The Coal Canal Wa Y
Total Page:16
File Type:pdf, Size:1020Kb
Upper Locks Lower Locks Aqueducts 1 2 3 4 5 6 7 8 9 10 11 1.5k Paulton Radford Camerton Carlingcott Dunkerton Tunnel Combe Hay Rowley Farm Bridge Farm Midford Combe Monkton Dundas Bath THE COAL CANAL WAY The Coal Canal Way is a series of walks which, when taken together, The Somersetshire Coal Canal was built in the early 1800s to bring cover the entire length of the Northern Branch of the disused coal from the mines in the Timsbury, Paulton and Radstock areas to the Somersetshire Coal Canal. The walks are described in both directions Kennet & Avon Canal for distribution across southern England. The for people who want a short exploration which returns to its starting Southern Branch was sold to the Somerset & Dorset Joint Railway after point. The individual short walks can be linked to those on adjacent 40 years, but the Northern Branch to Paulton survived for nearly 100 pages to form a longer walk for those who prefer greater distances. Each years and was one of the most profitable canals in England. page includes a map at an appropriate scale for that section and a This booklet was produced by the Somersetshire Coal Canal Society. description of the interesting things to be seen on the walk, with a © 2018 S.C.C.S. summary of their history. PLEASE STAY ON PUBLIC RIGHTS OF WAY AND DO NOT TRESPASS THE A WALKER’S COAL CANAL GUIDE by WAY http://www.coalcanal.org PAULTON 1 RADFORD Paulton to Radford 2 km or 1.2 miles Radford to Paulton From Goosard Bridge A a public right of way runs along the sewage From Radford Bridge N take the road steeply uphill and take the first works access road. left turn M. At the nature reserve batch, take the first left turn B which brings you At the bottom of the dip, take the footpath on the left L. over the Cam Brook and into a meadow adjacent to Timsbury Basin C Follow the footpath until it is joined by a lane coming from under a and the terminus of the canal. railway bridge K on the right, keep straight on up the slope. Follow the towpath to the right, keeping the canal on your left. At the top of the slope turn left downhill and then through a gate on the Go through a gate past Paulton Basin D and the Dry Dock Bridge, then right J, to join the canal towpath. down the right hand side of the Dry Dock. Follow the towpath with the canal on your right. direction of Bathampton. Follow the wharfside past the crane G and turn B to C Pass through the cutting in Sydney right over the decorative bridge F, then left onto Gardens and the tunnel under the A36 Warminster the towpath. Road. Continue along the towpath to Bathampton The towpath leads past Claverton Pumping Station and the George Inn D. E to the George Inn D at Bathampton. The towpath leads on past Claverton Pumping D Continue past the George Inn until you reach Station E to Dundas Aqueduct Basin. the tunnel under the A36 Warminster Road C. F Cross over the decorative bridge to the wharf Go through the tunnel into a cutting through with the crane Sydney Gardens. G and look for the entrance to the Somersetshire B Continue following the towpath until it brings Coal Canal under the metal lifting bridge you to the top lock of the Bath Lock Flight A. H. (Continued as Walk 10 ) Things to see on Walk 11 A There were several privately-owned coal wharves alongside the K&A Dry Arch can still be Canal in Bath, but the Somersetshire Coal Canal Company had its own found in the wharf at the top of the lock flight. An old photgraph shows the company’s undergrowth a little name boldly painted on the building and coal stockpiled on the wharfside. further up the plane from the site of the road bridge. B The towpath changes to the uphill side of the canal for a short distance, E Claverton has one of the two pumping stations that supplied water to this practice was usually avoided because it made the canal more the K&A Canal, the other was at Crofton. Unlike the steam-powered expensive to construct. When this occurs it is sometimes driven by pumps at Crofton, this one drew its power from the river by means of a geography but more often it is the result of a land ownership difficulty. very large waterwheel; it was completely pollution-free. The slow C Above the tunnel portals are carvings of Neptune, representing rotation of the water wheel is geared up to a faster speed to operate the waterways in general and Sabrina representing the Severn. Similar statues pumps more effectively and a large flywheel evens-out the pulsating can be found at Sapperton Tunnel on the Cotswold Canals. load of the pumps which would otherwise put a strain on the gearing. D to E The quarry at Bathampton Down was connected to the K&A I The entrance to the Somersetshire Coal Canal is under the aluminium Canal by an Inclined Plane gravity-powered tramway. The distinctive lifting bridge. The towpath of the K&A Canal towards Bradford on sloping bridge which carried it over the A36 road was incorrectly known Avon crossed the spectacular Dundas Aqueduct, designed by John Rennie, locally as the ‘Dry Arch’; it was demolished many years ago. The real which is worth a visit before continuing on your journey. 11 11 BATH DUNDAS Bath to Dundas 8 km or 5 miles Dundas to Bath A Start at the top lock of the Kennet & Avon H Start at the entrance to the Somersetshire Coal Canal. Walk away from the lock flight in the Canal by the metal lifting bridge. Look for a gate E in the left hand hedge. This brings you up onto the When the towpath ends I, carry straight on in the same direction across canal towpath at the site of the now-demolished Terminus Bridge. a meadow and up a slope to join the canal towpath again H. Continue in Follow the towpath with the canal on your left. the same direction as before. At the Dunford Bridge site H, cross the track and walk to a gateway I on Just before Paulton Basin the path goes down through a kissing gate E the far side of the meadow. on the left, then turns right. Go through the gate and then continue along the towpath to Mill Lane J. Go to the left of the Dry Dock, Dry Dock Bridge and Paulton Basin D. Turn left up Mill Lane, then immediately right down a slope. Go straight Continue through the gate, keeping the canal on your right on through a gate K and follow the footpath until it emerges onto a road Follow the path with the canal on your right until you reach Timsbury L. Basin and the end of the canal. Turn right on the road, then right again M downhill to Radford Bridge Leave by the gateway C on your left leading to a bridge over the Cam N. Brook. (Continued as Walk 2 ) Turn right at the sewage works B and meet the road at Goosard Bridge A. Things to see on Walk 1 A The sewage works has been built on the site of the Paulton Upper E Horses towing boats to and from the northern wharves crossed over to Engine Pit colliery. the northern towpath at Terminus Bridge, those using the southern B The track was a tramway taking coal from the pit to the canal. wharves stayed on the towpath and crossed over the Dry Dock bridge. C This is the terminus of the S.C.C., coal brought by tramway from pits F This stonework is the remains of a stop-plank point formed in the in the Timsbury area was loaded into boats on the northern side of footings of a swivel bridge adjacent to G the wharf wall of Withy Mills Timsbury Basin where there was a complex of tramways and buildings colliery, which carried a tramway. including a Wharfinger’s house and stables. H A tramway brought coal from Radford Colliery to a wharf adjacent to D Coal brought by tramway from pits in the Paulton area was loaded the canal towpath. into boats at a wharf on the southern side of Paulton Basin. The Dry J A level crossing took Mill Lane over the railway embankment, with a Dock was the largest on any canal in England and could repair three diversion to a bridge under the track for pedestrians. boats at a time. The bridge over the Dry Dock entrance has recently K This was the site of Radford halt on the Bristol and North Somerset been rebuilt but all the other canal bridges in this area have been Railway. demolished. 1 2 RADFORD CAMERTON Radford to Camerton 1 km or 0.62 miles Camerton to Radford From Radford Bridge A, opposite a house take the road which slopes From Camerton Batch Nature Reserve G, cross the road and enter Canal gently upwards. View, look for a footpath F descending on the left. Where the road curves to the left, it was built on the canal towpath. The Walk along the towpath with the infilled canal on your right until the canal was in the field on the left of the road. B. public footpath goes into the garden of a house D.