UNITING THE ENERGY 2018 Annual report ANNUAL REPORT 2018 OF PSJC FEDERAL HYDROGENERATING COMPANY – RUSHYDRO, INCLUDING INFORMATION ON SUSTAINABLE DEVELOPMENT
This Annual Report is preliminary approved by the Board of Directors on May 24, 2019, approved by decision of the Annual General Meeting of Shareholders on June 28, 2019 //COMPANY PROFILE PJSC RusHydro | Annual report 2018 CONTENT
10 28 62 146 214 Company Strategic Our Corporate Appendices profile review performance governance
4 Responsibility statement 12 About Company 30 Markets served 64 Economics and finance 148 Corporate governance 216 Auditor’s opinion 4 Information on the report 12 RusHydro’s background 32 Strategy of RusHydro Group 74 Production and sales 153 Shareholders and investors 220 Opinion on Public Assurance 6 Message from the Chairman 17 Key awards and ratings 36 Key performance indicators 106 Innovations 160 Governing bodies 222 Defining materiality and creating of the Board of Directors a materiality matrix 18 Key figures 40 Investment activities 112 Procurement 180 Executive bodies 8 Message from the Chairman of 224 GRI content index 20 Structure of Rushydro Group 51 Sustainable development 117 HR and social policy 187 Audit and control the Management Board – General 229 Tables of compliance with Director 22 Geographical spread Environmental protection 199 Risk management 131 International Integrated 24 Business model 210 Report on remuneration Reporting Framework of the governing and control 230 Glossary bodies 232 List of abbreviations 232 Feedback questionnaire 233 Contacts
2 3 //COMPANY PROFILE PJSC RusHydro | Annual report 2018
Comparability with the ↗↗ RusHydro’s Information Policy information expanded from 48 to 60 RESPONSIBILITY previous annual reports Regulations; companies. Criteria for inclusion in the ↗↗ the International Integrated consolidation perimeter: STATEMENT In 2018, there were no significant changes Reporting Framework (
1 For the purpose of this report, RusHydro Group means a group of companies which include PJSC RusHydro and its subsidiaries. The control is determined in accordance with Article 2 of Federal Law No. 39-FZ On Securities Market dated April 22,1996. 1 The report also covers information on PJSC Boguchanskaya HPP, which is not a subsidiary or part of RusHydro Group, but a joint venture of RusHydro Group and UC RUSAL.
4 5 //COMPANY PROFILE PJSC RusHydro | Annual report 2018 MESSAGE FROM THE CHAIRMAN OF THE BOARD OF DIRECTORS
Dear shareholders,
2018 marked yet another year for RusHydro power grid expansion – this is the only way to As Russia’s leader in generating green energy, healthcare institutions, along with culture, Group’s ongoing growth and development. accelerate the improvement of quality of living RusHydro Group remains committed to the education, sports and environment projects. We commissioned new power plants in the Far East going forward. principles of sustainable development. In 2018, in the Far East and modernized existing the Company made strong progress in this Over the past year, the Board of Directors hydropower plants to increase our total The Long-Term Program for Replacement field, including targets approved to reduce held 18 meetings, both in person and in installed capacity to 39.4 GW, setting a new of Retiring Capacities developed in 2018 greenhouse gas emissions and the mechanisms absentia, and considered more than 100 key record for the fourth consecutive year. by RusHydro’s management and approved for their achievement, with the regulations matters related to RusHydro Group’s general by its Board of Directors is key to address on procurements now requiring bidders’ management and strategic development. As a matter of strategic importance, we the problem of ageing CHPP equipment in this compliance with the principles of social help deliver on the national goals in the Far strategically important and rapidly growing responsibility and sustainable development. In We are grateful to our shareholders, partners Eastern Federal District. In 2018, we launched macroregion. 2018, RusHydro’s Board of Directors approved and employees for their contribution to Vostochnaya CHPP in Vladivostok, the third its updated Environmental Policy, which sets RusHydro’s development and confidence in hydropower unit of Ust-Srednekanskaya HPP The alignment of tariffs in the Far East’s targets to increase the installed capacity of the Company’s governing bodies. in the Magadan Region, and a wind power isolated areas outside of UES of the East with low-carbon generation, reduce direct and per plant in the Arctic settlement of Tiksi in Yakutia. average national rates helps promote further unit greenhouse gas emissions by 6.1% by 2025 We are also completing the construction investments in the region’s economy. The vs 2015, and prevent species elimination as a Yury of Sakhalinskaya GRES-2 and a CHPP in Russian Government is going to extend the result of the Group’s operating activities. TRUTNEV Sovetskaya Gavan. Grid infrastructure tariff adjustment mechanism up to 2028, with projects are underway, including in priority RusHydro as its operator. RusHydro Group focuses on the development Chairman of the Board of Directors of RusHydro development areas. of local communities across its footprint, In 2018, the Company continued its efforts providing for better living and health The Russian government places a great to improve corporate governance. RusHydro conditions. A major employer and taxpayer emphasis on the development of the Far East, Group delivered 15% optimization in its in the regions of its operations, RusHydro with the region’s investment appeal rising, structure by consolidating businesses with created 1,250 new jobs in 2018. Its tax new businesses emerging, and the economy similar functions or closing down poor payments to budgets of different levels booming. 2018 saw electricity consumption performers. The Group introduced and has ever exceeded RUB 81 bn. The Company in the region growing twice as fast as across since been improving its vertically integrated implements charitable projects prioritizing Russia. Still, we have to focus on energy audit, control and risk management framework support to vulnerable population groups, sector development and modernization and to enhance the quality of asset management. people with disabilities, veterans and
6 7 //COMPANY PROFILE PJSC RusHydro | Annual report 2018 MESSAGE FROM THE CHAIRMAN OF THE MANAGEMENT BOARD – GENERAL DIRECTOR
Dear shareholders, By the end of the year, the installed capacity and refurbishing more than 130 km of heat performance were the main drivers behind colleagues and partners, at the Company’s plants reached 39.4 GW, and 7,600 km of electric power supply strong consolidated financials. RusHydro putting RusHydro ahead of all its Russian peers. networks. During this period, the Group plans Group’s revenue grew by 5.1% to RUB 400.4 bn, The year of 2018 was another confident to launch Sakhalinskaya GRES-2, CHPP in EBITDA increased by 5.3% to a record step forward for RusHydro as we registered RusHydro’s Board of Directors supported Sovetskaya Gavan, Nizhne-Bureyskaya HPP, RUB 109.7 bn, and net profit rose by 28.5% to record-high power generation and ensured the Management Board’s initiative to Zaramagskaya HPP-1, and 5 smaller HPPs in RUB 31.8 bn. financial growth, including through consistent start levelling the station node building at the North Caucasus, while also completing cost optimization. In addition to bringing Zagorskaya PSP-2 using the compensation the construction of Ust-Srednekanskaya HPP RusHydro Group boasts a robust credit profile, to completion several major investment grouting technology to inject special solutions as per the design parameters and building a which makes it highly attractive for investors. projects, RusHydro drove home the need under the foundation. Once the project 110 kV Pevek-Bilibino power line. The upgrade In 2018, the Company successfully completed to build new and upgrade existing thermal is completed, RusHydro will make further and modernization program is expected three Eurobond offerings, including two power generation facilities in the Far East decisions on how to finish construction of this to yield 163.7 MW of additional capacity at ruble-denominated issues and a debut dim with guaranteed return on investment . essential element in Russia’s unified energy the existing hydropower generation facilities. sum bond issue, with the books substantially We are also working towards establishing system. oversubscribed by international investors. long-term tariff regulation in the Far Eastern Among other things, RusHydro focuses on The year marked the first time all three major Federal District that would take due account In 2018, the Company completed the implementing the Long-Term Program for international rating agencies – S&P, Moody’s, of energy companies’ economically justified construction of 110 kV and 35 kV approach lines Replacement of Retired Capacities and Power and Fitch – upgraded the Company’s credit expenses. Taken together, these initiatives to the 220 kV Maya substation. Thanks to this System Development in the Far East that was ratings to sovereign (investment grade). At represent a concerted effort on our part to major infrastructure project in the Far Eastern drafted by the Company’s management team the same time, ACRA confirmed RusHydro’s boost the Company’s fundamental value for Federal District, starting 2019, the frequencies and approved by the Board of Directors in top credit rating on the national scale, noting the benefit of all shareholders. of the Central and Western energy hubs of 2018. Key projects under the Program include the critical systemic importance of the Yakutia were synchronized with the UES of the construction of Khabarovskaya Company for the Russian economy. The Group’s power generation, including East, thereby ensuring a more reliable power CHPP-4, Artemovskaya CHPP-2 and the second Boguchanskaya HPP, increased 2.8% y-o-y supply for the republic. stage of Yakutskaya GRES-2, the upgrade I would like to take this opportunity to express to reach an all-time peak of 144.3 bn kWh, of Vladivostokskaya CHPP-2. Following deep gratitude to the employees engaged in while power output across Russia grew 1.6% RusHydro continues to develop power the inclusion of these projects in the state heat the generation, transmission, retail, design and y-o-y. Our strong operating performance retailing, having opened 17 unified accounting upgrade program, RusHydro will proceed with other operations of our unique energy holding. was the result of effective management centers in the Krasnoyarsk and Khabarovsk the construction and modernization of power At the end of the day, it was your hard work of hydropower operational regimes amid territories and in the Sakhalin Region, with plants with guaranteed return on investment. that made this year a success for RusHydro higher-than-usual water levels in rivers and two more centres in the Primorye Territory Group. We have no intention of slowing down. the growing demand for electricity in the set to follow in 2019. This aligns perfectly with RusHydro’s Value Growth Plan through 2021 Instead, we will continue raising the bar to bring Far Eastern Federal District, which is almost the Russian President’s Order On National includes a number of initiatives, but most the best value to our shareholders, consumers, entirely powered by RusHydro Group. Goals and Strategic Objectives of the Russian importantly it promotes the principles of and the country’s economy. Federation through to 2024, as such centers guaranteed return on investment in the Far In 2018, RusHydro launched Vostochnaya contribute to fostering a comfortable urban East thermal generation, introduction of CHPP in Vladivostok (the new capital of the environment and promoting digital economy. long-term tariff regulation in the Far Eastern Nikolay Far Eastern Federal District) and the third Unified accounting centers help create Federal District, stronger efficiency and lower SHULGINOV hydropower unit at Ust-Srednekanskaya synergies for RusHydro by consolidating operating costs. HPP in the Magadan Region. The Group also the Group’s retail functions, improving Chairman of the Management Board – commissioned a unique wind power plant in payment discipline, slashing consumer debt, In 2017–2018, savings from initiatives aimed General Director the Arctic settlement of Tiksi in the Republic and diversifying the utilities business. at cutting operating costs amounted to over of Sakha (Yakutia) and completed the first RUB 12 bn, while total procurement savings stage of Anadyrskaya CHPP gasification in The Group’s investment program through to across RusHydro Group came in at RUB 9.55 bn Chukotka. 2023 (as approved by the Board of Directors) for 2018 alone. We intend to continue our cost sets out the scope of mid-term initiatives, reduction and efficiency improvement efforts As part of its HPP Comprehensive providing for an estimated RUB 383 bn to to maximize savings. Modernization Program, RusHydro upgraded be spent on commissioning around 1.4 GW eight hydropower units with a total capacity and over 560 Gcal/h of power and heat The management’s work to optimize operating of 659 MW at seven HPPs. capacities, respectively, as well as on building costs coupled with strong operational
8 9 //COMPANYPROFILE
RUSHYDRO GROUP ANNUALLY COMMISSIONS NEW GENERATION FACILITIES AND UPGRADES EXISTING ONES. AT THE END OF 2018, RUSHYDRO’S INSTALLED CAPACITY INCREASED TO 39.4 GW, WHICH EVEN MORE BROUGHT THE POWER HOLDING TO FIRST PLACE AMONG DOMESTIC PEERS AGAINST THIS INDICATOR. RUSHYDRO OPERATES AND BUILDS POWER PLANTS IN THE CENTRAL PART OF RUSSIA, THE VOLGA REGION, IN THE NORTH CAUCASUS, IN SIBERIA, AND IN THE FAR EAST. //COMPANY PROFILE PJSC RusHydro | Annual report 2018 ABOUT RUSHYDRO’S COMPANY HISTORY PJSC RusHydro was established on December 2, 2004 as 2018 part of the reorganization of the national energy holding RAO UES of Russia. 2004–2005 2016 2017 RusHydro is the largest hydro-generating Installed electrical capacity of 1 The Company completed the construction of Zelenchukskaya RusHydro and VTB Bank completed the unique for the Russian company in Russia and among the top RusHydro Group is As part of the government program to HPP-PSP with a capacity of 140 MW and 156 MW in turbine market transaction on acquiring 13% of RusHydro’s shares and global hydropower companies in terms of reform the power sector, PJSC RusHydro (previously, OJSC HydroOGK) was and pump modes, respectively. concluding a five-year forward contract. All proceeds were used installed capacity of power plants. established on the basis of RAO UES of to refinance the debt of RusHydro Group’s Far Eastern energy Russia hydropower plants. The Company completed the second construction stage of companies. RusHydro Group is a leader in generating 39.4 Blagoveshchenskaya CHPP, increasing its electricity and heat renewable energy from water flows, solar, GW capacity by 120 MW to 400 MW and by 188 Gcal/h to 1,005 The Company completed the first construction stage of wind, and geothermal energy. [102-1], [102-2] Gcal/h, respectively. 193.5 MW Yakutskaya GRES-2, the largest power plant built under the Presidential Decree. The Company is registered in Krasnoyarsk Installed heat capacity of and headquartered in Moscow. [102-3] RusHydro Group is RusHydro Group operates within the 2006 Unified Energy System (UES) of Russia. RusHydro and RUSAL signed a joint One of the Group’s key assets is JSC RAO agreement on the implementation of the ES East Subgroup representing the most 18,924 Boguchanskaya Power and Metallurgical part of the Far Eastern Federal District’s Gcal/h Association project to complete 2010 2012 2015 power grid. The Company also operates in Boguchanskaya HPP – one of the largest and the global market by managing Armenia- longest construction projects of the Soviet For the first time in its history, RusHydro was In accordance with the Russian President’s Decree, 100 MW Gotsatlinskaya HPP was based Sevan-Hrazdan Сascade HPPs [102-4]. Headcount as at December 31, time and build an aluminium smelter. named among the world’s Top 250 largest RUB 50 bn were contributed to RusHydro’s put into operation in the Republic 2018 totaled energy companies, according to the 2010 authorized capital for the implementation of four of Dagestan. The Company also In accordance with the Russian President’s The Company put into operation the Top 250 Global Energy Company Rankings priority thermal generation projects in the Far East, commissioned 1 MW Batagay SPP, Order No. 1009 dated August 4, 2004, first stage of Irganayskaya (400 MW), by Platts. The Company ranked 113th in the including the construction of the second stage the world’s largest solar power PJSC RusHydro has been included in the Gelbakhskaya (44 MW), Maginskaya (1.2 MW) consolidated rating and 2nd in the list of the of Blagoveshchenskaya CHPP, the first stage of plant beyond the Arctic Circle, as world’s fastest-growing energy companies. well as four smaller SPPs. list of strategic enterprises and joint stock and Agulskaya (0.6 MW) smaller HPPs in the Yakutskaya GRES-2, Sakhalinskaya GRES-2, and CHPP 69.7 Republic of Dagestan, and the third stage of in Sovetskaya Gavan. companies since 2012. ‘000 people Zelenchukskaya HPP in Karachay-Cherkessia. Currently, RusHydro Group comprises over 400 power generation facilities, including Russia’s largest Sayano- Shushenskaya HPP named after P. S. Neporozhniy (capacity of 6,400 MW), nine power plants of Volga-Kama 2009 2011 2013–2014 cascade (total installed capacity over 10,000 MW), Bureyskaya HPP (capacity An accident took place at Sayano-Shushenskaya HPP. The Russian Federation contributed a The main recovery and reconstruction operations of Sayano-Shushenskaya RusHydro arranged for the recovery operations and controlling stake in RAO ES East to the HPP were completed, with the HPP reaching its design capacity of 6,400 MW. of 2,010 MW), Zeyskaya HPP (capacity of engaged Power Machines as a supplier of the core Company’s authorized capital, increasing the In addition, a major upgrade took place at the entire technological complex 1,330 MW), Novosibirskaya HPP (capacity equipment. First units were restored and put into installed capacity of RusHydro Group from of the plant, making Sayano-Shushenskaya HPP the most advanced and the of 480 MW), several dozen hydroelectric operation in next to no time. 26.1 to 35.2 GW. safest hydroelectric power plant in Russia. power plants in the North Caucasus and highly maneuverable capacities of The Company commissioned the first two hydropower units at Ust- pumped storage power plants (PSPP). Srednekanskaya HPP in the Magadan Region, with the plant capacity reaching RusHydro Group also includes thermal 2007–2008 168 MW. power plants in the Far East with a The Company achieved its target model. PJSC RusHydro total capacity of over 8,000 MW and Boguchanskaya HPP ramped up to the designed installed capacity consolidated more than 50 hydroelectric power plants in geothermal power plants in Kamchatka. of 2,997 MW. 18 Russian regions. Yuzhno-Sakhalinskaya CHPP-1 saw its 139 MW power unit No. 4 start Two 335 MW hydroelectric units of Bureyskaya HPP were put generating electricity. into operation.
1 The indicator includes the electric capacities of RAO ES East Subgroup and Boguchanskaya HPP built and jointly operated with UC RUSAL.
12 13 //COMPANY PROFILE PJSC RusHydro | Annual report 2018 2018 milestones February June August
↗↗RusHydro was the first of the Russian corporates to issue ↗↗Votkinskaya HPP’s hydropower unit No. 7 was ↗↗The Company paid out RUB 11.2 bn as dividends for 2017.1 three-year ruble-denominated Eurobonds with a coupon upgraded as part of RusHydro’s Comprehensive rate of 7.4% in 2018. The issue was oversubscribed by four Modernization Program, becoming the second ↗↗PJSC Sakhalinenergo completed the first stage of power asset consolidation in the Sakhalin Region, 1 times of the necessary volume of RUB 20 bn. fully modernized hydropower unit at the plant. which increased the Group’s voting share holding to above 75%. As part of the additional issue of PJSC Sakhalinenergo’s shares, 91 MW power unit No. 5 at Yuzhno-Sakhalinskaya CHPP-1 and other facility ↗↗The Group’s financial debt went down by RUB 26 bn infrastructure were transferred from JSC RAO ES East into the ownership of PJSC Sakhalinenergo. following exclusion of guarantee obligations between RusHydro and Vnesheconombank on ↗↗The Bank of Russia registered RusHydro’s additional share issue and the prospectus. The issue size totaled PJSC Boguchanskaya HPP. RUB 14 bn. The decision was made by RusHydro’s Board of Directors in June 2018 as part of the first stage of May construction of two 110 kV high-voltage single-circuit power lines Pevek – Bilibino in Chukotka. ↗↗PJSC RusHydro was named Approved Employer by the ↗↗RusHydro’s Dagestan branch Association of Chartered Certified Accountants (ACCA). commissioned Miatlisnkaya ↗↗Fitch Ratings (Fitch) upgraded the Company’s long-term credit rating and the credit ratings of its bonds to HPP’s hydropower unit an investment grade BBB- (stable outlook). ↗↗S&P Global Ratings (S&P) upgraded the Company’s long- No. 2. Now all HPP’s turbines term credit rating to an investment grade BBB- (stable were replaced as part of the outlook). Comprehensive Modernization Program.
March July September October
↗↗Volzhskaya HPP, the largest ↗↗RusHydro Group sold its stock in PJSC Inter RAO (5,131,669,622.18 shares) to JSC Inter RAO ↗↗CHPP Vostochnaya commissioned in Vladivostok ↗↗RusHydro and Uzbekgidroenergo, the Uzbek national hydro-generating HPP of the Volga-Kama Capital, which accounts for 4.915% of the authorized capital. The decision was part of non- is the first large-scale power plant going into company, signed a cooperation agreement to develop hydropower cascade, commissioned a new core asset divestment effort in accordance with the orders and directives of the Russian operation in the capital of the Primorye Territory generation in Uzbekistan. The agreement provides for a feasibility study hydropower unit and replaced Government. in the last 45 years. It is expected to produce of 240 MW Mullalakskaya HPP and 200 MW Verkhne-Pskemskaya HPP a turbine, generator and auxiliary 791 m kWh of electricity and 1.377 mn Gcal of construction projects on the Pskem River in Uzbekistan, including design equipment as part of the ↗↗At Novosibirskaya HPP, the turbine replacement was followed by commissioning of the heat annually. and survey, and research and development. Comprehensive Modernization hydropower unit No. 7, as part of the Comprehensive Modernization Program. The upgrade Program. boosted Novosibirskaya HPP’s installed capacity by 5 MW. ↗↗RusHydro’s updated environmental policy came into effect seeking to increase the installed capacity of low-carbon generation, reduce direct ↗↗The first gas power boiler of ↗↗The Alania National Park and RusHydro released two leopards on the IUCN Red List into the and per unit greenhouse gas emissions, and prevent species elimination Anadyrskaya TPP was launched wild. RusHydro’s leopard conservation project in the North Ossetia received the Vernadsky as a result of operating activities. under a gasification agreement National Environmental Award as the Best Social and Environmental Initiative. between RusHydro and the ↗↗RusHydro established the Institute of Hydropower and Renewable Energy Government of the Chukotka ↗↗Cheboksarskaya HPP put into operation hydropower unit No. 14 as part of the Comprehensive Sources as part of Moscow Power Engineering Institute to train engineers Autonomous Area to carry out Modernization Program, which included the recovery of the adjustable blade pitch and the for hydro- and renewable power generation. an extensive upgrade of the replacement of the generator stator. plant’s equipment and build gas pipelines.
1 At the end of the reporting year, the issue won annual Cbonds Award 2018 as Best Primary 1 As at December 31, 2018, RUB 11.188 bn was paid to all persons and entities listed in the dividend records, excluding those who had not provided full and accurate banking details for Eurobond Deal through open voting among professional bond market participants. the payment on their registration form, and those for whom the nominal holder has not fulfilled their dividend transfer obligations for reasons outside their control.
14 15 //COMPANY PROFILE PJSC RusHydro | Annual report 2018 November February March KEY ↗↗ A unique 900 kW wind power plant was commissioned in ↗↗The divestment of RusHydro’s 40% ↗↗RusHydro and RUSAL commissioned, the settlement of Tiksi, the Republic of Sakha (Yakutia). It share in VolgaHydro, a hydropower within two start-up complexes, the first AWARDS AND RATINGS produces green energy for over 4,500 inhabitants of the equipment manufacturing joint series of the Boguchansky Aluminum isolated polar settlement. venture in the Saratov Region, to Smelter being being part of the Voith. The sale price (RUB 450 mn) Boguchansky energy-metallurgical RUSHYDRO’S CREDIT RATINGS AWARDS ↗↗ RusHydro became the first Russian corporate borrower to was determined by an independent association. issue three-year dim sum bonds (Eurobonds denominated appraiser and fully covered in offshore Chinese renminbi) for CNH 1.5 bn. The issue is RusHydro’s investment into the ↗↗At once several projects were completed the largest public financing transaction denominated in project. within RusHydro Comprehensive CNH by a Russian borrower. The coupon rate was set at Modernization Program: next to the International: 6.125% per annum. ↗↗Moody’s Investors Service Inc. last hydro turbine was replaced at (Moody’s) upgraded the Company’s the Novosibirskaya HPP, the hydraulic S&P Global Ratings Cbonds Awards ↗↗ The first unit was commissioned at Rogun HPP, which long-term credit rating and unit No. 9 was commissioned at the In February 2018, the agency upgraded long-term credit rating RusHydro won annual Cbonds Award 2018 as its ruble- is under construction on the Vakhsh River (Tajikistan) Eurobonds rating to an investment Saratovskaya HPP, and a hydraulic unit of RusHydro and its Eurobonds at investment grade BBB- denominated notes placement in February 2018 was according to the resolution of the national government. grade Baa3 (stable outlook). with SS No. 3 and a new hydrogenerator (stable outlook), which was affirmed in April 2018. named Best Primary Eurobond Deal. The project was developed by the Moscow-based was commissioned at the Volzhskaya Hydroproject Institute, part of RusHydro Group. HPP, a hydraulic unit with SS No. 3 was commissioned at the Cheboksarskaya ↗↗ RusHydro issued ruble-denominated eurobonds in the HPP. Fitch Ratings Report Watch amount of RUB 15 bn maturing in 2022. The issue was In August 2018, the agency upgraded the Company’s long- Report Watch maintained its rating on RusHydro’s oversubscribed three times, and the coupon rate was set ↗↗RusHydro joined the leaders in the indices term credit rating and the credit ratings of its bonds to an annual report for 2017 at B+ (the top rating among the at 8.975% per annum. The eurobonds were placed on the of the Russian Union of Industrialists investment grade BBB- (stable outlook). Russian companies). Irish Stock Exchange. and Entrepreneurs “Responsibility and transparancy” and “Sustainability Vector”. Moody’s LACP 2018 Spotlight Awards In October 2018, the agency upgraded the Company’s BCA; in RusHydro’s annual report for 2017 won international February 2019, it upgraded credit ratings of RusHydro and its LACP 2018 Spotlight Awards and made it to the Top 100 bonds to an investment grade Baa3 (stable outlook). Worldwide.
Events after the reporting date National: RusHydro enjoys a leading position in ACRA corporate social responsibility In June 2018, ACRA affirmed its long-term credit rating on December January April RusHydro and its bonds at ААА(RU) (stable outlook), which ↗↗ Ranks among Top 3 most transparent electricity represents the top reliability level. companies, according to Transparency in ↗↗RusHydro’s Board of Directors adopted ↗↗The Central and Western districts ↗↗RusHydro held a public hearing on Corporate Reporting analysis conducted by the the resolution to begin the levelling of of Yakutia are connected to the the 2018 annual report draft involving Zagorskaya PSPP-2 building. The works Unified Energy System of Russia. the representatives of the main groups Russian branch of Transparency International; will kick off in 2019 and will take some 2.5 PJSC Yakutskenergo, a subsidiary of stakeholders. ↗↗ leads the Responsibility and Transparency and years. of PJSC RusHydro, transferred the Sustainability Vector indices of the Russian Union of supervision and control over the ↗↗The Board of Directors approved the new FOR THE FIRST TIME IN THE COMPANY’S HISTORY, Industrialists and Entrepreneurs; ↗↗RusHydro Group put into operation territory to the System Operator. edition of the Regulations on the Dividend INTERNATIONAL RATING AGENCIES PUT RUSHYDRO IN ↗↗ ranks second in the environmental rating of the the third hydropower unit at Ust- Policy of RusHydro. The basic scenario THE INVESTMENT CATEGORY. Russian energy companies and the best electricity Srednekanskaya HPP in the Magadan is the payment of 50% of RusHydro company according to Environmental Initiatives Region, increasing the plant’s capacity by Group’s profit under IFRS. The minimum of the Russian Companies in Media: Energy and 142.5 MW to 310.5 MW. dividend payout is the average amount of National Corporate Governance Rating Metals study; dividends paid for the previous 3 years. ↗↗ ranks among world’s Top 20 green energy The validity period of the Regulations is companies according to Energy Intelligence. 3 years. RusHydro›s corporate governance rating upgraded to level 8 (Best Corporate Governance Practice). It is the highest rating assigned by the National Corporate Governance Rating to its Russian members.
16 17 //COMPANY PROFILE KEY FIGURES [102-7] Financial data in accordance with IFRS1 Operational performance 1
Revenue and operating costs2, RUB mn Net income, RUB mn Installed capacity1, MW 8 8 8 0 0
2 8 2 8 1 0 0