Upper Eskdale Community Group Community Hub, Eskdalemuir Next Stage Big Lottery Requirements Architects Plus (UK) Ltd 1.0 Project Team Individual consultant CV’s, as outlined below and proof of professional indemnity insurances are appended to this report. Architect and lead consultant Architects Plus (UK) Ltd Victoria Galleries, Victoria Viaduct, Carlisle CA2 5DT Tel: 01228 515144 Fax:01228 515033 Email:
[email protected] or
[email protected] Tom Langlands: Director in overall charge of the project. Dan Clements: Chartered Technologist responsible for contract administration and production drawings and specifications. Quantity Surveyor McGowan Miller Partnership 36 George Street, Dumfries DG1 1EH Tel:01387 254283 Fax:01387 263471 Email:
[email protected] Stuart Callander: Partner in overall charge of Quantity Surveying requirements. Alan Thomson: Quantity Surveyor Structural Engineer Bingham Yates & Partners 38 Victoria Place, Carlisle, Cumbria CA1 1EX Tel:01228 521436 Fax:01228 515579 Emai:
[email protected] Chris Walters: Director in charge of structural engineering detailed design calculations and detailing. Mechanical & Electrical Engineer TTS Renewable Energy Ltd Suite 33, Geddes House, Kirkton Road North, Livingston EH54 6GU Tel: 01506 420198 Email:
[email protected] John Benson: Responsible for overall design philosophy monitoring agreed project targets and financial performance. Marcus Stout: Responsible for electrical system design Compliance with appropriate codes of practice including safety and liaison with utility suppliers Execution of lighting design. Kenny Lunn: Design of full mechanical services covering heating, internal water services and drainage, ventilation & reinstatement of existing services. Liaison with proposed Biomass equipment supplier. Keith Campbell: Review and selection of renewable energy equipment including Biomass boiler specification and fuel selection.