Environmental and Social Monitoring Report Project Number: 49222-001 18 August 2017 Tangguh Liquefied Natural Gas Expansion Project (Republic of Indonesia) January to June 2017 - Operator’s Environmental, Health, Safety and Social Report Prepared by BP Berau Ltd for the Asian Development Bank This report is a document of the borrower. The views expressed herein do not necessarily represent those of ADB's Board of Directors, Management, or staff, and may be preliminary in nature. Your attention is directed to the “Terms of Use” section of this website. In preparing any country program or strategy, financing any project, or by making any designation of or reference to a particular territory or geographic area in this document, the Asian Development Bank does not intend to make any judgments as to the legal or other status of any territory or area. OPERATOR’S EHS REPORT TANGGUH LNG Operator’s Si Monthl Report Environmental, Health, Safety and Social Project Tangguh LNG January - June 2017 TANGGUH LNG INTEGRATED AMDAL TELUK BINTUNI REGENCY PAPUA BARAT PROVINCE BP Indonesia Perkantoran Hijau Arkadia Tower D, Lantai 5 Jl. TB Simatupang Kav 88 JAKARTA 12520 OPERATOR’S EHS REPORT TANGGUH LNG TABLE OF CONTENT CHAPTER I INTRODUCTION........................................................................................................................... 5 A. COMPANY PROFILE ............................................................................................................................ 5 B. ACTIVITY LOCATION .......................................................................................................................... 6 C. ACTIVITY DESCRIPTION .................................................................................................................... 6 C.1 Current Operation ........................................................................................................................ 6 C.2 Construction Phase of Tangguh Expansion Project (TEP) and New Condensate and Diesel Tank (NCDT) Project .................................................................................................................... 9 C.3 Survey, Seismic and Exploration Drilling ............................................................................ 17 D. AUDIT UPDATE .................................................................................................................................. 17 E. SURROUNDING ENVIRONMENT .................................................................................................. 18 CHAPTER II IMPLEMENTATION AND EVALUATION .............................................................................. 20 A. CURRENT OPERATIONS .................................................................................................................. 20 A.1 Environmental Aspect ............................................................................................................... 20 A.2 Social Aspect ............................................................................................................................... 49 B. CONSTRUCTION OF TANGGUH EXPANSION PROJECT (TEP) and New Condensate and Diesel Tank (NCDT) ..................................................................................................................................... 84 B.1 Environmental Aspect ............................................................................................................... 84 C. SURVEY, SEISMIC, AND EXPLORATION DRILLING ............................................................... 126 C.1 Environmental Aspect ............................................................................................................. 126 C.2 SOCIAL Aspect .......................................................................................................................... 130 D. HEALTH ASPECT ............................................................................................................................. 133 D.1 Tangguh Operation.................................................................................................................. 133 E. SAFETY ASPECT .............................................................................................................................. 136 E.1 Tangguh Operation.................................................................................................................. 136 E.2 Tangguh Expansion Project................................................................................................... 137 CHAPTER III CONCLUSION ......................................................................................................................... 139 A. Environmental Aspect .................................................................................................................... 139 B. Social Aspect .................................................................................................................................... 139 C. Health Aspect .................................................................................................................................... 139 D. Safety Aspect .................................................................................................................................... 139 2 OPERATOR’S EHS REPORT TANGGUH LNG LIST OF FIGURES FIGURE 1 TANGGUH LOCATION ................................................................................................................... 6 FIGURE 2 LNG PLANT AND ITS SUPPORTING FACILITIES .................................................................... 7 FIGURE 3 PLATFORMS VR-A AND VR-B ...................................................................................................... 7 FIGURE 4 EARTH BUNDWALL (DREDGED MATERIAL PLACEMENT) AREA ...................................... 9 FIGURE 5 TANGGUH EXPANSION PROJECT SCOPE ............................................................................ 10 FIGURE 6 CONCEPTUAL HDD LAY-OUT .................................................................................................... 11 FIGURE 7 POTENTIAL LOCATION FOR SOIL RESISTIVITY SURVEY .................................................. 11 FIGURE 8 TOTAL POB FOR TEP CONSTRUCTION AT TANGGUH SITE ............................................ 13 FIGURE 9 CONTINUATION OF PRE-CONSTRUCTION SURVEY AND TRANSLOCATION ACTIVITY. (TOP) COLLECTION AND TRANSLOCATION OF SUGAR CANE ORCHID DURING TREE CUTTING ACTIVITY. (BOTTOM) SALVATION AND TRANSLOCATION OF MALEOS EGGS. .......................................................................................................................................................... 14 FIGURE 10 LABELED AND RECORDED LOGS AT LOG LANDING AREA. (RIGHT) LOG MEASUREMENT AND RECORD ACTIVITY. ....................................................................................... 14 FIGURE 11 (LEFT) BIOMASS PLACEMENT AS INITIAL EROSION AND SEDIMENTATION CONTROL. (MIDDLE) SILT FENCE AS EROSION CONTROL. (RIGHT) SEDIMENTATION POND. ......................................................................................................................................................... 15 FIGURE 12 (LEFT) DREDGING ACTIVITY AT BOF AREA. (MIDDLE) DREDGE MATERIAL DISPOSAL LOCATION. (RIGHT) SAMPLE OF IN-HOUSE SOFTWARE TO MONITOR DREDGING ACTIVITY. ............................................................................................................................. 16 FIGURE 13 ADAT CEREMONY IN TANAH MERAH BARU (APRIL, 2017 ............................................. 75 FIGURE 14 SERIAL MEETINGS FOR NEW AMDAL AND TEP FAMILIARIZATION IN KOKAS ....... 75 FIGURE 15 NUMBER OF COMMUNITY CONCERNS RECEIVED DURING THROUGH GRIEVANCE CARDS ........................................................................................................................................................ 76 FIGURE 16 MORTALITY CASES AMONG PREGNANT WOMEN IN 14 VILLAGES SURROUNDING OF TANGGUH LNG .................................................................................................................................. 77 FIGURE 17 SUPPLY OF AGRICULTURE AND FISHERIES PRODUCTSTREND FROM COMMUNITY STOCKING POINTS TO TANGGUH CATERING IN TONNES .............................. 78 FIGURE 18 THE OPENING CEREMONY OF SUBITU IN SORONG ATTENDED BY MAYOR OF SORONG CITY .......................................................................................................................................... 79 FIGURE 19 TREND OF NUMBER LOCAL STUDENT RECEIVED SCHOLARSHIP PROGRAM FROM TANGGUH ................................................................................................................................................. 82 FIGURE 20 REVEGETATION ACTIVITY BY NCDT PROJECT TEAM ................................................... 125 3 OPERATOR’S EHS REPORT TANGGUH LNG LIST OF TABLES TABLE 1 AMBIENT AIR MONITORING RESULTS IN JUNE 2017 ......................................................... 35 TABLE 2 EMISSION MONITORING RESULTS FROM AGI IN MARCH 2017 ...................................... 35 TABLE 3 EMISSION MONITORING RESULTS FROM BOILERS IN MARCH 2017 ............................ 35 TABLE 4 EMISSION MONITORING RESULTS FROM REGENERATION GAS HEATERS IN MARCH 2017 ............................................................................................................................................. 36 TABLE 5 EMISSION MONITORING RESULTS FROM GAS TURBINE TRAIN 1 IN FEBRUARI 2017 .....................................................................................................................................................................