Timetable No.2

Total Page:16

File Type:pdf, Size:1020Kb

Timetable No.2 TIMETABLE NO.2 DISTRICT 5 EFFECTIVE: WEDNESDAY, APRIL 01, 2015 AT 0001 HOURS REVISIONS PAGE Page Bulletin Date Description Number Number Central Florida Rail Corridor 1 Effective April 01, 2015 Timetable No. 2 TABLE OF CONTENTS GENERAL INFORMATION NAME PAGE EMERGENCY CONTACT VIA TELEPHONE Revisions Page 1 CFRC Safety and Security Communications Table of Contents 2 Coordinator (CFRC SSCC): Emergency Contact 2 (877) 235-7245 (407) 732-6755 CFRC Train Dispatcher Phone Numbers 2 Sheriff’s Office Emergency: 911 Officers 3 Non-Emergency: Volusia County: (386) 248-1777 Timetable Legend 4 – 6 Seminole County: (407) 665-6650 CFRC Timetable 7 – 9 Orange County: (407) 836-4357 Osceola County: (407) 348-2222 CFRC Special Instructions 10 – 14 CFRC Highway/Grade Crossings 15 – 18 Fire Department Emergency: 911 Non-Emergency: CFRC Bridges and Culverts 19 Volusia County (386) 248-1777 Opt #1 CFRC Speed Table 20 Seminole County (407) 665-5100 Orange County (407) 836-9000 Osceola County (407) 348-2222 CFRC TRAIN DISPATCHER PHONE NUMBERS CFRC Train Dispatcher Desk (D1) (407) 732-6753 (Primary) (407) 732-6754 (Secondary) CFRC SSCC (407) 732-6755 (Primary) (407) 732-6756 (Secondary) MANAGER OF TRAIN OPERATIONS (407) 732-6751 (Primary) (407) 732-6752 (Secondary) EMERGENCY CONTACT VIA RADIO Using the CFRC Train Dispatcher channel (097), press 9 to initiate an emergency call into the CFRC Operations Control Center (OCC). Central Florida Rail Corridor 2 Effective April 01, 2015 Timetable No. 2 OFFICERS FLORIDA DEPARTMENT OF TRANSPORTATION (FDOT) Name Position Email Office Phone Cell Phone Passenger Rail Operations Miguel Torres [email protected] (407) 732 6703 (386) 624-4116 Manager SunRail Public Transportation Jonathan Duazo [email protected].fl.us (407) 732-6707 (386) 956-7990 Manager BOMBARDIER – OPERATIONS & MAINTENANCE Name Position Email Office Phone Cheryl Boehm General Manager [email protected] (407) 732-6721 Dennis Smith Chief Transportation Officer [email protected] (407) 732-6716 Jeff Gilpin Manager of Train Operations [email protected] (407) 732-6751 Daniel Denton Safety and Security Manager [email protected] (407) 732-6709 Mike Dier Chief Engineer [email protected] (407) 732-6723 Denis Hamilton Mechanical Manager [email protected] (407) 732-6715 Shawn Furniss Road Foreman [email protected] (407) 732-6736 Richard Guindon Trainmaster [email protected] (407) 732-6725 TBD Road Foreman (407) 732-6724 Thomas Rossi Communications Manager [email protected] (407) 732-6732 HERZOG – SIGNAL MAINTENANCE Name Position Email Office Phone Nathan Morrison Signal Maintenance Manager [email protected] (407) 562-2700 John Humphrey Signal Maintenance Supervisor [email protected] (407) 562-2704 Central Florida Rail Corridor 3 Effective April 01, 2015 Timetable No. 2 TIMETABLE LEGEND STATION LISTINGS AND DIAGRAM PAGES HEADING SYMBOLS USED The railroad is identified by name and by a 4 Alpha character identifier - CFRC. 1. Track Direction COLUMN HEADINGS AND LISTINGS N – North S – South E – East W – West 1. Authorized Speed - The maximum speed NB – Northbound NE – North End permitted between mileposts listed may also SB – Southbound SE – South End include restrictions over road crossings or other EB – Eastbound EE – East End defined locations. Where speeds differ between WB – Westbound WE – West End various classes of trains, they will be listed in separate columns. 2. Speed References Abbreviations used are (P) – Passenger, (F) – SP – Refer to Speed Tables Freight, (I) – Intermodal, (U) – Unit. Where Where a speed is shown in the Authorized speeds differ in multiple track territory, the Speed Column of the Station Listings and speeds will be shown in shaded blocks. Diagram pages or the Additional Speed Table, the speed shown is the maximum speed and 2. Milepost - The alpha/numeric reference point does not supersede any additional requirements identifying a specific track location. At locations that may be imposed by Rules. to check speed indicators, the mileposts may be listed without alpha prefixes and will be shown 3. Abbreviations shown below are also found in with a wide border. the Special Instructions Page: 28.0 ABS Automatic Block Signal Rules 29.0 CONN Connection Track CONT Continuous 3. Station - A named reference point identifying a CP Control Point specific track location. CSDG Controlled Siding DB Drawbridge 4. Track Diagram - The timetable assigned DD Defect Detector direction from the first listing to the last is IND Industry Track defined above the track diagram by arrows and OTMT Other Than Main Track direction. (P) Passenger Station SG Single 5. Authority for Movement - (Auth for Move) - The STG Storage authority for movement rules applicable for the TC Traffic Control Central Florida Rail Corridor are listed below: TO Turnouts XOVER Crossover 510 – TC YD Yard 511 – CP 4. Road Crossings Activation Codes 6. Notes - Where station page information may need to be further defined, a number will refer to Types of Activation: “STATION PAGE NOTES” listed at the end of P – Constant Warning the diagram. M – Motion Sensor C – Conventional Track Circuits 5. Road Crossings Without Activation Codes XB – Cross Bucks Central Florida Rail Corridor 4 Effective April 01, 2015 Timetable No. 2 6. Type-1 Defect Detectors HBD – Hot Box Detector DED – Dragging Equipment Detector 7. Communications Text Boxes Communications Text Boxes show Dispatcher, Operator or other station. AAR channel, call-in tone and where used, the number of “clicks” to call the station. If there is a separate road channel it will be shown as “RD – ”. CFRC DISP 97 RD - 41 Central Florida Rail Corridor 5 Effective April 01, 2015 Timetable No. 2 LEGEND AUTHORIZED SPEED - MILE TRACK DIAGRAM AUTH FOR REFER TO SPEED STATION NOTES POST MOVE TABLES SOUTH 1 2 CFRC P F P F 60 50 60 50 SR 0.0 DISP - 001 TC Above the double line is a RD - 002 connecting RR or SD. 60 50 60 50 Text Boxes for SR 10.0 20 79 55 79 55 1 2 Dispatcher, Road, Yard and Engineering. Speed Track Number Change MP Designation TC 79 55 SR 20.0 NE METRO CP 50 50 Speed SR 24.0 24.0 Dead-end turnout Reference to Air Brake Indicator represent industry & Train Handling Rule Check XXXX spurs, team tracks etc. (Steep Grade) SR 28.0 28.0 TC 79 SR 30.0 MID METRO SP CP 65 SEE SPEED TC Miles between 10 TABLES stations. TC 65 55 SR 40.0 SE METRO CP 55 50 FCEN YARD Shaded and bordered YD - 003 represents the limits Yard Channel for yarding of a Controlled Point. instructions shown in text 1 box. 55 50 SR 55.0 50 40 Special Instructions Indication - refer to note in column. 1. Instructions for this location. 63.0 50 40 Reference to Equipment SR 65.0 Handling Rule (Handling XXXX 45 35 SR 67.0 cars prone to rocking) 65 65 67.1 50City Ordinance 45 Speed65 50 50 50 SR 70.0 DD 50 40 Connecting RR shown with dashed. Defect Detector Total miles on railroad or TC subdivision are shown on 65 50 50 40 SR 85.0 NE SKYLINE the bottom of the diagram. CP 85 MILES CSXT TO NS Central Florida Rail Corridor 6 Effective April 01, 2015 Timetable No. 2 CENTRAL FLORIDA RAIL CORRIDOR AUTHORIZED SPEED - MILE TRACK DIAGRAM AUTH FOR REFER TO SPEED STATION NOTES POST MOVE TABLES SOUTH P F CSXT SANFORD SD 79 60 A 749.6 SE DELAND CP A 749.8 TC A 750.0 CSXT DELAND 79 60 A 750.3 A 751.1 SPUR 50 50 CFRC A 751.5 DISP: 097-2 60 RD: 041 79 A 752.8 70 10.2 A 753.1 79 A 755.4 ORANGE CITY DD TYPE 1 A 757.0 70 A 757.2 79 TC A 759.8 NE BENSON JUNCTION CP 79 A 760.1 TC 65 CSDG 10,207 FT 65 60 2.0 A 761.4 SP 60 50 TC A 761.8 SE BENSON JUNCTION CP 60 A 761.9 1.3 1 2 TC 60 60 A 763.1 LAKE MONROE DB CP 45 25 A 763.7 1 2 1.2 TC 60 60 A 764.3 OCC CP TC CSXT CFRC VSMF 0.9 RAND YARD YD - 047 A 765.8 TC A 765.2 VSMF CP 60 60 A 765.9 0.8 TC 30 25 A 766.0 SANFORD CP A 766.4 CSXT TC 60 60 1 2 ALOMA SPUR 1 1. A 769.0 and A 770.0 are A 772.0 missing and there is only 50 45 749 feet between A 768.0 A 773.1 and A 771.10. 45 40 A 773.8 10.6 70 60 A 774.4 79 2 2. Measured Mile between A 776.1 LONGWOOD DD MP A775.0 and A 776.0. 79 60 TYPE 1 A 777.2 50 50 A 777.6 50 50 A 777.9 1 2 TC 50 60 A 779.2 LONGWOOD CP A 780.3 3.6 TC 50 50 Central Florida Rail Corridor 7 Effective April 01, 2015 Timetable No. 2 CENTRAL FLORIDA RAIL CORRIDOR AUTHORIZED SPEED - MILE TRACK DIAGRAM AUTH FOR REFER TO SPEED STATION NOTES POST MOVE TABLES SOUTH P F 50 50 A 782.0 1 2 TC 40 40 A 782.8 MAITLAND CP TC A 784.3 1.8 40 40 TC A 784.7 WINTER PARK CP 30 25 TC 3.1 1 2 TC 3. North Bound Signal A 787.8 FLORIDA HOSPITAL 3 CP Only. TC FCEN A 790.1 3.3 TC A791.1 NORTH ORLANDO CP 0.7 CSXT 3 1 2 TC KALEY YARD 30 25 A 791.8 MIDDLE ORLANDO CP 40 40 1.3 CSDG 3,696 FT TC SP CP A 793.1 SOUTH ORLANDO 40 40 TC A 793.6 60 45 2 3.4 1 60 45 CSXT A 795.5 TAFT YARD TC 79 60 A 796.5 SAND LAKE CP 0.2 SP TC A 796.7 TOFC CP TC SEXTON SPUR 1.3 SERVICE TRACK TC A 798.0 NE TAFT CP 0.8 TC A 798.8 MIDDLE TAFT CP CSDG TC 6,989 FT 0.4 SP TC A 799.2 SE TAFT CP 79 A 799.3 RC 70 0.5 BRANCH TC A 799.7 NE STANTON CP 70 0.8 STANTON A 799.8 SPUR TC 79 A 800.5 SE STANTON SP CP TC A 801.0 2.8 STANTON DD 79 TYPE 1 A 802.2 70 A 802.8 TC 79 A 803.3 KISSIMMEE HOLDOUT CP A 803.8 TC 65 60 Central Florida Rail Corridor 8 Effective April 01, 2015 Timetable No.
Recommended publications
  • Summer 2007 TOD Sketchbook
    Central Florida Commuter Rail Summer 2007 Central Florida Commuter Rail On the Inside: page Introduction ........................................ 1 DeLand Station................................... 5 Fort Florida Station ............................ 7 Sanford Station................................... 9 Lake Mary Station ............................ 11 Longwood Station............................. 13 Altamonte Springs Station................ 15 Maitland Station............................... 17 Winter Park Station.......................... 19 Florida Hospital Station ................... 21 LYNX Central Station......................... 23 Church Street Station........................ 25 Orlando Amtrak Station ................... 27 Sand Lake Road Station................... 29 Meadow Woods Station .................... 31 Osceola Parkway Station .................. 33 Kissimmee Station............................ 35 Poinciana Station.............................. 37 The Central Florida Commuter Rail project will provide the opportunity not only to move people more efficiently, but to also build new, walkable, transit-oriented communities around some of its stations and strengthen existing communities around others. In February 2007, FDOT conducted a week long charrette process, individually meeting with the agencies and major stakeholders from DeLand each of the jurisdictions along the proposed 61-mile commuter rail corridor. These The plans and concepts included: Volusia County, Seminole County, illustrated in this report Orange County,
    [Show full text]
  • 2019 Winter Events
    2019 Winter Events Events will be updated regularly. Check back often for new reasons to ride SunRail! Church Street Station Orlando Magic Games Amway Center, 7:00PM Special 10:30PM southbound service from Church St. Station available for the following home games: January 18, 25, 29 & 31 February 7, 14, 22 & 28 March 8, 14, 20, 22 & 25 April 3 & 5 Hamilton Dr. Philips Performing Arts Center Friday, January 25, 8:00PM Tuesday, January 29, 8:00PM Thursday, January 31, 8:00PM Thursday, February 7, 8:00PM Special 10:30PM southbound service from Church Street Station available. For additional show dates, visit drphillipscenter.org Music for Lovers – Nat King Cole at 100 Dr. Philips Performing Arts Center Thursday, February 14, 8:00PM Special 10:30PM southbound service from Church Street Station available. Hand to God Mad Cow Theatre Friday, January 25, 7:30PM Thursday, January 31, 7:30PM Thursday, February 7, 7:30PM Special 10:30PM southbound service from Church Street Station available. For additional show dates, visit madcowtheatre.com Gloria Mad Cow Theatre Thursday, February 14, 7:30PM Thursday, February 28, 7:30PM Special 10:30PM southbound service from Church Street Station available. For additional show dates, visit madcowtheatre.com SANFORD STATION Free Trolley to Downtown Sanford The Sanford Trolley runs a loop from the SunRail station through Historic Downtown Sanford Monday-Friday. WINTER PARK STATION Winter Park 9 Bring your clubs and golf the Winter Park 9, the city’s award-winning 9-hole golf course. Walking distance from the station. For more information, visit https://cityofwinterpark.org/departments/parks-recreation/golf- course/ AdventHealth STATION Winter Science Spectacular – Dinos in Lights Orlando Science Center Now through January 6, 2019 Monday – Friday, every 30 min.
    [Show full text]
  • Examining the Traffic Safety Effects of Urban Rail Transit
    Examining the Traffic Safety Effects of Urban Rail Transit: A Review of the National Transit Database and a Before-After Analysis of the Orlando SunRail and Charlotte Lynx Systems April 15, 2020 Eric Dumbaugh, Ph.D. Dibakar Saha, Ph.D. Florida Atlantic University Candace Brakewood, Ph.D. Abubakr Ziedan University of Tennessee 1 www.roadsafety.unc.edu U.S. DOT Disclaimer The contents of this report reflect the views of the authors, who are responsible for the facts and the accuracy of the information presented herein. This document is disseminated in the interest of information exchange. The report is funded, partially or entirely, by a grant from the U.S. Department of Transportation’s University Transportation Centers Program. However, the U.S. Government assumes no liability for the contents or use thereof. Acknowledgement of Sponsorship This project was supported by the Collaborative Sciences Center for Road Safety, www.roadsafety.unc.edu, a U.S. Department of Transportation National University Transportation Center promoting safety. www.roadsafety.unc.edu 2 www.roadsafety.unc.edu TECHNICAL REPORT DOCUMENTATION PAGE 1. Report No. 2. Government Accession No. 3. Recipient’s Catalog No. CSCRS-R{X}CSCRS-R18 4. Title and Subtitle: 5. Report Date Examining the Traffic Safety Effects of Urban Rail Transit: A Review April 15, 2020 of the National Transit Database and a Before-After Analysis of the 6. Performing Organization Code Orlando SunRail and Charlotte Lynx Systems 7. Author(s) 8. Performing Organization Report No. Eric Dumbaugh, Ph.D. Dibakar Saha, Ph.D. Candace Brakewood, Ph.D. Abubakr Ziedan 9. Performing Organization Name and Address 10.
    [Show full text]
  • BDV30-943-20Finalreport.Pdf
    e Executive Summary There are many benefits to fixed route transit, although some of these may not be immediately realized or quantified. One potential long-term benefit of these investments is the development and real estate impacts induced by the transit system. Community support for public transit could come more easily if transit systems could demonstrate positive fiscal impacts beyond those achieved through fare box returns. Other than direct operating revenues generated largely from fares, transit systems have the potential to generate additional public revenues through catalyzing development around transit stations and along transit routes, yielding increased property values and property taxes. The quantification of these development-related revenue streams can be a useful input into fiscal analyses of transit investments, and may demonstrate that these systems offer a greater return on investment than traditional cost recovery measures might suggest. This report provides an assessment of the property value changes and development impacts that have occurred around SunRail stations since the system’s opening. Using property appraiser data, the study team estimates tax revenue impacts that resulted from property value changes around the stations. As detailed in this report, the evidence shows that development around stations has been highly variable across the system, with some stations having experienced modest to substantial new development and other no new development of note. However, the evidence does indicate that SunRail stations have generally outperformed control areas that were identified as part of this study. The evidence illustrates that SunRail has yielded some substantial positive property value impacts - and by extension increased property taxes – to the affected jurisdictions.
    [Show full text]
  • A Better Way to Go!
    A Better Way To Go! 1 SunRail Feeder Bus Operations and Funding Overview FDOT will contract with LYNX and VOTRAN for the operations of feeder bus service to SunRail system: • Feeder bus service will be operated during weekdays (Monday – Friday) during AM and PM peak periods. • FDOT will pay for net operating subsidy (O&M cost less state and federal funding and fare revenue) • Subsidy for initial 7 years of SunRail operation when CFCRC takes over operations • Service levels defined by FDOT in consultation with LYNX and local funding partners FDOT paid local share for purchase of 16 LYNX buses in support of the feeder bus program (TRIP program) Feeder Bus Planning History Coordination with Local Jurisdictions: • City of DeBary/Votran DeBary • Seminole County/Lynx Sanford, Lake Mary, Longwood, Altamonte Springs • Orange County/Lynx Maitland, Winter Park, Sand Lake Road • City of Orlando/Lynx Florida Hospital, LYNX Central Station, Church Street, ORMC/Amtrak Coordination began in 2006 Letters of Understanding executed with Lynx and Votran in 2007 Sizing the Feeder Bus Plan How much feeder bus service is needed? • SunRail projected opening year ridership = 4,114 • About 27% of SunRail riders will use bus • About 1/3 of LYNX bus riders will use Lymmo and other local routes for “Last Mile” connections at LCS, Church St. • About 700-800 daily LYNX riders connecting at non-CBD stations 2007 plan was for 9,600 annual hours of LYNX service • In 2012 FDOT agreed to develop funding strategy for peak period service on #111 (OIA). 2013 plan is for 15,259 annual hours of LYNX service • Current plan increases service by 59% • Results in 12-13 riders per bus hour (LYNX average is 26) How much will it cost? Jurisdiction FDOT Seminole County 4,918 Orange County 7,461 Osceola County (18L) 2,880 Incremental Hours = 15,259 Total Annual Cost (FY 2014) = $918,000 Ridership Revenue (20.64%) = $189,000 Net Annual Contract Cost = $729,000 (1) Annual cost based on LYNX’ FY 2013 Regional Model cost per hour = $58.42, less one-half of farebox revenue recovery (20.64%).
    [Show full text]
  • SIS/Strategic Growth Designation Criteria
    SIS/Strategic Growth Designation Criteria Structure FDOT management has reviewed and approved the revised SIS structure. The new structure will continue to focus on the original intent of SIS and provide a greater focus on a managed system of designated facilities. Structure changes include: • Combine existing SIS and Emerging SIS components • Create Strategic Growth component • Strengthen bi-annual SIS designation reviews • Simplify SIS designation criteria where needed Hub Designation Criteria Strategic Growth Component (For all Hubs and corridors unless otherwise noted) Must meet AT LEAST ONE of the following: • Is the facility projected to meet SIS minimum activity levels within three years of being designated? • Is the facility determined by FDOT to be of compelling state interest, such as serving a unique marketing niche or potentially becoming the most strategic facility in a region that has no designated SIS facility? Must meet ALL of the following: • Does the facility have a current master plan as well as a prioritized list of production ready projects? • Is the facility identified in a local government comprehensive plan, Comprehensive Economic Development Strategy (CEDS), Transit Development Plan, or equivalent? • Does the facility have partner and public consensus on viability of a new or significantly expanded facility? • Does the facility meet Community and Environment screening criteria? SIS Commercial Service Airport Designation Criteria Size Criteria (must meet one of the following) • ≥ 2.5% of Florida total – annual
    [Show full text]
  • CAC Meeting Materials – October 1, 2020
    CUSTOMER ADVISORY COMMITTEE OCTOBER 1, 2020 January 9, 2020 1 Central Florida Commuter Rail Commission Customer Advisory Committee Date: October 1, 2020 Time: 5:00 p.m. Location: LYNX (FDOT/GoToWebinar Host) 455 N. Garland Ave., 2nd Floor Board Room Orlando, Florida 32801 PLEASE SILENCE CELL PHONES I. Call to Order and Pledge of Allegiance II. Announcements a. Chairman Remarks III. Confirmation of Quorum IV. Introductions a. Dorothy O’Brien CAC Seminole County Representative b. Margaret Iglesias CAC Volusia County Representative c. Marie Ann Regan CAC Orange County Representative V. Approvals a. Adoption of January 9, 2020 Meeting Minutes b. Proposed 2021 Meeting Schedule VI. Chairman’s Report – Mr. Grzesik VII. Public Comments VIII. Election of Officers IX. Agency Update – Charles M. Heffinger, Jr., P.E. FDOT/SunRail, Chief Operating Officer Central Florida Commuter Rail Commission Customer Advisory Committee October 1, 2020 Page 1 of 2 Central Florida Commuter Rail Commission Customer Advisory Committee X. Committee Member Comments IX. Next Meeting - Proposed a. Next Meeting – January 07, 2021 10:00 a.m. LYNX Board Room (Webinar Platform TBD) XII. Adjournment Public participation is solicited without regard to race, color, national origin, age, sex, religion, disability or family status. Persons who require accommodations under the Americans with Disabilities Act or persons who require translation services (free of charge) should contact Roger Masten, FDOT/SunRail Title VI Coordinator 801 SunRail Dr. Sanford, FL 32771, or by phone at 321-257-7161, or by email at [email protected] at least three business days prior to the event. Central Florida Commuter Rail Commission Customer Advisory Committee October 1, 2020 Page 2 of 2 Customer Advisory Committee January 9, 2020 5:00 p.m.
    [Show full text]
  • SATURDAY SERVICE SCHEDULE February 4, 2017 for the Latest Info: @Ridesunrail / Sunrail.Com Regular Fares Apply
    SATURDAY SERVICE SCHEDULE February 4, 2017 For the latest info: @RideSunRail / SunRail.com Regular fares apply. SOUTHBOUND P401 P403 P405 P407 P409 P411 P413 P415 P417 P419 DeBary 8:00 AM 9:00 AM 10:00 AM 11:00 AM 12:00 PM 1:00 PM 2:00 PM 3:00 PM 4:00 PM 5:00 PM Sanford 8:06 AM 9:06 AM 10:06 AM 11:06 AM 12:06 PM 1:06 PM 2:06 PM 3:06 PM 4:06 PM 5:06 PM Lake Mary 8:13 AM 9:13 AM 10:13 AM 11:13 AM 12:13 PM 1:13 PM 2:13 PM 3:13 PM 4:13 PM 5:13 PM Longwood 8:19 AM 9:19 AM 10:19 AM 11:19 AM 12:19 PM 1:19 PM 2:19 PM 3:19 PM 4:19 PM 5:19 PM Altamonte Springs 8:23 AM 9:23 AM 10:23 AM 11:23 AM 12:23 PM 1:23 PM 2:23 PM 3:23 PM 4:23 PM 5:23 PM Maitland 8:29 AM 9:29 AM 10:29 AM 11:29 AM 12:29 PM 1:29 PM 2:29 PM 3:29 PM 4:29 PM 5:29 PM Winter Park 8:36 AM 9:36 AM 10:36 AM 11:36 AM 12:36 PM 1:36 PM 2:36 PM 3:36 PM 4:36 PM 5:36 PM Florida Hospital Health Village 8:43 AM 9:43 AM 10:43 AM 11:43 AM 12:43 PM 1:43 PM 2:43 PM 3:43 PM 4:43 PM 5:43 PM LYNX Central Station 8:48 AM 9:48 AM 10:48 AM 11:48 AM 12:48 PM 1:48 PM 2:48 PM 3:48 PM 4:48 PM 5:48 PM Church Street 8:51 AM 9:51 AM 10:51 AM 11:51 AM 12:51 PM 1:51 PM 2:51 PM 3:51 PM 4:51 PM 5:51 PM Orlando Health/Amtrak 8:54 AM 9:54 AM 10:54 AM 11:54 AM 12:54 PM 1:54 PM 2:54 PM 3:54 PM 4:54 PM 5:54 PM Sand Lake Road 9:03 AM 10:03AM 11:03 AM 12:03 PM 1:03 PM 2:03 PM 3:03 PM 4:03 PM 5:03 PM 6:03 PM NORTHBOUND P402 P404 P406 P408 P410 P412 P414 P416 P418 P420 Sand Lake Road 9:15 AM 10:15 AM 11:15 AM 12:15 PM 1:15 PM 2:15 PM 3:15 PM 4:15 PM 5:15 PM 6:15 PM Orlando Health/Amtrak 9:22 AM 10:22 AM 11:22 AM 12:22 PM
    [Show full text]
  • Meeting of the Technical Advisory Committee
    Commissioner Lesley “Les” Miller, Jr. Meeting of the Technical Advisory Committee Hillsborough County MPO Chairman Monday, June 17, 2019, 1:30 PM County Center, 18th Floor – Plan Hillsborough Committee Room Commissioner Pat Kemp Hillsborough County MPO Vice Chair Paul Anderson I. Call to Order Port Tampa Bay II. Public Comment - 3 minutes per speaker, please Councilman Harry Cohen City of Tampa III. Approval of Minutes – May 20, 2019 Trent Green Planning Commission IV. Action Items Commissioner Ken Hagan Hillsborough County A. It’s TIME Hillsborough Survey (Lisa Silva, MPO Staff) Mayor Mel Jurado B. Temple Terrace Electric Vehicle Study (Wade Reynolds, MPO Staff) City of Temple Terrace Joe Lopano V. Status Reports Hillsborough County Aviation Authority A. East Fowler Avenue Land Use Study (Pedro Parra, TPC) Mayor Rick A. Lott City of Plant City B. THEA – Sketch Level Planning (Bob Frey, THEA) Councilman Guido Maniscalco C. Smart Cities Update (Vik Bhide, City of Tampa) City of Tampa VI. Old Business & New Business David Mechanik HART A. TAC Workshop July 29 Commissioner Kimberly Overman B. MPO TAC liaison – Sarah McKinley Hillsborough County Commissioner VII. Adjournment Mariella Smith Hillsborough County VIII. Addendum Cindy Stuart Hillsborough County A. MPO Meeting Summary & Committee Reports School Board Councilman Luis Viera B. Correspondence from FDOT on SIS Network City of Tampa C. Publication of Notice of Funding ATCMTD Joseph Waggoner Expressway Authority D. FTA to hold June 18 Webinar – Integrating Mobility Innovation Program Beth Alden, AICP Executive Director The full agenda packet is available on the MPO’s website, www.planhillsborough.org, or by calling (813) 272-5940.
    [Show full text]
  • Proposed SIS/Strategic Growth Designation Criteria
    Proposed SIS/Strategic Growth Designation Criteria Structure FDOT management has reviewed and approved the revised SIS structure. The new structure will continue to focus on the original intent of SIS and provide a greater focus on a managed system of designated facilities. Structure changes include: Combine existing SIS and Emerging SIS components Create Strategic Growth component Strengthen bi-annual SIS designation reviews Simplify SIS designation criteria where needed Proposed Hub Designation Criteria Proposed Strategic Growth Component (For all Hubs unless otherwise noted) Must meet AT LEAST ONE of the following: Is the facility projected to meet SIS minimum activity levels within three years of being designated? Is the facility determined by FDOT to be of compelling state interest, such as serving a unique marketing niche or potentially becoming the most strategic facility in a region that has no designated SIS facility? Must meet ALL of the following: Does the facility have a current master plan as well as a prioritized list of production ready projects? Is the facility identified in a local government comprehensive plan, Comprehensive Economic Development Strategy (CEDS), Transit Development Plan, or equivalent? Does the facility have partner and public consensus on viability of a new or significantly expanded facility? Does the facility meet Community and Environment screening criteria? Proposed SIS Commercial Service Airport Designation Criteria Size Criteria (must meet one of the following) ≥ 2.5% of Florida total
    [Show full text]
  • Examining Determinants of Rail Ridership: a Case Study of the Orlando Sunrail System
    Examining Determinants of Rail ridership: A Case Study of the Orlando SunRail System Moshiur Rahman PhD Candidate Department of Civil, Environmental & Construction Engineering University of Central Florida Tel: 321-276-7580, Fax: 407-823-3315 Email: [email protected] Shamsunnahar Yasmin* Postdoctoral Associate Department of Civil, Environmental & Construction Engineering University of Central Florida Tel: 407-823-4815, Fax: 407-823-3315 Email: [email protected] Naveen Eluru Associate Professor Department of Civil, Environmental & Construction Engineering University of Central Florida Tel: 407-823-4815, Fax: 407-823-3315 Email: [email protected] Date: March 2019 * Corresponding author 1 Abstract The current study contributes to literature on transit ridership by considering daily boarding and alighting data from a recently launched commuter rail system of Orlando - SunRail. The analysis is conducted based on daily boarding and alighting data for ten months for the year 2015. With the availability of repeated observations for every station the potential impact of common unobserved factors affecting ridership variables are considered. The current study develops an estimation framework, for boarding and alighting separately, that accounts for these unobserved effects at multiple levels – station, station-week and station-day. In addition, the study examines the impact of various observed exogenous factors such as station level, transportation infrastructure, transit infrastructure, land use, built environment, sociodemographic and weather variables on ridership. The model system developed will allow us to predict ridership for existing stations in the future as well as potential ridership for future expansion sites. Keywords: SunRail, Boarding, Alighting, Panel linear regression model, Policy analysis. 2 Introduction The economic development and the associated growth in household incomes in the United States post Second World War resulted in increased household and vehicle ownership, population and employment decentralization and urban sprawl.
    [Show full text]
  • Amtrak Agreements
    P DeLand • 2-hour off-peak service in each direction PHASE 2 • Up to 3-car train set • 30-minute peak service in each direction from: P DeBary • 5:30 am – 8:30 am P Sanford/SR 46 • 3:30 pm – 6:30 pm system map P Lake M a r y P PHASE 1 Longwood P Altamonte Springs P Maitland Winter Park/ParkAvenue Florida Hospital Lynx Central Church Street Orlando Health/Amtrak L P Sand Lake Road P MeadowWoods PHASE 2 P Osceola Parkway P KissimmeeAmtrak Poinciana P L • Approved by Federal Transit Administration for entry into Final Design in August 2008 • Full Funding Grant Agreement expected in Summer/Fall 2009 • Unanimous votes by local funding project status partners in four counties and the City of Orlando for $615 million capital costs • Costs split 25 percent local and state; 50 percent federal gas taxes • FDOT pays all operations and maintenance costs for first 7 years • Operating agreements approved • Governance agreements approved CSXT Agreements • State purchase of 61.5 miles of track • State dispatches all trains in corridor 24/7 • Local government responsibility in year 8 • State maintains corridor project status •Local government responsibility in year 8 • Unfettered passenger rail access 19 hours daily • Exclusive passenger rail 12 hours daily – no freight allowed Amtrak Agreements • Co-locating at four stations total (2 in IOS) • Signed memorandum of understanding July 2008 • Operations agreement nearly complete Bus Agreements •CRT budget include O&M costs for 13 Lynx and 3 Votran buses •State pays half of bus capital costs • Introduced TOD concepts to local partners and station hosts on Dec.
    [Show full text]