Department of Public Works and Highways (DPWH)

Total Page:16

File Type:pdf, Size:1020Kb

Department of Public Works and Highways (DPWH) Department of Public Works and Highways (DPWH) Contract ID : 20HBO155 contract Name : construction/Rehabilitation of Water Supply/Septage and sewerage/Rain Eater Collectors (Cluster I): 1) Canayaon E/t Garcia-Hernandez, Bohol 2) Cantagay E/S, Jagna, Bohol 3) Calabacita E/S, Jagna, Bohol 4) Itum P/S, Duero, Bohol 5) virgen E/S, Anda, Bohol 6) Concepcion NH/S, Mablnl, Bohot 7) San Roque NH/S, Mabini, Bohol 8) Cogtong NH/S, candiiay, Bohol 9) Sudlon, E/s, Alicia, Bohol contract Locatlon: Bohol Province Depaftment of Public Works and Highways Bohol 3d District Engineering Office Guindulfian, Bohol BAC RESOLUTION DECLARING THE BIDDER WITH THE LOWEST CALCULATED RESPONSIVE BID AND RECOMMENDING AWARD THERETO RESoLUTIoN No. 0155-:2029 WHEREAS, the Department of Public works and Highways. Bohol 3rd District Engineering Office, Guindulman, Bohol, advertised the lnvitation to Apply for Eligibility and to Bjd for the above:stated contract in ihe PhjIGEPS on May 21. 2O2O and posted the same at the DPWH website and in the conspicuous place at the premises of DPWH-Bohol 3d District Engineering office contlnuously for 7 days starting on May 2L 202oi WHEREAS, in response to the said Invitation, only Two (2) contractors purchased Bidding Documents and both were found eligible; WHEREAS, the BAC received Two (2) bids for the Contract On June 10, 2O2O when the bids were opened, the followinq bids as read passed the preliminary examination: Total Bid Amount As Read (Php) from ABC CLAVITE CONSTRUCTION AND SUPPLY 2,117,974-50 2.7O"/o ALTACS CONSTRUCTION 2,O9A ,6 / 5 -7 | 3.00% WHEREAS, the detalled evaluation of bid conducted on June 11,2O2O resulte'j in ihe following bid as calculated: Total Bid amount as calculated (Php) from ABC ALTACS CONSTRUCTION 2,A9A ,67 5 -7 | 3.00-o CLAVITE CONSTRUCT]ON AND SUPPLY 2,111,974.50 2.rAa/o WHEREAS, upon postqualification or careful examination, validation and veriflcation of all the eligibiljti, tec'hnicil and financjal requirements submitted bv the Bidder with the Lowest calcula[ed Bid aLTAcs coNSTRUcTroN, its bid has been found to be responsive; NOW, THEREFORE, we, the l\4embers of the Bids and Awards Committee, hereby RESoLVE, as it is hereby RESOLVED: Page 1 of 2 Department of Public Works and Highways (DPWH) Contract ID : 2OH80155 Contract Name : Construction/Rehabilitation of Water Supply/Septag€ and Sewerage/Rain Eater Collectors (Cluster I): 1) Canayaon E/S, Garcia-Hernandez, Bohol 2) Cantagay E/S, Jagna, Bohol 3) Calabacita E/+ Jagna, Bohol 4) Itum P/S, Duero, Bohol 5) Virgen E/S, Anda, Bohol 5) Concepclon NH/S, Mabini, Bohol 7) San Roque NH/s, Mabinl, Bohol 8) Cogtong NH/S, Candijay. Bohol 9) Sudlon, E/S, Alicia, Bohol Contracl Locataonr Bohol Province a) To declare ALTACS CONSTRUCTION, as the Bidder with the Lowest Calculated Responsive Bid (LCRB) for the abovementloned Contracu and b) To recommend to the OIC - Djstrict Engineer, l4agiting A. Cruz, for approval, the award of the said Contract to ALTACS CONSTRUCTION at its total Calculated Bid of Two Million Ninety Eight Thousand Slx Hundred Seventy Five Pesos and 71/1OO (PbP2,O94,675.7r), RESOLVED, at DPWH Bohol 3rd District Engineering Office, Guindulman, Bohol, this 18th day of June, 2020. MARIO BAC lUA ta6. aenntoo _zvtce Lnatrman^, TEOT. GHUCAN Approved: 'NG A. CRUZ District Engineer Paqe 2 of 2.
Recommended publications
  • SOCIAL MARKETING on SOLID WASTE MANAGEMENT: the JAGNA EXPERIENCE (Initial Implementation)
    A REPORT ON SOCIAL MARKETING ON SOLID WASTE MANAGEMENT: THE JAGNA EXPERIENCE (Initial Implementation) Conchita Gloria – Bigornia Regional IEC Specialist Region 7 TABLE OF CONTENTS A. Introduction ………………………………………………… 1 B. The Pilot Site ……………………………………………….… 2 1. Brief Description 2. SWM Issues and Concerns 3. SWM Activities 4. Why Jagna 5. Activity Post Decision to Pilot in Jagna C. Preparation of the Social Marketing Plan……………………… 4 1. Consultation with the TWG 2. Creation of the Social Marketing Core Group D. Summary of the Social Marketing Plan ………………………. 5 1. Target Barangays 2. Audience Profile 2.1 Behavior 2.2 Knowledge 3. Objectives and Goals 4. Promotion Strategies E. Implementation of the Plan …………………………………. 14 1. Establishing Partnerships 1.1 With Various Sectors 1.2 With Broadcast – Radyo Natin 1.3 With Video Group 1.4 With Possible Sponsors 2. Promotion 2.1 Key Messages 2.2 Launching of the ISWM Program 2.3 Poster Contest 2.4 Mascot 2.5 Billboard 2.6 Radio Plugs and Video 3. Actual Implementation of Promotion of Activities F. Analysis and Implementation …………………………………… 19 1. Situational Analysis 2. Involvement of Local Talents 3. Organization of the Core Group 4. Pace of Implementation 5. Support of the LGU 6. Cooperation of Different Sectors 7. Attitude and Outlook 8. Principles Underlying the Approaches Used 8.1 Regulation Strategy 8.2 Behavior Change Tools • Commitment • Prompts • Norms • Effective Messages G. Recommendations ……………………………………………. 25 1. Develop Goyo Boy 2. Develop the Model Households for Composting 3. Implement the EcoSavers Club 4. Utilize the Broadcast and Audio-Visual Media 5. Follow-up Sector Commitments, Provide Feedbacks and Incentives 6.
    [Show full text]
  • The “Chocolate Hills” of Bohol (Philippines) Skrivnostni Kras: “Čokoladni Griči” Otoka Bohol (Filipini)
    COBISS: 1.01 A MYSTERIOUS KARST: THE “CHOCOLATE HILLS” OF BOHOL (PHILIPPINES) SKRIVNOSTNI KRAS: “ČOKOLADNI GRIČI” OTOKA BOHOL (FILIPINI) Jean-Noël SALOMON1 Abstract UDC 911.2:551.435.8(599) Izvleček UDK 911.2:551.435.8(599) Jean-Noël Salomon: A Mysterious Karst: the “Chocolate Hills” Jean-Noël Salomon: Skrivnostni kras: “Čokoladni griči” otoka of Bohol (Philippines) Bohol (Filipini) A public showcase by the Philippine tourism authorities, and Glavni adut filipinske državne turistične organizacije, in to rightly so, are the “Chocolate Hills” of Bohol (Philippines), the z razlogom, so “Čokoladni griči” na otoku Bohol, ena najbolj strangest karst landform known. These numerous residual re- nenavadnih kraških pokrajin. Ti nenavadni reliefni ostanki so lief forms are so perfectly symmetrical that, in order to explain tako popolnoma simetrični, da se za razlago njihovega nasta- their existence, natural explanations are systematically sidelined nka izogiba naravnim procesom na račun legend in mitov, da by legends, myths and many so-called “scientific” explanations. niti ne omenimo številnih lažnoznanstvenih razlag. Ti kraški The object of many television broadcasts related to travel, these griči, pogosto predmet televizijskih oddaj o potovanjih, so karst hills are a particularly original example of mogotes tropi- posebni primer tropskega krasa z mogotami, ki so takorekoč cal karst; their almost “perfect” aspect had intrigued those who “popolne”, kar je povzročalo težave vsem, ki so se ukvarjali z have studied their formation and have given birth
    [Show full text]
  • PHL-OCHA-Bohol Barangay 19Oct2013
    Philippines: Bohol Sag Cordoba Sagasa Lapu-Lapu City Banacon San Fernando Naga City Jagoliao Mahanay Mahanay Gaus Alumar Nasingin Pandanon Pinamgo Maomawan Handumon Busalian Jandayan Norte Suba Jandayan Sur Malingin Western Cabul-an San Francisco Butan Eastern Cabul-an Bagacay Tulang Poblacion Poblacion Puerto San Pedro Tugas Taytay Burgos Tanghaligue San Jose Lipata Saguise Salog Santo Niño Poblacion Carlos P. Garcia San Isidro San Jose San Pedro Tugas Saguise Nueva Estrella Tuboran Lapinig Corte Baud Cangmundo Balintawak Santo Niño San Carlos Poblacion Tilmobo Carcar Bonbonon Cuaming Bien Unido Mandawa Campao Occidental Rizal San Jose San Agustin Nueva Esperanza Campamanog San Vicente Tugnao Santo Rosario Villa Milagrosa Canmangao Bayog Buyog Sikatuna Jetafe Liberty Cruz Campao Oriental Zamora Pres. Carlos P. Garcia Kabangkalan Pangpang San Roque Aguining Asinan Cantores La Victoria Cabasakan Tagum Norte Bogo Poblacion Hunan Cambus-Oc Poblacion Bago Sweetland Basiao Bonotbonot Talibon San Vicente Tagum Sur Achila Mocaboc Island Hambongan Rufo Hill Bantuan Guinobatan Humayhumay Santo Niño Bato Magsaysay Mabuhay Cabigohan Sentinila Lawis Kinan-Oan Popoo Cambuhat Overland Lusong Bugang Cangawa Cantuba Soom Tapon Tapal Hinlayagan Ilaud Baud Camambugan Poblacion Bagongbanwa Baluarte Santo Tomas La Union San Isidro Ondol Fatima Dait Bugaong Fatima Lubang Catoogan Katarungan San Isidro Lapacan Sur Nueva Granada Hinlayagan Ilaya Union Merryland Cantomugcad Puting Bato Tuboran Casate Tipolo Saa Dait Sur Cawag Trinidad Banlasan Manuel M. Roxas
    [Show full text]
  • Lidar Surveys and Flood Mapping of Loboc River
    LiDAR Surveys and Flood Mapping of Loboc River 1 Hazard Mapping of the Philippines Using LIDAR (Phil-LIDAR 1) 2 LiDAR Surveys and Flood Mapping of Loboc River © University of the Philippines Diliman and University of San Carlos 2017 Published by the UP Training Center for Applied Geodesy and Photogrammetry (TCAGP) College of Engineering University of the Philippines – Diliman Quezon City 1101 PHILIPPINES This research project is supported by the Department of Science and Technology (DOST) as part of its Grants-in-Aid Program and is to be cited as: E. C. Paringit and R. S. Otadoy (eds.) (2017), LiDAR Surveys and Flood Mapping of Loboc River, Quezon City: University of the Philippines Training Center for Applied Geodesy and Photogrammetry- 128pp. The text of this information may be copied and distributed for research and educational purposes with proper acknowledgement. While every care is taken to ensure the accuracy of this publication, the UP TCAGP disclaims all responsibility and all liability (including without limitation, liability in negligence) and costs which might incur as a result of the materials in this publication being inaccurate or incomplete in any way and for any reason. For questions/queries regarding this report, contact: Dr. Roland Emerito S. Otadoy Project Leader, Phil-LiDAR 1 Program University of San Carlos Cebu City, Philippines 6000 E-mail: [email protected] Enrico C. Paringit, Dr. Eng. Program Leader, Phil-LiDAR 1 Program University of the Philippines Diliman Quezon City, Philippines 1101 E-mail: [email protected]
    [Show full text]
  • 6Th Jagna International Workshop
    1st Circular (28 July 2019) 9th Jagna International Workshop: Stochastic Analysis – Mathematical Methods and Real World Models January 8 – 14, 2020 Pedagogical Level January 15- 18, 2020 Research Conference Research Center for Theoretical Physics Central Visayan Institute Foundation Jagna, Bohol 6308, Philippines ____________________________________________________________________________________________________ Stochastic fluctuations are ubiquitous in complex biological, physical, social and financial systems. Literature abounds in studies applying commonly encountered stochastic processes: Wiener, Lévy, Ornstein-Uhlenbeck, Poisson, noise in various forms – white, grey and colored, and fractional stochastic processes for anomalous diffusion. However, rapid advances in technology continue to spew large volumes of data. Maintaining a big picture perspective and decoding information from such rapid data outflow require an expanded mathematical toolbox that minimizes complicated estimation and approximation methods. This Workshop shall then be a forum for discussion of stochastic analytical methods for real world models of complex systems such as those exhibiting memory or dissipation. The Workshop is the 9th in a series organized by the Research Center for Theoretical Physics (RCTP). The informal nature of the Jagna Workshop series is meant to foster active interaction among speakers and participants, and to encourage graduate students and postdoctoral researchers to get insights from invited lecturers so that viable research targets could be clearly defined. There will also be sessions for oral and poster presentations by the participants. For research and teaching capacity building in local institutes, prior to the research conference, there will be a one-week introduction to stochastic analysis by Prof. Ludwig Streit. An orientation for the pedagogical lectures and some preparatory reading materials can be downloaded from the link http://ccm.uma.pt/jagna2020/, or at, https://sites.google.com/g.msuiit.edu.ph/msuiitphysics .
    [Show full text]
  • Item Indicators Albuquerque Anda Baclayon Bien Unido Buenavista
    Item Indicators Albuquerque Anda Baclayon Bien Unido Buenavista Calape Candijay Clarin Cortes Dauis Dimiao Duero Garcia Hernandez Guindulman Inabanga Jagna Jetafe Lila Loay Loon Mabini Maribojoc Panglao Pres. Carlos P. Tagbilaran (city) Talibon Tubigon Ubay Valencia Garcia 1.1 M/C Fisheries Yes Yes Yes Yes Yes No No Yes Yes Yes Yes Yes Yes Yes No report submitted Yes Yes Yes Yes Yes No report submitted No report submitted Yes No report submitted Yes Yes Yes Yes Yes 1.2 Ordinance on MCS N/A Yes No Yes No No No Yes Yes Yes Yes Yes Yes Yes No report submitted No Yes No Yes No No report submitted No report submitted Yes No report submitted Yes Yes Yes No Yes 1.3a Allow Entry of CFV Yes No No No No No No No No No No No No No No report submitted No No No Yes No No report submitted No report submitted No No report submitted Yes Yes Yes No No 1.3b Existence of Yes No N/A No Yes No No No No No No No No N/A No report submitted N/A N/A No Yes No No report submitted No report submitted No No report submitted No Yes Yes No No 1.4a CRMOrdinance Plan Yes No Yes Yes Yes Yes No Yes Yes Yes Yes Yes Yes Yes No report submitted Yes Yes Yes Yes Yes No report submitted No report submitted No No report submitted Yes Yes Yes Yes Yes 1.4b ICM Plan N/A No No Yes Yes Yes No No No No Yes Yes Yes Yes No report submitted Yes Yes Yes No Yes No report submitted No report submitted No No report submitted No report submitted No report submitted Yes No Yes 1.4c CWUP N/A No No Yes No No No No No No No Yes Yes Yes No report submitted No Yes No No No No report submitted No
    [Show full text]
  • Approved Winning Name and Bid Bidding Contract No. Name Of
    PDF Form 10a-Bid Out Results on Civil Works Republic of the Philippines CIVIL WORKS BID-OUT Province: BOHOL Municipality: DUERO SECOND QUARTER, CY 2019 Reference Approved Winning Name and Bid Bidding Contract No. No. Name of Project Budget for Location Bidder Address Amount Date Duration Contract 1 6250521 Completion of MPB 200,000.00 Anibongan JF Estapia Construction Pob. Candijay, Bohol 199,768.00 06/21/2019 60 Days 2 6250569 Completion of MPH 200,000.00 Imelda Clavite Construction & Supp. Pob., Carmen, Bohol 199,755.00 06/21/2019 60 Days 3 6250595 Completion of MPB 200,000.00 Madua Norte Clavite Construction & Supp. Pob., Carmen, Bohol 198,950.00 06/21/2019 60 Days 4 6250620 Completion of MPH 200,000.00 Itum JF Estapia Construction Pob. Candijay, Bohol 199,743.36 06/21/2019 60 Days 5 6250642 Completion of Waterworks System 200,000.00 Duay A & D Cons. & Supply Pob. Jagna, Bohol 199,951.00 06/21/2019 60 Days 6 6250662 Construction of Drainage System 200,000.00 Mawi Clavite Construction & Supp. Pob., Carmen, Bohol 199,952.72 06/21/2019 60 Days 7 6250686 Concreting of Brgy. Road 200,000.00 Danao A & D Cons. & Supply Pob. Jagna, Bohol 199,910.20 06/21/2019 30 Days 8 6250708 Completion of MPH 200,000.00 Guinsularan Clavite Construction & Supp. Pob., Carmen, Bohol 199,269.40 06/21/2019 60 Days 9 6250732 Concreting of Brgy. Road 200,000.00 Taytay Clavite Construction & Supp. Pob., Carmen, Bohol 199,087.23 06/21/2019 30 Days 10 6250750 Completion of MPB 200,000.00 Lobogon JF Estapia Construction Pob.
    [Show full text]
  • ANNEXES Volum
    Annexes ANNEXES Volum e 3 Part I Supporting Tables Table Title Page I-A.1 Detailed Physiographic Description by Land System and by City/M unicipality, Province of Bohol ............................................. I-1 A.2 Soil Type Distribution by Land Topography/Relief per City/M unicipality, Province of Bohol .............................................. I-6 A.3 Soil Attributes: Soils Depth and Description, Soil Texture and Reaction, and Soil Fertility Status by City/M unicipality, Province of Bohol ............................................................................ I-9 A.4 Detailed Inventory of the NIPAS Areas in the Province of Bohol ............................................................................................ I-11 A.5 Bat Species in the Province of Bohol (As of M ay 2005) .............. I-13 A.6 List of W ildlife Species per M unicipality/City, Province of Bohol I-14 A.7 M ajor M ineral, M etallic and Non-M etallic Deposits of Bohol, M ay 2005 ............................................................................ I-26 A.8a Non-M etallic M ineral Deposits of Bohol, M ay 2005 .................... I-27 A.8b Ore Reserves in the Province of Bohol, M ay 2005 ...................... I-27 A.9 Landslides/Subsidence/Slope Failure Incidences in Bohol (As of M ay 2005) ............................................................................. I-28 A.10 Flood Prone Areas in Bohol (As of M ay 2005) .............................. I-29 A.11 Total Population and Growth Rate, Num ber of Households and Average HH Size and Population Density, Province of Bohol; M ay 2000 Census ............................................................................ I-30 A.12 Projected Population by Age Group, Province of Bohol; CY 2000 – 2020 ................................................................................ I-32 A.13 Ten (10) Leading Causes of M orbidity, Num ber and Rate Per 100,000 Population in 2004 Com pared to the Past 5-Years Average (1999-2003), Province of Bohol ....................................
    [Show full text]
  • PDF Form 10B- Bid Results on Civil Works 3 Forms to Use: 1
    PDF Form 10b- Bid Results on Civil Works 3 Forms to Use: 1. Bid Results on Civil Works 2. Bid Results on Goods and Servcices Republic of the Philippines 3. Bid Results on Consulting Services INDIVIDUAL BID-OUTS ARE NOT ALLOWED CIVIL WORKS BID-OUT Province: BOHOL Municipality: DUERO SECOND QUARTER, CY 2020 Approved Winning Name and Bid Bidding Date Notice Contract No. Reference No. Name of Project Budget for Location Bidder Address Amount to Duration Contract Proceed 1 6921158 Rehabilitation/Improvement of Taytay 7,338,000.00 Taytay Maghuyop Poblacion, Ibabao 6,215,527.20 4/8/2020 210 Waterworks Sytem Level 2 Construction Loay, Bohol 2 6926918 Completion of Municipal Road Repair 1,200,000.00 Duero, Bohol A & D Construction 1,199,973.95 4/13/2020 5/11/2020 80 and Supply Jagna, Bohol 3 6999743 Construction of Draiange Canal 3,000,000.00 Guinsularan A & D Construction 2,999,054.25 6/8/2020 7/15/2020 120 and Supply Jagna, Bohol 4 7041014 Completion of Health Center 200,000.00 Itum A & D Construction 199,981.80 6/22/2020 8/3/2020 60 and Supply Jagna, Bohol 5 7041097 Completion of Multi-Purpose Building 200,000.00 Alejawan A & D Construction 199,988.05 6/22/2020 8/3/2020 60 and Supply Jagna, Bohol 6 7041137 Completion of Multi-Purpose Building 200,000.00 Mawi A & D Construction 199,988.05 6/22/2020 8/3/2020 60 and Supply Jagna, Bohol 7 7041118 Completion of Flooed Control 200,000.00 Guinsularan A & D Construction 199,989.75 6/22/2020 8/3/2020 60 and Supply Jagna, Bohol 8 7041163 Completion of Road Concreting Leading A & D Construction To Municipal
    [Show full text]
  • Republic of the Phuippines ENERGY REGULATORY COMMISSION San Miguel Avenue, Pasig City
    Republic of the PhUippines ENERGY REGULATORY COMMISSION San Miguel Avenue, Pasig City IN THE MATTER OF THE APPLICATION FOR APPROVAL OF THE 2017-2018 CAPITAL EXPENDITURE PROGRAM AND AUTHORITY TO CONTRACT LOANS 04° ERC Case No. 2017- RC BOHOL II ELECTRIC COOPERATIVE (BOHECOII), App icant. . X ---------------- - -- ---------- X APPLICATION BOHOL II ELECTRIC COOPERATIVE (BOHECO II), thru counsel, respectfully states: BOHECO Ills an electric cooperative duly organized and existing under Philippine law, with principal office address at Cantagay, Jagna, Bohol; franchised to construct, own, operate and maintain an electric distribution system in the municipalities of Alicia, Anda, Bien Unido, Buenavista, Candijay, Carlos P. Garcia Island, Dagohoy, Danao, Duero, Garcia Hernandez, Getafe, Gundulman, Jagna, Mabini, Pilar, San Miguel, Sierra Bullones, Talibon, Trinidad, Ubay and Valencia, all in the Province of Bohol; represented herein by its General Manager is Engr. Eugenio R. Tan. 2. In its efforts to provide an adequate, continuous and reliable electric service to its member-consumers, in a safe and standards-compliant manner, BOHECO II proposes the following capital expenditure program for the regulatory years 2017 and 2018, more particularly described as follows: Project PROJECT COST Count Project Name Code 2017 2018 Total NETWORK PROJECT Additional 5MVA Substation at San I NP-01 Jose, Getafe + 22.71km 69KV Line 89,134,887.82 46,799,617.92 135,934,505.74 and Lot Acquisition Distribution Line Relocation and 2 NP-02 Conversion from Vee-Phase
    [Show full text]
  • Province, City, Municipality Total and Barangay Population BOHOL 1,255,128 ALBURQUERQUE 9,921 Bahi 787 Basacdacu 759 Cantiguib 5
    2010 Census of Population and Housing Bohol Total Population by Province, City, Municipality and Barangay: as of May 1, 2010 Province, City, Municipality Total and Barangay Population BOHOL 1,255,128 ALBURQUERQUE 9,921 Bahi 787 Basacdacu 759 Cantiguib 555 Dangay 798 East Poblacion 1,829 Ponong 1,121 San Agustin 526 Santa Filomena 911 Tagbuane 888 Toril 706 West Poblacion 1,041 ALICIA 22,285 Cabatang 675 Cagongcagong 423 Cambaol 1,087 Cayacay 1,713 Del Monte 806 Katipunan 2,230 La Hacienda 3,710 Mahayag 687 Napo 1,255 Pagahat 586 Poblacion (Calingganay) 4,064 Progreso 1,019 Putlongcam 1,578 Sudlon (Omhor) 648 Untaga 1,804 ANDA 16,909 Almaria 392 Bacong 2,289 Badiang 1,277 National Statistics Office 1 2010 Census of Population and Housing Bohol Total Population by Province, City, Municipality and Barangay: as of May 1, 2010 Province, City, Municipality Total and Barangay Population Buenasuerte 398 Candabong 2,297 Casica 406 Katipunan 503 Linawan 987 Lundag 1,029 Poblacion 1,295 Santa Cruz 1,123 Suba 1,125 Talisay 1,048 Tanod 487 Tawid 825 Virgen 1,428 ANTEQUERA 14,481 Angilan 1,012 Bantolinao 1,226 Bicahan 783 Bitaugan 591 Bungahan 744 Canlaas 736 Cansibuan 512 Can-omay 721 Celing 671 Danao 453 Danicop 576 Mag-aso 434 Poblacion 1,332 Quinapon-an 278 Santo Rosario 475 Tabuan 584 Tagubaas 386 Tupas 935 Ubojan 529 Viga 614 Villa Aurora (Canoc-oc) 889 National Statistics Office 2 2010 Census of Population and Housing Bohol Total Population by Province, City, Municipality and Barangay: as of May 1, 2010 Province, City, Municipality Total and
    [Show full text]
  • Mango Production and Marketing BIAD 2
    BIAD 2 Municipalities Comprehensive Project Profile # 7 I. PROJECT DESCRIPTION: Project Title : Mango Production and Marketing forBIAD2 Project Type : Economic and Technical Assistance Project Components: 1. Social Preparation Organization of Mango Growers Capacity building Establishment of Coordinating Center 2. Database establishment and management Data gathering and analysis Database establishment Market study and linkaging 3. Operation and maintenance of the center Organization and hiring of staff Identification of tasks and responsibilities Monitoring and evaluation II. PROJECT STATUS : Proposed Project with Project Idea III. PROJECT JUSTIFICATION: Project Background Bohol Integrated Area Development (BIAD) 2 composed of nine municipalities in the northwestern part of Bohol Province namely: Catigbian, San Isidro, Loon, Calape, Tubigon, Clarin, Inabanga, Buenavista and Getafe. This area considering its proximity to Cebu City with Tubigon Port as the entry point is classified as the economic zone of the Province. One of the major thrusts of the area is to develop the economic activities primarily the agriculture sector. High value crops are prevalent in the area specifically mango which can be converted into a highly commercialized industry. According to the results of the survey there are a vast or large number of fruit bearing mango trees within BIAD 2 municipalities. However, mango production is sometimes very discouraging when the buying price goes down at very low level because of over supply in a certain period specially during harvesting period of the year. Small mango growers are usually hesitant to produce mango by themselves due to uncertainty of production because of high 1 production cost and the lack of appropriate technology. Only the big time producers can generate good income thus depriving small growers to add their family income out of their own mango plants themselves.
    [Show full text]