Sandy Lane 2 Sider
Total Page:16
File Type:pdf, Size:1020Kb
B&Q A224 Sidcup Town Centre Crittalls A224 Corner Orpington Sevenoaks Coca Cola LEFA Business & Booker Industrial Estate Cash & Carry Ruxley Corner A223 EDGINGTON WAYIndustrial Estate Lancaster Jaguar Car Dealership Proposed IKEA Tesco Store Ruxley Corner A20 phase 2 Rexel Senate SANDY LANE phase 1 M25/M20 30% Pre-Let Fitzroy BUSINESS PARK Sandy Lane Sidcup Kent A new development of 11 industrial/warehouse units from 2,600 - 13,600 sq ft (186-1,263 sq m) Available on a virtual freehold or leasehold basis Ready for occupation early 2008 www.fitzroybusinesspark.co.uk Fitzroy City Airport Woolwich Purfleet 31 BUSINESS A206 Erith location A102 PARK A205 Dartford The property lies between the commercial centres of Sidcup A220 Tunnel QEII and Orpington and is within the London Borough of Bromley, A207 A206 Bridge at the northern end of Sandy Lane, close to it’s junction with 1A Dartford Edgington Way (A223) at the Ruxley Corner Roundabout. A226 A2 Bexley 1B A222 The property is within a mixed commercial and semi rural area, backing A20 A211 A223 onto a Tesco supermarket and the former Klinger factory, off Edgington SIDCUP 2 Way. The former Klinger factory is currently the subject of a planning application for a new IKEA store and hotel development. Ruxley Wood Chislehurst Sutton Bromley and Golf Course are situated opposite the development site. A222 A208 Swanley A224 A225 The six lane A20 Sidcup By-Pass Road abuts the southern boundary 3/1 of the property and provides easy access, at the nearby Crittall’s A21 M20 Corner, east to Junction 3 M25 (5 miles) and the national motorway Orpington M25 network and west into central London (16 miles). Photographs of a similar site by the developer N Proposed IKEA 1 S A Pre-Let to N D Truckcraft Y L A 2 N 3 E description 4 A new 58,970 sq ft (5,478 sq m) development of 11 units arranged 5 in three blocks to provide unit sizes from 2,600 sq ft (186 sq m) to 6 13,600 sq ft (1,263 sq m). 7 8 Planning consent has been granted for business, general industry, storage and distribution uses (Use Classes B1, B2 & B8). Practical completion is estimated to be early 2008. 9 phase 2 specification 10 Steel portal frame construction with steel clad elevations and roof 11 6m - 7.2m clear internal height 30 kN/m2 floor loadings (unit 9 has 37.5 kN/m2) Attractive glazed curtain walling and fitted first floor offices to units 1 & 9 Units 2, 8 & 10 will be finished to a “serviced shell” with the benefit of WC’s A20 Units 3 - 7 & 11 will have fully fitted first floor offices accommodation terms Gr Fl sq ft 1st Fl sq ft Total GEA sq ft Available on a virtual freehold or leasehold basis. Further unit 1 Pre-Let 15,740 1,420 17,160 information available from the joint agents. unit 2 4,260 - 4,260 unit 3 2,600 405 3,005 unit 4 2,600 405 3,005 unit 5 2,600 405 3,005 unit 6 2,600 405 3,005 [email protected] Robert G Cox Leah.Jeffreys @knightfrank.com [email protected] unit 7 2,600 405 3,005 unit 8 2,600 - 2,600 unit 9 11,650 1,950 13,600 BAILEY unit 10 3,300 - 3,300 COX St George House, 1 Charlotte Road unit 11 2,615 410 3,025 London EC2A 3DH Total 53,165 5,805 58,970 020 7729 3859 This brochure and the descriptions and the measurements contained herein do not form part of any contract and whilst every effort has been to ensure accuracy, this cannot be guaranteed. May 2007..