Integrated Watershed Management Programme, West Bengal
Total Page:16
File Type:pdf, Size:1020Kb
Silabati Basumata Watershed Project (Bankura /IWMP 11/2011-12) Summary of DPR Integrated Watershed Management Programme, West Bengal Summary of DPR SECTION A: PROJECT LOCATION DETAILS Sl. No Particulars Details 1 Project Name Silabati Basumata Watershed 2 Project Code Bankura/IWMP- 11/2011-12 3 State West Bengal 4 District Bankura 5 CD Block Indpur 6 Gram Panchyet Raghunathpur, Bheduasole Mouza (Village) 7 Block G P Name JL. No Village Code Rajudih (P) 80 2042500 Raghunathpur (P) 81 2042600 Beldanga 95 2044000 Bondeuli 96 2044100 RAGHUNATHPUR Mayur Nachna (P) 97 2044200 Kaliapathar 78 2042300 Nekrekenda (P) 76 2042100 Dakkhin Pairachali (P) 77 2042200 Baga(P) 90 2043500 Niasha 91 2043600 Jambedia(P) 92 2043700 Jagatdeuli 112 2045700 Hitashi(P) 113 2045800 Hannya(P) 114 2045900 Deghariadihi 115 2046000 Puara(P) 116 2046100 Saluka 93 2043800 Kendbona(P) 94 2043900 INDPUR Bisharbera 99 2044400 Nadusenara 100 2044500 Hetyapathar 101 2044600 Banshidihi(P) 102 2044700 BHEDUASOLE Chaitandihi 117 2046200 Nischintapur 104 2044900 Jiarda 105 2045000 Banshketya 106 2045100 Arodihi 107 2045200 Tunamara 108 2045300 Chakaltasahar(P) 109 2045400 Panchpukhuria(P) 110 2045500 Kadamdeuli(P) 98 2044300 Kharakanali 103 2044800 Mauladanga 159 2045600 Churamonipur 111 2045600 Gobindapur 160 2050500 Bankata 155 2050000 14 Silabati Basumata Watershed Project (Bankura /IWMP 11/2011-12) Summary of DPR Watershed Committee Name Regd. No. Remarks S/2L/16090 Indpur Vivekananda W.C Indpur Vivekananda M.W.A. of 2013-14 8 S/2L/16082 Indpur Ramkrishna W.C Indpur Ramkrishna M.W.A. of 2013-14 S/2L/16083 Indpur Vidyasagar W.C Indpur Vidyasagar M.W.A. of 2014 9 Micro watershed Description Micro watershed Block GP Name of Mouza JL. No. Vill Code Rajudih (P) 80 2042500 Raghunathpur (P) 81 2042600 Beldanga 95 2044000 Indpur Bondeuli 96 2044100 Vivekananda Indpur Mayur Nachna (P) 97 2044200 M.W. Raghunathpur Kaliapathar 78 2042300 Nekrekenda (P) 76 2042100 Dakkhin Pairachali (P) 77 2042200 Baga(P) 90 2043500 Niasha 91 2043600 Jambedia(P) 92 2043700 Jagatdeuli 112 2045700 Hitashi(P) 113 2045800 Hannya(P) 114 2045900 Indpur Deghariadihi 115 2046000 Ramkrishna Indpur Raghunathpur Puara(P) 116 2046100 M.W. & Bheduasole Saluka 93 2043800 Kendbona(P) 94 2043900 Bisharbera 99 2044400 Nadusenara 100 2044500 Hetyapathar 101 2044600 Banshidihi(P) 102 2044700 Chaitandihi 117 2046200 Nischintapur 104 2044900 Jiarda 105 2045000 Banshketya 106 2045100 Arodihi 107 2045200 Tunamara 108 2045300 Indpur Chakaltasahar(P) 109 2045400 Indpur Vidyasagar M.W Panchpukhuria(P) 110 2045500 Bheduasole Kadamdeuli(P) 98 2044300 Kharakanali 103 2044800 Mauladanga 159 2045600 Churamonipur 111 2045600 Gobindapur 160 2050500 Bankata 155 2050000 10 Weightage (Table 2.3) Out of 150 85.5 11 Project Cost ( Rs in Lakh) 465.00 15 Silabati Basumata Watershed Project (Bankura /IWMP 11/2011-12) Summary of DPR SECTION B: SOCIO ECONOMIC PROFILE OF THE PROJECT AREA Sl. Ref Table No. Particulars Details No. DPR (Format) Name of Project Implementing Agency ASSISTANT DIRECTOR OF AGRICULTURE 1 (PIA) Indpur Block, Dist- Bankura Nature of PIA (a) VO b) Pancheyat c) 2 Others Others) 3 Total Population in the Watershed 1 3.14 24591 4 Total Number of households 3.12.1 3987 Total Number of ST households 5 3.15 590 Total Number of SC households 6 3.14 2070 7 Total Number of BPL households 3.15 2836 Total Number of Small Farmer 8 3.17 809 household 2(appox) Total number of Marginal farmer 9 3.17 3142 household3(appox) Total number of landless and asset less 10 3.17 2872 households Number of person days of seasonal 11 3.19 69180 migration Note: 1 Sum total of population of all the villages in the project area 2 A farmer cultivating (as owner, tenant or sharecropper) agricultural land upto 1 ha (2.5 acre) 3 A farmer cultivating (as owner, tenant or sharecropper) agricultural land more than 1 ha up to 2 ha SECTION C: OTHER DETAIL FROM BASE LINE SURVEY Sl. Description Ref Table No. DPR (Format) Particulars No. 1 Total geographical area (ha) Executive summary 4352ha 2 Treatable area 1) a) Waste land fit for Executive summary 467ha cultivation (ha) b) Waste land un- fit for Executive summary 00 ha cultivation (ha) c) Forest area available Executive summary 92 ha for cultivation(ha) Total watershed Executive summary 559 ha (1a+1b+1c) 2) Rain fed agriculture land Executive summary 2541ha (ha) 3) Total Treatable Area (ha) 3100 ha {1+2}1 4) Forest Executive summary 92 ha 3 Total cropped area (ha) 2 3.11 2999 4 Net sown area (ha) 3 Executive summary 2541 5 Average Cropping Intensity 3.10 118% Total No. of water storage 6 3.7 284 structure4 7 Total storage capacity of water 356000 16 Silabati Basumata Watershed Project (Bankura /IWMP 11/2011-12) Summary of DPR Sl. Description Ref Table No. DPR (Format) Particulars No. storage structure (cum) Total number of water extracting 3.7 216 8 units 5 9 Depth of ground water (mbgl) a) Pre monsoon 7.32m - 8.93m. b) Post monsoon 3.79m - 4.57m. Note: 1Total Treatable area excludes area under habitation, steep slopes, snow covered area, rock mountains, roads, forest, assured irrigation etc. 1+ Fringe- forest areas and degraded areas needing treatment 2 Total Cropped area represent total area sown once or more than once in a particular year i.e. the area counted as many times as they are sowings in a year. This total area is known as Gross Crop Area. 3 Net Sown Area represent the total area sown with crops and orchards area sown more than once in a same year is counted only once. 4 Total number of water structure includes ponds, tanks, check dams, any other surface water storage structures. 5 Total number of water extracting units include wells, bore wells, hand pumps, shallow tube wells, Medium shallow tube wells, deep tube wells. SECTION D: YEAR WISE ACTION PLAN (PHYSICAL) (Kindly fill in figures. i.e. 0.00 instead of NIL) Ref table of Sl. 2012- 2013- Particulars DPR 2014-15 2015-16 2016-17 Total No. 13 14 Format 1 Watershed Development works 1.1 Land Development 1.1.1 Aforestation (on wasteland) ha Table 10.2 0.00 4.22 3.02 2.86 0 10.10 (Mix.Plantation) 1.1.2 Aforestation (on other 0 0 0 0 0 0 land) 1.1.3 Horticulture (on waste Table 10.2 0 3.97 1.82 0.91 0 6.7 land) (ha) 1.1.4 Horticulture (on other 0 0 0 0 0 0 land) (ha) 1.1.5 Agriculture (on waste 0 0 0 0 0 0 land) (ha) 1.1.6 Agriculture (on other 0 0 0 0 0 0 land) (ha) 1.1.7 Pasture Dev ( on waste Table 10.2 0 81 250 106 0 437 land) (ha) 1.1.8 Pasture dev (on other 0 0 0 0 0 0 land) 1.1.9 Others –Fodder Development (on Table 10.2 0 4.4 4.8 4.00 0 13.2 wasteland)( Ha.) 1.2 Soil and moisture conservation 1.2.1 Staggered Trenching (ha) Table 10.2 0 0 2.05 1.36 0 3.41 1.2.2 Contour Bunding (ha) 0 0 0 0 0 0 1.2.3 Graded Bunding (ha) 0 0 0 0 0 0 1.2.4 Bench terracing (ha) 0 0 0 0 0 0 1.2.5 Others (ha) 0 0 0 0 0 0 1.3 Vegetative &Engg. Structure 1.3.1 Earthen Checks (cum) 0 0 0 0 0 0 1.3.2 Bush Wood Checks (cum) 0 0 0 0 0 0 1.3.3 Gully Plugs (cum) 0 0 0 0 0 0 1.3.4 Loose boulders (cum) 0 0 0 0 0 0 1.3.5 Gabion Structures (cum) 0 0 0 0 0 0 17 Silabati Basumata Watershed Project (Bankura /IWMP 11/2011-12) Summary of DPR Ref table of Sl. 2012- 2013- Particulars DPR 2014-15 2015-16 2016-17 Total No. 13 14 Format 1.3.6.1 Others-Inlet & Outlet Table 10.2 0 9 10 8 4 31 (No.) 1.3.6.2 Others–Field channel Table 10.2 0 500 405 400 284 1589 (rmt) cum 0 98889 80100 79111 56168 314268 1.4 Water harvesting structure (New) 1.4.1 Farm Pond (No.) Chapter 10 Table 2 0 0 1 0 1 (cum ) 0 0 2759 0 0 2759 1.4.2 Check Bund (no,) 0 0 0 0 0 0 (cum) 0 0 0 0 0 0 1.4.3 Nullah Bund (no.) 0 0 0 0 0 0 (cum) 0 0 0 0 0 0 1.4.4 Percolation Tank (no.) Chapter 10 0 0 12 7 4 23 (Cum) Table 2 0 0 10203 5952 3400 19555 1.4.5 Ground water recharges 0 0 0 0 0 0 structures. (no.) (Cum) 0 0 0 0 0 0 1.4.6 Others-Dhal bundh with Chapter 10 0 0 1 0 0 1 pipe culvert(no.) Table 2 (cum) 0 0 20000 0 0 20000 1.5 Water harvesting structure (renovated) 1.5.1 Farm Pond (no,) Chapter 10 0 22 10 20 10 62 (Cum) Table 2 0 74070 33947 65319 33947 207283 1.5.2 Check Bund (no,) 0 0 0 0 0 0 (cum) 0 0 0 0 0 0 1.5.3 Nullah Bund (no.) 0 0 0 0 0 0 (cum) 0 0 0 0 0 0 1.5.4 Percolation Tank (no.) 0 0 0 0 0 0 (cum) 0 0 0 0 0 0 1.5.5 Ground water recharge 0 0 0 0 0 0 structures.