November!8,!2010! ! TO:!! SE/NE!50s!Bikeway!Project! !!Citizens!Advisory!Committee! ! FROM:!! Sarah!Figliozzi,!Portland!Bureau!of!Transportation,!Project!Manager! !!Rich!Newlands,!Portland!Bureau!of!Transportation,!Project!Manager! ! SUBJECT:! Materials!for!Upcoming!Citizens!Advisory!Committee!meeting!! ! (Nov.!15,!2010)! ! Please!find!attached:! ! Agenda!for!the!November!15!meeting! ! Updated!parking!utilization!data! ! Oct!16th!CAC!Ride!summary! ! Open!House!notification!information! ! Draft!Design!Concept!! ! Draft!Design!Concept! The!primary!intent!of!the!upcoming!meeting!will!be!to!discuss!and!develop!a!draft! project!recommendation!from!the!committee!that!establishes!the!general!scope!of! improvements!to!construct.!!This!attachment!is!intended!to!serve!as!a!starting!point!for! that!discussion.!!The!proposed!improvements!shown!on!the!map!have!been!developed! by!the!project’s!staff!and!has!been!reviewed!by!the!project’s!technical!advisory! committee.! ! Please!note!that!feasibility!issues!remain!with!certain!elements!of!what!is!shown!on!the! draft!design!concept,!which!staff!are!still!working!on!to!resolve!.!!These!elements!are! coded!in!blue!on!the!map.!!We!will!discuss!in!greater!detail!what!the!specific!feasibility! issues!are!at!the!upcoming!meeting.!!Regardless!of!these!details,!we!still!feel!the!process! to!date!has!collected!sufficient!information!regarding!the!issues!and!options!that!we!can! begin!to!see!how!close!we!are!to!consensus!on!the!project’s!recommendations.! ! It!is!also!important!to!stress!that!if!we!succeed!in!developing!a!CAC!recommendation!at! the!meeting,!that!in!addition!to!resolving!the!remaining!technical!issues,!it!is!still! contingent!upon!what!is!learned!from!broader!public!comment!though!the!upcoming! open!houses.! ! As!always,!thanks!for!your!participation!and!hope!to!see!you!at!the!meeting!on!15th! (6:30"8:30,!Providence!Cancer!Center,!NE!47th/Glisan,!Rms!C!&!D)! ! Sarah!and!Rich! Grant Park November 3, 2010 Madison HS Rose City Park ES Rose City Golf Course Rose City Golf Course Vernon Ross Veterans Memorial SE/NE 50's Bikeway Project Grant HS Rose City Park

Fernwood MS DRAFT Design Concept NE Hancock St 2 10 Proposed Improvements Bicycle lanes, 6ft wide Bicycle lanes, 5ft wide, colored 1 NE Halsey St Sharrow pavement markings NE 57th Ave, Thompson to Hancock: 1 Bike Box Normandale Park High traffic volumes (9,000) 33ft cross‐section requires on‐street parking removal for bicycle lanes 2 Cross Bike Erv Lind Stadium Frazer Park 3 New signal/ pedestrian or HAWK 14 Bike detection for existing signal Montavilla Park 5 Curb Extensions NE 53rd Ave, Glisan to Burnside Cross‐section: 30 ft 6 Speed bumps Traffic volumes: 1,800, cut‐through problem Coe Circle 1 4 NE Glisan St Speed: 27 mph 7 Median refuge 8 6 8 Diverter/ diversion‐traffic calming NE 53rd Ave/ Burnside High traffic volume/speed crossing. No space for curb extensions or medians 9 Off‐set turn lanes 10 Active beacons 3 8 E Burnside St 11 Signal timing change NE 53rd Ave/ Stark Subject to further technical MS Moderately high volumes for crossings, poor gaps in peak periods # feasibility assessment Laurelhurst Park Subject to further 7 2 SE Stark St # public involvement NE 53rd Ave/ Belmont Moderately high volumes for crossings Diversion/ Traffic calming Glencoe ES SE Belmont St 5 2 Stop sign Sunnyside School Park NE 53rd Ave, Hawthorne to Madison Volume 330 Speed 23‐24 6 Significant neighborhood demand for traffic calming

SE Hawthorne Blvd 5 2 Mt Tabor Park

Bridger ES

52nd Ave/ Division Volume: 2,500, cut‐through traffic problem Diversion options complicated by routing of #71 bus SE Lincoln St 2 5 BinnHsmareriasdo nM PSark

Richmond ES SE Division St 8 1 52nd Ave: Division to Powell High traffic volumes: 6,000 (classified Local Street) High Speeds: 36 mph 54th Ave through Franklin HS and Clinton Park Franklin HS 40 ft cross‐section requires parking removal on on‐street for bicycle lanes Use of Franklin HS parking lot not feasible. Grade change through park difficult to add multi‐use path Clinton Park Youngson ES SE Woodward St 54th Ave/ Powell 6 Difficult crossing even with exisiting median island Kellogg MS 52nd Ave, Powell to Foster High traffic volumes and turn movements. Limited space for bicycKle lllaongegs MduSe to turn lanes 1 4 3 SE Powell Blvd 54th Ave/ Foster Utilize/modify crossing improvements Creston ES funded through Center/ GladstoCnere Sstt on Park Bike Boulevard Project 11 1 Creston ES Essex Park 4 Kern Park SE Foster Rd

Kenilworth Park

1 SE Holgate Blvd SE Firland Parkway 6 52nd Ave, Foster to Woodstock High traffic volumes (11,500 ‐ 13,500) and high speeds (35‐37 mph) Marysville ES SE Firland Parkway

57h Ave/ Harold Arleta ES Moderately traffic volumes, poor gaps SE Steele St 1

Woodstock Park 5 SE Harold St

Woodstock ES

Mt Scott Park

SE Woodstock Blvd 1 7 SE Reed College Parkway