DNVGL-OS-D301 Fire Protection

Total Page:16

File Type:pdf, Size:1020Kb

DNVGL-OS-D301 Fire Protection OFFSHORE STANDARDS DNVGL-OS-D301 Edition January 2017 Fire protection The content of this service document is the subject of intellectual property rights reserved by DNV GL AS ("DNV GL"). The user accepts that it is prohibited by anyone else but DNV GL and/or its licensees to offer and/or perform classification, certification and/or verification services, including the issuance of certificates and/or declarations of conformity, wholly or partly, on the basis of and/or pursuant to this document whether free of charge or chargeable, without DNV GL's prior written consent. DNV GL is not responsible for the consequences arising from any use of this document by others. The electronic pdf version of this document, available free of charge from http://www.dnvgl.com, is the officially binding version. DNV GL AS FOREWORD DNV GL offshore standards contain technical requirements, principles and acceptance criteria related to classification of offshore units. © DNV GL AS January 2017 Any comments may be sent by e-mail to [email protected] This service document has been prepared based on available knowledge, technology and/or information at the time of issuance of this document. The use of this document by others than DNV GL is at the user's sole risk. DNV GL does not accept any liability or responsibility for loss or damages resulting from any use of this document. CHANGES – CURRENT This document supersedes the July 2015 edition. Changes in this document are highlighted in red colour. However, if the changes involve a whole chapter, section or sub-section, normally only the title will be in red colour. Main changes January 2017, entering into force 1 July 2017 • Ch.1 Sec.1 Introduction Table 5 Definitions of terms are aligned with DNVGL-OS-A101. • Ch.2 Sec.1 Passive fire protection Changes - current Sec.1 [4] Detailed requirements to cables are deleted, as these are described in DNVGL-OS-D201. • Ch.2 Sec.3 Fire-fighting systems Sec.3 [2.2.3] Interpretation is deleted. Sec.3 [2.2.4] Fire pump capacity requirement is clarified to avoid misunderstandings. Sec.3 [2.2.6] Interpretation is deleted. Sec.3 [3.1], [3.2] and [3.3] Detailed requirements for local fire fighting systems are replaced by reference to the FSS Code. No changes to technical requirements. Sec.3 [3.7] Former clauses for spare charges to extinguishers are deleted. • Ch.2 Sec.4 Fire and/or gas detection and alarm systems Sec.4 [3.1.1] Item 2 in interpretation is deleted. Sec.4 [3.3] Guidance note is deleted. • Ch.2 Sec.6 Supplementary requirements for drilling and well intervention units Sec.6 [6.3.1] Requirement for smoke detection in air intakes is limited to accommodation areas. Requirement for H2S detection in air intakes is deleted. Sec.6 [6.3.2] Requirement related to helicopter decks is deleted. • Ch.2 Sec.7 Supplementary requirements for oil and gas production and storage units Sec.7 [table 1] Requirement for deluge capacity in turret areas is reduced from 20 (l/min)/m2 to 10 (l/min)/ m2. Sec.7 [3.3.5] New clause. Sec.7 [3.5] Turret requirement is removed from this paragraph, as these are considered as process areas. Fire fighting requirements in engine and boiler rooms are deleted from this paragraph. Such arrangements are covered in Ch.2 Sec.3. Sec.7 [5.3.4] New clause. • Ch.2 Sec.10 Supplementary requirements for offshore loading buoys Former sub-section [2] covering diving systems are deleted, as these systems are no longer described in the offshore standard. • Ch.3 Sec.2 Certification of equipment Sec.2 [1] and [2] Categories for certification of equipment is aligned in the offshore standards. Offshore standards, DNVGL-OS-D301. Edition January 2017 Page 3 Fire protection DNV GL AS Editorial corrections In addition to the above stated changes, editorial corrections may have been made. Changes - current Offshore standards, DNVGL-OS-D301. Edition January 2017 Page 4 Fire protection DNV GL AS CONTENTS Changes – current............................................................ 3 Chapter 1 Introduction..................................................... 8 Contents Section 1 General................................................................................................................ 8 1 General.................................................................................................................8 2 Normative references.........................................................................................10 3 Definitions..........................................................................................................11 4 Documentation................................................................................................... 19 Chapter 2 Technical provisions....................................... 21 Section 1 Passive Fire protection...................................................................................... 21 1 General...............................................................................................................21 2 Fire technical requirements............................................................................... 21 3 Protection of spaces or areas............................................................................ 25 4 Cables.................................................................................................................30 Section 2 Active fire protection of specific areas.............................................................. 31 1 General...............................................................................................................31 2 Fire-extinguishing systems in specific areas......................................................31 Section 3 Fire-fighting systems......................................................................................... 35 1 General...............................................................................................................35 2 Fire main systems..............................................................................................35 3 Local fire-fighting systems.................................................................................40 Section 4 Fire and/or gas detection and alarm systems................................................... 42 1 General...............................................................................................................42 2 Fire detection and alarm system....................................................................... 42 3 Gas detection and alarm systems...................................................................... 50 Section 5 Miscellaneous items........................................................................................... 53 1 Introduction....................................................................................................... 53 2 Fire-fighter’s outfits........................................................................................... 53 3 Recharging of air cylinders................................................................................ 53 4 Arrangements in machinery and working spaces...............................................54 5 Provisions for helicopter facilities......................................................................54 6 Storage of gas cylinders.................................................................................... 55 7 Fire control plan................................................................................................ 56 8 Emergency escape breathing devices................................................................ 56 Section 6 Supplementary requirements for drilling and well intervention units.................58 Offshore standards, DNVGL-OS-D301. Edition January 2017 Page 5 Fire protection DNV GL AS 1 General...............................................................................................................58 2 Passive fire protection....................................................................................... 58 3 Active fire protection of specific areas.............................................................. 58 4 Gas detection and alarm.................................................................................... 60 5 Emergency escape breathing devices................................................................ 61 6 Enhanced fire protection- ES............................................................................. 61 Contents Section 7 Supplementary requirements for oil and gas production and storage units....... 63 1 General...............................................................................................................63 2 Passive fire protection....................................................................................... 63 3 Active fire protection of specific areas.............................................................. 63 4 Fire-water systems............................................................................................ 67 5 Detection and alarm systems.............................................................................68 6 Conversions........................................................................................................71 Section 8 Supplementary requirements for floating storage units.....................................72 1 General...............................................................................................................72 2 Passive fire protection......................................................................................
Recommended publications
  • Analysis of Ontario Fires and Reliability of Active Fire Protection Systems
    ANALYSIS OF ONTARIO FIRES AND RELIABILITY OF ACTIVE FIRE PROTECTION SYSTEMS by Chandra S. Juneja A thesis submitted to the faculty of Graduate Studies and Research in partial fulfillment of the requirements of the degree of Masters of Applied Science Department of Civil and Environmental Engineering Carleton University Ottawa, Ontario © Chandra S. Juneja, 2004 Reproduced with permission of the copyright owner. Further reproduction prohibited without permission. Library and Bibliotheque et 1*1 Archives Canada Archives Canada Published Heritage Direction du Branch Patrimoine de I'edition 395 Wellington Street 395, rue Wellington Ottawa ON K1A 0N4 Ottawa ON K1A 0N4 Canada Canada Your file Votre reference ISBN: 0-494-00745-1 Our file Notre reference ISBN: 0-494-00745-1 NOTICE: AVIS: The author has granted a non­ L'auteur a accorde une licence non exclusive exclusive license allowing Library permettant a la Bibliotheque et Archives and Archives Canada to reproduce, Canada de reproduire, publier, archiver, publish, archive, preserve, conserve, sauvegarder, conserver, transmettre au public communicate to the public by par telecommunication ou par I'lnternet, preter, telecommunication or on the Internet, distribuer et vendre des theses partout dans loan, distribute and sell theses le monde, a des fins commerciales ou autres, worldwide, for commercial or non­ sur support microforme, papier, electronique commercial purposes, in microform, et/ou autres formats. paper, electronic and/or any other formats. The author retains copyright L'auteur conserve la propriete du droit d'auteur ownership and moral rights in et des droits moraux qui protege cette these. this thesis. Neither the thesis Ni la these ni des extraits substantiels de nor substantial extracts from it celle-ci ne doivent etre imprimes ou autrement may be printed or otherwise reproduits sans son autorisation.
    [Show full text]
  • Fire Protection Application Guide Armacell's Products for Passive Fire Protection
    FIRE PROTECTION APPLICATION GUIDE ARMACELL'S PRODUCTS FOR PASSIVE FIRE PROTECTION Tel.: +49 25 17 60 30 [email protected] www.armacell.eu 02 | Fire protection application guide Foreword “Nine dead in house fire.” Fortunately we don’t read this or similar headlines every day. Nevertheless, around 4,000 people die in fires every year in the EU member countries. In many cases, deaths, injuries and major damage to buildings can be prevented if the fire protection requirements are implemented correctly. Therefore, passive fire protec- tion in buildings aims to design, construct, modify and maintain build- ings in such a way that the outbreak of a fire and the spread of flames and smoke (fire spread) are prevented. And, if a fire does occur, it must be possible to rescue people and animals and carry out fire-fighting operations effectively. In terms of fire protection, building service equipment, such as pipe- work and ventilation systems, represents a particular weak point. Pipe- and ductwork passes through separating building elements (walls and ceilings), stairwells and corridors, and thus forms a path along which flames and smoke can spread. In the event of a fire, pipe- and ductwork has a significant impact on safety in buildings and can soon pose a seri- ous threat. The risk potential rises with the number of pipes and their various tasks, thicknesses, materials and media. Therefore, in order to achieve the necessary fire protection targets, service penetrations in separating building elements must be sealed off. These fire protec- tion measures can be carried out in accordance with the less strin- gent requirements of the MLAR (state building regulations) or with an approval.
    [Show full text]
  • Fire Service Features of Buildings and Fire Protection Systems
    Fire Service Features of Buildings and Fire Protection Systems OSHA 3256-09R 2015 Occupational Safety and Health Act of 1970 “To assure safe and healthful working conditions for working men and women; by authorizing enforcement of the standards developed under the Act; by assisting and encouraging the States in their efforts to assure safe and healthful working conditions; by providing for research, information, education, and training in the field of occupational safety and health.” This publication provides a general overview of a particular standards- related topic. This publication does not alter or determine compliance responsibilities which are set forth in OSHA standards and the Occupational Safety and Health Act. Moreover, because interpretations and enforcement policy may change over time, for additional guidance on OSHA compliance requirements the reader should consult current administrative interpretations and decisions by the Occupational Safety and Health Review Commission and the courts. Material contained in this publication is in the public domain and may be reproduced, fully or partially, without permission. Source credit is requested but not required. This information will be made available to sensory-impaired individuals upon request. Voice phone: (202) 693-1999; teletypewriter (TTY) number: 1-877-889-5627. This guidance document is not a standard or regulation, and it creates no new legal obligations. It contains recommendations as well as descriptions of mandatory safety and health standards. The recommendations are advisory in nature, informational in content, and are intended to assist employers in providing a safe and healthful workplace. The Occupational Safety and Health Act requires employers to comply with safety and health standards and regulations promulgated by OSHA or by a state with an OSHA-approved state plan.
    [Show full text]
  • Fire Prevention and Control in Compressor Buildings
    THE INGAA FOUNDATION, INC. 10 G Street, NE, Suite 700 • Washington, DC 20002 (202) 216-5900 • FAX (202) 216-0870 • www.ingaa.org Fire Prevention and Control in Compressor Buildings Prepared for The INGAA Foundation, Inc. by: Solomon Associates 13455 Noel Road Suite 1500 Dallas, TX 75240-6634 F-2004-50625 Copyright © 2004 by The INGAA Foundation, Inc. Table of Contents Executive Summary ii Introduction 1 Project Scope and Approach 2 Assumptions and Limitations 3 Project Results 4 Summary 6 Attachment A Master Summary Document A-1 Fire Prevention and Control Survey forDallas Compressor StationsLondon Beijing Shanghai Mexico City i Chennai Solomon Associates #4RL118C Dallas London Beijing Shanghai Mexico City Chennai Executive Summary Solomon Associates (Solomon) is pleased to submit the Fire Prevention and Control Survey for the results obtained from a survey designed to gather information on the fire prevention and control practices of Interstate Natural Gas Association of America (INGAA) membership. Some insurance industry loss control inspectors are recommending or requiring installation of active fire suppression systems in natural gas compressor buildings without due consideration of fire prevention efforts or costs versus benefits. The objective of this INGAA membership survey was to determine the extent to which insurance and risk management companies are requesting natural gas transmission companies to install active fire prevention controls, what types of active and passive controls are being used, and the incidence of fires. Active fire controls include a method of distinguishing the fire after ignition, whereas passive controls are methods to minimize fire risk or alert operators of a fire or fire condition.
    [Show full text]
  • Rules and Regulations for Fire Alarm and Fire Sprinkler Systems
    NORTH ATTLEBOROUGH FIRE DEPARTMENT 50 Elm Street, North Attleborough, Massachusetts 02760 Tel (508) 699-0140 • Fax (508) 643-0296 Issued: January 2020 Revised 02/10/2020 Rules and Regulations for Fire Alarm and Fire Sprinkler Systems The following rules and regulations shall govern the installation, use, and maintenance of all required fire alarm and fire sprinkler systems in the Town of North Attleborough. The rules and regulations are effective January 1, 2020 until otherwise revised or amended. They are intended to cover the most common variables encountered by architects, engineers, fire alarm and fire suppression professionals. These rules and regulations are subject to change and at no time should be considered complete towards all projects and scopes of work. Consult the fire prevention office after reading this document where additional clarification is required. Contents Section 1: General Requirements: ................................................................................................................... 2 Section 2: Engineer/Contractor Submittal and Plan Review ......................................................................... 3 Section 3: Interior System Design and Layout ............................................................................................... 6 Section 4: Sprinkler and Standpipe Systems ................................................................................................ 11 Section 5: Direct Connections to the North Attleborough Fire Department ..............................................
    [Show full text]
  • Active Fire Protection Systems
    NIST NCSTAR 1-4 Federal Building and Fire Safety Investigation of the World Trade Center Disaster Active Fire Protection Systems David D. Evans Richard D. Peacock Erica D. Kuligowski W. Stuart Dols William L. Grosshandler NIST NCSTAR 1-4 Federal Building and Fire Safety Investigation of the World Trade Center Disaster Active Fire Protection Systems David D. Evans Society of Fire Protection Engineers Richard D. Peacock Erica D. Kuligowski W. Stuart Dols William L. Grosshandler Building and Fire Research Laboratory National Institute of Standards and Technology September 2005 U.S. Department of Commerce Carlos M. Gutierrez, Secretary Technology Administration Michelle O’Neill, Acting Under Secretary for Technology National Institute of Standards and Technology William Jeffrey, Director Disclaimer No. 1 Certain commercial entities, equipment, products, or materials are identified in this document in order to describe a procedure or concept adequately or to trace the history of the procedures and practices used. Such identification is not intended to imply recommendation, endorsement, or implication that the entities, products, materials, or equipment are necessarily the best available for the purpose. Nor does such identification imply a finding of fault or negligence by the National Institute of Standards and Technology. Disclaimer No. 2 The policy of NIST is to use the International System of Units (metric units) in all publications. In this document, however, units are presented in metric units or the inch-pound system, whichever is prevalent in the discipline. Disclaimer No. 3 Pursuant to section 7 of the National Construction Safety Team Act, the NIST Director has determined that certain evidence received by NIST in the course of this Investigation is “voluntarily provided safety-related information” that is “not directly related to the building failure being investigated” and that “disclosure of that information would inhibit the voluntary provision of that type of information” (15 USC 7306c).
    [Show full text]
  • Separation Distances in NFPA Codes and Standards
    Separation Distances in NFPA Codes and Standards Final Report Prepared by: Dr. Ted Argo and Mr. Evan Sandstrom Applied Research Associates, Inc. Rocky Mountain Division 7921 Shaffer Parkway Littleton, CO 80127 © 2014 Fire Protection Research Foundation THE FIRE PROTECTION RESEARCH FOUNDATION ONE BATTERYMARCH PARK QUINCY, MASSACHUSETTS, U.S.A. 02169-7471 E-MAIL: [email protected] WEB: www.nfpa.org/Foundation —— Page c —— —— Page ii —— FOREWORD Many NFPA codes and standards, in particular NFPA 400, Hazardous Materials Code, specify separation/clearance distances for hazardous chemical storage and processes from other equipment and occupied buildings. Many of these requirements have historical undocumented origins. Guidance, which may inform a sound technical basis for adjusting these distances, has been requested by NFPA Technical Committees. There are a number of methodologies in the literature, both risk and hazard based, which are used in the chemical safety process safety field that may be relevant to the calculation of these distances. The purpose of this project is to provide guidance to NFPA technical committees on methodologies to develop technically based separation/clearance distances for hazardous chemical storage/processes and their application to the chemical storage and processes. The specific focus of the project is those hazards within the scope of NFPA 400. The Research Foundation expresses gratitude to the report author Dr. Ted Argo and Mr. Evan Sandstrom, who is with Applied Research Associates, Inc located in Littleton, CO. The Research Foundation appreciates the guidance provided by the Project Technical Panelists and all others that contributed to this research effort. Thanks are also expressed to the National Fire Protection Association (NFPA) for providing the project funding through the NFPA Annual Code Fund.
    [Show full text]
  • Best Practice Guide on Fire Stops and Fire Blocks and Their Impact on Sound Transmission
    http://irc.nrc-cnrc.gc.ca Best Practice Guide on Fire Stops and Fire Blocks and their Impact on Sound Transmission NRCC-49677 Richardson, J.K.; Quirt, J.D.; Hlady, R. June 2007 The material in this document is covered by the provisions of the Copyright Act, by Canadian laws, policies, regulations and international agreements. Such provisions serve to identify the information source and, in specific instances, to prohibit reproduction of materials without written permission. For more information visit http://laws.justice.gc.ca/en/showtdm/cs/C-42 Les renseignements dans ce document sont protégés par la Loi sur le droit d'auteur, par les lois, les politiques et les règlements du Canada et des accords internationaux. Ces dispositions permettent d'identifier la source de l'information et, dans certains cas, d'interdire la copie de documents sans permission écrite. Pour obtenir de plus amples renseignements : http://lois.justice.gc.ca/fr/showtdm/cs/C-42 Best Practice Guide on Fire and their Impact on Sound Transmission Stops and Fire Blocks 2007 June June 2007 Best Practice Guide on Fire Stops and Fire Blocks and their Impact on Sound Transmission J.K. Richardson, J.D. Quirt, R. Hlady BEST PRACTICE GUIDE ON FIRE STOPS AND FIRE BLOCKS AND THEIR IMPACT ON SOUND TRANSMISSION Prepared For Special Interest Group on Suitable Acoustic and Fire Stop Technologies Prepared by J. Kenneth Richardson J. David Quirt Ken Richardson Fire Technologies Inc. Institute for Research in Construction National Research Council of Canada Rob Hlady Affinity Fire Stop Consultants Inc. June 2007 DISCLAIMER The analysis, interpretations, and recommendations in this Guide are those of the authors and do not necessarily reflect the views of the Special Interest Group on Suitable Acoustic and Fire Stop Technologies or those organizations that assisted in the preparation, review and publication of the document.
    [Show full text]
  • NFPA 72 Fire Alarm System
    Fire Alarm System Plan Review Checklist 2010 OFC and 2007 NFPA 72 This checklist is for jurisdictions that permit the use of the 2007 NFPA 72 in lieu of IFC’s referenced 2002 NFPA 72. Date of Review: ______________________________ Permit Number: _____________________________ Business/Building Name: _______________________ Address of Project: __________________________ Designer Name: ______________________________ Designer’s Phone: ___________________________ Contractor: ________________________________ __Contractor’s Phone: __________________________ FA Manufacturer: ___________________ FA Model: ____________ Occupancy Classification: _________ Reference numbers following checklist statements represent an NFPA code section unless otherwise specified. Checklist Le gend: v or OK = acceptable N = need to provide NA = not applicable 1. ____ Three sets of drawings are provided. 2. ____ Equipment is listed for intended use and compatible with the system, specification data sheets are required, 4.3.1, 4.4.2. Drawings sh all detail t he follo wing items, OFC 907.1.2 and NFPA 72 4.5.1.1: 3. ____ Scale: a common scale is used and plan information is legible. 4. ____ Rooms are labeled and room dimensions are provided. 5. ____ Equipment symbol legend is provided. 6. ____ Class A or B system is declared, alarms zones do not exceed 22,500 sq. ft. (unless sprinklered then limit is set by NFPA 13, and each floor is a separate zone, OFC 907.7.3. 7. ____ When detectors are used, device locations, mounting heights, and building cross sectional details are shown on the plans. 8. ____ The type of devices used. 9. ____ Wiring for alarm initiating and alarm signaling indicating devices are detailed. 10.
    [Show full text]
  • Example Fire Alarm System Replacement General Notes Duct Detectors Existing Devices to Demolish Fa System Device Legend
    EXAMPLE FIRE ALARM SYSTEM REPLACEMENT GENERAL NOTES DUCT DETECTORS EXISTING DEVICES TO DEMOLISH FA SYSTEM DEVICE LEGEND 1. EACH ALARM AND SUPERVISORY SIGNAL INITIATING DEVICE CIRCUIT SHALL BE WIRED FOR CLASS "B", STYLE "4" OPERATION. FIRE ALARM NOTIFICATION APPLIANCE CIRCUIT SHALL BE WIRED DUCT DETECTORS SHALL BE PROVIDED AND INSTALLED IN ACCORDANCE WITH IMC 606.2 (COPIED BELOW). QUANTITY AND LOCATION OF DUCT DEVICE DESCRIPTION FOR CLASS "B", STYLE "Y" OPERATION. DETECTORS SHALL BE COORDINATED WITH MECHANICAL PLANS AND CONTRACTOR. FIRE ALARM CONTROL PANEL 606.2 WHERE REQUIRED. 2. THE EXTERIOR OF ALL FIRE ALARM SYSTEM JUNCTION BOXES SHALL BE PAINTED RED. FSA FIRE ALARM ANNUNCIATOR SMOKE DETECTORS SHALL BE INSTALLED WHERE INDICATED IN SECTIONS 606.2.1 THROUGH 606.2.3. RPS STROBE POWER SUPPLY 3. ALL PENETRATIONS IN WALLS, CEILINGS, AND FLOORS SHALL BE SEALED TO THE FULL THICKNESS OF THE PENETRATION WITH AN APPROVED FIRE STOPPING MATERIAL. PENETRATIONS IN EXCEPTION: SMOKE DETECTORS SHALL NOT BE REQUIRED WHERE AIR DISTRIBUTION SYSTEMS ARE INCAPABLE OF SPREADING SMOKE BEYOND THE DIGITAL ALARM COMMUNICATOR - POINT CONTACT ID EXISTING FIRE RATED WALLS, CEILINGS AND FLOORS SHALL BE SEALED TO THE FULL THICKNESS OF THE PENETRATION WITH AN APPROVED FIRE-STOPPING MATERIAL OF EQUAL OR ENCLOSING WALLS, FLOORS AND CEILINGS OF THE ROOM OR SPACE IN WHICH THE SMOKE IS GENERATED. GREATER FIRE RESISTANCE. LAN INTERFACE - IN EACH FACP 606.2.1 RETURN AIR SYSTEMS. GRAPHIC MAP 4. ALL WALL AND FLOOR PENETRATIONS SHALL BE CORE-DRILLED AND SLEEVED. SMOKE DETECTORS SHALL BE INSTALLED IN RETURN AIR SYSTEMS WITH A DESIGN CAPACITY GREATER THAN 2,000 CFM (0.9 M3/S), IN THE RETURN AIR MAP DUCT OR PLENUM UPSTREAM OF ANY FILTERS, EXHAUST AIR CONNECTIONS, OUTDOOR AIR CONNECTIONS, OR DECONTAMINATION EQUIPMENT AND F/S CAB RECORD DOCUMENT CABINET 5.
    [Show full text]
  • Overview of the Legal Design Basis for Passive Fire Protection in Korea and the Direction of Further Development
    Article Overview of the Legal Design Basis for Passive Fire Protection in Korea and the Direction of Further Development Jae-Young Choi and Sang-Hoon Byeon * Department of Health and Safety Convergence Science, Korea University, Seoul 02841, Korea; [email protected] * Correspondence: [email protected]; Tel.: +82-2-3290-5693 Abstract: The design of passive fire protection is applied to minimize the domino effect when a liquid pool fire occurs due to the facilities inside a process plant. In general, the design of passive fire protection has been applied using the API RP 2218 guideline as the basis regardless of the country or owner of the process plant. However, in Korea, legal regulations dictate that explosive areas should be regarded as fireproofing zones rather than following the API RP 2218 guideline. Because liquid pool fires and explosive gas atmospheres are different concepts, it is wrong from an engineering perspective to regard them as the same. Therefore, when a liquid pool fire occurs in a process plant in Korea, it may be more dangerous than in any other countries. In this study, we investigated three categories of fire risk. Korean safety regulations for the design of passive fire protection and others that are not reasonable from an engineering perspective need to be studied and revised. Specifically, Korea needs to revise the design basis of passive fire protection based on the API RP 2218 guideline as a legal standard in accordance with global trends. Keywords: passive fire protection; fireproofing; API RP 2218; hazardous area classification; loss pre- vention Citation: Choi, J.-Y.; Byeon, S.-H.
    [Show full text]
  • Contemporaneous Structural Steel Specifications (Draft)
    NIST NCSTAR 1-3A (Draft) Federal Building and Fire Safety Investigation of the World Trade Center Disaster Contemporaneous Structural Steel Specifications (Draft) William E. Luecke Thomas A. Siewert Frank W. Gayle For Public Comment NIST NCSTAR 1-3A (Draft) Draft for Public Comment Federal Building and Fire Safety Investigation of the World Trade Center Disaster Contemporaneous Structural Steel Specifications (Draft) William E. Luecke Thomas A. Siewert Frank W. Gayle Materials Science and Engineering Laboratory National Institute of Standards and Technology September 2005 U.S. Department of Commerce Carlos M. Gutierrez, Secretary Technology Administration Michelle O’Neill, Acting Under Secretary for Technology National Institute of Standards and Technology Hratch G. Semerjian, Acting Director Disclaimer No. 1 Certain commercial entities, equipment, products, or materials are identified in this document in order to describe a procedure or concept adequately or to trace the history of the procedures and practices used. Such identification is not intended to imply recommendation, endorsement, or implication that the entities, products, materials, or equipment are necessarily the best available for the purpose. Nor does such identification imply a finding of fault or negligence by the National Institute of Standards and Technology. Disclaimer No. 2 The policy of NIST is to use the International System of Units (metric units) in all publications. In this document, however, units are presented in metric units or the inch-pound system, whichever is prevalent in the discipline. Disclaimer No. 3 Pursuant to section 7 of the National Construction Safety Team Act, the NIST Director has determined that certain evidence received by NIST in the course of this Investigation is “voluntarily provided safety-related information” that is “not directly related to the building failure being investigated” and that “disclosure of that information would inhibit the voluntary provision of that type of information” (15 USC 7306c).
    [Show full text]