Status Quo Report

Total Page:16

File Type:pdf, Size:1020Kb

Status Quo Report Midmar Dam looking towards the snow covered Drakensberg © Kevan Zunckel uMgungundlovu District Municipality Strategic Environmental Assessment and Strategic Environmental Management Plan – STATUS QUO REPORT Reference: Tender No. 18/2010 Date: 12 June 2012 Submitted by: Submitted to: Mr Roger Davis and Mr Kevan Zunckel Nosipho Ntanzi ISIKHUNGUSETHU ENVIRONMENTAL SERVICES (PTY) uMgungundlovu District Municipality 242 Langalibalele Street LTD P O Box 13919 Pietermaritzburg, 3201 Cascades, 3202 E-mail: [email protected] E-mail: [email protected] Tel: (033) 897 6798 Tel: (082) 926 1348 Fax: (033) 394 5561 Fax: (033) 342 5741 In association with: ZUNCKEL ECOLOGICAL + ENVIRONMENTAL SERVICES and mapping by AFZELIA ENVIRONMENTAL CONSULTANTS cc uMgungundlovu District Municipality Strategic Environmental Assessment and Strategic Environmental Management Plan – STATUS QUO REPORT uMgungundlovu District Municipality Strategic Environmental Assessment and Strategic Environmental Management Plan – STATUS QUO REPORT Submitted to: Submitted by: AFZELIA Environmental Consultants cc Isikhungusethu (Pty) Ltd With Specialist input from: Thorn-Ex cc (Environmental Services) 12 June 2012 Isikhungusethu Environmental Services (Pty) Ltd in association with Page | ii Zunckel Ecological and Environmental Services and Afzelia Environmental Consulting cc uMgungundlovu District Municipality Strategic Environmental Assessment and Strategic Environmental Management Plan – STATUS QUO REPORT Indemnity and conditions relating to this report The findings, results, observations, conclusions and recommendations given in this report are based on the author’s best scientific and professional knowledge as well as available information. The report is based on survey and assessment techniques which are limited by time and budgetary constraints relevant to the type and level of investigation undertaken and Isikhungusethu Environmental Services (Pty) Ltd in association with Zunckel Ecological + Environmental Services and Afzelia Environmental Consulting cc and its staff reserve the right to modify aspects of the report including the recommendations if and when new information may become available from on-going research or further work in this field, or pertaining to this investigation. Although Isikhungusethu Environmental Services (Pty) Ltd in association with Zunckel Ecological + Environmental Services and Afzelia Environmental Consulting cc exercises due care and diligence in rendering services and preparing documents, Isikhungusethu Environmental Services (Pty) Ltd in association with Zunckel Ecological + Environmental Services and Afzelia Environmental Consulting cc accepts no liability, and the client, by receiving this document, indemnifies Isikhungusethu Environmental Services (Pty) Ltd in association with Zunckel Ecological + Environmental Services and Afzelia Environmental Consulting cc and its directors, managers, agents and employees against all actions, claims, demands, losses, liabilities, costs, damages and expenses arising from or in connection with services rendered, directly or indirectly by Isikhungusethu Environmental Services (Pty) Ltd in association with Zunckel Ecological + Environmental Services and Afzelia Environmental Consulting cc and by the use of the information contained in this document. Copyright This report must not be altered or added to without the prior written consent of the author. This also refers to electronic copies of this report which are supplied for the purposes of inclusion as parts of other reports, including main reports. Similarly, any recommendations, statements or conclusions drawn from or based on this report must make reference to this report. If these form part of a main report relating to this investigation or report, this report must be included in its entirety as an appendix or separate section to the main report. Citation When used in a reference, this report should be cited as follows: Isikhungusethu Environmental Services. May 2012. Status Quo Report for the uMgungundlovu District Municipality Strategic Environmental Assessment and Strategic Environmental Management, Isikhungusethu Environmental Services (Pty) Ltd, Pietermaritzburg. Isikhungusethu Environmental Services (Pty) Ltd in association with Page | iii Zunckel Ecological and Environmental Services and Afzelia Environmental Consulting cc uMgungundlovu District Municipality Strategic Environmental Assessment and Strategic Environmental Management Plan – STATUS QUO REPORT Table of Contents 1 PROJECT DESCRIPTION ............................................................................................................................ 1 1.1 INTRODUCTION AND PROJECT BRIEF............................................................................................................... 1 1.2 OVERALL APPROACH TO PROJECT IMPLEMENTATION ......................................................................................... 3 1.3 THE ROLE OF THE STATUS QUO REPORT IN THE SEA AND IEMP PROCESS ............................................................. 3 1.4 LOCATION OF THE STUDY AREA ..................................................................................................................... 4 1.5 STAKEHOLDER ENGAGEMENT AND PARTICIPATION PROCESS ............................................................................... 5 2 LEGISLATIVE FRAMEWORK ...................................................................................................................... 6 2.1 OVERVIEW ................................................................................................................................................ 6 2.2 LEGISLATION ............................................................................................................................................. 6 2.3 SEA & EMP ........................................................................................................................................... 12 2.3.1 SEA .................................................................................................................................................. 13 2.3.2 Strategic Environmental Management Plan ................................................................................... 13 2.3.3 EMP ................................................................................................................................................. 13 3 NATURAL CAPITAL ................................................................................................................................. 14 3.1 GEOPHYSICAL ENVIRONMENT ..................................................................................................................... 14 3.1.1 Topography ..................................................................................................................................... 14 3.1.2 Climate ............................................................................................................................................ 15 3.1.3 Geology and Land Types ................................................................................................................. 16 3.1.4 Hydrology and Water Resources ..................................................................................................... 17 3.1.5 Air Quality ....................................................................................................................................... 32 3.2 BIOPHYSICAL ENVIRONMENT ...................................................................................................................... 40 3.2.1 Vegetation and Habitat Types ........................................................................................................ 40 3.2.2 Species of Special Concern .............................................................................................................. 43 3.2.3 Protected Areas and other Conservation Areas .............................................................................. 44 3.2.4 Ecological Corridors ........................................................................................................................ 50 3.2.5 Sensitive Ecosystems ....................................................................................................................... 51 3.2.6 Transformation ............................................................................................................................... 55 3.2.7 Biodiversity Sector Plan ................................................................................................................... 61 3.3 BIOLOGICAL ADAPTATIONS TO CLIMATE CHANGE ........................................................................................... 67 3.3.1 Impacts of climate change on biodiversity and ecosystem services ............................................... 68 3.3.2 Mitigation of climate change impacts on biodiversity and ecosystem services.............................. 69 4 CULTURAL HERITAGE ............................................................................................................................. 71 4.1 STUDY APPROACH .................................................................................................................................... 72 4.1.1 Methodology ................................................................................................................................... 72 4.1.2 Limitations .....................................................................................................................................
Recommended publications
  • Descendants of William Park and Mary Martin
    Park Family History The following pages have a highly speculative attempt to reconstruct the history of the family of William Park, of Bath, Belfast and Quebec, who died in Bath, Somerset, England in 1844. It is known that his daughter Matilda married Richard Vause in Bath in January 1852, and that Matilda's sister married Frederick Hawkins on the same day, and that his wife was Mary Martin, daughter of John Martin, a merchant of Belfast, Antrim, Ireland. Most of the other information is based on circumstantial evidence and “connecting the dots”. Recently several people have helped by giving new dots to connect, but fresh evidence may show that they could be connected in entirely different way, so please do not add this information to your family tree yet. I've been helped a great deal by ShaunJ of the Rootschat website, who found some of the dots. I have compiled this family tree as a research tool only, as a working hypothesis to see where other family members might fit in. I will send this to some other family members who may be interested. If you have any more information on this family, please let me have it. If you would like me to pass on anything else I may find, please let me know. Please note the date on these documents. I am continuing my research and so the information here may be out of date and superseded within a few days, so please get in touch with me for the latest information. Stephen Hayes PO Box 7648 Pretoria 0001 South Africa E-mail: [email protected] Web: http://hayesgreene.wordpress.com http://hayesgreene.wikispaces.com Mon 26 September 2011 Family Group Record- 15 Page 1 of 3 Husband William PARK-2231 Born Place Abt 1780 Died-2 Place 23 May 1844Bath, Somerset, England Married Place Husband's father James PARK MRIN: 514 Husband's mother Elizabeth Wife Mary MARTIN-2223 Born-4 Place Abt 1784Belfast, Ulster, Ireland Died Place 19 Aug 1851Bath, Somerset, England Wife's father 5 John MARTIN-221 MRIN: 9 Wife's mother Children List each child in order of birth.
    [Show full text]
  • Provincial Road Network Provincial Road Network CLASS, SURFACE P, Concrete L, Blacktop G, Blacktop On-Line Roads !
    O D238 3 4 L0 Mkhize 3 6 Mahlutshini!. 4 Bhungane H 1 5 4 71 9 O 81 161 1 Enhlanganisweni H 1 6 OL0 L0 99 Treverton Treverton 0 7 7 Thibane 1 165 Mooi River Town L L 7 1 9 O 6 7 O Col Prep P 4 4 1 L0 Local Authority 2 1 P1 8 4 0 6 4-1 L 1 L 3 KwaMankonjane 7 8 0 O 44 Clinic R103 4 !.O P L OL016 12 L Weston 2 3 O 5 D 0 1 L 1 9 Mooi 6 1 - Agriculture R622 5 7 8 15 7 5 P !. 4 9 River P O L1 6 O 76 Col 4 L L 1 6 01 A I 01 9 1 1 68 3 0 8 4 0 6 P Kajee P 1 L O L 610 O O 8 F Fundukhuphuke O L 4 0 6 Mankonjane 1 F 6 6 95 5 Adult O 3 - 4 1 R L 8 0 0 16 1 A Education 2 L 1 P M O 3 O P s L01 3 n 622 1 9 !. a 1 1 m L sh P Bruntville u 2 Bruntville P B 3 Mount 6 163 1 Victoria P 489 0 Carshalton 3 L Mpofanyana 1 1 69 96 0 9 O 2 1 0 1 P 6 L Highover G Bruntville 4 1 Estates Provincial 0 L CHC O Ncibidwane Lakhanyilanga D Mts 21 4 Mount he 8 za 9 1 na KZN223 6 West P 4 L ulu Zamukwazi Hlatik O L0 83 16 !.30 KwaMkhize 4 Gezwayo JS 7 4 40 O OL0 L 12 L01 1629 D 625 Insonge 43 183 P 413 D 2 75 7 8 - - 1 KZNDMA22 1 P KZN221 Robin LP 11 D P 1 6 KZN222 7 94 f 162 92 o 27 lo rk a K a n a w id ib KZN224 c N Rosetta Local 0 69 5 Authority 4 D Satellite Clinic 2 4 9 5 1 6 L KZN225 53 N 1 3 P 104 Sibonokuhle P -4 34 Rosetta D !.
    [Show full text]
  • 7.3 Mooi System
    7 . 3 MMM OOI SSS Y S T E M 7 . 3 . 1 GGG REATER MMM POFANA BBB ULK WWW ATER SSS UPPLY Planning No. 105.24 Project No. Project Status Detailed Feasibility (as at January 2011) Project Description Sustained housing development and tourism related activities are increasing the water demand at several nodes along the R103 road between Lions River (uMngeni Local Municipality) and Mooi River (Mpofana Local Municipality). This growth is beginning to stress local water resources and water supply infrastructure in the area. It has been identified that a regional bulk water supply scheme is required to ensure that the area has a reliable water supply that will sustain this growth into the future. The proposed scheme ( Figure 7.4) will obtain raw water from the soon-to-be constructed Spring Grove Dam on the Mooi River for a WTP to be situated adjacent to the dam. From here potable water will be pumped to two command reservoirs. The first reservoir will be located at Bruntville in Mooi River. This reservoir will serve the greater Mooi River area and will have the potential to supply the Muden/Rocky Drift area. The Mooi River WTP and Rosetta WTP can then be decommissioned. A link pipeline to supply the Vaalekop community has also been investigated. The second reservoir will be at Nottingham Road which will then supply Balgowan, Lidgetton and possibly Lions River. There is also a link pipeline to Mount West. The scheme is likely to be built in phases to gradually increase the supply area. The scheme together with all the proposed phases is indicated in Figure 7.5.
    [Show full text]
  • South Africa
    Safrica Page 1 of 42 Recent Reports Support HRW About HRW Site Map May 1995 Vol. 7, No.3 SOUTH AFRICA THREATS TO A NEW DEMOCRACY Continuing Violence in KwaZulu-Natal INTRODUCTION For the last decade South Africa's KwaZulu-Natal region has been troubled by political violence. This conflict escalated during the four years of negotiations for a transition to democratic rule, and reached the status of a virtual civil war in the last months before the national elections of April 1994, significantly disrupting the election process. Although the first year of democratic government in South Africa has led to a decrease in the monthly death toll, the figures remain high enough to threaten the process of national reconstruction. In particular, violence may prevent the establishment of democratic local government structures in KwaZulu-Natal following further elections scheduled to be held on November 1, 1995. The basis of this violence remains the conflict between the African National Congress (ANC), now the leading party in the Government of National Unity, and the Inkatha Freedom Party (IFP), the majority party within the new region of KwaZulu-Natal that replaced the former white province of Natal and the black homeland of KwaZulu. Although the IFP abandoned a boycott of the negotiations process and election campaign in order to participate in the April 1994 poll, following last minute concessions to its position, neither this decision nor the election itself finally resolved the points at issue. While the ANC has argued during the year since the election that the final constitutional arrangements for South Africa should include a relatively centralized government and the introduction of elected government structures at all levels, the IFP has maintained instead that South Africa's regions should form a federal system, and that the colonial tribal government structures should remain in place in the former homelands.
    [Show full text]
  • Umngeni Resilience Project Annexes
    ANNEXES I. Vulnerability Analysis: Preliminary Prioritisation of Vulnerable Communities for Climate Change Adaptation in the uMgungundlovu District Municipality. II. Stakeholder Consultations Annex II.1 Organisations consulted during the project development period. Annex II.2: Attendance register for meeting to plan Inception Workshop. Annex II.3: Attendance register for Inception Workshop. Annex II.4: Attendance register for workshop to plan field visit itinerary. Annex II.5: Field visit itinerary to identify project interventions sites. Annex II.6: Attendance register for technical agriculture workshop. Annex II.7: Attendance register for built environment and ecological infrastructure workshop. Annex II.8: Attendance register for technical EWS workshop. Annex II.9: List of meetings from 18-22 November 2013. Annex II.10: List of meetings from 6-10 January 2014. Annex II.11: List of meetings from 27-29 January 2014. Annex II.12: List of meetings from 17-18 March 2014. Annex II.12.1: Attendance register from Management Committee meeting. Annex II.12.2: Attendance register from Disaster Management Forum meeting. Annex II.12.3: Attendance register from fire component meeting. Annex II.13: Attendance register from UMDM/DAEA meeting. Annex II.14: Attendance register from DAEA meeting. Annex II.15: Attendance register CoGTA meeting. Annex II.16: Attendance register from Msunduzi Local Municipality meeting. III. Maps of the demonstration sites for the Adaptation Fund project. Figure III.1: Ward 8 of Vulindlela showing position of households and traditional communities (2011). Figure III.2: Ward 8 of Swayimane showing position of households and traditional communities (2011). Figure III.3: Ward 5 of Nhlazuka showing position of households and traditional communities (2011).
    [Show full text]
  • BORN out of SORROW Essays on Pietermaritzburg and the Kwazulu-Natal Midlands Under Apartheid, 1948−1994 Volume One Compiled An
    BORN OUT OF SORROW Essays on Pietermaritzburg and the KwaZulu-Natal Midlands under Apartheid, 1948−1994 Volume One Compiled and edited by Christopher Merrett Occasional Publications of the Natal Society Foundation PIETERMARITZBURG 2021 Born out of Sorrow: Essays on Pietermaritzburg and the KwaZulu-Natal Midlands under Apartheid, 1948–1994. Volume One © Christopher Merrett Published in 2021 in Pietermaritzburg by the Trustees of the Natal Society Foundation under its imprint ‘Occasional Publications of the Natal Society Foundation’. All rights reserved. No part of this publication may be reproduced or transmitted in any form or by any means, without reference to the publishers, the Trustees of the Natal Society Foundation, Pietermaritzburg. Natal Society Foundation website: http://www.natalia.org.za/ ISBN 978-0-6398040-1-9 Proofreader: Catherine Munro Cartographer: Marise Bauer Indexer: Christopher Merrett Design and layout: Jo Marwick Body text: Times New Roman 11pt Front and footnotes: Times New Roman 9pt Front cover: M Design Printed by CPW Printers, Pietermaritzburg CONTENTS List of illustrations List of maps and figures Abbreviations Preface Part One Chapter 1 From segregation to apartheid: Pietermaritzburg’s urban geography from 1948 1 Chapter 2 A small civil war: political conflict in the Pietermaritzburg region in the 1980s and early 1990s 39 Chapter 3 Emergency of the State: detention without trial in Pietermaritzburg and the Natal Midlands, 1986–1990 77 Chapter 4 Struggle in the workplace: trade unions and liberation in Pietermaritzburg and the Natal Midlands: part one From the 1890s to the 1980s 113 Chapter 5 Struggle in the workplace: trade unions and liberation in Pietermaritzburg and the Natal Midlands: part two Sarmcol and beyond 147 Chapter 6 Theatre of repression: political trials in Pietermaritzburg in the 1970s and 1980s 177 Part Two Chapter 7 Inkosi Mhlabunzima Joseph Maphumulo by Jill E.
    [Show full text]
  • Southern Drakensberg & Midlands Tourist Map – Accommodation
    To Warden/JHB To Warden R57 FREE STATE To Bethlehem N5 Platberg 46km Nature Reserve Kestel To Newcastle To Glencoe ..De Beers Pass 1:8 To Dundee . Biggarsberg .. 24km 31km Swinburne R19 Montrose R602 31km R74 Van Reenen Wasbank Golden Gate N11 R712 . .. Van Reenens Reserve R57 .. Pass 1:16 9km Driefontein 21km . R602 .. .. Besters To Clarens To Reitz . Middledale Pass 18km T The Lost Valley FREE T Sterkfontein STATE Dam R103 N3 25km . .. D45 Nambiti .. KWAZULU-NATAL Game Reserve Oliviershoek Qedusize Dam To Tugela Ferry Pass 1:12 D44 R74 17km R616 N11 LESOTHO R600 Woodstock Dam 35km Spioenkop Dam Nature Reserve 32km Southern Drakensberg &R74 Midlands Tourist Map – Accommodation/Reservations 036 468 1241 24km Tugela River R103 22km 24 African Loom 25 Steve Bull Gallery 26 Winterton Country 27 Drakensberg Cave Lodge 28 Antbear Drakensberg Lodge Lodge @ Rose Cottage SimmiesR74 082 804 3774 Driel Dam 6 14km River Exit 207 loukrans Open 7am –7pmDrakensberg Ballooning B 7 days a week including public036 468holidays 1241 Winterton Simmies Ok shop 036 488 1828 no 26 t re 11km Pig and Plough 036 488 1542 R74 co For all of your daily requirements m 31km 20 Jo Photo & Print 074 894 4515 m 22km Butcherye | Bakery | Fresh Produce | Groceries | Ice 23 Chris’s Biltong & Braai 072 288 2437 N3 30 n km d e Winterton Museum d ATMs Spoil yourself. Stay in a “Luxury Cave” in the Drakensberg Mountains.R7 The4 cave Relax in the Drakensberg. Intimate, romantic and artisticly styled, the thatched is beautifully private and makes for the perfect honeymoon experience or accommodation overlooks the Bushmans River Valley and Giants Castle.
    [Show full text]
  • Marketing Constraints Faced by Communal Farmers in Kw Azulu-Na Tal, South Africa: a Case Study of Transaction Costs Maliem Pierr
    MARKETING CONSTRAINTS FACED BY COMMUNAL FARMERS IN KW AZULU-NA TAL, SOUTH AFRICA: A CASE STUDY OF TRANSACTION COSTS By MALIEM PIERRE MA TUNGUL SUBMITTED IN PARTIAL FULFILMENT OF THE REQUIREMENTS FOR THE DEGREE OF DOCTOR OF PHILOSOPHY (AGRICULTURAL ECONOMICS) IN THE SCHOOL OF AGRICULTURAL SCIENCES AND AGRIBUSINESS F ACUL TY OF SCIENCE AND AGRICULTURE UNIVERSITY OF NATAL PIETERMARITZBURG 2002 The financial assistance received from the NRF Agricultural Policy Research U nit and TOTAL South Africa towards this research is hereby acknowledged. Opinions expressed and conclusions arrived at, are those of the author and not necessarily to be attributed to the sponsors. I hereby certify that, unless specifically indicated to the contrary in the text, this dissertation is the result of my own original work. Maliem Pierre Matungul A Mamie Ursule et Jesse Tavun, je dedie ce travail. ABSTRACT Farmers engaged in small-scale agriculture in Africa generally have limited access to factors of production, credit and information. Empirical studies throughout the African continent have shown the extent to which high transaction costs constrain or prevent access to information and markets, especially for small-scale farmers. Despite these constraints, farmers in two communal areas of KwaZulu-Natal (Impendle and Swayimana) have managed to produce food for both own consumption and marketing. This study draws heavily on the New Institutional Economics, and particularly Transaction Cost Economics, which have demonstrated the important role of transaction costs in constraining economic activity, and of institutions developed to lower these costs. Transaction costs are the costs of exchange, including costs of information, negotiation, monitoring, coordination and enforcement of contracts.
    [Show full text]
  • Greater Mpofana Bulk Water Supply Scheme
    GREATER MPOFANA BULK WATER SUPPLY SCHEME IMPLEMENTATION READINESS REPORT OCTOBER 2016 PREPARED BY Umgeni Water Telephone N° : 033 341 1203 Fax N° : 033 341 1218 Email Address : [email protected] P O Box 3235 Pietermaritzburg, 3200 310 Burger Street Pietermaritzburg, 3201 EXECUTIVE SUMMARY Context This project involves a potable bulk water supply scheme located in the Midlands area of the KwaZulu-Natal province. It is referred to as the Greater Mpofana Bulk Water Supply Scheme (GMBWSS). The Greater Mpofana Region (described in this report as the area from Mooi River to Lidgetton) does not have a reliable water supply. Much of the area relies on boreholes and run of river abstraction. With increasing demands, the future supply is not considered sustainable. Phase 1 of the project is currently under construction and will provide a sustainable bulk water supply to the towns of Mooiriver, Rosetta and Nottingham Road. Phase 2 of the project is in the final feasibility stage and will provide a sustainable bulk water supply to the towns of Lidgetton and Lions River including the rural hinterland surrounding the abovementioned towns in KwaZulu Natal. The Scheme will provide bulk water supply to large areas within the uMgungundlovu WSA boundary and will include the rural areas of Bruntville, Lidgetton, Lions River and Msinga. The scheme will also supply economic activities in the areas of Mooiriver, Nottingham Road and Rosetta and will reinforce the supply to these towns. This Implementation Readiness Report (IRS) for the GMBWSS is a prerequisite for RBIG funding so that potable water is made available to both the developing and backlog areas of Mooi River and Rosetta in the Mpofana Local Municipality and Nottingham Road, Mount West, Balgowan and Lidgetton in the uMngeni Local Municipality.
    [Show full text]
  • DISTRICT ECONOMIC PROFILES Umgungundlovu District 2021
    Office of the Head of Department 270 Jabu Ndlovu Street, Pietermaritzburg, 3201 Tel: +27 (33) 264 2515, Fax: 033 264 2680 Private Bag X 9152 Pietermaritzburg, 3200 www.kznded.gov.za DISTRICT ECONOMIC PROFILES UMgungundlovu District 2021 1 GEOGRAPHICAL LOCATION UMgungundlovu DM (DC 22) Population: 1,149,439 2 Area Size: 9, 602.2 Km Located in the centre most part of KZN and houses the midlands area, the district is home to the KZN Legislature and Provincial Capital Pietermaritzburg. The district is comprised of the following seven local municipalities: . Impendle; . Mkhambathini; . Mpofana; . Msunduzi; . Richmond; . uMngeni; and . uMshwathi. The district offers distinguished education facilities and is a retirement hub for senior citizens. It also offers excellent sporting, commercial and health facilities. It is an important industrial, timber, dairy and agricultural hub. It is dissected by the N3 between Gauteng and Durban. DISTRICT SPATIAL FEATURES The Msunduzi Municipality houses the administrative and legislative centre of the provincial government in KwaZulu-Natal as well as performing an important commercial and industrial function in the economy of the district. Urban centres outside of Pietermaritzburg include Howick located in uMngeni Municipality, Mooi River located in Mpofana Municipality, Impendle village in Impendle Municipality, New Hanover-Wartburg-Hamburg in uMshwathi, Camperdown located in Mkhambathini Municipality and Richmond-Ndaleni located in the Richmond Municipality. The municipalities in the district include large areas of land owned by the Ingonyama Trust Board and occupied by traditional communities. There are number of identified nodes in these traditional areas as well as extensive areas of informal settlement and limited agriculture: a large proportion of the regional population is located in traditional areas.
    [Show full text]
  • 2009-2010 Annual Report
    1 BUILT ENVIRONMENT SUPPORT GROUP Vision BESG envisions a future in which all people in South Africa will live in a participatory democracy with equal access to habitable and sustainable living environments and livelihood security. Mission BESG exists to support the poor and vulnerable to access resources and increasingly gain control over their lives and destinies, through the promotion of sustainable livelihoods and habitable environments, achieving basic socio-economic rights and capacitating local government, with added emphasis on small rural towns. 2 1. CHAIRMAN’S REPORT The year ending 28th February 2010 saw a period of stabilisation and moderate growth following the implementation of BESG’s turn-around strategy over the previous 3 years. BESG remains firmly rooted in its core programmes of building sustainable human settlements, and promoting good governance and deepening democracy. Its gradual shift to a new donor-funded base has enabled BESG to be more strategic and focused, and rekindle some of the radicalism that characterises an organisation with a strong human rights ethic. This is reflected in the activities that are recorded in the Executive Director’s report. Shortly before the commencement of the finance year, BESG activated a long-standing plan to separate its charitable and trading activities. This resulted in the establishment of BESG Development Services, which will in future undertake service delivery work to clients in the fields of research, training, project management, and facilitation. BESG Development Services is managed by the same Board of Directors and runs by secondment of BESG staff as and when work is required. Interested persons who want to now more of its services may inquire through our office where you will be routed to an appropriate staff member.
    [Show full text]
  • Measuring Service Quality Delivery at Impendle Local Municipality in Kwazulu-Natal
    Measuring Service Quality Delivery at Impendle Local Municipality in KwaZulu-Natal By Vusumuzi David Mkhwanazi Student Number: 210538747 This dissertation is submitted in partial fulfilment of the requirements for the degree of Master of Commerce (Marketing) College of Law and Management Studies School of Management, Information Technology and Governance Supervisor: Dr Sanjay Soni July 2019 DECLARATION I, Vusumuzi David Mkhwanazi (student number 210538747), declare that: i. The research reported in this dissertation, except where otherwise indicated, is my original research. ii. This dissertation has not been submitted for any degree or examination at any other tertiary institution. iii. This dissertation does not contain other persons’ data, tables, figures and any other information, unless specifically acknowledged as being sources from other persons. iv. This dissertation does not contain other persons’ writing, unless specifically acknowledged as being sources from other authors. Where other written sources have been quoted then: a) Their words have been paraphrased but the general information attributed to them has been referenced; b) Where their exact words have been utilised, their writing has been placed inside quotation marks and referenced. v. This dissertation does not contain text, graphics or tables copied and pasted from the internet, unless specifically acknowledged, and the source being detailed in the dissertation and in the References section. Signature: Date: ii ACKNOWLEDGEMENTS The researcher wants to thank the following persons for their assistance and support during the course of this study. I would like to thank my family for the support they have given me during the course of this dissertation; without their encouragement, I could not have accomplished this.
    [Show full text]