AA Cullybackey
Total Page:16
File Type:pdf, Size:1020Kb
Load more
Recommended publications
-
2020 09 30 RP6 Network Investment Rigs Reporting Workbook
2020_09_30 RP6 Network Investment RIGs Reporting Workbook Licensee Name / s: NIE Networks Reporting price base: Nominal Year / s Oct 2017 - Mar 2020 Submission Date 30/09/2020 Submission Version Number v1 Key Licensee input cells Total cells (of formulae within worksheet) Reference to other worksheets Reference to other workbooks Check cell = OK Check cell = error No input Descriptions and pack data NIPRIGS Version Date Comments/ Notable changes (including sheet and cell references) Effect of changes Reason for changes V1.0 Issued to NIE Networks Not applicable (n.a.) n.a. To separate RP5 V1.0 05-Mar-19 Updated with reporting sheet 'RP5 Carryover Works' carryover costs. Agreed UR 1/3/19 Muff Repair programme incorrectly categorised as T19M Changed previous at the start of RP6, this Updated 110kV Muff Repairs code to T19n (from T19m). T19M 2018 year return (2018) was already an V1.0 17-Aug-20 Submission Asset Name changed to Earthwire Replacement submission code exisiting Cat code and current used within RP5. Changed to T19N to match NIEN internal SAP system RP6 NETWORK INVESTMENT RIGS DIRECT EXPENDITURE REPORTING YEAR PROGRAMME SUB-PROGRAMME ASSET IDENTIFICATION ASSET NAME VOLTAGE VOLUME (£) 2018 D06 D06A N/A HOLESTONE-KELLS-BALLYMENA 33kV 0.0 -20,114.54 2018 D07 D07A AN47 ANTRIM MAIN 33kV 0.0 95.18 2018 D07 D07A KR22 KILREA CENTRAL 33kV 0.0 6,788.05 2018 D07 D07A BR57 BANBRIDGE MAIN 33kV 1.4 12,774.20 2018 D07 D07A CL135 COLERAINE MAIN 33kV 0.0 8,092.28 2018 D07 D07A BR67 BANBRIDGE MAIN 33kV 0.4 27,359.57 2018 D07 D07A BR17 BANBRIDGE -
Planning Applications Validated for the Period 18/01/2021 to 22/01/2021 Reference Number Proposal Location Application Type
Planning Applications Validated For The Period 18/01/2021 to 22/01/2021 Reference Number Proposal Location Application Type LA02/2021/0038/RM Proposed dwelling on a Farm Adjacent to 126 Loughbeg Road Toomebridge Reserved Matters LA02/2021/0039/F Proposed erection of 17 dwellings comprising a mix of 1 detached and Lands immediately north north west of no.s 83 & 91- Full 16 semi-detached units, including construction of a section of the 117 (odds) Victoria Rise Victoria Link road scheme, associated parking and all other necessary site works. The proposal relates to an area of the over all scheme previously approved under LA02/2016/0919/F, namely site numbers 183a-198 formerly 2 detached and 14 semi-detached units. LA02/2021/0040/F Creation of 3 no. balconies to rear of building for apartments 3,5 & 7. Apartments 3 5 & 7 10 Chaine Memorial Road Full Window alterations to create access doors. Larne LA02/2021/0041/O New dwelling Site to rear of 216 Coast Road Ballygally Outline LA02/2021/0042/RM Replacement dwelling 40m approx. south east of 6 Cladytown Road Reserved Glarryford Matters LA02/2021/0043/F 2 storey side extension to dwelling 40 Fourtowns Manor Ahoghill Full LA02/2021/0045/O Site for dwelling on a farm 70M South-West of 99 Killagan Road Glarryford Outline LA02/2021/0046/LDP Construction of a new farm building adj to existing farm buildings. Adjacent to and North East of 40 Belfast Road LD Certificate Larne Proposed LA02/2021/0047/F Proposed new shed to provide Workshop/Office Space and Stores 47 Deerpark Road Glenarm Full LA02/2021/0048/F To erect a new 4 span 11,000 volt overhead line on wood pole From approx. -
Railway Investment Priorisation Strategy
CONTENTS Ministerial Foreword In the last few years, there has been a significant upturn in rail passenger growth in Northern Ireland. Passenger numbers have almost doubled since 2002. Whilst our railway service is not extensive, its role is increasing as a travel mode of choice in our transportation network. In 2013, I published a consultation paper inviting views on what should be the priorities for future investment in our railways network. This attracted a wide variety of informed responses from which I have developed this Strategy setting out a vision and strategic direction for future railways investment over the next 20 years and beyond. It will be important, in the present period of public expenditure restraint, to use whatever resources are available to sustain and make best use of the current railway system. However, I am convinced that rail travel can offer a safe, comfortable and efficient option, particularly for commuters and inter-city passengers. As and when additional resources become available, we should be ready to develop our rail network where there is the greatest potential for further passenger growth. This Strategy offers such a robust approach. I am particularly keen to extend the option of rail travel to commuters from mid-Ulster and to populations in the south and west within the catchments of Armagh and Dungannon. However, progress will depend on the amount of funding that can be made available from the Executive’s budget and, where possible, from European grant programmes. If delivered, this ambitious Strategy would allow for a significant enhancement of existing rail capacity, preparation for the future electrification of the network and the first major extensions to the railway since the closing of lines following the Benson Report in 1963. -
Comber Historical Society
The Story Of COMBER by Norman Nevin Written in about 1984 This edition printed 2008 0 P 1/3 INDEX P 3 FOREWORD P 4 THE STORY OF COMBER - WHENCE CAME THE NAME Rivers, Mills, Dams. P 5 IN THE BEGINNING Formation of the land, The Ice Age and after. P 6 THE FIRST PEOPLE Evidence of Nomadic people, Flint Axe Heads, etc. / Mid Stone Age. P 7 THE NEOLITHIC AGE (New Stone Age) The first farmers, Megalithic Tombs, (see P79 photo of Bronze Age Axes) P 8 THE BRONZE AGE Pottery and Bronze finds. (See P79 photo of Bronze axes) P 9 THE IRON AGE AND THE CELTS Scrabo Hill-Fort P 10 THE COMING OF CHRISTIANITY TO COMBER Monastery built on “Plain of Elom” - connection with R.C. Church. P 11 THE IRISH MONASTERY The story of St. Columbanus and the workings of a monastery. P 12 THE AUGUSTINIAN MONASTERY - THE CISTERCIAN ABBEY, THE NORMAN ENGLISH, JOHN de COURCY 1177 AD COMBER ABBEY BUILT P13/14 THE CISTERCIAN ABBEY IN COMBER The site / The use of river water/ The layout / The decay and plundering/ Burnt by O’Neill. P 15/17 THE COMING OF THE SCOTS Hamiltons and Montgomerys and Con O’Neill-The Hamiltons, 1606-1679 P18 / 19 THE EARL OF CLANBRASSIL THE END OF THE HAMILTONS P20/21 SIR HUGH MONTGOMERY THE MONTGOMERIES - The building of church in Comber Square, The building of “New Comber”. The layout of Comber starts, Cornmill. Mount Alexander Castle built, P22 THE TROUBLES OF THE SIXTEEN...FORTIES Presbyterian Minister appointed to Comber 1645 - Cromwell in Ireland. -
The Belfast Gazette 26 February 1993 Statutory
THE BELFAST GAZETTE 26 FEBRUARY 1993 197 COLLEEN CRAFTS LIMITED ISIBEAL'S (BELFAST) LIMITED The Official Receiver of Lindsay House, 8/14 Callender Street, The Official Receiver of Lindsay House, 8/14 Callender Street, Belfast BT1 SOU, the liquidator of the above-named company, Belfast BT1 5DU, the liquidator of the above-named company,1 was on 28th January, 1993, granted a release under Article 506 of was on 28th January, 1993, granted a release under Article 506 of the Companies (Northern Ireland) Order 1986. the Companies (Northern Ireland) Order 1986. /. McKay, J. McKay, for the Department of for the Department of Economic Development. Economic Development. JIMMY FUNKNO'S LIMITED DEERPARK ENGINEERING WORKS LIMITED The Official Receiver of Lindsay House, 8/14 Callender Street, The Official Receiver of Lindsay House, 8/14 Callender Street, Belfast BT1 5DU, the liquidator of the above-named company, Belfast BT1 5DU, the liquidator of the above-named company, was on 28th January, 1993, granted a release under Article 506 of was on 28th January, 1993, granted a release under Article 506 of the Companies (Northern Ireland) Order 1986. the Companies (Northern Ireland) Order 1986. J. McKay, /. McKay, for the Department of for the Department of Economic Development. Economic Development. McKEEGAN ENGINEERING LIMITED ELWOOD SALES (BELFAST) LIMITED The Official Receiver of Lindsay House, 8/14 Callender Street, Belfast BT1 5DU, the liquidator of the above-named company, The Official Receiver of Lindsay House, 8/14 Callender Street, was on 28th January, 1993, granted a release under Article 506 of Belfast BT1 5DU, the liquidator of the above-named company, the Companies (Northern Ireland) Order 1986. -
Ballymena Old Churchyard Graveyard: Plot Owners
Ballymena Old Churchyard Plot Owners c1875-1935+ This is a compilation and cross referencing of 3 existing records: Plot owners book and separate alphabetical index, both of which were damaged in a fire and have burnt edges losing some information. Also a transcript made after the fire to replace the original. Earliest of the few dates recorded is 1875 which predates the register to before the transfer of the graveyard to the Council from the Representative Church Body in 1896. Transfers are shown in red. Notes added for this transcription are shown in blue. No transfers or graves registered are recorded in the last 75 years, the last being 1935. © Transcribed by Alistair McCartney 2012, last updated 5 April 2013 No. Forename of Surname of Residence No. of Distinctive Marks Notes Owner Owner Graves 335 ____land Ballymoney St. 3 Side of Mr Cosbie's Headstone not in index/burnt 350 ____bert A______ Nursery 3Right side close to wall Wm Wilson in transcript 478 John A______ Crebilly 2 87 A______ Ballykeel 2 - 2 graves in transcript, 4 in index 140 _____rt A____on Ballymena Enclosure 503 James Aannah Cherrymount, Belfast Enclosure 411 Wm J. Abernethy Brocklamount 3 Beside Dugan's Enclosure 407 Maggie G. Acheson Market Rd. Transferred to Mrs Maggie G Acheson, Market Road by resolution of t_________ 175 Arch. Adams Henry St. 1 111 Aiken Railway St 8 Headstone 14 John Allan Ballymoney St. 2 Left side of Church Yew Tree 199 John Allan Dunnyvadden 2 At back of Wale's Headstone 418 John Allan Alexander St. 2 Opposite Revd. -
Craigs Parish Church Baptismal 1839
CRAIGS PARISH CHURCH BAPTISMAL 1839 - 1925 BAPTISM D O B SURNAME CHRISTIAN FATHER MOTHER ADDRESS OCCUPATION NOTES DATE NAME 25/07/1839 11/12/1836 Maclean Hugh Robert Nancy Craigs 25/07/1839 00/07/1832 Jackson John Robert Margaret Hillis 22/08/1839 00/05/1839 Coleman Mary Elizabeth Robert Ellen Dunminning 19/09/1839 00/11/1835 Douglas Martha Johnny Jane Sara Craigs 19/09/1839 00/11/1838 Douglas John Johnny Jane Sara Craigs 19/09/1839 00/11/1838 Boyle John David Mary Craigs 19/09/1839 17/05/1838 Porter William William Sarah 14/11/1839 10/05/1838 Sloan William Harry Martha Craigs 09/01/1840 06/12/1839 Taylor Frances Edward Jane Craigs 09/01/1840 00/05/1839 Crawford Agnes Robert Agnes Cambell 10/04/1840 04/02/1840 McClean James Elizabeth Loan 30/04/1840 00/05/1839 Brady Agnes James Mary Loan 30/04/1840 02/07/1839 Graham Hugh Matt Sarah Craigs 30/04/1840 18/11/1839 Kernahan Margaret Henry Margaret Loan 30/04/1840 00/11/1838 Cambell Margaret Robert Jane Loan 30/04/1840 00/11/1839 Maclean Agnes Ann Robert Nancy Craigs 30/04/1840 06/04/1840 Keanon James Edward M A Craigs 28/05/1840 Irvine Mary Ann George Matty Fenagh 28/05/1840 Dempsey Robert John Margaret Craigs 25/06/1840 15/05/1840 Workman Margaret James Susanna Hillhead 25/06/1840 15/01/1840 McIlroy Elizabeth Andrew Mary Drumrankin 25/06/1840 04/02/1840 Wright Anne John Betty Drumrankin 25/06/1840 25/03/1840 Macost John Rosanna 20/08/1840 25/02/1840 Aiken William Peter Margaret Craigs 20/08/1840 11/07/1840 Wilson Mary Jane William Matty Loan 15/10/1840 20/09/1840 Getty George James Martha -
Planning Applications Received and Decided in the Period 01 April – 29 February 2016
Update on Development Management Statistics: 23rd March 2016 Planning Applications Received and Decided in the period 01 April – 29 February 2016 Planning Committee Linkage to Council Strategy (2015-19) Strategic Theme Protecting and Enhancing our Environments and Assets Outcome Pro-active decision making which protects the natural features, characteristics and integrity of the Borough Lead Officer Denise Dickson Cost: (If applicable) N/A 1.0 Background The ‘’Protocol for the Operation of the Planning Committee’ sets out the requirement to provide monthly updates on the number of planning applications received and decided. 2.0 Details 2.1 Annex 1 and 2 provide a list of planning applications received and decided respectively by Causeway Coast and Glens Borough Council in the month of February. Please note these exclude Pre-Application Discussions; Certificates of Lawful Development – Proposed or Existing; Discharge of Conditions and Non- Material Changes, to correspond with official validated statistics published by DoE. 2.2 Table 1 below details the number of planning applications received and decided as well as the number of live planning applications in the system and those in the system over 12months. Please note that only Q1 are validated statistics and all other statistics are extracted from internal management reports. Table 1 Applications Received, Decided and Live Applications Q1 Q2 Q3 January February Received (Source: Northern Ireland Planning Statistics 2015/16 first Quarterly Bulletin) Received 301 295 302 111 115 Decided 230 256 283 48 122 Live 82 95 106 106 95 >12months Total Live 685 730 715 739 751 Source: Unvalidated Statistics; Excludes: Pre-Application Discussions; Certificate of Lawful Development Proposed or Existing; Discharge of Conditions; Non-Material Change. -
Kirkinriola Graveyard Ballymena Plot Owners C1875-1937
Kirkinriola Graveyard Ballymena Plot Owners c1875-1937 Nos.1 to 715 are in similar handwriting suggesting they were complied simutaneously, higher numbers are newer registrations often with the fee or date of registration (from 1896) entered in the distinctive marks column. Numbers with asterisks appear between 719-721 and are numerically out of sequence for an unknown reason. Plot numbers given are the original system and are not to be confused with the current individual grave numbers. Numbers preceeded by * appear between 719 & 721 in the register. All subsequent transfers and graves registered in the last 75 years are not included. © Transcribed by Alistair McCartney 2009, last updated 26 June 2012 No. Forename of Surname of Residence No. of Distinctive Marks Fee Paid for Notes Owner Owner Graves Registry 42 Blaney Adair Ballymena Enclosure 2.6 902 James Adams Kirkinriola 2 20/4/34 2.0.0 857 John Adams Lisnacrogher 3 14-6-20 3.0.0 105 David Aiken Lisnaclougher 6 Headstone 1.6 170 James Aiken Belfast 2 North J. Aiken's S 1.0 586 James Aiken Killyree 3 Headstone 1.6 168 John Aiken Cabragh 1 South J. Aiken's S 0.6 367 John Aiken Ummerbane 2 Behind Strahan's s 1.0 412 John Aiken Dunfane 3 4grs fr. North wall 1.6 62 Lena Aiken Craigywarren 3 Headstone 1.6 142 Lilly Aiken Philadelphia 2 Headstone 1.0 170 Maggie Aiken 7 Manor St. Belfast 23/3/12 142 Robert Aiken Lisnacrogher 3 13/12/98 170 Robert Aiken Belfast 367 Robert Aiken Ummerbane 1.0 15/3/19 61 Robt Aiken Carnlea 4 Headstone 1.6 140 Robt Aiken Lisnaclougher 4 next W. -
Register of Employers
REGISTER OF EMPLOYERS A Register of Concerns in which people are employed in accordance with Article 47 of the Fair Employment and Treatment (Northern Ireland) Order 1998 The Equality Commission for Northern Ireland Equality House 7-9 Shaftesbury Square Belfast BT2 7DP Tel: (02890) 500 600 Fax: (02890) 328 970 Textphone: (02890) 500 589 E-mail [email protected] SEPTEMBER 2003 ________________________________________________REGISTRATION The Register Under Article 47 of the Fair Employment and Treatment (Northern Ireland) Order 1998 the Commission has a duty to keep a Register of those concerns employing more than 10 people in Northern Ireland and to make the information contained in the Register available for inspection by members of the public. The Register is available for use by the public in the Commission’s office. Under the legislation, public authorities as specified by the Office of the First Minister and the Deputy First Minister are automatically treated as registered with the Commission. All other employers have a duty to register if they have more than 10 employees working 16 hours or more per week. Employers who meet the conditions for registration are given one month in which to apply for registration. This month begins from the end of the week in which the concern employed more than 10 employees in Northern Ireland. It is a criminal offence for such an employer not to apply for registration within this period. Persons who become employers in relation to a registered concern are also under a legal duty to apply to have their name and address entered on the Register within one month of becoming such an employer. -
1937 Census County Antrim Report
GOVERNMENT OF NORTHERN IRELAND CENSUS OF POPULATION OF NORTHERN IRELAND 1937 COUNTY OF ANTRIM Printed and presented pursuant to the provisions of 26 Geo. 5 and 1 Edw. 8, Chap. 25 : ..... ..._- ~ .... - ............ - ·.... - - ...,,__- - '·-· - - ,,. BELFAST PUBLISHED BY HIS MAJESTY'S STATIONERY OFFICE ON BEHALF OF THE GOVERNMENT OF NORTHERN IRELAND To be purchased directly from H.M. Stationery Office at the following addresses 80 CHICHESTER STREET, BELFAST Adastral House, Kingsway, London, W.C.2; 120, George Street, Edinburgh 2 26 York Street, Manchester 1; 1, St. Andrew's Crescent, Cardiff " or through any Bookseller 1938 Price 2s. 6d. net. iii PREFACE. This volume has been prepared in accordance vvith the provisions of Section 6 (1) of the Census Act (Northern Ireland), 1936, from the census returns made as at JJ?-idnight of the 28th February-1st March, 1937. The statistics contained herein supersede those contained in the Preliminary Report published in July, 1937, and may be regarded as final. The census which was taken in 1937 was a special one in the sense that it was limited .in .scope and was taken during the interval between normal census years, thus bndg1ng the gap between the 1926 census and the next full census. Certain ques~ions usually found on census schedules, such as those regarding occupation and Industry, were not asked, but a ne\v question as to usual residence \Vas in cluded for the first time. The 1937 census publications \Vill consist of :- 1. SEVEN CouNTY VoLUMES, each similar in design and scope. The smallest area for which statistics are given in the county volumes is the district electoral division, but statistics in respect of townlands, similar to those given in table 4, have been prepared in the Census Office and are available for reference upon application to the Registrar General. -
CCG Accommodation Guide Final
Accommodation Directory 2o19 Causeway Coast and Glens Contents Hotels 1-20 Guest Accommodation 1-21 Bed and Breakfast 1-23 Guest Houses 2-23 Hostels 2-23 Self-Catering 23-92 Caravan & Campsites 93-96 Camping Barn, Bunk House & Campsite 96 Glamping 96-97 Index 100 If you have a disability and need further information on which accommodation is accessible, for example has accessible bathrooms and toilets, please do contact any of our Visitor Information Centres who will do a specific search for you. Full contact details for all Centres on the back cover of this guide. Aghadowey Hotel Brown Trout Golf and Country Inn*** 209 Agivey Road, Aghadowey, BT51 4AD T: (028) 7086 8209 W: www.browntroutinn.com [email protected] 15 rooms, 15 ensuite Guest Accommodation Oaklands House 86 Mullaghinch Road, Aghadowey, BT51 4AX T: (028) 7086 9195 M: 07860 275 877 [email protected] 1 room, 1 ensuite Bed and Breakfast Crowfield House***** Rhee Farm B&B 1 Rhee Lane, Curragh Road, Aghadowey, BT51 4BF 138 Rhee Lane, Curragh Rd, Aghadowey, T: (028) 7086 8253 BT51 4BT M: 07770 935 131 T: (028) 7086 9050 W: www.crowfieldcountryhouse.com M: 07927 899 886 [email protected] [email protected] 2 rooms, 2 ensuite 3 rooms, 2 ensuite From £40.00 pps Agivey Lodge 174 Agivey Road, Aghadowey, BT51 4AB T: (028) 7086 8818 M: 07921 160 364 W: www.agiveylodge.co.uk [email protected] 2 rooms, 2 ensuite Armoy Bed and Breakfast Fernmount B&B The Armada Inn 11 Fermount Park, Armoy, BT53 8XF 167 Hillside Road, Armoy, BT53 8RH T: (028) 2075 1126 T: (028)