MARINE DEPARTMENT NOTICE NO. 1 of 2019 (Miscellaneous Information) HONG KONG MARINE DEPARTMENT NOTICES

Total Page:16

File Type:pdf, Size:1020Kb

MARINE DEPARTMENT NOTICE NO. 1 of 2019 (Miscellaneous Information) HONG KONG MARINE DEPARTMENT NOTICES MARINE DEPARTMENT NOTICE NO. 1 OF 2019 (Miscellaneous Information) HONG KONG MARINE DEPARTMENT NOTICES The following Marine Department Notices (MDN) are still in force as at 1 January 2019 : (I) Navigation Warnings & Related Information MDN Issue Date Typhoon Season 68/18 02/05/18 Tung Chung New Town Extension Project Temporary Arrangement of the Tung 70/18 03/05/18 Chung Buoyed Channel (II) Establishment, Withdrawal and Changes of Aids to Navigation, MDN Issue Date Fairways, Anchorages & Other Port Facilities Adoption of Emergency Wreck Marking Buoy for marking new dangerous 173/09 17/12/09 wreck in Hong Kong waters Changes to the Ship’s Routeing System and Ship Reporting System in the 97/15 30/06/15 Waters of Pearl River Estuary Establishment of Marker Buoys at Sai Kung and Tai Po 128/15 24/09/15 Removal of Government Mooring Buoy “ A 35 ” off Causeway Bay Typhoon 57/16 11/05/16 Shelter Continuous Operation of a Temporary Wind Monitoring Station off Basalt 37/17 09/03/17 Island, Sai Kung Re-arrangement of Passage Area in Causeway Bay Typhoon Shelter 99/17 06/07/17 Withdrawal of Light Buoy “Airport 3” off Hong Kong International Airport 15/18 02/02/18 Continuous operation of a Temporary Wind Monitoring Station off Lamma 66/18 26/04/18 Island Temporary Establishment of Scientific Research Buoy “SKLMP 1” to the 83/18 16/05/18 Southwest of Tai A Chau Removal of a Light buoy and Establishment of a Virtual Aids to Navigation in 100/18 20/06/18 Urmston Road Floating Barriers Across Starling Inlet 122/18 02/08/18 Establishment of Lights on Government Mooring Buoys off Tso Wo Hang, Sai 124/18 09/08/18 Kung Temporary Withdrawal of Weather Buoys To the South of Cheung Chau, and 134/18 24/08/18 To the Southeast of Sha Chau Establishment of Aids to Navigation on the Hong Kong Link Road 186/18 27/11/18 (III) Marine Works MDN Issue Date Establishment of Silt Curtains in Tsim Sha Tsui, Tai Wan Shan and Quarry Bay 158/15 06/11/15 Marine Works off Tsim Sha Tsui 36/17 09/03/17 Viaduct Construction Works at Junk Bay 66/17 12/05/17 Marine Works off North Point 94/17 03/07/17 We are One in Promoting Excellence in Marine Services (III) Marine Works MDN Issue Date Marine Works off Wan Chai 101/17 07/07/17 Repair Works for North Point Vehicular Ferry Pier 122/17 24/08/17 Marine Works at Lung Mei, Tai Po 182/17 21/12/17 Construction of the Tuen Mun – Chek Lap Kok Link (Northern Connection) 185/17 27/12/17 Marine Works to the East of the Hong Kong International Airport Capping of Mud Pits North of the Hong Kong International Airport 9/18 25/01/18 Marine Works for Construction of Three-Runway System at the North of the 38/18 14/03/18 Hong Kong International Airport Underwater Inspection Works and Submarine Cable Laying Operations from 43/18 22/03/18 Deep Water Bay to the Eastern Boundary of Hong Kong Waters Construction of the Hong Kong Link Road Marine Works to the South-east of 59/18 19/04/18 the Hong Kong International Airport Dredging Works in Marina Cove Basin and its Entrance Hebe Haven, 90/18 28/05/18 Sai Kung Marine Works off West of Hong Kong Convention & Exhibition Centre 99/18 19/06/18 Reclamation to the Southwest of Shek Kwu Chau for the Integrated Waste 107/18 05/07/18 Management Facilities Tung Chung New Town Extension Project marine Works Off Pak Mong, 108/18 05/07/18 Lantau Island Dredging operations in Shing Mun River Channel, Sha Tin 111/18 09/07/18 Temporary Establishment of Acoustic Monitors for Dolphin Survey in the Western Waters of Hong Kong 120/18 25/07/18 121/18 27/07/18 Marine Works at the East Coast of the Hong Kong International Airport Marine Works at the Black Point Power Station 129/18 13/08/18 Construction of the Tuen Mun- Chek lap Kok Link (Southern Connection) 130/18 13/08/18 Marine Works off Pak Mong, Lantau Island Marine Works at Causeway Bay Typhoon Shelter 131/18 14/08/18 Dredging operations at Tai O 132/18 14/08/18 Marine Works at Junk Bay 137/18 30/08/18 Reconstruction Works for Sharp Island Pier 141/18 04/09/18 Marine Site Investigation at Gold Coast Yacht & Country Club 143/18 07/09/18 Marine Works inside Ex-Wan Chai Public Cargo Working Area Basin 149/18 13/09/18 Breakwater Reinstatement Works at Aberdeen South Typhoon Shelter 157/18 08/10/18 Breakwater Reinstatement Works at Chai Wan Cargo Handling Basin 158/18 08/10/18 Marine Site investigation at Lai Chi Wo 162/18 10/10/18 Marine Works at Ma Tau Kok 163/18 10/10/18 Construction of the Tuen Mun- Chek lap Kok Link (Northern Connection) 165/18 15/10/18 Marine Works to the East of the River Trade Terminal Marine Works in the Hung Hom Fairway 169/18 23/10/18 Seawall Reinstatement Works at Tung Wan, Cheung Chau 170/18 23/10/18 Rock Excavation and Dredging Works in Kwai Tsing Container Basin 178/18 13/11/18 Establishment of Silt Curtains to the East of the Hong Kong International 181/18 14/11/18 Airport - - 2 (III) Marine Works MDN Issue Date Seawall Reinstatement Works at Sai Kung 189/18 04/12/18 Construction of the Hong Kong Boundary Crossing Facilities Marine Works to 190/18 05/12/18 the East of the Hong Kong International Airport Dredging Operations at Kwai Tsing Container Terminal 3 191/18 06/12/18 Removal of Wreck off Tuen Mun Typhoon Shelter, Tuen Mun 193/18 10/12/18 Geophysical Survey at Ping Chau 194/18 12/12/18 Marine Site Investigation to the Southeast of Soko Islands 195/18 12/12/18 Fender Repair Works for Dolphins in Tuen Mun Typhoon Shelter 197/18 13/12/18 Dredging Operations at Tuen Mun Public Cargo Working Area 198/18 13/12/18 Submarine Outfall Repair Works off Chai Wan 199/18 13/12/18 Marine Site Investigation near the Western and Southwestern Parts of the 200/18 19/12/18 Boundary of the Hong Kong Special Administrative Region Marine Works to the North of Sha Chau 201/18 19/12/18 Marine Works at Junk Bay 202/18 19/12/18 Removal of Wreck off Disneyland, Lautau Island 203/18 24/12/18 Marine Works at Tseung Kwan O 204/18 28/12/18 Dredging Operations to the North of Urmston Road Fairway and Castle Peak 205/18 28/12/18 Fairway (IV) Statutory Requirements and Related Information MDN Issue Date Requirement to Produce Local Certificates of Competency 139/09 15/10/09 United Nations Sanctions (Democratic People’s Republic of Korea) 8/10 15/01/10 (Amendment) Regulation 2010 Alteration to Local Vessels 86/10 21/06/10 Carriage of dangerous goods 76/11 18/07/11 Safe Operation of Sand Barges 84/11 11/08/11 Enhanced Management Mechanism for the Conveyance of Dangerous Goods by 39/12 14/03/12 Locally Licensed Vessels Ship Refuse Reception Service 135/12 20/09/12 Control of Dark Smoke Emission from Vessels 92/14 23/07/14 Report of Marine Incidents 156/14 03/12/14 Implementation of the Merchant Shipping (Limitation of Shipowners 64/15 28/04/15 Liability) (Amendment) Ordinance 2005 Prevention of Pollution by Garbage from Ships 93/15 29/06/15 Exemption of Compliance with the requirement concerning Horizontal 113/15 28/08/15 Positioning and Spacing of Lights Implementation of the Merchant Shipping (Prevention of Air Pollution) 39/16 06/04/16 Regulation on Local Vessels Guidelines on the Verification of Gross Mass of a Container with Cargo Packed 15/04/16 43/16 in Hong Kong Acceptance of Towing Voyage Survey Conducted by Non-Government 68/16 31/05/16 Surveyors - - 3 (IV) Statutory Requirements and Related Information MDN Issue Date Compulsory Third Party Risks Insurance of Local Vessels Increase on Amount of Insurance Cover 71/16 01/06/16 Implementation of the Merchant Shipping (Safety) (Signals of Distress and 86/16 24/06/16 Prevention of Collisions) (Amendment) Regulation 2016 International Shipment of Packed Containers on or after 1 July 2016 by Sea 87/16 24/06/16 Approved Weighing Equipment for Verification of Gross Mass of a Packed 28/06/16 90/16 Container Implementation of the Merchant Shipping (Prevention of Oil Pollution) 101/16 28/07/16 (Amendment) Regulation 2016 Establishment of Permanent Restricted Area within the Terminal Area of the Kai Tak Cruise Terminal under the Kai Tak Cruise Terminal Ordinance (Cap. 106/16 09/08/16 627) Implementation of the Merchant Shipping (Control of Harmful Anti-Fouling 155/16 24/11/16 Systems on Ships) Regulation Provision of Life-Saving Appliances for Class I and Class II Vessels licensed to 28/17 22/02/17 operate within Typhoon Shelters Updated Arrangements in the Recognition of Fishing Vessel Personnel Certificates for the Operation of “Guangdong/Hong Kong Mobile Fishing 92/17 30/06/17 Vessels” under the Merchant Shipping (Local Vessels) Ordinance (Cap. 548) Engagement of Competent Surveyors for carrying out Approval of Plans and Survey of Local Vessels under the Merchant Shipping (Local Vessels) 149/17 30/10/17 Ordinance (Cap. 548) Implementation of the Merchant Shipping (Limitation of Shipowners Liability) 165/17 28/11/17 Ordinance (Amendment of Schedule 2) Order 2017 Establishment of Restricted Areas and Special Areas for the Hong Kong Link 166/17 05/12/17 Road Establishment of Height Restricted Areas for the Southern Connection of Tuen 167/17 05/12/17 Mun-Chek Lap Kok Link Amendments to the Examination Rules – Navigation Simulation Assessment 11/18 26/01/18 Amendments to Vessel Traffic Services Reporting Procedures, Calling-in 23/18 15/02/18 Points, VHF Sectors and VHF Channels Implementation of the Merchant Shipping (Control of Pollution by Noxious Liquid Substances in Bulk)(Amendment) Regulation 2018; Merchant Shipping 109/18 29/06/18 (BCH Code)(Amendment) Regulation 2018; and Merchant Shipping (IBC Code)(Amendment) Regulation 2018 Speed in Restricted Zones 110/18 09/07/18 (V) Port Operations Procedures MDN Issue
Recommended publications
  • Geodiversity, Geoconservation and Geotourism in Hong Kong Global
    Proceedings of the Geologists’ Association 126 (2015) 426–437 Contents lists available at ScienceDirect Proceedings of the Geologists’ Association jo urnal homepage: www.elsevier.com/locate/pgeola Geodiversity, geoconservation and geotourism in Hong Kong Global Geopark of China Lulin Wang *, Mingzhong Tian, Lei Wang School of Earth Science and Resources, China University of Geosciences, Beijing 100083, China A R T I C L E I N F O A B S T R A C T Article history: In addition to being an international financial center, Hong Kong has rich geodiversity, in terms of a Received 22 November 2014 representative and comprehensive system of coastal landscapes, with scientific value in the study of Received in revised form 20 February 2015 Quaternary global sea-level changes, and esthetic, recreational and cultural value for tourism. The value Accepted 26 February 2015 of the coastal landscapes in Hong Kong was globally recognized when Hong Kong Global Geopark Available online 14 April 2015 (HKGG), which was developed under the well-established framework of Hong Kong Country Parks and Marine Parks, was accepted in the Global Geoparks Network (GGN) in 2011. With over 30 years of Keywords: experience gained from managing protected areas and a concerted effort to develop geoconservation and Coastal landscape geotourism, HKGG has reached a mature stage of development and can provide a well-developed Hong Kong Global Geopark Geodiversity example of successful geoconservation and geotourism in China. This paper analyzes the geodiversity, Geoconservation geoconservation and geotourism of HKGG. The main accomplishments summarized in this paper are Geotourism efficient conservation management, an optimized tourism infrastructure, a strong scientific interpretation system, mass promotion and education materials, active exchange with other geoparks, continuous training, and effective collaboration with local communities.
    [Show full text]
  • 1 Appendix 1 Issue of “2014 Hong Kong Definitive Stamps” and New
    Appendix 1 Issue of “2014 Hong Kong Definitive Stamps” and New Philatelic Products on 24 July 2014 A set of new “2014 Hong Kong Definitive Stamps” is designed by Ms. Shirman LAI and printed in lithography by Joh. Enschede B.V. of the Netherlands. “2014 Hong Kong Definitive Stamps” will be released on 24 July 2014. In parallel, “2006 Hong Kong Definitive Stamps” on the theme of birds, officially released on 31 December 2006, will continue to be on sale while stock lasts. In addition to the stamps and philatelic products of the new set of definitive stamps, an official souvenir cover and other philatelic products have been created to commemorate the concurrent sale of two sets of Hong Kong definitive stamps. They will also be released on the stamp issue day. Official First Day Covers for “2014 Hong Kong Definitive Stamps” at $1.2 each for small-sized covers and $2.2 each for large-sized covers as well as Official Souvenir Covers to commemorate the concurrent sale of the 2006 Hong Kong Definitive Stamps and the 2014 Hong Kong Definitive Stamps at $1.2 each will be on sale at all post offices from 10 July 2014. Advance orders for the additional philatelic products comprising two sets of definitive stamps can be placed at all post offices and online or mailed in from 26 May to 15 June 2014. These items and associated philatelic products will be displayed at the General Post Office, Tsim Sha Tsui Post Office, Tsuen Wan Post Office, Sha Tin Central Post Office and Tuen Mun Central Post Office from July 10.
    [Show full text]
  • GEO REPORT No. 282
    EXPERT REPORT ON THE GEOLOGY OF THE PROPOSED GEOPARK IN HONG KONG GEO REPORT No. 282 R.J. Sewell & D.L.K. Tang GEOTECHNICAL ENGINEERING OFFICE CIVIL ENGINEERING AND DEVELOPMENT DEPARTMENT THE GOVERNMENT OF THE HONG KONG SPECIAL ADMINISTRATIVE REGION EXPERT REPORT ON THE GEOLOGY OF THE PROPOSED GEOPARK IN HONG KONG GEO REPORT No. 282 R.J. Sewell & D.L.K. Tang This report was originally produced in June 2009 as GEO Geological Report No. GR 2/2009 2 © The Government of the Hong Kong Special Administrative Region First published, July 2013 Prepared by: Geotechnical Engineering Office, Civil Engineering and Development Department, Civil Engineering and Development Building, 101 Princess Margaret Road, Homantin, Kowloon, Hong Kong. - 3 - PREFACE In keeping with our policy of releasing information which may be of general interest to the geotechnical profession and the public, we make available selected internal reports in a series of publications termed the GEO Report series. The GEO Reports can be downloaded from the website of the Civil Engineering and Development Department (http://www.cedd.gov.hk) on the Internet. Printed copies are also available for some GEO Reports. For printed copies, a charge is made to cover the cost of printing. The Geotechnical Engineering Office also produces documents specifically for publication in print. These include guidance documents and results of comprehensive reviews. They can also be downloaded from the above website. The publications and the printed GEO Reports may be obtained from the Government’s Information Services Department. Information on how to purchase these documents is given on the second last page of this report.
    [Show full text]
  • Chapter 5 Provision of Aquatic Recreational and Sports Facilities
    Chapter 5 Provision of aquatic recreational and sports facilities Audit conducted a review to examine the provision and management of aquatic recreational and sports facilities by the Leisure and Cultural Services Department (LCSD) and to ascertain whether there were areas for improvement. Gazetted beaches 2. According to paragraph 2.4(a) of the Audit Report, a consultant, who carried out a coastal safety audit on the beaches of Hong Kong in 2000, had advised that the Rocky Bay Beach should be deleted from the list of gazetted beaches because of safety reason and low usage. However, the LCSD considered that de-gazetting beaches was a sensitive issue and decided not to take further action. The Committee asked about the sensitivity of the de-gazetting and whether the LCSD would de-gazette the beach. 3. In response, Ms Anissa WONG Sean-yee, Director of Leisure and Cultural Services, said that: - in deciding to close the Rocky Bay Beach because of its poor water quality, the Administration had considered whether the beach should be de-gazetted. At that time, the Administration was of the view that it should consider the development of the beach water quality. It was also concerned that the relevant District Council and beach goers might consider that they might need to observe the development of the issue for a period of time; and - taking into account the current situation of the water quality, the usage of the beach, as well as other factors, such as the usage rate of the Shek O Beach, the LCSD agreed in principle to Audit’s recommendation that the Rocky Bay Beach be de-gazetted.
    [Show full text]
  • Proposed Extension of Public Golf Course at Kau Sai Chau, Sai Kung
    Proposed Extension of Public Golf Course at Kau Sai Chau, Sai Kung Project Profile Prepared in accordance with the Environmental Impact Assessment Ordinance (Cap 499) Binnie Black & Veatch Hong Kong Ltd. The Hong Kong Jockey Club 11/F New Town Tower One Sports Road Pak Hok Ting Street Happy Valley Shatin, New Territories Hong Kong Hong Kong December 2000 Proposed Extension of Public Golf Course at Kau Sai Chau, Sai Kung Project Profile CONTENTS Page 1. BASIC INFORMATION 1 1.1 Project Title 1 1.2 Purpose and Nature of the Project 1 1.3 Name of the Project Proponent 2 1.4 Location and Scale of the Project, and History of the Site 2 1.5 The Type of Designated Project Covered in the Profile 3 1.6 Name and Telephone Number of Contact Persons 3 2. OUTLINE OF PLANNING AND IMPLEMENTATION PROGRAM 3 2.1 Planning and Implementation of the Project 3 2.2 Project Time Table 4 2.3 Considerations on Programme Requirements and Interactions 4 with Other Projects 3. POSSIBLE IMPACT ON THE ENVIRONMENT 4 3.1 Overview of the Project 4 3.2 Fisheries 5 3.3 Ecology 5 3.4 Noise and Air Quality 6 3.5 Contaminated Land 6 3.6 Generation of Solid Waste 6 3.7 Generation of Effluents 6 3.8 Traffic Generation and Marine Traffic Movements 7 3.9 Visual and Landscape Character 7 3.10 Cultural and Heritage Aspects 7 3.11 Hazard to Life 7 Name Signature Date Prepared Andrew J. Taylor Checked Richard C. Deacon December 2000 [g\report\pgc-ksc-pp-6628] i BBVHKL Proposed Extension of Public Golf Course at Kau Sai Chau, Sai Kung Project Profile Reviewed Stephen W.N.
    [Show full text]
  • Port and Marine Services
    Civil Engineering and Development Department The Government of the Hong Kong Special Administrative Region Port and Marine Services New Blake Pier at Stanley Sharp Island Pier at Sai Kung Sai Kung Public Pier CONSTRUCTION OF MARINE WORKS Apart from these, we commenced the reconstruction of Pak Kok Pier on Lamma Island in 2020, with a view to We design and construct various types of marine works, improving the berthing condition of the pier. including public piers, waterfront promenades and projects under the Pier Improvement Programme. We are also Other projects completed in the past few years include the conducting the feasibility study for the proposed construction of a riverwall at Yat Chung in Tai O, the improvement to/reconstruction of the Cheung Chau Ferry seawall upgrading works for the Ma On Shan Promenade Pier. and the widening of Tung Wan Tau Road along Silver Mine Bay Beach in Mui Wo. We also carry out improvement works to some existing public piers and landing facilities. In the past few years, we completed the construction or reconstruction of the following piers: • New Star Ferry Piers • Central Public Piers No. 9 and No. 10 • New Blake Pier at Stanley • Trio Beach Public Pier • Sai Kung Public Pier • Sharp Island Pier • Tap Mun Pier Reconstruction of Sharp Island Pier Tai O riverwall 2 CLIMATE CHANGE AND ITS IMPLICATIONS ON COASTAL STRUCTURES The emission of greenhouse gases lead to rise in global temperature and mean sea level. Extreme Sea Level Storm Surge High Tide Normal High Tide Mean Sea Level Low Tide Cyclone Storm
    [Show full text]
  • Hong Kong UNESCO Global Geopark Geopark Schools Programme (2021-2022)
    Hong Kong UNESCO Global Geopark Geopark Schools Programme (2021-2022) The Programme The Geopark Schools Programme is a key education programme of Hong Kong UNESCO Global Geopark. Working closely with local schools, Hong Kong Geopark rolls out a wide range of science popularisation activities to inspire student’s long-term interest in earth sciences, integrated with ecology and culture and to promote the concept of sustainable development. Details of the Geopark Schools Programme can be found on the official website of Hong Kong UNESCO Global Geopark and the Geopark Schools Programme FACEBOOK page. Follow us on FACEBOOK to get the latest news on the Geopark Schools Programme. https://www.geopark.gov.hk/index.htm https://www.facebook.com/geoparkscho Official website of Hong Kong UNESCO Global ols/ G e o p a r k Geopark Schools Programme on FACEBOOK Target Groups Local primary and secondary schools supporting the geoparks concept and interested in promoting science popularisation activities for students. Programme Period 1 September 2021 to 31 August 2022 Activities (Please see Annex 1 for details) 1) School talks 2) Workshops 3) Field trips 4) Others **Given the current COVID-19 situation, science workshops, outdoor field trips, and other activities are still suspended. Only online lectures or exchanges activities will be available. Such arrangement will be in place during this year until further notice. Activity Arrangements Every successful participant can make application to Hong Kong Geopark for up to 5 activities during the programme period, including not more than 2 school talks or workshops, 2 geopark land excursions and 1 geopark sea excursion, as detailed below: 1st Activity School talk: Discovering The 1st school talk must be conducted Hong Kong Geopark by 28 February 2022, otherwise the school will be deemed to have surrendered its right to hold other activities for this programme year.
    [Show full text]
  • Pre 1:40000 P1 Locations of Key Water Sensitive Receivers
    'l⁄ ^·” Pat Tsz Wo Penfold Park ‡_ Wong Chuk Wan TAI MONG TSAI Village¥d A KUNG KOK Nam A Wo Liu Hang LUK CHAU AU Long Keng 414 j⁄ Wo Liu FO TAN Tai Po 445 ‡_ PYRAMID HILL Tsai She Tau LUK CHAU SHAN ( TAI KAM CHUNG ) ¶¸ 536 314 Wong Chuk Yeung X¼ Cemetery ” Shan Liu LEGEND: õ¤´ ł¶B„¤N‡æ⁄` Pictorial Garden Tso Wo Hang t Fo Tan Village Olympic Equestrian Venue Ser Res ( Sha Tin ) ¥b ¤bs⁄¥ Lung Mei Tai Wan Shek Lung Tsai A»· Ngau Liu San Tin Hang Tai Mong Garden Vista Kak Hang Tun Tsai A` 281 J` MA ON SHAN COUNTRY PARK Lookout Sui Wo |fi k¤C Fu Tei SITE BOUNDARY t Court ”· NUI PO SHAN399 –l Keng Ser Res A A` Ravana Garden Mui Tsz Lam Pang Ha Hau Greenwood Terrace SHEK MUN A` Long Mei Lookout U⁄ ù© Lookout San Uk Ha Wo Che Ngong Ping “T Fu Yung Pit Muk Min Wo Tong Shan Tai Chau ƱY ¥| k¤C Kong w Pai Tau Hang NUI PO AU Sha Ha NEEDLE HILL W⁄ ¥bˆJ Nam Shan FLUSHING WATER INTAKE ͤR Sheung Wo Che Wo Che Shek Lung Tsai Sha Kok Mei Outward Bound Yau Oi Tsuen Estate F¨Ð¥Ä New Village School 532 û¤ Lap Sap SHING MUN Ngau Au T­W© j⁄ Kap Pin Long City One Shatin New Village Chau RESERVOIR n« Mau Ping 372 Tai Shui Tseng WSD1 - KOWLOON SOUTH wý TAI SHEK KWU Nam Shan Lo Uk D¹· Lek Yuen Kap Pin Long To Fung Shan Estate C Ʊ aª r´Ð ¥j T­ M©y t Pai Tau Sw P Shek Kwu Lung Ser Res YUEN Yue Tin «ø T­W© Mau Ping 314 Wo Yi Hop Court j¤Å Mau Ping Tan Cheung CHAU KOK Castello Tai Lam Liu 300 ⁄ 70 San Uk A» Ð¥ Wong Uk ¶d ¥ Kwun Tsoi Pai Tin Liu s•«« p¤w Wong Nai Tau SHEK NGA SHAN Yau Ma Po New Town Siu Lek Tai Ping ‹Q Pristine Villa Plaza s¼½ j¤ 540 j¤| r´A Yuen
    [Show full text]
  • Study on South East New Territories Development Strategy Review - Draft Recommended Development Strategy
    LC Paper No. CB(1)514/00-01(03) For discussion on 5.2.2001 LegCo Panel on Planning, Lands and Works Study on South East New Territories Development Strategy Review - Draft Recommended Development Strategy PURPOSE 1. This paper presents an overview of the draft Recommended Development Strategy (RDS) for South East New Territories (SENT) sub-region for Members' discussion and comments. BACKGROUND 2. The current sub-regional plan for SENT, covering Sai Kung and Tseung Kwan O Districts, was completed in 1989 and has become out-dated. The Study on SENT Development Strategy Review was commissioned in March 1999 to formulate an up-to- date planning and development strategy for the sub-region up to year 2016, in particular to facilitate conservation, tourism and recreation development. Since Tseung Kwan O is already the subject of a separate on-going new town development study, the Study concentrates its investigation on the Sai Kung District and its interface with the New Town. STUDY PROCESS 3. The Study has been conducted in four integrated stages, with the first three stages largely completed, as follows: (a) Stage 1: Planning information and baseline data were compiled which provided the basis to identify constraints, opportunities and key issues of the Study Area. (b) Stage 2: Concept plans were prepared for generation of three Initial Development Options with emphasis on conservation (upgrading), recreation (moderate development) and tourism (high growth). The "Recreation" option was found to outperform the other two options. While these options were not mutually exclusive, the “Recreation” option was further improved by incorporating beneficial components identified in other options.
    [Show full text]
  • Marine Protected Areas
    MARINE PROTECTED AREAS THE ISSUE Hong Kong's special geographic location and hydrographic conditions contribute to the region’s diverse and productive coastal habitats. To date, close to 6,000 marine species have been recorded in Hong Kong, which makes the city's biodiversity comparatively rich compared to many other regions of the world. However, this currently face numerous threats from development, unregulated fishing practices, escalating marine traffic, and marine litter. Other threats loom: a total of 2,000 hectares of local waters are planned for reclamation and development in the decades ahead. Not only is the marine biodiversity in local waters at stake, but some previously common commercially important fish species are close to extirpation. Currently only 5% of Hong Kong waters are designated or planned as marine protected areas (MPA) by 2023, which is grossly inadequate to conserve Hong Kong’s precious marine resources, especially after decades of intense coastal development. Less than 0.1% are true no-take zones. The rest of Hong Kong’s coastal waters receive little or no protection. This is in stark contrast to the protected land network where 40% of the land is designated as country parks in Hong Kong. Properly managed MPAs can play a critical role in both protecting biodiversity and generating many social and economic benefits within and outside their boundaries. A 20-year overview of Hong Kong’s marine parks system found numerous shortcomings: • No clear target or date for future MPA areas; • No transparent long-term MPA health check data; • Minimal stakeholder involvement; • No clear management plan for the existing MPAs; • No proactive, science-based MPA selection process; and, • Fishing with permits is still allowed in the vast majority of MPAs.
    [Show full text]
  • Figure 14.5.2 Locations of Key Water Sensitive Receivers
    'l⁄ ^·” Pat Tsz Wo Penfold Park ‡_ Wong Chuk Wan TAI MONG TSAI Village¥d A KUNG KOK Nam A Wo Liu Hang LUK CHAU AU Long Keng 414 j⁄ Wo Liu FO TAN Tai Po 445 ‡_ PYRAMID HILL Tsai She Tau LUK CHAU SHAN ( TAI KAM CHUNG ) ¶¸ 536 314 Wong Chuk Yeung X¼ Cemetery ” Shan Liu LEGEND: õ¤´ ł¶B„¤N‡æ⁄` Pictorial Garden Tso Wo Hang t Fo Tan Village Olympic Equestrian Venue Ser Res ( Sha Tin ) ¥b ¤bs⁄¥ Lung Mei Tai Wan Shek Lung Tsai A»· Ngau Liu San Tin Hang Tai Mong Garden Vista Kak Hang Tun Tsai A` 281 J` MA ON SHAN COUNTRY PARK Lookout Sui Wo |fi k¤C Fu Tei SITE BOUNDARY t Court ”· NUI PO SHAN399 –l Keng Ser Res A A` Ravana Garden Mui Tsz Lam Pang Ha Hau Greenwood Terrace SHEK MUN A` Long Mei Lookout U⁄ ù© Lookout San Uk Ha Wo Che Ngong Ping “T Fu Yung Pit Muk Min Wo Tong Shan Tai Chau ƱY ¥| k¤C Kong w Pai Tau Hang NUI PO AU Sha Ha NEEDLE HILL W⁄ ¥bˆJ Nam Shan FLUSHING WATER INTAKE ͤR Sheung Wo Che Wo Che Shek Lung Tsai Sha Kok Mei Outward Bound Yau Oi Tsuen Estate F¨Ð¥Ä New Village School 532 û¤ Lap Sap SHING MUN Ngau Au T­W© j⁄ Kap Pin Long City One Shatin New Village Chau RESERVOIR n« Mau Ping 372 Tai Shui Tseng WSD1 - KOWLOON SOUTH wý TAI SHEK KWU Nam Shan Lo Uk D¹· Lek Yuen Kap Pin Long To Fung Shan Estate C Ʊ aª r´Ð ¥j T­ M©y t Pai Tau Sw P Shek Kwu Lung Ser Res YUEN Yue Tin «ø T­W© Mau Ping 314 Wo Yi Hop Court j¤Å Mau Ping Tan Cheung CHAU KOK Castello Tai Lam Liu 300 ⁄ 70 San Uk A» Ð¥ Wong Uk ¶d ¥ Kwun Tsoi Pai Tin Liu s•«« p¤w Wong Nai Tau SHEK NGA SHAN Yau Ma Po New Town Siu Lek Tai Ping ‹Q Pristine Villa Plaza s¼½ j¤ 540 j¤| r´A Yuen
    [Show full text]
  • Water Taxis in Hong Kong: Their Potential and Future
    Water Taxis in Hong Kong: Their Potential and Future An Interactive Qualifying Project submitted to the Faculty of WORCESTER POLYTECHNIC INSTITUTE in partial fulfilment of the requirements for the degree of Bachelor of Science by Daniela Baez Josie Brashaw Marco Intelandi Connor McNamara Date: 2 March 2018 Report Submitted to: Paul Zimmerman Designing Hong Kong Margaret Brooke, Kira Brownlee, Cynthia Chan, Jackson Hui Harbour Business Forum Professor Thomas Balistrieri (Co-Advisor) and Professor Stephan Sturm (Co-Advisor) Worcester Polytechnic Institute This report represents work of WPI undergraduate students submitted to the faculty as evidence of a degree requirement. WPI routinely publishes these reports on its website without editorial or peer review. For more information about the projects program at WPI, see http://www.wpi.edu/Academics/Projects. ABSTRACT This project, completed at the WPI Hong Kong Project Center in collaboration with the Harbour Business Forum and Designing Hong Kong, evaluates the future of water taxis in Victoria Harbour. Water taxis exist in Hong Kong, and our team found that there is demand for this service; we observed and interviewed providers of current water taxi type services as well as gauged public interest through a survey. Based on frequent consultation with public and private stakeholders, we developed a vision for the future of water taxis. We recommend a phased development plan for the organization of water taxis in Hong Kong. ii ACKNOWLEDGEMENTS We would like to thank all of the following organizations and individuals for helping with the completion of this project: DESIGNING HONG KONG AND THE HARBOUR BUSINESS FORUM: In particular, thank you to our liaisons, Margaret Brooke, Kira Brownlee, Cynthia Chan, Jackson Hui, and Paul Zimmerman, for providing us with constant support, contacts, and feedback.
    [Show full text]