GERMANNA-WILDERNESS AREA PLAN PUBLIC COMMENT TRACKING DATE METHOD OF PHYSICAL PAGE NAME SUBAREA COMMENT COMMITTEE ACTION RECEIVED SUBMISSION ADDRESS NUMBER The Steering Committee has completed a Folks, I have been tracking the various iterations of the plan so far working draft of the plan which and it is (the latest being the one from the Steering Committee’s Nov 17 available at agenda). http://orangecountyva.gov/index.aspx?NID=703. Following the adoption of the plan and similar As this progresses to public presentation and comment on 9 Dec, to the development of the Germanna- will there be more substance/detail to the plan than the Powerpoint- Wilderness Area Plan, working drafts of the 10812 Millridge Lane 11/23/14 Email:
[email protected] deep presentations we’ve been seeing provided to the public? utility, transportation, and historical and Bob Foster Spotsylvania, VA 22553 General (Comment 1) cultural opportunities plans will be available on Note that your website the Orange County website. Additionally, all (http://orangecountyva.gov/index.aspx?NID=681) indicates the subdivision, zoning, and other land use presentation starts at 6 PM, but the Free Lance Star article in today’s regulations which may be developed to paper indicates 7 PM. implement specific portions of the Germanna- Wilderness Area Plan will be made available for review via the Orange County website. A significant first phase of the Master Utility Plan will be to scope the potential locational, design financial, and operational viability and associated impacts of the two (2) reservoirs Folks, identified for Subarea 4. Further, if these reservoirs are shown to be potentially viable In your mapping for Sub-Area #4, you show two “reservoirs”, the through the master planning process then the larger one created by damming up the Shotgun Hill Branch.