Forest Division Obedullaganj, Distt. Raisen

Total Page:16

File Type:pdf, Size:1020Kb

Forest Division Obedullaganj, Distt. Raisen ~ m<i>R CfiT 31mlJT) 174/2 ,~IFchi<T\JI'(, ~ ire 1 cf> ~,3W:JR;r46 2024 . .:> a:r ~:+91 (755) 4295368 JIT, 2770550 m.: 9752417 902 $'-if<;r: cpm .v [email protected] No.12.2 BKA-BI\JIjWorks. Corres Date:-26.09.2016 To, DFO, Obedullaganj & (Nodal Officer) Forest Division Obedullaganj, Distt. Raisen Sub: -Submission of documents in connection with Forest Clearance application of RVNL Bhopal for the Project "Construction of Electrified 3rdRailway Line Between Barkheda(Excl) KM 789.43-Budni (Excl) KM 770.040 on Bhopal ­ ) Itarasi route of Bhopal Division of West Central Railway in the State of Madhya-Pradesh, India , Ref: (i) Your L/No.Ma.CHI/16/1228 dt.0~.05.16 & Ma.Chi./16/1974 dt. 11.08.16 (ii) This office L/No. 12.2 BKA-BNI/Works- Corre dt, 09.08.2016 In reference to above, the original copy of FRA certificate (hard copy) issued by DC Raisen & DC Sehore was submitted to your office vide this office letter under reference (ii) and soft copy of same was also Emailed to you on 10.8.2016 through E-Mail ([email protected]). The soft copy of KML file for Compensatory afforestation was also mailed on 26.08.2016 through EMail ([email protected]). The hard & soft copy of the mobile mapping has ('llre('ldy submitted in First week of June, 2016 to your office through Mr. Nayak, CDM Office of the DFO Obedullaganj. In reference to your letter under reference, following documents are being submitted to you for necessary action please­ (i) Hard & soft copy of Gram Sabha certificate of Gram Panchayat Karmauda(D ~~;' 0 ) (ii) Soft Copy of the FRA certificate submitted to you on 10.8.2016 (iii) Soft copy of Mobile mapping showing area of forest land to be acquire in Obedullaganj Forest Division, Distt. Raisen & its paper print (one copy) (iv) Soft copy of Mobile mapping showing area of land to be acquired in Sehore Forest Division, Distt. Sehore & its paper print (one copy) (v) Soft copy of KML file for Compensatory afforestation & paper print (one copy) (vi) Old format Forest Application Form I duly filled & signed by User Agency (six copy) (vii) Old format Forest Application Form II (DFO part) signed by User Agency (six copy) (viii) Scanned copy of Forest map showing proposed third line & area of forest and revenue land Lu be acquired ( 1 In 250,000) scale & 15 Lu~i~s ~d~~1 ~IiIIL ill A4 size (ix) Scanned copy of Alternative alignment map & its paper print 15 copy in A4 size Therefore, it is my humble request to kindly upload all relevant documents on line, related to the Construction of 3rd Rly. Line bet. Barkheda-Budni at the earliest. DA: - As above in pages lIo I r~ ) ~ Mukesh Gupta AGM P-I, Bhopal Copy to: (i) CCF/Forest Circle, Bhopal - for kind information please. (ii) CCF/LM, Satpura Bhawan, Bhopal -for kind information please in reference to his L/No. F-5/Meeting /RaiIj2016/10-11/1866, Bhopal dt. 01.09.2016 (iii) ACF/LM & Nodal Officer- for kind information & necessary action please. (iv) Distt. Collector /Raisen- For kind information & request to up load on line NOC & FRA certificate (v) Distt. Collector /Sehore- For kind information & request to up load on line I'JOC & FRA certificate (vi) DFO/Sehore --for kind information & request to provide the necessary details to l\Joda I Officer , ,'" '£)-:-~ b ~ e j .- Mukesh Gupti3 ....., AGM P-I, Bhopal .
Recommended publications
  • Construction of 6-Lane Bhopal – Indore Green Field Expressway – 146.880 Kms in the State of Madhya Pradesh Alternative Option Analysis- Annexure-III
    Construction of 6-Lane Bhopal – Indore Green Field Expressway – 146.880 Kms in the State of Madhya Pradesh Alternative Option Analysis- Annexure-III Criteria for Fixing Alignment for Expressways 1. The Expressway between two terminal stations should be short and straight as far as possible, but due to engineering, social and environmental considerations some deviations may be required. 2. The project should be constructible and easy to maintain; the Greenfield project should reduce the vehicle operation cost with respect to the existing option already available i.e. using the NH/SHs in combination to reach from point A to point B. 3. It should be safe at all stages i.e. during design, construction and operation stages. Safety audits at each stage should confirm the same. 4. The project initial cost, maintenance cost, and operating cost should be optimum so as to be considered economical with respect to its options. 5. The alignment should be finalised giving due consideration to sitting/location of major structures including Major/Minor Bridges, Interchanges and ROBs. The space requirement of interchanges to be kept into consideration to avoid major resettlement. 6. Tunnel / Box cutting of Hills should be considered as the last option and should be provided only when it is absolutely necessary. 7. The location of spurs for connecting the important towns to be decided while fixing the alignment Options. 8. The alignment should follow the unused / barren land to the extent possible to reduce the cost of land acquisition. 9. The proposed options in the present case connects the under developed regions of Madhya Pradesh which would lead to the development of new growth centres along the proposed highway i.e.
    [Show full text]
  • Nagar Parishad, Rehti District - Sehore (M.P.) Map Title
    77°24'40"E 77°25'0"E 77°25'20"E 77°25'40"E 77°26'0"E 77°26'20"E 77°26'40"E 77°27'0"E Nagar Parishad, Rehti District - Sehore (M.P.) Map Title ! ! j ! ! CITY BASE MAP ! n N ! N ! " ! a " ! ! 0 0 ! ! g ! 2 2 ! ! ' a ' ! l ! ! 5 l 5 ! ! ! 4 ! u 4 ! ° ° ! ! ! 2 d 2 ! ! ! i ! 2 2 ! ! a ! ! ! ! b Legend ! ! ! ! ! O ! ! ! ! ! ! % ! o ! ! ! T ! ! ! ! ! ! ! ! ! ! ! ! ! Important Landmarks ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! Municipal Area Boundary ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! !! ! ! ! ! ! ! ! t ! ! ! c ! ! a ! ! Railway Line ! ! y ! ! z ! ! r a ! ! ! e ! B ! ! v ! ! a i ! i ! l ! ! ! R a ! ! ! p ! r ! i National Highway ! ! a ! P ! ! ! b ! o ! ! ! T b # ! ! ! a ! Tehsil ! ! ! B ! ! ! ! ! State Highway ! o ! ! ! ! ! ! ! ! ! ! T ! ! ! ! ! ! ! ! N ! N ! ! " ! ! " ! ! ! ! ! 0 0 ! ! ' ! ! ! ' ! ! ! ! ! 5 5 ! ! ! ! ! ! ! 4 ! 4 ! ! ! ! ! ° ! ° ! ! ! ! ! ! 2 2 ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! 2 ! 2 Major Road ! ! ! ! ! ! ! ! ! ! ! # ! ! ! ! ! ! ! ! Aara Machine ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! 2 ! 2 ! ! - ! ! ! Other Road H S ! ! ! ! ! ! ! j ! ! ! ! ! ! ! ! ! ! River se # ! u Ware Ho ! ! ! ! ! ! ! ! ! j ! ! ! # ! ! ! ! Balbir Singh House ! ! ! ! ! Drainage / Nala ! ! ! ! # ! ! ! Maulana Steel Fabrication ! ! Ay j # odhya Bas ! ! ti ! ! ! ! ! ! ! ! ! ! ! Canal ! ! ! ! # ! ! Salma Bee ! ! r ! ! e ! ! v ! i d oa ! R ! R ! r ya ! i ! a ad ! r ! b Bu Holkar Singh # Pond / Tank / Reservoir Ho ! b i use ! a nd ! u ! N B Ga N ! " " ! ! 0 0 ! ! 4 4 ' ' ! ! 4 4 ! ! 4 4 ! ! ° ° ! 2 2 ! ! 2 2 # ! ! ! !
    [Show full text]
  • Lions Clubs International Club Membership Register
    LIONS CLUBS INTERNATIONAL CLUB MEMBERSHIP REGISTER SUMMARY THE CLUBS AND MEMBERSHIP FIGURES REFLECT CHANGES AS OF DECEMBER 2018 MEMBERSHI P CHANGES CLUB CLUB LAST MMR FCL YR TOTAL IDENT CLUB NAME DIST NBR COUNTRY STATUS RPT DATE OB NEW RENST TRANS DROPS NETCG MEMBERS 4950 026289 BHOPAL INDIA 3233G2 4 12-2018 91 0 0 0 -32 -32 59 4950 026346 UJJAIN INDIA 3233G2 4 12-2018 53 8 3 0 -4 7 60 4950 026347 VIDISHA INDIA 3233G2 4 12-2018 61 0 1 0 -3 -2 59 4950 031720 KHACHRAUD INDIA 3233G2 4 12-2018 20 0 0 0 -1 -1 19 4950 031897 NAGDA INDIA 3233G2 4 12-2018 40 0 0 0 0 0 40 4950 035870 SAGAR INDIA 3233G2 4 11-2018 35 0 0 0 0 0 35 4950 036632 BHOPAL SOUTH INDIA 3233G2 4 12-2018 68 1 0 0 -8 -7 61 4950 037290 BHOPAL HILLTOP-IDGAH INDIA 3233G2 4 12-2018 15 0 0 0 -4 -4 11 4950 038742 TIKAMGARH INDIA 3233G2 4 12-2018 55 4 0 0 0 4 59 4950 039478 BHOPAL BEHL INDIA 3233G2 4 12-2018 54 0 0 0 0 0 54 4950 039479 TARANA INDIA 3233G2 4 12-2018 37 0 0 0 0 0 37 4950 039590 BETUL CITY INDIA 3233G2 4 12-2018 46 6 1 0 -2 5 51 4950 040065 SARANGPUR INDIA 3233G2 4 12-2018 28 0 0 0 0 0 28 4950 050230 BAIRAGARH GREATER INDIA 3233G2 6 12-2018 5 0 0 0 -5 -5 0 4950 052069 BHOPAL LAKE CITY INDIA 3233G2 4 12-2018 54 0 0 0 -6 -6 48 4950 053166 BHOPAL CAPITAL INDIA 3233G2 4 12-2018 10 0 0 0 -3 -3 7 4950 054428 BHOPAL COUPLE INDIA 3233G2 4 12-2018 50 0 0 0 0 0 50 4950 055778 UJJAIN AWANTIKA INDIA 3233G2 4 12-2018 36 0 0 0 0 0 36 4950 056205 BHOPAL CLASSIC INDIA 3233G2 4 09-2018 44 0 0 0 0 0 44 4950 056305 BHOPAL PRATAP INDIA 3233G2 4 12-2018 39 0 0 0 0 0 39 4950 056608 NAGDA
    [Show full text]
  • Bank Wise-District Wise Bank Branches (Excluding Cooperative
    Bank wise-District wise Bank Branches (Excluding Cooperative Bank/District No. of Branches Allahabad Bank 205 Agar-Malwa 2 Anuppur 2 Balaghat 4 Bhopal 25 Burhanpur 1 Chhatarpur 3 Chhindwara 8 Damoh 3 Datia 1 Dewas 1 Dhar 1 Dindori 1 East Nimar 1 Gwalior 3 Harda 1 Hoshangabad 3 Indore 12 Jabalpur 24 Katni 6 Mandla 4 Mandsaur 2 Morena 1 Narsinghpur 7 Neemuch 2 Panna 3 Raisen 1 Rajgarh 2 Ratlam 2 Rewa 16 Sagar 6 Satna 28 Sehore 2 Seoni 2 Shahdol 3 Shajapur 1 Shivpuri 2 Sidhi 5 Singrauli 6 Tikamgarh 1 Ujjain 2 Vidisha 4 West Nimar 1 Andhra Bank 45 Betul 1 Bhind 1 Bhopal 8 Burhanpur 1 Chhindwara 1 Dewas 1 Dhar 1 East Nimar 1 Gwalior 2 Harda 1 Hoshangabad 2 Indore 11 Jabalpur 3 Katni 1 Narsinghpur 2 Rewa 1 Sagar 1 Satna 1 Sehore 2 Ujjain 1 Vidisha 2 Au Small Finance Bank Ltd. 37 Agar-Malwa 1 Barwani 1 Betul 1 Bhopal 2 Chhatarpur 1 Chhindwara 2 Dewas 2 Dhar 2 East Nimar 1 Hoshangabad 1 Indore 2 Jabalpur 1 Katni 1 Mandla 1 Mandsaur 2 Neemuch 1 Raisen 2 Rajgarh 1 Ratlam 2 Rewa 1 Satna 1 Sehore 2 Shajapur 1 Tikamgarh 1 Ujjain 1 Vidisha 2 West Nimar 1 Axis Bank Ltd. 136 Agar-Malwa 1 Alirajpur 1 Anuppur 1 Ashoknagar 1 Balaghat 1 Barwani 3 Betul 2 Bhind 1 Bhopal 20 Burhanpur 1 Chhatarpur 1 Chhindwara 2 Damoh 1 Datia 1 Dewas 1 Dhar 4 Dindori 1 East Nimar 1 Guna 2 Gwalior 10 Harda 1 Hoshangabad 3 Indore 26 Jabalpur 5 Jhabua 2 Katni 1 Mandla 1 Mandsaur 1 Morena 1 Narsinghpur 1 Neemuch 1 Panna 1 Raisen 2 Rajgarh 2 Ratlam 2 Rewa 1 Sagar 3 Satna 2 Sehore 1 Seoni 1 Shahdol 1 Shajapur 2 Sheopur 1 Shivpuri 2 Sidhi 2 Singrauli 2 Tikamgarh 1 Ujjain 5 Vidisha 2 West Nimar 4 Bandhan Bank Ltd.
    [Show full text]
  • CEO Madhya Pradesh
    General Elections to Lok-Sabha -2019 (Madhya Pradesh) Parliamentary Assembly Returning Offricer ARO DEO Constituency Constituency District Name Division Name No. Name Name E-Mail Contact No. No. Name Officer Name E-Mail Contact No. Officer Name E-Mail Contact No. Shri. Devendra devendrasingh52 1Morena 1Sheopur 9806126292 SHEOPUR CHAMBAL Pratap singh [email protected] Shri Basant dmsheopur@m 9425064030 kurre p.nic.in erovjrsheopur@g 1 Morena 2 Vijaypur Shri Saurabh Mishra 8959575348 SHEOPUR CHAMBAL mail.com sdmsabalgarh@g 1 Morena 3 Sabalgarh Mr. Mrinal Meena 9111466449 MORENA CHAMBAL mail.com sdmjoura20@gm 1MorenaMs. Priyanka dmmorena 4 Joure Mr. Vinod Singh 9425338594 MORENA CHAMBAL 7898332844 ail.com Das @nic.in prakashkasbe59 1 Morena 5 Sumawali Mr. Prakash Kasbe 9425038737 MORENA CHAMBAL @gmail.com Ms. Priyanka dmmorena@ni 7898332844 suresh.jadav4@g Das c.in 1 Morena 6 Morena Mr. Suresh Jadhav 9893504461 MORENA CHAMBAL mail.com Shri. Suresh Kumar dimini07morena 1Morena 7Dimani 9926044085 MORENA CHAMBAL Barahdiya @gmail.com sdmambah123@ 1 Morena 8 Ambah (SC)Mr. Neeraj Sharma 9826248644 MORENA CHAMBAL gmail.com [email protected] 2 Bhind (SC) 9 Ater Shri Siddharth Patel 9754846815 BHIND CHAMBAL om ro.bhind1@gmail 2 Bhind (SC) 10 Bhind Shri H.B.Sharma 9425743666 BHIND CHAMBAL .com Shri Iqbal ro.lahar1@gmail. Dr vijay [email protected] 2Bhind (SC) 11Lahar 9893708227 BHIND 8435333095 CHAMBAL Mohammad com Kumar J. n ro.mehgaon@gm 2 Bhind (SC) 12 Mehgaon Shri M. K. Sharma 9424314844 BHIND CHAMBAL Shri Dr. vijay dmbhind@n ail.com 8435333095 Kumar J. ic.in ro.gohad@gmail. 2 Bhind (SC) 13 Gohad (SC)Shri D.K.
    [Show full text]
  • Barkatullah University, Bhopal 2019-2020
    BARKATULLAH UNIVERSITY, BHOPAL FACULATY -- Eduacation Course - -B.Ed. M.ed. BA-BED., BSC.-B.ED (DEGREE COURSE) FACULATY -- PHYSICAL EDUCATION -- BPED. M.P.ED. BPES, (3YDC) 2019-2020 SNo Code Name of College Status Courses Seat Fee 2018 -19 Req. 2019-20 dues + TOTAL 25% Let FEE 1. 023 Indira Priya darshani College, Temp. BPED 50 20000 ------ VIP Road Khanu Goan, MPED 30 25000 ------ Bhopal BPE 15000 ------ 60000 2. Indira Priyadarshini College Temp. BED 100 20000 ------- ------- Pura Chhindwra, 2014 Affili. B.Ed. - ii 57500 71875 91875 Biaora Road Bhopal 3. 063 VNS College of Physical Temp. BPE III 50 15000 ------ ------ Education, 1995 BPED 30 20000 ------ ------ Neelbad Road, Bhopal MPED 100 5000 ------ ------ BED 100 20000 Affili. B.Ed. - ii 57500 71875 131875 4. Rajeev Gandhi College, Perm. BED 100 20000 Trilanga Colony, Temp. BPES III 15000 ---- ---- E-8 Shahpura, Bhopal BPED 70 20000 ---- ---- MPED 30 25000 ---- ---- MED 50 25000 ---- ---- Affili. B.Ed. - ii 57500 71875 176875 5. Bhopal Degree College, Temp. BED 100 20000 ------- ------- 393 Ashok Vihar, Ashoka Affili. B.Ed. - ii 71875 91875 Garden, Bhopal 6. Bonnie Foi College , Narela Temp. BED 150 20000 -------- Shankari, MED 50 25000 ---------- ------- By Pass Road, Ayodhya Affili. B.Ed. - ii 57500 71875 116875 Nagar, Bhopal 7. 028 Johri Prof essional College Temp. BED 100 Seats 20000 ------- ------- Rajat Nagar, 2007 Affili. B.Ed. - ii 71875 91875 Narli Shankari, Bhopal 8. Shashib College of Science & Temp. BED 100 Seats 20000 ------- ------- Management, Affili. B.Ed. - ii 71875 91875 Parvaliya Sadak, Bhopal BED.MED. BA-BED AND OTHER Collges FEE Page 1 9. Takshila College, Jhirniya 2004 BED 100 Seats 20000 ------- ------- Biaora Road, NH-12,Bhopal Temp.
    [Show full text]
  • Madhya Pradesh Size:( 5.5
    37th Meeting of the Central Sanctioning cum Monitoring Committee(CSMC) under Pradhan Mantri Awas Yojana - Housing For All rd Urban Development & Housing Department 23 August, 2018 Government of Madhya Pradesh Indicators Current Status (No.) . Cities Approved 378 . Demand Survey Completed 378 . Total Demand 11.52 Lakh . Demand received through Common Service Centre 4,44,606 and Online Application . Cases accepted/rejected 2,07,397 . Whether HFAPoA Submitted Yes, For all 378 Towns . Whether AIP Submitted Yes 10,49,665 Surveyed Data Entries have been entered in PMAY . Whether HFAPoA & AIP entered in MIS MIS . SLTC/CLTC staffs approved vs. placed SLTC:10 vs 10 / CLTC: 454 vs 521 Sanctioning: 2.47 Lakh DUs (Excluding CLSS) . Target of DUs in 2018-19 Completion: 5.00 Lakh DUs As per provision of GoI matching budgetary provisions is . State Budgetary Provision for PMAY (U) in 2018-19 ensured in state budget 2 Indicators Current Status (No.) .Survey entry made (%) 87.60% .Projects approved: 887 .Projects entered (7A/B/C/D) 851 .DUs approved under BLC 3,47,242 (Excluding 35,475 Surrendered DUs) .Beneficiaries attached 3,04,186 .Geo-tagged Points 6,77,539 (No. of Unique Houses Geo-Tagged: 2,56,075) 3 Grounded for Construction / In-Progress EWS Work Verticals Houses Tendered Order Completed Approved Issued Foundation Lintel Roof Total AHP 1,49,645 48,499 1,01,146 58,816 18,643 5,748 83,207 17,939 (Including RAY) BLC (N) 3,47,242 - - 1,24,110 26,775 18,767 1,69,652 97,313 ISSR 2,172 960 - - - - - - CLSS 11,616 - - - - - - 11,616 (Including LIG/MIG)
    [Show full text]
  • LIST of MINING PROJECTS - MPSEIAA PENDING S.No
    LIST OF MINING PROJECTS - MPSEIAA PENDING S.No. Case No Category Name of Project Proponent Activity 1 22/2008 1(a) Jai Minerals Sindursi Laterite and Haematite mine 9.0 ha.. at 1(a) village, Sindursi Tehsil, Sihora Distt. Jabalpur M.P. 2 27/2008 1(a) M.P Lime works Jabalpur Mining lease area 10.60 h Mining of Dolomite 1(a) 6707 ton. Seoni, Distt. Jabalpur , M.P 3 65/2008 1(a) M/s Ismail and Sons MissionChowk, Bauxite, laterite and fire clay mine 25.19 ha.Village 1(a) Katni M.P . Kubin Teh- Maihar, Satna M.P. 4 96/20081 1(a) M/sNirmala Minaral Pathale ward- Agaria Iron ore mine 20.141. ha. Village Agaria (a) Katni M. P. Teh- Sehora Jabalpur M.P 5 119/2008 1(a) Western coalfields Ltd, Coal estate, Harradounder ground coal mines 27-45 ha. at Teh- 1(a) Civil Lines, Nagpur Junerdeo ChhindwaraM.P. 6 154/2008 1(a) Mohini Industries, Gandhiganj, Manganese ore mine 18.68 hect. Vill- Lodhikhera 1(a) Chhindwara M.P. Teh- Souncer, Distt.Chindwara M.P. 7 158/2008 1(a) M/s Haryana Manganese mine 18.68 hect. Vill-Lodhikhera Teh- 1(a) MineralsGandhiganj,Chhindwara Souncer, Distt-Chhindwara M.P. M.P. 8 161/2008 1(a) M/s Kamadigiri store crusher Udyog Quarry Lease 20,000 MTPA stone mine 161 43.0 1(a) Brij Kishore Sharma Bhind M.P. ha. Vill-Dang, Teh-Gohad, Distt-Bhind M.P. 9 184/2008 1(a) Ghanshyam Das Mahawar 95 Fireclay, Laterite & silica's and mine 8.00 hact.at 1(a) Cantt.Sadar, Jabalpur vill-Pindari Teh-Dhimarkhera, Katni M.P.
    [Show full text]
  • 30. Milk Chilling Infrastructure Expansion in District Sehore
    Success Story of Milk Chilling infrastructure expansion in district Sehore under Rastriya Krishi Vikas Yojana. Background Dairying was hardly known as an organized activity at the time of formation of the State of Madhya Pradesh in 1956. The dairy trade was unorganized and largely under the control of milk traders, middlemen and vendors. Dairying, as an allied activity to agriculture, provides many rural families with their only source of continuous income. Lately, the concept has undergone a lot of change owing to the participative and interactive approach having been organized on proper lines as an integrated and inter-linked activity involving production, processing and marketing. Bhopal Sahakari Dugdh Sangh Maryadit, Bhopal a regional cooperative milk producers' entity, affiliated to MP State Cooperative Dairy Federation Ltd., Bhopal, was established in the year 1976. The milk union was aimed at establishing dairying network and related processing & chilling infrastructure in the ambit of Bhopal milkshed thus covering 11 districts, 68 Tehsils and Blocks. Since then, the milk union has developed manifold and currently has the spread of following in its fold - 1. Fluid Milk Dairy plant of 1.50 Lakh Litres Per day capacity, 2. Cattle Feed plant of 100 Metric Ton per day manufacture capacity 3. 16 milk Chilling Centers in the milkshed area. In addition, currently (in November 2011) the Bhopal milk union has 1,263 functional Dairy Cooperative Societies collecting an average of 2,36,273 liters daily from its 62,328 milk producer members. The member classification represents 22% General, 68% OBC, 8% Scheduled Caste and 2% Scheduled Tribe category.
    [Show full text]
  • The District Collector, Sehore District, Sehore, Madhya Pradesh
    FCA Proposal for Kandla Gorakhpur Pipeline (KGPL) Project of IHB Pvt Ltd (Dumad - Bhopal Section) A PROPOSAL UNDER FOREST (CONSERVATION) ACT, 1980 The District Collector, Sehore District, Sehore, Madhya Pradesh Kandla Gorakhpur Pipeline (KGPL) Project: Request for issuing certificate regarding Diversion of forest land for non-forest purpose under the Forest (Conservation) Act. 1980 – Ensuring compliance of the Scheduled Tribes and Other Traditional Forest Dwellers (Recognition of Forest Rights) Act, 2006 – communication of guidelines to the project establishment. By IHB Private Limited Project Office, WRPL, KOYALI Qtr. No. 3/120, Gujarat Refinery, Township Po.: Jawaharnagar-391320, Vadodara (Gujarat), Phone: (o) 0265 - 2230557, 2230125, 2230566, 2230102 Private Limited IHB/ MP/DBPL/2020/003 Date: 12.03.2020 To, The District Collector, Sehore District, Sehore, Madhya Pradesh Subject: Kandla Gorakhpur Pipeline (KGPL) Project: Request for issuing certificate regarding Diversion of forest land for non-forest purpose under the Forest (Conservation) Act. 1980 – Ensuring compliance of the Scheduled Tribes and Other Traditional Forest Dwellers (Recognition of Forest Rights) Act, 2006 – communication of guidelines to the project establishment. Ref: - 1. Online application no. FP/MP/Others/42797/2019 2. GoI, MoEF, New Delhi F. No. 11-9/98-FC(Pt.) dated 03.08.2009 3. GoI, MoEF, New Delhi F. No. 11-9/98-FC(Pt.) dated 05.02.2013 4. GoI, MoEF, New Delhi F. No. 11-9/98-FC(Pt.) dated 05.07.2013 5. GoI, MoEF, New Delhi F. No. 11-9/98-FC(Pt.) dated 15.01.2014 Copies of MoEF, GoI. New Delhi references cited are enclosed herewith for your ready reference.
    [Show full text]
  • Y CURRENT a PPLICATION NUMBER INSTITUTE NAME
    CURRENT_A PPLICATION_ NUMBER INSTITUTE_NAME INSTI_ADDRESS INSTI_STATE INSTI_WEBSITE TECHNOCRATS INSTITUTE OF IN FRONT OF HATHAIKHEDA DAM, POST 1-396057225 TECHNOLOGY PIPLANI, P.B. NO. 24, BHEL Madhya Pradesh www.titbhopal.net BEHIND DR.H.S.GOUR UNIVERSITY, N.H.-26, NARSHINGPUR ROAD, SWAMI VIVEKANAND INSTITUTE SIRONJA, 1-396064472 OF TECHNOLOGY, SAGAR SAGAR (M.P.) 470228 Madhya Pradesh www.svnitmp.com TRUBA INSTITUTE OF ENGINEERING & INFORMATION 1-396077204 TECHNOLOGY KAROND-GANDHI NAGAR, BY PASS ROAD Madhya Pradesh www.trubainstitute.ac.in RADHARAMAN INSTITUTE OF BHADBHDA ROAD, FATEHPUR DOBRA, 1-396649415 TECHNOLOGY AND SCIENCE RATIBAD Madhya Pradesh www.radharamanbhopal.com SRI SATYA SAI INSTITUTE OF SH-18,BHOPAL INDORE ROAD,OPP. OIL 1-396697631 SCIENCE & TECHNOLOGY FED PLANT,PACHAMA SEHORE(MP) Madhya Pradesh www.sssist.org JAWAHARLAL NEHRU COLLEGE N.H.-7, NEAR BYPASS CROSSING 1-396790811 OF TECHNOLOGY RATAHRA,,( REWA (M.P.)) Madhyya Pradesh www.jnctrewa.orgjg TRUBA COLLEGE OF SCIENCE & 1-396798671 TECHNOLOGY KAROND-GANDHINAGAR, BY PASS ROAD. Madhya Pradesh www.trubainstitute.ac.in NEAR RGPV CAMPUS AIRPORT BY-PASS SRI SATYA SAI COLLEGE OF ROAD, GONDERMAU, GANDHINAGAR, 1-396798862 ENGINEERING BHOPAL Madhya Pradesh www.ssscebhopal.com NEAR RGPV CAMPUS, AIRPORT BYPASS VEDICA COLLEGE OF B. ROAD, GONDERMAU, GANDHINAGAR, 1-396871591 PHARMACY BHOPAL Madhya Pradesh www.vedicagroup.org VEDICA INSTITUTE OF NEAR RGPV CAMPUS, AIRPORT BYPASS, 1-396893501 TECHNOLOGY GONDERMAU, GANDHINAGAR, BHOPAL Madhya Pradesh www.vitbhopal.com RKDF SCHOOL OF NH-12,HOSHANGABAD ROAD 1-396898342 PHARMACEUTICAL SCIENCE JATKHEDI, BHOPAL Madhya Pradesh www.rkdfsps.com NEAR RGPV CAMPUS, AIRPORT BYPASS RKDF COLLEGE OF ROAD, GONDERMAU, GANDHINAGAR, 1-396899583 TECHNOLOGY & RESEARCH BHOPAL Madhya Pradesh www.vedicagroup.org BHOPAL INSTITUTE OF TECHNOLOGY & SCIENCE - 1-396908662 PHARMACY BHOJPUR ROAD, BANGRASIA CHOURAHA Madhya Pradesh www.globus.ac.in OPP.
    [Show full text]
  • 47100-004: Madhya Pradesh Power Transmission and Distribution
    Initial Environment Examination Project Number: 47100-004 January 2019 IND: Madhya Pradesh Power Transmission and Distribution System Improvement Project Submitted by Madhya Pradesh Madhya Kshetra Vidyut Vitaran Co. Ltd. (DISCOM-C), Bhopal This initial environmental examination report is a document of the borrower. The views expressed herein do not necessarily represent those of ADB's Board of Directors, Management, or staff, and may be preliminary in nature. This report is an updated version of the IEE report posted in September 2013 available on https://www.adb.org/projects/documents/madhya-pradesh-power-transmission-distribution-system- improvement-project-iee. In preparing any country program or strategy, financing any project, or by making any designation of or reference to a particular territory or geographic area in this document, the Asian Development Bank does not intend to make any judgments as to the legal or other status of any territory or area. INITIAL ENVIRONMENTAL EXAMINATION [IEE] REPORT November 2018 Madhya Pradesh Madhya Keshtra Vidyut Vitaran Co. Limited- DISCOM-Central, Nishtha Parisar, Govindpura, Bhopal (MP) Power Transmission and Distribution System Improvement Project under ADB Loan-No -3066 IND Prepared by: Environmental Planning and Coordination Organization [EPCO], Bhopal, Department of Environment, Government of Madhya Pradesh The initial environmental examination report is a document of the borrower. The views expressed herein do not necessarily represent those of ADB‟s Board of Directors, Management, or
    [Show full text]