Keno City – Gestern Und Heute, S Entdeckungstour am Keno Hill GESCHICHTEN AUS EINER SILBERBERGBAUREGION ���������� Inhalt In dieser Broschüre beschriebene Wege: Willkommen am Keno Hill, S. 1 Signpost Road, S. 5 Lightning Creek-Weg, S. 15 So kommen Sie hierher: Der Silver Trail Highway, S. 2 Butterfly-Weg, S. 11 Gambler Gulch-Weg, S. 20 Keno City – gestern und heute, S. 4 Silver Basin-Weg, S. 12 Keno 700-Weg, S. 21 Beringia und Vergletscherung, S. 6 Monument-Weg, S. 13 Mount Hinton, S. 25 Nacho Nyak Dun: „Die Menschen am großen Fluss“, S. 8 Signpost Road: Wandern auf dem Höhenzug des Keno Hill, S. 10 10,5 km langer, steiler Anstieg Goldtagebau – Die Suche nach dem gelben Metall!, S. 14 zum Gipfel Am Gipfel des Keno Hill: Ein Silbervorkommen von Weltrang, S. 16 Geologie, S. 22 Butterfly-Weg: Wanderung in einem Mineralisierung, S. 23 Schmetterlingslebensraum Silver Basin-Weg: Wanderung mit Ausblicken über das Keno-Ladue-Tal und zum Silver Basin ©2004, Yukon Development Corporation Gulch Telefon: (867) 393-5300 Monument-Weg: Wanderung auf dem Kamm Produktion: K-L Services, Whitehorse, Yukon mit Blick über die alte Anlage des Keno 700- Bergwerkes Übersetzung aus dem Englischen: TransGerman Lightning Creek-Weg: Communications, Whitehorse, Yukon Wanderung, die bis zum McMillan Gulch fortgesetzt werden kann Diese Broschüre wurde von Yukon Development zur Gambler Gulch-Weg: Förderung des Gemeinwohls produziert. Es wurden Wanderung zum Gambler alle erforderlichen Bemühungen angestellt, um Claim und der verlassenen Ortschaft Wernecke; exakte Informationen zu veröffentlichen. Wir freuen kann zur Tageswanderung ausgedehnt werden uns ausdrücklich über Verbesserungsvorschläge Keno 700-Weg: Wanderung zu einem alten für zukünftige Auflagen. DIE BENÜTZUNG Bergwerk mit Blick auf die Gustavus-Berge DER BESCHRIEBENEN GEGEND ERFOLGT Mount Hinton: AUSDRÜCKLICH AUF EIGENE GEFAHR. In dieser Reihe örtlicher, deutschsprachiger Führer Sourdough Hill-Weg: Wanderung, die bis zum sind auch erschienen: Wandern rund um Whitehorse, Die Südgipfel von Mount Hinton fortgesetzt werden Fischleiter von Whitehorse entdecken, und Whitehorse von kann oben gesehen. Bunker Hill-Weg: Wanderung von Keno City zum Als Querverweis zu dieser Broschüre benutzen Sie Nordgipfel von Mount Hinton. bitte: K-L Services, 2004. Entdeckungstour am Keno Hill. Geschichten aus einer Silberbergbauregion. Yukon Weitere Informationen: Development Corporation, 25 Seiten Gaffin, Jane. Cashing In. Word Pro, Whitehorse, 1980. Alle Fotos © die jeweils angegebenen Fotografen Kindle, E.D. Geology, Keno Hill, Commission géologique Umschlagfotografien: Insa Schultenkotter (Hund du Canada, carte 1105A, 1962. am Keno 700-Weg, Hütten im Gambler Gulch), LeBarge, W., Bond, J.D. et F.J.M. Hein. Placer gold Bruce Bennett (Schmetterling), Peter Long (Elch deposits of the Mayo area, central Yukon. Division des am Sourdough Hill, Loren am Keno 700-Bergwerk, services géologiques et d’exploration, région du Yukon, Wanderer am Silver Basin-Weg, Mountain Club-moss, Lycopodium selago) ministère des Affaires indiennes et du Nord canadien, bulletin 13, 2002. Danke an… Lipovsky, P., Bond, J. et W. LeBarge. Mayo area placer activity map. Division des services géologiques et Bruce Bennett, Barbara Bergmann, Jeff Bond, d’exploration, région du Yukon, ministère des Affaires Steve Buyck, Marilyn Dobbin-White, Doug Eaton, indiennes et du Nord canadien, dossier public 2001-31, Diane Emond, Libby Gunn, Greg Hare, Lillian Loponen, 2001. Laurie MacFeeters, Mike Mancini, Mike Phillips, Sally Robinson, Charlie Roots, Nerissa Rosetti, Mayo Historical Society. Gold & Galena. 1990. Insa Schultenkotter, Sonia Stangee, Sam Wallingham McTaggart, K.C. The geology of Keno and Galena hills, territoire du Yukon, Commission géologique du Canada, Active Living ist eine Lebensweise, die bulletin 58, 1960. körperliche Aktivitäten hoch einstuft und in den Lebensalltag integriert. Die Recreation Pielou, E.C. After the Ice Age. University of Chicago Press, and Parks Association of the Yukon fordert 1991. Yukoner auf, jeden Tag aktiv zu sein! Weitere Yukon. Ministère de l’Énergie, des Mines et des Informationen und Inspirationen erhalten Sie unter Ressources. 105M/14/quartz claims, Mayo Mining District, 867-668-2328. 2003. Whitehorse, gouvernement du Yukon. Also published in English and French. Yukon. Ministère des Richesses renouvelables. Guide Publié aussi en français et en anglais. d’observation de la faune du Yukon, Whitehorse, gouvernement du Yukon, 2002. Willkommen am Keno Hill ie Gegend um Keno Hill, gelegen Geschichte unbeschadet. Es ist gesetzwidrig, in den Bergen des Zentral-Yukon, Gegenstände zu entfernen. Alle Fundstücke beheimatete einst eines der größten sind Zeugen der Bergbaugeschichte Kenos. DSilbervorkommen der Erde. Die vielen Wege Die Einwohner von Keno heißen alle Besucher und Pfade, ursprünglich von den Bergwerken herzlich willkommen und bitten Sie, keine angelegt, werden heute gerne von erfah- Abfälle zurückzulassen. renen Wanderern, Mountainbikern und SICHERHEIT: Bitte halten Sie sich von alten Wintersportenthusiasten genutzt. Bergwerksanlagen fern. Alte Schächte sind Aufgrund seiner Höhe (1.848 m ü.NN) und oft kaum erkennbar, tief, und unverschlossen. Lage war der Gipfel des Keno Hill während Stützpfosten können verrottet sein und ohne der letzten Eiszeit nicht von Gletschern über- Vorwarnung nachgeben. zogen. Verwandte von Pflanzen und Insekten Nähern sie sich Steilabbrüchen sehr vor- (inklusive Schmetterlingen), die während der sichtig. Steine sind oft lose und bröckeln leicht letzten Eiszeit hier heimisch waren, besiedeln ab. Schneefelder sind vereist und können sehr heute die alpinen Wiesen. steil und gefährlich sein. Diese Gegend besucht man am besten Benutzen Sie die alten Bergbaustraßen mit im Spätfrühling oder Frühsommer, wenn Vorsicht. Diese Straßen werden nicht unter- die Sonne lange am Himmel steht und halten und sind oft überwuchert. An manchen zu Nachtwanderungen einlädt. Es ist ein Stellen sind die Straßen kaum erkennbar und wahrer Genuss, nach Sonnenuntergang dem führen durch Weiden- und Erlengebüsche. Vogelgesang zu lauschen. Auswaschungen, Erdrutsche, RESPEKT: Alpine Ökosysteme sind sehr Wasseraustritte, Eis, Schlamm und andere empfindlich und können leicht gestört Gefahrenstellen gibt es häufig. Bedenken Sie, werden. Bleiben Sie auf den Wegen und dass es in Keno keinen Rettungsdienst gibt. Pfaden, um Bodenbrüter und Pflanzen zu Benutzen Sie gesunden Menschenverstand. schützen. Blumen sind Nahrungsquelle für Informieren Sie andere Personen über Ihr Schmetterlinge und andere Wanderer nach Ausflugsziel und geplante Rückkehrzeit. Ihnen erfreuen sich ebenfalls gerne an der Sie befinden sich hier in der Wildnis. Vegetation. Führen Sie Ihre Vierbeiner an der Seien Sie aufmerksam, machen Sie Lärm und Leine, um die Wildtiere nicht zu beunruhigen bleiben Sie wo möglich in offenen Gebieten, – Hunde sind für die langsamen Murmeltiere um Bären nicht unangenehm zu überraschen. ein unbekannter Feind. Das Mayo Renewable Resource Council Viele Pfade führen zu alten Gebäuden und ist an Ihren Tierbeobachtungen, insbesondere Relikten. Bitte lassen Sie diese Zeugnisse der von Karibus, sehr interessiert. Das letzte existierende Gebäude des Sheep Camp-Bergwerkes, erbaut in den 20er Jahren. Insa Schultenkotter 1 So kommen Sie hierher: Der Silver Trail Highway er 112 km lange Silver Trail Highway Abzweigung zum 5 MW-Wasserkraftwerk von führt von Stewart Crossing nach Keno Yukon Energy. Die 1952 erbaute Anlage lieferte City am Fuß des Keno Hill. Bekannt als einst Strom für die Silberbergwerke in Keno und DSilver Trail befindet sich Highway 11 im traditio- Elsa. Heutzutage verbindet eine Stromleitung nellen Gebiet der Nacho Nyak Dun-Ureinwohner, den Staudamm mit Dawson City. (Am Tor der einer Gegend mit sensationeller Landschaft, die Anlage gibt es keine Wendemöglichkeit.) zum Wandern, Angeln, Beerensammeln und Am Five Mile Lake Campground gibt Campen einlädt. es ein Picknickgelände, Bademöglichkeit, Bootsrampe und einen Wanderweg um den Der Silver Trail beginnt an der Klondike See. Der Campground befindet sich einen Highway-Brücke über den Stewart River. halben Kilometer nach der Abzweigung Die Straße hat festen Fahrbahnbelag und zum Wasserkraftwerk. Von hier aus führt der ermöglicht von etlichen Rastplätzen Ausblicke Highway als gut unterhaltene Schotterstraße auf den Stewart River und Eisfelder. In den weiter. Besucherzentren finden Sie weiterführende Bei Halfway Lakes stoßen Sie auf Broschüren wie Yukon’s Wildlife Viewing Guide ein typisches Beispiel des „betrunkenen und It’s all on the Silver Trail. Waldes“ (engl: drunken forest) – auftauender Permafrostboden bringt die Bäume auf ihm aus In der Ortschaft Mayo gibt es Benzin und der Senkrechten und lässt sie in verschiedenste Propangas, Motels, Restaurants, ein Postamt, Richtungen ragen. Tiefe Moosauflagen und staatlichen Alkoholladen, Lebensmittelgeschäft, Sträucher wie Grönländischer Sumpfporst und Recycling Centre, Schwimmbad, Krähenbeerenblättrige Bergheide schirmen den Krankenstation, Polizeistation, Flugplatz und Boden von der Sonneneinstrahlung ab. Wenn Wasserflugplatz. die Schutzvegetation beschädigt wird, beginnt Im Binet House Interpretive Centre (geöffnet der Boden zu tauen. nur im Sommer) finden Sie eine Sammlung his- Mit 1.839 m Höhe ist Mount Haldane ein torischer Fotografien, allgemeine Informationen, beeindruckender Gipfel. Eine Wanderung auf eine dreidimensionale Karte der Umgebung den Berg können sie an der Zufahrtsstraße und ein großes Exponat über die Geologie und auf der Westseite des Highways kurz vor dem
Recommended publications
  • Yukon Energy State of Play Updated 24DEC18
    Yukon Energy State of Play Submitted to: Yukon Energy, Mines and Resources Energy Branch 206 Lowe Street Whitehorse, Yukon Y1A 1W5 Submitted by: Paul Kishchuk, MA 203 – 301 Hawkins Street Whitehorse, Yukon Y1A 1X5 www.vectorresearch.ca [email protected] 867.668.3164 6 February 2018 Updated 24 DecemBer 2018 Yukon Energy State of Play Table of Contents Introduction ........................................................................................................................................................................................................... 1 Yukon Energy Overview ........................................................................................................................................................................................ 1 Energy Balance of Trade ....................................................................................................................................................................................... 6 Energy Transportation Infrastructure ................................................................................................................................................................... 7 Yukon Energy Capacity ........................................................................................................................................................................................ 10 Yukon Energy Production ...................................................................................................................................................................................
    [Show full text]
  • YEC-1-1 REVISED the Proposed Mayo Hydro Enhancement Project (Mayo B)
    UTILITIES CONSUMERS’ GROUP (UCG) Application for an Energy Project Certificate and Yukon Energy Corporation an Energy Operation Certificate Regarding UCG-YEC-1-1 REVISED the Proposed Mayo Hydro Enhancement Project (Mayo B) 1 TOPIC: 2 3 REFERENCE: 4 5 Application, page 1 6 7 YEC indicates that “the planned in-service date for Mayo B of late 2011 reflects 8 requirements of Yukon Energy’s funding agreement with the federal government for 9 Mayo B and Stage 2 of the Carmacks-Stewart Transmission Project (CSTP) connecting 10 the Mayo-Dawson (MD) and Whitehorse-Aishihik-Faro (WAF) grids. The timing for Mayo 11 B also reflects the opportunity to displace diesel generation energy requirements 12 associated with growing power loads on both grids”. 13 14 QUESTION: 15 16 a) Please explain the requirements of the funding agreement with the Federal 17 government that are determining the construction schedule of this Yukon 18 infrastructure project. 19 20 b) What efforts have been taken to extend the funding agreement timeframes to 21 allow for a more complete and thorough review of this project? Please provide all 22 correspondence related to these efforts. 23 24 ANSWER: 25 26 (a) 27 28 Section 3 of the Federal Funding Agreement sets out the obligations of the parties; 29 section 3.1 notes the contribution to be paid by Canada is subject to the Terms and 30 Conditions of the agreement, including Schedule B. Section 3.1(a) states that Canada 31 will not pay more than 50% of the Eligible Costs (up to $71 million) during the three 32 Fiscal Years starting in 2009-2010 and ending in 2011-2012.
    [Show full text]
  • 2019 Annual Report
    2019 annual report Our Whitehorse Rapids Generation Station – Archbould.com ii table of contents Who we are ............................................................ 2 Mission .............................................................. 2 Values ............................................................... 2 Vision ................................................................. 2 Message to Yukoners ............................................ 4 President’s Welcome ............................................. 6 2019 At a Glance ................................................... 8 2019–2024 Strategic Priorities and Performance .................................................10 2019 Corporate Goals and Performance ...........12 Health, Safety and Environment ..........................14 Customers, Community and Partnerships ..........16 Management Discussion and Analysis .............22 Financial Statements ............................................28 1 who we are Established in 1987, Yukon Energy is a publicly owned electrical utility that operates as a business, at arms-length from the Yukon government. We are the main generator and transmitter of electrical energy in Yukon. We work with our parent company, Yukon Development Corporation, to provide Yukoners with sustainable, cost-effective and reliable electricity. There are over 21,000 electricity consumers in the territory. Yukon Energy directly serves over 2,200 of these customers, most of whom live in and around Mission Dawson City, Mayo and Faro. Indirectly, we provide
    [Show full text]
  • August 28Th, 2018 1
    AUGUST 28TH, 2018 1. INTRODUCTION On June 20th and June 21st, an important gathering took place in the Yukon. For the 127-year-old Canadian Electricity Association (CEA), it was the first Board of Directors meeting in Canada’s North. The meeting also came at an important juncture in Canadian history—one defined by the pursuit of reconciliation with Indigenous peoples and prosperity for all Canadians. On the first day, CEA, together with two of our member companies that operate in the North — Yukon Energy and ATCO — hosted a symposium addressing the energy needs of the North, in Carcross, on the traditional territory of the peoples of Carcross / Tagish First Nation. Despite this backdrop of promise and commitment, Canada’s remote and northern communities suffer from a significant level of “energy inequality”, where the cost of electricity in many communities is estimated to be over ten times higher than the Canadian average. This lack of access to affordable power has limited their economic potential and stifled the region’s economic development and prosperity. It also impacts their social fabric. Yet, within the challenge of addressing this inequality lies the opportunity for industry, Indigenous peoples, communities, and all levels of government to work in partnership to invest in clean energy, spur economic development, address environmental challenges, and power tomorrow’s low-carbon economy. That is why CEA brought leaders from industry, governments, Indigenous organizations, academia and other community leaders to Carcross for a symposium entitled, “Powering the Future: Partnering in Energy Development”, to discuss the unique challenges and opportunities that exist in Canada’s North and how we can all work together to build a cleaner, more prosperous future for all.
    [Show full text]
  • Yukon Energy Corporation Independent Power Producers
    Yukon Energy Corporation Independent Power Producers Interconnection Technical Guide Revision: 04b Release Date: 2019 01 24 Disclaimer This report was prepared under the supervision of Teshmont Consultants LP (“Teshmont”), whose responsibility is limited to the scope of work as shown herein. Teshmont disclaims responsibility for the work of others incorporated or referenced herein. Revision History Revision Number Date Released Prepared by Reviewed by Comments Robyn Tarrant, PEng David King, PEng 00 May 14, 2018 First Draft Dwayne Aming, PEng Robert Baker, PEng Robyn Tarrant, PEng 01 May 30, 2018 David King, PEng Second Draft Dwayne Aming, PEng Robyn Tarrant, PEng Third Draft. Incorporated 02 June 5, 2018 David King, PEng Dwayne Aming, PEng YEC Comments. Robyn Tarrant, PEng Fourth Draft. Incorporated 03 June 18, 2018 David King, PEng Dwayne Aming, PEng YEC Comments. Robyn Tarrant, PEng Fifth Draft. Incorporated 04 September 17, 2018 David King, PEng Dwayne Aming, PEng YEC Comments. i Independent Power Producers Interconnection Technical Guide | 2019 01 Contents Executive Summary ....................................................................................................................................... 6 1. Introduction and Scope ......................................................................................................................... 7 1.1. Purpose ........................................................................................................................................... 7 1.2. Limitations .....................................................................................................................................
    [Show full text]
  • Presentation-Yecpresentation E.Pdf
    Good morning, Chairman Neufeld and committee members. Thank you for the invitation to present to you on Yukon Energy’s business and the issues facing us. I will refer you to the slide presentation which I believe you have a copy of. I am now turning to slide 2. 1 I’ll address three general topics in my presentation: 1. Firstly. I’ll provide an overview of Yukon Energy, our asset profile, our recent project history, and our current status. 2. Next, I’ll discuss the options that we are focusing on for new supplies of energy 3. And finally, I’ll touch on some of the challenges that we face. After my formal remarks, I’ll be happy to take any questions that you have. Moving now to slide 3. 2 Yukon Energy is one of two regulated utilities in the Yukon. We are responsible for the majority of electricity generation in the Territory, including 3 hydro facilities and a fleet of back‐up diesel generators. We also own and operate the majority of the electrical grid in the Territory. We distribute electricity to residential and commercial customers in a few of the grid‐connected communities outside of Whitehorse, including Dawson City, Mayo and Faro. We do not serve any remote off‐grid communities. ATCO Electric Yukon is the other regulated utility in the Yukon –they distribute power to residential and commercial customers here in Whitehorse, and they also provide power to a number of off‐grid communities, including Burwash Landing, Destruction Bay, Beaver Creek, Old Crow and Watson Lake.
    [Show full text]
  • Yukon Electrical Company Limited & Yukon
    ________________________________________________________________________ Yukon Electrical Company Limited & Yukon Energy RATE SCHEDULES Approved in Board Order 2011-06 (June 22, 2011) YECL/YEC Joint 2009 Phase II Page 1 of 3 Effective: 2011 07 01 Supercedes: 1997 01 01 ________________________________________________________________________ RATE SCHEDULES Residential Rates - Non Government (Equalized) Rate Schedule 1160 Service in Hydro Area 1260 Service in Small Diesel Area 1360 Service in Large Diesel Area 1460 Service in Old Crow Diesel Area Residential Rates - Government (Equalized) Rate Schedule 1180 Service in Hydro Area 1280 Service in Small Diesel Area 1380 Service in Large Diesel Area 1480 Service in Old Crow Diesel Area General Service Rates - Non Government (Equalized) Rate Schedule 2160 Service in Hydro Area 2260 Service in Small Diesel Area 2360 Service in Large Diesel Area 2460 Service in Old Crow Diesel Area General Service Rates - Municipal Government (Equalized) Rate Schedule 2170 Service in Hydro Area 2270 Service in Small Diesel Area 2370 Service in Large Diesel Area 2470 Service in Old Crow Diesel Area Approved in Board Order 2011-06 (June 22, 2011) YECL/YEC Joint 2009 Phase II Page 2 of 3 Effective: 2011 07 01 Supercedes: 2003 03 01 ________________________________________________________________________ General Service Rates - Federal and Territorial Government (Equalized) Rate Schedule 2180 Service in Hydro Area 2280 Service in Small Diesel Area 2380 Service in Large Diesel Area 2480 Service in Old Crow Diesel Area
    [Show full text]
  • TO the PRESENT and Building for the Future
    FROM THE PAST TO THE PRESENT And Building for the Future YUKON ENERGY CORPORATION 2008 Annual Report Left: Construction on the Whitehorse dam, c. 1957. PHOTO: Yukon Archives/Whitehorse Star. Right: Stringing line on the Carmacks-Stewart transmission project. PHOTO: www.archbould.com TABLE OF CONTENTS Message from the President . .2 Supporting Our Communities . .14 Overview (Vision, Mission and Values) . .4 Whitehorse Food Bank . .14 Southern Lakes Community Meetings . .14 Our Employees . .5 Swan Cam . .14 Summary of Utility Operations . .6 Rescue Equipment. .14 French Service Award . .15 Financial Contributions to Non-Profi t Groups . .15 Key Activities . .7 Scholarships . .15 General Rate Application . .7 50th Anniversary Celebrations . .16 Carmacks-Stewart Transmission Line Project . .7 Community Involvement . .16 Mayo B . .8 Aishihik Third Turbine . .8 Diesel Improvements . .8 Board of Directors/Senior Management . .17 Reliability . .8 Board of Directors’ Appointments . .18 Geo-thermal Power . .9 Southern Lakes Hydrology Study . .9 Remuneration . .19 Mayo-Dawson Transmission Line . .9 Management Discussion and Analysis . .20 Secondary Sales . .10 Financial Highlights . .21 Legal Issues. .10 Audited Financial Statements . .22 Health and Safety . .10 Protecting Our Environment . .11 Greenhouse Gas Emission Reductions . .11 Yukon Energy is committed to providing our customers with Climate Change . .11 exceptional value in rates, service, Demand Side Management . .11 reliability and public safety. Whitefi sh Study. .12 This annual report is a tribute to all our customers and our highly Whitehorse Rapids Fishway . .13 professional and dedicated staff. Whitehorse Rapids Fish Hatchery. .13 MESSAGE FROM THE PRESIDENT This was, without a doubt, one of the busiest years in Yukon Energy’s history.
    [Show full text]
  • Keno Brochure PRINT.Indd
    Exploring Keno Hill STORIES OF A SILVER DEPOSIT ���������� CONTENTS Trails described in this guide Welcome to Keno Hill, p.1 Signpost Road, p.5 Lightning Creek trail, p.15 Getting here: The Silver Trail highway, p.2 Butterfly trail, p.11 Gambler Gulch trail, p.20 Keno City, then and now, p.4 Silver Basin trail, p.12 Keno 700 trail, p.21 Monument trail, p.13 Mount Hinton, p.25 Beringia and glaciation, p.6 Nacho Nyak Dun: “Big River People,” p.8 Signpost Road: 10.5-km steep drive to the top Hiking on top of Keno Hill, p.10 Top of Keno Hill Placer mining: The search for gold!, p.14 Butterfly trail: hike in a butterfly meadow A world-class silver deposit, p.16 Geology, p.22 Silver Basin trail: hike with views over Keno- Ladue valley and down Silver Basin Gulch Mineralization, p.23 Monument trail: hike on the summit overlooking old Keno 700 minesite ©2004, Yukon Development Corporation, (867) 393-5300 Lightning Creek trail: hike with long option to McMillan Gulch Production by: K-L Services, Whitehorse, Yukon Gambler Gulch trail: This guide is provided by Yukon Development as a hike to Gambler claim community service. Every effort has been made to and Wernecke townsite with full-day option verify the information provided here. Any suggestions to Faro Gulch you have for inclusion in future printings are welcome. Keno 700 trail: hike to old minesite with views USE OF THIS AREA IS STRICTLY AT YOUR to Gustavus Range OWN RISK. Mount Hinton One in a series of local attraction guides.
    [Show full text]
  • Diesel & Thermal Electricity Generation Options
    DIESEL & THERMAL ELECTRICITY GENERATION OPTIONS Background Paper, Yukon Energy Company Energy Planning Charrette Whitehorse, March 6-9, 2011 Cam Osler Chair/CEO InterGroup Consultants Ltd. 500-280 Smith Street Winnipeg, MB R3C 1K2 [email protected] March 4, 2011 TABLE OF CONTENTS INTRODUCTION ......................................................................................................................... 1 1.0 DIESEL GENERATION OPTIONS .....................................................................................2 1.1 TECHNOLOGY OPTION OVERVIEW .....................................................................2 1.2 DIESEL AS YUKON DEFAULT OPTION .................................................................3 2.0 NATURAL GAS/LNG THERMAL GENERATION OPTIONS .................................................6 3.0 OTHER THERMAL GENERATION OPTIONS .....................................................................9 3.1 COAL RESOURCES ...............................................................................................9 3.2 OTHER THERMAL GENERATION RESOURCES ...................................................13 4.0 SUMMARY CONCLUSIONS ............................................................................................15 ATTACHMENT 1 -CURRENT & HISTORIC YUKON POWER FACILITIES AND GENERATION .. A1-1 ATTACHMENT 2 -FUTURE GRID DIESEL CAPACITY & GENERATION ................................... A2-1 LIST OF TABLES Table 1 - Yukon Energy Integrated System Capability (GW.h) .............................................................
    [Show full text]
  • Yukon Energy Corporation
    YUKON ENERGY CORPORATION APPLICATION FOR APPROVALS REGARDING THE VGC GROUP POWER PURCHASE AGREEMENT INTERROGATORY RESPONSES FILED December 11, 2017 John Maissan (JM) Yukon Energy Corporation Application for Approvals regarding the VGC Group Power Purchase Agreement JM-YEC-1-1 1 TOPIC: YEC-VGC PPA Application 2 3 REFERENCE: Page 1: VGC on-site diesel generation less than 5 MW 4 5 PREAMBLE: 6 7 QUESTION: 8 9 a) What number and sizes of diesel generators does Victoria Gold plan to install? 10 11 ANSWER: 12 13 (a) 14 15 VGC Group plans to install 3 units [1.65 MW for each unit]. December 11, 2017 Page 1 of 1 Yukon Energy Corporation Application for Approvals regarding the VGC Group Power Purchase Agreement JM-YEC-1-2 1 TOPIC: YEC-VGC PPA Application 2 3 REFERENCE: Page 2 and elsewhere: 4 5 PREAMBLE: 6 7 QUESTION: 8 9 a) Please explain why YEC is having VGC build the McQuesten substation – is it 10 because VGC can do it at lower cost or faster than YEC, has fewer contracting 11 constraints, has better access to capital, etc.? 12 13 b) The PPA Schedule B on page 5 (Appendix B1) indicates that VGC will be having 14 ATCO tender the long lead equipment. 15 i. Is the ATCO referred to here ATCO Electric Yukon, or ATCO Electric in 16 Alberta? 17 ii. Please explain the relationship between VGC and ATCO on this project. 18 iii. Please explain the relationship between YEC and ATCO on this project. 19 20 ANSWER: 21 22 (a) 23 24 YEC and VGC Group have worked together to finalize detailed design of the McQuesten 25 Substation and are continuing to work together, pursuant to the MOU and the PPA, on the 26 tendering, procurement, construction, commissioning and turnover of the substation to 27 YEC.
    [Show full text]
  • ENERGY STRATEGY for YUKON Energy Strategy for Yukon
    ENERGY STRATEGY FOR YUKON Energy Strategy for Yukon Published January 2009 ISBN: 1-55362-402-5 For more information: Energy, Mines and Resources Government of Yukon Box 2703 Whitehorse, Yukon Y1A 2C6 www.emr.gov.yk.ca/energy Photos Government of Yukon except: p. 10 – F. Möckel p. 22, 25, 26 – YG photo by J. Devost p. 5, 17 – YG photo by F. Mueller Printed on 100% post-consumer recycled paper Table of Contents Minister’s Message. 2 Summary. 3 Vision and Principles. 5 Efficiency and Conservation . 6 Renewable Energy. 10 Electricity. 14 Oil and Gas . 18 Energy Choices. 22 Conclusion. 25 Appendix I: Public Consultation. 26 Appendix II: Glossary. 27 Appendix III: Yukon’s Energy Options . 28 Minister’s Message As Minister of Energy, Mines and Resources, I am pleased to release the Energy Strategy for Yukon. With this release, the government is following through on its commitment to develop a strategy to address Yukon’s energy needs, for now and for the future. The Energy Strategy is an important guide for how we produce, conserve and use energy in Yukon. It provides guidance to energy programs, to economic development in the energy sector and to energy conservation and efficiency. We use energy in almost every aspect of our lives, and because energy is so vital, it is important for Yukon to manage our energy resources in a planned and careful manner. A lot of hard work has been done over the last year by many Yukoners to put together this Strategy. Energy sector research, a public workshop and an extensive consultation process all contributed to a final Strategy that is designed for Yukon, by Yukoners.
    [Show full text]