintenance & Lake Forest Orange 21/22 New Lake Forest from Bake Pkwy to I-5 This project will include: Document Preparation, Cost Estimating, Preliminary Design Portions of Lake Forest from Bake Pkwy to I-5 Fyw Pre-Construction 09/2021 12/2023 10-15 68 37 Rehabilitation Fwy

Street Resurfacing: portions of El Road Maintenance & Lake Forest Orange 21/22 New Toro Rd from Glenn Ranch Rd to I- This project will include: Cost Estimating, Document Preparation, Preliminary Design Portions of El Toro Rd from Glenn Ranch Rd to I-5 Fwy Pre-Construction 09/2021 12/2023 10-15 68 37 Rehabilitation 5

Street Resurfacing: portions of Road Maintenance & Bake Parkway from Rancho Parkway South to South Pointe Lake Forest Orange 21/22 New Bake Pkwy from Rancho Parkway This project will include: Cost Estimating, Document Preparation, Preliminary Design Pre-Construction 09/2021 12/2023 10-15 68 37 Rehabilitation Drive South to South Pointe Drive

THE WOODCREST AND This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), The Woodcrest and College Park North Neighborhoods, which Road Maintenance & PORTION OF COLLEGE PARK Pre-Construction and 07/2021 12/2021 Los Alamitos Orange 21/22 New Sidewalk and/or Crosswalk Rehab/Repair (Existing), Preliminary Design, ADA Curb includes Del Norte Way, El Dorado Way, San Joaquin Way and 15-20 72 34 Rehabilitation NORTH NEIGHBORHOOD Construction 03/2022 06/2022 Ramp Rehab/Repair (Existing) Toland Avenue. STREET REHABILITATION

*This list is subject to change and will be finalized upon the adoption of any jurisdiction that meets subsequent eligibility at the October 2021 Commission Meeting. Draft City Submitted - Fiscal Year 2021-22 Local Streets and Roads List of Projects *Projects listed are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1) August 19, 2021

Fiscal Year Initially Proposed Project Est Assembly Senate City County Project Type Title Description Location Components Est Start Est Useful Life Proposed Status Completion Districts Districts

Public residential streets in Residential Resurfacing Area 1, which is bounded by Trabuco Road Road Maintenance & This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Mission Viejo Orange 21/22 New Residential Resurfacing and Alicia Parkway to the north, Marguerite Parkway to the east, Construction 07/2021 11/2021 7-20 73 36 Rehabilitation Pavement Rehab/Repair (Existing) Jeronimo Road to the south and the City boundary to the west, in the City of Mission Viejo.

Muirlands Boulevard from Los Alisos Boulevard to La Paz Road, Olympiad Road from This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Marguerite Parkway to Alicia Parkway, Melinda Road from Road Maintenance & Sidewalk and/or Crosswalk Rehab/Repair (Existing), Pavement Rehab/Repair Mission Viejo Orange 21/22 New Arterial Highway Resurfacing Olympiad Road to Santa Margarita Construction 03/2022 06/2022 15-20 73 36 Rehabilitation (Existing), ADA Curb Ramp Rehab/Repair (Existing), Bicycle Lane Rehab/Repair Parkway, and Alicia Parkway from Olympiad Road to the east (Existing) city limit, in the City of Mission Viejo.

Jamboree Road Pavement Road Maintenance & Rehabilitation and Median This project is located on Jamboree Road from Coast Highway to Newport Beach Orange 21/22 New This project will include: Pavement Rehab/Repair (Existing) Construction 01/2022 05/2022 15-20 74 37 Rehabilitation Landscape Irrigation Ford Road Improvements

1. Santiago Canyon Rd from Jamboree Road to Newport Blvd 2. Struck Ave from Katella Ave to Main St 3. Struck Ave from Main St to Batavia St 4. Orange-Olive Road from Lincoln Ave to Fellows Dr This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Road Maintenance & Annual Pavement Maintenance 5. Orangewood Ave from 1475' w/o Eckhoff St to Main St Orange Orange 21/22 New Sidewalk and/or Crosswalk Rehab/Repair (Existing), Pavement Rehab/Repair Construction 04/2022 12/2022 10-15 68 37 Rehabilitation FY22 6. Walnut Ave from Batavia St to Glassell St (Existing), ADA Curb Ramp Rehab/Repair (Existing) 7. La Veta Ave from Pepper St to Parker St 8. La Veta Ave from Tustin Ave to Frontage Rd 9. Meats Ave from Park Lane to Breckenridge St 10. Handy St from Katella Ave to Collins Ave

This project will rehab 1.75 million square feet of roadway in the southern portion of the City including the following arterial Road Maintenance & FY 2020-21 Arterial Roadway streets: Pre-Construction and 07/2020 06/2021 Placentia Orange 20/21 In Progress This project will include: Pavement Rehab/Repair (Existing) 15-21 39 29 Rehabilitation Rehabilitation Project • Madison Avenue - Full Limits Construction 08/2021 10/2021 • Melrose Street - South City Limits to Orangethorpe Avenue • Orangethorpe Avenue - Van Buren Street to Lakeview Avenue

Rancho Santa Road Maintenance & Arroyo Vista Pavement Arroyo Vista between Avenda Empresa and the cul de sac at the Orange 20/21 Carried Over This project will include: Pavement Rehab/Repair (Existing) Construction 09/2021 11/2021 10-15 73 36 Margarita Rehabilitation Rehabilitation Project Tijeras Creek Golf Club entrance.

Rancho Santa Road Maintenance & Annual Residential Slurry Seal Residential streets north of Santa Margarita Parkway, east of SR- Orange 21/22 New This project will include: Pavement Rehab/Repair (Existing) Construction 08/2021 10/2021 5-7 73 36 Margarita Rehabilitation Project - Zone 4 241 and west of Plano Trabuco.

Rancho Santa Road Maintenance & Antonio Parkway/Alas De Paz Antonio Parkway from Santa Margarita Parkway to Alas De Paz, Orange 21/22 New This project will include: Pavement Rehab/Repair (Existing) Construction 08/2021 11/2021 10-15 73 36 Margarita Rehabilitation Overlay Project and Alas De Paz from Antonio Parkway to Plano Trabuco

*This list is subject to change and will be finalized upon the adoption of any jurisdiction that meets subsequent eligibility at the October 2021 Commission Meeting. Draft City Submitted - Fiscal Year 2021-22 Local Streets and Roads List of Projects *Projects listed are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1) August 19, 2021

Fiscal Year Initially Proposed Project Est Assembly Senate City County Project Type Title Description Location Components Est Start Est Useful Life Proposed Status Completion Districts Districts

This project will include: Project Scope Development, Preliminary Design | For improving signalized intersections by adding yellow reflective backplates to all traffic Road Maintenance & Signalized Intersection San Clemente Orange 21/22 New signal heads and upgrade and replace aging internally illuminated street name signs, Citywide Pre-Construction 01/2022 06/2022 5-20 73 36 Rehabilitation Improvements as well as converting detection systems from cameras to loops at selected intersections to improve system performance.

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Camino Capistrano and Avenida Camino Capistrano between Avenida Aeropuerto and southern San Juan Road Maintenance & Sidewalk and/or Crosswalk Rehab/Repair (Existing), ADA Curb Ramp Installation Orange 21/22 New Aeropuerto Pavement City limit, in the city of San Juan Capistrano. Avenida Aeropuerto Construction 07/2022 12/2022 20-20 73 36 Capistrano Rehabilitation (New), Pavement Rehab/Repair (Existing), ADA Curb Ramp Rehab/Repair (Existing), Rehabilitation Project between Camino Capistrano and the railroad tracks. Bicycle Lane Rehab/Repair (Existing) | Signage

This project will include: Project Scope Development, Cost Estimating, Document Preparation, Preliminary Design | City's Pavement Management System has identified Garnsey Business District Improvements as a priority for rehabilitation to prevent Garnsey Street from Dyer Rd to Warner Ave, Central Avenue Road Maintenance & Garnsey Business District further deterioration of the pavement section due to weather, age and heavy usage. from Garnsey St to Birch St, Birch Street from End to Warner Santa Ana Orange 21/22 New Pre-Construction 06/2021 12/2022 20-20 72 34 Rehabilitation Improvements This project will rehabilitate 1.6 miles of Garnsey Street from Dyer Rd to Warner Ave, Ave, Central Ave from Birch St to Main St, Broadway from Central Avenue from Garnsey St to Birch St, Birch Street from End to Warner Ave, Central Ave to Warner Ave Central Ave from Birch St to Main St, Broadway from Central Ave to Warner Ave., replace damaged curbs, gutters, etc

This project will include: Project Scope Development, Document Preparation, Cost Estimating, Preliminary Design | City's Pavement Management System has identified Bristol Street Rehabilitation: Santa Clara to Memory Lane as a priority for rehabilitation Road Maintenance & Bristol Street Rehabilitation: Santa to prevent further deterioration of the pavement section due to weather, age and heavy Santa Ana Orange 21/22 New Bristol Street between Santa Clara and Memory Lane Pre-Construction 06/2021 12/2022 20-20 72 34 Rehabilitation Clara to Memory Lane usage. This project will rehabilitate 0.5 miles of Bristol Street between Santa Clara and Memory Lane; replace damaged curbs, gutters, and sidewalks; reconstruct approximately 7 curb ramps to conform to the latest ADA standards; and incorporate bicycle lane elements.

This project will include: Project Scope Development, Document Preparation, Cost Estimating, Preliminary Design | City's Pavement Management System has identified Grand Avenue Rehabilitation from Warner to Edinger as a priority for rehabilitation to Road Maintenance & Grand Avenue Rehabilitation: Santa Ana Orange 21/22 New prevent further deterioration of the pavement section due to weather, age and heavy Grand Avenue from Warner to Edinger Pre-Construction 06/2021 12/2022 20-20 72 34 Rehabilitation Warner to Edinger usage. This project will rehabilitate 0.75 miles of Grand Avenue; replace damaged curbs, gutters, and sidewalks; reconstruct approximately 6 curb ramps to conform to the latest ADA standards; and incorporate bicycle lane elements.

This project will include: Project Scope Development, Document Preparation, Cost Estimating, Preliminary Design | City's Pavement Management System has identified Road Maintenance & Main Street Rehabilitation: Main Street Rehabilitation from MacArthur Blvd to Dyer Rd as a priority for Santa Ana Orange 21/22 New Main Street from MacArthur Blvd to Dyer Rd Pre-Construction 06/2021 12/2022 10-10 72 34 Rehabilitation MacArthur Blvd to Dyer Rd rehabilitation to prevent further deterioration of the pavement section due to weather, age and heavy usage. This project will rehabilitate 0.6 miles of Main Street; and replace 5 damaged curbs, gutters, and sidewalks.

This project will include: Project Scope Development, Cost Estimating, Document Preparation, Preliminary Design | City's Pavement Management System has identified Westminster Avenue Westminster Avenue Rehabilitation from Newhope St to Harbor Blvd as a priority for Road Maintenance & Santa Ana Orange 21/22 New Rehabilitation: Newhope St to rehabilitation to prevent further deterioration of the pavement section due to weather, Westminster Avenue from Newhope St to Harbor Blvd Pre-Construction 06/2021 12/2022 20-20 72 34 Rehabilitation Harbor Blvd age and heavy usage. This project will rehabilitate 0.5 miles of Westminster Avenue; replace damaged curbs, gutters, and sidewalks; reconstruct approximately 5 curb ramps to conform to the latest ADA standards; and incorporate bicycle lane elements.

Road Maintenance & FY 2021-22 Local Street Paving City of Seal Beach - College Park East Neighborhood, Old Town. Seal Beach Orange 21/22 New This project will include: Pavement Rehab/Repair (Existing) Construction 10/2021 05/2022 5-10 72 34 Rehabilitation Program Locations are preliminary.

*This list is subject to change and will be finalized upon the adoption of any jurisdiction that meets subsequent eligibility at the October 2021 Commission Meeting. Draft City Submitted - Fiscal Year 2021-22 Local Streets and Roads List of Projects *Projects listed are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1) August 19, 2021

Fiscal Year Initially Proposed Project Est Assembly Senate City County Project Type Title Description Location Components Est Start Est Useful Life Proposed Status Completion Districts Districts

Cerritos Ave(Magnolia - City Limit(CL)); Chapman(Beach Blvd - CL);Western Ave(CL-Cerritos Ave);Flower St (Main St -Cerritos Ave), Kermore Ln (Keenan Pl - Lowden St), Autumn Ln This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), (Briarwood St - End); Chapman (Beach Blvd - CL), Dale Ave (CL - Road Maintenance & FY 21/22 Citywide Street Stanton Orange 21/22 New Sidewalk and/or Crosswalk Rehab/Repair (Existing), Pavement Rehab/Repair Cerritos and S CL - Katella), Garden Grove Blvd (Fern Ave - Construction 10/2021 04/2022 7-15 65 29 Rehabilitation Rehabilitation (Existing), ADA Curb Ramp Rehab/Repair (Existing) Beach Blvd), Katella Ave EB (Magnolia Ave - Magnolia Ave), Lampson Ave (Magnolia Ave - Magnolia CL), Magnolia Ave (CL S/ Syracuse - CL N Katella), Courtright(Cody Dr - End); Orangewood (Western-E End)

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing), ADA Curb Ramp Rehab/Repair (Existing) | Road Maintenance & Repave/resurface 0.80 miles of road, including localized removal and repair of asphalt Tustin Orange 19/20 In Progress Newport Avenue Rehabilitation Intersate 5 Freeway to Holt Ave. Construction 06/2021 12/2021 20-30 68 37 Rehabilitation concrete pavement failure areas, repair of sidewalk and curb & gutter, reconstruction of curb ramps to be ADA compliant, cold plane existing asphalt, construction of asphalt concrete overlay, traffic detector loops, and traffic striping

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing), ADA Curb Ramp Rehab/Repair (Existing) | Road Maintenance & Repave/resurface 0.63 miles of road, including localized removal and repair of asphalt Tustin Orange 19/20 In Progress Newport Avenue Rehabilitation Sycamore Ave. to Interstate 5 Freeway Construction 06/2021 12/2021 20-30 68 37 Rehabilitation concrete pavement failure areas, repair of sidewalk and curb & gutter, reconstruction of curb ramps to be ADA compliant, cold plane existing asphalt, construction of asphalt concrete overlay, traffic detector loops, and traffic striping

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing), Cost Estimating, Document Preparation, Preliminary Design, Environmental Study/Documents, ADA Curb Ramp Rehab/Repair Road Maintenance & Pre-Construction and 10/2021 03/2022 Tustin Orange 19/20 Carried Over Red Hill Avenue Rehabilitation (Existing) | Repave/resurface 0.31 miles of road, including localized removal and San Juan St. to First St. 20-30 68 37 Rehabilitation Construction 04/2022 03/2023 repair of asphalt concrete pavement failure areas, repair of sidewalk and curb & gutter, reconstruction of curb ramps to be ADA compliant, cold plane existing asphalt, construction of asphalt concrete overlay, traffic detector loops, and traffic striping.

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing), Cost Estimating, Document Preparation, Preliminary Design, Environmental Study/Documents, ADA Curb Ramp Rehab/Repair Road Maintenance & Pre-Construction and 03/2022 08/2022 Tustin Orange 19/20 Carried Over Red Hill Avenue Rehabilitation (Existing) | Repave/resurface 0.47 miles of road, including localized removal and Walnut Ave. to Interstate 5 Freeway 20-30 68 37 Rehabilitation Construction 09/2022 08/2023 repair of asphalt concrete pavement failure areas, repair of sidewalk and curb & gutter, reconstruction of curb ramps to be ADA compliant, cold plane existing asphalt, construction of asphalt concrete overlay, traffic detector loops, and traffic striping

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing), Cost Estimating, Document Preparation, Preliminary Design, Environmental Study/Documents, ADA Curb Ramp Rehab/Repair Road Maintenance & Pre-Construction and 09/2023 02/2024 Tustin Orange 19/20 Forecasted Jamboree Road Rehabilitation (Existing) | Repave/resurface 1.6 miles of road, including localized removal and repair Barranca Pkwy. to SCRRA Railroad 20-30 68 37 Rehabilitation Construction 03/2024 02/2025 of asphalt concrete pavement failure areas, repair of sidewalk and curb & gutter, reconstruction of curb ramps to be ADA compliant, cold plane existing asphalt, construction of asphalt concrete overlay, traffic detector loops, and traffic striping

This project will include: Sidewalk and/or Crosswalk Rehab/Repair (Existing), Road Maintenance & Valley Drive Street Rehabilitation Villa Park Orange 21/22 New Pavement Rehab/Repair (Existing), ADA Curb Ramp Installation (New), ADA Curb Valley Drive between Lemon Street & Loma Street Construction 03/2022 07/2022 15-20 68 37 Rehabilitation Project Ramp Rehab/Repair (Existing)

*This list is subject to change and will be finalized upon the adoption of any jurisdiction that meets subsequent eligibility at the October 2021 Commission Meeting. Draft City Submitted - Fiscal Year 2021-22 Local Streets and Roads List of Projects *Projects listed are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1) August 19, 2021

Fiscal Year Initially Proposed Project Est Assembly Senate City County Project Type Title Description Location Components Est Start Est Useful Life Proposed Status Completion Districts Districts

This project will include: Sidewalk and/or Crosswalk Installation (New), Pavement Improvement (New), ADA Curb Ramp Installation (New), Paving and/or Striping Road Maintenance & Westminster Boulevard Installation (New Safety) | Remove existing pavement and place new asphalt concrete Westminster Orange 21/22 New Westminster Boulevard from Bushard Street to Magnolia Street Construction 02/2022 06/2022 15-20 72 34 Rehabilitation Improvement Project overlay; remove and replace damaged curb, gutter, cross gutter, spandrel, sidewalk, ADA ramps, driveway approach, bus pad; adjust mnahole and water valve to grade; install signing and striping.

Zone 6 is located on the southeasterly side of the City and is On Going Street Maintenance generally bounded by Village Center Dr. to the West, Yorba Road Maintenance & Program/Annual Pavement This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Yorba Linda Orange 21/22 New Linda Blvd. to the North/East, and Esperanza Rd. to the South. Construction 01/2022 04/2022 5-7 55 29 Rehabilitation Preservation Program (APPP) Pavement Rehab/Repair (Existing) The zone consists of 68 lane miles of pavement which include a Zone 6 combination of arterials, collectors, and local streets.

This project will include: Pavement Rehab/Repair (Existing) | Staff identified the Road Maintenance & City of Auburn 2019 Street Overlay proposed FY 18/19 project based on the FY 13/14 to FY 22/23 Road Overlay Report Auburn Placer 20/21 Carried Over Auburn Folsom Rd. from Indian Hill Rd. to Lincoln Way. Construction 09/2021 06/2022 20-20 5 1 Rehabilitation Project Management System. Pavement will consist of 2-inch overlays.

Road Maintenance & Culver Street Reconstruction This project will include: Pavement Rehab/Repair (Existing) | This project will Colfax Placer 20/21 Carried Over Culver St. from Church St. to W. Grass Valley St. Construction 10/2021 06/2022 20-20 1 1 Rehabilitation (Phase III) reconstruct up to 350 linear feet of Culver St. from Church St. to W. Grass Valley St.

Road Maintenance & This project will include: Pavement Rehab/Repair (Existing) | This project will Colfax Placer 20/21 Carried Over Pleasant Street Project Pleasant St. from Depot St. to Park hill Dr. Construction 10/2021 06/2022 20-20 1 1 Rehabilitation reconstruct approximately 1,600 feet of Pleasant St.

This project will include: The bridge reconstruction will not only provide 100-year flood protection but will also be widened to provide sidewalks, bike and NEV lanes. The Auburn Ravine Bridge bridge is approximately 200 feet in length. The intersections on both sides of the McBean Park Drive between Ferrari Ranch Road and East Lincoln Placer 19/20 Carried Over Other Replacement at McBean Park Construction 12/2021 12/2023 30-40 6 1 bridge will also include improvements and rehabilitation to existing asphalt. | Project Avenue at Auburn Ravine Drive currrently in environmental review and will take several months to a couple of years before HBP funds are available for construciton.

Four different locations: Lincoln Blvd Bridge over Auburn Ravine This project will include: This project would provide necessary maintenance to four Lincoln Placer 19/20 Carried Over Other Bridge Maintenance Project Twelve Bridges Drive Bridge over Orchard Creek; Joiner Construction 08/2021 06/2022 8-10 6 1 bridges as recommended by Caltrans Bridge Inspection Reports dating back to 2015. Parkway Bridge over Auburn Ravine; Brentford Circle Bridge over Ingram Slough

Road Maintenance & This project will include: Full roadway reconstruction is anticipated to be necessary to Lincoln Placer 19/20 Carried Over Moore Road Repaving Project Moore Road between Fiddyment Road and Sorrento Parkway Construction 09/2021 12/2023 15-20 6 1 Rehabilitation rehabilitate the roadway.

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Railroad Grade Separation Rehab/Repair, ADA Curb Ramp Installation (New), Pavement Rehab/Repair (Existing), Traffic Signals, Lights, and/or Signage Complete Streets Rehab/Repair (Existing Safety) | For a half mile along Lincoln Boulevard and sections Lincoln Placer 19/20 In Progress Lincoln Blvd Phase 3 Lincoln Boulevard at 1st, 3rd, 5th 6th and7thStreets. Construction 09/2020 12/2022 30-40 6 1 Components of 1st, 3rd, 5th, 6th and 7th Street: construct pedestrian improvements and upgrades to the existing 5 UPRR at-grade crossings, including 0.6 miles of improved sidewalks, 0.3 miles of NEV/Bike lanes and improved UPRR crossing signals and equipment at all 5 locations.

*This list is subject to change and will be finalized upon the adoption of any jurisdiction that meets subsequent eligibility at the October 2021 Commission Meeting. Draft City Submitted - Fiscal Year 2021-22 Local Streets and Roads List of Projects *Projects listed are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1) August 19, 2021

Fiscal Year Initially Proposed Project Est Assembly Senate City County Project Type Title Description Location Components Est Start Est Useful Life Proposed Status Completion Districts Districts

Road Maintenance & This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Lincoln Placer 19/20 Carried Over Joiner Parkway Rehab Ph2 Joiner Parkway from Moore Road to Nicolaus Road. Construction 09/2021 08/2022 15-20 6 1 Rehabilitation Pavement Rehab/Repair (Existing)

Road Maintenance & This project will include: ADA Curb Ramp Installation (New), Pavement Rehab/Repair Lincoln Placer 21/22 New I Street & J Street Rehabilitation I Street and J Street between 1st & 6th Streets Construction 12/2020 12/2022 20-100 6 1 Rehabilitation (Existing) | Reconstruction of existing ADA parking stalls to be ADA compliant.

On Twelve Bridges Drive from E.Joiner Parkway to Sierra Lincoln Placer 21/22 New Safety Twelve Bridges Stiping Refresh This project will include: Paving and/or Striping Rehab/Repair (Existing Safety) Construction 09/2021 11/2021 20-40 6 1 College Blvd.

Road Maintenance & This project will include: Right of Way, Cost Estimating, Document Preparation, Will depend if project is approved for fiscal year budget. Specific Lincoln Placer 21/22 New Pothole Repair - Various Locations Pre-Construction 11/2021 01/2022 15-20 6 1 Rehabilitation Preliminary Design location will be determined if not cut from streets budget.

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Railroad Grade Separation Rehab/Repair, Sidewalk and/or Crosswalk Rehab/Repair Complete Streets Ferrari Ranch Road UPRR Lincoln Placer 20/21 Carried Over (Existing), ADA Curb Ramp Installation (New), Pavement Rehab/Repair (Existing), Lincoln Blvd. and Ferrari Ranch Road Construction 10/2021 05/2022 30-40 6 1 Components Crossing Bicycle Lane (New), Storm Drain and/or Culvert Rehab/Repair (Existing), ADA Curb Ramp Rehab/Repair (Existing), Bicycle Lane Rehab/Repair (Existing)

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Road Maintenance & Lincoln Boulevard between Auburn Ravine Bridge to Sterling Lincoln Placer 19/20 Completed Lincoln Boulevard Repaving Pavement Rehab/Repair (Existing), Bridge Structure Rehab/Repair (Existing), Bicycle Construction 03/2020 08/2020 15-20 6 1 Rehabilitation Parkway. Lane Rehab/Repair (Existing), ADA Curb Ramp Rehab/Repair (Existing)

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Road Maintenance & Sidewalk and/or Crosswalk Rehab/Repair (Existing), Pavement Rehab/Repair Lincoln Placer 19/20 Completed First Street Resurfacing Phase 1 First Street between O Street to Alley east of L Street. Construction 03/2020 03/2021 15-20 6 1 Rehabilitation (Existing), Storm Drain and/or Culvert Rehab/Repair (Existing), ADA Curb Ramp Rehab/Repair (Existing), Bicycle Lane Rehab/Repair (Existing)

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), ADA E 6th (East to S Herold); E 7th (East to S Herold); E 8th (East to Road Maintenance & East Side Water & Sewer Lincoln Placer 20/21 Completed Curb Ramp Installation (New), Pavement Rehab/Repair (Existing), ADA Curb Ramp S Herold); E 8th (S Herold to End); E 9th (East to S Herold); S Construction 04/2019 03/2021 20-20 6 1 Rehabilitation Replacement Project Rehab/Repair (Existing) Herold (E 6th to E 8th); S Herold (E 8th to E 9th)

This project will include: Pavement Improvement (New) | The removing and replacing Road Maintenance & Various streets and roadways within the Mission Hills Rocklin Placer 20/21 Carried Over Mission Hills Reconstruction of degraded asphalt needs to be done as part of general repairs and is necessary to Construction 07/2021 06/2022 17-20 4 1 Rehabilitation Neighborhood. preserve the roadways and prevent major rehabilitation in the coming years.

*This list is subject to change and will be finalized upon the adoption of any jurisdiction that meets subsequent eligibility at the October 2021 Commission Meeting. Draft City Submitted - Fiscal Year 2021-22 Local Streets and Roads List of Projects *Projects listed are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1) August 19, 2021

Fiscal Year Initially Proposed Project Est Assembly Senate City County Project Type Title Description Location Components Est Start Est Useful Life Proposed Status Completion Districts Districts

Sierra College Blvd. This project will include: Pavement Rehab/Repair (Existing) | Reconstruct the portion Road Maintenance & Rocklin Placer 19/20 Carried Over Reconstruction (Clover Valley to Sierra College Blvd. that is failing and needs to be reconstructed. This will involve Sierra College Blvd. Between Clover Valley Road and City Limits Construction 07/2021 06/2022 17-20 4 1 Rehabilitation City Limits) reconstruction of the travel way and will not include the shoulders.

Road Maintenance & Colfax Placer 20/21 Carried Over Depot Street Project This project will include: Pavement Rehab/Repair (Existing) Depot St. from N. Main St. to Kneeland St. Construction 10/2021 06/2022 20-20 1 1 Rehabilitation

Road Maintenance & Colfax Placer 20/21 Carried Over School Street Project This project will include: Pavement Rehab/Repair (Existing) School Street from N. Main St. to Pleasant St. Construction 10/2021 06/2022 20-20 1 1 Rehabilitation

Road Maintenance & Colfax Placer 20/21 Carried Over Forest Hill Street Project (All) This project will include: Pavement Rehab/Repair (Existing) Forest Hill Street from Highway 174 to Dinky Ave. Construction 10/2021 06/2022 20-20 1 1 Rehabilitation

1) Boyington Rd from King Rd to Town Limits; 2) Brace Rd from Sierra College Blvd to I-80 Overpass; 3) Swetzer Rd from King Rd to Town Limits; 4) Laird Rd from Wishing Well Wy to Horseshoe Bar Rd; Road Maintenance & Arterial and Collector Pavement Loomis Placer 21/22 New This project will include: Pavement Rehab/Repair (Existing) 5) King Rd from Taylor Rd to Town Limits; Construction 04/2022 09/2022 25-50 6 1 Rehabilitation Repair 6) Sierra College Blvd from Bankhead Rd to Town Limits; 7) Arcadia Ave from Humphrey Rd to King Rd; 8) Horseshoe Bar Rd from Taylor Rd to Town Limits; 9) Margaret Dr from King Rd to Sparas St;

This project will include: Pavement Improvement (New), Pavement Rehab/Repair Sierra College Boulevard Third (Existing), Bridge Structure Rehab/Repair (Existing), Bicycle Lane (New), Landscape Loomis Placer 19/20 Carried Over Safety Lane from Brace Road to Taylor Safety Rehab/Repair (Existing), Traffic Signals, Lights, and/or Signage Rehab/Repair Sierra College Boulevard from Brace Road to Taylor Road Construction 07/2022 07/2023 25-35 6 1 Road (Existing Safety), Paving and/or Striping Installation (New Safety) | Adding a third lane on both northbound and southbound directions.

Road Maintenance & Various streets and roadways within the Northern and Central Rocklin Placer 20/21 Carried Over Annual Road Resurfacing This project will include: Pavement Rehab/Repair (Existing) Construction 07/2021 06/2022 5-7 4 1 Rehabilitation portions of the City of Rocklin.

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing) | The project includes the application of a Road Maintenance & Sun City - Phase 1 Resurfacing preventative maintenance surface treatment. The maintenance surface treatment will Roseville Placer 21/22 New Various residential streets within the Sun City, Roseville. Construction 07/2021 11/2021 7-10 6 4 Rehabilitation Project provide a waterproof membrane to protect the existing asphalt surfaces and extend the life of the underlying pavement. The project will also include removal and replacement of failed asphalt concrete roadway sections.

Road Maintenance & Portola Plumas 21/22 New E. Magnolia Ave. Patching This project will include: Pavement Rehab/Repair (Existing) East Magnolia, east of Beckwith Street Construction 05/2021 10/2021 2-5 1 1 Rehabilitation

*This list is subject to change and will be finalized upon the adoption of any jurisdiction that meets subsequent eligibility at the October 2021 Commission Meeting. Draft City Submitted - Fiscal Year 2021-22 Local Streets and Roads List of Projects *Projects listed are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1) August 19, 2021

Fiscal Year Initially Proposed Project Est Assembly Senate City County Project Type Title Description Location Components Est Start Est Useful Life Proposed Status Completion Districts Districts

Road Maintenance & Portola Plumas 21/22 New Beckwith Street Patching This project will include: Pavement Rehab/Repair (Existing) Beckwith Street, north of east Magnolia Ave. Construction 05/2021 10/2021 2-5 1 1 Rehabilitation

Road Maintenance & Wells and Willow Street This project will include: Project Scope Development, Pavement Rehab/Repair West Wells Street starting at South Lovekin Blvd to South Willow Pre-Construction and 09/2021 11/2021 Blythe Riverside 21/22 New 15-20 56 28 Rehabilitation Improvement Project (Existing), Cost Estimating, Preliminary Design Street ending at West 14th Ave. Construction 01/2022 04/2022

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Road Maintenance & Lovekin-Barnard Street North Lovekin Blvd from West Hobsonway to West Barnard and Pre-Construction and 07/2021 08/2021 Blythe Riverside 21/22 New Project Scope Development, Sidewalk and/or Crosswalk Rehab/Repair (Existing), 15-20 56 28 Rehabilitation Improvement West Barnard from North Lovekin to North Main Construction 01/2022 02/2022 Storm Drain and/or Culvert Rehab/Repair (Existing), Preliminary Design

This project will include: Pavement Improvement (New), Paving and/or Striping Rehab/Repair (Existing Safety), ADA Curb Ramp Installation (New), Pavement Rehab/Repair (Existing), Bicycle Lane (New) | Joint improvement project with the City County Line Road Corridor Calimesa Riverside 20/21 In Progress Safety of Yucaipa to construct improvements on County Line Road from Calimesa Blvd to County Line Road from Calimesa Blvd to Bryant St. Construction 09/2021 06/2022 20-40 42 23 Improvements Project Bryant St including 4 intersections, sidewalk, ADA ramps, bike lanes, utility relocations and street widening. | The total cost is design through construction. Costs are split between Cities of Yucaipa and Calimesa, by funding agreement.

Road Maintenance & Street Pavement Rehabilitation This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Coachella Riverside 21/22 New Escondida Pointe and Valencia Neighborhoods Construction 03/2022 06/2022 20-20 56 28 Rehabilitation Phase 17 Pavement Rehab/Repair (Existing), ADA Curb Ramp Rehab/Repair (Existing)

Road Maintenance & This project will include: Pavement Improvement (New), Pavement Rehab/Repair Coachella Riverside 21/22 New Avenue 48 Widening Project Avenue 48 from Dillon St to Van Buren Construction 08/2021 06/2022 20-20 56 28 Rehabilitation (Existing), Bicycle Lane (New), Paving and/or Striping Installation (New Safety)

This project will include: Sidewalk and/or Crosswalk Rehab/Repair (Existing), ADA Frederick Street Connectivity Coachella Riverside 21/22 New Safety Curb Ramp Installation (New), Bicycle Lane (New), Paving and/or Striping Installation Frederick Street from Avenue 53 to Avenue 54 Construction 03/2022 06/2022 20-20 56 28 Project (New Safety), ADA Curb Ramp Rehab/Repair (Existing)

This project will include: Sidewalk and/or Crosswalk Installation (New), Sidewalk and/or Crosswalk Rehab/Repair (Existing), Pavement Rehab/Repair (Existing), ADA Curb Complete Streets 2021 Citywide Pedestrian Safety Various locations on major and minor corridors throughout the Coachella Riverside 21/22 New Ramp Installation (New), Bicycle Lane (New), Paving and/or Striping Installation (New Construction 09/2021 12/2021 20-20 56 28 Components Improvement Project City, including, but not limited to Avenue 52 and Avenue 536 Safety), Bicycle Lane Rehab/Repair (Existing), ADA Curb Ramp Rehab/Repair (Existing)

Del Mar Dr - El Toro to Eaton, El Rancho Cir - El Pueblo to El This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Pueblo, El Toro Cir - El Pueblo to El Pueblo, La Casa Ct - El Project Scope Development, Sidewalk and/or Crosswalk Rehab/Repair (Existing), Road Maintenance & 2021-22 SB1 Pavement Rancho to N end, Ensueno Ct - El Rancho to N end, Raquel Ct - Pre-Construction and 07/2021 08/2021 Hemet Riverside 21/22 New Pavement Rehab/Repair (Existing), Cost Estimating, Document Preparation, 15-20 42 23 Rehabilitation Rehabilitation S end to El Rancho, Tabla Ct - S end to El Rancho, El Paso Way Construction 11/2021 12/2021 Preliminary Design, Environmental Study/Documents, ADA Curb Ramp Rehab/Repair - S end to El Rancho, El Pueblo St - Fruitvale to El Toro, Entrada (Existing), Bicycle Lane Rehab/Repair (Existing) St - Kirby to El Rancho, El Grande St - El Toro to El Toro

*This list is subject to change and will be finalized upon the adoption of any jurisdiction that meets subsequent eligibility at the October 2021 Commission Meeting. Draft City Submitted - Fiscal Year 2021-22 Local Streets and Roads List of Projects *Projects listed are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1) August 19, 2021

Fiscal Year Initially Proposed Project Est Assembly Senate City County Project Type Title Description Location Components Est Start Est Useful Life Proposed Status Completion Districts Districts

Grand Ave. (from Jane Ct. to Clinton Keith Rd.), Wildomar Trail Road Maintenance & Street Rehabilitation Project (FY This project will include: Sidewalk and/or Crosswalk Installation (New), Paving and/or Wildomar Riverside 20/21 Carried Over (from Palomar St. to 3000' east), Lemon St. (800' west to 300' Construction 08/2021 10/2021 20-25 67 28 Rehabilitation 2021-22) Striping Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing) east of Gafford Rd.)

30 Residential Streets in the Westerly Portion of the City (Chelsea Ln., Elm St., Maple Tree Ln., Willow Tree Ln., Mapleleaf Ct., Brighton Ct., Hunters Run Ct., Hidden Glen Cir., Road Maintenance & This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Darby St., Front St., Cashew St., Pecan St., Orchard St., Linda Wildomar Riverside 21/22 New Slurry Seal (FY 2021-22) Construction 08/2021 10/2021 8-8 67 28 Rehabilitation Pavement Rehab/Repair (Existing) Vista Ln., Penrose St., Dunn St., Sheffield Ct., Osprey Ct., Bayberry Rd., Wade Ct., Sequoia Cir., Wild Stallion Ln., Almond St., Hillcrest Ct., South Pasadena St., Dunn St., Orange St., Jennifer Dr.) (Locations are estimates, not yet final).

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Road Maintenance & Banning Riverside 21/22 New Nicolet Street AC Overlay Sidewalk and/or Crosswalk Rehab/Repair (Existing), Pavement Rehab/Repair Nicolet Street from Hargrave Street to Hathaway Street Construction 01/2022 07/2022 10-15 42 23 Rehabilitation (Existing), ADA Curb Ramp Rehab/Repair (Existing)

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Road Maintenance & Banning Riverside 21/22 New 20th Street AC Overlay Sidewalk and/or Crosswalk Rehab/Repair (Existing), Pavement Rehab/Repair 20th Street from Wilson Street to Nicolet Street Construction 01/2022 07/2022 10-15 42 23 Rehabilitation (Existing), ADA Curb Ramp Rehab/Repair (Existing)

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Road Maintenance & Banning Riverside 21/22 New Alessandro Road AC Overlay Sidewalk and/or Crosswalk Rehab/Repair (Existing), Pavement Rehab/Repair Alessandro Road from Williams Street to Hoffer Street Construction 01/2022 07/2022 10-15 42 23 Rehabilitation (Existing), ADA Curb Ramp Rehab/Repair (Existing)

1. A portion of the Sundance community generally located south This project will include: ADA Curb Ramp Installation (New), Pavement Rehab/Repair of Oak Valley Parkway, west of Highland Springs, north of Eighth (Existing), ADA Curb Ramp Rehab/Repair (Existing) | This project will consist of: Road Maintenance & Annual Citywide Street Street, and east of Cherry Avenue. Beaumont Riverside 21/22 New placement of slurry seal and ARAM cape seal, Construction 04/2022 07/2022 7-15 42 23 Rehabilitation Rehabilitation and Maintenance 2. A portion of the Fairway Canyon community generally located Mill and overlay existing ac paving, and south of City boundary, west of Tukwet Canyon, north of Oak dig out irreparable material and replace with ac pavement. Valley Parkway, and east of Oak Valley Parkway.

Road Maintenance & San Luis Way from West Barnard Street to West Wisconsin Blythe Riverside 21/22 New San Luis Way Street Improvement This project will include: Pavement Rehab/Repair (Existing) Construction 09/2021 12/2021 15-20 56 28 Rehabilitation Street

Railroad Canyon Road Lighting This project will include: Traffic Signals, Lights, and/or Signage Installation (New Pre-Construction and 07/2021 01/2022 Canyon Lake Riverside 21/22 New Safety Railroad Canyon Road (between western and eastern City limits) 15-20 67 28 Improvements Safety), Cost Estimating, Preliminary Design Construction 01/2022 05/2022

*This list is subject to change and will be finalized upon the adoption of any jurisdiction that meets subsequent eligibility at the October 2021 Commission Meeting. Draft City Submitted - Fiscal Year 2021-22 Local Streets and Roads List of Projects *Projects listed are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1) August 19, 2021

Fiscal Year Initially Proposed Project Est Assembly Senate City County Project Type Title Description Location Components Est Start Est Useful Life Proposed Status Completion Districts Districts

This project will include: Project Scope Development, Document Preparation, Cost Railroad Canyon Road - westbound from Sorrel Lane to Towne Pre-Construction and 01/2022 04/2022 Canyon Lake Riverside 20/21 Carried Over Safety Sound Wall Repairs Estimating, Preliminary Design | Repair various areas of the Railroad Canyon Road 10-15 67 28 Center Drive South Construction 04/2022 08/2022 sound wall.

This project will include: Project Scope Development, Sidewalk and/or Crosswalk Pedestrian Crosswalk Railroad Canyon Road (all traffic signals between Sorrel Lane Pre-Construction and 01/2022 04/2022 Canyon Lake Riverside 20/21 Carried Over Traffic Control Devices Rehab/Repair (Existing), Cost Estimating, Preliminary Design, Traffic Signals, Lights, 15-20 67 31 Enhancements and Skylink Drive) Construction 04/2022 08/2022 and/or Signage Rehab/Repair (Existing Safety)

Striping Improvements Railroad Canyon Lake Riverside 20/21 In Progress Safety This project will include: Paving and/or Striping Rehab/Repair (Existing Safety) Along Railroad Canyon Road within City limits Construction 05/2021 07/2021 5-10 67 31 Canyon Road

The Century Park Neighborhood is bound between Avenue 30 to the Road Maintenance & Century Park Neighborhood Street This project will include: Pavement Rehab/Repair (Existing), Document Preparation, Pre-Construction and 03/2022 04/2022 Cathedral City Riverside 21/22 New north, McCallum Way to the south, Date Palm Drive to the west, 15-20 56 28 Rehabilitation Pavement Rehabilitation Preliminary Design Construction 04/2021 07/2022 and Da Vall Drive to the east.

Candlewood Drive, Shifting Sands Trail, Whispering Palms Trail, Road Maintenance & Whispering Palms Neighborhood This project will include: Pavement Rehab/Repair (Existing), Cost Estimating, Pre-Construction and 01/2021 03/2021 Cathedral City Riverside 20/21 In Progress Sky Blue Water Trail, Navajo Trail, Pueblo Trail, and Mission 15-20 56 28 Rehabilitation Street Pavement Rehabilitation Document Preparation, Preliminary Design, ADA Curb Ramp Rehab/Repair (Existing) Construction 04/2021 06/2021 Indian Trail between Ramon Road and Avenue 33.

This project will include: Document Preparation, Traffic Signals, Lights, and/or Signage Landau Boulevard and McCallum Rehab/Repair (Existing Safety), Preliminary Design, ADA Curb Ramp Rehab/Repair Intersection of Landau Boulvard and McCallum Way in Cathedral Pre-Construction and 10/2021 11/2021 Cathedral City Riverside 19/20 Carried Over Safety Way Intersection Traffic Signal 15-20 56 28 (Existing) | Construct new traffic signal at intersection near Mt. San Jacinto High City Construction 07/2022 08/2022 Construction School. Pedestrian fatality in 2015

Road Maintenance & This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Coachella Riverside 20/21 Carried Over Street Rehabilitation Avenue 52 Avenue 52 and Calhoun Construction 09/2021 12/2021 20-20 56 28 Rehabilitation Pavement Rehab/Repair (Existing)

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), ADA Road Maintenance & 2022 Major and Local Street Curb Ramp Installation (New), Pavement Rehab/Repair (Existing), Bicycle Lane West Sixth Street, Ontario Avenue, Main Street, West Grand Corona Riverside 21/22 New Construction 07/2022 11/2022 15-20 60 31 Rehabilitation Pavement Rehabilitation Project (New), Landscape Safety Rehab/Repair (Existing), Traffic Signals, Lights, and/or Blvd, East Grand Blvd, South Main Street Signage Rehab/Repair (Existing Safety), Bicycle Lane Rehab/Repair (Existing)

Hacienda Ave Street Improvement This project will include: Project Scope Development, Right of Way, Feasibility Study, Desert Hot Springs Riverside 20/21 Carried Over Safety Hacienda Ave - West Dr to Foxdale Ave Pre-Construction 07/2021 06/2022 10-15 56 28 Project Document Preparation, Environmental Study/Documents | Engineering Design

*This list is subject to change and will be finalized upon the adoption of any jurisdiction that meets subsequent eligibility at the October 2021 Commission Meeting. Draft City Submitted - Fiscal Year 2021-22 Local Streets and Roads List of Projects *Projects listed are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1) August 19, 2021

Fiscal Year Initially Proposed Project Est Assembly Senate City County Project Type Title Description Location Components Est Start Est Useful Life Proposed Status Completion Districts Districts

This project will include: Pavement Improvement (New), Sidewalk and/or Crosswalk Installation (New), Paving and/or Striping Rehab/Repair (Existing Safety), Sidewalk Palm Drive Improvements - and/or Crosswalk Rehab/Repair (Existing), Pavement Rehab/Repair (Existing), ADA Desert Hot Springs Riverside 21/22 New Safety Palm Drive from Pierson Blvd to Mission Lakes Blvd Construction 10/2023 06/2024 10-15 56 28 Pierson Blvd to Mission Lakes Blvd Curb Ramp Installation (New), Bicycle Lane (New), Paving and/or Striping Installation (New Safety), ADA Curb Ramp Rehab/Repair (Existing), Bicycle Lane Rehab/Repair (Existing)

This project will include: Pavement Improvement (New), Paving and/or Striping Road Maintenance & Rehab/Repair (Existing Safety), ADA Curb Ramp Installation (New), Pavement Desert Hot Springs Riverside 21/22 New Pierson Blvd - slurry and striping Pierson Blvd from Golden Eagle Way to Mesquite Construction 09/2021 03/2022 5-10 56 28 Rehabilitation Rehab/Repair (Existing), Paving and/or Striping Installation (New Safety), Bicycle Lane Rehab/Repair (Existing)

2021/22 City-wide asphalt grind, Road Maintenance & Desert Hot Springs Riverside 21/22 New overlay, slurry and road This project will include: Cost Estimating city wide Pre-Construction 07/2021 06/2022 5-10 56 28 Rehabilitation reconstruction project

Road Maintenance & Bellegrave Ave, Sumner Ave, Milliken Ave, Whitewell Dr, Eastvale Riverside 21/22 New 2021 Annual Overlay Project This project will include: Pavement Rehab/Repair (Existing) Construction 09/2021 06/2022 13-15 60 31 Rehabilitation Chadler St, Orange St, RIverside Dr, Harp St and Samantha Dr.

Road Maintenance & This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Indian Wells Riverside 20/21 Carried Over Washington Street Overlay Washington St from Fred Waring Dr. to Miles Ave. Construction 08/2021 10/2021 8-15 42 28 Rehabilitation Pavement Rehab/Repair (Existing)

Road Maintenance & Indian Wells Riverside 19/20 Carried Over Highway 111 Slurry Seal This project will include: Preliminary Design Highway 111 from eastern city limits to western city limits Pre-Construction 07/2021 01/2022 15-15 42 28 Rehabilitation

1. Van Buren from Indio Boulevard to Avenue 48 2. Indio Boulevard from Highway 111 to Avenue 48 Road Maintenance & Fiscal Year 2021/2022 Citywide Indio Riverside 21/22 New This project will include: Pavement Rehab/Repair (Existing) 3. Adams Street from Avenue 38 to Avenue 39 Construction 07/2021 06/2022 5-10 56 28 Rehabilitation Pavement Rehabilitation 4. Avenue 38 from Dune Palms to Adams Street 5. Highway 111 from Indio Boulevard to Golf Center Parkway

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Road Maintenance & Mission Boulevard Pavement Pre-Construction and 07/2021 10/2021 Jurupa Valley Riverside 21/22 New Pavement Rehab/Repair (Existing), Cost Estimating, Document Preparation, Mission Blvd. - Bellegrave to Pyrite 15-20 60 31 Rehabilitation Rehabilitation - Ph. 2 Construction 01/2021 02/2022 Preliminary Design, Environmental Study/Documents

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Road Maintenance & 2021/22 Citywide Pavement Pavement Rehab/Repair (Existing), Document Preparation, Cost Estimating, Rubidoux Blvd. - SR60 to 29th, Limonite Ave. - Felspar to Pre-Construction and 10/2021 01/2022 Jurupa Valley Riverside 21/22 New 15-20 60 31 Rehabilitation Rehabilitation Preliminary Design, Environmental Study/Documents, ADA Curb Ramp Rehab/Repair Pedley, Jurupa Rd. - Agate to Galena Construction 03/2022 05/2022 (Existing)

*This list is subject to change and will be finalized upon the adoption of any jurisdiction that meets subsequent eligibility at the October 2021 Commission Meeting. Draft City Submitted - Fiscal Year 2021-22 Local Streets and Roads List of Projects *Projects listed are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1) August 19, 2021

Fiscal Year Initially Proposed Project Est Assembly Senate City County Project Type Title Description Location Components Est Start Est Useful Life Proposed Status Completion Districts Districts

Dune Palms Road Pavement This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Road Maintenance & Pre-Construction and 07/2021 07/2022 La Quinta Riverside 21/22 New Rehabilitation (Miles Avenue to Pavement Rehab/Repair (Existing), Cost Estimating, Preliminary Design, Dune Palms Road from Miles Avenue to Fred Waring Drive 20-20 42 28 Rehabilitation Construction 07/2021 07/2022 Fred Waring Drive) Environmental Study/Documents

The project is located in the Downtown area of Lake Elsinore, CA, which the project limits are between the I-15 Interstate to Prospect Street in the north-south direction and Main Street and This project will include: Pavement Rehab/Repair (Existing), Preliminary Design | The Road Maintenance & Downtown Pavement Resurfacing Rancho Street in the west-east direction. Includes Ellis St Pre-Construction and 08/2021 12/2021 Lake Elsinore Riverside 21/22 New project consists of slurry seal type II treatment, 2" grind and overlay, or AC 10-12 67 28 Rehabilitation Project FY 21/22 (Pottery - Flint, Heald - Franklin, Franklin - Pottery); Lookout Construction 01/2022 06/2022 reconstruction depending on the PCI or condition of the road segment. (Pottery - Flint, Flint-End); Granite St (Flint-End); E Hill (Franklin - Pottery, Pottery- Flint); Adobe (Pottery - Flint, S End - Pottery, Flint - End); and others.

Road Maintenance & Tradewinds Community Menifee Riverside 21/22 New This project will include: Pavement Rehab/Repair (Existing) Trade Winds Drive from Highway 74 to Summer Winds Drive Construction 09/2021 12/2021 15-20 67 23 Rehabilitation Resurfacing (Romoland)

This project will include: Pavement Rehab/Repair (Existing), ADA Curb Ramp Road Maintenance & Menifee Road from Holland Road to Bayport Road; Menifee Menifee Riverside 19/20 Carried Over Menifee Road Street Resurfacing Rehab/Repair (Existing), Bicycle Lane Rehab/Repair (Existing) | repave 1.2 miles of Construction 03/2022 06/2022 20-25 67 23 Rehabilitation Road from Rockport Road to 650' north of Camino Cristal local arterial road

14 segments of arterial/collector sts and 54 segments of residential sts; Arterial/collector sts Bay Ave, Locust Ave, This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Delphinium Ave, Ironwood Ave, Kitching St, John F Kennedy Dr, Road Maintenance & Citywide Pavement Rehabilitation Moreno Valley Riverside 21/22 New Pavement Rehab/Repair (Existing) | Local Repairs/ Slurry Seal and Pavement Surface Redlands Blvd, Moreno Beach Dr, Nason St, Alessandro Blvd, Construction 07/2022 12/2022 5-10 61 31 Rehabilitation Program FY 21/22 Replacement Pigeon Pass Rd, Sunnymead Blvd, Sunnymead Ranch Pkwy; Residential sts within City Tract Nos. 11234, 13161, 18455, 19393, 19685, and 20715

Pavement Resurfacing of Murrieta Hot Springs Road from Madison Murrieta Hot Springs Road from Madison Avenue to Alta Murrieta Road Maintenance & Avenue to Alta Murrieta Drive and Murrieta Riverside 19/20 In Progress This project will include: Pavement Rehab/Repair (Existing) Drive and Hancock Ave from Las Brisas Road South to Murrieta Construction 11/2021 12/2021 10-15 67 28 Rehabilitation Hancock Ave from Las Brisas Hot Springs Road Road South to Murrieta Hot Springs Road

Pavement Resurfacing of Clinton Keith Road from Westerly City Clinton Keith Road from Westerly City Limits to Grand Avenue Road Maintenance & Limits to Grand Avenue and Murrieta Riverside 21/22 New This project will include: Pavement Rehab/Repair (Existing) and Murrieta Hot Springs Road from Whitewood Road to Construction 07/2022 08/2022 10-15 67 28 Rehabilitation Murrieta Hot Springs Road from Margarita Road Whitewood Road to Margarita Road

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Sidewalk and/or Crosswalk Rehab/Repair (Existing), Pavement Rehab/Repair (Existing), Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), ADA Road Maintenance & Sixth St Widening and Dual Right The street improvements will be located on Sixth St between Norco Riverside 19/20 Carried Over Curb Ramp Rehab/Repair (Existing) | Street widening and improvement project on Construction 07/2021 06/2022 15-25 60 31 Rehabilitation Turn Lanes onto I-15 FWY Hamner Ave and the I-15 Freeway Sixth Street (between Hamner Avenue and I-15 Freeway) to add dual right turn lanes onto the I-15 southbound Freeway

*This list is subject to change and will be finalized upon the adoption of any jurisdiction that meets subsequent eligibility at the October 2021 Commission Meeting. Draft City Submitted - Fiscal Year 2021-22 Local Streets and Roads List of Projects *Projects listed are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1) August 19, 2021

Fiscal Year Initially Proposed Project Est Assembly Senate City County Project Type Title Description Location Components Est Start Est Useful Life Proposed Status Completion Districts Districts

Road Maintenance & Citywide Pavement Conditions This project will include: Contract with a consultant to perform a pavement condition Palm Desert Riverside 20/21 Carried Over Citywide Pre-Construction 07/2021 06/2022 3-5 42 28 Rehabilitation Evaluation survey, assessment, and inventory services on the entire City street network.

Road Maintenance & Cook Street Resurfacing Project - This project will include: Pavement Rehab/Repair (Existing) | Capped with rubberized Palm Desert Riverside 21/22 New Cook Street from Frank Sinatra to Merle Construction 01/2022 12/2022 25-30 42 28 Rehabilitation Phase 2 asphalt concrete

This project will include: ADA Curb Ramp Installation (New), Traffic Signals, Lights, Traffic Signal at San Rafael Drive Intersection of San Rafael Drive and Avenida Caballeros in the Palm Springs Riverside 20/21 In Progress Traffic Control Devices and/or Signage Installation (New Safety), Paving and/or Striping Installation (New Construction 11/2021 05/2022 40-50 42 28 and Avenida Caballeros City of Palm Springs Safety), ADA Curb Ramp Rehab/Repair (Existing)

This project will include: ADA Curb Ramp Installation (New), Traffic Signals, Lights, Traffic Signal at Rosa Parks Road Intersection of Rosa Parks Road and Indian Canyon Drive in the Palm Springs Riverside 20/21 In Progress Traffic Control Devices and/or Signage Installation (New Safety), Paving and/or Striping Installation (New Construction 10/2021 05/2022 40-50 42 28 and Indian Canyon Drive City of Palm Springs Safety), ADA Curb Ramp Rehab/Repair (Existing)

HSIP Cycle 8 Traffic Signal This project will include: Cost Estimating, Document Preparation, Preliminary Design, Palm Springs Riverside 21/22 In Progress Traffic Control Devices 14 intersections city wide. Pre-Construction 06/2020 11/2021 25-50 42 28 Improvements Environmental Study/Documents | Est. Construction Year: 2021-22

Road Maintenance & 2021 Citywide Street This project will include: Project Scope Development, Cost Estimating, Document Perris Riverside 20/21 Carried Over Various City roadways where pavement rehabilitation is needed. Pre-Construction 08/2021 12/2021 5-10 61 31 Rehabilitation Improvements Preparation, Preliminary Design

Road Maintenance & 2022 Citywide Street Improvement This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Perris Riverside 21/22 New Citywide Construction 04/2022 06/2022 5-10 61 31 Rehabilitation Projects Pavement Rehab/Repair (Existing)

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing) | This project will include a full rehabilitation of existing pavement for ¾ of a mile on the southbound lanes of Monterey Avenue Monterey Avenue, west side, from Hovley Lane to the north edge Road Maintenance & Monterey Avenue Street Pavement between Hovley Lane and the north edge of the bridge at the Whitewater Channel. Rancho Mirage Riverside 19/20 In Progress of the bridge at the Whitewater Channel (Total distance: 0.75 Construction 05/2020 08/2020 10-20 42 28 Rehabilitation Rehabilitation The existing pavement has deteriorated over numerous years and is in poor condition miles) over the entire length of the subject area. The City plans to utilize a cold in-place recycling method with a hot mix top course to reconstruct the ¾ mile stretch of roadway.

This project will include: Pavement Rehab/Repair (Existing) | Pavement rehabilitation. Road Maintenance & Mountain Avenue from Seventh to | This project has been in the City's CIP for past years. The delay with the rehab is San Jacinto Riverside 19/20 In Progress Mountain Avenue from Seventh to Esplanade. Construction 01/2022 02/2022 7-10 42 23 Rehabilitation Esplanade associated to EMWD waterline installation that must be completed prior to rehab by city to prevent damage to a brand new pavement rehab.

*This list is subject to change and will be finalized upon the adoption of any jurisdiction that meets subsequent eligibility at the October 2021 Commission Meeting. Draft City Submitted - Fiscal Year 2021-22 Local Streets and Roads List of Projects *Projects listed are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1) August 19, 2021

Fiscal Year Initially Proposed Project Est Assembly Senate City County Project Type Title Description Location Components Est Start Est Useful Life Proposed Status Completion Districts Districts

This project will include: Project Scope Development, Right of Way, Feasibility Study, Document Preparation, Preliminary Design, Environmental Study/Documents | This Road Maintenance & San Jacinto Riverside 20/21 Carried Over Citywide Slurry Seal Program annual citywide slurry seal program combines two years of funding (included in prior Various locations throughout the City based on PMS report. Pre-Construction 06/2021 08/2021 5-8 42 23 Rehabilitation years SB1 RMRA) and local funds to create a bigger and more competitive project. Start of construction is August 2021.

This project will include: Project Scope Development, Cost Estimating | To evaluate the streets in San Jacinto for pavement condition indexes. | The Pavement San Jacinto Riverside 20/21 Carried Over Other Pavement Management System Citywide. Pre-Construction 07/2021 06/2022 10-10 42 23 Management System will be completed by June 30, 2022. This project was also included in prior years SB1 RMRA.

Road Maintenance & Ramona Expressway San Jacinto Riverside 20/21 In Progress This project will include: Pavement Rehab/Repair (Existing) West of Warren Road to Sanderson Avenue. Construction 06/2021 09/2021 7-10 42 23 Rehabilitation Rehabilitation

This project will include: Project Scope Development, Right of Way, Pavement Road Maintenance & San Jacinto Street Pavement and This project consists of the following streets: Artesia Avenue Pre-Construction and 10/2020 06/2021 San Jacinto Riverside 20/21 In Progress Rehab/Repair (Existing), Cost Estimating, Document Preparation, Preliminary Design, 7-10 42 23 Rehabilitation Sidewalk Improvement from Camino Los Banos to North Jordan Avenue Construction 08/2021 11/2021 Environmental Study/Documents

This project will include: Preparation of plan to complete ADA improvements City wide. Americans with Disabilities Act Due to budget constraints, the ADA self evaluation, complaint/grievance procedure San Jacinto Riverside 20/21 Carried Over Other (ADA) Self Assessment and Citywide Pre-Construction 07/2021 06/2022 10-10 42 23 and transition plan, the City is completing the plan in phases. Phase 1 is 100%. Transition Plan Phase 2 will be included in future years,

Roadway rehabilitation of the full width of Pauba Road Citywide Pavement Rehabilitation This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Road Maintenance & approximately from Margarita Road to Butterfield Stage Road, Temecula Riverside 21/22 New Program – Butterfield Stage Road Sidewalk and/or Crosswalk Rehab/Repair (Existing), Pavement Rehab/Repair Construction 07/2021 02/2022 10-20 75 28 Rehabilitation and the full width of Butterfield Stage Road from 405 feet south and Pauba Road (Existing), ADA Curb Ramp Rehab/Repair (Existing) of De Portola Road to 230 feet south of Rancho California Road

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Road Maintenance & Pavement Rehabilitation Program Sidewalk and/or Crosswalk Rehab/Repair (Existing), Pavement Rehab/Repair Roadway rehabilitation of the full width of Winchester Road from Temecula Riverside 21/22 New Construction 02/2022 07/2022 10-20 75 28 Rehabilitation – Citywide -Winchester Road (Existing), ADA Curb Ramp Rehab/Repair (Existing), Bicycle Lane Rehab/Repair Jefferson Avenue to Diaz Road (Existing)

Road Maintenance & This project will include: Pavement Rehab/Repair (Existing) | Slurry Seal - This is a Isleton Sacramento 19/20 Carried Over Everything West of Delta Avenue Everything West of Delta Avenue Construction 07/2021 08/2022 15-20 11 3 Rehabilitation actual quote for a slurry seal coat | Put to bid twice and received no bids.

Local Road Safety Plan/Caltrans This project will include: Feasibility Study, Document Preparation, Cost Estimating, Isleton Sacramento 20/21 In Progress Match Funds Highway 160 Pre-Construction 07/2021 07/2022 10-30 11 3 Highway Safety Project Environmental Study/Documents

*This list is subject to change and will be finalized upon the adoption of any jurisdiction that meets subsequent eligibility at the October 2021 Commission Meeting. Draft City Submitted - Fiscal Year 2021-22 Local Streets and Roads List of Projects *Projects listed are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1) August 19, 2021

Fiscal Year Initially Proposed Project Est Assembly Senate City County Project Type Title Description Location Components Est Start Est Useful Life Proposed Status Completion Districts Districts

This project will include: Pavement Rehab/Repair (Existing) | Grind and Overlay - 454' Road Maintenance & Jackson Blvd., From 2nd St to 4th Isleton Sacramento 19/20 Carried Over x 33' Two large manholes 4 small services points gutters need rehab (cost does not Jackson Blvd., From 2nd St to 4th St Construction 10/2021 11/2022 15-20 11 3 Rehabilitation St include gutter rehab)

This project will include: Pavement Rehab/Repair (Existing) | Grind and Overlay - 454' Road Maintenance & Jackson Blvd. Ext. from 4th St to Isleton Sacramento 19/20 Carried Over x 33' Two large manholes 4 small services points gutters need rehab (cost does not Jackson Blvd. Ext. from 4th St to 6th St. Construction 10/2021 11/2022 15-20 11 3 Rehabilitation 6th St. include gutter rehab)

Isleton Sacramento 20/21 Completed Safety Street Signs This project will include: Preliminary Design Citywide Pre-Construction 09/2020 05/2021 10-20 11 3

Road Maintenance & El Camino Avenue Safety El Camino Avenue from Steelhead Creek bridge deck to Del Sacramento Sacramento 20/21 Carried Over This project will include: Document Preparation, Cost Estimating, Preliminary Design Pre-Construction 09/2021 03/2023 30-30 7 6 Rehabilitation Improvements Paso Boulevard

This project will include: Pavement Rehab/Repair (Existing), ADA Curb Ramp Northgate Neighborhood bounded by Camarillo Drive to the Road Maintenance & Northgate Neighborhood Roadway Pre-Construction and 09/2020 07/2021 Sacramento Sacramento 20/21 In Progress Installation (New), Cost Estimating, Document Preparation, Storm Drain and/or Culvert north, Garden Highway to the south, Stonecreek Drive to the 15-15 7 6 Rehabilitation Rehabilitation Construction 08/2021 03/2022 Rehab/Repair (Existing) west, and Northgate Boulevard to the east

This project will include: Sidewalk and/or Crosswalk Installation (New), Sidewalk and/or Crosswalk Rehab/Repair (Existing), Traffic Signals, Lights, and/or Signage Installation (New Safety), Cost Estimating, Traffic Signals, Lights, and/or Signage Rehab/Repair Pre-Construction and 03/2021 06/2022 Sacramento Sacramento 20/21 In Progress Safety Florin Road Safety Improvements (Existing Safety), ADA Curb Ramp Rehab/Repair (Existing), Bicycle Lane Florin Road from 24th Street to Munson Way 30-30 9 6 Construction 07/2022 03/2025 Rehab/Repair (Existing), Pavement Rehab/Repair (Existing), ADA Curb Ramp Installation (New), Document Preparation, Paving and/or Striping Installation (New Safety), Preliminary Design, Environmental Study/Documents

This project will include: Sidewalk and/or Crosswalk Installation (New), Paving and/or Striping Rehab/Repair (Existing Safety), Sidewalk and/or Crosswalk Rehab/Repair Central City Sacramento -Bikeways P (15th to 21st), Q(15th to Road Maintenance & (Existing), Pavement Rehab/Repair (Existing), ADA Curb Ramp Installation (New), 21st), 10th (Q to Broadway), 9th (L to Q Street)Two-Way Sacramento Sacramento 20/21 Carried Over Downtown Mobility Project Construction 03/2022 03/2023 15-30 7 6 Rehabilitation Bicycle Lane (New), Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Conversions 5th Street(H Street to Broadway), I Street(16th to Safety), Paving and/or Striping Installation (New Safety), ADA Curb Ramp 21st) and I Street road diet (12th to 16th) Rehab/Repair (Existing), Bicycle Lane Rehab/Repair (Existing)

This project will include: Cost Estimating, Document Preparation, Preliminary Design, Broadway from Martin Luther King Jr Boulevard to Stockton Sacramento Sacramento 20/21 Carried Over Safety Broadway Safety Improvements Pre-Construction 09/2021 03/2023 30-30 6 6 Environmental Study/Documents Boulevard; Stockton Boulevard from Broadway to 13th Avenue

Road Maintenance & Del Paso Boulevard Safety This project will include: Cost Estimating, Document Preparation, Preliminary Design, Del Paso Boulevard from Marysville Boulevard to Arcade Pre-Construction and 01/2020 04/2022 Sacramento Sacramento 20/21 In Progress 30-30 7 6 Rehabilitation Improvements Paving and/or Striping Installation (New Safety), Environmental Study/Documents Boulevard Construction 06/2022 03/2023

*This list is subject to change and will be finalized upon the adoption of any jurisdiction that meets subsequent eligibility at the October 2021 Commission Meeting. Draft City Submitted - Fiscal Year 2021-22 Local Streets and Roads List of Projects *Projects listed are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1) August 19, 2021

Fiscal Year Initially Proposed Project Est Assembly Senate City County Project Type Title Description Location Components Est Start Est Useful Life Proposed Status Completion Districts Districts

Marysville Boulevard Safety This project will include: Cost Estimating, Document Preparation, Preliminary Design, Sacramento Sacramento 20/21 Carried Over Safety Marysville Boulevard from North Avenue to Arcade Pre-Construction 09/2021 03/2024 30-30 7 6 Improvements Environmental Study/Documents

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), North 12th Street from Richards Blvd to H Street. Richards Blvd Road Maintenance & Sacramento Sacramento 21/22 New North 12th Complete Street Project Pavement Rehab/Repair (Existing), Bicycle Lane (New) | Integrates road rehabilitation from North 12th Street to Sunbeam Ave. Sunbeam Ave from Construction 05/2021 03/2022 30-30 7 6 Rehabilitation with ATP grant Richards Blvd to North 12th St.

This project will include: Pavement Rehab/Repair (Existing), Document Preparation, Road Maintenance & Lampasas Avenue and Rio Linda Lampasas Avenue (Oakmont Street to Del Paso Blvd) and Rio Pre-Construction and 09/2021 04/2022 Sacramento Sacramento 21/22 New Preliminary Design, ADA Curb Ramp Rehab/Repair (Existing) | To support intersection 30-30 7 6 Rehabilitation Boulevard Safety Project Linda Blvd (El Camino Ave to Eleanor Ave). Construction 06/2022 04/2023 improvements that are HSIP project

This project will include: Pavement Rehab/Repair (Existing), Preliminary Design | A Road Maintenance & Franklin Boulevard (Turnbridge to A Parkway), partially located in Pre-Construction and 08/2021 08/2022 Sacramento Sacramento 21/22 New Franklin Boulevard Overlay Project joint City/Sacramento County project as corridor falls within incorporated and 30-30 7 6 Rehabilitation unincorporated county Construction 09/2022 04/2023 unincorporated territory. Will be delivered by Sacramento County.

Road Maintenance & West El Camino Avenue Roadway This project will include: ADA Curb Ramp Installation (New), Pavement Rehab/Repair West El Camino Avenue from Truxel Boulevard to Northgate Pre-Construction and 09/2021 06/2023 Sacramento Sacramento 21/22 New 15-30 7 6 Rehabilitation Rehabilitation (Existing), Preliminary Design Blvd Construction 07/2023 03/2024

Road Maintenance & This project will include: Pavement Rehab/Repair (Existing), Bicycle Lane (New), Cost Pre-Construction and 09/2021 09/2022 Sacramento Sacramento 21/22 New 34th Street Bike Lanes T Street to 5th Avenue 15-30 7 6 Rehabilitation Estimating, Document Preparation, Preliminary Design Construction 09/2022 03/2024

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Sidewalk and/or Crosswalk Rehab/Repair (Existing), Pavement Rehab/Repair Complete Streets Shared County Project - Madison Madison Ave from Dewey Drive to San Juan Ave; and Kenneth Citrus Heights Sacramento 21/22 In Progress (Existing), Storm Drain and/or Culvert Rehab/Repair (Existing), Traffic Signals, Lights, Construction 04/2021 10/2022 15-20 8 4 Components Avenue; Kenneth Ave Ave from Central to Oak Ave. and/or Signage Rehab/Repair (Existing Safety), ADA Curb Ramp Rehab/Repair (Existing), Bicycle Lane Rehab/Repair (Existing)

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Sidewalk and/or Crosswalk Rehab/Repair (Existing), Pavement Rehab/Repair Complete Streets Greenback Lane Complete Streets Citrus Heights Sacramento 20/21 Carried Over (Existing), Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Greenback Lane from Sunrise Boulevard to Fair Oaks Blvd Construction 03/2022 10/2022 15-20 8 4 Components Project Storm Drain and/or Culvert Rehab/Repair (Existing), ADA Curb Ramp Rehab/Repair (Existing)

Work will take place in the following Subzones: 4, 5, 14, 16, 22, This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Road Maintenance & 2022 Pavement Slurry Seal and 23, 27, 46, 50, 62, 89 and 100 Elk Grove Sacramento 21/22 New Sidewalk and/or Crosswalk Rehab/Repair (Existing), Pavement Rehab/Repair Construction 08/2021 10/2022 5-10 9 6 Rehabilitation Resurfacing Project (WPR022) https://elkmap.maps.arcgis.com/apps/webappviewer/index.html?i (Existing), ADA Curb Ramp Rehab/Repair (Existing) d=cfd268d6f3564ee4b1e39be7266b5034

*This list is subject to change and will be finalized upon the adoption of any jurisdiction that meets subsequent eligibility at the October 2021 Commission Meeting. Draft City Submitted - Fiscal Year 2021-22 Local Streets and Roads List of Projects *Projects listed are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1) August 19, 2021

Fiscal Year Initially Proposed Project Est Assembly Senate City County Project Type Title Description Location Components Est Start Est Useful Life Proposed Status Completion Districts Districts

This project will include: Sidewalk and/or Crosswalk Installation (New), Paving and/or Striping Rehab/Repair (Existing Safety), Sidewalk and/or Crosswalk Rehab/Repair Elk Grove Florin Road Complete Complete Streets (Existing), Pavement Rehab/Repair (Existing), Traffic Signals, Lights, and/or Signage Elk Grove Sacramento 21/22 New Street and Resurfacing Project Elk Grove Florin Rd, between Calvine Rd and Elk Grove Blvd. Construction 06/2023 10/2023 15-20 9 6 Components Installation (New Safety), Bicycle Lane (New), Paving and/or Striping Installation (New (WTR078) Safety), Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Bicycle Lane Rehab/Repair (Existing), ADA Curb Ramp Rehab/Repair (Existing)

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), WPR020 all locations listed are an estimate and have yet to be Sidewalk and/or Crosswalk Rehab/Repair (Existing), Pavement Rehab/Repair finalized. For all street locations, please see the City's online Road Maintenance & 2020 Pavement slurry seal and Elk Grove Sacramento 20/21 Completed (Existing) | This project is broken down into 2 phases. Phase 1 included base as map of the areas. Construction 11/2019 10/2020 5-10 9 6 Rehabilitation resurfacing project (WPR020) surface pavement repairs. Phase 2 will include surface treatment and striping of http://www.elkgrovecity.org/city_hall/departments_divisions/publi 3,248,910 SF c_works/pavement_management_program

This project will include: Sidewalk and/or Crosswalk Installation (New), Sidewalk and/or Crosswalk Rehab/Repair (Existing), Pavement Rehab/Repair (Existing), ADA Curb Ramp Installation (New), Bicycle Lane (New), Preliminary Design, Bicycle Lane Rehab/Repair (Existing) | The project will rehabilitate or resurface pavement on portions of Waterman Rd. and Elk Grove Florin Rd. and provide class II bike lanes. This project is located at Waterman Rd. (from Bond Road to Elk Road Maintenance & Pre-Construction and 05/2021 03/2022 Elk Grove Sacramento 20/21 In Progress Arterial Roads Rehabilitation Also included are a mid-block pedestrian crossing along Elk Grove-Florin Rd. and a Grove Blvd) Waterman Rd. (from Charolais Way to Grant Line 5-10 9 6 Rehabilitation Construction 03/2022 12/2022 new sidewalk along one section of the west side of Waterman Rd. Rd.) Elk Grove Florin Rd. (from Elk Grove Blvd to Valley Oak Ln)

Waterman Rd; Grant Line Rd to Charolais Way Waterman Rd; Elk Grove Blvd to Bond Rd Elk Grove Florin Rd; Valley Oak to Elk Grove Blvd

This project will include: Pavement Rehab/Repair (Existing), ADA Curb Ramp Rehab/Repair (Existing) | This project will construct: (1) street improvements on This project is located on Railroad St. from Elk Grove Blvd. south Railroad St. from Elk Grove Blvd. to its southern terminus at Elk Grove Creek; (2) to Elk Grove Creek and on Grove St. from Railroad St. to the Complete Streets Railroad Street Improvements Elk Grove Sacramento 19/20 In Progress street improvements on Grove St. from Railroad St. to the eastern edge of the Old eastern edge of the City's existing Old Town Plaza property. Construction 06/2020 12/2022 15-20 9 6 Components Project (WTR049) Town Plaza; (3) curb, gutter, and sidewalk along Elk Grove Blvd, Grove St., and Some modifications will also occur at the intersection of Railroad Railroad St; (4) two parking lots south of the Old Town Plaza; and (5) underground St. and Elk Grove Blvd. utilities.

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Work to take place in the following Subzones 0, 14,16, 22, 24, Project Scope Development, Sidewalk and/or Crosswalk Rehab/Repair (Existing), 27, 41, 50, 58, 61 and 100. Please use this link to show all the Road Maintenance & 2021 Pavement Slurry Seal and Pavement Rehab/Repair (Existing), ADA Curb Ramp Rehab/Repair (Existing) | This Pre-Construction and 03/2021 12/2021 Elk Grove Sacramento 20/21 In Progress streets included in 2021 5-10 9 6 Rehabilitation Resurfacing (WPR021) project is planned to be broken down into 3 phases. Phase 1 ADA improvements and Construction 02/2021 12/2021 https://elkmap.maps.arcgis.com/apps/webappviewer/index.html?i sidewalk repairs. Phase 2 base and surface AC repairs. Phase 3 surface treatments d=cfd268d6f3564ee4b1e39be7266b5034 and striping of 2,748,412 SF.

Natoma Street Drainage Project Folsom Sacramento 20/21 Carried Over Other This project will include: Storm Drain and/or Culvert Rehab/Repair (Existing) Natoma Street Drainage System area west of Scott Street Construction 07/2021 06/2022 25-50 6 1 (Phase II)

Willow Creek Estates Storm Drain Folsom Sacramento 20/21 Carried Over Other This project will include: Storm Drain and/or Culvert Rehab/Repair (Existing) Various streets within the Lexington Hills neighborhood Construction 07/2021 06/2022 25-50 6 1 Lining (Phase II)

Willow Creek Estates East, Briggs Ranch, Rancho Diablo, Iron Road Maintenance & Pavement Resurfacing Project FY This project will include: Pavement Rehab/Repair (Existing) | Pavement rehabilitation Folsom Sacramento 21/22 New Point Road (Prairie City Road to E. Bidwell Street), Broadstone Construction 07/2021 06/2022 25-25 6 1 Rehabilitation 21-22 of various locations. Parkway (E. Bidwell Street to Iron Point Road)

*This list is subject to change and will be finalized upon the adoption of any jurisdiction that meets subsequent eligibility at the October 2021 Commission Meeting. Draft City Submitted - Fiscal Year 2021-22 Local Streets and Roads List of Projects *Projects listed are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1) August 19, 2021

Fiscal Year Initially Proposed Project Est Assembly Senate City County Project Type Title Description Location Components Est Start Est Useful Life Proposed Status Completion Districts Districts

SPRUCE AVE FROM VICTORIA PARK DR TO A ST; GROUSE DR FROM WEST ELM AVE TO QUAIL HOLLOW DR; EMERALD OAK DR FROM WEST ELM AVE TO QUAIL HOLLOW DR; EMERALD OAK DR FROM QUAIL HOLLOW DR Road Maintenance & TO WEST A ST; RANCH RD FROM LINCOLN WY TO BERNAL Galt Sacramento 21/22 New 2021/22 Pavement Project This project will include: Pavement Rehab/Repair (Existing) Construction 06/2022 11/2022 5-25 9 5 Rehabilitation RD; KENT ST FROM TUDOR ST TO CINDY LN; CARLO CT FROM 1ST ST TO W END; KANDY ST FROM TUDOR ST TO CREEKSIDE WY; TUDOR ST FROM KENT ST TO KOST RD; CINDY LN FROM 1ST ST TO TUDOR ST; COMPLETE LIST CAN BE FOUND IN RESOLUTION 2021-36.

This project will include: Pavement Improvement (New), Sidewalk and/or Crosswalk The project is bound by Coloma Road, Cordova Lane, Zinfandel Road Maintenance & Citywide Street Rehabilitation Rehab/Repair (Existing), ADA Curb Ramp Installation (New), Pavement Rehab/Repair Pre-Construction and 07/2021 07/2022 Rancho Cordova Sacramento 21/22 New Drive and Folsom Blvd and also within Chase Drive, Coloma 15-20 8 4, 8 Rehabilitation Project - RC02 and RC04 (Existing), Document Preparation, Cost Estimating, Storm Drain and/or Culvert Construction 10/2021 07/2022 Road, Rossmoor Drive and Ambassador Drive. Rehab/Repair (Existing), Preliminary Design

Gabilan Dr. – east of Clearview Dr. to west of Highland Dr., Diablo Dr. - east of Clearview Dr. to west of Highland Dr., Cembellin Dr. - east of Clearview Dr. to west of Highland Dr., This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Road Maintenance & Albright Dr.- east of Clearview Dr. to west of Highland Dr., Hollister San Benito 21/22 New Road Rehabilitation Program 21/22 Sidewalk and/or Crosswalk Rehab/Repair (Existing), Pavement Rehab/Repair Construction 04/2022 09/2022 10-20 30 12 Rehabilitation Monticello –end to north of Terrace Dr., Terrace Dr. – east of (Existing), ADA Curb Ramp Rehab/Repair (Existing) Bella Vista Dr. to west of Monticello Dr., Bella Vista Dr. –south of Sunnyslope to north of Terrace Dr. Bella Vista Ct. – east of Bella Vista Dr. to end.

Road Maintenance & Pavement Management Program Franklin St, North St, Second St, Monterey St, The Alameda St San Juan Bautista San Benito 21/22 New This project will include: Maintenance Program Plan Development Pre-Construction 07/2020 12/2020 5-20 30 12 Rehabilitation Street Rehabilitation Project and Polk St

-Stevens St. and Aster Rd. between Chamberlaine Way and Vintage Road. This project will include: Pavement Rehab/Repair (Existing) | Apply crack seal & type II -Vintage Rd. and Chamberlaine Wy. Between Stevens St. and Road Maintenance & Pavement Repair and Adelanto San Bernardino 19/20 Forecasted slurry over 184,000 square feet of existing asphalt pavement. Re-install all pavement Aster Rd. Construction 06/2023 07/2024 5-10 33 21 Rehabilitation Rehabilitation Project, Phase III markings. -The east half of Mendicino Rd. between Stevens St. and Aster Rd. -Sonoma Rd, Zinfadel Dr, Bouquet Ave. and Napa

This project will include: Pavement Rehab/Repair (Existing) | Apply crack seal & type II -Aster Rd. between Bartlett Ave. and Inyo St. Road Maintenance & Pavement Repair and Adelanto San Bernardino 19/20 Forecasted slurry over 290,000 square feet of existing asphalt pavement. Re-install all pavement -Chevron Ct, Florence Ct, Leisure Rd, Lee Ave, Arlette Ct. and Construction 06/2024 07/2024 5-10 33 21 Rehabilitation Rehabilitation Project, Phase IV markings. Inyo Ct. from Aster Rd. to cul-de-sac.

This project will include: Pavement Rehab/Repair (Existing) | Apply crack seal & type II -Panther Ave. from Chamberlaine Wy end of pavement. Road Maintenance & Pavement Repair and Adelanto San Bernardino 19/20 Forecasted slurry over 65,900 square feet of existing asphalt pavement. Re-install all pavement -Franklin Ct from Panther Ave. to cu-de-sac. Construction 06/2025 07/2025 5-10 33 21 Rehabilitation Rehabilitation Project, Phase V markings. -Colonial Ave. and Payne Ct.

-Muskrat Ave, Joshua St, Dennis St, Panther Ave. and Janine St. This project will include: Pavement Rehab/Repair (Existing) | Apply crack seal & type II Road Maintenance & Pavement Repair and between Jay St. and Kay St. Adelanto San Bernardino 19/20 Forecasted slurry over 237,000 square feet of existing asphalt pavement. Re-install all pavement Construction 06/2022 07/2022 5-10 33 21 Rehabilitation Rehabilitation Project, Phase II -Jay St. between Racoon Ave. and Muskrat Ave. markings. -Kay St. between Janine St. and Muskrat Ave.

*This list is subject to change and will be finalized upon the adoption of any jurisdiction that meets subsequent eligibility at the October 2021 Commission Meeting. Draft City Submitted - Fiscal Year 2021-22 Local Streets and Roads List of Projects *Projects listed are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1) August 19, 2021

Fiscal Year Initially Proposed Project Est Assembly Senate City County Project Type Title Description Location Components Est Start Est Useful Life Proposed Status Completion Districts Districts

The project location is defines as east of Road Maintenance & Pavement Maintanance This project will include: Placement of pavement preservation techniques on existing Avenue H, West of Barstow Road, South of Main Street, and Barstow San Bernardino 20/21 In Progress Pre-Construction 04/2021 10/2021 3-5 33 16 Rehabilitation Preservation Project FY20/21 roadways. North of I-15. and north of Interstate 15.

Road Maintenance & Pavement Preservation Project This project will include: Maintenance Program Plan Development | Placement of The project is define as east of Muriel Drive, South of East Main Barstow San Bernardino 19/20 Carried Over Pre-Construction 08/2019 09/2019 3-7 33 16 Rehabilitation 2019/2020 pavement preservation techniques on existing roadways. Street, and North of Interstate 15.

This project will include: Document Preparation | This project is in Design and is using Road Maintenance & West Section 7 Rehabilitation West Section 7 is defined as North of Rimrock Road, West of Barstow San Bernardino 19/20 Carried Over RMRA funding in support of Construction which includes: Reconstruct 23,401 center Pre-Construction 06/2021 12/2021 15-20 33 16 Rehabilitation Project Barstow Road, East of Agarita Avenue and South of Interstate 15 line feet of roadway.

Road Maintenance & Barstow San Bernardino 21/22 New Irwin Road Pavement Preservation This project will include: Pavement Rehab/Repair (Existing) | Pavement Preservation Irwin Road between First Avenue to Old Hwy 58 Construction 11/2021 04/2022 3-5 33 16 Rehabilitation

Barstow Road and Rimrock Road Barstow San Bernardino 21/22 New Traffic Control Devices This project will include: Document Preparation Intersection of Rimrock Road and Barstow Road (Route 247) Pre-Construction 11/2021 06/2022 15-25 33 16 Traffic Signal Project

Traffic Signal Modifications on Barstow San Bernardino 21/22 New Traffic Control Devices This project will include: Document Preparation All City traffic signals on Main Street and Barstow Road. Pre-Construction 11/2021 06/2022 15-25 33 16 Main Street and Barstow Road

This project will include: Pavement Rehab/Repair (Existing), Traffic Signals, Lights, and/or Signage Installation (New Safety) | FY 2021-22 Street Improvement Project which includes Maple Avenue consists of select removal and replacement of asphalt Maple Avenue between Main Street and Cedar Avenue; Road Maintenance & FY 2021-22 Street Improvement on Maple Avenue between Main Street and Cedar Avenue; Cottonwood Avenue which Cottonwood Avenue between Main Street and Willow Street; and Hesperia San Bernardino 21/22 New Construction 02/2022 06/2022 10-20 59 17 Rehabilitation Project includes slurry seal and/or micropaving of asphalt on Cottonwood Avenue between Jacaranda Avenue between Outer Bear Valley Road and Main Street and Willow Street; and Jacaranda Avenue which includes select removal Eucalyptus Avenue. and replacement and slurry seal and/or micropaving of asphalt on Jacaranda Avenue between Outer Bear Valley Road and Eucalyptus Avenue.

Road Maintenance & Five Mile Road Rehabilitation Needles San Bernardino 19/20 Carried Over This project will include: Slurry/chip seal. City's portion of Five Mile Road by County of San Bernardino. Construction 07/2021 06/2022 5-10 33 16 Rehabilitation Project

*This list is subject to change and will be finalized upon the adoption of any jurisdiction that meets subsequent eligibility at the October 2021 Commission Meeting. Draft City Submitted - Fiscal Year 2021-22 Local Streets and Roads List of Projects *Projects listed are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1) August 19, 2021

Fiscal Year Initially Proposed Project Est Assembly Senate City County Project Type Title Description Location Components Est Start Est Useful Life Proposed Status Completion Districts Districts

This project will include: Sidewalk and/or Crosswalk Rehab/Repair (Existing), Traffic Campus Avenue & Walnut Street; Campus Avenue & Francis Ontario San Bernardino 20/21 Carried Over Traffic Control Devices Traffic Improvement Program Signals, Lights, and/or Signage Installation (New Safety), ADA Curb Ramp Construction 07/2021 12/2021 25-35 52 20 St. Rehab/Repair (Existing)

Potential locations: Alleys south of Sunkist Street and North of This project will include: Sidewalk and/or Crosswalk Rehab/Repair (Existing), Road Maintenance & Mission Boulevard between Cypress Avenue and San Antonio Ontario San Bernardino 20/21 Carried Over Alley Rehabilitation Program Pavement Rehab/Repair (Existing) | Grind & overlay asphalt street, repair failed Construction 03/2022 06/2022 15-25 52 20 Rehabilitation Avenue and alley south of B Street between Bouldver Avenue asphalt areas, repair sidewalk, repair curb & gutter. and San Antonio Avenue.

This project will include: Pavement Improvement (New), Sidewalk and/or Crosswalk Installation (New), Sidewalk and/or Crosswalk Rehab/Repair (Existing), Traffic Signals, Lights, and/or Signage Installation (New Safety), Bicycle Lane (New), Traffic Signals, Complete Streets TCC Mission Boulevard Lights, and/or Signage Rehab/Repair (Existing Safety), Storm Drain and/or Culvert Ontario San Bernardino 19/20 Carried Over Mission Boulevard between Benson Avenue & Bon View Avenue Construction 07/2021 08/2022 25-35 52 20 Components Improvements( CON) Rehab/Repair (Existing), ADA Curb Ramp Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety), Storm Drain/Culvert Installation (New), Pavement Rehab/Repair (Existing), ADA Curb Ramp Installation (New), Paving and/or Striping Installation (New Safety) | Class IV bike facilities

Road Maintenance & FY 21- 22 Slurry Seal/ Cape Seal Ontario San Bernardino 21/22 New This project will include: Project Scope Development Various areas Pre-Construction 06/2020 12/2021 10-15 52 20 Rehabilitation Program

This project will include: Sidewalk and/or Crosswalk Installation (New), Paving and/or Striping Rehab/Repair (Existing Safety), Sidewalk and/or Crosswalk Rehab/Repair (Existing), Pavement Rehab/Repair (Existing), ADA Curb Ramp Installation (New), Traffic Signals, Lights, and/or Signage Installation (New Safety), Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), ADA Curb Ramp Bon View Avenue - Riverside Drive to State Route 60; Grove Rehab/Repair (Existing), Bicycle Lane Rehab/Repair (Existing) | Construction of Road Maintenance & FY 21- 22 Pavement Rehabilitation Avenue -Philadelphia Street to State Route 60; Guasti Road at Ontario San Bernardino 21/22 New Rubberized Asphalt Hot Mix pavement including removal and replacement offailing Construction 07/2021 06/2022 15-25 52 20 Rehabilitation Project Milliken Avenue; Haven Avenue- Jurupa Street to Airport Drive; pavement areas, replacement of damaged sidewalk, curb and gutter, placement of Milliken Avenue at Jurupa Street ADA ramps, updated signage and striping. This rubberized ashpalt mix is a high performing asphalt product that extends the pavement life while providing an environmentally friendly recycled tire usage.

This project will include: Document Preparation, Preliminary Design | Design and Complete Streets ATP Cycle 5 Bicycle Improvements construction of 2 miles of combined Class III and IV bike facilities and street Ontario San Bernardino 21/22 New B Street and Vine Avenue Pre-Construction 07/2021 06/2022 25-35 52 20 Components (PA&ED) improvements including curb extensions, high visibility crosswalks, traffic circles and street lights.

Lilac Ave from Tahoe St to Walnut Ave; Linden Ave from This project will include: Project Scope Development, Cost Estimating, Document Riverside Ave to 155' south of Candlewood Ave; Linden Ave Preparation, Preliminary Design | Pavement rehabilitation: Cold Milling and Asphalt from 374' south of Persimmon Ave to Casmalia St; Locust Ave Road Maintenance & Concrete Surface Course, Full Depth AC removal and re-construction, Full Depth from Riverside Ave to Casa Grande Dr; Locust Ave from Lowell Rialto San Bernardino 19/20 Carried Over Annual Street Overlay Project Pre-Construction 10/2020 09/2021 7-20 47 20 Rehabilitation Reclamation including in-place pulverization and mixing of the existing pavement to St to Casmalia St; Pepper Ave from Baseline Rd to Etiwanda create a stabilized base, Cold In-Place Recycling of existing pavement, followed by Ave; Pepper Ave from Foothill Blvd to 2nd St; Summit Ave from construction of an AC Surface Course. Maple Ave to Apple Ave; Willow Ave from Walnut Ave to Chaparral St

*This list is subject to change and will be finalized upon the adoption of any jurisdiction that meets subsequent eligibility at the October 2021 Commission Meeting. Draft City Submitted - Fiscal Year 2021-22 Local Streets and Roads List of Projects *Projects listed are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1) August 19, 2021

Fiscal Year Initially Proposed Project Est Assembly Senate City County Project Type Title Description Location Components Est Start Est Useful Life Proposed Status Completion Districts Districts

This project will include: Sidewalk and/or Crosswalk Installation (New), Paving and/or Striping Rehab/Repair (Existing Safety), Sidewalk and/or Crosswalk Rehab/Repair Lilac Ave from Tahoe St to Walnut Ave; Linden Ave from (Existing), ADA Curb Ramp Installation (New), Pavement Rehab/Repair (Existing), Riverside Ave to 155' south of Candlewood Ave; Linden Ave Traffic Signals, Lights, and/or Signage Installation (New Safety), Traffic Signals, from 374' south of Persimmon Ave to Casmalia St; Locust Ave Lights, and/or Signage Rehab/Repair (Existing Safety), Paving and/or Striping Road Maintenance & from Riverside Ave to Casa Grande Dr; Locust Ave from Lowell Rialto San Bernardino 19/20 Forecasted Annual Street Overlay Project Installation (New Safety), Bicycle Lane Rehab/Repair (Existing), ADA Curb Ramp Construction 10/2021 06/2022 7-20 47 20 Rehabilitation St to Casmalia St; Pepper Ave from Baseline Rd to Etiwanda Rehab/Repair (Existing) | Pavement rehabilitation: Cold Milling and Asphalt Concrete Ave; Pepper Ave from Foothill Blvd to 2nd St; Summit Ave from Surface Course, Full Depth AC removal and re-construction, Full Depth Reclamation Maple Ave to Apple Ave; Willow Ave from Walnut Ave to including in-place pulverization and mixing of the existing pavement to create a Chaparral St stabilized base, Cold In-Place Recycling of existing pavement, followed by construction of an AC Surface Course.

Pepper Ave. from Etiwanda Ave. to Foothill Blvd.; Pepper Ave. Road Maintenance & Rialto San Bernardino 19/20 In Progress Annual Street Overlay Project This project will include: Cost Estimating, Document Preparation, Preliminary Design from 2nd St. to 680 ft. south of 2nd St.; Riverside Ave. from Pre-Construction 10/2020 09/2021 7-20 47 20 Rehabilitation UPRR Bridge to South City Limit

This project will include: Pavement Improvement (New), Sidewalk and/or Crosswalk Installation (New), Paving and/or Striping Rehab/Repair (Existing Safety), Sidewalk and/or Crosswalk Rehab/Repair (Existing), Pavement Rehab/Repair (Existing), ADA Pepper Ave. from Etiwanda Ave. to Foothill Blvd.; Pepper Ave. Road Maintenance & Rialto San Bernardino 19/20 Forecasted Annual Street Overlay Project Curb Ramp Installation (New), Traffic Signals, Lights, and/or Signage Installation (New from 2nd St. to 680 ft. south of 2nd St.; Riverside Ave. from Construction 10/2021 06/2022 7-20 47 20 Rehabilitation Safety), Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Paving UPRR Bridge to South City Limit and/or Striping Installation (New Safety), ADA Curb Ramp Rehab/Repair (Existing), Bicycle Lane Rehab/Repair (Existing)

This project will include: Sidewalk and/or Crosswalk Installation (New), Sidewalk and/or Bohnert Ave. from Linden Ave. to Cactus Ave.; Casmalia St. Crosswalk Rehab/Repair (Existing), Traffic Signals, Lights, and/or Signage Installation from Laurel Ave. to Locust Ave.; Riverside Ave. from Bridge (210 (New Safety), Bicycle Lane (New), Cost Estimating, Storm Drain and/or Culvert FWY) to Foothill Blvd.; Maple Ave. from Baseline Rd. to Rehab/Repair (Existing), Traffic Signals, Lights, and/or Signage Rehab/Repair Road Maintenance & Annual Pavement Rehabilitation Etiwanda Ave.; Cedar Ave. from Baseline Rd. to Foothill Blvd.; Pre-Construction and 10/2020 09/2021 Rialto San Bernardino 20/21 In Progress (Existing Safety), ADA Curb Ramp Rehab/Repair (Existing), Bicycle Lane 7-20 47 20 Rehabilitation Project Sycamore Ave. from Madrona St. to Foothill Blvd.; Etiwanda Ave. Construction 10/2021 06/2022 Rehab/Repair (Existing), Project Scope Development, Paving and/or Striping from Maple Ave. to Cedar Ave.; Etiwanda Ave. from Cactus Ave. Rehab/Repair (Existing Safety), ADA Curb Ramp Installation (New), Pavement to Willow Ave.; Etiwanda Ave. from Sycamore Ave. to Acacia Rehab/Repair (Existing), Document Preparation, Preliminary Design, Paving and/or Ave. Striping Installation (New Safety), Environmental Study/Documents

This project will include: Pavement Improvement (New), Sidewalk and/or Crosswalk Installation (New), Sidewalk and/or Crosswalk Rehab/Repair (Existing), Traffic Signals, The project will include select local street segments in Street Lights, and/or Signage Installation (New Safety), Bicycle Lane (New), Cost Estimating, Maintenance Zones 1, 2, and 3. Street Maintenance Zones 1, 2, Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Storm Drain and 3 are located north of Foothill Boulevard. The project street Road Maintenance & 2020/2021 Street Overlay & and/or Culvert Rehab/Repair (Existing), Bicycle Lane Rehab/Repair (Existing), ADA Pre-Construction and 10/2020 09/2021 Rialto San Bernardino 21/22 In Progress list contains more than 130 individual street segments. The size 10-20 47 20 Rehabilitation Reconstruction Project Curb Ramp Rehab/Repair (Existing), Project Scope Development, Paving and/or Construction 10/2021 06/2022 of the street segment list exceeds the character limits of this text Striping Rehab/Repair (Existing Safety), Storm Drain/Culvert Installation (New), box; however, the complete street segment list is included in City Pavement Rehab/Repair (Existing), ADA Curb Ramp Installation (New), Document of Rialto Resolution No. 7731. Preparation, Preliminary Design, Paving and/or Striping Installation (New Safety), Environmental Study/Documents

Road Maintenance & This project will include: Active Transportation Plan, Preliminary Design | 0.17 miles of Upland San Bernardino 19/20 Carried Over Mulberry Avenue Reconst. Foothill Blvd. to Pine Street. Pre-Construction 07/2021 06/2022 20-30 41 25 Rehabilitation water main replacement and asphalt concrete pavement reconstruction.

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Sidewalk and/or Crosswalk Rehab/Repair (Existing), Pavement Rehab/Repair Road Maintenance & Pre-Construction and 07/2021 06/2022 Upland San Bernardino 19/20 Carried Over 14th Street Rehabilitation (Existing), Cost Estimating, Document Preparation, Preliminary Design, ADA Curb Campus Ave. to Grove Ave. 10-20 41 25 Rehabilitation Construction 07/2022 10/2022 Ramp Rehab/Repair (Existing) | 0.69 miles of asphalt concrete pavement resurfacing and minor water facility upgrades.

*This list is subject to change and will be finalized upon the adoption of any jurisdiction that meets subsequent eligibility at the October 2021 Commission Meeting. Draft City Submitted - Fiscal Year 2021-22 Local Streets and Roads List of Projects *Projects listed are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1) August 19, 2021

Fiscal Year Initially Proposed Project Est Assembly Senate City County Project Type Title Description Location Components Est Start Est Useful Life Proposed Status Completion Districts Districts

This project will include: Sidewalk and/or Crosswalk Installation (New), Pavement Improvement (New), Pavement Rehab/Repair (Existing), ADA Curb Ramp Installation Road Maintenance & Arrowhead Drive / 7th Avenue Arrowhead/7th Avenue from Green Tree Boulevard to Bear Victorville San Bernardino 20/21 Carried Over (New), Bicycle Lane (New), ADA Curb Ramp Rehab/Repair (Existing) | Pavement Construction 09/2021 06/2022 15-30 33 21 Rehabilitation Improvement Project Valley Road, a distance of approximately 2.1 miles. reconstruction, asphalt overlays, widening at certain locations, restriping, and reconstructing access ramps to meet ADA current standards.

This project will include: Pavement reconstruction will involve removing and reusing existing road base and asphalt concrete and constructing a new pavement section Road Maintenance & Industrial Blvd. (Bear Valley Rd. To with road base and asphalt concrete pavement. Access ramps will be reconstructed to Victorville San Bernardino 19/20 In Progress Industrial Blvd. (Bear Valley Rd. To Silica Dr.) 0.50 miles; Construction 06/2021 10/2021 20-30 33 21 Rehabilitation Silica Dr.) 0.50 miles meet Americans with Disabilities Act (ADA) current standards. | The estimated project start is the construction contract award date. Construction activities would start 3 to 5 weeks thereafter.

This project will include: Pavement reconstruction will involve removing and reusing existing road base and asphalt concrete and constructing a new pavement section Road Maintenance & Silica Rd. (Industrial Blvd. to with road base and asphalt concrete pavement. Access ramps will be reconstructed Victorville San Bernardino 19/20 In Progress On Silica Road from Industrial Blvd. To Hesperia Road. Construction 06/2021 10/2021 20-30 33 21 Rehabilitation Hesperia Rd.) , 0.45 miles to meet Americans with Disabilities Act (ADA) current standards. | The estimated project start is the construction contract award date. Construction activities would start 3 to 5 weeks thereafter.

Citywide. Please check the city website map for updated street Road Maintenance & This project will include: Pavement Improvement (New), Paving and/or Striping locations at the Public Works and Development Project Updates Yucaipa San Bernardino 20/21 Carried Over Pavement Management Program Construction 06/2021 06/2022 1-24 42 23 Rehabilitation Rehab/Repair (Existing Safety), Paving and/or Striping Installation (New Safety) link. http://yucaipa.org/government/departmentsservices/engineering/

Multiple areas throughout the Town of Apple Valley to include: street segments to include segments of: Mesquite Rd, Joshua Road Maintenance & Resurfacing 2021-22 Roadway Rd, Powhatan Rd, Ottawa Rd, Nisqually Rd, Hurons Ave, Skyline Apple Valley San Bernardino 21/22 New This project will include: Pavement Rehab/Repair (Existing) Construction 07/2021 08/2021 7-10 33 21 Rehabilitation Repair Ranch Dr, Havasu Rd, Ivanpah Rd, Coachella Rd, Cronese Ln, and others adjacent to Rio Vista Academy, Rancho Verde Elementary, and Skyline Ranch as listed on Resolution 2021-15

Various locations throughout the Town of Apple Valley to include Road Maintenance & Resurfacing 2021-22 Cold Mix This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), segments of: Mesquite Rd, Eyota Rd, Powhatan Rd, Pioneer Rd, Apple Valley San Bernardino 21/22 New Construction 11/2021 12/2021 10-12 33 21 Rehabilitation Overlay Pavement Rehab/Repair (Existing) Shasta Rd, Wintun Rd, Roanoke Rd, Tacony Rd, and Nacomis Rd.

Shared roadway segments bordering the Town of Apple Valley San Bernardino County Central and County of San Bernardino to include portions of: Dale Evans Road Maintenance & This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Apple Valley San Bernardino 21/22 New Road and Other Roads Chip Seal Parkway, Johnson Rd, Central Rd, Joshua Rd, South Rd, Construction 07/2021 06/2022 10-12 33 21 Rehabilitation Pavement Rehab/Repair (Existing) and Overlay Project. Waalew Rd, Yucca Rd, Central Rd, Kiowa Rd, and Ocotillo Way as listed on Resolution 2021-15

Road Maintenance & Barstow San Bernardino 20/21 In Progress Fisher Blvd Rehabilitation Project This project will include: Pavement Rehab/Repair (Existing) Fisher Blvd Construction 04/2021 10/2021 3-5 33 16 Rehabilitation

*This list is subject to change and will be finalized upon the adoption of any jurisdiction that meets subsequent eligibility at the October 2021 Commission Meeting. Draft City Submitted - Fiscal Year 2021-22 Local Streets and Roads List of Projects *Projects listed are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1) August 19, 2021

Fiscal Year Initially Proposed Project Est Assembly Senate City County Project Type Title Description Location Components Est Start Est Useful Life Proposed Status Completion Districts Districts

Cottage Ln (Big Bear-Croft) Forest Rd (Big Bear-Arroyo) Georgia St (Big Br-Oak) Gibralter Ln (GibralterRd-Gibralter Landing) Lowe Dr (Big Br-Talbot) Metcalf Ln (Big Br-End) Bayview Rd (Metcalf-Lintner) Lintner Rd (Daisy-Big Br) This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Road Maintenance & FY 21/22 Street Rehabilitation Delamar Dr (Daisy-End) Big Bear Lake San Bernardino 19/20 Carried Over Pavement Rehab/Repair (Existing) | Mill and overlay and full depth reconstruction of Construction 07/2021 07/2022 20-30 33 23 Rehabilitation Project Daisy Ln (Daisy-Poppy) local streets. Poppy Way (Daisy-Lintner) Blue Jay (Big Br-Willow Ldg Rd) North Bay Dr (Chipmnk-Timber and Catbird-Woodlnd) Oak St (Jeffries-End) Rueda Ln (Big Br-Rayo) Rayo Ln (Big Br-Rueda) Sheephorn Rd (Luna-Menlo) Fox Dr (Constln-Avalon)

Road Maintenance & This project will include: Pavement Improvement (New), Pavement Rehab/Repair Carbon Canyon Road from 400 feet south to 1,700 feet south of Chino Hills San Bernardino 21/22 New Carbon Canyon Road Widening Construction 07/2021 06/2022 10-20 55 29 Rehabilitation (Existing) | Widening by adding one traffic lane in the southbound direction. Chino Hills Parkway

Road Maintenance & Olympic View Drive/Skyview Ridge Olympic View Dr from Peyton Dr to Skyview Ridge and Skyview Chino Hills San Bernardino 21/22 New This project will include: Pavement Rehab/Repair (Existing) Construction 07/2021 06/2022 10-15 55 29 Rehabilitation Pavement Rehabilitation Ridge from Olympic View Dr to Peyton Dr

Road Maintenance & Rock Springs Drive Pavement Chino Hills San Bernardino 21/22 New This project will include: Pavement Rehab/Repair (Existing) Rock Springs Drive from Peyton Drive to Chino Avenue Construction 07/2021 06/2022 10-15 55 29 Rehabilitation Rehabilitation

Road Maintenance & Woodview Road Pavement Woodview Road from Peyton Drive to 3200 feet east of Peyton Chino Hills San Bernardino 21/22 New This project will include: Pavement Rehab/Repair (Existing) Construction 07/2021 06/2022 10-15 55 29 Rehabilitation Rehabilitation – Phase 2 Drive

*This list is subject to change and will be finalized upon the adoption of any jurisdiction that meets subsequent eligibility at the October 2021 Commission Meeting. Draft City Submitted - Fiscal Year 2021-22 Local Streets and Roads List of Projects *Projects listed are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1) August 19, 2021

Fiscal Year Initially Proposed Project Est Assembly Senate City County Project Type Title Description Location Components Est Start Est Useful Life Proposed Status Completion Districts Districts

Valley Blvd - Wildrose to Rexford Riverside Ave - Key to Center Key St - Riverside Av to East end Bond St - Key to north end Trade St - Key to north end 3rd St - Valley to E St 3rd St - L to north end Cahuilla St - Mohave to East End Road Maintenance & FY 21-22 (SB-1) Pavement This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Colton San Bernardino 21/22 New Tara Ridge Ct - Canyon Vista to End Construction 01/2022 06/2022 10-15 47 20 Rehabilitation Rehabilitation Project Pavement Rehab/Repair (Existing) Fairview Av - Colton Ave.to Olive Teresa St - Laurel to Alida Laurel Av - Teresa to Latham 7th St - La Cadena to O C St - City Limit to Cemetery ent Fairway Dr- Auto Center to East end N St - La Cadena to 9th O St - 10th to 11th

Walnut Street - Cherry Avenue to Citrus Avenue; Marlay Avenue - Road Maintenance & Pavement Rehab RMRA SB-1 Etiwanda Avenue to Mulberry Avenue; Cherry Avenue - Foothill Fontana San Bernardino 21/22 New This project will include: Pavement Rehab/Repair (Existing) Construction 07/2021 06/2022 10-15 47 20 Rehabilitation 2021/22 Boulevard to Baseline Avenue; Alder Avenue - Arrow Boulevard to Baseline Avenue

Vivienda Ct to Vivienda Ave, De Soto St to Mount Vernon Ave, Road Maintenance & Year 2021/2022 Pavement This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Pico St to Reed Ave, Van Buren St to Michigan Ave, Van Buren Grand Terrace San Bernardino 21/22 New Construction 02/2022 06/2022 10-15 47 20 Rehabilitation Rehabilitation Pavement Rehab/Repair (Existing) St to Mount Vernon, Vivienda Ave to Barton Rd, Fulmar Pl to CDS, La Cadena Dr to Barton Rd

Sector E Pavement Rehabilitation Road Maintenance & (Previously Titled: Pavement This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Various street segments in Sector E of the City's Pavement Highland San Bernardino 20/21 Carried Over Construction 10/2021 06/2022 10-20 40 23 Rehabilitation Rehabilitation at 11 Street Pavement Rehab/Repair (Existing) Management Program. Segments)

Tippecanoe Avenue (Joint Project Road Maintenance & This project will include: Pavement Rehab/Repair (Existing) | Pavement rehabilitation Highland San Bernardino 21/22 New with SB County) Pavement Tippecanoe Avenue from 3rd Street to Vine Street Construction 01/2022 06/2022 10-20 40 23 Rehabilitation and striping. Rehabilitation

Road Maintenance & City-wide Minor/Pothole Street This project will include: Maintenance Program Plan Development | Repair and Highland San Bernardino 21/22 New City-wide with emphasis on major arterial and collector streets Pre-Construction 07/2021 06/2022 2-5 40 23 Rehabilitation Maintenance servicing of City-wide major arterial and collector streets.

This project will include: Maintenance Program Plan Development | Repair and City-wide Pavement Striping and City-wide on arterial and collector streets, and on street abutting Highland San Bernardino 21/22 New Safety servicing of City-wide streets, on arterial and collector streets, and on streets abutting Pre-Construction 07/2021 06/2022 3-7 40 23 Marking school campuses. school campuses.

*This list is subject to change and will be finalized upon the adoption of any jurisdiction that meets subsequent eligibility at the October 2021 Commission Meeting. Draft City Submitted - Fiscal Year 2021-22 Local Streets and Roads List of Projects *Projects listed are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1) August 19, 2021

Fiscal Year Initially Proposed Project Est Assembly Senate City County Project Type Title Description Location Components Est Start Est Useful Life Proposed Status Completion Districts Districts

City-wide Traffic Signal & Lighted This project will include: Maintenance Program Plan Development | Repair and City-wide, various locations as needed based on maintenance Highland San Bernardino 21/22 New Safety Pre-Construction 07/2021 06/2022 10-30 40 23 Crosswalk Maintenance servicing of City-wide traffic signal and lighted crosswalk maintenance. schedule.

City-wide at locations where there is heavy pedestrian traffic, City-wide Sidewalk Repair This project will include: Maintenance Program Plan Development | Repair and such as school campuses, shopping centers, churches, etc. Highland San Bernardino 21/22 New Safety Pre-Construction 07/2021 06/2022 10-20 40 23 Services servicing of City-wide sidewalks. These locations are mostly on the east side of the City, east of SR-210 freeway.

Purchase of Spare Traffic Signal Purchase of spare traffic signal controllers and video cameras. Procurement/Operatio Highland San Bernardino 21/22 New Safety Controllers and Video Detection This project will include: Procurement of Public Works Safety Materials and Gear To be store at City's Corporate Yard located at 7935 Central 07/2021 06/2022 10-15 40 23 nal Needs Systems Ave., Highland, Ca 92346.

Curtis Street from Lomas Verdes St. to Mead St. Lomas Verdes Street from Curtis St. to End; Elm Street; Road Maintenance & This project will include: Cost Estimating, Document Preparation, Environmental Cottonwood Road;; Mead Street; Mead Court; Mead Lane; Mead Loma Linda San Bernardino 21/22 New Pavement rehabilitation 2021 Pre-Construction 07/2021 10/2021 7-15 40 23 Rehabilitation Study/Documents Way; San Juan Street from University Ave. to Stewart St.; Evans Street ; Rincon Street; Canada Street Stewart Street from Campus St. to west end

Road Maintenance & Needles Hwy (Pashard Street to Needles San Bernardino 21/22 Carried Over This project will include: Maintenance Program Plan Development Needles CA Pre-Construction 07/2021 06/2022 5-10 33 8 Rehabilitation Broadway Ave)

Road Maintenance & River Road ( K Street to Jack Needles San Bernardino 21/22 Carried Over This project will include: Maintenance Program Plan Development River Road (K Street to Smith Park) Pre-Construction 06/2021 06/2022 5-10 33 16 Rehabilitation Smith Park)

Needles San Bernardino 20/21 Carried Over Safety Various Sidewalk Safety Repairs This project will include: Maintenance Program Plan Development Citywide Pre-Construction 06/2021 06/2022 20-20 33 8

Road Maintenance & Needles San Bernardino 20/21 Carried Over Shore Street Paving Rehabilitation This project will include: Pavement Rehab/Repair (Existing) Shore Street Construction 07/2021 06/2022 20-20 33 8 Rehabilitation

This project will include: Sidewalk and/or Crosswalk Installation (New), Paving and/or Striping Rehab/Repair (Existing Safety), Sidewalk and/or Crosswalk Rehab/Repair Complete Streets ATP Cycle 4 Pedestrian (Existing), ADA Curb Ramp Installation (New), Pavement Rehab/Repair (Existing), Euclid Avenue to Benson Avenue; State Route 60 to Mission Ontario San Bernardino 20/21 Carried Over Construction 07/2021 12/2022 25-35 52 20 Components Improvements (Construction) Traffic Signals, Lights, and/or Signage Installation (New Safety), Landscape Safety Boulevard Installation (New), Right of Way Acquisition, Paving and/or Striping Installation (New Safety), ADA Curb Ramp Rehab/Repair (Existing)

*This list is subject to change and will be finalized upon the adoption of any jurisdiction that meets subsequent eligibility at the October 2021 Commission Meeting. Draft City Submitted - Fiscal Year 2021-22 Local Streets and Roads List of Projects *Projects listed are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1) August 19, 2021

Fiscal Year Initially Proposed Project Est Assembly Senate City County Project Type Title Description Location Components Est Start Est Useful Life Proposed Status Completion Districts Districts

Foothill Boulevard Pavement This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Rancho Road Maintenance & San Bernardino 21/22 New Rehabilitation-1-15 FWY to East Sidewalk and/or Crosswalk Rehab/Repair (Existing), Pavement Rehab/Repair Foothill Boulevard from I-15 to East Avenue (Fontana City Limit) Construction 09/2021 10/2021 20-30 40, 41 23 Cucamonga Rehabilitation Avenue (Fontana City Limit) (Existing), Bicycle Lane (New), ADA Curb Ramp Rehab/Repair (Existing)

Rochester Avenue Pavement This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Rancho Road Maintenance & San Bernardino 21/22 New Rehabilitation-Base Line Road to Sidewalk and/or Crosswalk Rehab/Repair (Existing), Pavement Rehab/Repair Rochester Avenue from Base Line Road to Highland Avenue Construction 09/2021 10/2021 20-30 40, 41 23 Cucamonga Rehabilitation Highland Avenue (Existing), Bicycle Lane (New), ADA Curb Ramp Rehab/Repair (Existing)

SEGMENTS OF: 16TH 17TH 18TH ACACIA AFTON ALABAMA ARIZONA ASHFORTH This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), ASHLEY Pavement Rehab/Repair (Existing), Storm Drain and/or Culvert Rehab/Repair AVENUE Road Maintenance & PMP 2021 Street Resurfacing (Existing), ADA Curb Ramp Rehab/Repair (Existing) | The City of Redlands PMP 2021 AVIATION Redlands San Bernardino 21/22 New Construction 09/2021 03/2022 20-20 40 23 Rehabilitation Project Street Resurfacing Project is a citywide rehabilitation of various City streets within the BALBOA City. The City will be using RMRA funding to supplement additional funding to BLACK HAWK rehabilitate City streets for this project which falls in Fiscal Year 2021-22. BLUE WING BOW B BRADBURY BRIGHTON BROOKSIDE CALHOUN CALLE DE ACACIA CALLE DE BARRANCA CALLE DE LAS PALMAS CALLE OCOTILLO

1- King Street: K Street to Mt. Vernon Avenue 2- Highland Avenue: 210/215 to Lincoln 3- K Street: Mill to Hillcrest 4- Pumalo Street: Arden Avenue to Sterling Avenue Road Maintenance & Citywide Pavement Rehabilitation This project will include: Project Scope Development, Document Preparation, Cost San Bernardino San Bernardino 21/22 New 5- Churchill Street: Belmont Avenue to Olive Avenue Pre-Construction 10/2021 04/2022 20-30 47 20 Rehabilitation Project (9 Segments) Estimating, Preliminary Design, Environmental Study/Documents 6- Baseline Street: Medical Center to Mt. Vernon 7- 28th Street: Golden Avenue to Flood Control 8- Parkdale Avenue: Mt. View to Sierra Way 9- Mill Street: Allen Street to G Street"

Cholla Ave from SR62 south 360'; Smoketree Ave from SR62 Road Maintenance & This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Twentynine Palms San Bernardino 21/22 New 2021-2022 Street Reconstruction south 500'; Yucca Ave from SR62 south 460'; and Tamarisk Ave Construction 07/2021 06/2022 10-12 42 16 Rehabilitation Pavement Rehab/Repair (Existing) from SR62 south 250'

This project will include: Sidewalk and/or Crosswalk Installation (New), Sidewalk and/or Crosswalk Rehab/Repair (Existing), ADA Curb Ramp Installation (New), Paving and/or Onaga Trail Pedestrian Striping Installation (New Safety), ADA Curb Ramp Rehab/Repair (Existing) | Yucca Valley San Bernardino 21/22 New Safety Onaga Trail: Acoma Trail to Sage Ave Construction 05/2022 07/2022 20-25 42 16 Improvements Project construction of curb & gutter (new) construction of driveways (new) grading & widening of street (new)

This project will include: Sidewalk and/or Crosswalk Installation (New), ADA Curb Ramp Installation (New), Paving and/or Striping Installation (New Safety), ADA Curb Little League Drive Pedestrian Yucca Valley San Bernardino 21/22 New Safety Ramp Rehab/Repair (Existing) | construction of cul-de-sac (new) Little League Drive: Palm Ave to Sage Ave Construction 05/2022 07/2022 20-25 42 16 Improvements Project construction of driveways (new) construction of curb & gutter (new)

*This list is subject to change and will be finalized upon the adoption of any jurisdiction that meets subsequent eligibility at the October 2021 Commission Meeting. Draft City Submitted - Fiscal Year 2021-22 Local Streets and Roads List of Projects *Projects listed are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1) August 19, 2021

Fiscal Year Initially Proposed Project Est Assembly Senate City County Project Type Title Description Location Components Est Start Est Useful Life Proposed Status Completion Districts Districts

Various roadways throughout the City including from Olivenhain Road Maintenance & Concrete Repair/Replacement This project will include: Conrete repairs to sidewalks, curb and gutter, pedestrian and La Costa Ave northward to I-78 FWY, and from Carlsbad Carlsbad San Diego 19/20 In Progress Pre-Construction 07/2021 06/2022 25-50 76 36 Rehabilitation Program ramps, driveway approaches and cross gutters. Boulevard eastward to the city limits including Rancho Santa Fe and Melrose Drive.

This project will include: The Pavement Management Program is an ongoing annual program designed to extend the service life of city streets and to maintain a smooth Road Maintenance & The Pavement Management Program resurfaced various Carlsbad San Diego 19/20 In Progress Pavement Management Program and safe driving surface for vehicles. The City utilizes a pavement management Pre-Construction 07/2021 06/2022 5-20 76 36 Rehabilitation roadways throughout the City. database program to determine pavement management needs for the purpose of establishing which streets are to be slurry sealed, overlaid, or reconstructed.

The following locations identified are subject to be changed. South Coast Highway 101 from D Street to G Street; Golden Road from Melba Road to Regal Road; West E Street from Road Maintenance & FY 2021-22 Annual Overlay and This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Second Street to South Coast Highway 101; Summer Holly Lane Encinitas San Diego 21/22 New Construction 09/2021 03/2022 5-20 76 36 Rehabilitation Slurry Pavement Rehab/Repair (Existing), Bicycle Lane Rehab/Repair (Existing) from West Cul-De-Sac to Olive Crest Drive; Avenida De Las Lilas from Camino De Las Flores to Willowspring Drive; El Camino Real from Encinitas Blvd to Garden View Road. A complete list of roads is attached to the Resolution.

This project will include: Sidewalk and/or Crosswalk Installation (New), Paving and/or The project primarily focuses on Residential streets and portions Striping Rehab/Repair (Existing Safety), Sidewalk and/or Crosswalk Rehab/Repair of Collector and higher classified streets within the East-North Road Maintenance & 2021/22 Street Rehabilitation and (Existing), Pavement Rehab/Repair (Existing), Traffic Signals, Lights, and/or Signage Escondido San Diego 21/22 New Maintenance Zone bounded by Ash Street on the west, Lincoln Construction 03/2022 09/2022 7-15 75 38 Rehabilitation Maintenance Project Installation (New Safety), Bicycle Lane (New), Traffic Signals, Lights, and/or Signage Avenue on the north, Valley Parkway to the south, and the City Rehab/Repair (Existing Safety), Paving and/or Striping Installation (New Safety), ADA limits to the east. Curb Ramp Rehab/Repair (Existing), Bicycle Lane Rehab/Repair (Existing)

This project will include: Bridge Structure Rehab/Repair (Existing) | Provide Road Maintenance & CIP2013-01 Bridge Restorations maintenance and repairs to City owned bridges. Including bridge joint seals, deck Santee San Diego 19/20 In Progress Magnolia Avenue Bridge over the San Diego River Construction 09/2021 03/2022 20-50 71 38 Rehabilitation Citywide sealing, and minor patching | Project is carried over to begin in FY 2020-21 as funds accrue.

Zones 1/2, Via Felicidad, Calle Buenvidos, Via Soledad, Calle Colorado, Alvarado, Calle Dulce, Calle Independencia, Rudd, Portola, Felicita, Troy, Primrose, This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Alestar, Upland, Old Foothill, Monte Mar, Avalon, Oak, York, Road Maintenance & Sidewalk and/or Crosswalk Rehab/Repair (Existing), ADA Curb Ramp Installation Vista San Diego 21/22 New Street Rehabilitation Project 2021 Vine, Morningside, El Dorado, Encino, Encino Ct, Franklin, Construction 08/2021 12/2021 15-25 76 36 Rehabilitation (New), Pavement Rehab/Repair (Existing), ADA Curb Ramp Rehab/Repair (Existing), Massachusetts, E. Connecticut, N. Citrus, Valerie, Coyote, Bicycle Lane Rehab/Repair (Existing) Hillside, The Circle, Calle Jules, Bartlett, Ardy's, San Luis Rey, Alta Mesa, Hawley, Barsby, S. Santa Fe, E. Vista Way, Bobier, N. Santa Fe, Foothill, Old Taylor

This project will include: Pavement Rehab/Repair (Existing), Cost Estimating, Road Maintenance & RMRA Pavement Rehabilitation - Document Preparation, Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Pre-Construction and 10/2021 04/2022 Chula Vista San Diego 21/22 New Orange Avenue (Palomar St - Hilltop Dr) and Boswell Road/Court 20-25 79, 80 40 Rehabilitation FY2021/22 Safety), Preliminary Design, Bicycle Lane Rehab/Repair (Existing), ADA Curb Ramp Construction 05/2022 08/2022 Rehab/Repair (Existing)

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Road Maintenance & RMRA Pavement Maintenance - Rancho Del Rey, Eastlake, Avenida, CALLE CANDELERO, Pre-Construction and 10/2021 06/2022 Chula Vista San Diego 21/22 New Sidewalk and/or Crosswalk Rehab/Repair (Existing), Pavement Rehab/Repair 7-10 79, 80 40 Rehabilitation FY2021/22 CORTE DE CERA, VALENCIA CT Construction 07/2022 10/2022 (Existing), Cost Estimating, Document Preparation, Preliminary Design

*This list is subject to change and will be finalized upon the adoption of any jurisdiction that meets subsequent eligibility at the October 2021 Commission Meeting. Draft City Submitted - Fiscal Year 2021-22 Local Streets and Roads List of Projects *Projects listed are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1) August 19, 2021

Fiscal Year Initially Proposed Project Est Assembly Senate City County Project Type Title Description Location Components Est Start Est Useful Life Proposed Status Completion Districts Districts

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Sidewalk and/or Crosswalk Rehab/Repair (Existing), Pavement Rehab/Repair (Existing) | Project will widen existing sidewalk on south side of Ocean Blvd to minimum 8 feet from R. H. Dana Pl to Ocean Dr to improve pedestrian circulation/ Complete Streets Ocean Boulevard Sidewalk Pre-Construction and 04/2021 12/2021 Coronado San Diego 20/21 In Progress safety. Street furniture will be relocated to further maximize pedestrian walkway. Curb Ocean Boulevard from R.H. Dana Place to Ocean Drive 20-30 78 39 Components Enhancement Construction 01/2022 03/2022 bulb-outs will be constructed where feasible. Asphalt overlay along Ocean Blvd will be constructed with deeper repair to base as needed. Striping modifications may be included in accordance with City’s ATP and to maintain minimum driving lane width of 11 feet.

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Road Maintenance & FY 2021-22 Citywide Roadway Sidewalk and/or Crosswalk Rehab/Repair (Existing), Pavement Rehab/Repair Varies: Camino del Mar, Carmel Valley Road, Jimmy Durante Del Mar San Diego 21/22 New Construction 08/2021 02/2022 25-75 78 39 Rehabilitation Improvement Project (Existing), Landscape Safety Rehab/Repair (Existing), Storm Drain and/or Culvert Boulevard Rehab/Repair (Existing), ADA Curb Ramp Rehab/Repair (Existing)

Anza St., Benedict Ave., Benjamin Pl., Decker St., Dehesa Rd., Dominguez Way, E Main St., El Rancho Dr., Emerald Ave., This project will include: Sidewalk and/or Crosswalk Installation (New), Paving and/or Road Maintenance & Granite Hills Dr., Grape St., Janich Ranch Ct., Lura Ave., El Cajon San Diego 19/20 Carried Over Overlay 2020 Striping Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing), Bicycle Construction 07/2021 08/2021 13-20 71 38 Rehabilitation Madison Ave., Mona Pl., Nidrah St., O'Connor St., Raleigh Ave., Lane (New), Paving and/or Striping Installation (New Safety) Rancho Valle Ct., Sandy St., Skyview St., Tilling Way, Washington Ave.

Australia St., Batchelder Ct., Blanchard Rd., Cliffdale Rd., This project will include: Sidewalk and/or Crosswalk Installation (New), Paving and/or Cuyamaca St., Dryden Rd., E Main St., Eastside Rd., Ferdinand Road Maintenance & El Cajon San Diego 20/21 Carried Over Overlay 2021 Striping Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing), Bicycle Rd., Gillespie Way, Hacienda Dr., Loma Portal Dr., Oakdale Construction 03/2022 04/2022 13-20 71 38 Rehabilitation Lane (New), Paving and/or Striping Installation (New Safety) Ave., Oakdale Ln., Pfeifer Ln., Southern Rd., Sterling Dr., W Main St., Washington Ave., Witherspoon Way

This project will include: Sidewalk and/or Crosswalk Installation (New), Pavement Road Maintenance & El Cajon San Diego 20/21 Carried Over Slurry 2021 Rehab/Repair (Existing), Bicycle Lane (New), Paving and/or Striping Installation (New Maintenance Zone 5 and Cloverleaf Dr. Construction 08/2021 09/2021 5-8 71 38 Rehabilitation Safety)

This project will include: Sidewalk and/or Crosswalk Installation (New), Pavement Road Maintenance & El Cajon San Diego 21/22 New Slurry 2022 Rehab/Repair (Existing), Bicycle Lane (New), Paving and/or Striping Installation (New Maintenance Zone 1 and S Anza St. Construction 04/2022 05/2022 5-8 71 38 Rehabilitation Safety)

This project will include: Pavement Improvement (New), Sidewalk and/or Crosswalk 3rd Street, 5th Street, 7th Street, 8th Street, 11th Street, 12th Installation (New), Paving and/or Striping Rehab/Repair (Existing Safety), Sidewalk Street, 15th Street, Calla Avenue, Carnation Avenue, Carolina Road Maintenance & FY 22 Annual Roadway and/or Crosswalk Rehab/Repair (Existing), ADA Curb Ramp Installation (New), Street, Cherry Avenue, Connecticut Street, Dahlia Avenue, Imperial Beach San Diego 21/22 New Construction 07/2021 06/2022 10-20 78 40 Rehabilitation Improvements Pavement Rehab/Repair (Existing), Paving and/or Striping Installation (New Safety), Delaware Street, Elder Avenue, Elkwood Avenue, Fern Avenue, Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), ADA Curb Florida Street, Hemlock Avenue, Holly Avenue, Imperial Beach Ramp Rehab/Repair (Existing) Boulevard, Palm Avenue

This project will include: Pavement Rehab/Repair (Existing) | FY 20-21 Citywide 70th Street (North Bound) from Alvarado Road to I-8. Amarillo Road Maintenance & FY 20-21 Citywide Pavement La Mesa San Diego 20/21 Carried Over Pavement Rehabilitation (Re-Listed) Citywide Pavement Rehabilitation of Arterials, Ave from Abilene Terrace to Clay Street. Waite Dr from Construction 07/2021 06/2022 10-20 79 38 Rehabilitation Rehabilitation (Re-Listed) Collectors and Residential Streets funded by SB 1. Massachusetts Ave to West City Limit.

*This list is subject to change and will be finalized upon the adoption of any jurisdiction that meets subsequent eligibility at the October 2021 Commission Meeting. Draft City Submitted - Fiscal Year 2021-22 Local Streets and Roads List of Projects *Projects listed are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1) August 19, 2021

Fiscal Year Initially Proposed Project Est Assembly Senate City County Project Type Title Description Location Components Est Start Est Useful Life Proposed Status Completion Districts Districts

68th Street, Jackson Drive, Rosefield Drive, University Avenue, Road Maintenance & FY 21-22 Citywide Pavement La Mesa San Diego 21/22 New This project will include: Pavement Rehab/Repair (Existing) Vigo Drive, and prioritized residential streets Citywide within Construction 07/2021 06/2022 10-20 79 38 Rehabilitation Rehabilitation Zone 6.

Streets may include: Alton Dr (Skyline to Morose), Beth Pl (Mt. Vernon to North End), Bonita (Mt. Vernon to Beryl), Broadway WB (Grove to LGA, Olive to LGA, Buena Vista to New Jersey, Road Maintenance & FY 2021-2022 Street Rehabilitation Pre-Construction and 07/2021 06/2022 Lemon Grove San Diego 20/21 Carried Over This project will include: Pavement Rehab/Repair (Existing), Document Preparation Grove to LGA), Broadway WB/EB (Olive to Buena Vista), 5-10 79 38 Rehabilitation Project Construction 07/2021 06/2022 Broadway EB (West to New Jersey, Harris to West, Mass to Harris, Buena. https://www.lemongrove.ca.gov/Home/ShowDocument?id=4856

Road Maintenance & National City Blvd Street This project will include: Pavement Rehab/Repair (Existing), ADA Curb Ramp National City San Diego 21/22 New National City Blvd between W. 33rd Street and 16th Street Construction 12/2021 06/2022 10-15 78, 80 40 Rehabilitation Resurfacing Rehab/Repair (Existing)

Road Maintenance & This project will include: Pavement Rehab/Repair (Existing), ADA Curb Ramp National City San Diego 21/22 New East Plaza Blvd Street Resurfacing E. Plaza Blvd between "D" Avenue and "N" Avenue Construction 12/2021 06/2022 10-15 78, 80 40 Rehabilitation Rehab/Repair (Existing)

Road Maintenance & This project will include: Pavement Rehab/Repair (Existing), ADA Curb Ramp National City San Diego 21/22 New E. 16th Street Resurfacing E. 16th Street between "D" Avenue and Highland Avenue Construction 12/2021 06/2022 10-15 78, 80 40 Rehabilitation Rehab/Repair (Existing)

Road Maintenance & This project will include: Pavement Rehab/Repair (Existing), ADA Curb Ramp National City San Diego 21/22 New Mann Avenue Street Resurfacing Mann Avenue between Beta Street and Alpha Street Construction 12/2021 06/2022 10-15 78, 80 40 Rehabilitation Rehab/Repair (Existing)

This project will include: Maintenance Program Plan Development | Consists of Road Maintenance & FY 21/22 Storm Drain installation of new storm drain facilities including devices required to comply with the Oceanside San Diego 21/22 New Various / will be determined locations. Pre-Construction 07/2021 06/2022 40-50 76 36 Rehabilitation Improvements state trash amendment. Replacement of failing corrugated metal pipes (CMP) throughout the City.

Laguna Street, Machado Street, Camelia Street, Moreno Street, This project will include: Pavement Improvement (New), Paving and/or Striping Frazee Road, Silver Bluff Drive, Siesta Drive, Tacayme Drive, Road Maintenance & Rehab/Repair (Existing Safety) | Preparatory work including patching, crack sealing. Oceanside San Diego 21/22 New FY 21/22 Asphalt Overlay Luna Drive, Sol Sitio, and Casa Drive, and others which are Construction 07/2021 06/2022 15-15 76 36 Rehabilitation Asphalt overlaying to repair mainly arterial streets as they often carry truck traffic. targeted on an annual basis as per Pavement Management Replace striping and pavement markings. Program.

This project will include: Bridge Structure Rehab/Repair (Existing) | The project consists of the repair of a portion of the El Camino Real Bridge Barrier Railing located Road Maintenance & Oceanside San Diego 21/22 New El Camino Real Bridge over State Route 78 which was damaged due to a vehicular accident. Per the May 25, El Camino Real Bridge over State Route 78 Construction 07/2021 06/2022 20-35 76 36 Rehabilitation 1977 Freeway Maintenance Agreement between the city of Oceanside and Caltrans, the City is responsible for the repair costs.

*This list is subject to change and will be finalized upon the adoption of any jurisdiction that meets subsequent eligibility at the October 2021 Commission Meeting. Draft City Submitted - Fiscal Year 2021-22 Local Streets and Roads List of Projects *Projects listed are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1) August 19, 2021

Fiscal Year Initially Proposed Project Est Assembly Senate City County Project Type Title Description Location Components Est Start Est Useful Life Proposed Status Completion Districts Districts

This project will include: Grant match to facilitate infrastructure improvements Road Maintenance & Oceanside San Diego 21/22 New Laurel St. Elementary complemented by non-infrastructure activities to better the safety and convenience for Laurel Street Construction 07/2021 06/2022 10-20 76 36 Rehabilitation students walking or biking to school.

This project will include: Repair and Servicing of Public Works Equipment, Road Maintenance & FY 21/22 Street & Median Procurement/Operatio Oceanside San Diego 21/22 New Procurement of Road Maintenance and Rehab Materials, Public Works Staffing | The various streets 07/2021 06/2022 2-7 76 36 Rehabilitation Maintenance nal Needs fund will be used to repair street potholes throughout the City of Oceanside.

This project will include: Maintenance Program Plan Development | Slurry sealing 50 lane-miles of streets in Oceanside. The projects target preservation of pavements of Douglas Drive and Cardiff Bay drive, Rancho Del Oro and Road Maintenance & FY 21/22 Street Slurry Seal communities which consist of communities near Douglas Drive and Cardiff Bay drive, Golfers Drive and Stewart Street area near California street , and Oceanside San Diego 21/22 New Pre-Construction 07/2021 06/2022 7-10 76 36 Rehabilitation Program Rancho Del Oro and Golfers Drive and Stewart Street area near California street , and others which are targeted on an annual basis as per the others which are targeted on an annual basis as per the Pavement Management Pavement Management Program. Program.

This project will include: ADA Curb Ramp Installation (New), Pavement Rehab/Repair Laguna street, Machado street, Moreno Street, Frazee Road, (Existing) | ADA concrete work associated with annual asphalt overlay project includes Oceanside San Diego 21/22 New Safety FY 21/22 ADA for Overlay Siesta Drive, Tacayme Drive, Luna Drive, Sol Sitio, Casa Drive Construction 07/2021 06/2022 50-70 76 36 replacement of non- conforming ramps directly adjacent to proposed asphalt paving and others. work. Work is on-going and will continue on an annual basis.

Street Maintenance Zone 4 - The streets are located north of and including Twin Peaks Road and Camino Del Norte from the Road Maintenance & FY 2021-22 Street Maintenance Poway San Diego 21/22 New This project will include: Pavement Rehab/Repair (Existing) Western City limit to Midland Road, streets east and west of and Construction 07/2021 09/2021 8-10 77 38 Rehabilitation project including Community Road and Midland Road from Twin Peaks Road to Poway Road.

Carmel Mountain Ranch, Carmel Valley, Clairemont Mesa, La Road Maintenance & This project will include: Pavement Rehab/Repair (Existing), Bicycle Lane Jolla, Linda Vista, Mira Mesa, Navajo, Pacific Highlands Ranch, San Diego San Diego 21/22 New Slurry Seal Group 2123 Construction 08/2021 01/2022 3-7 77, 78, 79 38, 39, 40 Rehabilitation Rehab/Repair (Existing) Rancho Bernardo, Rancho Penasquitos, Scripps Miramar Ranch, Serra Mesa, University

Balboa Park, Centre City, City Heights, College Area, Eastern Road Maintenance & This project will include: Pavement Rehab/Repair (Existing), Bicycle Lane Area, Encanto, Greater Golden Hill, Mission Bay Park, Otay San Diego San Diego 21/22 New Slurry Seal Group 2124 Construction 09/2021 03/2022 3-7 77, 78, 79 38, 39, 40 Rehabilitation Rehab/Repair (Existing) Mesa, Otay Mesa -Nestor, Pacific Beach, Peninsula, Tijuana River Valley, Uptown

Clairemont Mesa, Del Mar Mesa, La Jolla, Linda Vista, Mira Road Maintenance & This project will include: Pavement Rehab/Repair (Existing), Bicycle Lane Mesa, Navajo, Pacific Highlands Ranch, Rancho San Diego San Diego 21/22 New Slurry Seal Group 2221 Construction 11/2021 04/2022 3-7 77, 78, 79 38, 39, 40 Rehabilitation Rehab/Repair (Existing) Bernardo, Rancho Penasquitos, Sabre Springs, San Pasqual, Scripps Miramar Ranch, Serra Mesa, University

Balboa Park, Centre City, City Heights, Clairemont Mesa, College Area, Eastern Area, Encanto, Greater Golden Hill, Road Maintenance & This project will include: Pavement Rehab/Repair (Existing), Bicycle Lane Greater North Park, Linda Vista, Normal San Diego San Diego 21/22 New Slurry Seal Group 2222 Construction 01/2022 06/2022 3-7 77, 78, 79 38, 39, 40 Rehabilitation Rehab/Repair (Existing) Heights, Otay Mesa, Otay Mesa -Nestor, Pacific Beach, Peninsula, San Ysidro, Skyline -Paradise Hills, Southeastern San Diego, Uptown

*This list is subject to change and will be finalized upon the adoption of any jurisdiction that meets subsequent eligibility at the October 2021 Commission Meeting. Draft City Submitted - Fiscal Year 2021-22 Local Streets and Roads List of Projects *Projects listed are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1) August 19, 2021

Fiscal Year Initially Proposed Project Est Assembly Senate City County Project Type Title Description Location Components Est Start Est Useful Life Proposed Status Completion Districts Districts

La Jolla, Mira Mesa, Mission Valley, Navajo, Rancho Bernardo, Road Maintenance & This project will include: Pavement Rehab/Repair (Existing), Bicycle Lane Rancho Penasquitos, Sabre Springs, Scripps Miramar Ranch, San Diego San Diego 21/22 New Slurry Seal Group 2223 Construction 03/2022 08/2022 3-7 77, 78, 79 38, 39, 40 Rehabilitation Rehab/Repair (Existing) Tierrasanta, Torrey Highlands, Torrey Hills, Torrey Pines, University

Borden Road. The project will include pavement repair and a Road Maintenance & Annual Surface Seal Project FY19- This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Pre-Construction and 06/2021 08/2021 San Marcos San Diego 21/22 New surface overlay on Borden Road, an arterial street that runs east 7-10 75 38 Rehabilitation FY23 Pavement Rehab/Repair (Existing), Cost Estimating, Preliminary Design Construction 09/2021 07/2022 to west.

The projects are located as identified by our Public Works and Complete Streets Concrete Repair/Replacement Santee San Diego 21/22 New This project will include: Document Preparation, Cost Estimating Engineering staff and are available to the public for review on Pre-Construction 10/2021 03/2022 20-50 71 38 Components Program Santee's Concrete repair list database.

Road Maintenance & Citywide Pavement Repair and As identified in our attached Pavement Management Report Santee San Diego 21/22 Forecasted This project will include: Cost Estimating, Document Preparation Pre-Construction 11/2021 04/2022 15-20 71 38 Rehabilitation Rehabilitation 2017 to includes streets in Zones CE, ED and EF.

Road Maintenance & Citywide Pavement Roadway As identified in our attached Pavement Management Report Santee San Diego 21/22 New This project will include: Cost Estimating, Document Preparation Pre-Construction 11/2021 04/2022 10-15 71 38 Rehabilitation Maintenance 2017 and will include repairs in Zones CE, ED. and EF

Road Maintenance & 2021 Street Maintenance and This project will include: Pavement Improvement (New), Paving and/or Striping On portions of Lomas Santa Fe Drive, Santa Camelia and Punta Solana Beach San Diego 21/22 New Construction 09/2021 02/2022 15-25 78 39 Rehabilitation Repair Project Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing) Baja.

This project will include: Pavement Improvement (New), Paving and/or Striping Various residential street blocks throughout the Sunset District Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing), ADA Curb Ramp and Telegraph Hill, on: 11th Ave, 16th Ave, 17th Ave, 21st Ave, Road Maintenance & Various Locations Pavement Installation (New), Paving and/or Striping Installation (New Safety), ADA Curb Ramp 25th Ave, 30th Ave, 33rd Ave, 40th Ave, 46th Ave, 47th Ave, San Francisco San Francisco 21/22 New Construction 12/2021 12/2023 14-21 17, 19 11 Rehabilitation Renovation No 57 Rehab/Repair (Existing) | Construction of ADA compliant curb ramps Child St, Dunnes Aly, Edgardo Pl, Genoa Pl, Kramer Pl, La Grind and pave 43 Blocks Playa, Lawton St, Montague Pl, Moraga St, Sacramento St, Grind and pave 13 Intersections Telegraph Pl, Telegraph Hill Blvd, Vallejo St, Venard Aly

Various residential street blocks in the Portola, Excelsior, and This project will include: Pavement Improvement (New), Paving and/or Striping Balboa Park areas. The project includes blocks on 26th St, Rehab/Repair (Existing Safety), ADA Curb Ramp Installation (New), Pavement Athens St, Avalon Ave, Bacon St, Cambridge St, Cayuga Ave, Road Maintenance & Various Locations Pavement Rehab/Repair (Existing), Paving and/or Striping Installation (New Safety), ADA Curb San Francisco San Francisco 21/22 New Felton St, Hamilton St, Harvard St, Howth St, Louisburg St, Construction 05/2022 05/2024 14-21 17 11 Rehabilitation Renovation No 58 Ramp Rehab/Repair (Existing) | Construction of ADA compliant curb ramps Marston Ave, Onondaga Ave, Oxford St, Frida Kahlo Way, Grind and pave 46 Blocks Princeton St, Sillman St, Staples Ave, Sweeny St, University St, Grind and pave 33 Intersections Wayland St

This project will include: Pavement Improvement (New), Paving and/or Striping Various residential street blocks in the Castro, Twin Peaks and Rehab/Repair (Existing Safety), ADA Curb Ramp Installation (New), Pavement Bayview neighborhoods. The project includes blocks on 15th St, Road Maintenance & Various Locations Pavement Rehab/Repair (Existing), Paving and/or Striping Installation (New Safety), ADA Curb 19th St, Burnett Ave, Collingwood St, Corbett Ave, Douglass St, San Francisco San Francisco 21/22 New Construction 07/2022 07/2024 14-21 17 11 Rehabilitation Renovation No 59 Ramp Rehab/Repair (Existing) | Construction of ADA compliant curb ramps Graystone Ter, Levant St, Mars St, Mckinnon Ave, Oakdale Ave, Grind and pave 42 Blocks Ord St, Phelps St, Quint St, Shafter Ave, States St, Underwood Grind and pave 24 Intersections Ave

*This list is subject to change and will be finalized upon the adoption of any jurisdiction that meets subsequent eligibility at the October 2021 Commission Meeting. Draft City Submitted - Fiscal Year 2021-22 Local Streets and Roads List of Projects *Projects listed are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1) August 19, 2021

Fiscal Year Initially Proposed Project Est Assembly Senate City County Project Type Title Description Location Components Est Start Est Useful Life Proposed Status Completion Districts Districts

This project will include: Pavement Improvement (New), Paving and/or Striping Various residential street blocks in the Sunset District, Pacific Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing), ADA Curb Ramp Heights, and Fillmore District areas. The project includes blocks Road Maintenance & Various Locations Pavement Installation (New), Paving and/or Striping Installation (New Safety), ADA Curb Ramp San Francisco San Francisco 21/22 New on: 17th Ave, 29th Ave, 34th Ave, Buchanan St, California St, Construction 09/2022 09/2024 14-21 17, 19 11 Rehabilitation Renovation No 60 Rehab/Repair (Existing) | Construction of ADA compliant curb ramps Clay St, Pacheco St, Eddy St, Ellis St, O'Farrell St, Ortega St, Grind and pave 46 Blocks Pacheco St, Presidio Ave, Sacramento St, Turk St, Ulloa St Grind and pave 14 Intersections

Various residential street blocks in the Portola, Excelsior, This project will include: Pavement Improvement (New), Paving and/or Striping Visitacion Valley and Bayview neighborhoods. The project Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing), ADA Curb Ramp includes blocks on Alpha St, Athens St, Bancorft Ave, Barneveld Road Maintenance & Various Locations Pavement Installation (New), Paving and/or Striping Installation (New Safety), ADA Curb Ramp San Francisco San Francisco 21/22 New Ave, Brazil Ave Brussels St, Carter St, Desmond St, Gaven St, Construction 11/2022 11/2024 14-21 17 11 Rehabilitation Renovation No 61 Rehab/Repair (Existing) | Construction of ADA compliant curb ramps Gilman Ave, Girard St, Goettingen St, Hawes St, Hollister Ave, Grind and pave 42 Blocks Ingalls St, Ingerson Ave, Jennings St, Keith St, Olmstead St, Grind and pave 9 Intersections Peninsula Ave, Rutland St

Work will occur throughout the County, primarily on residential Road Maintenance & FY21-22 Citywide Pavement San Francisco San Francisco 21/22 New This project will include: Cost Estimating, Preliminary Design streets, including but not limited to blocks on Cabrillo Street, Pre-Construction 02/2021 12/2023 3-7 17, 19 11 Rehabilitation Preservation Octavia Street, and Cayuga Avenue.

Various Streets within the City of Escalon; Yosemite Avenue from Mitchell Avenue to Campbell Avenue, Elisabeth Street from Road Maintenance & This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), California to Hwy 120, Brayton Avenue from California to Hwy Escalon San Joaquin 20/21 In Progress 2020 Slurry Seal Various Streets Construction 06/2021 06/2022 5-10 12 5 Rehabilitation Pavement Rehab/Repair (Existing) 120, Blossom Avenue, and Fisk Avenue between California Street and First Street. Adjustments to streets may be required when project bids are received based on funding.

Damaged curb, gutter, and sidewalk will be replaced, and This project will include: Sidewalk and/or Crosswalk Rehab/Repair (Existing), ADA wheelchair ramps will be constructed within City Council Districts Curb Ramp Installation (New), Document Preparation, Cost Estimating, Environmental Road Maintenance & Sidewalk, Curb, Gutter, Curb Ramp 1, 2, 3, 4, 5, and 6. Final locations will be reported upon Pre-Construction and 10/2021 02/2022 Stockton San Joaquin 21/22 New Study/Documents, ADA Curb Ramp Rehab/Repair (Existing) | Relocation of drainage 5-50 13 5 Rehabilitation Repairs FY 2021-22 SB1 completion in the expenditure report. City Council District map Construction 05/2022 12/2022 inlet/lateral and relocate and or replace pedestrian push buttons as needed to comply can be found at the following link: with ADA standards for wheelchair ramps. http://www.stocktongov.com/files/CouncilMap.pdf

Faulty streetlight fixtures within City Council Districts 4, 5, and 6. This project will include: Document Preparation, Cost Estimating, Traffic Signals, will be replaced. Final locations will be reported upon completion Residential Streetlight LED Pre-Construction and 10/2021 02/2022 Stockton San Joaquin 21/22 New Safety Lights, and/or Signage Rehab/Repair (Existing Safety), Environmental in the expenditure report. City Council District map can be 7-10 13 5 Replacement FY 2021-22 SB1 Construction 05/2022 12/2022 Study/Documents found at the following link: http://www.stocktongov.com/files/CouncilMap.pdf

This project will include: Document Preparation, Cost Estimating, Traffic Signals, Streetlight Pole Replacement FY Project location roughly bounded by Alexandria Pl., W. Lincoln Pre-Construction and 10/2021 02/2022 Stockton San Joaquin 21/22 New Safety Lights, and/or Signage Rehab/Repair (Existing Safety), Environmental 50-90 13 5 2021-22 SB1 Rd., N. El Dorado St., and Robinhood Dr. Construction 05/2022 12/2022 Study/Documents

Street segments within City Council Districts 1, 2, 3, 4, 5, and 6 will be re-striped. Final street segments will be reported upon Road Maintenance & City Street Re-striping FY 2021-22 This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Cost Pre-Construction and 10/2021 02/2022 Stockton San Joaquin 21/22 New completion in the expenditure report. City Council District map 5-7 13 5 Rehabilitation SB1 Estimating, Document Preparation, Environmental Study/Documents Construction 05/2022 12/2022 can be found at the following link: http://www.stocktongov.com/files/CouncilMap.pdf

Naglee Road (from Grant Line Road to Pavillion Parkway); This project will include: Project Scope Development, Document Preparation, Cost Naglee Road (from Larch Road to 331 feet south of Larch Road); Road Maintenance & Pavement Rehabilitation FY 2019- Tracy San Joaquin 19/20 In Progress Estimating, Preliminary Design | Paving rehab/repair of about 2.78 lane miles of Hollywood Avenue (from Holly Drive to Mae Avenue); 12th Street Pre-Construction 11/2019 08/2021 10-15 13 5 Rehabilitation 2020 streets. (from Holly Drive to Adam Street); Mae Avenue (from Beverly Place to Eaton Avenue); All locations are estimates.

*This list is subject to change and will be finalized upon the adoption of any jurisdiction that meets subsequent eligibility at the October 2021 Commission Meeting. Draft City Submitted - Fiscal Year 2021-22 Local Streets and Roads List of Projects *Projects listed are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1) August 19, 2021

Fiscal Year Initially Proposed Project Est Assembly Senate City County Project Type Title Description Location Components Est Start Est Useful Life Proposed Status Completion Districts Districts

Naglee Road (from Grant Line Road to Pavillion Parkway); This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Naglee Road (from Larch Road to 331 feet south of Larch Road); Road Maintenance & Pavement Rehabilitation FY 2019- Sidewalk and/or Crosswalk Rehab/Repair (Existing), Pavement Rehab/Repair Tracy San Joaquin 19/20 Carried Over Hollywood Avenue (from Holly Drive to Mae Avenue); 12th Street Construction 09/2021 02/2022 10-15 13 5 Rehabilitation 2020 (Existing), ADA Curb Ramp Rehab/Repair (Existing) | Paving rehab/repair of about (from Holly Drive to Adam Street); Mae Avenue (from Beverly 2.78 lane miles of streets. Place to Eaton Avenue); All locations are estimates.

This project will include: Project Scope Development, Cost Estimating, Document Lowell Avenue (from Orchard Parkway to Tracy Boulevard); Road Maintenance & Pavement Rehabilitation FY 2020- Preparation, Preliminary Design, Environmental Study/Documents | Paving Tracy San Joaquin 20/21 In Progress Lincoln Boulevard (from Lowell Avenue to 11th Street); All Pre-Construction 07/2020 02/2022 10-15 13 5 Rehabilitation 2021 rehab/repair of about 8.09 lane miles of streets. Paving rehab/repair of about 0.43 lane locations are estimates. miles of bicycle lanes.

Subdivisions of: Sienna Park (Unit 1); Hearthstone (Units 2 and 3); Parkside Estates (Units 1, 2, and 3); Ironwood; Muirfield (Unit This project will include: Pavement Rehab/Repair (Existing), Bicycle Lane 3); Harvest Glen (Units 1 and 2); Victoria Greens (Units 1, 2, and Road Maintenance & Rehab/Repair (Existing) | Slurry seal and paving rehab/repair of about 24.28 lane Pre-Construction and 07/2021 04/2022 Tracy San Joaquin 21/22 New Slurry Seal FY 21-22 3). Spot patching only of: Grant Line Road (from Naglee Road to 5-10 13 5 Rehabilitation miles of streets. Slurry seal and paving rehab/repair of about 0.06 bicycle lane miles of Construction 05/2022 11/2022 Lammers Road); Valpico Road (from Tracy Boulevard to streets. Pebblebrook Drive); Tracy Boulevard (from Lowell Avenue to 11th Street). All locations are estimates.

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Clover Road (from West City Limits to Tracy Boulevard); Cypress Road Maintenance & Sidewalk and/or Crosswalk Rehab/Repair (Existing), Pavement Rehab/Repair Drive (Centre Court Drive to 108' West of Hickory Avenue); Pre-Construction and 07/2021 04/2022 Tracy San Joaquin 21/22 New Pavement Rehabilitation FY 21-22 10-15 13 5 Rehabilitation (Existing), ADA Curb Ramp Rehab/Repair (Existing) | Paving rehab/repair of about Centre Court Drive (from Palm Circle to Tracy Boulevard); All Construction 05/2022 11/2022 2.59 lane miles of streets. locations are estimates.

Mt. Diablo Avenue (from Tracy Boulevard to C Street); Road Maintenance & This project will include: Pavement Rehab/Repair (Existing) | Slurry seal and paving Subdivisions of: Sienna Park (Unit 2); Hearthstone (Unit 1); Pre-Construction and 01/2021 07/2021 Tracy San Joaquin 21/22 New Slurry Seal FY 20-21 5-10 13 5 Rehabilitation rehab/repair of about 12.16 lanes miles of streets. Regency Square (Unit 1); Muirfield (Unit 1); Warmington Homes Construction 08/2021 02/2022 at Glencreek (Units 1 and 2). All locations are estimates.

This project will include: Sidewalk and/or Crosswalk Rehab/Repair (Existing), Lowell Avenue (from Orchard Parkway to Tracy Boulevard); Road Maintenance & Pavement Rehabilitation FY 2020- Pavement Rehab/Repair (Existing), Bicycle Lane Rehab/Repair (Existing), ADA Curb Tracy San Joaquin 21/22 Carried Over Lincoln Boulevard (from Lowell Avenue to 11th Street); All Construction 03/2022 07/2022 10-15 13 5 Rehabilitation 2021 Ramp Rehab/Repair (Existing) | Paving rehab/repair of about 8.09 lane miles of locations are estimates. streets. Paving rehab/repair of about 0.43 lane miles of bicycle lanes.

Citywide locations including but not limited to: Road Maintenance & FY 2021-2022 Road Maintenance This project will include: Maintenance Program Plan Development, Cost Estimating, - Stonebridge Ln from Harlan Rd to Slate St Pre-Construction and 07/2021 09/2021 Lathrop San Joaquin 21/22 New 8-10 13 5 Rehabilitation and Rehabilitation Document Preparation, Preliminary Design, ADA Curb Ramp Rehab/Repair (Existing) - J St from Harlan Rd to 5th St Construction 09/2021 12/2021 - Thomsen Rd from Harlan Rd to 5th St

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), In the neighborhoods bound by Lodi Avenue to the north, State Road Maintenance & 2021/2022 Pavement Resurfacing Pre-Construction and 07/2021 12/2021 Lodi San Joaquin 21/22 New Pavement Rehab/Repair (Existing), Document Preparation, Cost Estimating, Highway 99 to the east, Century Blvd to the south, and Mills 5-10 9 14 Rehabilitation Project Construction 03/2022 06/2022 Preliminary Design, Environmental Study/Documents Avenue to the west.

This project will include: Pavement Rehab/Repair (Existing) | Pavement maintenance This project area is East of Main Street, North of Louise Avenue, Road Maintenance & Springtime Estates Improvement of 65,000 square yards of road surface. This could include asphalt overlays, slurry Manteca San Joaquin 19/20 In Progress and Southwest of Construction 03/2021 09/2021 10-20 12 5 Rehabilitation Project seals, dig outs, base repair, and other pavement repairs in accordance with the State Highway 99. recommendations of the City Pavement Management Program.

*This list is subject to change and will be finalized upon the adoption of any jurisdiction that meets subsequent eligibility at the October 2021 Commission Meeting. Draft City Submitted - Fiscal Year 2021-22 Local Streets and Roads List of Projects *Projects listed are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1) August 19, 2021

Fiscal Year Initially Proposed Project Est Assembly Senate City County Project Type Title Description Location Components Est Start Est Useful Life Proposed Status Completion Districts Districts

This project will include: Pavement Rehab/Repair (Existing) | This project will entail pavement repair including asphalt overlays, base repairs, crack seal, cape seal, microsurfacing, and other pavement repairs at the Mayor’s Park Subdivision. The Road Maintenance & Mayor's Park Subdivision project is consistent with the recommendation of the City Pavement Maintenance Mayor's Park Subdivision located at 1440 Kelley Drive, Manteca, Manteca San Joaquin 19/20 Carried Over Construction 03/2021 08/2021 10-20 12 5 Rehabilitation Pavement Project Program (PMP). CA 95336

Project construction is scheduled for FY 2021-22. The useful life of the pavement rehabilitation is approximately 10-12 years.

The Local Road Safety Plan (LRSP) covers the entire City of This project will include: The Local Road Safety Plan (LRSP) covers the entire City of Manteca. The Local Road Safety Plan (LRSP) will identify and Procurement/Operatio Manteca San Joaquin 20/21 Carried Over Safety Local Road Safety Plan (LRSP) Manteca. The Local Road Safety Plan (LRSP) will identify and prioritize projects for 07/2021 12/2021 10-20 12 5 prioritize projects for roads and streets traffic safety nal Needs roads and streets traffic safety improvements. improvements.

This project will include: Pavement Rehab/Repair (Existing) | This project will rehabilitate, replace, and/or restore pavement that is aging or beginning to fail. The Main Street: Yosemite Avenue to Road Maintenance & project will include converting Main Street to 5-lanes with a two-way left turn lane, This project is located on Main Street between Yosemite and Manteca San Joaquin 21/22 New Alameda Street Improvement Construction 07/2021 12/2021 10-20 12 5 Rehabilitation install concrete pavers as a road surface, removal of 67 parking spaces, removal and Alameda Street Project replacing of landscape medians, modifying curb, gutter and sidewalks, new street striping, and ADA curb ramp improvements.

This project will include: Pavement Rehab/Repair (Existing) | The Airport Way Rehabilitation - Phase 1 project includes the removal and reconstruction of pavement Airport Way Roadway sections, grind and overlay, asphalt rubber chip seal, slurry seal or microsurfacing, Road Maintenance & Rehabilitation - Phase 1 - The project is located on Airport Way between Hwy 120 and Manteca San Joaquin 21/22 New and striping. The project is located between Hwy 120 and Lathrop Rd, as shown in the Construction 07/2021 12/2021 10-20 12 5 Rehabilitation Rehabilitation and Repair of Airport Lathrop Rd map. The Pavement Management Program identifies Airport Way to be in need of Way from Hwy 120 to Lathrop Rd pavement maintenance and repair. Airport Way is classified an Arterial road that receives heavy truck traffic.

This project will include: Traffic Signals, Lights, and/or Signage Installation (New Traffic Signal - Union Rd and Safety) | This project will install new traffic signals for this intersection. The project will The project is located in the City of Manteca at the intersection of Manteca San Joaquin 21/22 New Traffic Control Devices Construction 07/2021 12/2021 10-30 12 5 Mission Ridge Drive include installation of new signal poles, arms, equipment, and new traffic and Union Rd and Mission Ridge Drive crosswalk striping.

Along Second St. from S Wilma Ave to S Stockton Ave, N Road Maintenance & Ripon Safe Routes to School This project will include: Pavement Improvement (New), Sidewalk and/or Crosswalk Ripon San Joaquin 21/22 New Acacia Ave from Hwy 99 to Doak Blvd, Prospect Ave from Construction 07/2022 11/2022 15-15 12 5 Rehabilitation Improvements (Second Street) Rehab/Repair (Existing), Bicycle Lane (New) Frontage Rd to Ripona Ave, and the full length of Ripona Ave

Road Maintenance & River Road Overlay/Ripona River Rd., Ripona Ave., Ridge Ave., Prospect Ave. in Ripon, CA Ripon San Joaquin 20/21 Carried Over This project will include: Paving and/or Striping Rehab/Repair (Existing Safety) Construction 06/2022 09/2022 10-10 12 5 Rehabilitation Resurface Project and surrounding roads.

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Street segments within City Council Districts 1, 2, 3, 4, 5, and 6 Pavement Rehab/Repair (Existing), Document Preparation, Cost Estimating, will be resurfaced. Final street segments will be reported upon Road Maintenance & Local Street Resurfacing FY 2021- Pre-Construction and 10/2021 02/2022 Stockton San Joaquin 21/22 New Environmental Study/Documents | Relocation of drainage inlet/lateral and relocate and completion in the expenditure report. City Council District map 5-7 13 5 Rehabilitation 22 SB1 Construction 05/2022 12/2022 or replace pedestrian push buttons as needed to comply with ADA standards for can be found at the following link: wheelchair ramps. http://www.stocktongov.com/files/CouncilMap.pdf

*This list is subject to change and will be finalized upon the adoption of any jurisdiction that meets subsequent eligibility at the October 2021 Commission Meeting. Draft City Submitted - Fiscal Year 2021-22 Local Streets and Roads List of Projects *Projects listed are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1) August 19, 2021

Fiscal Year Initially Proposed Project Est Assembly Senate City County Project Type Title Description Location Components Est Start Est Useful Life Proposed Status Completion Districts Districts

This project will include: Pavement maintenance and rehabilitation of approximately Road Maintenance & El Camino Real Resurfacing - 1.90 miles of arterial roadway to improve deteriorated pavement conditions and better El Camino Real from the South City Limit of Atascadero to El Atascadero San Luis Obispo 19/20 Carried Over Pre-Construction 06/2021 09/2021 10-20 35 17 Rehabilitation South define roadway configuration for all roadway users, including motorists, bicyclists, and Bordo Avenue. pedestrians.

This project will include: Project Scope Development, Pavement Rehab/Repair Valley Road, Corbett Canyon Road, Fair Oaks Road Maintenance & Pre-Construction and 01/2021 08/2021 Arroyo Grande San Luis Obispo 21/22 New 2021 Street Repairs (Existing), Document Preparation, Cost Estimating, Preliminary Design, Environmental Avenue, Wesley Street, Vernon Street, South 5-7 35 17 Rehabilitation Construction 08/2021 12/2021 Study/Documents Elm Street, East Grand Avenue

This project will include: Pavement Improvement (New), Sidewalk and/or Crosswalk Installation (New), Sidewalk and/or Crosswalk Rehab/Repair (Existing), Traffic Signals, Lights, and/or Signage Installation (New Safety), Bicycle Lane (New), Storm Drain Road Maintenance & and/or Culvert Rehab/Repair (Existing), Traffic Signals, Lights, and/or Signage El Paso de Robles San Luis Obispo 21/22 New Creston Road Creston Road--Capitol Hill to Lana Construction 10/2022 12/2024 10-20 33 17 Rehabilitation Rehab/Repair (Existing Safety), ADA Curb Ramp Rehab/Repair (Existing), Bicycle Lane Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety), ADA Curb Ramp Installation (New), Pavement Rehab/Repair (Existing), Paving and/or Striping Installation (New Safety)

This project will include: Pavement Rehab/Repair (Existing), Bicycle Lane (New), Road Maintenance & Major Street Rehabilitation South Grover Beach San Luis Obispo 21/22 New Paving and/or Striping Installation (New Safety), ADA Curb Ramp Rehab/Repair South Oak Park Boulevard from West Grand Avenue to Mentone Construction 09/2021 06/2022 15-20 35 17 Rehabilitation Oak Park Bouldevard CIP 2284 (Existing) | Lane reconfiguration

This project will include: Pavement Rehab/Repair (Existing), Cost Estimating, Road Maintenance & Pre-Construction and 07/2021 09/2021 Morro Bay San Luis Obispo 21/22 New Main Street - Heavy Maintenance Document Preparation, ADA Curb Ramp Rehab/Repair (Existing), Bicycle Lane Main Street - Beach Street to Morro Bay Blvd 15-25 35 17 Rehabilitation Construction 10/2021 11/2021 Rehab/Repair (Existing)

This project will include: Sidewalk and/or Crosswalk Installation (New), Paving and/or Mattie Road, Ocean Boulevard, Wadsworth Avenue, Price Road Maintenance & Pismo Beach San Luis Obispo 21/22 New FY 2022 Paving Project Striping Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing), ADA Street, and roads in neighborhoods north of James Way in Construction 10/2021 06/2022 20-50 35 17 Rehabilitation Curb Ramp Installation (New), Bicycle Lane Rehab/Repair (Existing) Pismo Beach, California

This project will include: Sidewalk and/or Crosswalk Installation (New), Pavement Improvement (New), Paving and/or Striping Rehab/Repair (Existing Safety), Sidewalk Downtown San Luis Obispo. Streets include Nipomo from Road Maintenance & 2021 Downtown Pavement and/or Crosswalk Rehab/Repair (Existing), ADA Curb Ramp Installation (New), San Luis Obispo San Luis Obispo 21/22 New Buchon to Leff, Marsh and Higuera outside of downtown core, Construction 07/2021 12/2021 15-20 35 17 Rehabilitation Improvements Pavement Rehab/Repair (Existing), Bicycle Lane (New), Paving and/or Striping and Johnson, Philips, and Pepper loop to Mill Street Installation (New Safety), ADA Curb Ramp Rehab/Repair (Existing), Bicycle Lane Rehab/Repair (Existing)

This project will include: Sidewalk and/or Crosswalk Installation (New), Pavement Improvement (New), Paving and/or Striping Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing), ADA Curb Ramp Installation (New), Bicycle Lane (New), Complete Streets Landscape Safety Rehab/Repair (Existing), Landscape Safety Installation (New), San Luis Obispo San Luis Obispo 20/21 Carried Over Anholm Greenway Phase 2 Foothill to Ramona and Ramona Downtown along Broad Street Construction 12/2021 06/2022 10-20 35 17 Components Paving and/or Striping Installation (New Safety), ADA Curb Ramp Rehab/Repair (Existing), Bicycle Lane Rehab/Repair (Existing) | This project will construct a Class I bike path between Foothill and Ramona, and a Class IV two-way protected bike-way along Ramona from the Class I path to Broad Street.

*This list is subject to change and will be finalized upon the adoption of any jurisdiction that meets subsequent eligibility at the October 2021 Commission Meeting. Draft City Submitted - Fiscal Year 2021-22 Local Streets and Roads List of Projects *Projects listed are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1) August 19, 2021

Fiscal Year Initially Proposed Project Est Assembly Senate City County Project Type Title Description Location Components Est Start Est Useful Life Proposed Status Completion Districts Districts

This project will include: Pavement Improvement (New), Sidewalk and/or Crosswalk Mezes Avenue from Alameda de las Pulgas to Notre Dame Road Maintenance & Belmont San Mateo 21/22 New 2022 Pavement Project Rehab/Repair (Existing), ADA Curb Ramp Installation (New), Bicycle Lane (New), Avenue; Masonic Avenue from Old County Road to Hiller Construction 06/2022 09/2022 15-15 22 13 Rehabilitation Paving and/or Striping Installation (New Safety) Avenue.

This project will include: Pavement Improvement (New), Paving and/or Striping Loree Lane, Santa Barbara Avenue, Murchison Drive, Broadway, Road Maintenance & 2021-2022 Pavement Rehab/Repair (Existing Safety), Sidewalk and/or Crosswalk Rehab/Repair (Existing), Hillcrest Boulevard, La Cruz Avenue, Victoria Avenue, Taylor Pre-Construction and 08/2021 03/2022 Millbrae San Mateo 21/22 New 20-29 22 13 Rehabilitation Rehabilitation Project Pavement Rehab/Repair (Existing), Cost Estimating, ADA Curb Ramp Rehab/Repair Avenue, La Mancha Place, Minorca Way, San Anselmo, Landing Construction 03/2022 09/2022 (Existing) Lane

Brookside Lane, Dumont Court, East Millbrae Avenue, El Bonito Road Maintenance & 2021-2022 Pavement Maintenance This project will include: Pavement Improvement (New), Paving and/or Striping Way, Hacienda Way, La Prenda, Madrone Street, Millbrae Circle, Millbrae San Mateo 21/22 New Construction 04/2022 07/2022 7-10 22 13 Rehabilitation Project Rehab/Repair (Existing Safety), Sidewalk and/or Crosswalk Rehab/Repair (Existing) Millwood Drive, Palm Avenue, Queen Ann Court, Spruce Street, Hacienda Way, Millbrae Avenue (EB & WB)

Road Maintenance & This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Watkins Avenue - between Middlefield Road and Caltrain Right- Atherton San Mateo 21/22 New 2022 Street Overlay Project Construction 06/2021 10/2021 5-10 24 13 Rehabilitation Pavement Rehab/Repair (Existing) of-Way

Overlay of Visitacion Avenue Road Maintenance & Visitacion Ave between San Francisco Ave and Monterey St in Brisbane San Mateo 21/22 New between San Francisco Avenue This project will include: Pavement Rehab/Repair (Existing) Construction 06/2022 07/2022 20-20 22 13 Rehabilitation the City of Brisbane and Monterey Street

Anza Boulvard; Easton Drive; Escalante Way; Hillview Court; Road Maintenance & This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Hunt Drive; Laguna Avenue; Linden Avenue; Ray Drive; Burlingame San Mateo 21/22 New 2022 Street Resurfacing Project Construction 06/2022 10/2022 15-25 22 13 Rehabilitation Pavement Rehab/Repair (Existing) Sebastian; Summit Drive; Valdivia Way; Vancouver; Westmoor Road

Road Maintenance & Town of Colma, F Street (Block 300) from El Camino Real to City Colma San Mateo 21/22 New F Street Resurfacing Project This project will include: Cost Estimating Pre-Construction 05/2022 06/2022 10-20 19 11 Rehabilitation Limit

87th St, Alpine Ave, Arcadia Dr, Avalon Dr, Baldwin Ave, Beachside Ct, Beechwood Dr, Belcrest Ave, Bradley Dr., Brooklawn Ave, Callan Blvd, Campus Dr, Carmel Ave, Castillejo This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Right Dr, Castleton Ave, Christopher Ct, Clarinada Ave, Clearview Dr, Road Maintenance & of Way, Pavement Rehab/Repair (Existing), Cost Estimating, Document Preparation, Pre-Construction and 11/2021 03/2022 Daly City San Mateo 21/22 New Skyline Street Slurry Seal Crenshaw Dr, Crestline Ave, Creston Ave, Crestview Ave, Eaton 5-7 11 19 Rehabilitation Preliminary Design, Environmental Study/Documents, Bicycle Lane Rehab/Repair Construction 05/2022 09/2022 Ave, Fairview Ave, Fernwood Ave, Gateway Dr, Gellert Blvd, (Existing) Glenrose Ave, Higate Dr, Highland Ave, Hillview Ct, Kent Ct, Lake Meadow Dr, Lakeshire Dr, Longview Dr, Lynvale Ct, Manzanita Ave.

*This list is subject to change and will be finalized upon the adoption of any jurisdiction that meets subsequent eligibility at the October 2021 Commission Meeting. Draft City Submitted - Fiscal Year 2021-22 Local Streets and Roads List of Projects *Projects listed are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1) August 19, 2021

Fiscal Year Initially Proposed Project Est Assembly Senate City County Project Type Title Description Location Components Est Start Est Useful Life Proposed Status Completion Districts Districts

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Right Road Maintenance & of Way, Sidewalk and/or Crosswalk Rehab/Repair (Existing), Pavement Rehab/Repair Geneva Ave, Bayshore Blvd, Frankfort St, Lowell St, Edgemar Pre-Construction and 09/2021 03/2022 Daly City San Mateo 21/22 New 21-22 Street Resurfacing 20-25 11 19 Rehabilitation (Existing), Document Preparation, Cost Estimating, Environmental Study/Documents, St, Mar Vista Dr Construction 03/2022 09/2022 ADA Curb Ramp Rehab/Repair (Existing), Bicycle Lane Rehab/Repair (Existing)

Abelia Wy; Addison Ave; Alberni St; Annapolis St; Aster Wy; Avelar St; Azalia Dr; Baines St; Bay Rd; Baylor St; Beech St; Bell Ct; Bell St; Blue Jay Ct; Bradley Wy; Brentwood Ct; Buchanan This project will include: This project provides for the resurfacing of City streets during Ct; Camellia Ct; Camellia Dr; Camphor Wy; Capitol Ave; Carole Road Maintenance & the ten-year life of the CIP. Roughly $1,000,000 needs to be expended annually on East Palo Alto San Mateo 19/20 In Progress ST-07 Street Resurfacing Program Ct; Circle Dr; Clarence Ct; Clarke Ave; Cypress St; Daisy Ln; Construction 07/2021 05/2022 20-40 24 13 Rehabilitation street resurfacing. | Resurfacing Projects completed each year, rolling estimated costs Daphne Ct; Daphne Wy; Demeter St; Donohoe St; Drew Ct; and future costs Dumbarton Ave; East Bayshore Rd; East O’keefe St; Emmett Wy; Euclid Ave; and others. Full list in City Resolution No. 71- 2021.

This project will include: The Bay Road project will include street repaving; bicycle and Complete Streets East Palo Alto San Mateo 19/20 In Progress ST-05A Bay Road Improvements pedestrian improvements; landscaping improvements; and replacement of storm drain 0.7 miles of Bay Road from Clarke Avenue to Cooley Landing Construction 08/2020 12/2021 20-40 24 13 Components and water trunk lines.

University Ave, Pulgas Ave, Clarke Ave, Cooley Ave, Bay Rd, ST-09 Bicycle & Pedestrian This project will include: This project is for the installation of street improvements to East Palo Alto San Mateo 19/20 Carried Over Safety Newbridge Ave, East Bayshore Rd, West Bayshore Rd, Construction 07/2021 05/2022 5-40 24 13 Improvements enhance vehicular, pedestrian and bicycle safety throughout the City. Woodland Avenue, Donohoe St, Weeks St

This project will include: This project provides for the planning and construction of Pulgas Avenue, Clarke Avenue, Cooley Avenue, Bay Road, East East Palo Alto San Mateo 19/20 Carried Over Traffic Control Devices ST-12 Traffic Calming Program speed bumps, bulb-outs and other traffic calming devices to reduce speed through Bayshore Rd, West Bayshore Rd, Woodland Avenue, Weeks Construction 07/2021 05/2022 20-40 24 13 residential zones and to increase safety. Street, Runnymede St

This project will include: This project will provide for the widening of the University Avenue/US 101 overpass to provide safer pedestrian and bicycle travel and more Complete Streets ST-14 University Avenue East Palo Alto San Mateo 19/20 Forecasted efficient vehicle travel. The project will include the widening of the overpass bridge University Avenue from Woodland Avenue to Donohoe Street Construction 12/2021 06/2022 20-40 24 13 Components Interchange and construction of a new diagonal off-ramp from southbound (SB) 101 onto SB University Avenue

Road Maintenance & Street Rehabilitation (FY 2020- This project will include: Pavement Rehab/Repair (Existing), Bicycle Lane (New), ADA Neighborhoods 7 and 8 (Edgewater Boulevard from Beach Park Foster City San Mateo 20/21 Carried Over Construction 06/2022 09/2022 10-20 22 13 Rehabilitation 2021) Curb Ramp Rehab/Repair (Existing), Bicycle Lane Rehab/Repair (Existing) Boulevard to Baffin Street and various side streets.

E. Hillsdale Blvd./Beach Park Blvd. & Gull Ave.; Foster City Blvd. CIP 301-681 Traffic Signals at This project will include: Traffic Signals, Lights, and/or Signage Installation (New Foster City San Mateo 21/22 New Traffic Control Devices & Polynesia Dr.; Beach Park Blvd. & Shell Blvd.; Edgewater Construction 12/2021 12/2023 10-50 22 13 Various Locations Safety) Blvd. & Port Royal Ave. (north end)

*This list is subject to change and will be finalized upon the adoption of any jurisdiction that meets subsequent eligibility at the October 2021 Commission Meeting. Draft City Submitted - Fiscal Year 2021-22 Local Streets and Roads List of Projects *Projects listed are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1) August 19, 2021

Fiscal Year Initially Proposed Project Est Assembly Senate City County Project Type Title Description Location Components Est Start Est Useful Life Proposed Status Completion Districts Districts

CIP301-694 Dynamic Signage for This project will include: Traffic Signals, Lights, and/or Signage Installation (New E. Hillsdale Blvd. & Edgewater Blvd., E. Hillsdale Blvd. & Shell Foster City San Mateo 21/22 New Traffic Control Devices Construction 10/2021 01/2022 12-25 22 13 Traffic Relief Pilot Program Safety) Blvd.

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Sidewalk and/or Crosswalk Rehab/Repair (Existing), Pavement Rehab/Repair (Existing), Maintenance Program Plan Development, Document Preparation, Storm Main Street from Correas St. to Highway 1 North, Correas Street Drain and/or Culvert Rehab/Repair (Existing), Preliminary Design, Environmental Road Maintenance & Pavement Management & Traffic from Main St. to Johnston St., Johnston Street from Correas St. Pre-Construction and 07/2021 04/2022 Half Moon Bay San Mateo 20/21 Carried Over Study/Documents, ADA Curb Ramp Rehab/Repair (Existing) | The project includes 15-30 24 13 Rehabilitation Safety Program to Mill St. Mill Street from Johnston St. to Main St., and Belleville Construction 05/2022 08/2022 pavement rehabilitation as well as traffic safety measures and active transportation Boulevard, based on available funding. components throughout the City. The project will look at reconstruction of pavement, reconstruct ADA ramps, and other related improvements as funding becomes available.

This project will include: Sidewalk and/or Crosswalk Installation (New), Storm Drain/Culvert Installation (New), Sidewalk and/or Crosswalk Rehab/Repair (Existing), Pavement Rehab/Repair (Existing), ADA Curb Ramp Installation (New), Roundabout Complete Streets Installation (New), Bicycle Lane (New), Landscape Safety Rehab/Repair (Existing), Poplar Street from Railroad Avenue to Main Street, excluding Half Moon Bay San Mateo 21/22 New Poplar Complete Streets Project Construction 07/2021 08/2022 15-30 24 13 Components Landscape Safety Installation (New), Storm Drain and/or Culvert Rehab/Repair HWY 1. (Existing), ADA Curb Ramp Rehab/Repair (Existing) | The project includes pavement rehabilitation, sidewalk installation for better accessibility for pedestrians, and installing Class 3 bike lanes for bicyclists.

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Selected streets are located in various areas within the Town’s Pavement Rehab/Repair (Existing), Paving and/or Striping Installation (New Safety) | limit. A list of newly proposed projects that will be funded with Road Maintenance & Hillsborough San Mateo 20/21 In Progress 2021 Street Resurfacing Project The 2021 Street Resurfacing Project consists of essential maintenance and Fiscal Year 2020-21 Road Maintenance and Rehabilitation Construction 05/2021 10/2021 3-30 22 13 Rehabilitation rehabilitation work for approximately 27 miles of hot mix asphalt (HMA) mill and fill, Account revenues is attached (27 miles of the Town's 83 miles of HMA overlay, microsurfacing, and crack sealing. roadways for this FY 2020-21)

Willow Road Road Maintenance & Menlo Park San Mateo 21/22 New Willow Road resurfacing This project will include: Pavement Rehab/Repair (Existing) begin at Middlefield Road Construction 07/2021 10/2021 15-20 24 13 Rehabilitation end at Chester Street

Road Maintenance & Ravenswood Avenue begin Alma Street Menlo Park San Mateo 21/22 New Ravenswood Avenue Resurfacing This project will include: Pavement Rehab/Repair (Existing) Construction 08/2021 10/2021 15-20 24 13 Rehabilitation end Marcussen Drive

Haven Avenue Complete Streets Haven Avenue Streetscape This project will include: Sidewalk and/or Crosswalk Rehab/Repair (Existing), Menlo Park San Mateo 21/22 New beginning at Marsh Road Construction 08/2021 10/2021 15-20 24 13 Components Improvement Pavement Rehab/Repair (Existing), Bicycle Lane (New) ending at Atherton Channel

Road Maintenance & FY 2020-2021 Pavement This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), ADA Pacifica San Mateo 20/21 Carried Over Fassler Avenue and Crespi Drive Construction 07/2021 10/2021 5-10 22 13 Rehabilitation Rehabilitation Project Curb Ramp Installation (New), Pavement Rehab/Repair (Existing)

*This list is subject to change and will be finalized upon the adoption of any jurisdiction that meets subsequent eligibility at the October 2021 Commission Meeting. Draft City Submitted - Fiscal Year 2021-22 Local Streets and Roads List of Projects *Projects listed are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1) August 19, 2021

Fiscal Year Initially Proposed Project Est Assembly Senate City County Project Type Title Description Location Components Est Start Est Useful Life Proposed Status Completion Districts Districts

Various City Streets including but not limited to. ACACIA COURT; ADOBE DRIVE; ALTA VISTA DRIVE; ANDORRA COURT; ANZA DRIVE; ARGUELLO BOULEVARD; CADIZ COURT; CERVANTES WAY; CHICO COURT; CRESPI This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Road Maintenance & FY 2020-21 & FY 2021-22 DRIVE; DE SOLO DRIVE; DELL ROAD; DRIFTWOOD CIRCLE; Pacifica San Mateo 21/22 New Sidewalk and/or Crosswalk Rehab/Repair (Existing), ADA Curb Ramp Installation Construction 07/2021 10/2021 5-10 22 13 Rehabilitation Pavement Resurfacing Project DRIFTWOOD COURT; ELM COURT; ENCANTO WAY; (New), Pavement Rehab/Repair (Existing) ESCALERO AVENUE; ESTELLA DRIVE; EVERGLADES DRIVE; FASSLER AVENUE; FERNANDEZ WAY; FLORES DRIVE; KENDALL COURT; LERIDA WAY; LINDA MAR BOULEVARD; MARVILLA CIRCLE; Full list is in the Resolution.

Roosevelt Avenue, Alameda de las Pulgas to Foothill Street; Arguello Street, Marshall Street to Whipple Avenue; Wilson Street, Franklin Street to End Upland Court, Cordilleras Road to Cul de sac; This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), ADA Barbour Drive, Canyon Road to Foss Drive; Road Maintenance & Fiscal Year 2020-21 Roadway Curb Ramp Installation (New), Pavement Rehab/Repair (Existing), Paving and/or Redwood City San Mateo 20/21 Carried Over Rolison Road, 2nd Avenue to 5th Avenue; Construction 08/2021 12/2021 8-15 22 13 Rehabilitation Pavement Management Program Striping Installation (New Safety), ADA Curb Ramp Rehab/Repair (Existing), Bicycle 2nd Avenue, Spring Street to Broadway, Lane Rehab/Repair (Existing) Broadway, Woodside Road to 5th Avenue; Shoreway Road, Marine Parkway to City limits; Bowsprit Drive, Bridge Parkway to Lanyard Drive; Lagoon Drive, Twin Dolphin Parkway to Marine Pa

This project will include: Pavement Rehab/Repair (Existing), Document Preparation, Road Maintenance & Cost Estimating | Preventative rehabilitation and pavement maintenance, including Pre-Construction and 01/2021 07/2021 Redwood City San Mateo 20/21 In Progress Hopkins Avenue Overlay Project Hopkins Avenue, El Camino Real to Upland Road 8-15 22 13 Rehabilitation raising utilities covers to grade, ADA improvements and installation of associated Construction 08/2021 12/2021 markers and striping.

Embarcadero, Rainsong to Canvasback; Farm Hill, Jefferson to City Limit; Fifth, 615 South of Spring and Bay; Jefferson, El Camino Real to Farm Hill; Main, Bridge past convention to Road Maintenance & Fiscal Year 2021-22 Roadway Veterans; Oracle, Marine (West) to Marine (East); Quay, Turks Redwood City San Mateo 21/22 New This project will include: Document Preparation, Cost Estimating Pre-Construction 08/2021 12/2021 8-15 22 13 Rehabilitation Pavement Management Program Head to Lanyard; Redwood Shores, City Limit to Bridge Pkwy; Rolison, Second to Fifth; Seaport, E Bayshore to Seaport; Second, Rolison to City limit; Shearwater, Marine to Canvasback; Shell, Marine to Baywalk.

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Road Maintenance & 2021-22 Street Reconstruction Montogmery Ave between Walnut St and Scott St, Parkview Ct Pre-Construction and 07/2021 05/2022 San Bruno San Mateo 21/22 New Pavement Rehab/Repair (Existing), ADA Curb Ramp Installation (New), Preliminary 15-15 22 13 Rehabilitation Project between Parkview Dr and End Construction 05/2022 10/2022 Design

Belmont Ave, Carmelita Ave, Cordilleras Ave, Debbie Ct, Elm St, Road Maintenance & 2021 Annual Pavement Melendy Dr, Oakview Dr, Wildwood Ave, Woodland Ave, Cedar San Carlos San Mateo 21/22 New This project will include: Document Preparation Pre-Construction 06/2021 01/2022 15-25 22 13 Rehabilitation Rehabilitation Project St, Chestnut St, Geneva Ave, Hill Wy, Maple Wy, Neal Ave, Oakhurst Ave, Sherwood Dr, and Cowgill Alley

10 roadway segments: Pacific Blvd (Delaware to Hillsdale), This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Norton St (Kehoe to So. End), Birch Ave (Railroad to Claremont), Road Maintenance & Citywide Street Reconstruction Project Scope Development, ADA Curb Ramp Installation (New), Pavement Stephen Rd (Hillsdale to Alameda), Tilia St (Borel to Hobart), Pre-Construction and 05/2021 04/2022 San Mateo San Mateo 21/22 New 10-30 22 13 Rehabilitation Package 3 Rehab/Repair (Existing), Cost Estimating, Document Preparation, Preliminary Design, 30th Ave (Monterey to Fernwood), Oregon Ave (St. John's to Construction 05/2022 12/2022 Environmental Study/Documents, ADA Curb Ramp Rehab/Repair (Existing) Bucknell), Jody Ct (Edna to End), Kingridge Dr (Fernwood to N/o Dalehurst), Lansdale St (31st to 30th)

*This list is subject to change and will be finalized upon the adoption of any jurisdiction that meets subsequent eligibility at the October 2021 Commission Meeting. Draft City Submitted - Fiscal Year 2021-22 Local Streets and Roads List of Projects *Projects listed are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1) August 19, 2021

Fiscal Year Initially Proposed Project Est Assembly Senate City County Project Type Title Description Location Components Est Start Est Useful Life Proposed Status Completion Districts Districts

This project will include: The Pre-Construction/Design work is in progress for this project that will Improve El Camino Real between Arroyo Drive and Kaiser Way by installing enhanced pedestrian crossings, bike lanes, corner bulbout and median South San Complete Streets Grand Boulevard Project Phase 3 Pre-Construction and 07/2017 12/2021 San Mateo 20/21 In Progress refuges, expanded bus stop/waiting areas, a new landscaped median, and green El Camino Real between Arroyo Drive and Kaiser Way 10-30 19, 22 13 Francisco Components (Arroyo Drive to Kaiser Way) Construction 01/2022 11/2022 infrastructure. | City received approval for federal funds to assist in funding the project. City worked with Caltrans to initiate the receipt of the federal funds for the preconstruction phase work.

This project will include: This project will consist of a roadway and pedestrian grade South Linden Avenue and Scott South San Road Maintenance & separation of the Caltrain commuter railroad. Useful life elements include ADA curb San Mateo 21/22 In Progress Street Grade Separation Project South Linden Avenue and Scott Street Pre-Construction 04/2016 04/2028 50-100 19, 22 13 Francisco Rehabilitation ramps, traffic signal modifications, pedestrian improvements, roadway grade (st1004) separation, and pedestrian grade separation.

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), The project will cover streets in the following neighborhoods: Sidewalk and/or Crosswalk Rehab/Repair (Existing), ADA Curb Ramp Installation Avalon, Baden, Buri -Buri, Brentwood, Paradise Valley, Serra (New), Pavement Rehab/Repair (Existing), Storm Drain and/or Culvert Rehab/Repair Highlands, and Sunshine Gardens neighborhoods. City (Existing), Paving and/or Striping Installation (New Safety) | Will consist of approx 2.25 streets included in this pavement rehabilitation project include South San Road Maintenance & 2020 Pavement Rehabilitation centerline miles of local street rehabilitation consisting of pavement base failure San Mateo 21/22 In Progress sections of: Alta Mesa Drive, Ash Construction 04/2021 08/2021 5-25 19, 22 13 Francisco Rehabilitation Project (st2104) repairs; cold mill of pavement surface & placement of Hot Mix Asphalt overlay; Avenue, Camaritas Avenue, Cuesta Drive, Escanyo Drive, addition of ADA compliant curb ramps; replacing failed concrete curb & gutter; Hazelwood Drive, Northwood Drive, replacing & adding new HMA speed cushions for traffic calming, & replacing all Southwood Center, Emerald Court, Forestview Drive, Iris Court, existing striping & pavement markings. Useful life elements include concrete repairs, and Sunnyside Drive. ADA curb ramps, pavement repairs & surface mill & overlay.

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), ADA Curb Ramp Installation (New), Pavement Rehab/Repair (Existing), Storm Drain and/or Culvert Rehab/Repair (Existing) | Will consist of approximately 1.28 centerline miles of local street The project will cover streets in the following neighborhoods: resurfacing & approximately 1. 31 centerline miles of local street rehabilitation Downtown and Old consisting of pavement base failure repairs; crack seal with asphalt rubberized cape Downtown neighborhoods. City streets included in this pavement South San Road Maintenance & 2021 Pavement Rehabilitation seal; cold mill of pavement surface & placement of Rubberized Hot Mix Asphalt Pre-Construction and 04/2021 06/2021 San Mateo 21/22 In Progress rehabilitation project include sections 5-25 19, 22 13 Francisco Rehabilitation Project (st2106) (RHMA) overlay (various depths); addition of ADA compliant curb ramps; replacing Construction 06/2021 10/2021 of. First Lane, Second Lane, Third Lane, Fourth Lane, Magnolia failed concrete curb & gutter; replacing failed concrete valley gutter; | replacing failed Avenue, Maple Avenue, Orange concrete valley gutter; replacing damaged storm and sewer manhole frame and Avenue, Pine Terrace and Railroad Avenue. covers; replacing HMA speed cushions for traffic calming, and replacing all existing striping and pavement markings. Useful life elements include: concrete repairs, ADA curb ramps, pavement repairs, rubberized cape seal surface treatment and RHMA pavement surface mill and overlay.

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), ADA The project will cover streets in majority of neighborhoods W of Curb Ramp Installation (New), Pavement Rehab/Repair (Existing), Storm Drain and/or 101. City streets Culvert Rehab/Repair (Existing) | This project will consist of approximately 14.7 tentatively included in this pavement rehabilitation project include centerline miles of local street rehabilitation consisting of pavement base failure sections of Second Ln,Airport repairs; cold mill of pavement surface and placement of Hot Mix Asphalt ( HMA) South San Road Maintenance & 2022 West of 101 Pavement Blvd,Avalon Dr,Bourbon Ct,Browning Wy,C St,Callan Blvd,Canal Pre-Construction and 04/2021 02/2022 San Mateo 21/22 In Progress overlay ( various depths); addition of ADA compliant curb ramps; replacing failed 5-25 19, 22 13 Francisco Rehabilitation Rehabilitation Project (st2107) St,Carter Dr,Chestnut Ave,Dollar Ave,Duhallow Wy,El Cortez Construction 03/2022 10/2022 concrete curb & gutter; replacing damaged storm and sewer manhole frame and Ave,Elm Ct,Erin Pl,Gellert Blvd,Hickey Blvd,Junipero Serra covers; replacing Blvd,Keats Ave,Linden Ave,Memorial Dr,Myrtle Ave,Park HMA speed cushions for traffic calming; and replacing all existing striping and Wy,Produce Ave,Radburn Dr,Ridge Ct,Ridgeview Ct,Ryan pavement markings. | Useful life elements include: concrete repairs, ADA curb ramps, Wy,San Mateo Ave,Shaw Rd, etc. pavement repairs and HMA pavement surface mill and overlay.

Miramontes Avenue from Woodside Road to 281 Miramontes Ave.; Miramontes Avenue from 318 Miramontes Avenue to Road Maintenance & Manuella Ave.; Manzanita Way from Mountain Home Rd. to Woodside San Mateo 21/22 New 2022 Road Rehabilitation Project This project will include: Pavement Rehab/Repair (Existing) Construction 07/2022 11/2022 5-15 24 13 Rehabilitation Sandhill Rd.; Bardet Rd. from Canada Rd. to End; Greenways from Alameda de las Pulgas to End; Tum Suden Way from California Way to End

*This list is subject to change and will be finalized upon the adoption of any jurisdiction that meets subsequent eligibility at the October 2021 Commission Meeting. Draft City Submitted - Fiscal Year 2021-22 Local Streets and Roads List of Projects *Projects listed are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1) August 19, 2021

Fiscal Year Initially Proposed Project Est Assembly Senate City County Project Type Title Description Location Components Est Start Est Useful Life Proposed Status Completion Districts Districts

Cathedral Oaks from Calle Real to Winchester Canyon Road and This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Road Maintenance & 2020 Pavement Rehabilitation from Glen Annie Road to Alameda Avenue, Hollister Avenue Pre-Construction and 07/2020 06/2021 Goleta Santa Barbara 20/21 Carried Over Pavement Rehab/Repair (Existing) | The Proposed list of projects includes road 20-30 37 19 Rehabilitation Project from Kinman Avenue to Kellogg Avenue, and Kellogg Avenue Construction 09/2021 03/2022 reconstruction for some of the roadways. from Hollister Avenue to Kellogg Way

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Glen Annie Road from Highway 101 to Cathedral Oaks Road, Road Maintenance & 2021 Pavement Rehabilitation Pre-Construction and 07/2020 06/2021 Goleta Santa Barbara 20/21 Carried Over Pavement Rehab/Repair (Existing) | The proposed project locations will include road Storke Road from Hollister Avenue to Bollay Drive, and Calle 20-30 37 19 Rehabilitation Program Construction 09/2021 03/2022 reconstruction for some roadways. Real from Glen Annie Road to Sonoma Drive

Storke Road from Hollister Avenue to Bollay Drive, Los Carneros Road Maintenance & 2022 Pavement Rehabilitation Goleta Santa Barbara 21/22 New This project will include: Cost Estimating Road from Cathedral Oaks Road to Calle Real, and Cathedral Pre-Construction 09/2021 04/2022 20-30 37 19 Rehabilitation Program Oaks from Glen Annie Road to W/S Bridge.

This project will include: Procurement of Public Works Safety Materials and Gear, Procurement of Road Maintenance and Rehab Materials, Public Works Staffing | This Maintenance of Traffic Control Procurement/Operatio Lompoc Santa Barbara 21/22 New Traffic Control Devices project includes the purchase, fabrication, installation, repair, replacement, removal, Citywide 07/2021 06/2022 2-10 35 19 Devices nal Needs use, and maintenance of traffic control devices. | Units of staffing are in hours, and units of materials are in dollars.

This project will include: Public Works Staffing, Procurement of Road Maintenance Road Maintenance & and Rehab Materials | This project includes the purchase and construction of asphalt Procurement/Operatio Lompoc Santa Barbara 21/22 New Pavement Repair Citywide 07/2021 06/2022 1-10 35 19 Rehabilitation pavement and related materials to repair and rehabilitate City streets and alleys. | nal Needs Units of staffing are in hours, and units of materials are in dollars.

Project 092-320 location: south west Buellton including the following streets: Riverview Drive, Farmland Drive, Parkview Road Maintenance & This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Buellton Santa Barbara 21/22 New 2021/22 Road Maintenance Project Road, Meadow Road, Dairy Way, Sycamore Drive, Ranch Road, Construction 05/2022 07/2022 15-25 37 19 Rehabilitation Pavement Rehab/Repair (Existing) Valley Dairy Road, Dairyland Road, Meadow View Drive. Project 092-319 location includes: McMurray Road

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Road Maintenance & FY 2020-21 Road Maintenance Buellton Santa Barbara 20/21 Carried Over Pavement Rehab/Repair (Existing), Bicycle Lane (New), Paving and/or Striping McMurray Road and South of State Highway 246 Construction 10/2021 04/2022 20-25 37 19 Rehabilitation Project Installation (New Safety), Bicycle Lane Rehab/Repair (Existing) | CIP #092-319

Fourth Street (Holly Avenue to End of Holly Avenue); Third This project will include: Pavement Improvement (New), Paving and/or Striping Street (Linden Avenue to Ash Avenue); Calle Ocho (Concha Road Maintenance & 2021 Pavement Rehabilitation Rehab/Repair (Existing Safety), Sidewalk and/or Crosswalk Rehab/Repair (Existing), Loma Drive to South End of Calle Ocho); Calle Ocho (Concha Carpinteria Santa Barbara 21/22 New Construction 07/2021 11/2021 5-20 37 19 Rehabilitation Project ADA Curb Ramp Installation (New), Storm Drain and/or Culvert Rehab/Repair Loma Drive to North End of Calle Ocho); Elm Lane (Sawyer (Existing), ADA Curb Ramp Rehab/Repair (Existing) Avenue to Carpinteria Avenue); Eigth Street (Palm Avenue to Walnut Avenue); Holly Avenue (Seventh Street to Fifth Street)

Obispo St (9th-11th), Almaguer Ave, Nelson Dr, Masatani Ct, Road Maintenance & This project will include: ADA Curb Ramp Installation (New), Pavement Rehab/Repair Guadalupe Santa Barbara 21/22 New 2021 Road Rehabilitation Project Montez Ct, Julia Dr, Camp Ln, Hernandez Dr, Mills Ln, Sanchez Construction 04/2021 11/2021 3-5 35 19 Rehabilitation (Existing) Dr, Chapman Dr

*This list is subject to change and will be finalized upon the adoption of any jurisdiction that meets subsequent eligibility at the October 2021 Commission Meeting. Draft City Submitted - Fiscal Year 2021-22 Local Streets and Roads List of Projects *Projects listed are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1) August 19, 2021

Fiscal Year Initially Proposed Project Est Assembly Senate City County Project Type Title Description Location Components Est Start Est Useful Life Proposed Status Completion Districts Districts

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), •Castillo Street (Carrillo St. to north of Haley St.) Road Maintenance & FY21B Pavement Maintenance Sidewalk and/or Crosswalk Rehab/Repair (Existing), Pavement Rehab/Repair •Mission Street (State St. to Santa Barbara St.) Santa Barbara Santa Barbara 21/22 New Construction 10/2021 05/2022 20-20 37 19 Rehabilitation Project (Existing), ADA Curb Ramp Installation (New), ADA Curb Ramp Rehab/Repair •Mission Street (Modoc Rd. to Hwy 101) (Existing), Bicycle Lane Rehab/Repair (Existing) •Chapala Street (Sola St. to Mission St.)

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Sidewalk and/or Crosswalk Rehab/Repair (Existing), Pavement Rehab/Repair (Existing), ADA Curb Ramp Rehab/Repair (Existing), Bicycle Lane Rehab/Repair Road Maintenance & Santa Barbara Santa Barbara 20/21 Carried Over Haley Street Overlay (Existing) | The project will rehabilitate 13 blocks of Haley Street from Castillo Street to Haley Streets from Castillo Street to Alisos Street Construction 10/2022 06/2023 15-20 37 19 Rehabilitation Milpas Street; replacing damaged concrete sidewalks, curbs, gutters, and cross gutters; upgrading access ramps to meet Americans with Disabilities Act requirements; and grinding and overlaying the roadway surface.

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Sidewalk and/or Crosswalk Rehab/Repair (Existing), Pavement Rehab/Repair (Existing), ADA Curb Ramp Installation (New), Bicycle Lane (New), ADA Curb Ramp East Alvin Avenue from College Drive to Bradley Drive; East Alvin Avenue, South College Rehab/Repair (Existing), Bicycle Lane Rehab/Repair (Existing) | This project will South College Drive from Stowell Road to Enos Drive; Battles Road Maintenance & Drive, Battles Road Ovelays and include digouts, restoration of pavement failures, and the placement of a standard 2- Santa Maria Santa Barbara 20/21 Carried Over Road from Miller to College; arterial digouts on Skyway from Construction 09/2021 12/2021 15-20 35 19 Rehabilitation Arterial Pavement Rehabilitation inch asphalt overlay over three (3) highily distressed street sections. It also includes Betteravia to Broadway, Stowell from Broadway to Black Road, Project the digout and replacement of failed areas of pavement on several other distressed and Depot St from Stowell to Cook. arterials. Additionally, the project also includes installation of new striping and pavement markings. | Approximately 250,000 SF of roadway, equivalent to 2.5-3 lane miles, will be overlayed and 150,000 SF of digouts will be repaired.

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Various streets including: Stowell Road from Black Road to Pavement Rehab/Repair (Existing), Paving and/or Striping Installation (New Safety) | Broadway, Skyway Dr from Betteravia to SR-135, Railroad Ave Road Maintenance & Annual Surface Seal Street This project consists of placing a chip seal, slurry seal, or other surface treatments for Santa Maria Santa Barbara 21/22 New from Donovan Rd. to Canal St., Depot St from Main to Morrison, Construction 09/2021 12/2021 4-10 35 19 Rehabilitation Maintenance Project pavement preservation and install pavement markings on various City streets in the Alvin Ave., Railroad Ave., and several residential streets around City of Santa Maria. The project will provide a surface treatment for 26 centerline the City. miles, 650,000 square yards of pavement area.

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing), Storm Drain and/or Culvert Rehab/Repair (Existing), Paving and/or Striping Installation (New Safety) | Reconstruct South Alisal Road Maintenance & South Alisal Road Pavement South Alisal Road from the Santa Ynez River to the southerly Solvang Santa Barbara 19/20 Carried Over Road by recycling the existing asphalt pavement and road base using a process know Construction 08/2021 11/2021 25-40 35 19 Rehabilitation Reconstruction Project City Limits. as full depth reclamation. | Due to revenue impacts from COVID-19 the project was delayed. Project construction was delayed from winter-spring 2021 to summer-fall 2021 (FY 2021-22).

City of Cupertino - Various residential and collector streets Road Maintenance & 2021 Pavement Maitenance Phase This project will include: Project Scope Development, Cost Estimating, Document Cupertino Santa Clara 21/22 New including but not limited to Mary Ave, Beardon Ave, Valley Pre-Construction 09/2021 11/2021 5-8 28 15 Rehabilitation 2 Preparation, Preliminary Design Green Dr, De Foe Dr, De La Farge, and Disney Dr

Landess Ave from Piedmont Rd to Dempsey Rd; Milmont Dr from California Circle to Dixon Landing Rd; This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Streets bounded by Milmont Dr, Penetencia Creek, and Dixon Road Maintenance & Sidewalk and/or Crosswalk Rehab/Repair (Existing), Pavement Rehab/Repair Landing Rd; Streets bounded by railroad tracks, Milmont Dr, Milpitas Santa Clara 20/21 Carried Over Street Resurfacing 2021 Construction 06/2021 12/2021 10-15 25 10 Rehabilitation (Existing), Bicycle Lane Rehab/Repair (Existing), ADA Curb Ramp Rehab/Repair Penetencia Creek, and Calera Creek Piedmont Rd from Landess (Existing) Ave to Yosemite Dr; Streets bounded by Piedmont Rd, Yosemite Dr, Landess Ave, Ben Rodgers Park, and Hillcrest Park.

*This list is subject to change and will be finalized upon the adoption of any jurisdiction that meets subsequent eligibility at the October 2021 Commission Meeting. Draft City Submitted - Fiscal Year 2021-22 Local Streets and Roads List of Projects *Projects listed are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1) August 19, 2021

Fiscal Year Initially Proposed Project Est Assembly Senate City County Project Type Title Description Location Components Est Start Est Useful Life Proposed Status Completion Districts Districts

Traughber St from N Park Victoria to eastern end, and the entirety of Prada Dr, Santos Ct, Stemel Way, Stemel Ct, Prada This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Ct, Topham Ct, Simas Dr, Quail Dr, Ramos Ct, Serpa Dr, Old Road Maintenance & Sidewalk and/or Crosswalk Rehab/Repair (Existing), Pavement Rehab/Repair Milpitas Santa Clara 21/22 New Street Resurfacing 2022 Evans Rd, Michael St, Michael Ct, Brian Ct, Fanyon St, N. Construction 05/2022 12/2022 7-14 25 10 Rehabilitation (Existing), Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Gadsden Dr, Lynne Ave, N. Temple Dr, Spring Valley Ln, Ellise Bicycle Lane Rehab/Repair (Existing), ADA Curb Ramp Rehab/Repair (Existing) Ave, Adams Ave, Dennis Ave, Carl Ave, Braly Ave, Golden Hills Dr, View Dr, Arana Ct, and Fair Hill Dr.

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Sidewalk and/or Crosswalk Rehab/Repair (Existing), Pavement Rehab/Repair Road Maintenance & Annual Roadway Improvements 21- Saratoga Santa Clara 21/22 New (Existing), ADA Curb Ramp Installation (New), Paving and/or Striping Installation (New Saratoga Avenue, El Camino Grande, and Via Colina Construction 08/2021 03/2022 5-25 28 15 Rehabilitation 22 Safety), ADA Curb Ramp Rehab/Repair (Existing), Bicycle Lane Rehab/Repair (Existing) | Curb and Gutter Repair

Cascade Dr, Cheyenne Drive, Connemara Way, Cortez Dr, Enderby Wy, Gail Ave, Lark Ln, Lawrence Station Rd, Lochinvar Road Maintenance & Pavement Rehabilitation 2022- Sunnyvale Santa Clara 21/22 Carried Over This project will include: Pavement Rehab/Repair (Existing) | Mill & FIll Ave, Old San Francisco Rd, S Murphy Ave, Sandia Ave, Construction 02/2021 10/2022 10-20 24 13 Rehabilitation SB1, ST-21-05 Sheraton Dr, Spinosa Dr, Teal Dr, W Maude Ave, E Arques, Vienna Dr

Birchwood Drive Borregas Ave California Ave E. Evelyn Ave Fair Oaks Avenue Geneva Dr Kifer Road Macara Ave Road Maintenance & Moffett Park Dr Sunnyvale Santa Clara 21/22 In Progress Slurry Seal 2021-B ST-21-07 This project will include: Pavement Rehab/Repair (Existing) | Slurry Seal Construction 01/2021 12/2021 10-20 24 13 Rehabilitation Moffett Park Dr N Sunnyvale Ave Old San Francisco Rd Old San Francisco Rd Old San Francisco Rd Old San Francisco Rd Old San Francisco Rd S Sunnyvale Ave Tasman Drive

Wolfe Rd (Fremont-El Camino Real s/s); Wolfe Rd (Marion - Road Maintenance & Pavement Rehabilitation Wolfe Rd, Sunnyvale Santa Clara 21/22 Forecasted This project will include: Pavement Rehab/Repair (Existing) | Mill & Fill Fremont); Wolfe Rd (Inverness - Marion); Wolfe Rd (Homestead Construction 07/2021 10/2022 10-20 24 13 Rehabilitation ST-21-08 City Limit - Inverness)

Approximately 4.5 miles of residential and collector streets in This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), City of Campbell including segments of Capri Dr, Chapman Dr, Annual Street Maintenance Project Road Maintenance & Sidewalk and/or Crosswalk Rehab/Repair (Existing), ADA Curb Ramp Installation Crocket Ave, Cronwell, Dr, Division St, El Patio Ct, El Patio Dr, Campbell Santa Clara 21/22 New 22-BB: Collector and Residential Construction 06/2022 12/2022 5-20 28 15 Rehabilitation (New), Pavement Rehab/Repair (Existing), ADA Curb Ramp Rehab/Repair (Existing) | Gilman Ave, Grace Av, Hawthorne Av, and others. Full proposed Street Resurfacing Putting back striping for existing sharrows on some streets. candidate street list included in City Resolution No. 12714 Exhibit A.

In the City of Gilroy. The list of street segments were too many This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Road Maintenance & FY 22 Pavement Maintenance to name, therefore we are including the following link of the Gilroy Santa Clara 21/22 New Pavement Rehab/Repair (Existing), Bicycle Lane (New), ADA Curb Ramp Construction 04/2022 06/2022 5-7 30 17 Rehabilitation Project website of the proposed work: Rehab/Repair (Existing) https://www.cityofgilroy.org/844/Capital-Improvement-Program

*This list is subject to change and will be finalized upon the adoption of any jurisdiction that meets subsequent eligibility at the October 2021 Commission Meeting. Draft City Submitted - Fiscal Year 2021-22 Local Streets and Roads List of Projects *Projects listed are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1) August 19, 2021

Fiscal Year Initially Proposed Project Est Assembly Senate City County Project Type Title Description Location Components Est Start Est Useful Life Proposed Status Completion Districts Districts

Road Maintenance & Annual Street Resurfacing FY2021-This project will include: Pavement maintenance work including dig-out repairs, Various streets within Los Altos jurisdiction. Street list is attached Los Altos Santa Clara 21/22 New Pre-Construction 07/2022 08/2022 6-15 24 13 Rehabilitation 22 microsurfacing, hot-mix asphalt overlays and signage and striping improvement. as part of the resolution.

This streets operation and maintenance will cover town-wide public streets (total 216 streets) in general, the approximate boundary streets are listed below: Road Maintenance & Streets Operations and This project will include: This budget will support the necessary work on various street Page Mill Road - Arastradero Road - Foothill Expressway - Edith Los Altos Hills Santa Clara 19/20 In Progress Pre-Construction 07/2021 06/2022 5-10 24 13 Rehabilitation Maintenance Budget repairs and maintenance throughout town on as needed basis. Ave - Fremont Road - O'Keefe Ln - El Monte Road - Summerhill Avenue - Magdalena Avenue - Eastbrook Avenue - W Loyola Drive - Stone Brook Drive - Moody Road Then back on Page Mill Road.

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing) | This is an annual street resurfacing project that 2021 Pavement Rehabilitation and includes 1.5” and 2” overlay with digouts, microsurfacing, microsurfacing and digouts, Road Maintenance & Selection is ongoing but potential roads include Adonna Court, Los Altos Hills Santa Clara 21/22 New Storm Drainage Improvement and pavement markings replacement throughout various streets within Town limits. Construction 07/2021 10/2021 5-20 24 13 Rehabilitation Robleda Road, and Viscaino Court. Project (See attached exhibit for street names.) The selected streets were determined by the recommendation from the Metropolitan Transportation Commission’s Pavement Management Program.

This project will include: Sidewalk and/or Crosswalk Rehab/Repair (Existing), Road Maintenance & Winchester Boulevard Class IV Winchester Boulevard within the City Limits (Pleasant View Monte Sereno Santa Clara 21/22 New Pavement Rehab/Repair (Existing), Paving and/or Striping Installation (New Safety), Construction 04/2021 08/2021 10-25 15 28 Rehabilitation Bikeway Project Avenue to Nagpal Court) Bicycle Lane Rehab/Repair (Existing), ADA Curb Ramp Rehab/Repair (Existing)

1) Tennant Avenue from east of Monterey Road to west of Vineyard Blvd; 2) Peak Avenue from Wright Avenue to Dunne Avenue; 3) Wright Avenue from Monterey Rd to Peak Avenue; 4) Road Maintenance & 2021 Pavement Resurfacing This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Morgan Hill Santa Clara 21/22 New Alkire Drive from Dewitt Avenue to Peak Avenue; 5) Dewitt Construction 06/2021 09/2021 5-20 30 17 Rehabilitation Project Pavement Rehab/Repair (Existing) Avenue from Alkire Drive to West Main Avenue; 6) Farallon Drive; 7) Torrey Court; and 8) West Main Avenue from Dewitt Avenue to Peak Avenue.

1) East Dunne Avenue from Hill Road to lower Thomas Grade; Flaming Oak to upper Thomas Grade; 2500' east of Holiday Drive to the eastern City limit; 2) Hill Road from south of East Road Maintenance & 2022 Pavement Resurfacing This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Morgan Hill Santa Clara 21/22 New Dunne Avenue to the southern City limit; 3) Jackson Oaks Drive; Construction 06/2022 09/2022 5-20 30 17 Rehabilitation Project Pavement Rehab/Repair (Existing) 4) Murphy Avenue from San Pedro Avenue to the southern City limit; and 5) various residential streets in the Jackson Meadows neighborhood.

Appletree Lane from Fordham Way to Rose Avenue; Boranda Road Maintenance & This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Ave from ECR to Hans Ave; Dana Street from Calderon Ave to Pre-Construction and 08/2022 02/2023 Mountain View Santa Clara 21/22 New 23-03: SB-1 Streets Project 8-10 24 13 Rehabilitation Pavement Rehab/Repair (Existing) | Resurfacing and/or Slurry Seal. Moorpark Way; Fordham Way from Barbara Ave to Meadow Construction 03/2023 07/2023 Lane, and Lola Lane from Barbara Ave to Begen Avenue

*This list is subject to change and will be finalized upon the adoption of any jurisdiction that meets subsequent eligibility at the October 2021 Commission Meeting. Draft City Submitted - Fiscal Year 2021-22 Local Streets and Roads List of Projects *Projects listed are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1) August 19, 2021

Fiscal Year Initially Proposed Project Est Assembly Senate City County Project Type Title Description Location Components Est Start Est Useful Life Proposed Status Completion Districts Districts

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Sidewalk and/or Crosswalk Rehab/Repair (Existing), Pavement Rehab/Repair (Existing), Landscape Safety Installation (New), Traffic Signals, Lights, and/or Signage Arastradero Road (Los Palos Avenue to El Camino Real), West Complete Streets Charleston-Arastradero Corridor Rehab/Repair (Existing Safety), Bicycle Lane Rehab/Repair (Existing), ADA Curb Palo Alto Santa Clara 19/20 Carried Over Charleston Road (El Camino Real to Alma Street), and East Construction 08/2021 07/2022 25-30 24 13 Components Project (Phase 3) Ramp Rehab/Repair (Existing) | This project will install enhanced bicycle and Charleston Road (Middlefield Road to San Antonio Road). pedestrian improvements, 42,000 square feet of landscaped median and bio-retention areas, bulb-outs, traffic signal modifications and installation of a new traffic signal and new rubberized pavement.

Segments of the following roads: AIRPORT BL BASCOM AV S BROKAW RD CAMINO VERDE DR CURTNER AV EDENVALE AV GOLD ST HILLSDALE This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), ADA JULIAN ST W Road Maintenance & Curb Ramp Installation (New), Pavement Rehab/Repair (Existing), Bicycle Lane San Jose Santa Clara 21/22 New 2022 Major Streets Sealing Project LEYLAND PARK DR Construction 05/2022 12/2022 5-7 25, 27, 28, 29 10, 15, 17 Rehabilitation (New), Paving and/or Striping Installation (New Safety), ADA Curb Ramp PROSPECT RD Rehab/Repair (Existing), Bicycle Lane Rehab/Repair (Existing) QUIMBY RD SADDLE BROOK DR SILVER CREEK RD SNELL AV SPRECKLES AV TAYLOR ST N TULLY RD WAR ADMIRAL AV WHITE RD S

Segments of the following Roads: AIRPORT PK ALUM ROCK AV AVENIDA ESPANA AVENIDA ROTELLA BASCOM AV S BOOKSIN AV COLEMAN AV ECHO VALLEY DR This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), ADA GOLD ST Road Maintenance & 2022 Major Streets Resurfacing Curb Ramp Installation (New), Pavement Rehab/Repair (Existing), Bicycle Lane HILLCREST DR San Jose Santa Clara 21/22 New Construction 05/2022 12/2022 15-20 25, 27, 28, 29 10, 15, 17 Rehabilitation Project (New), Paving and/or Striping Installation (New Safety), Bicycle Lane Rehab/Repair JACOB AV (Existing), ADA Curb Ramp Rehab/Repair (Existing) KIRK RD MINNESOTA AV RESEARCH PL SAN CARLOS ST W SKYWAY DR SNELL AV SNOW DR STEVENS CREEK BL VIA DEL ORO WINCHESTER BL

Lafayette St (Aldo Ave to Clyde Ave); Lafayette St N/B (Clyde This project will include: Sidewalk and/or Crosswalk Installation (New), Paving and/or Ave to Montague Expwy); Lafayette St S/B (Clyde Ave to Striping Rehab/Repair (Existing Safety), Sidewalk and/or Crosswalk Rehab/Repair Montague Expwy); Lafayette St (Montague Expwy to Agnew Rd); Road Maintenance & Annual Street Maintenance and (Existing), ADA Curb Ramp Installation (New), Pavement Rehab/Repair (Existing), Pre-Construction and 06/2021 04/2022 Santa Clara Santa Clara 21/22 New Lafayette St N/B (Agnew Rd to Hogan Dr); Lafayette St S/B 3-20 25 10 Rehabilitation Rehabilitation Program Bicycle Lane (New), Document Preparation, Cost Estimating, Paving and/or Striping Construction 04/2022 12/2022 (Agnew Rd to Hogan Dr); Lafayette St (Hogan Dr to Calle De Installation (New Safety), Preliminary Design, Bicycle Lane Rehab/Repair (Existing), Luna); Mission College Blvd (Freedom Circle West to Montague ADA Curb Ramp Rehab/Repair (Existing) Expwy)

*This list is subject to change and will be finalized upon the adoption of any jurisdiction that meets subsequent eligibility at the October 2021 Commission Meeting. Draft City Submitted - Fiscal Year 2021-22 Local Streets and Roads List of Projects *Projects listed are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1) August 19, 2021

Fiscal Year Initially Proposed Project Est Assembly Senate City County Project Type Title Description Location Components Est Start Est Useful Life Proposed Status Completion Districts Districts

Huckleberry Court Bidwell Avenue Karameos Drive Karameos Court Road Maintenance & Pavement Rehabilitation 2022- Sunnyvale Santa Clara 21/22 In Progress This project will include: Pavement Rehab/Repair (Existing) Picasso Drive Construction 06/2021 10/2022 7-10 24 13 Rehabilitation SB1, ST-18-09 Commercial Street Maude Avenue E. Arques Avenue Remington Drive

This project will include: Project Scope Development, Paving and/or Striping 42nd Avenue - Capitola Road to Jade Street Rehab/Repair (Existing Safety), Sidewalk and/or Crosswalk Rehab/Repair (Existing), Bay Avenue - Highway 1 to Capitola Avenue Road Maintenance & Pavement Rehab/Repair (Existing), Maintenance Program Plan Development, Clares Street - Wharf Road to 41st Avenue Pre-Construction and 06/2021 08/2021 Capitola Santa Cruz 21/22 Carried Over 2021 Pavement Management Plan 15-30 29 17 Rehabilitation Document Preparation, Cost Estimating, Storm Drain and/or Culvert Rehab/Repair Diamond Street - 42nd Avenue to 45th Avenue Construction 09/2021 05/2022 (Existing), Preliminary Design, Environmental Study/Documents, Bicycle Lane Ruby Court - entire length Rehab/Repair (Existing), ADA Curb Ramp Rehab/Repair (Existing) Fanmar Way - Capitola Ave to Monterey

This project will include: Sidewalk and/or Crosswalk Rehab/Repair (Existing), ADA Road Maintenance & City street arterial and collector Chestnut Street (locust St to Laurel St), Ocean Street (Rte 1 to Santa Cruz Santa Cruz 21/22 New Curb Ramp Installation (New), Pavement Rehab/Repair (Existing), Bicycle Lane Construction 07/2021 06/2022 5-15 29 17 Rehabilitation street rehabilitation Water Street), Bay Street (Rte 1 to Redwood St) Rehab/Repair (Existing)

This project will include: This project is an annual street overlay program that includes Road Maintenance & Annual Street Whispering Pines Drive, starting at Estrella Drive to Baja Sol Scotts Valley Santa Cruz 21/22 New resurfacing of various city-maintained streets on a rotating basis. Maintenance in FY Pre-Construction 04/2022 06/2022 10-15 29 17 Rehabilitation Maintenance/Resurfacing Program Drive 21/22 will consist of HMA overlays.

This project will include: Sidewalk and/or Crosswalk Rehab/Repair (Existing), Pavement Rehab/Repair (Existing), Traffic Signals, Lights, and/or Signage Installation Road Maintenance & Freedom Blvd Improvements from (New Safety), ADA Curb Ramp Rehab/Repair (Existing), Bicycle Lane Rehab/Repair Watsonville Santa Cruz 21/22 New Freedom Blvd from Alta Vista Ave to Green Valley Rd Construction 07/2021 06/2022 20-20 29 17 Rehabilitation Alta Vista Ave to Green Valley Rd (Existing) | Install new traffic signal at Sydney Ave. Includes design, environmental documentation and construction enhancements on Rodriguez St, Union St and Brennan St. Bulb-out improvements on Rodriguez St and Union St

Road Maintenance & Green Valley Rd Reconstruction This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), ADA Watsonville Santa Cruz 19/20 In Progress Green Valley Rd from Freedom Blvd to City Limits Construction 07/2021 06/2022 20-20 30 17 Rehabilitation (Freedom Blvd to City Limits) Curb Ramp Rehab/Repair (Existing), Bicycle Lane Rehab/Repair (Existing)

Road Maintenance & Watsonville Santa Cruz 20/21 Carried Over Road Repair This project will include: Pavement Rehab/Repair (Existing) Airport Blvd from Freedom Blvd to 600 ft west of Freedom Blvd Construction 07/2021 06/2022 10-10 30 17 Rehabilitation

This project will include: Sidewalk and/or Crosswalk Installation (New), Bicycle Lane Pre-Construction and 03/2018 08/2020 Redding Shasta 20/21 In Progress Match Funds West Street Safety Improvements West Street from Eureka Way to 7th Street 15-30 1 1 (New) Construction 05/2021 01/2022

Along Churn Creek Road between Hartnell Avenue and Cypress Churn Creek/Maraglia This project will include: Sidewalk and/or Crosswalk Installation (New), ADA Curb Redding Shasta 20/21 Carried Over Match Funds Avenue and on Maraglia Street between Churn Creek Road and Construction 06/2021 12/2021 15-30 1 1 Improvements Ramp Installation (New), Bicycle Lane (New) | Street Lighting Hilltop Drive.

*This list is subject to change and will be finalized upon the adoption of any jurisdiction that meets subsequent eligibility at the October 2021 Commission Meeting. Draft City Submitted - Fiscal Year 2021-22 Local Streets and Roads List of Projects *Projects listed are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1) August 19, 2021

Fiscal Year Initially Proposed Project Est Assembly Senate City County Project Type Title Description Location Components Est Start Est Useful Life Proposed Status Completion Districts Districts

This project will include: Procurement of Public Works Systems/Databases, Procurement of Public Works Safety Materials and Gear, Procurement of Public Road Maintenance & Procurement/Operatio Redding Shasta 21/22 New General Street Maintenance Works Equipment, Public Works Staffing, Repair and Servicing of Public Works Citywide 07/2021 06/2022 1-5 1 1 Rehabilitation nal Needs Systems/Databases, Procurement of Road Maintenance and Rehab Materials, Repair and Servicing of Public Works Equipment

Complete Streets This project will include: Project includes a road diet, sidewalk gap closure, ADA curb Bechelli Lane from Cypress Avenue on the; North to Riverview Redding Shasta 19/20 In Progress Bechlli Lane ATP Improvements Construction 03/2018 08/2022 15-30 1 1 Components ramps, buffered bike lanes and enhanced pedestrian crossings Country Club.

Pre-Construction and 06/2018 11/2022 Shasta Lake Shasta 20/21 Carried Over Other Moody Creek Bridge Replacement This project will include: Replace bridge. Cascade Boulevard @ Moody Creek 50-75 1 1 Construction 03/2023 03/2024

Road Maintenance & Pine Grove Area Street This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Pine Grove area of Shasta Lake, including Deer Creek Ave, Shasta Lake Shasta 21/22 New Construction 05/2022 06/2022 10-20 1 1 Rehabilitation Improvements 2022 Pavement Rehab/Repair (Existing) Smith Ave, Ostling Ave, Ostling Court, Cottage Ave, and Ivy Ave.

Street Boundaries Include: Poole Ln, Beckwith Rd, White St, Jones St, Zollinger St, Meeker St, 1st St, 2nd St, 3rd St, 4th St, E This project will include: Pavement Rehab/Repair (Existing) | Chip Seal and Slurry on 2nd St, W 3rd St, N 5th St, Church St, Court Ln, Pine St, Road Maintenance & all city streets Railroad Ave, School St, Front St, E Lewis St, Mill St, Taylor Ave, Pre-Construction and 08/2021 12/2021 Loyalton Sierra 19/20 Carried Over City of Loyatlon 5-10 1 1 Rehabilitation New Stop Signs Granite Ave, Patterson Ave, Cemetery Rd, Hill St Construction 01/2022 08/2022 Fix pothole on city streets All locations have yet to be finalized and are subject to change. Each location will be selected based on priority need and resources throughout the year.

This project will include: Pavement Rehab/Repair (Existing), Cost Estimating | Road Maintenance & Pre-Construction and 08/2021 12/2021 Loyalton Sierra 19/20 Carried Over Rail Road and Lewis Preparation and plans and specification to repair curbs and roadway damaged in the Railroad Ave and Lewis Ave 3-5 1 1 Rehabilitation Construction 01/2022 08/2022 flood of 2017.

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Road Maintenance & Cleveland from Woodland Sr. South/Bryan Sr. From College St. Etna Siskiyou 20/21 Carried Over Cleveland/Bryan Street Rehab Pavement Rehab/Repair (Existing) | Overlay dilapidated road and resolve road base Construction 03/2021 10/2021 15-20 1 1 Rehabilitation North issues

Road Maintenance & Montague Siskiyou 20/21 Carried Over New Sidewalks This project will include: Cost Estimating 6th St. & E. Prather St Pre-Construction 06/2024 06/2025 15-20 1 1 Rehabilitation

*This list is subject to change and will be finalized upon the adoption of any jurisdiction that meets subsequent eligibility at the October 2021 Commission Meeting. Draft City Submitted - Fiscal Year 2021-22 Local Streets and Roads List of Projects *Projects listed are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1) August 19, 2021

Fiscal Year Initially Proposed Project Est Assembly Senate City County Project Type Title Description Location Components Est Start Est Useful Life Proposed Status Completion Districts Districts

City of Yreka 2021 Strategic This project will include: Pavement Rehab/Repair (Existing) | This project will include: Road Maintenance & Yreka Siskiyou 21/22 New Paving, Preventive and Planning Pavement Rehab/Repair (Existing) | Strategic chipsealing and other preventive Campbell Avenue and Sharps Road, Yreka, Ca Construction 07/2021 10/2021 5-15 1 1 Rehabilitation Project maintenance of City of Yreka streets.

Road Maintenance & Dorris Siskiyou 20/21 Carried Over N. PIne Street Rehab This project will include: Pavement Rehab/Repair (Existing) N. Pine Street between cross street of Sly and Hazen Construction 04/2021 10/2022 20-40 1 1 Rehabilitation

intersection of Wood St and Dunsmuir Ave. Siskiyou Ave Road Maintenance & This project will include: Procurement of Public Works Equipment, Procurement of (between Hope Ln and Dunsmuir Ave). Dunsmuir Ave (north of Procurement/Operatio Dunsmuir Siskiyou 21/22 New Street Rehabilitation 07/2021 06/2022 3-5 1 1 Rehabilitation Road Maintenance and Rehab Materials | rental of crack seal machine Spring St to 800 ft bridge). Scherrer Ave. Frontage road near nal Needs water bottling plant.

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Mt Shasta Siskiyou 21/22 New Other Chip Seal Street Maintenance Southwest quadrant of the City. Southwest quadrant of the city. Construction 05/2021 09/2022 5-10 1 1 Pavement Rehab/Repair (Existing) | None

Modoc Avenue- First Street to E Street- 3,054'; Main Street- B Street to Havlina Road- 503'; Second Street- Modoc Avenue to C Road Maintenance & FY2021-22 Crack Sealing - City of Street- 1,111'; A Street- Modoc Avenue to End- 1,065'; B Street- Tulelake Siskiyou 21/22 New This project will include: Pavement Rehab/Repair (Existing) Construction 07/2021 06/2022 15-20 1 1 Rehabilitation Tulelake Main Street to End- 1,221'; C Street- Modoc Avenue to Main Street- 571'; D Street- Modoc Avenue to Alley between Main & Fourth Streets-737 feet.

This project will include: Sidewalk and/or Crosswalk Rehab/Repair (Existing), Traffic Weed Siskiyou 20/21 Carried Over Safety Public Safety Pedestrian Crossing Signals, Lights, and/or Signage Installation (New Safety), ADA Curb Ramp South Weed Blvd at Boles Street Construction 12/2020 08/2022 10-25 1 1 Rehab/Repair (Existing)

This project will include: Rehabilitation & maintenance of a local roadway. | No RMRA Road Maintenance & Weed Siskiyou 19/20 Carried Over Vista Drive Rehabilitation funds were expended in FY 17-18, 18-19, or 19-20. The City is rolling those funds over Vista Drive Construction 10/2020 08/2022 10-20 1 1 Rehabilitation to deliver projects in the next FY.

Road Maintenance & Weed Siskiyou 19/20 Carried Over Parks Street This project will include: Rehab of failing asphault Park Street from Main St to Tebbe St. Construction 05/2022 07/2023 10-20 1 1 Rehabilitation

This project will include: Pavement Rehab/Repair (Existing), Bicycle Lane (New), ADA Road Maintenance & North Texas Street Watermain Fairfield Solano 19/20 Carried Over Curb Ramp Rehab/Repair (Existing) | 2.5" grind and asphalt overlay of approximately North Texas Street (Travis Boulevard to Air Base Parkway) Construction 10/2021 06/2022 12-16 11 3 Rehabilitation Replacement and Overlay 360,000 square feet, with water main replacement.

*This list is subject to change and will be finalized upon the adoption of any jurisdiction that meets subsequent eligibility at the October 2021 Commission Meeting. Draft City Submitted - Fiscal Year 2021-22 Local Streets and Roads List of Projects *Projects listed are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1) August 19, 2021

Fiscal Year Initially Proposed Project Est Assembly Senate City County Project Type Title Description Location Components Est Start Est Useful Life Proposed Status Completion Districts Districts

Complete Streets This project will include: Project Scope Development, Document Preparation, City-wide - list to be determined based upon review of Active Vallejo Solano 21/22 New Annual ADA Curb Ramps Pre-Construction 07/2021 06/2022 20-30 14 3 Components Preliminary Design Transportation Plan and compliance needs and available budget.

The project includes specific segments but not the entire length Road Maintenance & of the following streets: Claverle Wy, Columbus Pkwy, Hastings Benicia Solano 21/22 New FY 21-22 Micro-Surfacing Project This project will include: Pavement Rehab/Repair (Existing) Construction 04/2022 05/2022 5-7 14 3 Rehabilitation Dr, East 2nd St, East 5th, East G St, East I St, East J St, Military West, Robinson Wy, Rose Dr.

Air Base Parkway (Peabody Rd to Parker Rd) Parker Road (Air Base Pkwy to End) Fulton Drive (Lopes Rd to Watt Dr) Fermi Drive (Watt Dr to Lopes Rd) This project will include: Pavement Rehab/Repair (Existing), Bicycle Lane (New), ADA Road Maintenance & 2021 Pavement Maintenance Watt Drive (Fulton Dr to Redtop Rd) Fairfield Solano 19/20 Carried Over Curb Ramp Rehab/Repair (Existing) | Cape seal paving surface treatment of Construction 08/2021 02/2022 7-10 11 3 Rehabilitation Project Eastman Court (Watt Dr to End) approximately 1,065,000 square feet. Edison Court (Fulton Dr to End) Pascal Court (Fermi Dr to End) Watt Court (Watt Dr to End) Travis Boulevard (Eisenhower St to Sunset Ave)

Road Maintenance & Rio Vista Solano 19/20 Completed McCormick Road Rehabilitation This project will include: Pavement Rehab/Repair (Existing) City of Rio Vista section of McCormick Road about 1/2 mile Construction 06/2020 04/2021 30-40 11 3 Rehabilitation

Village Dr (Highway 12 to Pintail Dr, Pintail Dr to Leafwood Ct, This project will include: Sidewalk and/or Crosswalk Installation (New), Paving and/or Road Maintenance & Asphalt Rubber Cape Seal with Leafwood Ct to Railroad Ave) and Whispering Bay Lane Suisun City Solano 19/20 In Progress Striping Rehab/Repair (Existing Safety), ADA Curb Ramp Installation (New), Bicycle Construction 06/2020 12/2021 15-50 11 3 Rehabilitation Digouts and ADA Ramp Upgrades (Francisco Dr to 225' N of Francisco Dr, 225' N of Francisco Dr to Lane (New), ADA Curb Ramp Rehab/Repair (Existing) Josiah Cir)

Floyd Ct (Craven Ct to Cul-de-sac), Capistrano Dr (Montebello to This project will include: Project Scope Development, Paving and/or Striping Bella Vista), Catamaran Wy, Harbor Park Dr, Breakwater Cir, Road Maintenance & Crack Seal and Slurry Seal Project Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing), Maintenance Pre-Construction and 06/2022 12/2022 Suisun City Solano 20/21 Forecasted Catalina Cir, Anderson Dr (E of Canal to Lawler Ranch Pkwy), 15-50 11 3 Rehabilitation on Various Streets Program Plan Development, Document Preparation, Cost Estimating, Preliminary Construction 06/2023 12/2023 Lawler Ranch Pkwy (Mayfield Wy to Potrero St, Potrero St to Design, Paving and/or Striping Installation (New Safety) | Crack seal and slurry seal Highway E End ), and Hoyt Ct

This project will include: Sidewalk and/or Crosswalk Installation (New), Project Scope Development, Paving and/or Striping Rehab/Repair (Existing Safety), Sidewalk and/or Road Maintenance & Crack Seal and Slurry Seal Project Crosswalk Rehab/Repair (Existing), Pavement Rehab/Repair (Existing), Maintenance Pre-Construction and 03/2020 12/2021 Suisun City Solano 21/22 In Progress Main Street from Cordelia Street to Lotz Way 15-50 11 3 Rehabilitation on Main Street Program Plan Development, Cost Estimating, Document Preparation, Preliminary Construction 06/2022 12/2022 Design, Paving and/or Striping Installation (New Safety), ADA Curb Ramp Rehab/Repair (Existing) | Crack seal and slurry seal

This project will include: Sidewalk and/or Crosswalk Installation (New), Paving and/or Various residential and collector streets in Area 5 - south of Striping Rehab/Repair (Existing Safety), Sidewalk and/or Crosswalk Rehab/Repair Monte Vista Avenue, Northwest of I-80 and east of the City Limit, Road Maintenance & Vacaville Solano 21/22 New 2022 Slurry Seal (Existing), Pavement Rehab/Repair (Existing), Bicycle Lane (New), Traffic Signals, Area 7- bounded by I-80, Leisure Town Road, Ulatis Drive and Construction 03/2022 06/2022 10-15 11 3 Rehabilitation Lights, and/or Signage Rehab/Repair (Existing Safety), Paving and/or Striping Nut Tree Road and Area 10- bounded by I-80, Marshall Road, Installation (New Safety), Bicycle Lane Rehab/Repair (Existing) and Alamo Drive.

*This list is subject to change and will be finalized upon the adoption of any jurisdiction that meets subsequent eligibility at the October 2021 Commission Meeting. Draft City Submitted - Fiscal Year 2021-22 Local Streets and Roads List of Projects *Projects listed are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1) August 19, 2021

Fiscal Year Initially Proposed Project Est Assembly Senate City County Project Type Title Description Location Components Est Start Est Useful Life Proposed Status Completion Districts Districts

Road Maintenance & Meadows Drive Pavement This project will include: Sidewalk and/or Crosswalk Rehab/Repair (Existing), Between Roleen Dr and Tobin Dr and Between Tobin Dr and Vallejo Solano 21/22 New Construction 07/2021 06/2022 10-30 14 3 Rehabilitation Rehabilitation Pavement Rehab/Repair (Existing), ADA Curb Ramp Rehab/Repair (Existing) Sonoma Blvd

This project will include: Project Scope Development, Paving and/or Striping Road Maintenance & Clark Avenue Rehabilitation Pre-Construction and 07/2021 06/2022 Cloverdale Sonoma 21/22 New Rehab/Repair (Existing Safety), Cost Estimating, Document Preparation, Preliminary Clark Street from South Street to Blair Street. 20-30 2 2 Rehabilitation Project Construction 02/2023 08/2024 Design

Road Maintenance & 2021 Pavement Preservation This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), The following streets within the City of Cotati: Eagle Drive, Lark Cotati Sonoma 21/22 New Construction 06/2021 09/2021 6-10 10 3 Rehabilitation Project Pavement Rehab/Repair (Existing), ADA Curb Ramp Rehab/Repair (Existing) Drive, Flamingo Road, and Falcon Drive.

Various street segments: Andrieux St from 5th St W to 4th St W, This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Joaquin Dr from Dead end to 100' south of Mitchell Way, Pavement Rehab/Repair (Existing), Paving and/or Striping Installation (New Safety) | | Joaquin Drive from Lasuen St to 5th St W, W MacArthur St from The project will provide slurry seal street surface treatment for various street segments 5th St W to Manor Dr, Mariano Ct from Mariano Dr to Cul de Sac, Road Maintenance & throughout the City of Sonoma. Auxiliary work in support of the slurry seal treatment Sonoma Sonoma 20/21 Carried Over 2022 Citywide Slurry Seal Mariano Dr from Fano Lane to 705 Mariano Dr, 5th St W from Construction 02/2022 06/2022 5-7 3 10 Rehabilitation includes Andrieux St to W MacArthur St, Saunders Dr from Brockman Ln surface preparation; crack seal; removal and replacement of pavement striping to 5th St E, Andrieux St from Cul se Sac to 5th St W, Linda Dr markings; protection of existing utility structures, curb and gutter, and cross gutter; and from 5th St W to 4th St W, Newcomb St from dead end to Fryer other related work. Creek Dr

This project will include: Reconstruct 4th Street from Jefferson Street to street end. | Road Maintenance & Cloverdale Sonoma 19/20 Carried Over 4th Street Reconstruction Due to delays and anticipated cost increases associated with COVID-19, the City 4th Street from intersection of Jefferson Street to street end Construction 06/2021 09/2021 20-30 2 2 Rehabilitation delayed construction of the Fourth Street Reconstruction Project to FY 2020/2021.

Various locations, including: Mason street from University to Front Street; Fairway Court from Greeens Drive to end; Greens Drive from South Fitch Mountain Healdsburg Pavement Road Maintenance & to end; Tee Court from Tee Dirve to Piper Street; Vine from North Healdsburg Sonoma 20/21 Carried Over Preventative Maintenance Project - This project will include: Pavement Rehab/Repair (Existing) Construction 05/2022 08/2022 5-7 2 2 Rehabilitation Street to the Roundabout; Heron Drive from South Fitch 2020 Mountain to Almond Way; Tee Drive from Greens Drive to Piper Street; Sunset Drive from North Fitch Mtn Rd to end; Valley View from Sunset Drive to end.

This project will include: Sidewalk and/or Crosswalk Installation (New), Sidewalk and/or Crosswalk Rehab/Repair (Existing), Active Transportation Plan, Bicycle Lane (New), Cost Estimating, Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Pavement Restoration 21/22 - Complete Streets Safety), Bicycle Lane Rehab/Repair (Existing), ADA Curb Ramp Rehab/Repair North McDowell Blvd from Sunrise Pkwy to Old Redwood Hwy, Pre-Construction and 01/2021 11/2021 Petaluma Sonoma 21/22 New North McDowell Blvd Complete 20-30 10 3 Components (Existing), Project Scope Development, Paving and/or Striping Rehab/Repair (Existing Petaluma CA 94954 Construction 11/2021 11/2022 Streets Safety), ADA Curb Ramp Installation (New), Pavement Rehab/Repair (Existing), Document Preparation, Preliminary Design, Paving and/or Striping Installation (New Safety)

This project will include: Roundabout Installation (New) | Construction of roundabout, Intersection of Southwest Boulevard and Commerce Boulevard, Rohnert Park Sonoma 19/20 In Progress Safety Southwest/Commerce Roundabout Construction 07/2020 12/2022 25-25 4 3 including pavement, concrete form, landscaping, signage, pavement marking. Rohnert Park, California

*This list is subject to change and will be finalized upon the adoption of any jurisdiction that meets subsequent eligibility at the October 2021 Commission Meeting. Draft City Submitted - Fiscal Year 2021-22 Local Streets and Roads List of Projects *Projects listed are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1) August 19, 2021

Fiscal Year Initially Proposed Project Est Assembly Senate City County Project Type Title Description Location Components Est Start Est Useful Life Proposed Status Completion Districts Districts

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Road Maintenance & Pavement Rehab/Repair (Existing), Bicycle Lane Rehab/Repair (Existing) | Pavement East Cotati Avenue: Rohnert Park City Limits at Sunflower Drive Rohnert Park Sonoma 19/20 Carried Over East Cotati Avenue Rehabilitation Construction 03/2019 12/2021 20-30 4 3 Rehabilitation rehabilitation (asphalt overlay with pavement fabric reinforcement), replacement of to Snyder Lane existing Class 2 bike lanes

This project will include: Pavement preservation treatments including small areas of pavement repair (i.e. "digouts") and cape seal application (i.e. a combination of chip seal and thin slurry seal) . Cape seals are used when the pavement deterioration is Road Maintenance & Southwest Boulevard Southwest Boulevard between Commerce Boulevard and No Rohnert Park Sonoma 19/20 In Progress greater than what a slurry seal or microsurfacing is designed to correct, yet the Pre-Construction 07/2020 12/2021 6-10 4 3 Rehabilitation Rehabilitation Cape Seal Name Street pavement has not deteriorated to the point of requiring an expensive asphalt overlay. A cape seal prevents water penetration, reducing subsequent damage to the road bed, along with providing a new wearing surface.

This project will include: Sidewalk and/or Crosswalk Installation (New), Paving and/or Striping Rehab/Repair (Existing Safety), Sidewalk and/or Crosswalk Rehab/Repair Rohnert Park Expressway between Commerce Boulevard and Complete Streets Rohnert Park Expressway / State (Existing), ADA Curb Ramp Installation (New), Traffic Signals, Lights, and/or Signage SMART Pathway; State Farm Drive from Rohnert Park Rohnert Park Sonoma 19/20 Carried Over Construction 07/2019 10/2023 12-17 4 3 Components Farm Traffic Improvements Project Installation (New Safety), Bicycle Lane (New), Traffic Signals, Lights, and/or Signage Expressway to Enterprise Drive; Enterprise Drive from Seed Rehab/Repair (Existing Safety), Paving and/or Striping Installation (New Safety), ADA Farm Drive to State Farm Drive Curb Ramp Rehab/Repair (Existing), Bicycle Lane Rehab/Repair (Existing)

This project will include: Sidewalk and/or Crosswalk Installation (New), Pavement Improvement (New), Sidewalk and/or Crosswalk Rehab/Repair (Existing), Traffic Signals, Lights, and/or Signage Installation (New Safety), Bicycle Lane (New), Storm Fulton Road Widening and Drain and/or Culvert Rehab/Repair (Existing), Traffic Signals, Lights, and/or Signage City of Santa Rosa, Sonoma County - Fulton Road between Road Maintenance & Santa Rosa Sonoma 20/21 Carried Over Reconstruction - Guerneville Road Rehab/Repair (Existing Safety), ADA Curb Ramp Rehab/Repair (Existing), Bicycle Guerneville Road and Piner Road, residential neighborhoods, Construction 10/2021 10/2022 5-20 2 2 Rehabilitation to Piner Road Lane Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety), near Piner High School Storm Drain/Culvert Installation (New), ADA Curb Ramp Installation (New), Pavement Rehab/Repair (Existing), Paving and/or Striping Installation (New Safety) | Median, stormwater and low impact design improvements

Road Maintenance & Sebastopol Sonoma 21/22 New Citywide Paving of Local Streets This project will include: Pavement Rehab/Repair (Existing) Hanson Ct, Kathleen Ct, Cleveland Ave Construction 04/2022 12/2022 5-15 10 2 Rehabilitation

Road Maintenance & Sebastopol Sonoma 21/22 New Bodega Ave Resurfacing This project will include: Pavement Rehab/Repair (Existing) Bodega Ave, from High St to Pleasant Hill Rd Construction 10/2022 09/2023 5-30 10 2 Rehabilitation

A slurry seal is proposed for the residential streets in the Vintage Greens and Vintana neighborhoods to provide an estimated useful life of seven years. The Oak Park neighborhood and Road Maintenance & Town-Wide Street Resurfacing - This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Windsor Sonoma 20/21 Carried Over portions of Shira Street, Samantha Way, Shannon Way, Tamara Construction 08/2021 10/2021 7-10 2 2 Rehabilitation Southwest Quadrant Pavement Rehab/Repair (Existing) Way, 3rd Street, Bell Road, Hembree Lane and Pleasant Avenue are proposed to be cape sealed for an estimated useful life of ten years.

This project will include: Construct new pedestrian and bicycle improvements on Whitmore Avenue, including sidewalk and bicycle lane, across BSNF Rail Lines | We Whitmore Avenue Pedestrian Hughson Stanislaus 19/20 Carried Over Safety have to complete a water pipe upgrade that will go right under the proposed street and Whitmore Avenue from east of Tully Road to Charles Street Construction 09/2020 03/2022 10-30 12 8 Improvement Project and Overlay we do not want to make the street improvement until this pipe repaid can be planned for and repaired. This is why this project keeps getting pushed off.

*This list is subject to change and will be finalized upon the adoption of any jurisdiction that meets subsequent eligibility at the October 2021 Commission Meeting. Draft City Submitted - Fiscal Year 2021-22 Local Streets and Roads List of Projects *Projects listed are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1) August 19, 2021

Fiscal Year Initially Proposed Project Est Assembly Senate City County Project Type Title Description Location Components Est Start Est Useful Life Proposed Status Completion Districts Districts

Streets bounded generally by Pontiac Street to the North, Road Maintenance & Oakdale Stanislaus 21/22 New Slurry Seal Area 3 This project will include: Cost Estimating Naturewood Dr./Sugar Pine Drive to the south, Willowood Drive Pre-Construction 09/2021 10/2021 5-7 12 8 Rehabilitation to the East and Crane Road to the West.

Road Maintenance & Valley Gutter Repair & Crack Seal This project will include: Pavement Rehab/Repair (Existing), Storm Drain and/or Chief Tucker & Kansas, Stanislaus St. & Jackson, Riverbank Stanislaus 21/22 New Construction 08/2021 09/2021 20-50 12 5 Rehabilitation Project Culvert Rehab/Repair (Existing) Cypresswoods & Candlewood, Crack seal multiple streets

Road Maintenance & Valley Gutter Repair - Second This project will include: Pavement Rehab/Repair (Existing), Storm Drain and/or Riverbank Stanislaus 21/22 New Second Street @ Riverside Drive Construction 03/2022 04/2022 20-50 12 5 Rehabilitation Street @ Riverside Drive Culvert Rehab/Repair (Existing)

Address potholes throughout the City of Turlock encompassed by Taylor Rd, Waring Rd, Glenwood Ave, and Washington Rd. Road Maintenance & for a total of 984 streets. Exact locations have yet to be Procurement/Operatio Turlock Stanislaus 19/20 Carried Over Road Maintenance Worker 1 This project will include: Public Works Staffing 07/2021 06/2022 1-10 12 8 Rehabilitation determined by the City; all locations selected for service or nal Needs improvements will be chosen based on priority need throughout the year.

Potholes throughout the City of Turlock encompassed by Taylor Rd, Waring Rd, Glenwood Ave, and Washington Rd. for a total of Road Maintenance & Procurement/Operatio Turlock Stanislaus 19/20 Carried Over Road Maintenance Worker 2 This project will include: Public Works Staffing 984 streets. Exact locations have yet to be determined by the 07/2021 06/2022 1-10 12 8 Rehabilitation nal Needs City; all locations selected for service or improvements will be chosen based on priority need throughout the year.

For potholes throughout the City of Turlock encompassed by Taylor Rd, Waring Rd, Glenwood Ave, and Washington Rd. for a Road Maintenance & Procurement/Operatio Turlock Stanislaus 19/20 Carried Over Hot Mix Truck and Trailer This project will include: Procurement of Road Maintenance and Rehab Materials total of 984 streets. Exact locations have yet to be determined 07/2021 06/2022 10-20 12 8 Rehabilitation nal Needs by the City; all locations selected for service or improvements will be chosen based on priority need throughout the year.

Throughout the City of Turlock encompassed by Taylor Rd, Waring Rd, Glenwood Ave, and Washington Rd. for a total of Road Maintenance & Procurement/Operatio Turlock Stanislaus 19/20 Carried Over Thermoplastic Material This project will include: Procurement of Road Maintenance and Rehab Materials 984 streets. Exact locations have yet to be determined by the 07/2021 06/2022 5-10 12 8 Rehabilitation nal Needs City; all locations selected for service or improvements will be chosen based on priority need throughout the year.

Potholes throughout City of Turlock encompassed by Taylor Rd, Waring Rd, Glenwood Ave, and Washington Rd. for a total of Road Maintenance & Procurement/Operatio Turlock Stanislaus 19/20 In Progress Hot Mix Asphalt This project will include: Procurement of Road Maintenance and Rehab Materials 984 streets. Exact locations have yet to be determined by the 07/2021 06/2022 1-10 12 8 Rehabilitation nal Needs City; all locations selected for service or improvements will be chosen based on priority need throughout the year.

Maintain Transportation Facilities - This project will include: Public Works Staffing, Repair and Servicing of Public Works City Wide, Taylor Rd to the north, Washington Rd to the west, Procurement/Operatio Turlock Stanislaus 19/20 Carried Over Traffic Control Devices 07/2021 06/2022 1-1 12 8 Traffic Signals Systems/Databases, Repair and Servicing of Public Works Equipment Glenwood Ave to the south and Daubenberger Rd to the east nal Needs

*This list is subject to change and will be finalized upon the adoption of any jurisdiction that meets subsequent eligibility at the October 2021 Commission Meeting. Draft City Submitted - Fiscal Year 2021-22 Local Streets and Roads List of Projects *Projects listed are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1) August 19, 2021

Fiscal Year Initially Proposed Project Est Assembly Senate City County Project Type Title Description Location Components Est Start Est Useful Life Proposed Status Completion Districts Districts

Maintain Transportation Facilities - This project will include: Repair and Servicing of Public Works Systems/Databases, City Wide, Taylor Rd to the north, Washington Rd to the west, Procurement/Operatio Turlock Stanislaus 19/20 Carried Over Traffic Control Devices 07/2021 06/2022 1-1 12 8 Street Lights Public Works Staffing, Repair and Servicing of Public Works Equipment Glenwood Ave to the south and Daubenberger Rd to the east nal Needs

This project will include: Pavement Improvement (New), Sidewalk and/or Crosswalk Installation (New), Sidewalk and/or Crosswalk Rehab/Repair (Existing), Bicycle Lane (New), ADA Curb Ramp Rehab/Repair (Existing), Bicycle Lane Rehab/Repair Road Maintenance & Pre-Construction and 07/2021 06/2022 Turlock Stanislaus 21/22 New Roadway Element Maintenance (Existing), Roundabout Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair City Wide 1-10 12 8 Rehabilitation Construction 07/2021 06/2022 (Existing Safety), ADA Curb Ramp Installation (New), Pavement Rehab/Repair (Existing), Landscape Safety Rehab/Repair (Existing), Landscape Safety Installation (New), Paving and/or Striping Installation (New Safety)

Road Maintenance & Procurement/Operatio Turlock Stanislaus 21/22 New Patch Truck This project will include: Procurement of Public Works Equipment City Wide 07/2021 06/2022 1-20 12 8 Rehabilitation nal Needs

Address potholes throughout the City of Turlock encompassed by Taylor Rd, Waring Rd, Glenwood Ave, and Washington Rd. Road Maintenance & for a total of 984 streets. Exact locations have yet to be Procurement/Operatio Turlock Stanislaus 20/21 Carried Over Road Maintenance Worker 1 This project will include: Public Works Staffing 07/2021 06/2022 1-10 12 8 Rehabilitation determined by the City; all locations selected for service or nal Needs improvements will be chosen based on priority need throughout the year.

Academy Ave (University Dr-Coventry Way) Agua Ct (Standiford Ave-End) Alta Way (Derby Ln-Woodrow Ave) Anchorage Ave (Whitehorse Ave-Yukon Dr) Andrew Ave (Goldie Ave-Prescott Rd) Annapolis Ave (University Dr-Napier Dr) Applewood Way (Briarwood Dr-Fairington Ln) Road Maintenance & Modesto Stanislaus 21/22 New Slurry Seal Program This project will include: Pavement Rehab/Repair (Existing) Arnhem Pl (St Nicholas Dr-End) Construction 07/2021 06/2022 5-7 12 5 Rehabilitation Arroyo Way (Vallejo Dr-Rose Ave) Ashwood Dr (Westland Dr-Crescent Dr) Ashwood Dr (Crescent Dr-Greenwood Dr) Aulston Ave (Sharon Way-Eicher Ave) Bahia Way (Floyd Ave-Chapala) Baron Ave (Colonial-Heidi) Bay

Various locations are determined as most serious priorities Traffic Signal & Street Lighting Modesto Stanislaus 21/22 New Safety This project will include: Maintenance Program Plan Development present. The attached map shows Modesto locations subject to Pre-Construction 07/2021 06/2022 10-10 12 5 Maintenance change depending on need.

Various locations are determined as most serious priorities Traffic Sign & Striping Modesto Stanislaus 21/22 New Safety This project will include: Maintenance Program Plan Development present. The attached map shows Modesto locations subject to Pre-Construction 07/2021 06/2022 2-5 12 5 Maintenance change depending on need.

T Street from Yolo Avenue to Inyo Avenue; Kern Street from Road Maintenance & This project will include: Pavement Rehab/Repair (Existing) | Crack seal, slurry and Main Street to T Street; Fresno Street from State Route 33 to T Newman Stanislaus 20/21 Carried Over 2018-19 SB-1 Construction 08/2021 02/2022 5-10 21 12 Rehabilitation stripe. Small pavement replacement (potholes). Street; Tulare Street from State Route 33 to T Street; Mariposa Street from State Route 33 to T Street;

*This list is subject to change and will be finalized upon the adoption of any jurisdiction that meets subsequent eligibility at the October 2021 Commission Meeting. Draft City Submitted - Fiscal Year 2021-22 Local Streets and Roads List of Projects *Projects listed are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1) August 19, 2021

Fiscal Year Initially Proposed Project Est Assembly Senate City County Project Type Title Description Location Components Est Start Est Useful Life Proposed Status Completion Districts Districts

Road Maintenance & West A Street between North Yosemite Avenue and Laurel Oakdale Stanislaus 20/21 Carried Over West A Street Slurry Seal This project will include: Pavement Rehab/Repair (Existing) Construction 09/2021 10/2021 5-7 12 8 Rehabilitation Avenue.

Poppy:clover to Del Puerto;Canyon: Poppy to end; Hansen: Poppy to end; Kinshire: Clover to Del Puerto; Klopping: Kinshire to end; S 9th: Kinshire to Sperry; De Lash: Kinshire to end; KInshire - FDR 2" HMA/9" AB - Road Maintenance & This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Agadoni: Kinshire to end; Clover: Poppy to Sperry; Del Puerto: Patterson Stanislaus 20/21 Carried Over Streets Submitted FY 18/19 - Construction 03/2022 09/2022 15-20 21 12 Rehabilitation Pavement Rehab/Repair (Existing) | FDR 2" HMA/9" AB Poppy to Sperry; Amberina CT: Ambernia to end; Ambernina Dr: Phase 2 Ambernia Ct to Del Puerto; Bonneau: 9th to end; *All locations subject to change, and will be selected based on priority, need and resources throughout the year.

E. Las Palmas Ave: 699 East of Hartley to Hartley. E. Las Road Maintenance & This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Patterson Stanislaus 20/21 In Progress Las Palmas Overlay Palmas: La Lynn to N. Hartley. E. Las Palmas Ave: N. 1st to Construction 03/2021 09/2021 10-15 21 12 Rehabilitation Pavement Rehab/Repair (Existing), ADA Curb Ramp Rehab/Repair (Existing) Weber Ave.

Del Puerto Ave, Poppy Ave, Ittureria Dr, Gnesa Dr, Traina Dr, Road Maintenance & Kinshire FDR 2" HMA/9" AB - This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Patterson Stanislaus 20/21 In Progress Meghan Dr, Inaudi Dr, Inaudi Ct, Sunflower Dr, NiCastro Dr, D Construction 04/2021 10/2021 15-20 21 12 Rehabilitation Phase 1 Pavement Rehab/Repair (Existing), ADA Curb Ramp Rehab/Repair (Existing) Arpino Ct, and Marisa Dr.

Road Maintenance & This project will include: Pavement Rehab/Repair (Existing), ADA Curb Ramp Patterson Stanislaus 21/22 New Sperry Avenue Overlay Phase 2 Sperry Avenue from American Eagle Avenue to Ward Avenue Construction 04/2022 09/2022 10-15 21 12 Rehabilitation Rehab/Repair (Existing), Bicycle Lane Rehab/Repair (Existing)

Road Maintenance & Riverbank Stanislaus 21/22 New Topeka Street Overlay This project will include: Pavement Rehab/Repair (Existing) Topeka Street between Third Street and Fifth Street Construction 08/2021 10/2021 15-20 12 5 Rehabilitation

Road Maintenance & Topeka Street Overlay - Callander Riverbank Stanislaus 21/22 New This project will include: Pavement Rehab/Repair (Existing) Topeka Street between Callander Avenue and Jackson Avenue Construction 03/2022 04/2022 15-20 12 5 Rehabilitation to Jackson

Road Maintenance & Pre-Construction and 07/2021 07/2022 Turlock Stanislaus 21/22 New Dump Truck This project will include: Pavement Rehab/Repair (Existing) City Wide 1-20 12 8 Rehabilitation Construction 07/2021 07/2022

*This list is subject to change and will be finalized upon the adoption of any jurisdiction that meets subsequent eligibility at the October 2021 Commission Meeting. Draft City Submitted - Fiscal Year 2021-22 Local Streets and Roads List of Projects *Projects listed are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1) August 19, 2021

Fiscal Year Initially Proposed Project Est Assembly Senate City County Project Type Title Description Location Components Est Start Est Useful Life Proposed Status Completion Districts Districts

Tm Bell from Yosemite to El Pomar N Western from Yosemite to F Street S. Western from Yosemite to Riverside Road Maintenance & This project will include: Pavement Rehab/Repair (Existing), ADA Curb Ramp Waterford Stanislaus 21/22 New 2021 Surface Improvements N. Reinway from Yosemite to N. City Limit Construction 07/2021 09/2021 7-10 12 8 Rehabilitation Rehab/Repair (Existing) S. Reinway from Yosemite to Tuolumne River Bentley from Yosemite to Tim Bell Dorsey from F Street to B Street

Road Maintenance & Pennington Road Complete This project will include: Pavement Rehab/Repair (Existing) | Rehabilitate existing Pennington Road from Connecticut Avenue to Broadway, west of Live Oak Sutter 19/20 In Progress Construction 01/2020 08/2021 20-40 3 4 Rehabilitation Streets Rehabilitation roadway and complete streets elements SR 99

This project will include: Pavement Rehab/Repair (Existing) | Reconstruct and improve Road Maintenance & Live Oak Sutter 19/20 In Progress Kola Street Reconstruction Kola St from Larkin Rd to N St in coordination with the Highway 99 Streetscape Project Kola Street from Larkin Rd to N St Construction 07/2021 06/2022 20-40 3 4 Rehabilitation beginning in 2020

Road Maintenance & This project will include: Pavement Rehab/Repair (Existing) | Utility Relocation and Live Oak Sutter 19/20 In Progress Highway 99 Widening Highway 99 Ash Street to Ramsdell Construction 07/2018 07/2023 20-40 3 4 Rehabilitation Repair

This project will include: Sidewalk and/or Crosswalk Installation (New), Pavement Improvement (New), Paving and/or Striping Rehab/Repair (Existing Safety), Storm Drain/Culvert Installation (New), ADA Curb Ramp Installation (New), Pavement Rehab/Repair (Existing), Traffic Signals, Lights, and/or Signage Installation (New Road Maintenance & Safety), Bicycle Lane (New), Storm Drain and/or Culvert Rehab/Repair (Existing), Walton Avenue, from Sam's Club Driveway to Hazel Avenue, Yuba City Sutter 21/22 New Walton Avenue Improvements Construction 04/2022 10/2022 20-30 3 4 Rehabilitation Paving and/or Striping Installation (New Safety), Traffic Signals, Lights, and/or Yuba City, CA Signage Rehab/Repair (Existing Safety) | Pavement digouts, AC overlay, roadway widening, rubberized cape seal, class II bicycle lane improvements, installation of curb, gutter, sidewalk, driveways, and ADA-compliant curb ramps, storm drainage improvements, installation of landscaped parkway strips, and striping improvements.

This project will include: Pavement Improvement (New), Sidewalk and/or Crosswalk Installation (New), Storm Drain/Culvert Installation (New), Sidewalk and/or Crosswalk Rehab/Repair (Existing), ADA Curb Ramp Installation (New), Traffic Signals, Lights, Road Maintenance & and/or Signage Installation (New Safety), Bicycle Lane (New), Landscape Safety Yuba City Sutter 19/20 Carried Over Bridge Street Widening Gray Avenue to Cooper Avenue Construction 10/2021 12/2022 30-50 3 4 Rehabilitation Installation (New), Traffic Signals, Lights, and/or Signage Rehab/Repair (Existing Safety), Storm Drain and/or Culvert Rehab/Repair (Existing) | Widening and complete reconstruction, installation of curb and gutter, ADA-compliant curb ramps, shared-use sidewalk, landscaped medians, and striping improvements.

El Verano Ave between McLane and Hoag, Del Norte Ave This project will include: Project Scope Development, Paving and/or Striping Road Maintenance & Annual Maintenance/Rehabilitation between McLane and Hoag, El Paso Ave between McLane and Pre-Construction and 07/2021 12/2021 Corning Tehama 21/22 New Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing), Document 7-10 3 4 Rehabilitation Project Hoag, Divisadero Ave between Fripp and El Paso & McLane Ave Construction 03/2022 06/2022 Preparation, Cost Estimating, Preliminary Design, Environmental Study/Documents between McLane Circle and El Paso

*This list is subject to change and will be finalized upon the adoption of any jurisdiction that meets subsequent eligibility at the October 2021 Commission Meeting. Draft City Submitted - Fiscal Year 2021-22 Local Streets and Roads List of Projects *Projects listed are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1) August 19, 2021

Fiscal Year Initially Proposed Project Est Assembly Senate City County Project Type Title Description Location Components Est Start Est Useful Life Proposed Status Completion Districts Districts

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Road Maintenance & South Jackson Street Red Bluff Tehama 20/21 Carried Over Sidewalk and/or Crosswalk Rehab/Repair (Existing), Pavement Rehab/Repair South Jackson Street between Oak Street and Luther Road Construction 09/2021 02/2022 10-15 3 4 Rehabilitation Reconstruction (Existing), ADA Curb Ramp Rehab/Repair (Existing)

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Road Maintenance & Red Bluff Tehama 20/21 Carried Over South Main Street Reconstruction Sidewalk and/or Crosswalk Rehab/Repair (Existing), Pavement Rehab/Repair South Main Street between Oak Street and Luther Road Construction 09/2021 02/2022 10-15 3 4 Rehabilitation (Existing), Bicycle Lane (New), ADA Curb Ramp Rehab/Repair (Existing)

Road Maintenance & Tehama Tehama 19/20 In Progress Crack seal city streets This project will include: Paving and/or Striping Rehab/Repair (Existing Safety) C, D, E, F, G, H, 2nd, 3rd, 4th, 5th Sts., E Gyle Rd., Tehama Ave Construction 08/2020 11/2020 3-5 3 4 Rehabilitation

Road Maintenance & Tehama Tehama 21/22 New F Street Reconstruction This project will include: Document Preparation F Street in City of Tehama Pre-Construction 04/2024 06/2024 15-20 3 4 Rehabilitation

Located in Farmersville, CA around Farmersville Junior High including the following roadway segments: N. June Avenue from W. Costner Street to W. Ash Street, N. Steven Avenue from W. Road Maintenance & This project will include: Project Scope Development, Document Preparation, Cost Visalia Road to W. Ash Street, N. Virginia Avenue from W. Farmersville Tulare 21/22 New 2024 Streets Project Pre-Construction 07/2023 12/2024 24-30 26 14 Rehabilitation Estimating, Preliminary Design, Environmental Study/Documents Costner Street to W. Front Street, W. Ash Street from west of N. Virginia Avenue to N. Steven Avenue, W. Costner Street from N. Virginia Avenue to N. Steven Avenue, and W. Front Street from N. Virginia Avenue to N. Ventura Avenue.

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Storm Road Maintenance & Pre-Construction and 07/2021 06/2022 Lindsay Tulare 21/22 New Hermosa II: Harvard to Foothill Drain/Culvert Installation (New), Sidewalk and/or Crosswalk Rehab/Repair (Existing), Hermosa street from Harvard Avenue to Foothill Ave. 15-20 26 14 Rehabilitation Construction 07/2021 06/2022 Pavement Rehab/Repair (Existing), ADA Curb Ramp Rehab/Repair (Existing)

Intersection Rehab: Foothill Av / This project will include: Addition of bollards at the rehabbed intersection to improve Lindsay Tulare 20/21 Carried Over Safety Intersection Foothill Av / Tulare Rd Construction 07/2021 06/2022 5-15 26 14 Tulare Rd pedestrian safety. Rehab intersection sidewalk transition to the crosswalk.

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Road Maintenance & Sidewalk and/or Crosswalk Rehab/Repair (Existing), Pavement Rehab/Repair Lindsay Tulare 20/21 Carried Over Burem Lane Renovation Burem Lane, west of Westwood Avenue Construction 07/2021 06/2022 15-18 26 14 Rehabilitation (Existing), Storm Drain and/or Culvert Rehab/Repair (Existing) | Recycle and rehabilitate 0.1 miles and renovate concrete curbs, gutters and sidewalks

*This list is subject to change and will be finalized upon the adoption of any jurisdiction that meets subsequent eligibility at the October 2021 Commission Meeting. Draft City Submitted - Fiscal Year 2021-22 Local Streets and Roads List of Projects *Projects listed are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1) August 19, 2021

Fiscal Year Initially Proposed Project Est Assembly Senate City County Project Type Title Description Location Components Est Start Est Useful Life Proposed Status Completion Districts Districts

This project will include: Sidewalk and/or Crosswalk Installation (New), Paving and/or Striping Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing), Storm Road Maintenance & Porterville Tulare 19/20 Carried Over Newcomb Street Reconstruction Drain and/or Culvert Rehab/Repair (Existing), ADA Curb Ramp Rehab/Repair Located between Olive Avenue and Morton Avenue. Construction 09/2021 05/2022 15-20 26 14 Rehabilitation (Existing) | Reconstruction of roadway section of four-lane arterial roadway, 0.5 miles in length and 64 feet of width.

King Avenue between O Street and Cherry Street; Sycamore Avenue between Cherry Street and Blackstone Street; San Joaquin Avenue between O Street and Blackstone Street; Complete Streets Sycamore & San Joaquin This project will include: Project Scope Development, Document Preparation, Cost Tulare Tulare 21/22 New Madden Street between Tulare Avenue and King Street; Delwood Pre-Construction 07/2021 06/2023 20-25 26 16 Components Improvements Estimating, Preliminary Design, Environmental Study/Documents Street between Sycamore Avenue and San Joaquin Avenue; and N. Highland Street between Tulare Avenue and Sycamore Avenue.

Apricot Avenue between Gem Street and Blackstone Street; Academy Avenue between Gem Street and Blackstone Street; Pine Drive between Academy Avenue and Highland Street; E. La Complete Streets This project will include: Project Scope Development, Cost Estimating, Document Tulare Tulare 21/22 New Apricot & Academy Improvements Mesa Drive between Academy Avenue and Blackstone Street; N. Pre-Construction 07/2021 06/2023 20-25 26 16 Components Preparation, Preliminary Design, Environmental Study/Documents Gem Street between San Joaquin Avenue and Academy Avenue; Highland Street between San Joaquin Avenue and the ; and Olympic Court at Apricot Avenue.

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Owens Avenue between West Street and Santa Clara Street; Los Complete Streets Sidewalk and/or Crosswalk Rehab/Repair (Existing), ADA Curb Ramp Installation Angeles Street between Bardsley Avenue and Owens Avenue; Tulare Tulare 21/22 New Elliott Tract Improvements Construction 07/2021 06/2022 20-25 26 16 Components (New), Pavement Rehab/Repair (Existing), Storm Drain and/or Culvert Rehab/Repair Elm Avenue between West Street and Sacramento Street; Santa (Existing), ADA Curb Ramp Rehab/Repair (Existing) Clara Street between Bardsley Avenue and Inyo Avenue.

This project will include: Pavement Improvement (New), Sidewalk and/or Crosswalk Rehab/Repair (Existing), Bicycle Lane (New), Landscape Safety Installation (New), Road Maintenance & FY 2021-22 SB1 Street Right of Way Acquisition, Storm Drain and/or Culvert Rehab/Repair (Existing), ADA Center Avenue from Willis Street to Santa Fe Street, Acequia Visalia Tulare 21/22 New Construction 12/2021 05/2023 15-20 26 16 Rehabilitation Rehabilitation - Center & Acequia Curb Ramp Rehab/Repair (Existing) | Video detection cameras | Preconstruction Avenue from Willis Street to Santa Fe Street anticipated December 2021 to December 2022. Construction anticipated February 2023 to December 2023.

Antelope Avenue/Lakeview This project will include: Sidewalk and/or Crosswalk Installation (New), Sidewalk and/or Complete Streets East Antelope Ave and East Lakeview Ave. from Magnolia St. to Woodlake Tulare 21/22 New Avenue Street Improvements Crosswalk Rehab/Repair (Existing), Pavement Rehab/Repair (Existing), ADA Curb Construction 07/2021 02/2022 15-20 26 14 Components Olive Lane. Project Ramp Installation (New)

This project will include: Sidewalk and/or Crosswalk Installation (New), Pavement Complete Streets Woodlake Tulare 21/22 New Olive Lane Street Improvements Improvement (New), ADA Curb Ramp Installation (New), Paving and/or Striping Olive Lane at the intersection with Antelope Ave. Construction 08/2021 03/2023 15-20 26 14 Components Installation (New Safety)

Road Maintenance & Alta Ave. and Nebraska Ave This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), ADA Dinuba Tulare 21/22 New Alta Avenue and Nebraska Avenue Intersection Construction 12/2021 02/2022 10-20 26 14 Rehabilitation Reconstruction Curb Ramp Installation (New)

*This list is subject to change and will be finalized upon the adoption of any jurisdiction that meets subsequent eligibility at the October 2021 Commission Meeting. Draft City Submitted - Fiscal Year 2021-22 Local Streets and Roads List of Projects *Projects listed are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1) August 19, 2021

Fiscal Year Initially Proposed Project Est Assembly Senate City County Project Type Title Description Location Components Est Start Est Useful Life Proposed Status Completion Districts Districts

Road Maintenance & Dinuba Tulare 21/22 New Tulare Avenue Grind and Overlay This project will include: Pavement Rehab/Repair (Existing) Tulare Avenue from Railroad to East El Monte Way Construction 09/2021 11/2021 15-20 26 14 Rehabilitation

Road Maintenance & Dinuba Tulare 21/22 New Road 74 Reconstruction This project will include: Pavement Rehab/Repair (Existing) Road 74 Reconstruction Sierra Avenue to Kamm Avenue Construction 12/2021 02/2022 15-20 26 14 Rehabilitation

Road Maintenance & Dinuba Tulare 21/22 New Kern Street Grind and Overlay This project will include: Pavement Rehab/Repair (Existing) Kern Street from Q Street to College Avenue Construction 12/2021 01/2022 15-20 26 14 Rehabilitation

Road Maintenance & Dinuba Tulare 19/20 Carried Over Kamm Ave. Grind and Overlay This project will include: Pavement Rehab/Repair (Existing) On Kamm Ave. from Alta Ave. to College Ave. Construction 11/2021 12/2021 5-15 26 14 Rehabilitation

Road Maintenance & Nebraska & Crawford Avenue Intersection of Nebraska Avenue & Crawford Avenue , Dinuba Dinuba Tulare 19/20 Carried Over This project will include: Pavement Rehab/Repair (Existing) Construction 09/2021 01/2022 20-30 26 14 Rehabilitation Reconstruction CA

The project is located in Exeter, CA. The extents of this project will be along Pine Street (F Street to Kaweah Ave), Rocky Hill Road Maintenance & Exeter Tulare 19/20 Carried Over Downtown Streets Project This project will include: Paving and/or Striping Rehab/Repair (Existing Safety) Drive (Kaweah and C Street) and B-F Street (between Palm and Construction 07/2021 09/2021 8-10 26 16 Rehabilitation Maple). These streets run through downtown Exeter, which is mostly commercial property.

Road Maintenance & Lindsay Tulare 21/22 New Samoa St This project will include: Pavement Rehab/Repair (Existing) From Harvard, continuing eastward until end of street. Construction 07/2021 06/2022 8-10 26 14 Rehabilitation

Road Maintenance & Lindsay Tulare 21/22 New Oragewood Avenue This project will include: Pavement Rehab/Repair (Existing) Samoa St. to Hermosa St. Construction 07/2021 06/2022 8-10 26 14 Rehabilitation

Road Maintenance & Lindsay Tulare 21/22 New Sierra View Street This project will include: Pavement Rehab/Repair (Existing) Harvard Ave, eastward until the end of City limits. Construction 07/2021 06/2022 8-10 26 14 Rehabilitation

*This list is subject to change and will be finalized upon the adoption of any jurisdiction that meets subsequent eligibility at the October 2021 Commission Meeting. Draft City Submitted - Fiscal Year 2021-22 Local Streets and Roads List of Projects *Projects listed are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1) August 19, 2021

Fiscal Year Initially Proposed Project Est Assembly Senate City County Project Type Title Description Location Components Est Start Est Useful Life Proposed Status Completion Districts Districts

Complete Streets Linoberg and Bradford Street This project will include: Pavement Rehab/Repair (Existing), Landscape Safety Sonora Tuolumne 21/22 New Linoberg at Bradford Street Sonora, CA 95370 Construction 08/2021 03/2022 20-30 5 8 Components Project Rehab/Repair (Existing), Storm Drain and/or Culvert Rehab/Repair (Existing)

2 Signals at the Restano Way intersection . Both controllers are S Washington-Sanguinetti and This project will include: Traffic Signals, Lights, and/or Signage Rehab/Repair no longer supported by the manufacturer and need to be Sonora Tuolumne 21/22 New Traffic Control Devices Construction 08/2021 11/2021 15-15 5 8 Restano Way Intersection (Existing Safety) replaced. Also, with the updated controllers battery backup systems can be installed.

Sanguinetti Road at Greenley This project will include: Traffic Signals, Lights, and/or Signage Rehab/Repair Sonora Tuolumne 21/22 New Traffic Control Devices Sanguinetti Road at Greenley Road Intersection Construction 08/2021 11/2021 15-15 5 8 Road (Existing Safety)

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Project Scope Development, Sidewalk and/or Crosswalk Rehab/Repair (Existing), Road Maintenance & Neighborhood Street Rehabilitation Pre-Construction and 07/2021 09/2021 Fillmore Ventura 21/22 New Pavement Rehab/Repair (Existing), Cost Estimating, Document Preparation, Various streets incl Santa Clara, Sierra Vista, Los Serenos 20-20 37 19 Rehabilitation FY2021-22 Construction 09/2021 06/2022 Preliminary Design, Environmental Study/Documents, ADA Curb Ramp Rehab/Repair (Existing), Bicycle Lane Rehab/Repair (Existing)

This project will include: Sidewalk and/or Crosswalk Installation (New), Project Scope Development, ADA Curb Ramp Installation (New), Pavement Rehab/Repair (Existing), Complete Streets Mountain View St from Ventura Street (SR126) to Santa Clara Pre-Construction and 07/2020 09/2021 Fillmore Ventura 19/20 In Progress Mountain View Sidewalk Project Document Preparation, Cost Estimating, Paving and/or Striping Installation (New 30-50 37 19 Components Street Construction 09/2020 06/2022 Safety), Preliminary Design, Environmental Study/Documents, Bicycle Lane Rehab/Repair (Existing)

This project will include: Sidewalk and/or Crosswalk Installation (New), Bicycle Lane (New), Cost Estimating, Storm Drain and/or Culvert Rehab/Repair (Existing), Paving and/or Striping Rehab/Repair (Existing Safety), Project Scope Development, Storm Construct sidewalk and resurface Drain/Culvert Installation (New), Pavement Rehab/Repair (Existing), ADA Curb Ramp Arroyo Drive between the Simi A portion of Arroyo Drive (relinquished SR 118) between the Simi Road Maintenance & Installation (New), Document Preparation, Preliminary Design, Paving and/or Striping Pre-Construction and 07/2021 06/2022 Moorpark Ventura 20/21 In Progress Valley Boundary to the western Valley boundary and Collins Drive (expanded from the western 20-30 44 27 Rehabilitation Installation (New Safety), Environmental Study/Documents | Project will also include Construction 10/2022 06/2023 limit of the Villa del Arroyo Mobile limit of the Villa del Arroyo Mobile Home Park). investigating potential railroad crossing improvements. | Paving project will include Home Park complete streets components of pedestrian and bicycle safety, as well as drainage and stormwater capture. Investigation of traffic control devices and railroad crossing improvements will also be included.

Various sections of the City including residential streets off of This project will include: Project Scope Development, Paving and/or Striping Road Maintenance & Mountain Meadow Drive and Walnut Creek Road, south of Tierra Pre-Construction and 08/2021 11/2022 Moorpark Ventura 21/22 New Pavement Maintenance Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing), Cost Estimating, 4-7 44 27 Rehabilitation Rejada Road and residential streets off of Peach Hill Road north Construction 12/2021 06/2022 Document Preparation, Preliminary Design of Tierra Rejada Road and west of Spring Road.

This project will include: Procurement of a consultant to establish a citywide pavement Road Maintenance & Procurement/Operatio Moorpark Ventura 21/22 New Pavement Management Program condition index (PCI). | The PCI will be used to guide the City in determining the level Citywide study of all public streets 09/2021 03/2022 1-5 44 27 Rehabilitation nal Needs of repairs that streets require as well as the priority of City streets for maintenance.

*This list is subject to change and will be finalized upon the adoption of any jurisdiction that meets subsequent eligibility at the October 2021 Commission Meeting. Draft City Submitted - Fiscal Year 2021-22 Local Streets and Roads List of Projects *Projects listed are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1) August 19, 2021

Fiscal Year Initially Proposed Project Est Assembly Senate City County Project Type Title Description Location Components Est Start Est Useful Life Proposed Status Completion Districts Districts

Lion St., Summer St., Pleasant Ave., Crestview Dr., Daly Rd., This project will include: Sidewalk and/or Crosswalk Installation (New), Pavement Cuyama Rd., Topa Topa St., Red Hill Rd., White Oak Circle, Road Maintenance & Rehab/Repair (Existing), ADA Curb Ramp Rehab/Repair (Existing) | The work is Church Rd., Grand Ave., Santa Ana St., Fairview Rd., San Ojai Ventura 20/21 Carried Over 2021 Road Rehabilitaion Project Construction 09/2021 01/2022 15-15 37 19 Rehabilitation comprised of street overlays, including cold planing, milling, placing ruberized asphalt Antonio St., Eucalyptus St., Summer St., and Emily St. Full list of concrete (RAC), concrete work, striping, and ADA curb ramps. streets and roads can be found in Exhibit A of Resolution No. 21- 35. Locations are estimates not yet final.

Several locations throughout the City of Camarillo for project ST- 5021 Annual Resurfacing as described in detail in the attached This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Resolution No. 2021-30 including but not limited to Sweetwater Sidewalk and/or Crosswalk Rehab/Repair (Existing), Pavement Rehab/Repair Road Maintenance & Ave neighborhood, Corby Ave neighborhood, Temple Ave from Camarillo Ventura 21/22 New Annual Resurfacing ST-5021 (Existing), ADA Curb Ramp Rehab/Repair (Existing), Bicycle Lane Rehab/Repair Construction 08/2021 05/2022 7-10 44 19 Rehabilitation Las Posas Rd to Ponderosa Dr, Verdugo Way from Camino Ruiz (Existing) | Asphalt Rubber Aggregate Membrane (ARAM), Slurry Seal, and to Camino Carillo, Camino Carillo from S End to Adolfo Rd, appurtenant work. Cortez Cr. from S End to Adolfo Rd, Balboa Cr. from S End to Adolfo Rd, and Camino Ruiz from Adolfo Rd to Camino Carillo.

Citywide pavement preservation program database. All Citywide This project will include: Work includes visual pavement inspection of all streets, streets are included in this planning project. City streets and Road Maintenance & assignment of a Pavement Condition Index (PCI) and entry into StreetSaver software intersections may include: Procurement/Operatio Oxnard Ventura 19/20 In Progress Annual Pavement System Update 06/2020 06/2023 3-3 44 19 Rehabilitation database program. | Project will provide ability to develop resurfacing prioritization and Ventura Road, Oxnard Boulevard, Saviers Road, Rose Avenue, nal Needs improvement plan. Rice Avenue, Gonzales Road, Fifth Street, Wooley Road, Channel Islands Boulevard, and Pleasant Valley Road.

All Citywide streets are included in this operational project, which provides as-needed and ongoing maintenance for all City street This project will include: Public Works Staffing, Repair and Servicing of Public Works and traffic signal infrastructure. City streets and intersections Road Maintenance & Public Works Road and Signal Procurement/Operatio Oxnard Ventura 19/20 In Progress Equipment | Non-capitalized roadway maintenance repair and traffic signal safety may include: Ventura Road, Oxnard Boulevard, Saviers Road, 06/2021 06/2023 7-7 44 19 Rehabilitation Maintenance nal Needs maintenance. Rose Avenue, Rice Avenue, Gonzales Road, Fifth Street, Wooley Road, Channel Islands Boulevard, and Pleasant Valley Road.

This project was carried over and combined with additional locations to make one Arterial Street Resurfacing project. Road Maintenance & This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Original project was East Gonzales Road between Oxnard Oxnard Ventura 20/21 Carried Over Arterial Street Resurfacing Construction 07/2021 12/2022 10-15 44 19 Rehabilitation Pavement Rehab/Repair (Existing), ADA Curb Ramp Rehab/Repair (Existing) Boulevard and Rice Avenue. Additional locations include: West Gonzales Road From Oxnard Boulevard to Victoria Avenue, and Teal Club Road From Ventura Road to Victoria Avenue.

Rice Avenue Commercial and Neighborhood Area. See attached list and map. This project was carried over and combined with additional locations to make one Neighborhood Street Resurfacing project. Additional locations include: Graves Road Maintenance & This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Oxnard Ventura 20/21 Carried Over Neighborhood Street Resurfacing Avenue, Kinetic Drive, Camino Avenue, Trabajo Drive, Celsius Construction 07/2021 06/2023 10-15 44 19 Rehabilitation Pavement Rehab/Repair (Existing), ADA Curb Ramp Rehab/Repair (Existing) Avenue, Candelaria Road, North Elevar Street, Bernoulli Circle, Latigo Avenue, Maulhardt Avenue, Santiago Court, Solar Drive, Wankel Way, Lockwood Street, Outlet Center Drive, and Hearst Drive.

This project will include: Pavement Improvement (New), Paving and/or Striping Road Maintenance & Rehab/Repair (Existing Safety), Pavement Rehab/Repair (Existing), Paving and/or Pre-Construction and 12/2021 01/2022 Port Hueneme Ventura 20/21 In Progress Patterson Road Grind and Overlay Patterson Road between Hemlock St. and Channel Islands Blvd 10-20 44 19 Rehabilitation Striping Installation (New Safety) | Asphalt grinding, asphalt resurfacing, and traffic Construction 12/2021 01/2022 striping.

*This list is subject to change and will be finalized upon the adoption of any jurisdiction that meets subsequent eligibility at the October 2021 Commission Meeting. Draft City Submitted - Fiscal Year 2021-22 Local Streets and Roads List of Projects *Projects listed are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1) August 19, 2021

Fiscal Year Initially Proposed Project Est Assembly Senate City County Project Type Title Description Location Components Est Start Est Useful Life Proposed Status Completion Districts Districts

Surfside Dr. between Ventura Rd. and Ocean View Dr. This project will include: Pavement Rehab/Repair (Existing) | Phase I and Phase II Road Maintenance & Surfside Drive Resurfacing - Phase 2 Surfside Dr. between Ventura Rd. and Market St. Pre-Construction and 08/2021 10/2021 Port Hueneme Ventura 20/21 Carried Over consist of asphalt resurfacing and traffic 8-10 44 19 Rehabilitation Phases 1 and 2 Surfside Dr. is a two-lane Construction 09/2021 10/2021 striping. collector street with a striped median.

This project will include: Sidewalk and/or Crosswalk Rehab/Repair (Existing), Bridge Structure Rehab/Repair (Existing), Pavement Rehab/Repair (Existing), Traffic Signals, Bubbling Springs Area, Patterson Road, Channel Islands Blvd, Lights, and/or Signage Installation (New Safety), Traffic Signals, Lights, and/or Clara Signage Rehab/Repair (Existing Safety), ADA Curb Ramp Rehab/Repair (Existing) | St, Sunkist Elementary School Neighborhood, Hueneme Install cross walks with Accessory Pedestrian Signal (APS), install speeq cushions for Elementary School Pre-Construction and 07/2021 06/2022 Port Hueneme Ventura 20/21 In Progress Safety Safe Street Measures 15-20 44 19 traffic calming, upgrade reflective traffic signage, install digital speed signs to alert Neighborhood, Park View Elementary School Neighborhood, and Construction 07/2021 06/2022 drivers of their vehicle speed, install overhead street lights to improve visibility and Richard Bard pedestrian safety, line or repair storm drains that have structural issues that Elementary School Neighborhood, Evergreen Ln, Scott Street, may collapse a roadway, stripe and sign bike paths, improve sidewalk grades and and Panama St. install ADA complaint ramps.

Residential Streets Bounded by Pleasant Valley to the north, J Road Maintenance & Ann Street Neighborhood This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Right Pre-Construction and 06/2021 07/2021 Port Hueneme Ventura 19/20 Carried Over Street to the East, Ventura Rd to the West, Hueneme Rd to the 5-10 44 19 Rehabilitation Resurfacing Phase I/II of Way Construction 07/2021 08/2021 South

This project will include: Sidewalk and/or Crosswalk Rehab/Repair (Existing), ADA Bard Road, Scott Street, Pearl Street, Bryce Canyon, Sunkist Port Hueneme Ventura 19/20 In Progress Safety Annual Sidewalk Repair Curb Ramp Rehab/Repair (Existing), Bicycle Lane Rehab/Repair (Existing) | Construction 06/2021 06/2022 15-20 44 19 Street and Wheelhouse Avenue Replacement of cracked, uplifted sidewalks and additional curb ramps

Road Maintenance & Pre-Construction and 06/2021 07/2021 Port Hueneme Ventura 21/22 New Ocean View Drive Resurfacing This project will include: Pavement Rehab/Repair (Existing) Ocean View Drive 10-15 44 19 Rehabilitation Construction 07/2021 08/2021

Channel Islands Blvd between Victoria Street. and Wheelhouse Road Maintenance & Channel Islands Blvd Resurfacing - This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Pre-Construction and 02/2021 03/2022 Port Hueneme Ventura 21/22 New Avenue. Channel Islands Blvd is an arterial road with 4 lanes of 10-15 44 19 Rehabilitation Phase I Pavement Rehab/Repair (Existing) Construction 03/2022 04/2022 travel.

The project is located on the west side of the City at Peck Road from Eastbound State Route 126 Off-ramp/Acacia Way Road Maintenance & Peck Road and Faulkner Road This project will include: Pavement Rehab/Repair (Existing), ADA Curb Ramp Intersection. Harvard, Orchard and Park Street. Santa Paula Ventura 20/21 Carried Over Construction 07/2021 06/2022 15-20 37 19 Rehabilitation Pavement Rehabilitation Project Rehab/Repair (Existing) | Split project in expenditure report. to Peck Road Overpass, Peck Road from Santa Barbara Street to Santa Paula Street, and Faulkner Road from Peck Road to Westbound State Route 126 On- and Off-ramps.

Paving and slurry seal of select local/residential streets in the vicinity of following areas: Aristotle St. between Madera Rd. and Road Maintenance & FY 2021-22 Annual Minor Streets This project will include: Sidewalk and/or Crosswalk Rehab/Repair (Existing), Simi Valley Ventura 21/22 New Sinaloa Rd., Marvel Ave. between Cochran St. and Graham St., Construction 09/2021 09/2022 5-20 38 27 Rehabilitation Rehabilitation Program Pavement Rehab/Repair (Existing), ADA Curb Ramp Rehab/Repair (Existing) Fourth St. from Royal Ave. to Catlin St., and in the Wood Ranch area adjacent to Martha Morrison Dr. and Circle Knoll Dr.

*This list is subject to change and will be finalized upon the adoption of any jurisdiction that meets subsequent eligibility at the October 2021 Commission Meeting. Draft City Submitted - Fiscal Year 2021-22 Local Streets and Roads List of Projects *Projects listed are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1) August 19, 2021

Fiscal Year Initially Proposed Project Est Assembly Senate City County Project Type Title Description Location Components Est Start Est Useful Life Proposed Status Completion Districts Districts

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Road Maintenance & 2022 Pavement Overlay and Sidewalk and/or Crosswalk Rehab/Repair (Existing), Pavement Rehab/Repair Locations within the city include Dos Veintos, Moorpark road, Thousand Oaks Ventura 21/22 New Construction 03/2022 12/2022 7-25 37 27 Rehabilitation Resurfacing Program (Existing), ADA Curb Ramp Installation (New), Paving and/or Striping Installation (New Thousand Oaks blvd, Hillcrest drive and several neighborhoods Safety), ADA Curb Ramp Rehab/Repair (Existing)

Locations are estimates, not yet final. Pole Line Rd, Loyola, Fifth St, Second St, Sycamore Ln, Research Park Dr, Arroyo Ave, This project will include: Sidewalk and/or Crosswalk Installation (New), Paving and/or Albany Cir, Cordova Pl, Anza Ave, Belmont Dr, Grosbeak Ct, Striping Rehab/Repair (Existing Safety), Sidewalk and/or Crosswalk Rehab/Repair Transportation Infrastructure Kestrel Pl, Alta Loma St, Barbera Pl, Bella Casa St, Chateau Ln, Road Maintenance & (Existing), ADA Curb Ramp Installation (New), Pavement Rehab/Repair (Existing), Davis Yolo 21/22 New Rehab – Pavement Rehabilitation Estrella Pl, Exeter Ct, Francisco Pl, Jasmine Ct, Rainier St, Construction 04/2022 10/2022 10-20 4 3 Rehabilitation Storm Drain and/or Culvert Rehab/Repair (Existing), Traffic Signals, Lights, and/or Project 2021/22 Amoroso Pl, Cedar Pl, Cottage Cir, Costeau Pl, Eel Ave, Signage Rehab/Repair (Existing Safety), ADA Curb Ramp Rehab/Repair (Existing), Evergreen Ct, Fermi Pl, Hacienda Ave, Luz Pl, Madson Pl, Bicycle Lane Rehab/Repair (Existing) Michaelangelo Pl, Myrtle Pl, Northfiedl Ct, Pistachio Ct, Raphael Pl, 14th

This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Sidewalk and/or Crosswalk Rehab/Repair (Existing), Bicycle Lane Rehab/Repair (Existing), ADA Curb Ramp Rehab/Repair (Existing) | Roadway rehabilitation including Road Maintenance & Matmor Road from E. Main Street to Gibson E. Road and Gum Woodland Yolo 19/20 Forecasted 2020 Road Rehabilitation Project asphalt roadway rehabilitation, repair damaged curb, gutter and sidewalk sections, Construction 07/2022 06/2024 15-20 4 3 Rehabilitation Avenue from East Street to Matmor Road. improve ADA access at intersections, improve delineation of, and widen bike lanes. Project will improve access to shopping, school and neighborhoods within and through the project area.

This project will include: Project includes asphalt roadway rehabilitation, restriping Gibson Road Bicycle/Pedestrian Complete Streets narrower travel lanes to slow traffic, adding buffered bike lanes, constructing ADA Woodland Yolo 19/20 Carried Over Mobility Project - East to West Gibson Road from East Street to West Street. Construction 07/2021 12/2022 15-20 4 3 Components compliant curb ramps and sidewalk repairs, installing drainage improvements, and Street completing traffic signal improvements to include bicycle and pedestrian actuation.

This project will include: Project includes asphalt roadway rehabilitation, restriping Complete Streets W. Gibson Road Rehabilitation - narrower travel lanes to slow traffic, adding buffered bike lanes, constructing ADA Woodland Yolo 19/20 Carried Over Gibson Road from West Street to County Road 98. Construction 07/2021 12/2022 15-20 4 3 Components West Street to County Road 98 compliant curb ramps and sidewalk repairs, installing drainage improvements, and completing traffic signal improvements to include bicycle and pedestrian actuation.

This project will include: Project includes microsurfacing, curb and gutter, landscape, fencing, irrigation and storm drainage, restriping narrower travel lanes to slow traffic, widen existing on-street bike lanes, and add bike lanes where they do not exist. Install Complete Streets East Main Street Improvement East Main Street from East Street to the Interstate 5 northbound Woodland Yolo 21/22 New a landscape separated, off-street bike path on the north side of E. Main Street Construction 07/2021 12/2021 7-10 4 3 Components Project off ramp between Pioneer Avenue and Matmor Road. | The estimated start and completion dates are for construction only. The estimated total project cost is overall, including pre-construction and construction.

Targeted Traffic Operations This project will include: Project Scope Development, Cost Estimating, Document West Sacramento Yolo 20/21 In Progress Traffic Control Devices To be determined Pre-Construction 04/2021 11/2021 5-20 7 6 Improvements Preparation, Preliminary Design

This project will include: Project Scope Development, Cost Estimating, Document Road Maintenance & Southport Parkway Pavement Southport Parkway between Lake Washington Blvd and Ramco West Sacramento Yolo 19/20 In Progress Preparation, Preliminary Design | Project is in preliminary engineering and design Pre-Construction 04/2020 12/2021 10-20 7 6 Rehabilitation Rehabilitation Street phase only.

*This list is subject to change and will be finalized upon the adoption of any jurisdiction that meets subsequent eligibility at the October 2021 Commission Meeting. Draft City Submitted - Fiscal Year 2021-22 Local Streets and Roads List of Projects *Projects listed are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1) August 19, 2021

Fiscal Year Initially Proposed Project Est Assembly Senate City County Project Type Title Description Location Components Est Start Est Useful Life Proposed Status Completion Districts Districts

This project will include: Project Scope Development, Document Preparation, Cost Industrial Blvd from approximately Beacon Blvd to Terminal Road Maintenance & Industrial Blvd & Harbor Blvd West Sacramento Yolo 21/22 New Estimating, Preliminary Design | Project is in preliminary engineering and design Street and Harbor Blvd from approximately Industrial Blvd to Pre-Construction 07/2021 03/2022 10-20 7 6 Rehabilitation Pavement Rehabilitation phase only. Interstate -80.

This project will include: Rehabilitate the local street network including storm drainage Road Maintenance & States Streets Neighborhood repairs, ADA accessibility upgrades and pavement rehabilitation in an older West Pre-Construction and 07/2019 06/2021 West Sacramento Yolo 19/20 In Progress States Streets Neighborhood 5-10 7 6 Rehabilitation Pavement Rehabilitation Sacramento neighborhood. | Project is currently in design phase. First phase of Construction 07/2021 12/2021 construction planned summer 2021.

Main St: Railroad to First St Almeria Dr: Almeria Pl to Niemann Almeria Pl: Almeria Dr to End This project will include: Pavement Improvement (New), Project Scope Development, Road Maintenance & Martinez St: Railroad to Almeria Dr Pre-Construction and 04/2022 05/2022 Winters Yolo 21/22 New SB1 2021-22 Street Rehab Project Pavement Rehab/Repair (Existing), Bicycle Lane (New), Cost Estimating, Document 5-7 4 3 Rehabilitation Malaga Ct: Martinez to End Construction 05/2022 06/2022 Preparation, Paving and/or Striping Installation (New Safety) First St: Grant to Abbey First St: Main to Wolfskill Second St: Grant to Wolfskill

This project will include: Procurement of Public Works Systems/Databases, Public Works Staffing | This project is planned to implement a city-wide pavement management program based upon a widely-used software program (MTC's Pavement Management Program Procurement/Operatio Wheatland Yuba 20/21 Carried Over Other StreetSaver®), including the survey and condition ratinq of all the City's, maintained City Wide 01/2021 12/2021 10-20 3 4 (PMP) Implementation nal Needs mileage. This program will enable full compliance with SB 1 requirements and provide the basis for efficient, cost-effective identification and delivery of pavement maintenance work for the City.

Yuba Street - 6th to 10th Street and 12th to 17th Street; Ramirez Road Maintenance & Marysville Yuba 19/20 Carried Over 2020 Resurfacing Project This project will include: Pavement Rehab/Repair (Existing) Street - 12th to 24th Street; East 22nd Street - Ramirez Street to Construction 05/2022 09/2023 15-20 3 4 Rehabilitation Huston Street

Road Maintenance & Preventative Maintenance H Street - 3rd Street to 14th Street; D Street 3rd - 5th St.; E. 17th Marysville Yuba 19/20 Carried Over This project will include: Pavement Rehab/Repair (Existing) Construction 03/2022 09/2023 15-20 3 4 Rehabilitation Program St. - Chestnut St. to SR20

*This list is subject to change and will be finalized upon the adoption of any jurisdiction that meets subsequent eligibility at the October 2021 Commission Meeting.