Fire Protection and Life Safety Design Standards

Total Page:16

File Type:pdf, Size:1020Kb

Fire Protection and Life Safety Design Standards FIRE PROTECTION AND LIFE SAFETY DESIGN STANDARDS Release 1.0 April 2011 Released by: Cleveland Clinic 9500 Euclid Ave. Cleveland OH 44195 All information within this Document is considered CONFIDENTIAL and PROPRIETARY. By receipt and use of this Document, the recipient agrees not to divulge any of the information herein and attached hereto to persons other than those within the recipients’ organization that have specific need to know for the purposes of reviewing and referencing this information. Recipient also agrees not to use this information in any manner detrimental to the interests of Cleveland Clinic. Cleveland Clinic Design Standards Copyright © 2011 By the Cleveland Clinic These Standards, or parts thereof, may not be reproduced in any form without the permission of the Cleveland Clinic. Cleveland Clinic Cleveland Clinic Design Standards: Fire Protection and Life Safety The following pages contain guidelines for the design and construction of new and renovated facilities at all domestic Cleveland Clinic locations. They shall be used by A/E firms in the preparation of drawings and specifications for construction of facilities. The general purpose of Design Standards is to provide minimal criteria for design, materials, and equipment at Cleveland Clinic facilities regarding Codes and FM Global compliance, warranty, approved products, execution and uniformity. The Standards are not Contract Specifications, but used to prepare more detailed, project specific specifications. The Standards are intended to be used to address system design aspects of equipment that Cleveland Clinic desires to standardize among facilities, and identify prohibited materials and construction practices. The use of these Standards is mandatory for all design or maintenance projects. Deviations are discouraged. If project conditions arise which require a deviation, it shall be thoroughly documented by the user and submitted to Cleveland Clinic for review and approval using the Design Standards Revision Request document. Additionally, all Cleveland Clinic staff, architects, engineers, and contractors are encouraged to participate in the ongoing development of these guidelines by communicating any suggestions by use of the Revision Request document. CLEVELAND CLINIC FIRE PROTECTION & LIFE SAFETY DESIGN STANDARDS TABLE OF CONTENTS 1 INTRODUCTION ....................................................................................................... 1 2 GENERAL ................................................................................................................. 1 2.1 Purpose ................................................................................................................ 1 2.2 Application............................................................................................................ 1 2.3 Applicable Codes, Standards, Guidelines, and References ................................. 2 2.4 Equipment ............................................................................................................ 2 2.5 Cleveland Clinic Contacts..................................................................................... 3 2.6 Abbreviations........................................................................................................ 3 2.7 Definitions............................................................................................................. 3 2.8 Fire Protection during Construction and Renovation ............................................ 4 2.9 Document Submittal ............................................................................................. 4 2.10 Role of the Fire Protection Engineer..................................................................... 7 2.11 Permitting ............................................................................................................. 7 3 BUILDING FEATURES ............................................................................................. 8 3.1 Construction Type ................................................................................................ 8 3.2 Occupancy Classification ..................................................................................... 8 3.3 Smoke Barriers, Smoke Partitions, and Fire Barriers ........................................... 8 3.4 Interior Finish and Furnishings ........................................................................... 10 3.5 Smoke Control Systems ..................................................................................... 11 3.6 Health Care Suites ............................................................................................. 11 3.7 Horizontal Exits................................................................................................... 12 3.8 Elevators ........................................................................................................... 13 3.9 Protection of Openings ....................................................................................... 14 3.10 Doors.................................................................................................................. 14 3.11 Firestopping........................................................................................................ 14 3.12 Sprayed on Fireproofing ..................................................................................... 14 4 SPECIAL OCCUPANCY REQUIREMENTS ........................................................... 14 4.1 Linen Storage Rooms......................................................................................... 14 4.2 Storage Rooms................................................................................................... 14 4.3 Laundry and Rubbish Chutes ............................................................................. 15 4.4 Trash Collection Rooms ..................................................................................... 16 4.5 Technology Rooms (IT Rooms).......................................................................... 16 4.6 Electrical Rooms................................................................................................. 17 4.7 Health Care Corridor Alcoves............................................................................. 17 4.8 High-Rise Buildings ............................................................................................ 18 4.9 Laboratories........................................................................................................ 18 4.10 Atriums and Other Vertical Openings ................................................................. 19 4.11 Food Preparation Facilities................................................................................. 19 4.12 Pharmacies......................................................................................................... 19 4.13 Utility Rooms and Shop Areas............................................................................ 20 4.14 Health Care Gift Shops....................................................................................... 20 4.15 Behavioral Health Areas and Holding Areas ...................................................... 20 4.16 On-Call Rooms................................................................................................... 20 5 MEANS OF EGRESS .............................................................................................. 21 5.1 Travel Distance................................................................................................... 21 5.2 Number of Exits .................................................................................................. 21 5.3 Corridors............................................................................................................. 21 5.4 Stairs .................................................................................................................. 21 5.5 Exit Signage ....................................................................................................... 22 6 WATER SUPPLY FOR FIRE PROTECTION ......................................................... 22 6.1 Adequacy of Water Supply ................................................................................. 22 6.2 Capacity ............................................................................................................. 23 6.3 Fire Pumps ......................................................................................................... 23 6.4 Distribution System............................................................................................. 24 6.5 Hydrants ............................................................................................................. 25 6.6 Fire Department Connection............................................................................... 26 6.7 Backflow Preventers for Fire Protection Systems............................................... 26 6.8 Forward Flow Test Connections......................................................................... 26 6.9 Pressure Reducing Valves ................................................................................. 27 7 FIRE EXTINGUISHING SYSTEMS ......................................................................... 27 7.1 Design Criteria.................................................................................................... 27 7.2 Zoning Requirements ........................................................................................
Recommended publications
  • Fire Service Features of Buildings and Fire Protection Systems
    Fire Service Features of Buildings and Fire Protection Systems OSHA 3256-09R 2015 Occupational Safety and Health Act of 1970 “To assure safe and healthful working conditions for working men and women; by authorizing enforcement of the standards developed under the Act; by assisting and encouraging the States in their efforts to assure safe and healthful working conditions; by providing for research, information, education, and training in the field of occupational safety and health.” This publication provides a general overview of a particular standards- related topic. This publication does not alter or determine compliance responsibilities which are set forth in OSHA standards and the Occupational Safety and Health Act. Moreover, because interpretations and enforcement policy may change over time, for additional guidance on OSHA compliance requirements the reader should consult current administrative interpretations and decisions by the Occupational Safety and Health Review Commission and the courts. Material contained in this publication is in the public domain and may be reproduced, fully or partially, without permission. Source credit is requested but not required. This information will be made available to sensory-impaired individuals upon request. Voice phone: (202) 693-1999; teletypewriter (TTY) number: 1-877-889-5627. This guidance document is not a standard or regulation, and it creates no new legal obligations. It contains recommendations as well as descriptions of mandatory safety and health standards. The recommendations are advisory in nature, informational in content, and are intended to assist employers in providing a safe and healthful workplace. The Occupational Safety and Health Act requires employers to comply with safety and health standards and regulations promulgated by OSHA or by a state with an OSHA-approved state plan.
    [Show full text]
  • Best Practice Guide on Fire Stops and Fire Blocks and Their Impact on Sound Transmission
    http://irc.nrc-cnrc.gc.ca Best Practice Guide on Fire Stops and Fire Blocks and their Impact on Sound Transmission NRCC-49677 Richardson, J.K.; Quirt, J.D.; Hlady, R. June 2007 The material in this document is covered by the provisions of the Copyright Act, by Canadian laws, policies, regulations and international agreements. Such provisions serve to identify the information source and, in specific instances, to prohibit reproduction of materials without written permission. For more information visit http://laws.justice.gc.ca/en/showtdm/cs/C-42 Les renseignements dans ce document sont protégés par la Loi sur le droit d'auteur, par les lois, les politiques et les règlements du Canada et des accords internationaux. Ces dispositions permettent d'identifier la source de l'information et, dans certains cas, d'interdire la copie de documents sans permission écrite. Pour obtenir de plus amples renseignements : http://lois.justice.gc.ca/fr/showtdm/cs/C-42 Best Practice Guide on Fire and their Impact on Sound Transmission Stops and Fire Blocks 2007 June June 2007 Best Practice Guide on Fire Stops and Fire Blocks and their Impact on Sound Transmission J.K. Richardson, J.D. Quirt, R. Hlady BEST PRACTICE GUIDE ON FIRE STOPS AND FIRE BLOCKS AND THEIR IMPACT ON SOUND TRANSMISSION Prepared For Special Interest Group on Suitable Acoustic and Fire Stop Technologies Prepared by J. Kenneth Richardson J. David Quirt Ken Richardson Fire Technologies Inc. Institute for Research in Construction National Research Council of Canada Rob Hlady Affinity Fire Stop Consultants Inc. June 2007 DISCLAIMER The analysis, interpretations, and recommendations in this Guide are those of the authors and do not necessarily reflect the views of the Special Interest Group on Suitable Acoustic and Fire Stop Technologies or those organizations that assisted in the preparation, review and publication of the document.
    [Show full text]
  • BART) Climate Change Adaptation Assessment Pilot
    San Francisco Bay Area Rapid Transit District (BART) Climate Change Adaptation Assessment Pilot DECEMBER 2013 FTA Report No. 0074 Federal Transit Administration PREPARED BY BART Arup North America Ltd. Parsons Brinckerhoff, Inc. COVER PHOTO Courtesy of BART DISCLAIMER This document is disseminated under the sponsorship of the U.S. Department of Transportation in the interest of information exchange. The United States Government assumes no liability for its contents or use thereof. The United States Government does not endorse products of manufacturers. Trade or manufacturers’ names appear herein solely because they are considered essential to the objective of this report. San Francisco Bay Area Rapid Transit District (BART) Climate Change Adaptation Assessment Pilot DECEMBER 2013 FTA Report No. 0074 PREPARED BY San Francisco Bay Area Rapid Transit District (BART) 300 Lakeside Dr., 22th Floor Oakland, CA 94612 Arup North America Ltd. 560 Mission Street, Suite 700 San Francisco, CA 94105 Parsons Brinckerhoff 303 2nd Street, Suite 700 North San Francisco, CA 94107 SPONSORED BY Federal Transit Administration Office of Budget and Policy U.S. Department of Transportation 1200 New Jersey Avenue, SE Washington, DC 20590 AVAILABLE ONLINE http://www.fta.dot.gov/research Metric Conversion Table SYMBOL WHEN YOU KNOW MULTIPLY BY TO FIND SYMBOL LENGTH in inches 25.4 millimeters mm ft feet 0.305 meters m yd yards 0.914 meters m mi miles 1.61 kilometers km VOLUME fl oz fluid ounces 29.57 milliliters mL gal gallons 3.785 liter L ft3 cubic feet 0.028 cubic meters m3 yd3 cubic yards 0.765 cubic meters m3 NOTE: volumes greater than 1000 L shall be shown in m3 MASS oz ounces 28.35 grams g lb pounds 0.454 kilograms kg megagrams T short tons (2000 lb) 0.907 Mg (or “t”) (or “metric ton”) TEMPERATURE (exact degrees) o 5 (F-32)/9 o F Fahrenheit Celsius C or (F-32)/1.8 FEDERAL TRANSIT ADMINISTRATION ii REPORT DOCUMENTATION PAGE Form Approved OMB No.
    [Show full text]
  • Strike the Right Balance Between Active and Passive Fire Protection
    Safety Strike the Right Balance between Active and Passive Fire Protection Cynthia Spitzenberger Use scenario-based fire modeling to Chris Johnson Minmin Le determine the most effective combination of Ayuba Mshelia active fire protection and Robin Pitblado DNV GL passive fire protection for your facility. hen designing an effective fire protection system, provide flexibility in the design of a fire-safe facility, because engineers need to implement both active and any means suitable may be employed to meet the goal. Wpassive fire protection measures. Active fire Prescriptive codes provide a strong basis for fire safety protection (AFP) is required to manage and mitigate process design. They are intended to be all-inclusive codes for typical fires; passive fire protection (PFP) prevents escalation. designs based on the intended function of the facility. For This article describes how to determine the optimum innovative or unique facility designs, the flexibility afforded balance of AFP and PFP through quantitative risk-based by performance-based codes allows designers to implement fire modeling techniques. It reviews current fire protection novel approaches to achieve their fire safety goals. standards — both prescriptive and scenario-based — and Neither method of fire safety design necessarily replaces addresses the challenges of scenario selection. It also covers the other; they are not in competition. Rather, performance- additional factors that should be considered when designing based design codes can supplement prescriptive codes. a fire protection system, including detection, drainage, iso- When the two approaches are used in conjunction, a fire lation and blowdown systems, and the timing of emergency safety design plan is not limited and the fire protection response activities.
    [Show full text]
  • Seattle Building Code, Chapter 9, Fire Protection Systems
    CHAPTER 9 FIRE PROTECTION SYSTEMS (including 2017 errata) User note: Code change proposals to sections preceded by the designation [F] will be considered by the International Fire Code Development Committee during the 2016 (Group B) Code Development Cycle. See explanation on page iv. SECTION 901 Exceptions: GENERAL 1. A supervising station is not required for auto- 901.1 Scope. The provisions of this chapter shall specify matic sprinkler systems protecting one- and two- where fire protection systems are required and shall apply to family dwellings. the design, installation and operation of fire protection sys- 2. Limited area systems serving fewer than 20 tems. sprinklers. 901.2 Fire protection systems. Fire protection systems shall 901.6.2 Fire alarm systems. Fire alarm systems required be installed, repaired, operated and maintained in accordance by the provisions of Section 907.2 of this code and Sec- with this code and the International Fire Code. tions 907.2 and 907.9 of the International Fire Code shall Any fire protection system for which an exception or be monitored by an approved supervising station in accor- reduction to the provisions of this code has been granted shall dance with Section 907.6.6. be considered to be a required system. Exceptions: Exception: Any fire protection system or portion thereof 1. Single- and multiple-station smoke alarms not required by this code shall be permitted to be installed required by Section 907.2.11. for partial or complete protection provided that such sys- tem meets the requirements of this code. 2. Smoke detectors in Group I-3 occupancies.
    [Show full text]
  • Fire Protection and Life Safety Requirements for Elevator Systems
    Don’t Get Caught Up (or Down)” Fire Protection and Life Safety Requirements for Elevator Systems By: André Garabedian, P.E. Fire Protection Engineer Topics • Basic intro to elevator types • 2015 International Building Code (IBC) and International Fire Code (IFC) o General construction requirements, function, etc. o Specifics of Fire Service Access Elevators (FSAE) and Occupant Evacuation Elevators (OEE) • National Fire Protection Association (NFPA) requirements o NFPA 13 and NFPA 72 • Touch upon ASME A17.1-2013 (by reference) Topics (cont.) Alternate Compliance - Important Exclusions/Additions • Unified Facilities Criteria (UFC) o 3-600-01, Section 6-30 o Breakdown by elevator type, etc. • GSA PBS P-100 Facilities Standards for the Public Buildings Service, Section 7.10 Not Included • General safety requirements o Lights, ladders, safety interlocks for maintenance, etc. • Convenience requirements o Sump pumps, maintenance outlets, etc. • Pressurization/Venting o Presentation on its own • Construction Elevators • Full-on Commissioning o Loading requirements, etc. Elevator Types Typical Elevator Types • Direct Plunger • Hole-less Hydraulic o Machine Room or Machine Room-less • External Machine Room Traction Elevator • Machine Room-less Traction Elevator o Geared and Non-Geared Understanding operational concepts will help you understand code requirements. Elevators are Simple Direct Plunger Elevator • Hydraulically-based – Limited to casing • Piston and bore casing below • Limited equipment above car • Hydraulic machine room – Controller
    [Show full text]
  • Passive Fire Protection
    NIST NCSTAR 1-6A Federal Building and Fire Safety Investigation of the World Trade Center Disaster Passive Fire Protection Nicholas J. Carino Monica A. Starnes John L. Gross Jiann C. Yang Scott R. Kukuck Kuldeep R. Prasad Richard W. Bukowski NIST NCSTAR 1-6A Federal Building and Fire Safety Investigation of the World Trade Center Disaster Passive Fire Protection Nicholas J. Carino* Monica A. Starnes** John L. Gross Jiann C. Yang Scott R. Kukuck*** Kuldeep R. Prasad Richard W. Bukowski Building and Fire Research Laboratory National Institute of Standards and Technology *Retired **Current affiliation: Johns Hopkins University Applied Physics Laboratory Laurel, Maryland ***Current affiliation: U.S. Army Research Laboratory Aberdeen Proving Grounds, Maryland September 2005 U.S. Department of Commerce Carlos M. Gutierrez, Secretary Technology Administration Michelle O’ Neill, Acting Under Secretary for Technology National Institute of Standards and Technology William Jeffrey, Director Disclaimer No. 1 Certain commercial entities, equipment, products, or materials are identified in this document in order to describe a procedure or concept adequately or to trace the history of the procedures and practices used. Such identification is not intended to imply recommendation, endorsement, or implication that the entities, products, materials, or equipment are necessarily the best available for the purpose. Nor does such identification imply a finding of fault or negligence by the National Institute of Standards and Technology. Disclaimer No. 2 The policy of NIST is to use the International System of Units (metric units) in all publications. In this document, however, units are presented in metric units or the inch-pound system, whichever is prevalent in the discipline.
    [Show full text]
  • Bus Rapid Transit, Volume 2: Implementation Guidelines
    TRANSIT COOPERATIVE RESEARCH TCRP PROGRAM REPORT 90 Sponsored by the Federal Transit Administration Bus Rapid Transit Volume 2: Implementation Guidelines TCRP OVERSIGHT AND PROJECT TRANSPORTATION RESEARCH BOARD EXECUTIVE COMMITTEE 2003 (Membership as of August 2003) SELECTION COMMITTEE (as of June 2003) OFFICERS CHAIR Chair: Genevieve Giuliano, Director and Prof., School of Policy, Planning, and Development, USC, Los Angeles J. BARRY BARKER Vice Chair: Michael S. Townes, President and CEO, Hampton Roads Transit, Hampton, VA Transit Authority of River City Executive Director: Robert E. Skinner, Jr., Transportation Research Board MEMBERS DANNY ALVAREZ MEMBERS Miami-Dade Transit Agency MICHAEL W. BEHRENS, Executive Director, Texas DOT KAREN ANTION JOSEPH H. BOARDMAN, Commissioner, New York State DOT Karen Antion Consulting GORDON AOYAGI SARAH C. CAMPBELL, President, TransManagement, Inc., Washington, DC Montgomery County Government E. DEAN CARLSON, President, Carlson Associates, Topeka, KS JEAN PAUL BAILLY JOANNE F. CASEY, President and CEO, Intermodal Association of North America Union Internationale des Transports Publics JAMES C. CODELL III, Secretary, Kentucky Transportation Cabinet RONALD L. BARNES JOHN L. CRAIG, Director, Nebraska Department of Roads Central Ohio Transit Authority BERNARD S. GROSECLOSE, JR., President and CEO, South Carolina State Ports Authority LINDA J. BOHLINGER SUSAN HANSON, Landry University Prof. of Geography, Graduate School of Geography, Clark University HNTB Corp. LESTER A. HOEL, L. A. Lacy Distinguished Professor, Depart. of Civil Engineering, University of Virginia ANDREW BONDS, JR. HENRY L. HUNGERBEELER, Director, Missouri DOT Parsons Transportation Group, Inc. ADIB K. KANAFANI, Cahill Prof. and Chair, Dept. of Civil and Environmental Engineering, University of JENNIFER L. DORN FTA California at Berkeley NATHANIEL P.
    [Show full text]
  • 2.01 2016 Fire Alarm Submittals
    2.01 Fire Alarm Submittals (2016) Reference: 2016 SFBC, Section 907.1.1; 2016 NFPA 72, Chapter 7 & § 10.4.1 The San Francisco Building Code, Section 1.11.1 requires that all fire alarm system installations, repairs, alterations, and upgrades of existing systems be approved by the San Francisco Fire Department. Detailed plans shall be submitted to the SFFD Plan Check Section. Purpose: The following information shall be provided when plans are submitted for a building permit to install or modify a fire alarm system. NOTE: Approved reference ARCHITECTURAL and MECHANICAL plans must be provided with NEW fire alarm system plan submittals. Approved reference MECHANICAL plans must be provided for fire alarm permits for tenant improvement having mechanical work such as fans and fire smoke dampers. Fire alarm permit plans shall be drawn to an indicated scale (not smaller than 1/8" = 1') with all fonts on the plans not less than 1/8” in size, on sheets of uniform size (11" x 17" minimum), with a plan of each floor. Plans must be clear with legible text and symbols so they could be electronically scanned. The scope of work must be indicated in detail and the reason for providing the fire alarm system must be indicated (e.g. new system required by code, voluntary/non-required system at the owner’s request, etc.). All applicable codes and standards used must be referenced (e.g. NFPA 72, SFBC, SFFC, SFEC). The Fire Alarm submittal plans must comply with all applicable sections of NFPA 72, Chapter 7 “Documentation”. The following notes shall be incorporated as verbatim notes on the plans: 1.
    [Show full text]
  • Fire Protection Design Manual
    FIRE PROTECTION DESIGN MANUAL Eighth Edition – June 1, 2021 Veterans Health Administration Office of Occupational Safety Health (19HEF) FIRE PROTECTION DESIGN MANUAL June 1, 2021 TABLE OF CONTENTS INTRODUCTION ................................................................................................................................. 1 1. GENERAL ..................................................................................................................................... 1 1.1 SCOPE ............................................................................................................................................... 1 1.2 APPLICATION ...................................................................................................................................... 1 1.3 FIRE PROTECTION CODES AND STANDARDS ............................................................................................. 2 1.4 FIRE PROTECTION DURING CONSTRUCTION ............................................................................................. 3 1.5 AMERICANS WITH DISABILITIES ACT (ADA) ............................................................................................. 4 2. BUILDING FEATURES.................................................................................................................... 5 2.1 TYPES OF CONSTRUCTION ..................................................................................................................... 5 2.2 BUILDING SEPARATION .......................................................................................................................
    [Show full text]
  • Wayside Worker Protection Technology—Tracksafe Phase II Research & Demonstration Report
    Wayside Worker Protection Technology—TrackSafe Phase II Research & Demonstration Report MAY 2021 FTA Report No. 0194 Federal Transit Administration PREPARED BY Abhay “A.J.” Joshi, PMP, LEED AP Program Manager Metropolitan Atlanta Rapid Transit Authority Pawel Waszczur, P.Eng. Bombardier Transportation Paul Carey Bombardier Transportation COVER PHOTO Courtesy of Bombardier Transportation and Abhay “A.J.” Joshi DISCLAIMER This document is disseminated under the sponsorship of the U.S. Department of Transportation in the interest of information exchange. The United States Government assumes no liability for its contents or use thereof. The United States Government does not endorse products or manufacturers. Trade or manufacturers’ names appear herein solely because they are considered essential to the objective of this report. The opinions and/or recommendations expressed herein do not necessarily reflect those of the U.S. Department of Transportation. Wayside Worker Protection Technology— TrackSafe Phase II Research & Demonstration Report MAY 2021 FTA Report No. 0194 PREPARED BY Abhay “A.J.” Joshi, PMP, LEED AP Program Manager Metropolitan Atlanta Rapid Transit Authority 2424 Piedmont Rd, NE Atlanta, GA 30324 Pawel Waszczur, P.Eng. Bombardier Transportation Paul Carey Bombardier Transportation SPONSORED BY Federal Transit Administration Office of Research, Demonstration and Innovation U.S. Department of Transportation 1200 New Jersey Avenue, SE Washington, DC 20590 AVAILABLE ONLINE https://www.transit.dot.gov/about/research-innovation FEDERAL
    [Show full text]
  • DNVGL-OS-D301 Fire Protection
    OFFSHORE STANDARDS DNVGL-OS-D301 Edition January 2017 Fire protection The content of this service document is the subject of intellectual property rights reserved by DNV GL AS ("DNV GL"). The user accepts that it is prohibited by anyone else but DNV GL and/or its licensees to offer and/or perform classification, certification and/or verification services, including the issuance of certificates and/or declarations of conformity, wholly or partly, on the basis of and/or pursuant to this document whether free of charge or chargeable, without DNV GL's prior written consent. DNV GL is not responsible for the consequences arising from any use of this document by others. The electronic pdf version of this document, available free of charge from http://www.dnvgl.com, is the officially binding version. DNV GL AS FOREWORD DNV GL offshore standards contain technical requirements, principles and acceptance criteria related to classification of offshore units. © DNV GL AS January 2017 Any comments may be sent by e-mail to [email protected] This service document has been prepared based on available knowledge, technology and/or information at the time of issuance of this document. The use of this document by others than DNV GL is at the user's sole risk. DNV GL does not accept any liability or responsibility for loss or damages resulting from any use of this document. CHANGES – CURRENT This document supersedes the July 2015 edition. Changes in this document are highlighted in red colour. However, if the changes involve a whole chapter, section or sub-section, normally only the title will be in red colour.
    [Show full text]