90 ABBEY WOOD ROAD Abbey Wood, London SE2 9NN

Total Page:16

File Type:pdf, Size:1020Kb

90 ABBEY WOOD ROAD Abbey Wood, London SE2 9NN ABBEY WOOD MAINLINE STATION OPENING 2021 Site outline for indicative purposes only 90 ABBEY WOOD ROAD Abbey Wood, London SE2 9NN Consented South East London Residential Development Opportunity 90 Abbey Wood Road Abbey Wood, SE2 9NN 2 EXECUTIVE SUMMARY LOCATION • Residential development opportunity The property is prominently positioned on in Abbey Wood, south east London. the corner of Conference Road and Abbey Wood Road, within 100 metres of Abbey Wood • The site extends to 0.27 acres (0.109 Mainline and Crossrail station. The site benefits from excellent transport links to the M25 via the hectares) and comprises a 2 storey Dartford Link and wider transport network. building which was formerly occupied by a post office. This has been vacant The site is well served by public transport, with Abbey Wood station providing direct services to since January 2019. London Bridge (29 minutes) and Cannon Street (38 minutes). Journey times to Canary Wharf are • The property benefits from planning approximately 37 minutes, with connections to permission under reference 19/1081/F the DLR network at Woolwich Arsenal. for 30 residential units. From Autumn 2021 Crossrail services are • The scheme is arranged as 16 x 1 bed, scheduled to commence which will add up to 12 extra trains an hour. This will cut journey times 9 x 2 bed, 5 x 3 bed and 3 flexible A1/ with trains to Canary Wharf in 11 minutes, Bond OPENING 2021 A2/A3/B1 ground floor commercial Street in 25 minutes and Heathrow Airport in units totalling 458.5 sq m (4,935 sq ft) 51 minutes. GIA. The London Borough of Bexley and The Royal Borough of Greenwich are working together • The Scheme will have a combined Net to regenerate the local area. The plans include Saleable Area of approximately 1,911 regeneration of the high street, a new library, new sq m (20,569 sq ft) NSA, 2,899 sq m central square and new business and commercial (31,205 sq ft) GIA. space. HUB Development are constructing a Build to Rent scheme with additional retail and leisure • The site is located approximately amenities less than a mile to the north of the 100 metres to the South of Abbey site. Further amenities close to the site include Sainsburys and Lidl which are situated to the Wood Mainline and Crossrail Station north of the station. providing regular services to London Bridge in 34 minutes and Cannon Street in 38 minutes. • From 2021 the site will benefit from a Crossrail terminal & Elizabeth Line services providing connectivity into Bond Street in 25 minutes. • For sale freehold with vacant possession. Ordnance Survey © Crown Copyright 2020. All Rights Reserved. Licence number 100022432 Plotted Scale - 1:5000. Paper Size - A4 90 Abbey Wood Road Abbey Wood, SE2 9NN 3 DESCRIPTION The broadly rectangular site extends to 0.27 acres (0.109 hectares). The property was originally constructed in circa 1970 as a main post office and sorting depot, with a brick cladding and frame structure. The site is on a gradient and the Post Office was located at ground floor level beneath the Sorting Office. The Sorting Office occupied both part ground and first floor level across the site. The building has been vacant since January 2019 when the post office vacated the premises. The surrounding area although predominantly residential is adjacent to Abbey Wood local centre which offers a parade of shops concentrated along Wilton Road, to the north east of the site. To the south of the site is a local vicarage, to the south east is Abbey wood community Image of existing building from Conference Road looking east centre and to the west of the site is Folkrite Congregational Church. We understand the existing building extends as follows: GIA GIA (SQ M) (SQ FT) Sorting Office 476.18 5,125.55 Upper Sorting Office 86.59 932.05 Lower Post Office 229.53 2,470.64 BUILDING 792.3 8,528.24 TOTAL Source: D&A Statement CGI of consented scheme looking South East (Source: JDW Architects) 90 Abbey Wood Road Abbey Wood, SE2 9NN 4 PLANNING FLOOR NUMBER TENURE AREA (SQM) AREA (SQ FT) 1 Flat 1 Shared Ownership 50.5 543.5 The property falls within the jurisdiction of the Royal Borough of Greenwich, is not listed and lies outside of any conservation areas. 1 Flat 2 London Affordable Rent 88 947 The site received resolution to grant permission at committee in December 2019 for the following scheme 1 Flat 3 Flat 50 538 (Ref: 19/1081/F). 1 Flat 4 Flat 69 742.5 “Redevelopment of the site to provide a five-storey building comprised of ground floor shared-workspace 1 Flat 5 Flat 54.5 586.5 (Use Class B1), with 30 self-contained flats above (16 x 1 bed, 9 x 2 bed, 5 x 3 bed) (Use Class C3) as well as three residential disabled car parking spaces.” 1 Flat 6 Flat 54 581.5 We understand that the s106 is now agreed with Royal Borough of Greenwich. The scheme includes 1 Flat 7 Flat 50 538 6 affordable units with further detail available in the dataroom. 1 Flat 8 Flat 114 1227 The S106 costings are approximately £88,700. Please see the datasite for the full detailed breakdown. 1 Flat 9 Flat 75.5 812.5 There is a late stage viability review mechanism within the S106. We ask parties to review as part of their due 2 Flat 10 London Affordable Rent 50.5 543.5 diligence and enquiries. 2 Flat 11 London Affordable Rent 86 925.5 2 Flat 12 Flat 51 549 2 Flat 13 Flat 64 689 2 Flat 14 Flat 53 571 2 Flat 15 Flat 52.5 565 2 Flat 16 Flat 50 538 2 Flat 17 Flat 75.5 812.5 3 Flat 18 London Affordable Rent 50.5 543.5 3 Flat 19 London Affordable Rent 86 925.5 3 Flat 20 Flat 51 549 3 Flat 21 Flat 64 689 3 Flat 22 Flat 53 570.5 3 Flat 23 Flat 52.5 565 3 Flat 24 Flat 50 538 3 Flat 25 Flat 75.5 812.5 4 Flat 26 Flat 50 538 4 Flat 27 Flat 87 936.5 4 Flat 28 Flat 67.5 726.5 4 Flat 29 Flat 66 710.5 4 Flat 30 Flat 70 753 Total NSA 1,911 20,568.6 CGI of proposed scheme from Conference Road looking north (Source: JDW Architects) 90 Abbey Wood Road Abbey Wood, SE2 9NN 5 TITLE & TENURE FURTHER INFORMATION The site is for sale freehold with vacant Further information including technical and legal possession. documentation is available at: The site is for sale on the basis of an www.savills.co.uk/abbeywood asset sale or company sale if preferred. Business rates are payable on the property and CONTACT can be provided upon request. For further information please contact: METHOD OF SALE Savills Andrew Cox Ed De Jonge The site will be sold by way of informal tender 020 7016 3851 020 7016 3849 with a bid deadline to be set in due course. [email protected] [email protected] Lucy Robbie VAT 020 7409 5988 We understand that the property is not elected [email protected] for VAT. City & Counties Commercial Tom Castro Nathan King VIEWINGS 020 8106 8666 020 8106 8666 Viewings are strictly by appointment; please [email protected] [email protected] contact the joint selling agents should you wish to undertake an internal inspection of the building. IMPORTANT NOTICE Maps are reproduced from the Ordnance Survey Map with the permission of the Controller of H.M. Stationery Office. © Crown copyright licence number 100022432 Savills (UK) Ltd, and published for the purposes of identification only and although believed to be correct accuracy is not guaranteed. Savills, their clients and any joint agents give notice that: 1. They are not authorised to make or give any representations or warranties in relation to the property either here or elsewhere, either on their own behalf or on behalf of their client or otherwise. They assume no responsibility for any statement that may be made in these particulars. These particulars do not form part of any offer or contract and must not be relied upon as statements or representations of fact. 2. Any areas, measurements or distances are approximate. The text, photographs and plans are for guidance only and are not necessarily comprehensive. It should not be assumed that the property has all necessary planning, building regulation or other consents and Savills have not tested any services, equipment or facilities. Purchasers must satisfy themselves by inspection or otherwise. Designed and Produced by Savills Marketing: 020 7499 8644 | July 2020 Outline for indicative purposes Ordnance Survey © Crown Copyright 2020. All Rights Reserved. Licence number 100022432 Plotted Scale - 1:1000. Paper Size - A4.
Recommended publications
  • All London Green Grid River Cray and Southern Marshes Area Framework
    All River Cray and Southern Marshes London Area Framework Green Grid 5 Contents 1 Foreword and Introduction 2 All London Green Grid Vision and Methodology 3 ALGG Framework Plan 4 ALGG Area Frameworks 5 ALGG Governance 6 Area Strategy 8 Area Description 9 Strategic Context 10 Vision 12 Objectives 14 Opportunities 16 Project Identification 18 Project Update 20 Clusters 22 Projects Map 24 Rolling Projects List 28 Phase Two Early Delivery 30 Project Details 48 Forward Strategy 50 Gap Analysis 51 Recommendations 53 Appendices 54 Baseline Description 56 ALGG SPG Chapter 5 GGA05 Links 58 Group Membership Note: This area framework should be read in tandem with All London Green Grid SPG Chapter 5 for GGA05 which contains statements in respect of Area Description, Strategic Corridors, Links and Opportunities. The ALGG SPG document is guidance that is supplementary to London Plan policies. While it does not have the same formal development plan status as these policies, it has been formally adopted by the Mayor as supplementary guidance under his powers under the Greater London Authority Act 1999 (as amended). Adoption followed a period of public consultation, and a summary of the comments received and the responses of the Mayor to those comments is available on the Greater London Authority website. It will therefore be a material consideration in drawing up development plan documents and in taking planning decisions. The All London Green Grid SPG was developed in parallel with the area frameworks it can be found at the following link: http://www.london.gov.uk/publication/all-london- green-grid-spg .
    [Show full text]
  • Buses from North Greenwich Bus Station
    Buses from North Greenwich bus station Route finder Day buses including 24-hour services Stratford 108 188 Bus Station Bus route Towards Bus stops Russell Square 108 Lewisham B for British Museum Stratford High Street Stratford D Carpenters Road HOLBORN STRATFORD 129 Greenwich C Holborn Bow River Thames 132 Bexleyheath C Bromley High Street 161 Chislehurst A Aldwych 188 Russell Square C for Covent Garden Bromley-by-Bow and London Transport Museum 422 Bexleyheath B River Thames Coventry Cross Estate The O2 472 Thamesmead A Thames Path North CUTTER LANE Greenwich 486 Bexleyheath B Waterloo Bridge Blackwall Tunnel Pier Emirates East india Dock Road for IMAX Cinema, London Eye Penrose Way Royal Docks and Southbank Centre BLACKWALL TUNNEL Peninsula Waterloo Square Pier Walk E North Mitre Passage Greenwich St George’s Circus D B for Imperial War Museum U River Thames M S I S L T C L A E T B A N I Elephant & Castle F ON N Y 472 I U A W M Y E E Thamesmead LL A Bricklayers Arms W A S Emirates Air Line G H T Town Centre A D N B P Tunnel Y U A P E U R Emirates DM A A S E R W K Avenue K S S Greenwich Tower Bridge Road S T A ID Thamesmead I Y E D Peninsula Crossway Druid Street E THAMESMEAD Bermondsey Thamesmead Millennium Way Boiler House Canada Water Boord Street Thamesmead Millennium Greenwich Peninsula Bentham Road Surrey Quays Shopping Centre John Harris Way Village Odeon Cinema Millennium Primary School Sainsbury’s at Central Way Surrey Quays Blackwall Lane Greenwich Peninsula Greenwich Deptford Evelyn Street 129 Cutty Sark WOOLWICH Woolwich
    [Show full text]
  • Deptford Church Street & Greenwich Pumping Station
    DEPTFORD CHURCH STREET & GREENWICH PUMPING STATION ONLINE COMMUNITY LIAISON WORKING GROUP 13 July 2021 STAFF Chair: Mehboob Khan Tideway • Darren Kehoe, Project Manager Greenwich • Anil Dhillon, Project Manager Deptford • Natasha Rudat • Emily Black CVB – main works contractor • Audric Rivaud, Deptford Church Street Site Manager • Anna Fish– Deptford Church Street, Environmental Advisor • Robert Margariti-Smith, Greenwich, Tunnel & Site Manager • Rebecca Oyibo • Joe Selwood AGENDA Deptford Update • Works update • Looking ahead • Noise and vibration Greenwich Update • Works update • Looking ahead • Noise and vibration Community Investment Community Feedback / Questions DEPTFORD CHURCH STREET WHAT WE’RE BUILDING DEPTFORD WORKS UPDATE SHAFT & CULVERT Shaft • Vortex pipe installed and secondary lining complete • Tunnel Boring Machine crossing complete • Vortex generator works on-going Culvert • Excavation complete • Base slab and walls complete • Opening to shaft complete DEPTFORD WORKS UPDATE COMBINED SEWER OVERFLOW (CSO) CSO Phase 1: Interception Chamber • Internal walls and roof complete • Mechanical, Electrical, Instrumentation, Controls, Automation (MEICA) equipment installation on-going CSO Phase 2: Sewer connection • Protection works of Deptford Green Foul Sewer complete • Secant piling works complete • Capping beam and excavation to Deptford Storm Relief Sewer on-going time hours: Monday to Friday: 22:00 to 08:00 DEPTFORD 12 MONTHS LOOK AHEAD WHAT TO EXPECT AT DEPTFORD CSO: connection to existing sewer Mitigations • This work will take place over a 10 hour shift – the time of the shift • Method of works chosen to limit noise will be dependent on the tidal restrictions in the Deptford Storm Relief Sewer’ generation such as sawing concrete into • Lights to illuminate works and walkways after dark blocks easily transportable off site.
    [Show full text]
  • Unit 1 Hope Wharf, 37 Greenwich High Road, London SE10 8LR Long Let Nursery in Greenwich (15 Year Lease with RPI Linked Reviews)
    Unit 1 Hope Wharf, 37 Greenwich High Road, London SE10 8LR Long let Nursery in Greenwich (15 year lease with RPI linked reviews) Investment Highlights Offers in excess of £625,000 • Newly constructed nursery let on a new 15 year lease • Situated within a prominent residential development in Greenwich, London • 1,491 sq ft of ground floor accommodation with outdoor space and car parking Income • Let to ‘Twinnie Day Nursery Limited’ for 15 years (without £40,000 break) at a passing rent of £40,000 per annum • 5 yearly rent reviews to the higher of RPI (collar and cap of 2% and 4%) and the open market rent. • Excellent transport links to Central London with nearby stations including Greenwich Station and Deptford Bridge DLR NIY 6.10% Location Situation London Borough of Greenwich has a population of The property is situation on Hope Wharf which is 254,557 residents (2011 census). Greenwich has located on Greenwich High Road in close proximity experienced extensive regeneration over the last 2 to both Greenwich Station and Deptford Bridge decades and attracted a large amount of DLR, both of which provide access to Central investment into the locality, including developments London and Canary Wharf. such as the New Capital Quay and the Greenwich Peninsula. Transport Links Distance Greenwich is strategically located to the south east Deptford Bridge DLR 0.2 miles of Central London with excellent transport links via Greenwich Station 0.4 miles Greenwich Station (National Rail) and Deptford A2 120 yards Bridge DLR. The area is best known for the National Maritime There’s a variety of restaurants, bars, shops and Museum, Royal Observatory, Cutty Sark and the markets nearby, including the well known Cutty O2 Arena, which attract over a million tourist each Sark and Greenwich Market which is just over a 15 year.
    [Show full text]
  • Mary Ney Chief Executive the Royal Borough of Greenwich Woolwich Town Hall 16 April 2014 Wellington Street Woolwich London
    Mary Ney Chief Executive The Royal Borough of Greenwich Woolwich Town Hall 16 April 2014 Wellington Street Woolwich London. SE18 6PW Via email [email protected] Dear Ms Ney, THE LOCAL GOVERNMENT ACT 1986 NOTICE UNDER SECTION 4A(5) I enclose a written notice to your authority of a proposed direction which the Secretary of State for Communities and Local Government is minded to give to your authority under section 4A of the Local Government Act 1986. Yours sincerely, Paul Rowsell Paul Rowsell Tel 0303 44 42005 Deputy Director – Democracy Email [email protected] Department for Communities and Local Government 3/J1, Eland House Bressenden Place London SW1E 5DU THE LOCAL GOVERNMENT ACT 1986 NOTICE UNDER SECTION 4A(5) The Secretary of State hereby gives the local authority known as the Royal Borough of Greenwich notice of a direction that he proposes to give to the authority under section 4A of the 1986 Act. Having regard to the information available to him about the local authority’s publicity, the Secretary of State proposes to direct the Royal Borough of Greenwich to comply by no later than 1 May 2014 with all of the provisions of the Recommended Code of Practice on Local Authority Publicity issued under section 4 of the Local Government Act 1986 on 31 March 2011 having been approved by a resolution of each House of Parliament. The Royal Borough of Greenwich may make written representations to the Secretary of State about the proposed direction within the period of 14 days beginning with the day on which this notice is given to it.
    [Show full text]
  • Abbey Wood Station – Zone 4 I Onward Travel Information Local Area Map Bus Map
    Abbey Wood Station – Zone 4 i Onward Travel Information Local Area Map Bus Map 45 1 HARTSLOCK DRIVE TICKFORD CLOSE Y 1 GROVEBURY ROAD OAD 16 A ALK 25 River Thames 59 W AMPLEFORTH R AMPLEFORTH ROAD 16 Southmere Central Way S T. K A Crossway R 1 B I N S E Y W STANBROOK ROAD TAVY BRIDGE Linton Mead Primary School Hoveton Road O Village A B B E Y W 12 Footbridge T H E R I N E S N SEACOURT ROAD M E R E R O A D M I C H A E L’ S CLOSE A S T. AY ST. MARTINS CLOSE 1 127 SEWELL ROAD 1 15 Abbey 177 229 401 B11 MOUNTJOYCLOSE M Southmere Wood Park ROAD Steps Pumping GrGroroovoveburyryy RRoaadd Willow Bank Thamesmead Primary School Crossway Station W 1 Town Centre River Thames PANFIE 15 Central Way ANDW Nickelby Close 165 ST. HELENS ROAD CLO 113 O 99 18 Watersmeet Place 51 S ELL D R I V E Bentham Road E GODSTOW ROAD R S O U T H M E R E L D R O A 140 100 Crossway R Gallions Reach Health Centre 1 25 48 Emmanuel Baptist Manordene Road 79 STANBROOK ROAD 111 Abbey Wood A D Surgery 33 Church Bentham Road THAMESMEAD H Lakeside Crossway 165 1 Health Centre Footbridge Hawksmoor School 180 20 Lister Walk Abbey Y GODSTOW ROAD Footbridge N1 Belvedere BUR AY Central Way Wood Park OVE GROVEBURY ROAD Footbridge Y A R N T O N W Y GR ROAD A Industrial Area 242 Footbridge R Grasshaven Way Y A R N T O N W AY N 149 8 T Bentham Road Thamesmead 38 O EYNSHAM DRIVE Games N Southwood Road Bentham Road Crossway Crossway Court 109 W Poplar Place Curlew Close PANFIELD ROAD Limestone A Carlyle Road 73 Pet Aid Centre W O LV E R C O T E R O A D Y 78 7 21 Community 36 Bentham Road
    [Show full text]
  • South East London Green Chain Plus Area Framework in 2007, Substantial Progress Has Been Made in the Development of the Open Space Network in the Area
    All South East London Green London Chain Plus Green Area Framework Grid 6 Contents 1 Foreword and Introduction 2 All London Green Grid Vision and Methodology 3 ALGG Framework Plan 4 ALGG Area Frameworks 5 ALGG Governance 6 Area Strategy 8 Area Description 9 Strategic Context 10 Vision 12 Objectives 14 Opportunities 16 Project Identification 18 Project Update 20 Clusters 22 Projects Map 24 Rolling Projects List 28 Phase Two Early Delivery 30 Project Details 50 Forward Strategy 52 Gap Analysis 53 Recommendations 56 Appendices 56 Baseline Description 58 ALGG SPG Chapter 5 GGA06 Links 60 Group Membership Note: This area framework should be read in tandem with All London Green Grid SPG Chapter 5 for GGA06 which contains statements in respect of Area Description, Strategic Corridors, Links and Opportunities. The ALGG SPG document is guidance that is supplementary to London Plan policies. While it does not have the same formal development plan status as these policies, it has been formally adopted by the Mayor as supplementary guidance under his powers under the Greater London Authority Act 1999 (as amended). Adoption followed a period of public consultation, and a summary of the comments received and the responses of the Mayor to those comments is available on the Greater London Authority website. It will therefore be a material consideration in drawing up development plan documents and in taking planning decisions. The All London Green Grid SPG was developed in parallel with the area frameworks it can be found at the following link: http://www. london.gov.uk/publication/all-london-green-grid-spg .
    [Show full text]
  • London Borough of Bexley Local Implementation Plan 2019/20 – 2021/22
    www.bexley.gov.uk London Borough of Bexley Local Implementation Plan 2019/20 – 2021/22 May 2019 LB Bexley LIP 2019/20 – 2021/22 Contents London Borough of Bexley Local Implementation Plan ............................................................................................. 2 Foreword ........................................................................................................................................................................... 6 1. Introduction and Preparation of the Draft Local Implementation Plan ..................................................... 7 1.1 Introduction ..................................................................................................................................................... 7 1.2 Local Approval Process ................................................................................................................................. 7 1.3 Statutory Consultation .................................................................................................................................. 8 1.4 Statutory duties ............................................................................................................................................... 9 1.5 LIP approval ..................................................................................................................................................... 9 2. Borough Transport Objectives ..........................................................................................................................
    [Show full text]
  • Greenwich TC Visitor
    Greenwich Meridian Island C to The O2 H Island R I L and Blackwall Tunnel D Gardens S A L WE RO PELTON T St. Joseph ST FERRY RO A Gardens AD C E T H ham RC Church W es N P U ath K A OO GREENWICH R LW C W ICH EET L C RO STR A AD L FERRY H B C A W AN L L A A V to East TOWN CENTRE Y S H S 6 E N O E 0 R 2 AN Greenwich Library, L T S S L A Trinity K The Forum E I DA S Thames Barrier and N T D Thames Path S R @ Greenwich OA R M Hospital O LE E R Woolwich S E A T A T H R D Tunnel T E R C E A E O ROA T G A L L A R Highbridge F O L D Greenwich Foot A M R S Wharf W . T B 16 ST R AD O E E V O S I N R R O A UT CH LN T CR I D A . LW W RD R E E Greenwich O E V O TR E AD W S RO USKAR S T A T TR T LE D E F A Pier L N D 4 O E T R R NAN O E AN OLD B B E ach I T Re R Greenwich S H Arches U ROYAL D E P G WOO L A R A R N G COLLEGE WAY S T R E Leisure D T AD ha K E RO NAVAL 6 .
    [Show full text]
  • Bexley Station – Zone 6 I Onward Travel Information Local Area Map Bus Map N
    Bexley Station – Zone 6 i Onward Travel Information Local Area Map Bus Map N R D 686 22 1 144 Eighty Oak 200 Footbridge R O C H E S T E R D R I V E E A S O C H E S T E R W T R O E A S T R A Y C H E S T E 20 201 R BASING DRIVE GRAVEL HILL CLOSE GRAVEL HILL CLOSE Hall Place Thamesmead W A D Thamesmead Belvedere U Y 122 A Boiler House /RZHU5RDG P 8 Town Centre T O 12 Ri O N BAYNHAM CLOSE ver West Street 40 S R h ut R Thamesmead O tle 229 Abbey Wood A HARTLANDS CLOSE D Crossway E S B12 O 50 U N T WILLOW CLOSE Hall Place H 15 Erith Town Centre R 1 River Shuttle Gardens y THAMESMEAD U ra 25 C D O r 20 e Erith Health Centre iv 1 A Blackckk PrPPrincence B R FA R M VA L E O ERITH Beths R Interchchahangangenge Grammar 1 FINSBURY WAY 3 229 School D Avenue Road L Parsonage Northumberland O 67 H A R 2 T F Manorway Heath Erith & District Hospital O R 9 W D Holiday Inn R O O TFORD 6KLQJOHZHOO5RDG &DUOWRQ5RDG N E A H D L A D 1 C L O V E 1 33 L O SE T A E 1 1 198 O A Carlton Road +DLO 5LGH L O V E L A N E U R S 52 T section 1 O 13 30 31 E N R S Barnehurst 104 ELMINGTO O 1 E R Bedonwell Road CRAYFORD D S U C A N C L 14 O H O OSE L O Old Road Greenhithe 37 R H C B E L L A Bexleyheath O R N S RIVERDALE ROAD K N T 1 Perry Street Crayford Shepherd’s Lane Dartford Waterstone Park 1 F O O T R D T Old Dartfordians Bus Garage e G E tl ALBERT ROAD R t O N R 15 u A I Association h 14 D S M W Mayplace Road Crayford Chastilian Road Horns Cross D L er A D Riv E A 35 PARKHURST ROAD E A M R O Y East Bull L E L Town Hall T L 2 Pickford Lane T T H E C L O S E O U N BEXLEYHEATH H U K S P T O 1 14 N 132 R O DARTFORD 29 A 98 Mayplace Road West Bluewater Shopping Centre 65 D 20 North Greenwich 48 1 N21 S O Foresters Crescent U E for The O2 492 T H E R I D G E T A N continues to 2 H L Bexleyheath 1 K 132 S C H 267 A Bank , Bexleyheath U T B 132 T L Bexley FC y E M 38 ra Broadway +LJKODQG5RDG E A C St.
    [Show full text]
  • Charlton Riverside SPD
    Charlton Riverside SPD Draft February 2017 Contents 1 Introduction 1 2 Vision and Objectives 2 3 Context 13 4 Development Concept 29 5 Theme 1 – A Residentially Diverse Charlton Riverside 41 6 Theme 2 – An Economically Active Charlton Riverside 49 7 Theme 3 – A Connected and Accessible Charlton Riverside 61 8 Theme 4 – An Integrated and Lifetime Ready Charlton Riverside 73 Draft9 Theme 5 – A Well-designed Charlton Riverside 87 10 Theme 6 – A Sustainable and Resilient Charlton Riverside 113 11 Theme 7 – A Viable and Deliverable Charlton Riverside 121 12 Illustrative Masterplan 135 Appendices Charlton Riverside SPD | February 2017 iii List of Figures Figure Page Figure Page Figure Page 1.1 SPD Area 3 5.4 Development densities 47 8.7 Green Bridge Option 1 83 1.2 Basis of this SPD and how it should be used 5 6.1 Existing land use (at ground floor) 50 8.8 Green Bridge Option 2 84 3.1 The City in the East 14 6.2 Economic activity at Charlton Riverside 52 8.9 Green Crossing 85 3.2 Charlton Riverside 15 6.3 Angerstein and Murphy’s Wharves 53 9.1 Character areas 88 3.3 Economic activity at Charlton Riverside 17 6.4 Riverside Wharf 54 9.2 Neighbourhood and local centres 91 3.4 Existing building heights 18 6.5 Proposed ground floor uses 55 9.3 Neighbourhood Centre/High Street 92 3.5 Flood risk 20 6.6 Proposed upper floor uses 56 9.4 Retail and commercial uses 93 3.6 Public Transport Accessibility Level (PTAL) 21 6.7 Employment locations 57 9.5 Historic assets map 95 3.7 Existing open space 22 7.1 Proposed network of streets 62 9.6 Block structure
    [Show full text]
  • 2. Project Description
    Crossrail: Socio-Economic Technical Report - 2. Project description 2.1 Introduction 2.1.1 This chapter provides a general introduction to Crossrail in terms of an overview of the permanent works that will be constructed as part of the project, information on the operation of Crossrail and a description of how the permanent works will be constructed. 2.2 Crossrail – a general introduction 2.2.1 Crossrail is a major new cross-London rail link project that has been developed to serve London and the southeast of England. Crossrail will support and maintain the status of London as a world city by providing a world class transport system. The project includes the construction of a twin-bore tunnel on an east-west alignment under central London and the upgrading of existing National Rail lines to the east and west of central London. The Crossrail route is shown in Figure 2.1. FIGURE 2.1 OVERVIEW OF CROSSRAIL ROUTE Transport for London 2.2.2 The project will enable the introduction of a range of new and improved rail journeys into and through London. It includes the construction of seven central area stations, providing interchange with London Underground, National Rail and London bus services, and the upgrading or renewal of existing stations outside central London. Crossrail will provide fast, efficient and convenient rail access to the West End and the City by linking existing routes from Shenfield and Abbey Wood in the east with Maidenhead and Heathrow in the west. 2.2.3 Crossrail will be a significant addition to the transport infrastructure of London and the southeast of England.
    [Show full text]