Riverside Energy Park Belvedere EIA Scoping Report

Total Page:16

File Type:pdf, Size:1020Kb

Riverside Energy Park Belvedere EIA Scoping Report Riverside Energy Park Belvedere EIA Scoping Report On behalf of Cory Riverside Energy Project Ref: 42166 | Rev: Final | Date: November 2017 EIA Scoping Report Riverside Energy Park Document Control Sheet Project Name: Riverside Energy Park, Belvedere Project Ref: 42166 Report Title: EIA Scoping Report Doc Ref: FINAL Date: 24th November 2017 Name Position Signature Date Environmental Prepared by: Jonny Murphy JM 24.11.17 Planner Reviewed by: Stefan Boss Senior Associate SB 24.11.17 Approved by: Dermot Scanlon Equity Director DS 24.11.17 For and on behalf of Peter Brett Associates LLP Peter Brett Associates LLP disclaims any responsibility to the Client and others in respect of any matters outside the scope of this report. This report has been prepared with reasonable skill, care and diligence within the terms of the Contract with the Client and generally in accordance with the appropriate ACE Agreement and taking account of the manpower, resources, investigations and testing devoted to it by agreement with the Client. This report is confidential to the Client and Peter Brett Associates LLP accepts no responsibility of whatsoever nature to third parties to whom this report or any part thereof is made known. Any such party relies upon the report at their own risk. © Peter Brett Associates LLP 2017 ii EIA Scoping Report Riverside Energy Park Contents 1 Introduction ................................................................................................................................. 1 Overview ........................................................................................................................ 1 Purpose of this Report ................................................................................................... 1 Report Structure ............................................................................................................ 1 2 Proposed Development .............................................................................................................. 3 Proposed Development ................................................................................................. 3 Construction .................................................................................................................. 5 Decommissioning .......................................................................................................... 5 3 The Site and the Surrounding Area ........................................................................................... 6 Site Location and Description ........................................................................................ 6 The Surrounding Area ................................................................................................... 7 4 Regulatory and Policy Background .......................................................................................... 8 Introduction .................................................................................................................... 8 National Planning Policy and Guidance ........................................................................ 8 Regional Planning Policy and Guidance ..................................................................... 10 Emerging Regional Planning Policy and Guidance ..................................................... 11 Local Planning Policy and Guidance ........................................................................... 12 Emerging Local Planning Policy and Guidance .......................................................... 15 5 The EIA Process ........................................................................................................................ 16 EIA Regulations ........................................................................................................... 16 Consultation ................................................................................................................. 16 Assessment ................................................................................................................. 16 Mitigation ..................................................................................................................... 17 Monitoring .................................................................................................................... 17 Preliminary Environmental Information Report (PEIR) ................................................ 18 Environmental Statement ............................................................................................ 18 Consideration of Alternatives ...................................................................................... 18 EIA Team ..................................................................................................................... 18 6 Proposed Scope of the EIA ...................................................................................................... 20 Technical Scope .......................................................................................................... 20 Temporal Scope .......................................................................................................... 21 Spatial Scope .............................................................................................................. 22 Assessment of Effects ................................................................................................. 22 7 Topics Included in the EIA Scope ........................................................................................... 27 Introduction .................................................................................................................. 27 Transport ..................................................................................................................... 27 Air Quality .................................................................................................................... 31 Noise and Vibration ..................................................................................................... 34 iii EIA Scoping Report Riverside Energy Park Townscape and Visual Impact Assessment ................................................................ 36 Historic Environment ................................................................................................... 43 Terrestrial Biodiversity ................................................................................................. 48 Marine Biodiversity ...................................................................................................... 54 Marine Geomorphology ............................................................................................... 61 Hydrology, Flood Risk and Water Resources ............................................................. 65 Ground Conditions....................................................................................................... 73 Socio-economics ......................................................................................................... 76 Summary and Impact Interactions ............................................................................... 78 8 Topics Not Included in the EIA Scope .................................................................................... 80 Introduction .................................................................................................................. 80 Risks of Major Accidents and/or Disasters .................................................................. 80 Climate ........................................................................................................................ 80 Aviation ........................................................................................................................ 80 Daylight and Sunlight .................................................................................................. 81 Environmental Wind .................................................................................................... 81 Lighting ........................................................................................................................ 81 Human Health .............................................................................................................. 82 Waste .......................................................................................................................... 82 9 Summary and Next Steps ......................................................................................................... 84 Summary ..................................................................................................................... 84 The Environmental Statement ..................................................................................... 84 Next Steps ................................................................................................................... 84 Tables Table 6.1: Technical Scope ................................................................................................................... 20 Table 6.2: Significance criteria .............................................................................................................. 24 Table 7.2.1: Receptor Sensitivity ........................................................................................................... 30 Table 7.2.2: Significance Matrix ...........................................................................................................
Recommended publications
  • All London Green Grid River Cray and Southern Marshes Area Framework
    All River Cray and Southern Marshes London Area Framework Green Grid 5 Contents 1 Foreword and Introduction 2 All London Green Grid Vision and Methodology 3 ALGG Framework Plan 4 ALGG Area Frameworks 5 ALGG Governance 6 Area Strategy 8 Area Description 9 Strategic Context 10 Vision 12 Objectives 14 Opportunities 16 Project Identification 18 Project Update 20 Clusters 22 Projects Map 24 Rolling Projects List 28 Phase Two Early Delivery 30 Project Details 48 Forward Strategy 50 Gap Analysis 51 Recommendations 53 Appendices 54 Baseline Description 56 ALGG SPG Chapter 5 GGA05 Links 58 Group Membership Note: This area framework should be read in tandem with All London Green Grid SPG Chapter 5 for GGA05 which contains statements in respect of Area Description, Strategic Corridors, Links and Opportunities. The ALGG SPG document is guidance that is supplementary to London Plan policies. While it does not have the same formal development plan status as these policies, it has been formally adopted by the Mayor as supplementary guidance under his powers under the Greater London Authority Act 1999 (as amended). Adoption followed a period of public consultation, and a summary of the comments received and the responses of the Mayor to those comments is available on the Greater London Authority website. It will therefore be a material consideration in drawing up development plan documents and in taking planning decisions. The All London Green Grid SPG was developed in parallel with the area frameworks it can be found at the following link: http://www.london.gov.uk/publication/all-london- green-grid-spg .
    [Show full text]
  • Bexley Growth Strategy
    www.bexley.gov.uk Bexley Growth Strategy December 2017 Bexley Growth Strategy December 2017 Leader’s Foreword Following two years of detailed technical work and consultation, I am delighted to present the Bexley Growth Strategy that sets out how we plan to ensure our borough thrives and grows in a sustainable way. For centuries, Bexley riverside has been a place of enterprise and endeavour, from iron working and ship fitting to silk printing, quarrying and heavy engineering. People have come to live and work in the borough for generations, taking advantage of its riverside locations, bustling town and village centres and pleasant neighbourhoods as well as good links to London and Kent, major airports, the Channel rail tunnel and ports. Today Bexley remains a popular place to put down roots and for businesses to start and grow. We have a wealth of quality housing and employment land where large and small businesses alike are investing for the future. We also have a variety of historic buildings, neighbourhoods and open spaces that provide an important link to our proud heritage and are a rich resource. We have great schools and two world-class performing arts colleges plus exciting plans for a new Place and Making Institute in Thamesmead that will transform the skills training for everyone involved in literally building our future. History tells us that change is inevitable and we are ready to respond and adapt to meet new opportunities. London is facing unprecedented growth and Bexley needs to play its part in helping the capital continue to thrive. But we can only do that if we plan carefully and ensure we attract the right kind of quality investment supported by the funding of key infrastructure by central government, the Mayor of London and other public bodies.
    [Show full text]
  • Sites of Importance for Nature Conservation (SINC) Within the Borough
    LONDON BOROUGH OF BEXLEY SITES OF IMPORTANCE FOR NATURE CONSERVATION REPORT DECEMBER 2016 Table of contents Bexley sites of importance for nature conservation PART I. Introduction ...................................................................................................... 5 Purpose and format of this document ................................................................................ 5 Bexley context ................................................................................................................... 5 What is biodiversity? ......................................................................................................... 6 Sites of Importance for Nature Conservation (SINCs) ....................................................... 6 Strategic green wildlife corridors ....................................................................................... 8 Why has London Borough of Bexley adopted a new SINC assessment? ........................ 10 PART II. Site-by-site review ......................................................................................... 12 Sites of Metropolitan Importance for Nature Conservation ....................................... 13 M015 Lesnes Abbey Woods and Bostall Woods ........................................................... 13 M031 the River Thames and tidal tributaries ................................................................. 15 M041 Erith Marshes ...................................................................................................... 19 M105
    [Show full text]
  • South East London Green Chain Plus Area Framework in 2007, Substantial Progress Has Been Made in the Development of the Open Space Network in the Area
    All South East London Green London Chain Plus Green Area Framework Grid 6 Contents 1 Foreword and Introduction 2 All London Green Grid Vision and Methodology 3 ALGG Framework Plan 4 ALGG Area Frameworks 5 ALGG Governance 6 Area Strategy 8 Area Description 9 Strategic Context 10 Vision 12 Objectives 14 Opportunities 16 Project Identification 18 Project Update 20 Clusters 22 Projects Map 24 Rolling Projects List 28 Phase Two Early Delivery 30 Project Details 50 Forward Strategy 52 Gap Analysis 53 Recommendations 56 Appendices 56 Baseline Description 58 ALGG SPG Chapter 5 GGA06 Links 60 Group Membership Note: This area framework should be read in tandem with All London Green Grid SPG Chapter 5 for GGA06 which contains statements in respect of Area Description, Strategic Corridors, Links and Opportunities. The ALGG SPG document is guidance that is supplementary to London Plan policies. While it does not have the same formal development plan status as these policies, it has been formally adopted by the Mayor as supplementary guidance under his powers under the Greater London Authority Act 1999 (as amended). Adoption followed a period of public consultation, and a summary of the comments received and the responses of the Mayor to those comments is available on the Greater London Authority website. It will therefore be a material consideration in drawing up development plan documents and in taking planning decisions. The All London Green Grid SPG was developed in parallel with the area frameworks it can be found at the following link: http://www. london.gov.uk/publication/all-london-green-grid-spg .
    [Show full text]
  • Days out on a Budget
    Days Out on a Budget Royal Greenwich Families Information Service. Tel: 020 8921 6921 Email: [email protected] 1 This listing provides some ideas of places to visit within the local area and central London with your child(ren). We have selected places that are free or low cost. This is a developing list and we would be pleased to receive details of any other places or activities you can recommend. Please contact us, tel. 020 8921 6921, email [email protected]. Please note that this information is correct at time of print but is liable to change at any time. With regards Royal Greenwich Families Information Service Contents Museums & galleries Pages 3 – 9 Local venues 3-4 Venues around London 5-9 Parks, gardens & farms 10 – 18 Local venues 10-14 Venues around London 15-18 Visit the woods 19 Other 20 Travel information 20 Royal Greenwich Families Information Service. Tel: 020 8921 6921 Email: [email protected] 2 Museums & Galleries – Local Venues Firepower The Royal Artillery Museum, Royal Arsenal, Woolwich, SE18 6ST. Tel. 020 8855 7755 Email: [email protected]; Web: www.firepower.org.uk Price: Adult £5.30 / Child £2.50 / Concessions £4.60 (ES40, Seniors 60+; Students – ID required) Inclusive child admission during holidays - access to all activities £6.50. Tuesday-Saturday: 10am-5pm, last admission 4pm. Closed Sunday & Monday Buses: 177, 180, 472, 161, 96, 99, 469, 51, 54 / Rail/DLR: Woolwich Arsenal The Museum offers an insight into artillery and the role that the Gunners and their equipment have played in our Nation’s History.
    [Show full text]
  • Bexley Bird Report 2016
    Bexley Bird Report 2016 Kingfisher –Crossness – Donna Zimmer Compiled by Ralph Todd June 2017 Bexley Bird Report 2016 Introduction This is, I believe, is the very first annual Bexley Bird Report, it replaces a half yearly report previously produced for the RSPB Bexley Group Newsletter/web-site and Bexley Wildlife web- site. I shall be interested in any feedback to try and measure how useful, informative or welcome it is. I suspect readers will be surprised to read that 153 different species turned up across the Borough during the 12 months of 2016. What is equally impressive is that the species reports are based on just over 13,000 individual records provided by nearly 80 different individuals. Whilst every endeavour has been made to authenticate the records they have not been subject to the rigorous analysis they would by the London Bird Club (LBC) as would normally be the case prior to publication in the annual London Bird Report (LBR). This report has also been produced in advance of the final data being available from LBC as this is not available until mid-summer the following year – it is inevitable therefore that some records might be missing. I am, however, confident no extra species would be added. The purpose of the report is four-fold:- To highlight the extraordinary range of species that reside, breed, pass through/over or make temporary stops in the Borough To hopefully stimulate a greater interest not only in the birds but also the places in which they are found. Bexley Borough has a wide range of open spaces covering a great variety of habitat types.
    [Show full text]
  • Regional Flood Risk Assessment
    London Regional Flood Risk Appraisal First Review August 2014 Contents Page Updating the January 2014 Consultation Draft 3 Executive Summary 4 Chapter 1 - Introduction 1.1 Wider Policy Background 5 1.2 The London Plan 6 1.3 The Sequential Test 8 1.4 How to use this RFRA 9 Chapter 2 - Overview of Flood Risk to London 2.1 Tidal Flood Risk 10 2.2 Fluvial Flood Risk 15 2.3 Surface Water Flood Risk 23 2.4 Foul Sewer Flood Risk 27 2.5 Groundwater Flood Risk 28 2.6 Reservoir Flood Risk 29 Chapter 3 – Spatial Implications of Flood Risk 3.1 Introduction 32 3.2 Specific Development Areas 33 3.3 Main Rail Network and Stations 47 3.4 London Underground & DLR Network 48 3.5 Main Road Network and Airports 49 3.6 Emergency Services 51 3.7 Schools 52 3.8 Utilities 53 3.9 Other Sites 55 Chapter 4 – Conclusions and Look Ahead 56 Appendix 1 List of Monitoring Recommendations 57 Appendix 2 Glossary 59 Appendix 3 Utility Infrastructure within Flood Risk Zones 60 Appendix 4 Comparison of Flood Risk Data with 2009 RFRA 66 Appendix 5 Flood Risk Maps Separate Document London Regional Flood Risk Appraisal – First Review – August 2014 page 2 of 66 Updating the January 2014 Consultation Draft This document represents an update of the draft, that was published in January 2014, in the light of a three-month consultation. Alongside further assistance by the Environment Agency, this final version of the First Review was also informed by responses the Mayor received from TfL as well as the London Boroughs of Richmond, Havering and Southwark (see Statement of Consultation provided separately).
    [Show full text]
  • Londons Bridges: the Bridges of the Royal River Free
    FREE LONDONS BRIDGES: THE BRIDGES OF THE ROYAL RIVER PDF Ian Pay | 128 pages | 05 May 2009 | AAPPL Artists & Photographers Press Limited | 9781904332909 | English | London, United Kingdom 12 Of The Most Beautiful Bridges in London (with photos) - DELVE INTO EUROPE Show all questions. London 03 Find the correct answers. London London is the capital of Great Britain. It is situated in the Londons Bridges: The Bridges of the Royal River of England on the River Thames and there are lots of bridges across the Thames. The most famous of these bridges is Tower Bridge. The machinery which draws up the bridge when a ship passes under it is hidden in the two towers. It is a big castle, its oldest part, White Tower, dates back to the times of William the Conqueror. Back in history The Tower served as a prison - now it is one of London's main tourist attractions. Tourists are guided by "Beefeaters" in historic uniforms and the Crown Jewels are on display there. Another magnet for tourists is St. Paul's Cathedral. It is Sir Christopher Wren's masterpiece. Like many other churches it was built after the great fire had destroyed big parts of London in It is metres high and steps lead up to the Whispering Gallery in the dome. In the royal wedding between Prince Charles and Lady Diana was celebrated there. The coronation of the Kings and Queens takes place in Westminster Abbey. Near this enormous church there are the Houses of Parliament, the seat of the British government. They consist of a group of buildings, among them St.
    [Show full text]
  • 12179 Greenchainnature Reserve- 16 5 14 PROOF
    Visit 12 nature reserves along the Green Chain Walk Take a walk on the wild side The Wider Landscape This guide introduces you to Now it’s over to you. Whatever the Sensitive sites such as these cannot time of year you will find survive in isolation. The wider landscape some of the very best nature and something to delight you. Use the wildlife sites on the Green Chain. of the Green Chain - some 2,500 hectares checklist to tick off the sites you of open space in south east London (the have visited and anything that Each one has something special about it. All have been selected size of 3,400 football pitches!), provides inspired you on your visit! an important role in their survival. As because they are easy to get to by train or bus. As well as maps well as acting as a buffer to urban for each site we have also provided information that will make Crossness page 6 - 7 encroachment and the increasing your visit more interesting. demand for more housing, the Green Lesnes Abbey Woods page 8 - 9 Chain supports the mobility of wildlife so that alternative sources of food can be Take a walk found within the wider landscape. Oxleas Woods page 10 -11 Working together Maryon Wilson Park page 12 - 13 In the future our open spaces will need to be more resilient to threats such as on the wildside Sutcliffe Park page 14 - 15 climate change, floods, droughts and sea level rises. The vision of a connected and Grove Park page 16 - 17 robust living landscape can only be achieved by organisations working together.
    [Show full text]
  • Seeing the Capital Differently Welcome to Citythemes
    Seeing the Capital Differently Trees Welcome to CityThemes By printing this leaflet you have decided to discover, or rediscover, the sights and delights of London in a different way. We hope that you enjoy your explorations of our fascinating and historical capital city. This leaflet has been designed to allow you to explore as the mood takes you. Both well- known and lesser-known attractions are included and they are randomly listed so that you plan your own itinerary and visit as many or as few as you wish. Please note:- some places restrict entry and ask for prior application either in writing or by telephone. This is indicated where known. Others may change opening days and hours with little warning – it may be worth checking by phone if they are off the beaten track. A very brief description of the reason for the choice of site is given but because of space it is not possible to include much detail. Again a telephone call to the site may help you to decide on whether a visit is worthwhile. Remember there may be other items that interest you at the same site. Themes are constantly being updated and new titles added so please keep looking at our website or get in touch with us by e-mail or letter. We welcome your comments especially if you feel that some site should be included or details are incorrect/inaccurate. Contact details are website: www.citytheme.co.uk e-mail: info@ citythemes.co.uk address: CityThemes PO Box 42530, London E1W 3WL Enjoy Your Explorations 1 Theme 47: Trees revised March 2006 the trees in this leaflet are listed because they are the largest outdoor olive tree in Britain standing 30ft tall unusual , exotic or decorative.
    [Show full text]
  • An Evaluation of Community-Based Monitoring of Biodiversity in Greater London
    An Evaluation of Community-based Monitoring of Biodiversity in Greater London Zestin Soh Final Year Research Project BSc Biology Department of Life Sciences, Imperial College London Supervisor: Prof. E.J. Milner-Gulland Student CID: 00653907 Submission date: 5 th June 2015 Word Count: 5973 0 1. Abstract The collective monitoring of biodiversity by community groups in Greater London has great potential toward scientific and management goals. However, issues such as gaps in spatial and temporal coverage, uneven taxonomic representation and poor data sharing can limit its utility. An evaluation of community-based monitoring (CBM) is thus crucial to identify opportunities for effective use of the data. To achieve this, an online questionnaire and semi- structured interviews were used to collect data on CBM surveys and motivations of community groups in Greater London. Community group records stored by the biological records centre of London were also examined. 90 of 556 community groups (16.1%) responded to the questionnaire, of which 47 (53.5%) conduct CBM. These groups provided data on 119 monitoring surveys. Contrary to previous suggestions, a large proportion (56.2%) of the surveys utilised standardised protocols. Top-ranked motivation for with conducting monitoring surveys was significantly associated with local nature conservation (χ 2 test: df=3, n=90, χ 2 = 13.60, P=0.003). Analyses of questionnaire responses and GiGL records showed extreme unevenness in spatial and temporal coverage of CBM among taxonomic groups, precluding applications of CBM involving general biodiversity. CBM datasets were best for Birds, Butterflies and Other Invertebrates and might be suitable for uses in research and management in Greater London.
    [Show full text]
  • Section 5 – Natural and Semi Natural Provision
    SECTION 5 – NATURAL AND SEMI NATURAL PROVISION Natural and semi natural provision Definition 5.1 Natural and semi natural open space includes woodlands, urban forestry, scrubland, grasslands (eg downlands, commons, meadows, grazing marshes), wetlands, nature reserves and wastelands. Sites offer significant opportunities for wildlife conservation and biodiversity as well as providing recreational opportunities for local residents. Achieving an appropriate balance between recreational use and the maximisation of biodiversity is an ongoing challenge. 5.2 To an extent, natural and semi natural open space offers similar recreational functions to more formal parks and there are many interrelationships between the two types of open space. 5.3 In light of the multidimensional nature of parks in Bexley, many contain vast elements of natural and semi natural open space. Although natural areas falling within the larger formal parks have been classified as parks, their role in maximising access to natural open space will be discussed within this section and it is essential to consider the provision of the two similar types of open space both in isolation and in the context of each other. 5.4 This section outlines the strategic context and key consultation findings relating to natural and semi natural open space and then details the recommended local standards. The application of these standards highlights priorities for the future delivery of natural and semi natural open space across the London Borough of Bexley. 5.5 There are a number of regional and local documents that refer to the importance of natural and semi natural open space. The key issues arising from these documents and the links with this study are set out in Table 5.1 overleaf.
    [Show full text]