Draft City Submitted - Fiscal Year 2021-22 Local Streets and Roads List of Projects *Projects listed are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1) August 19, 2021 Fiscal Year Initially Proposed Project Est Assembly Senate City County Project Type Title Description Location Components Est Start Est Useful Life Proposed Status Completion Districts Districts For this year, staff will focus on selecting streets from the West Road Maintenance & 2021 Pavement Management This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Alameda Alameda 21/22 New End zone, which is located between the western limits of the City Construction 07/2021 06/2022 4-20 18 9 Rehabilitation Project Pavement Rehab/Repair (Existing), Bicycle Lane Rehab/Repair (Existing) of Alameda and Grand Street. *Browning Street from Addison Street to Dwight Way *Colusa Avenue from North City Limit to Solano Avenue *Delaware Street from Acton Street to Sacramento Street This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), *Ellsworth Street from Stuart Street to Ashby Avenue Road Maintenance & Sidewalk and/or Crosswalk Rehab/Repair (Existing), Pavement Rehab/Repair Berkeley Alameda 21/22 New FY 2022 Street Rehabilitation *Fulton Street from Dwight Way to Stuart Street Construction 06/2022 12/2022 10-20 15 9 Rehabilitation (Existing), Storm Drain and/or Culvert Rehab/Repair (Existing), ADA Curb Ramp *Heinz Avenue from Seventh Street to San Pablo Avenue Rehab/Repair (Existing), Bicycle Lane Rehab/Repair (Existing) *Stuart Street from Fulton Street to Ellsworth Street *Stuart Street from Benvenue Avenue to College Avenue Locations are estimates not yet final/complete. 48TH STREET(SAN PABLO AVENUE - CITY LIMITS ) SALEM STREET(48TH STREET - 47TH STREET ) 47TH STREET(SAN PABLO AVENUE - ADELINE STREET) This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), 45TH STREET(SAN PABLO AVENUE - ADELINE STREET) FY2021/2022 Annual Street Sidewalk and/or Crosswalk Rehab/Repair (Existing), Pavement Rehab/Repair SALEM STREET(45TH STREET - 43RD STREET) Road Maintenance & Emeryville Alameda 20/21 Carried Over Rehabilitation and Preventive (Existing), Bicycle Lane (New), Traffic Signals, Lights, and/or Signage Rehab/Repair ESSEX STREET(45TH STREET - 43RD STREET) Construction 03/2022 06/2022 5-10 15 9 Rehabilitation Maintenance Project (Existing Safety), Paving and/or Striping Installation (New Safety), ADA Curb Ramp 43RD STREET(SAN PABLO AVENUE - ADELINE STREET) Rehab/Repair (Existing), Bicycle Lane Rehab/Repair (Existing) 41ST STREET(SAN PABLO AVENUE - ADELINE STREET) DOYLE STREET(47TH STREET - 45TH STREET) 45TH STREET(HORTON STREET - SAN PABLO AVENUE) 53RD STREET(HORTON STREET - SAN PABLO AVENUE) The locations are as follows: Road Maintenance & This project will include: Curb and Gutter Repair Livermore Alameda 19/20 Carried Over 2020 Street Resurfacing Airway Blvd (Kitty Hawk Road to North Canyon Parkway) Construction 09/2021 05/2022 20-25 16 7 Rehabilitation Adjust Utility Boxes to Finished Grade First Street (Las Positas Road to Springtown Blvd) All preliminary street locations are subject to change and will be selected based on priority need and resources throughout the This project will include: Sidewalk and/or Crosswalk Installation (New), Paving and/or year. Striping Rehab/Repair (Existing Safety), Sidewalk and/or Crosswalk Rehab/Repair Springtown Blvd at Oleander St, S. Vasco Rd (Naylor Ave to Road Maintenance & (Existing), ADA Curb Ramp Installation (New), Pavement Rehab/Repair (Existing), Livermore Alameda 20/21 In Progress 2021 Slurry Seal Preston Rd), S. Vasco Rd (East Ave to Mesquite Wy), S. Vasco Construction 07/2022 06/2023 10-15 16 7 Rehabilitation Bicycle Lane (New), Paving and/or Striping Installation (New Safety), Bicycle Lane Rd (Patterson Pass to Daphne Dr), N. Vasco Rd (Northfront Rd Rehab/Repair (Existing), ADA Curb Ramp Rehab/Repair (Existing) | Adjust Utility Box to Scenic Ave), Portola Ave (Woodhaven Cmmn to Murrieta to Finished Grade Blvd), Murdell Ln (E. Stanley Blvd to Cinnabar Dr), Third St (S. M St to S. Livermore Ave) This project will include: Active Transportation Plan, Cost Estimating, Document Preparation, Preliminary Design, Environmental Study/Documents | ADA curb Ramp Installation/Rehab/Repair Bicycle Lane Installation/Rehab/Repair Road Maintenance & Collier Canyon Creek Culvert, Livermore Alameda 21/22 New Pavement Rehab/Repair Collier Canyon Road at North Canyons Pkwy Pre-Construction 07/2021 06/2023 20-30 16 7 Rehabilitation Drainage and Road Improvements Paving and/or Striping Installation/Rehab/Repair Storm Drain and/or Culvert Installation/Rehab/Repair Curb and Gutter Installation/Rehab/Repair Adjust Utility Boxes to grade *This list is subject to change and will be finalized upon the adoption of any jurisdiction that meets subsequent eligibility at the October 2021 Commission Meeting. Draft City Submitted - Fiscal Year 2021-22 Local Streets and Roads List of Projects *Projects listed are consistent with Streets and Highways Code Sections 2030(b)(1) and 2034(a)(1) August 19, 2021 Fiscal Year Initially Proposed Project Est Assembly Senate City County Project Type Title Description Location Components Est Start Est Useful Life Proposed Status Completion Districts Districts All preliminary street locations are subject to change and will be This project will include: Sidewalk and/or Crosswalk Installation (New), Paving and/or selected based on priority need and resources throughout the Striping Rehab/Repair (Existing Safety), Sidewalk and/or Crosswalk Rehab/Repair year. (Existing), ADA Curb Ramp Installation (New), Pavement Rehab/Repair (Existing), First St(Q St to M St), N. Livermore Ave (Railroad Underpass to Road Maintenance & Traffic Signals, Lights, and/or Signage Installation (New Safety), Bicycle Lane (New), Livermore Alameda 21/22 New 2022 Street Resurfacing Railroad Ave), S. Livermore Ave (Fifth St to Pacific Ave), N. Construction 07/2023 12/2023 20-25 16 7 Rehabilitation Paving and/or Striping Installation (New Safety), Traffic Signals, Lights, and/or Greenville Rd (580 Overpass to Southfront Rd), Las Positas Rd Signage Rehab/Repair (Existing Safety), ADA Curb Ramp Rehab/Repair (Existing), (N. Livermore Ave to Hiliker Pl), N. Livermore Ave (Chestnut St Bicycle Lane Rehab/Repair (Existing) | Curb and Gutter Repair to Railroad Underpass), N Greenville Rd (Southfront Rd to Las Adjust Utility Boxes to Finished Grade Positas Rd), Maple St (Railroad Ave to First St) All preliminary street locations are subject to change and will be selected based on priority need and resources throughout the This project will include: Sidewalk and/or Crosswalk Installation (New), Paving and/or year. Striping Rehab/Repair (Existing Safety), Sidewalk and/or Crosswalk Rehab/Repair Holmes St(Alden Ln to Concannon Blvd), Springtown Blvd at Road Maintenance & (Existing), Pavement Rehab/Repair (Existing), ADA Curb Ramp Installation (New), Livermore Alameda 21/22 New 2022 Slurry Seal Oleander St, First St (Bridge deck E/Inman to Scott St), E. Construction 07/2023 12/2023 10-15 16 7 Rehabilitation Bicycle Lane (New), Paving and/or Striping Installation (New Safety), Bicycle Lane Stanley Blvd (Wall St to Murrieta Blvd), E. Stanley Blvd (Fenton Rehab/Repair (Existing), ADA Curb Ramp Rehab/Repair (Existing) | Adjust Utility Box St to Railroad Ave), Fourth St at Holmes St, Holmes St to Finished Grade (Concannon Blvd to Vancouver Wy), Portola Ave (N. Livermore Ave to Yorkshire Dr), Holmes St (Lexington Wy to Alden Ln) Grand Avenue - Wildwood to Fairview Hampton Rd. - Glen Alpine to St. James This project will include: Sidewalk and/or Crosswalk Installation (New), Pavement Hill Lane - Jerome to end Road Maintenance & Piedmont Alameda 20/21 Carried Over 2021 Street Rehabilitation Project Rehab/Repair (Existing), ADA Curb Ramp Rehab/Repair (Existing), Bicycle Lane Wildwood - Grand to Nova; and Prospect to Highland Construction 09/2021 11/2021 20-25 15 9 Rehabilitation Rehab/Repair (Existing) Requa Rd. - Hazel to Wildwood Manor Dr. - Arroyo to Cambridge Dudley Ave. - Blair to Mountain This project will include: Paving and/or Striping Rehab/Repair (Existing Safety), Sidewalk and/or Crosswalk Rehab/Repair (Existing), Pavement Rehab/Repair (Existing), Bicycle Lane (New), Landscape Safety Rehab/Repair (Existing), Storm Road Maintenance & Washington Avenue Pavement Drain and/or Culvert Rehab/Repair (Existing), Paving and/or Striping Installation (New Washington Avenue between Cornell Ave and Masonic Ave in Albany Alameda 19/20 In Progress Construction 09/2021 11/2021 10-20 15 9 Rehabilitation Restoration Project Safety), ADA Curb Ramp Rehab/Repair (Existing), Bicycle Lane Rehab/Repair Albany (Existing) | Project construction Phase I was substantially completed in Spring 2021. Utility conflicts with EBMUD necessitated phasing of construction. Phase II is scheduled for construction in late summer/fall 2021. This project will include: Traffic Signals, Lights, and/or Signage Installation (New Safety), Cost Estimating, Document Preparation, Preliminary Design, Traffic Signals, Citywide Signal Communications Along Dublin Blvd. from the Civic Plaza/Sierra Court intersection Pre-Construction and 12/2019 09/2021 Dublin Alameda 19/20 In Progress Traffic Control Devices Lights, and/or Signage Rehab/Repair (Existing Safety) | Upgrade of the traffic signal 10-20 16 7 Upgrade to the San Ramon Road intersection. Construction 11/2021 06/2022 communication system and replace existing
Details
-
File Typepdf
-
Upload Time-
-
Content LanguagesEnglish
-
Upload UserAnonymous/Not logged-in
-
File Pages137 Page
-
File Size-