Travel Directions to Leipzig

Total Page:16

File Type:pdf, Size:1020Kb

Travel Directions to Leipzig Travel Directions to Leipzig Note: If you have received a travel grant, please make sure to save all your receipts in order to be reimbursed. Please note: It may take 30-60 days after the conference for the money to be transferred to your bank account. How to get to Leipzig, if you arrive at Berlin Schönefeld Airport and want to take a train: The best connection to Leipzig Hauptbahnhof (main station): • Take the Regionalbahn (RB) from Berlin Schönefeld Flughafen (airport) to Berlin Hauptbahnhof (main station). The first train leaves at 06:55 on track 4, and runs hourly until 20:55 from the same track. Please be aware that there is no train leaving at 21:55. The last train leaves at 22:55. The train ride to Berlin main station will take approximately 30 minutes. • At Berlin Hauptbahnhof, take the Intercity-Express (ICE) to Leipzig Hauptbahnhof leaving either on track 1 or 2. Please be aware that when you leave Berlin Schönefeld at 20:55 or 22:55, the train from Berlin Hauptbahnhof to Leipzig Hauptbahnhof will be an Intercity (IC). The train ride to Leipzig Hauptbahnhof takes approximately 1:15h. How to get to Leipzig, if you arrive at Berlin Tegel Airport and want to take a train: The best connection to Leipzig Hauptbahnhof (main station): • Take the bus TXL to Berlin Hauptbahnhof (main station) (Bus Direction: S+U Alexanderplatz). The bus ride to Berlin Hauptbahnhof will take approximately 20 minutes. • At Berlin Hauptbahnhof take the Intercity-Express (ICE) to Leipzig Hauptbahnhof leaving either on track 1 or 2. The train ride to Leipzig Hauptbahnhof will take approximately 1:15h. • The first bus on Sunday, March 21, 2010 leaves Berlin Tegel airport at 06:18. • The last bus on Sunday, March 21, 2010 leaves Berlin Tegel airport at 21:27. How to get from Berlin Hauptbahnhof to Leipzig Hauptbahnhof taking the Interconnex: • The Interconnex (a train independent from Deutsche Bahn) runs twice a day between Berlin and Leipzig: departure is 07:57 and 17:06 at Berlin Hauptbahnhof. • A ticket costs either 19€ (ordered online) or 23€ (bought in the train). • For further information please see: http://www.interconnex.com/tmpl/XStartPage____13811.aspx?epslanguage=ML (Please note that the page is in German only.) How to get to Leipzig, if you arrive at Frankfurt/Rhein-Main Airport and want to take a train: The best connection to Leipzig Hauptbahnhof (main station): • There is an Intercity-Express (ICE) running directly from Frankfurt Flughafen Fernbahnhof (long distance station) to Leipzig Hauptbahnhof. The train ride to Leipzig main station will take approximately 3:45h. • The first ICE on Sunday, March 21, 2010 leaves in Frankfurt at 09:01 from track Fern 4 (long distance 4). • The last ICE on Sunday, March 21, 2010 leaves in Frankfurt at 21:02 from track Fern 4 (long distance 4). How to get from Leipzig/Halle Airport to Leipzig Hauptbahnhof (main station): • You can either take the Intercity (IC), the Regionalexpress (RE), or the Mitteldeutsche Regiobahn (MRB). Please be aware that when you take the RE/MRB you cannot purchase the ticket in advance onlinebut need to do that at Leipzig/Halle Flughafen (airport). Please bring enough change, for the ticket machines often want the exact amount of money! • The last train to Leipzig Hauptbahnhof on Sunday, March 21, 2010 leaves at 23:41. • Please be aware that all times, prices, and tracks mentioned above are object to change. • For further information on Deutsche Bahn and train connections please go to: http://www.bahn.de/i/view/GBR/en/index.shtml How to get to Villa Tillmanns from Leipzig main station: • Bus: Take bus 89 (toward Connewitz, Kreuz) at bus stop Goethestraße and get out after 4 stops at Neues Rathaus. • Tram: Take tram 16 (toward Lößnig) and get out at the next stop Augustusplatz. Then take tram 8 (toward Miltitz) and get out after one stop at Neues Rathaus. • Tickets and prices (Please bring enough change, for the ticket machines often want the exact amount of money!): ◦ short distance ticket (Kurzfahrt):1.40€ (Please note: With this ticket you can go 4 stops only.) ◦ hour ticket (Stundenfahrt): 2.00€ (Please note: This ticket is valid one hour.) ◦ day ticket (Tageskarte): 5.00€ (Please note: This ticket is valid for a day starting at the time of validation until 4 am the next day.) Note: Times are given in German format to make orientation in the German public transportation system easier..
Recommended publications
  • Investitionen in Die Schieneninfrastruktur 2019 in Südost
    Investitionen in die Schieneninfrastruktur 2019 in Südost 14 Bahnknoten Magdeburg Sachsen 15 Bahnhof Stendal 1 Bahnknoten Leipzig Thüringen 15 2 Bahnhof Taucha 16 ESTW Meiningen Dresden Hauptbahnhof Mittelhalle 3 17 Strecke Erfurt – Nordhausen 4 Chemnitzer Bahnbogen 14 18 Bahnhof Sondershausen 5 Strecke Pirna – Bad Schandau 13 19 Bahnhof Wernshausen 10 6 Strecke Leipzig – Dresden 12 20 Bahnhof Zella-Mehlis 11 7 Sachsen-Franken-Magistrale 9 Sachsen-Anhalt 2 1 6 Baumaßnahmen Merseburg/ 8 18 Weißenfels – Erfurt 8 3 9 Halle Hauptbahnhof Westseite 17 7 5 4 10 Bahnknoten Dessau/Roßlau 16 19 11 Bahnknoten Köthen 20 21 Werratalbahn 12 Strecke Dessau – Köthen 13 Strecke Magdeburg – Halberstadt 1 Ausgewählte Projekte DB Südost | 21.02.2019 Brückenprogramm LuFV II Erneuerung von 875 Brücken bundesweit bis 2019 2019 werden 44 Brücken in der Region Südost fertiggestellt. Davon • Sachsen: 24 • Sachsen-Anhalt: 12 • Thüringen: 8 2 Ausgewählte Projekte DB Südost | 21.02.2019 1 Bahnknoten Leipzig (1/2) Projektinhalt Ausblick 2019 . Einbindung der Strecken in den Knoten Leipzig von . Fertigstellung und Inbetriebnahme der Zugbildungs- Leipzig Messe bis Leipzig Hauptbahnhof und Behandlungsanlage mit Verbesserung der Anbindung ICE-Werk an den Leipziger Hauptbahnhof . Erneuerung von Brücken im Stadtgebiet Leipzig (Parthe, Rackwitzer Straße, Essener Straße) . Fertigstellung Umbau der Eisenbahnüberführung . Erneuerung der Fernverkehrsbahnsteige 10 bis 15 Essener Straße (teilweise bis auf 410 m Länge) . Erhöhung Ein- und Ausfahrgeschwindigkeit in 2 Gleisen auf 160 km/h zwischen Mockau und . Neuer Haltepunkt Essener Straße Wiederitzsch . Neubau von 14 km Gleis, 80 Weichen, 5,2 km Schallschutzwänden, ca. 50 km Oberleitung . Neubau und Inbetriebnahme eines Elektronischen Stellwerks in Leipzig-Mockau . Neubau der Zugbildungs- und Behandlungsanlage Leipzig-Nord mit verbesserter Anbindung des ICE- Werks an den Leipziger Hauptbahnhof .
    [Show full text]
  • TECHNICAL REPORT DOCUMENTATION PAGE Formats
    STATE OF CALIFORNIA • DEPARTMENT OF TRANSPORTATION ADA Notice For individuals with sensory disabilities, this document is available in alternate TECHNICAL REPORT DOCUMENTATION PAGE formats. For alternate format information, contact the Forms Management Unit TR0003 (REV 10/98) at (916) 445-1233, TTY 711, or write to Records and Forms Management, 1120 N Street, MS-89, Sacramento, CA 95814. 1. REPORT NUMBER 2. GOVERNMENT ASSOCIATION NUMBER 3. RECIPIENT'S CATALOG NUMBER CA-17-2969 4. TITLE AND SUBTITLE 5. REPORT DATE A Comparative Analysis of High Speed Rail Station Development into Destination and/or Multi-use Facilities: The Case of San Jose Diridon February 2017 6. PERFORMING ORGANIZATION CODE 7. AUTHOR 8. PERFORMING ORGANIZATION REPORT NO. Anastasia Loukaitou-Sideris Ph.D. / Deike Peters, Ph.D. MTI Report 12-75 9. PERFORMING ORGANIZATION NAME AND ADDRESS 10. WORK UNIT NUMBER Mineta Transportation Institute College of Business 3762 San José State University 11. CONTRACT OR GRANT NUMBER San José, CA 95192-0219 65A0499 12. SPONSORING AGENCY AND ADDRESS 13. TYPE OF REPORT AND PERIOD COVERED California Department of Transportation Final Report Division of Research, Innovation and Systems Information MS-42, PO Box 942873 14. SPONSORING AGENCY CODE Sacramento, CA 94273-0001 15. SUPPLEMENTARY NOTES 16. ABSTRACT As a burgeoning literature on high-speed rail development indicates, good station-area planning is a very important prerequisite for the eventual successful operation of a high-speed rail station; it can also trigger opportunities for economic development in the station area and the station-city. At the same time, “on the ground” experiences from international examples of high-speed rail stations can provide valuable lessons for the California high-speed rail system in general, and the San Jose Diridon station in particular.
    [Show full text]
  • Berlin by Sustainable Transport
    WWW.GERMAN-SUSTAINABLE-MOBILITY.DE Discover Berlin by Sustainable Transport THE SUSTAINABLE URBAN TRANSPORT GUIDE GERMANY The German Partnership for Sustainable Mobility (GPSM) The German Partnership for Sustainable Mobility (GPSM) serves as a guide for sustainable mobility and green logistics solutions from Germany. As a platform for exchanging knowledge, expertise and experiences, GPSM supports the transformation towards sustainability worldwide. It serves as a network of information from academia, businesses, civil society and associations. The GPSM supports the implementation of sustainable mobility and green logistics solutions in a comprehensive manner. In cooperation with various stakeholders from economic, scientific and societal backgrounds, the broad range of possible concepts, measures and technologies in the transport sector can be explored and prepared for implementation. The GPSM is a reliable and inspiring network that offers access to expert knowledge, as well as networking formats. The GPSM is comprised of more than 150 reputable stakeholders in Germany. The GPSM is part of Germany’s aspiration to be a trailblazer in progressive climate policy, and in follow-up to the Rio+20 process, to lead other international forums on sustainable development as well as in European integration. Integrity and respect are core principles of our partnership values and mission. The transferability of concepts and ideas hinges upon respecting local and regional diversity, skillsets and experien- ces, as well as acknowledging their unique constraints. www.german-sustainable-mobility.de Discover Berlin by Sustainable Transport This guide to Berlin’s intermodal transportation system leads you from the main train station to the transport hub of Alexanderplatz, to the redeveloped Potsdamer Platz with its high-qua- lity architecture before ending the tour in the trendy borough of Kreuzberg.
    [Show full text]
  • S 3 Halle Saale
    MDSB Jahresfahrplan 2018 gültig: 10.12.2017 - 29.09.2018 Zugtyp S (3) S (3) S (3) S (3) S (3) S (3) S (3) S (3) S (3) S (3) S (3) S (3) S (3) S (3) S (3) S (3) S (3) S (3) S (3) S (3) S (3) S (3) S (3) S (3) S (3) S (3) Zugnummer 37378 37380 37382 37384 37386 37388 37300 37302 37304 37306 37308 37310 37312 37312 37314 37314 37316 37316 37318 37320 37322 37324 37326 37328 37330 37332 W(Sa) Sa+S Sa+S W(Sa) Sa+S W(Sa) W(Sa) W(Sa) Sa+S W(Sa) Sa+S W(Sa) Sa+S Gültigkeit 11.12.2017- 10.12.2017- 10.12.2017- 11.12.2017- 10.12.2017- 11.12.2017- 11.12.2017- 11.12.2017- 10.12.2017- 11.12.2017- 10.12.2017- 11.12.2017- 10.12.2017- 28.... ►2 29.0... ►1 29.0... ►1 28.... ►2 29.0... ►1 28.... ►2 28.... ►2 28.... ►2 29.0... ►1 28.... ►2 29.0... ►1 28.... ►2 29.0... ►1 Borna (b Borna (b Von: Geithain Leipzig) Leipzig) Gaschwitz 23:34 0:43 3:00 6:43 7:13 7:43 Markkleeberg-Großstädteln 23:37 0:46 3:03 6:46 7:16 7:46 Markkleeberg 23:39 0:48 3:05 6:48 7:18 7:48 Markkleeberg N 23:41 0:50 3:07 6:49 7:19 7:49 Lpz-Connewitz o 23:43 0:52 3:09 6:51 7:21 7:51 Lpz-Connewitz 23:44 1:09 0:53 2:19 3:23 3:10 3:50 4:22 4:52 5:22 5:52 6:22 6:52 6:52 7:22 7:22 7:52 7:52 8:22 8:52 9:22 9:52 10:22 10:52 11:22 11:52 Leipzig-Stötteritz | | | | | | |||||||||||||||||||| L Völkerschlacht | | | | | | |||||||||||||||||||| Leipzig MDR 23:46 1:12 0:56 2:22 3:26 3:13 3:53 4:25 4:55 5:25 5:55 6:25 6:55 6:55 7:25 7:25 7:55 7:55 8:25 8:55 9:25 9:55 10:25 10:55 11:25 11:55 Leipzig Bayer Bf 23:48 1:14 0:58 2:24 3:28 3:15 3:55 4:27 4:57 5:27 5:57 6:27 6:57 6:57 7:27 7:27 7:57 7:57 8:27 8:57
    [Show full text]
  • Autologous, Non-Invasively Available Mesenchymal Stem Cells from the Outer Root Sheath of Hair Follicle Are Obtainable by Migrat
    cells Article Autologous, Non-Invasively Available Mesenchymal Stem Cells from the Outer Root Sheath of Hair Follicle Are Obtainable by Migration from Plucked Hair Follicles and Expandable in Scalable Amounts Hanluo Li 1, Federica Francesca Masieri 2, Marie Schneider 3, Tina Kottek 1, Sebastian Hahnel 4, Kensuke Yamauchi 5, Danilo Obradovi´c 6, Jong-Keun Seon 7, Sook Jung Yun 7 , 8 8 8 1, Rubén A. Ferrer , Sandra Franz , Jan-Christoph Simon , Bernd Lethaus y and 1, , Vuk Savkovi´c * y 1 Department of Cranial Maxillofacial Plastic Surgery, University Clinic Leipzig, 04103 Leipzig, Germany; [email protected] (H.L.); [email protected] (T.K.); [email protected] (B.L.) 2 School of (EAST) Engineering, Arts, Science & Technology, University of Suffolk, Ipswich, Suffolk IP41QJ, UK; [email protected] 3 Clinic for Hematology, Cell Therapy and Hemostaseology, University Hospital Leipzig, 04103 Leipzig, Germany; [email protected] 4 Polyclinic for Dental Prosthetics and Material Sciences, University Hospital Leipzig, 04103 Leipzig, Germany; [email protected] 5 Kensuke Yamauchi, Department of Oral & Maxillofacial Surgery, Tohoku University, Sendai 980-8577, Japan; [email protected] 6 Leipzig Heart Center, 04289 Leipzig, Germany; [email protected] 7 Chonnam National University Hwasun Hospital, Hwasun-gun 58128, Korea; [email protected] (J.-K.S.); [email protected] (S.J.Y.) 8 Clinic for Dermatology, Venereology and Allergology, University Hospital Leipzig, 04103 Leipzig, Germany; [email protected] (R.A.F.); [email protected] (S.F.); [email protected] (J.-C.S.) * Correspondence: [email protected]; Tel.: +49-341-97-21115 These authors contributed equally to this work.
    [Show full text]
  • Streckenkarte Regionalverkehr Rheinland-Pfalz / Saarland
    Streckenkarte Regionalverkehr Rheinland-Pfalz / Saarland Niederschelden Siegen Mudersbach VGWS FreusburgBrachbach Siedlung Eiserfeld (Sieg) Niederschelden Nord Köln ten: Kirchen or Betzdorf w Au (Sieg) ir ant Geilhausen Hohegrete Etzbach Köln GrünebacherhütteGrünebachSassenroth OrtKönigsstollenHerdorf Dillenburg agen – w Breitscheidt WissenNiederhövels (Sieg)Scheuerfeld Alsdorf Sie fr Schutzbach “ Bonn Hbf Bonn Kloster Marienthal Niederdreisbach ehr Köln Biersdorf Bahnhof verk Obererbach Biersdorf Ort Bonn-Bad Godesberg Daaden 0180 t6 „Na 99h 66 33* Altenkirchen (Ww) or Bonn-Mehlem Stichw /Anruf Rolandseck Unkel Büdingen (Ww) Hattert Oberwinter Ingelbach Enspel /Anruf aus dem Festnetz, HachenburgUnnau-Korb Bad BodendorfRemagen Erpel (Rhein) *20 ct Ahrweiler Markt Heimersheim Rotenhain Bad Neuenahr Walporzheim Linz (Rhein) Ahrweiler bei Mobilfunk max. 60 ct Nistertal-Bad MarienbergLangenhahn VRS Dernau Rech Leubsdorf (Rhein) Westerburg Willmenrod Mayschoß Sinzig Berzhahn Altenahr Bad Hönningen Wilsenroth Kreuzberg (Ahr) Bad Breisig Rheinbrohl Siershahn Frickhofen Euskirchen Ahrbrück Wirges Niederzeuzheim Brohl Leutesdorf NeuwiedEngers Dernbach Hadamar Köln MontabaurGoldhausenGirod Steinefrenz Niederhadamar Namedy Elz Andernach Vallendar Weißenthurm Urmitz Rheinbrücke Staffel Miesenheim Dreikirchen Elz Süd Plaidt Niedererbach Jünkerath Mendig KO-Lützel Limburg (Lahn) KO-Ehrenbreitstein Diez Ost Gießen UrmitzKO-Stadtmitte Thür Kruft Diez Eschhofen Lissendorf Kottenheim KO-Güls Niederlahnstein Lindenholzhausen Winningen (Mosel) BalduinsteinFachingen
    [Show full text]
  • Global Competitiveness in the Rail and Transit Industry
    Global Competitiveness in the Rail and Transit Industry Michael Renner and Gary Gardner Global Competitiveness in the Rail and Transit Industry Michael Renner and Gary Gardner September 2010 2 GLOBAL COMPETITIVENESS IN THE RAIL AND TRANSIT INDUSTRY © 2010 Worldwatch Institute, Washington, D.C. Printed on paper that is 50 percent recycled, 30 percent post-consumer waste, process chlorine free. The views expressed are those of the authors and do not necessarily represent those of the Worldwatch Institute; of its directors, officers, or staff; or of its funding organizations. Editor: Lisa Mastny Designer: Lyle Rosbotham Table of Contents 3 Table of Contents Summary . 7 U.S. Rail and Transit in Context . 9 The Global Rail Market . 11 Selected National Experiences: Europe and East Asia . 16 Implications for the United States . 27 Endnotes . 30 Figures and Tables Figure 1. National Investment in Rail Infrastructure, Selected Countries, 2008 . 11 Figure 2. Leading Global Rail Equipment Manufacturers, Share of World Market, 2001 . 15 Figure 3. Leading Global Rail Equipment Manufacturers, by Sales, 2009 . 15 Table 1. Global Passenger and Freight Rail Market, by Region and Major Industry Segment, 2005–2007 Average . 12 Table 2. Annual Rolling Stock Markets by Region, Current and Projections to 2016 . 13 Table 3. Profiles of Major Rail Vehicle Manufacturers . 14 Table 4. Employment at Leading Rail Vehicle Manufacturing Companies . 15 Table 5. Estimate of Needed European Urban Rail Investments over a 20-Year Period . 17 Table 6. German Rail Manufacturing Industry Sales, 2006–2009 . 18 Table 7. Germany’s Annual Investments in Urban Mass Transit, 2009 . 19 Table 8.
    [Show full text]
  • Germany Berlin Tiergarten Tunnel Verkehrsanlagen Im Zentralen
    Germany Berlin Tiergarten Tunnel Verkehrsanlagen im zentralen Bereich – VZB This report was compiled by the German OMEGA Team, Free University Berlin, Berlin, Germany. Please Note: This Project Profile has been prepared as part of the ongoing OMEGA Centre of Excellence work on Mega Urban Transport Projects. The information presented in the Profile is essentially a 'work in progress' and will be updated/amended as necessary as work proceeds. Readers are therefore advised to periodically check for any updates or revisions. The Centre and its collaborators/partners have obtained data from sources believed to be reliable and have made every reasonable effort to ensure its accuracy. However, the Centre and its collaborators/partners cannot assume responsibility for errors and omissions in the data nor in the documentation accompanying them. 2 CONTENTS A PROJECT INTRODUCTION Type of project Project name Description of mode type Technical specification Principal transport nodes Major associated developments Parent projects Country/location Current status B PROJECT BACKGROUND Principal project objectives Key enabling mechanisms Description of key enabling mechanisms Key enabling mechanisms timeline Main organisations involved Planning and environmental regime Outline of planning legislation Environmental statements Overview of public consultation Ecological mitigation Regeneration Ways of appraisal Complaints procedures Land acquisition C PRINCIPAL PROJECT CHARACTERISTICS Detailed description of route Detailed description of main
    [Show full text]
  • Travel to Leipzig from Berlin by Train
    Travel to Leipzig from Berlin by train Delegates who arrive at an airport in Berlin (Tegel or Schönefeld) are offered high speed train first class return ticket to Leipzig at 99.00 EUR. This offer is valid for a return trip to Leipzig on Intercity-Express trains (ICE) as well as EuroCity (EC) and InterCity (IC) trains from 20 May 2019 until 26 May 2019 (inclusive). Upon reservation and payment of this option during the registration process, you will be provided with a booking confirmation number required for issuing the ticket. Your ticket for the train of your choice must be collected before departure from a vending machine at the railway station. Detailed instructions can be found on the next pages. Please note that in first class seats are usually available. However, if you wish to reserve your seat in advance, please use the DB website or go to the ticket desk at the railway station. Seat reservations will incur an additional cost of 4,50 EUR per seat (9 EUR for a return trip). This offer includes transfers to/from Berlin Tegel or Schönefeld airports to Berlin main railway station (Berlin Hauptbahnhof) as well as access to the DB Lounge. Dedicated staff will be available throughout to ensure a smooth transfer process. Arrival Upon your arrival at the airport in Berlin (Tegel or Schönefeld) you will be met by a host at the arrival gate - look for a sign with the logo of the International Transport Forum. The host will escort you to the shuttle to Berlin main railway station.
    [Show full text]
  • Accommodation Meeting Venue
    Accommodation Potsdam offers a variety of suitable hotels in and close to the historical center. Here is a selection based mainly on distance to the venue and availability of rooms: 1. Mercure Hotel Potsdam City (http://www.mercure-potsdam.com/en/) Lange Brücke 14467 Potsdam 4*Hotel, 5 Minute walk to ZeM. 20 Rooms have been reserved for participants until February 15th. Single Room 79 EUR per night Double Room 99 EUR per night Room prices include breakfast, option without is 16 Euro less. If you are interested in booking a room there, please send an email to Adelheid Heftberger ([email protected]) with the name and number of nights. 2. Steigenberger Potsdam (https://www.steigenberger.com/en/hotels/all- hotels/germany/potsdam/steigenberger-hotel-sanssouci) Allee nach Sanssouci 1 14471 Potsdam T: +49 331 9091-0 Single Room ca. 89 EUR per night including breakfast Double Room ca. 109 EUR per night including breakfast 3. Altstadt Hotel Potsdam http://altstadt-hotel-potsdam.de/ Dortusstraße 9-10 14476 Potsdam Tel.: +49 (0) 331 – 284990 Single Room ca. 90 EUR per night including breakfast Double Room ca. 95 EUR per night including breakfast Meeting Venue Brandenburgisches Zentrum für Medienwissenschaften (ZeM) Friedrich-Ebert-Straße 4 14467 Potsdam http://www.zem-brandenburg.de/ Travel Travel to Potsdam from Berlin is fairly straightforward. There is an S-Bahn line (S7) which runs directly to Potsdam Main station from Berlin. Alternatively there are regional trains which are slightly faster but not as frequent. Prices are the same from either airport or Berlin Main Station , choose the ticket “Berlin ABC”), and are at the moment 3.40 Euros one direction.
    [Show full text]
  • DIANA WESSER *1970 in Stuttgart, Lives in Leipzig, Germany Education
    DIANA WESSER *1970 in Stuttgart, lives in Leipzig, Germany Education 2005 Postgraduate in the master class of Prof. D‘Urbano, Academy of Visual Arts, Leipzig 2001 Master of Fine Arts (Diploma Degree), Academy of Visual Arts, Leipzig 1994 – 2001 Studies of Media Arts & Illustration, Academy of Visual Arts, Leipzig 1990 – 1987 Education Graphic Design, Kolping Berufskolleg für Grafik-Design, Fellbach Selected Performances & Participatory Projects (since 2011) 2020/2021 Next Stop Stengårsdvej – A performative travel into the future of Esbjerg Ø, a ’6705 + Statens Kunstfond‘ project by collctive bleeding, Esbjerg 2019 Fabrik der Frauen (factory of women), Audiowalk and installation in collaboration with former workers of the spinning mill Leipzig, X-Spindeln Festival, LOFFT Theater Leipzig Sport findet Stadt, performative walk in collaboration with locals, Museum Weißenfels (October) 2018 Sehnsucht Wanne – a Neighbourhood Laboratory, long term community project, Junge Impulse Festival Herne Hafen der Stadt – Arrival City, audio walk based on interviews with locals, Pöge-Haus Leipzig 2017 A matter of faith Leipzig – interreligious dialogical project involving the multicultural neighbourhood of the so called “most dangerous street of Germany”, Kirchentag auf dem Weg, Leipzig Lindenau Re-Visited (2007/2017), with Herman Heisig, LOFFT Theatre Leipzig Casino of the Values, with Juliane Meckert, World Congress of Reformatory Churches, Leipzig 2016 A matter of faith Aarhus – an interreligious treasure hunt in public space, Aarhus Theatre Neighbourhood
    [Show full text]
  • Faktenblatt 5 Jahre S-Bahn Mitteldeutschland Und City-Tunnel
    Faktenblatt 5 Jahre S-Bahn Mitteldeutschland und City-Tunnel Leipzig (Leipzig, 13. Dezember 2018) Vor fünf Jahren begann für den Wirtschaftsraum Leipzig/Halle und dessen Umland eine neue Ära des Nahverkehrs: Mit der Fertigstellung des rund vier Kilometer langen Leipziger City-Tunnels nahm am 15. Dezember 2013 die S-Bahn Mitteldeutschland ihren Betrieb auf. Nachdem das Tunnelprojekt am 26. Juni 1996 startete, am 19. Mai 2000 der Planfeststellungsbeschluss vorlag, am 23. Mai 2003 die Bau- und Finanzierungsvereinbarung sowie der Projektvertrag unterzeichnet werden konnten, erfolgte am 9. Juli 2003 der offizielle erste Spatenstich. Nachdem die notwendigen Baufelder freigemacht und im Streckenverlauf zahlreiche Leitungen umverlegt wurden, rollten im Februar 2005 die ersten Bagger an, um beispielsweise das Untergrundmessehaus für die künftige Station Leipzig Markt abzureißen, die Tunneldecke am Vorplatz des Leipziger Hauptbahnhofs zu montieren sowie die Baugrube am Bayerischen Bahnhof auszuheben. Die Verschiebung des Portikus geschah dort am 10. April 2006 unter großer Anteilnahme der Bevölkerung und erregte überregionales Medieninteresse. Auf den Namen „Leonie“ wurde am 11. Januar 2007 die Tunnelbohrmaschine getauft, die sich vom 15. Januar 2007 bis zum 10. März 2008 für die künftige Oströhre durch den Leipziger Untergrund bohrte. Für die Weströhre machte sich „Leonie“ am 9. Mai 2009 wiederum vom Bayerischen Bahnhof auf den Weg zum Leipziger Hauptbahnhof, den sie am 31. Oktober 2009 erreichte. Nun konnte die bahntechnische Ausrüstung des Tunnels mit Gleisen, Weichen, Oberleitung sowie Signal-, Sicherungs- und Brandschutztechnik erfolgen. Auch die vier unterirdischen Stationen Leipzig Hauptbahnhof (tief), Leipzig Markt, Leipzig Wilhelm-Leuschner-Platz und Leipzig Bayerischer Bahnhof wurden entsprechend der Vorgaben der Architekten errichtet und technisch ausgerüstet.
    [Show full text]