Final Appendix F, Site Work Plan, Time Critical Removal Action for OU a Charleston Beach with Attached Transmittal Letter
SES-TECH JUL 2 1 2008 July 18, 2008 Environmental Cleanup Office SEST-1104-0031-0016 5.0/Deliverables Ms. Suzanna Jefferis Remedial Project Manager Naval Facilities Engineering Command, Northwest 1101 Tautog Circle, Suite 203 Silverdale, WA 98315-1101 SUBJECT: FINAL APPENDIX F, SITE WORK PLAN, TIME CRITICAL REMOVAL ACTION, BREMERTON NAVAL COMPLEX (BNC), OU A CHARLESTON BEACH, BREMERTON, WASHINGTON Ref: Contract N68711 -04-D-1104 for Environmental Remediation Services in Alaska, Arizona, Califomia, Nevada, New Mexico, Oregon, Utah, and Washington Dear Ms. Jefferis: Enclosed are 2 hard copies and one (1) CD-ROM ofthe Final Appendix F to the Site Work Plan for the Interim Repair Action at OU A Charleston Beach, Bremerton Naval Complex, Bremerton, Washington. Additional hard copies have been submitted to the Stakeholders as requested (see below). This document includes: • Specifications and Design Drawings for the Interim Repair Action • Attachment A - Fish Mix Design Document • Attachment B - Interim Repair Action Design Memorandum Please call either Shanti Montgomery at (360) 780-1433 or myself at (206) 842-4247 regarding comments or questions on this submittal. Sincerely, WM^ Thomas C. Goodlin, LHG Senior Hydrogeologist SES-TECH Enclosure cc: Rod Gross (w/out attachment) Kimberly Gillette (w/out attachment) Denice Taylor - Suquamish Tribe Fisheries Department (1 hard copy) Tom Ostrom - Suquamish Tribe Fisheries Department (1 hard copy) Nancy Hamey - U.S. Environmental Protection Agency (1 hard copy) Chung Yee - Washington State Department
[Show full text]