SUCOFINDO INTERNATIONAL CERTIFICATION SERVICES

RSPO Assessment Report PUBLIC SUMMARY

PT. Kresna Duta Agroindo – Jelatang Mill Jambi,

This public summary has been prepared in accordance with RSPO requirements and the information included is the result of a full RSPO assessment of the Mills and supply base as included in the scope of the certificate.

Prepared by: Tuti Suryani Sirait (Lead Assessor) Certification decision made by: Triyan Aidilfiitri

PT. SUCOFINDO (Sucofindo International Certification Services – SICS) Graha Sucofindo B1 Floor, Jl. Raya Pasar Minggu Kav. 34, Jakarta 12780 Indonesia Contact Person : Tuti Suryani Sirait Phone : (62-21) 7983666: Fax : (62-21) 7987015 Email : [email protected]

Sucofindo ICS FRM 3.04 Issue 04 Rev. 6 1of 106

SUCOFINDO INTERNATIONAL CERTIFICATION SERVICES

List of Contents Page

A Scope of the Certification Assessment ...... 4

A.1. National Interpretation Used ...... 4

A.2. Assessment Type (Estate and Mill) ...... 4

A.3. Location Map ...... 4

A.3.1. Location Address of the Mill and Approximate Tonnages Certified

(CPO and PKO) ...... 5

A.4. Description of Supply Base ...... 5

A.4.1. General Description ...... 5

A.4.2. Location of Supply Base ...... 6

A.4.3. Statistic of Supply Base ...... 6

A.5. Organizational Information and Contact Person ...... 7

A.5.1 Audit Againstthe Rules for Partial Certification ...... 8

A.6. Date Certificate Issued and Scope of Certificate ...... 11

B. Assessment Process ...... 12

B.1. Certification Body ...... 12

B.2. Qualifications of the Assesment Team ...... 13

B.2.1. Qualifications of the Lead Assessor and Assessment Team ...... 13

B.3. Assesment Methodology ...... 14

B.3.1. General Overview ...... 14

B.4. Stakeholder Consultation ...... 18

Sucofindo ICS FRM 3.04 Issue 04 Rev. 6 2of 106

SUCOFINDO INTERNATIONAL CERTIFICATION SERVICES

B.4.1. Summary of How Stakeholder Consultation was Organized ...... 18

B.5. Date of Next Surveillance Visit ...... 19

C. Assessment Findings ...... 20

C.1. Lead Assessor’s Summary and Recommendation for Certification ...... 20

C.2. Summary of the Findings by Criteria ...... 21

D. Certified Organization’s Acknowledgement of Internal Responsibility...... 61

D.1. Formal Sign-Off the Assessment Findings ...... 61

D.2. Statement by the Certifier Body on Behalf of PT. Sucofindo SBU-SICS ...... 62

List of Abbreviation ...... 63

Appendix-1 Map ...... 65

Appendix-2 NCR ...... 71

Appendix-3 PT. Kresna Duta AGroindo – Jelatang Mill

RSPO Supply Chain Checklist – Mass Balance Modul ...... 101

Appendix-4 Supporting Document ...... 105

Sucofindo ICS FRM 3.04 Issue 04 Rev. 6 3of 106

SUCOFINDO INTERNATIONAL CERTIFICATION SERVICES

A. Scope of the Certification Assessment

A. 1. National Interpretation Used

The management of the Palm Oil Mill(s) and associated suppliers of Fresh Fruit Bunches (FFB) were assessed for compliance against the International RSPO criteria as interpreted and endorsed for Indonesia, RSPO Certification Systems and RSPO Suply Chain Certification Systems.

A. 2. Assessment Type (Estate And Mill)

Certification Unit : PT. Kresna Duta Agroindo – Jelatang Mill located at Desa Jelatang, Kecamatan Pamenang, Kabupaten Merangin – Jambi, INDONESIA A.3. Location map

Please see Appendix-1 Map: 1. Map of Location, 2. Land area, 3. Topography and 4. HCV areas

Sumatera Island - Indonesia

Sucofindo ICS FRM 3.04 Issue 04 Rev. 6 4of 106

SUCOFINDO INTERNATIONAL CERTIFICATION SERVICES

A. 3. 1. Location address of the mill and approximate tonnages certified (CPO and PK)

Annual Output (mt) No Name of Mill Location Address GPS Reference CPO PK

1. Jelatang Mill PT. Desa Jelatang, Latitude: Kresna Duta Kecamatan 02o04’ 15,7” LS Agroindo Pamenang, Kabupaten 28,646.90 6,151.19 Merangin, Provinsi Longitude: Jambi, Indonesia 102o09’10,2” BT

Note : This data (Annual output) exclude from non certified suppliers)

A.4. Description of Supply Base

A. 4. 1. General description

PT. Kresna Duta Agroindo operates 2 palm oil mills under PT. Kresna Duta Agroindo, named PT. Kresna Duta Agroindo - Jelatang Mill (JLTM) and PT. Kresna Duta Agroindo – Langling Mill (LNGM). This report scope is only for PT Kresna Duta Agroindo - Jelatang Mill and its supply base Sucofindo ICS FRM 3.04 Issue 04 Rev. 6 5of 106

SUCOFINDO INTERNATIONAL CERTIFICATION SERVICES

(Bangko Estate only). The raw material/ FFB for PT. Kresna Duta Agroindo - Jelatang Mill is supplied from the own estate i.e.: 1. Bangko Estate (Division 4).The raw material/ FFB for PT. Kresna Duta Agroindo - Jelatang Mill is also supplied from Plasma i.e.: 1. Tiga Serumpun KKPA. 2. Pamenang Plasma; 3. Bukit Bungkul KKPA. Totally supplied FFB from the Bangko estate within the scope of certification is 6,237.18 MT. All estates are operated under one management of PT. Kresna Duta Agroindo. All estates located in Jambi, Indonesia. PT. Kresna Duta Agroindo is a subsidiary of PT SMART Tbk which is a member of RSPO and they are implementing a program to achieve RSPO Certified Palm Oil for all its production. There is no plan to expand the land holding and therefore Principles 7 is not applicable to this assessment.

A. 4. 2. Location of the supply base

GPS No. Estate Name Location Latitude Longitude

Desa Langling, Kecamatan Bangko, Kabupaten Bangko Estate o o 1 Merangin, Provinsi Jambi, 02 05’ 50” 102 21’ 58” Indonesia

A. 4. 3. Statistic of supply base

No. Estate Planting Area/Planting Age/Planting Estimated Estimated Name Year Year Year FFB/Year CPO/Year

1 Bangko 1993 103,3 20 3,301.28 668.72 Estate 1995 100 18 2,935.90 594.71 Divisi 4

TOTAL 6,237.18 1,263.43

Sucofindo ICS FRM 3.04 Issue 04 Rev. 6 6of 106

SUCOFINDO INTERNATIONAL CERTIFICATION SERVICES

A. 5. Organizational Information and Contact Person

1 Company Name PT. KRESNA DUTA AGROINDO

2 Personal Contact Ismu Zulfikar

3 Vice Management Eldimart

Sinarmas Land Menara 2 Lantai 30, Jalan M. H. 4 Company Address Thamrin No. 51, Jakarta, Indonesia

5 Company Status PMDN

7 Phone/ Fax 021 50338899

8 E-mail [email protected]

9 Website www.smart-tbk.com

10 RSPO membership number 1-0019-05-000-00

Sucofindo ICS FRM 3.04 Issue 04 Rev. 6 7of 106

SUCOFINDO INTERNATIONAL CERTIFICATION SERVICES

A. 5. 1. Audit Again the Rules for Partial Certification

1. Introduction The audit team has visited Head office at Sinarmas Land Plaza, Tower 2, 30th Floor, Jalan M. H. Thamrin No. 51, Jakarta, Indonesia to find out the compliance with the rules for partial certification standard in the whole group of PT Sinar Mas Agro Resources and Technology, Tbk (SMART). There are 14 mills, 40 own estates and 14 plasma (associated smallholders) within this group. The team found a major and a minor non conformity refer to the RSPO requirements for partial certification as stated in the final RSPO certification Systems documents, June 2007, section 4.2.4 as describe below :

2. Assessment agenda (partial Certification Audit)

Date Location Agenda

19November BangkoEstate Verifying legal documents, meeting with 2013 Human resources department for Labor Union and workers information

3. Audit Team Findings in Correlation to the Rules Partial Certifications a. The Organization is a member of RSPO PT Kresna Duta Agroindo has confirmed membership of the RSPO under PT SMART Tbk. with no.1-0019-05-000-00 b. A Time Bound Plan for achieving certification within relevant entities Estimate time of No Name of Mill Supply Base Company Location Certifica tion 1 Padang Padang Halaban Estate PT. SMART TBK North 2011 Halaban Mill Pernantian Estate Sumatera Adipati Estate Kanopan Ulu Estate 2 Batu Ampar Batu Ampar Estate PT. SMART TBK South 2012 Mill Batu Mulia Estate Kalimantan Sungai Panci Estate Sungai Panci KKPA 3 Tanah Laut Tanah Laut Estate PT. SMART TBK South 2012 Mill Kintapura Estate Kalimantan 4 Langga Langga Payung Estate PT. Tapian North 2012 Payung Mill Paya Baung Estate Nadenggan Sumatera Normak Estate

Sucofindo ICS FRM 3.04 Issue 04 Rev. 6 8of 106

SUCOFINDO INTERNATIONAL CERTIFICATION SERVICES

5 Hanau Mill Hanau Estate PT. Tapian Central 2012 Tasik Mas Estate Nadenggan Kalimantan Tanjung Paring Estate Langadang Estate

Medang Sari Estate PT. Satya Kisma 2015 Usaha 6 Leidong Leidong West Utara PT. Leidong West Bangka 2013 West Mill Estate Indonesia Leidong West Selatan Estate Bukit Intan Estate Bukit Mas Estate 7 Semilar Mill Semilar Estate PT. Tapian Central 2013 Sei Rindu Estate Nadenggan Kalimantan Mandang Estate Puri Estate 8 Jak Luay Mill Pantun Mas Estate PT. Tapian East 2014 Pantun Mas KKPA Nadenggan Kalimantan Jak Luay Estate Jak Luay KKP Long Buluh Estate Bukit Subur Estate Bukit Subur KKPA 9 Gunung Gunung Kombeng Estate PT. Kresna Duta East 2014 Kombeng Gunung Kombeng KKPA Agroindo Kalimantan Mill/Muara Muara Wahau Estate Wahau Mill Estate Rantau Panjang KKPA Bangko Inti Estate PT. Kresna Duta Jambi 2014 Tiga Serumpun KKPA Agroindo 2014 10 Jelatang Mill Pamenang Plasma 2015 Bukit Bungkul KKPA 2015 Pelakar Estate PT. Kresna Duta Jambi 2014 Tiga Serumpun KKPA Agroindo 2014 11 Pelakar Mill Batang Merangin Estate 2014 Batang Tembesi Estate 2014 Kubang Ujo Plasma 2015 12 Langling Mill Bangko Inti Estate PT. Kresna Duta Jambi 2014 Bangko Plasma Agroindo 2015 Bukit Bungkul KKPA 2015 Pamenang Plasma 2015

Batang Gading Estate PT. Satya Kisma 2015 Batang Gading KKPA Usaha 2015 13 Sungai Sungai Bengkal Estate PT. Satya Kisma Jambi 2014 Bengkal Mill Sungai Bengkal KKPA Usaha Kilis Estate Kilis KKPA

Sucofindo ICS FRM 3.04 Issue 04 Rev. 6 9of 106

SUCOFINDO INTERNATIONAL CERTIFICATION SERVICES

14 Bukit Kapur Sungai Cantung Estate PT. SMART TBK South 2015 Mill Bukit Kapur Estae Kalimantan

The raw material for POM PT. Kresna Duta Agroindo (KDA) – Jelatang Mill is supplied from the FFB which are; one (1) Own estate – Bangko Estate (division 4); and 3 (three) Plasma (Associated Smallholders); 1. Tiga Serumpun KKPA 2. Pamenang Plasma; 3. Bukit Bungkul KKPA; and from associated smallholders.

The application of Certification audit was Jelatang Mill and Bangko Estate Division 4 as a supply base.

Team has been verified documents during partial certification audit. The company has conducted Gap analysis to the whole group compare to P & C RSPO requirement. The Gap Analysis conducted by other Certification Body. Randomly, the team checked the content of reports to ensure the fulfillment of partial certification. From the sampling report, the team found that not all report has the conclusion for the fulfillment regards to partial certification requirement. The company has made the self declaration for partial certification rule and signed by management. The self declaration stated as belows (a-d) :

a. Significant Conflicts The company has the SOP for Conlict Land Resolution refers to RSPO criteria 6.4, 7.5 and 7.6. All the conflicts so far has been resolved with mutual agreement. GAR also registerd as member of RSPO Dispute Settlement Facility Advisory Group as a representative of grower. Supporting document is DSF RSPO member as a grower dated 22 April 2013. b. No replacement of primary forest and or area with HCV’s since November 2005 or year 2007 (National Interpretation) PT SMART Tbk has conducted Historical HCV Assesment (HHA) in collaboration with Faculty of Forestry, Institut Pertanian Bogor (IPB) April 2011. Historical HCV Assesment (HHA) Report has been submitted to RSPO on May 2011. As a follow up from the Historical HCV Assesment (HHA) Report, GAR has been proposed HCV Remediation Plan to RSPO. Revisions of HCV Remediation Plan are on going process/ discussion with RSPO Biosdiversity and HCV Working Group (BHCV WG). Supporting documents is Historical HCV Assesment (HHA) report. c. No labor disputes that are not being resolved through an agreed The company has the SOP and menchanism to resolve dispute with union labour with mutually agreement. The last data shows that there was a labor dispute in Jambi in 2012. The dispute has been resolved by related parties and has been final through Jambi Industrial Relation Court. There is the Decision of the Supreme Court of the Republic of Indonesia No. 1007 K/Pdt.Sus/2010 related to the case of the industrial relation dispute. d. No evidence of non-compliance with law in any of the non-certified holdings There are no land dispute or court cases. The last case was in 2012 relating to the PT SMART Tbk land located in North Sumatera. The people occupied land under the company’s HGU and the case was won by the company.

Sucofindo ICS FRM 3.04 Issue 04 Rev. 6 10of 106

SUCOFINDO INTERNATIONAL CERTIFICATION SERVICES

A.6. Date Certificate Issued and Scope of Certificate

Name of Client PT KRESNA DUTA AGROINDO

Client Number RSPO 00005

Certificate Number RSPO 00005

Certification Decision Date

Issued by PT SUCOFINDO, SBU SICS

Address Graha Sucofindo, SBU SICS. Jl Raya Pasar Minggu Kav 34 Jakarta 13640

Telephone /Fax Tel.: +62-21-7983666 / Fax.: +62-21-7987015

Email [email protected]

Website www.sucofindo.co.id

Scope :

Mill Jelatang Mill

Estate Bangko Estate

Projected mass balance CPO & PK CPO : 28,646.90 MT and PK : 6,151.19 MT

Certification Registration Code SICS-00003

Type of Certification Single site

Certifier TriyanAidilfitri

Signed

Sucofindo ICS FRM 3.04 Issue 04 Rev. 6 11of 106

SUCOFINDO INTERNATIONAL CERTIFICATION SERVICES

B. Assessment Process

B. 1. Certification Body

SUCOFINDO INTERNATIONAL CERTIFICATION SERVICES (SUCOFINDO ICS), which was formed in 1994, is one of the strategic business unit that provides certification services for leading companies.SucofindoCertification by International Certification Services is recognized nationally and international.Quality Management System Certification by SUCOFINDO ICS has obtained accreditation from National Accreditation Committee (KAN-Indonesia). Lead Auditors and Auditors of SUCOFINDO ICS are trained professionals in the field of international standards, auditing and management systems and are registered in the IRCA (International Register of Certified Auditors) and IEMA (Institute of Environmental Management & Assessment), UK. SUCOFINDO ICS certification process is supported by experts at PT. SUCOFINDO who understand the industry sectors and services in Indonesia. SUCOFINDO ICS Operational is supported by a network of branch and representative offices of PT. SUCOFINDO spread in 45 cities across Indonesia. The services provided by International Certification Services Sucofindo are: . Quality Management System Certification . Environmental Management System . ISO 22000 :2005 . OHSAS 18000 Certification . Hazard Analytical Critical and Control Point (HACCP) Certification . Good Manufacturing Practice (GMP) Audit . Product Certification . Sustainable Forest Management Certification . Products Organic Food Certification . RSPO certification . ISPO Certification . Certification of Integrated Management System Certification (SMT) . Training

Sucofindo ICS FRM 3.04 Issue 04 Rev. 6 12of 106

SUCOFINDO INTERNATIONAL CERTIFICATION SERVICES

B. 2. Qualifications of the Assessment Team

B. 2. 1. Qualifications of the Lead Assessor and Assessment Team Tuti Suryani Sirait (Lead Auditor) : Graduated from Institute Agriculture in Bogor (IPB), 1991 She has more than 10 years audit experiences in auditing HACCP, GMP, ISO 9001:2008, ISO 22000:2005, ISPO and RSPO. She has successfully completion training RSPO by Komisi RSPO, Jakarta, SCC Standard Training by David Ogg & Partner – Jakarta, ISPO Lead Auditor Training by Komisi ISPO, Jakarta, Lead Auditor Training of ISO 9000/19011 organized by SICS – Sucofindo, ISO 22000 : 2005 FSMS Auditor / Lead Auditor by Moody International, ; Lead Assessor for Food Safety Management System (HACCP&GMP) by QAS Sydney, Australia and Social Lead Auditor Training (SA 8000) from Social International Audit (SIA), Turkey. She is actively participated in RSPO meeting to discuss RSPO P & C and also as a trainer in ISPO Lead auditor training. Nuzwardi Sjahwil (Auditor) He graduated from Institutee Agriculture of Bogor (IPB). He has more than 5 years audit experiences in OSHAS and SMK3. He has successfully completion from Lead auditor for SMK3, Lead Auditor for OHSAS and Lead Auditor for ISO 9001. He has successfully completion training Lead Auditor RSPO by Proforest, Lead Auditor Training by Komisi ISPO, Jakarta, and Supply Chain Training. Rizky Qomaruzaman (Auditor) Lead Auditor SMK3 since year 1997 till now. Lead Auditor OHSAS 18001 since year 2000. Auditor ISO 14001 since 2002. Premises visited: many various industries, petrochemical, oil & gas, EPC, general contractor, Palm Oil Plantation and Mill, chemical, pulp & paper, coal mining, cement industries, and so on. Attended Green Company Training year 2008. He has successfully completion from ISPO lead auditor course year 2013 andtraining Lead Auditor RSPO by Proforest, attended environmental seminar (Environmental Audit) from Environmental Ministry Republic Of Indonesia year 2013. Perigia Ariromas (Auditor) Graduated from ITB. She has successfully completion Lead Auditor Training RSPO by Proforest, Lead Auditor Training ISPO by Komisi ISPO, Jakarta, Lead Auditor IRCA Training of ISO 9001:2008 and Lead Auditor Training IRCA ISO 14001: 2004.

Sucofindo ICS FRM 3.04 Issue 04 Rev. 6 13of 106

SUCOFINDO INTERNATIONAL CERTIFICATION SERVICES

Ganjar Gumelar (Auditor): He graduated from University of Gadjah Mada (UGM), Forestry Faculty, majoring in Forest Management, Yogyakarta. He has completed the training such as Indonesian Sustainable Palm Oil (ISPO) auditor training, Komisi ISPO – Ministry of Agriculture & Komisi Akreditasi Nasional (KAN), Bogor (West Java) & Pangkalan Bun (Kalimantan), Indonesia, 2013 ; ISO 9001 : 2000 Quality Management Systems (QMS) Auditor/Lead Auditor Training Course (IRCA), PT. SUCOFINDO (Persero), Jakarta, Indonesia, 2013 ; Awareness Hazard Analysis Critical Control Point (HACCP), PT. SUCOFINDO (Persero), Jakarta, Indonesia, 2013 ; Assessor Training High Conservation Value Forest – HCVF, Tropenbos International Indonesia Program, The Nature Conservancy (TNC), WWF Indonesia & Institut Pertanian STIPER (INSTIPER) Yogyakarta, Yogyakarta, Indonesia (2011).

B.3. Assessment Methodology

B. 3. 1. General Overview

The assessment was carryingout in conformity with the SBU SICS RSPO manual and procedures for auditor and certifier. The assessment was conducted by qualified auditors and referred to RSPO standard as endorsed for the Indonesia National interpretation. Partial certification audit conducted in March to check compliance with Final RSPO Certification System for partial certification. The opening and closing meeting was conducted at the office Bangko Estate- Jambi and then continue in Mill’s and estate’s offices. Stakeholders meeting was conducted twice, firstly was held during main assessment and secondly during follow up audit. At the opening meeting, the team audit confirm to conduct the audit at : Office at Bangko Estate  Review the company’s response for previous findings  Documentation review for transparencies  CSR plan and policy  Internal Audit program & Management Review Meeting  Land ownership and compensation mechanism  Documentation of RSPO’s requirement refers to P & C

At estate, include :  Worker interviews:OSH. Sexual, religious, racial harassment. Payment scheme, contracts. Child labor. First aid. Awareness.

Sucofindo ICS FRM 3.04 Issue 04 Rev. 6 14of 106

SUCOFINDO INTERNATIONAL CERTIFICATION SERVICES

 Chemical stores: Storage. MSDS leaflets. Herbicide mixing areas. PPE. Ventilation. Security.  Field inspections: Fertilizingoperations. SOP’s., Herbicide application program.Harvesting sites and efficiency. Soil maps. Land preparation. Ground cover. IPM. First aiders and boxes. Soil erosion.  HCV’s: Identification. Management plans. Environmental Impact Assessments  Riparian zones:Width. Current and future management, monitoring system  Water management: Water courses. Water monitoring.  Road maintenance: Program and progress of road improvement.  Social amenities: Social Impact Assessments.  Workshops: Oil traps. Safe working environment. PPE.Diesel tanks. Environmental waste management.  Line sites: Interviews with householders. Inspection of water discharge points. Water improvement plans. Waste disposal.  Local communities.Contributions made. Employment opportunities. Social impacts. Complaints procedures, Transparency.

At Mill include :  Mill and workshop inspections.  Documentation.  Worker interviews. SOP’s. Safe working environment. Gen sets. Walk ways. Signs. EFB. POME treatment. Emissions. Mass balance. Diesel tanks. PPE. Fire extinguishers. First aiders and boxes. Fuel and water usage.  OSH. Training. Management structure. First aiders.  Full document review. Completion of the checklist. Review and documentation of evidence. All aspects of RSPO P&C’s applicable.  Worker interviews. OSH. Sexual, religious, racial harassment. Payment scheme, contracts, union labor  Supply Chain Certification System : Incoming FFB data input, CPO/PK out going/dispatched database, marking, certified CPO & PK reporting, Document Control and related procedures.

Actual Audit Programme Phase I : Prelimenary Audit Date/Time Functions / areas / Department / activities (include related Auditor(s) requirements) 30/09/2013 1st Day 05.45 Departure from Jakarta to Jambi Team 07.30 Departure from Jambi to Site Team 17.30 End of the day 1 01/10/2013 Day 2nd Audit 08.00 Location: Kresna Duta Agroindo Office Opening Meeting at Site Alls - Arrangements Schedule Auditor vs auditees - Arrangements location (mill, estate and stakeholders) to be visited

Sucofindo ICS FRM 3.04 Issue 04 Rev. 6 15of 106

SUCOFINDO INTERNATIONAL CERTIFICATION SERVICES

08.30 Document Review of : - Worker welfare, Union, stakeholders TSS - Transparencies/communication, CSR program - Legality Document Review of : - Management Aspects (Internal audit, MRM, Training, GIA Jobdesc) - Environment Aspect Document Review of : NZ - Best Practices - OSHAS/SMK3 Document Review of : GGU - Legality - HCV 12.00 Break Field visit Jelatang Mill - PT. Kresna Duta Agroindo TEAM 17.00 End of the day 2 02/10/2013 Day 3rd Audit 08.00 Kresna Duta AgroIndo, Bangko Estate Environment Aspects : Water management (Water courses, water GIA monitoring); Environment waste management, Environmental Impacts;Chemical store (Block B04 Division 4 BNGE) HCV Aspects : HGU and Land Status Estates confirmation, GGU Riparioan zone, HCV confirmation Plantation Aspects : Herbicide Application Programme, Integrated Pest Management, Harvesting site, Fertilizing Operations, Land Preparation and Assessment (Division 4 BNGE) Social Aspects: Meeting Stakeholders TSS Worker Welfare: Housing, Clinic, Labour Union, Koperasi, Worker NS welfare 12.00 Break All Visit Langling Mill & Jelatang Mill- PT. Kresna Duta Agroindo TEAM 17.00 End of the day 3 03/10/2013 Day 4th 08.00 Reporting Team 12.00 Break Team 14.00 Closing Meeting All 16.00 End of Closing Meeting All 16.30 Departure from Site to Jambi All 04/10/2013 Day 5th 08.00 Departure from Jambi to Jakarta All Number of assessor participating :4 auditors, totally 4 person Number of days spent for the assessment on site : 5 days Total number of person days used for the assessment on site :20 days

Sucofindo ICS FRM 3.04 Issue 04 Rev. 6 16of 106

SUCOFINDO INTERNATIONAL CERTIFICATION SERVICES

Phase II : Certification Audit Date/Time Functions / areas / Department / activities to be audited Auditor(s) (include related requirements) 18 Nop’13 1st Day 05.45 Departure from Jakarta to Jambi Team 07.30 Departure from Jambi to Site Team 13.00 Break& Lunch 14.00 Arrive at site 14.30 Opening Meeting at Kresna Duta Agroindo Office All - Introduction by Team Leader - Arrangements Schedule Auditor vs auditees 15.30 Audit Partial of PT. KDA Team 16.30 End of the day 1 19 Nop’13 Day 2nd Audit Location: Kresna Duta Agroindo Office 08.00 See the previous findings and Audit Against the Rules for Partial Team 10.00 Certification Documentation Review of : TSS - Worker welfare, Union, stakeholders - SIA, CSR Documentation Review of : - Management Aspects (Internal audit, MRM, Training, Jobdesc) NZ - SMK3 / OSHAS Aspect - Worker welfare Documentation Review of : - Environment Aspects RQ - Best Practices Mill Documentation Review of : - Legality GGU - HCV& Biodiversity - Best Practices Estate 12.00 Break 13.30 Continue audit for documentation TEAM 17.00 End of the day 2 20 Nop’13 Day 3rd Audit 08.00 Kresna Duta AgroIndo Estate Environment Aspects : Water management (Water courses, water RQ monitoring); Environment waste management, Environmental Impacts;Chemical store, hazards Handling (B03 Division 4 BNGE) HCV Aspects : HGU and Land Status Estates confirmation, GGU Riparian zone, HCV confirmation Legal Aspects : Boundaries Stones with Coordinate data Best Practices : Nursery, Spraying, Harvesting, IPM, Fertilizing System, Topography (Division 4 BNGE) Social Aspects: Meeting Stakeholders TSS OSHAS/SMK3 : Interview worker for PPE, reproduction protection NS policy, safety at work issue Worker Welfare: Housing, Clinic, Labour Union, Koperasi, working

Sucofindo ICS FRM 3.04 Issue 04 Rev. 6 17of 106

SUCOFINDO INTERNATIONAL CERTIFICATION SERVICES

hour & overtime, sexual harassment, pays system (Block B01- C01, B04, Division 4 BNGE) 12.00 Break 13.30 Field visit Mill PT. Kresna Duta Agroindo (Langling & Jelatang) Environment aspects, Best Practices at Mill: RQ SMK3/OSHAS Aspects, worker welfare NS Contractors & Suppliers interview, TBS Receiving at Mill, SCC TSS System 17.00 End of the day 3

21 Nop’13 Day 4th 08.00 Reporting Team 12.00 Break Team 13.30 Closing Meeting 15.30 End of Closing Meeting All 16.00 Departure from Site to Jambi All 20.30 Arrived at Hotel (Jambi) All

22 Nop’13 Day 5th 07.00 Departure from Jambi to Jakarta All

Number of assessor participating: 4 auditors, totally 4 person Number of days spent for the assessment on site:5 days Total number of person days used for the assessment on site :20 days

B. 4. Stakeholder Consultation B. 4. 1. Summary of How Stakeholder Consultation was Organized

Stakeholders Consultation and Company Responses

Issue Company Responses Assessor Findings

Trade Unions a. Workers who work overtime a. The a. Conform exceeding the government companyalreadymakesthe overtime hour requirements rulesthroughout (over 14 hours/week) theMillsandEstatesto b. Damaged Personal Protection comply withworking Equipment (PPE) is not hoursandovertimepaymenti promptly replaced because n out of stock. accordancewithgovernmen b. Conform t regulations. b. The company will ensure the stock of each of PPE

Sucofindo ICS FRM 3.04 Issue 04 Rev. 6 18of 106

SUCOFINDO INTERNATIONAL CERTIFICATION SERVICES

items in the office Bangko Village (Customary leaders, religious leaders, a. The company has followed plasma representatives, a. Confirmation with the up by: Village Chiefs) public representatives: - Distributing circulars has met the community a. Complaint about dust of roads and displaying traffic desiresConform passed by FFB trucks that signs of truck maximum cross residential areas. speed limit outside b. No complaint related to water, residential areas: 40 air and sound pollution. km/hourandin residential c. No cases of land dispute. The areas: 25 km/hour. last compensation process - Conducting regular road was in 1999. watering during the dry d. Confirmation that no worker is season. employed under the age of 18 years old (child labour). e. The company has given CSR assistance in the form of religious, glasses, and biogas assistance. Karya Mukti Cooperative a. The Mill’s acceptance criteria a. The company has Conform of accepted and unaccepted conducted re-socialization palm fruit are not fully to the farmer group and understood. displayed images of b. FFB price has been accepted and unaccepted transparent and complied with palm fruit as an aid. local government regulations. c. SPK has been revised and the scope has conformed to field actual implementation. d. Payment has been on time according to the agreement. Contractors Conform Bpk. Mulyani (Contractor for Diesel Pump House Construction) - The agreed SPK has been available and payment has been on time.

B. 5. Date of Next Surveillance Visit One (1) year after date of certification

Sucofindo ICS FRM 3.04 Issue 04 Rev. 6 19of 106

SUCOFINDO INTERNATIONAL CERTIFICATION SERVICES

C. Assessment Findings

C. 1. Lead Assessor’s Summary and Recommendation for Certification

The management (Mill and estate) showed the commitment to the implementation of the principles and criteria of the RSPO NI-INA. The assessment has been carried out through field visit to head office, mill and estate. The public announcement for certification has published on RSPO website prior 30 days from the audit certification to give the opportunity to stakeholders for comments and feedback. There is no a grievance or complaints received from the stakeholders during 30 days of public consultation period. Team auditors also conducted separate meeting with village head, local community, union labor team, and government official representatives. There are 2 NC major, 13 NC minor and 16 observations issued during preliminary audit. The company has followed up all NCRs. At certification audit, the team issued 4 NC major, 2 NC minor and 4 observations. There is commitment of management to make corrective action and for continuous improvement. There is also improved plan for social and environmental area. The audit team found that PT Kresna Duta Agroindo Jelatang Mill and its estate is complying against RSPO P & C approved for Indonesia. Therefore the recommendation of the Lead Auditor that Certificatre of RSPO is awarded to PT Kresna Duta Agroindo Jelatang Mill and its estate. Signed :

Tuti Suryani Sirait Date : 6 March 2014

Sucofindo ICS FRM 3.04 Issue 04 Rev. 6 20of 106

SUCOFINDO INTERNATIONAL CERTIFICATION SERVICES

C. 2. Summary Of The Findings by Criteria

1 COMMITMENT TO TRANSPARENCY

1.1 Palm oil growers and millers provide adequate information to other stakeholders on environmental, social and legal issues relevant to RSPO Criteria, in appropriate languages & forms to allow for effective participation in decision making.

The company provides information to stakeholders who are grouped based on their interests. All requests for information through a letter are recorded according to their types. There are 3 types of record books. The first is a book of Grievance and Complaint of the workers (internal) and the community. Data shows that there is no complaint up to the time of the audit. The second is a book of communication and consultation for requests and consisting of all letters coming into the company. Finally, a book of communication and response to stakeholders. The company has had SOP of Information and Request Response (SOP/SPO/SMART/LH-01). There has been a list of information that can be accessed by relevant stakeholders that vary among the mill, core estate and plasma estate. Estate Manager is responsible for providing information to the stakeholders especially relating to social aspects. The company has recorded all letters of requestand their response in the log book and ensured that the response is given within the timeframe set out in the SOP i.e. no longer than 5 weeks. All incoming and outgoing letters that belong to the category of SPO document are retained for 5 years (SOP/SPO/SMART/LH-02). Compliance Status : Compliance

1.2 Management documents are publicly available except where this is prevented by commercial confidentiality or where disclosure of information would result in negative environmental or social outcomes

The company has had a list of stakeholders and the types of information that the stakeholders can access. The list of stakeholders is of Bangko Estate and Jelatang Mill. Confidential documents are those documents that not listed in the list of information for Stakeholders. For example, commercial data and data that may lead to negative impacts that is accessible only at the management’s consent such as data of conflicts. During the preliminary audit, the company had not established a list of information that can be accessed by the stakeholders. During the certification audit, data the stakeholders can access had been available in the form of the List of Information and Stakeholders. For example, data of workers and List of workers’ basic Wage can be accessed by the Regency and Provincial Manpower Service. Compliance Status: Compliance

Sucofindo ICS FRM 3.04 Issue 04 Rev. 6 21of 106

SUCOFINDO INTERNATIONAL CERTIFICATION SERVICES

2 COMPLIANCE WITH APPLICABLE LAWS AND REGULATIONS

2.1 There is compliance with all applicable local, national and ratified international laws and regulations. The company conducts evaluation of all regulations periodically per semester and is regulated through the SOP/SPO/SMART/LH/03 (Legal and Other Requirements rev 01). The head office’s Sustainability Division conducts the evaluation and the result is communicated to the units (estates and mills), and then the units select those regulations relevant to their respective estate/mill. The result of the evaluation of compliance

The Jelatang Mill has carried out the evaluation of regulatory compliance in employment, environmental, K3 and permit areas.

For Bangko, there is evaluation of employment, environment, K3, permit and HCV. Sample is on the evaluation of the use of fertilizers through Government Regulation No. 7/73 concerning control over the distribution, storage and use of pesticides.

During the audit, there was still a worker found working overtime that exceeds overtime hours prescribed by the Manpower Department (40 hours /month and overtime max. 14 hours/week). The company has made the corrective action by issuing the Circular Letter by Director of Human Resources No. 004/HR Ops/2014, stated that the overtime should be met with the government regulation. The overtime offering should also be base on vloluntary and agreed by both parties. The evidence of the implementation of the policy will be sought on the next surveillance.

Compliance Status : Minor

2.2 The right to use the land can be demonstrated, and is not legitimately contested by local communities with demonstrable rights

Site permit

Decree of Head of Land Office of Sarolangun Bangko Regency No. 07/1998 regarding Granting of Site permit for the Purpose of Palm Estate Development of 622 Ha dated 2 June 1998.

Decree of Regent Head of 2nd Level Region of Sarolangun Bangko No. 230/1999 Regarding Granting of Site Permit for the Purpose of Palm Estate Development of 134,273 Ha dated 13 July 1999.

Decree of Regent Head of 2nd Level Region of Sarolangun Bangko No. 231/1999 Regarding Granting of Site Permit for the Purpose of Palm Estate Development of 89,433 Ha dated 13 July 1999.

Decree of Regent Head of 2nd Level Region of Sarolangun Bangko No. 232/1999 Regarding Granting of Site Permit for the Purpose of Palm Estate Development of 109,649 Ha dated 13 July 1999.

HGU (Land Use Permit)

The company has had HGU certificates consisting of:

Sucofindo ICS FRM 3.04 Issue 04 Rev. 6 22of 106

SUCOFINDO INTERNATIONAL CERTIFICATION SERVICES

HGU No. 70/HGU/BPN/98 totaled 622 Ha dated 2 June 1998 to PT. KDA by Sarolangun Bangko Regency, Jambi Province. EXPIRED 24/11/2033

HGU No. 01-540.1-06-2000 totaled 134,273 Ha dated 07-09-2000 to PT. KDA by Head of Land Office of Jambi Province. EXPIRED 20/09/2035

HGU No. 02-540.1-06-2000 totaled 89,433 Ha dated 07-09-2000 to PT. KDA by Head of Land Office of Jambi Province. EXPIRED 20/09/2035

HGU No. 03-540.1-06-2000 totaled 109,649 Ha dated 07-09-2000 to PT. KDA by Head of Land Office of Jambi Province. EXPIRED 20/09/2035

HGB No. 06.04.10.05.3.00002 totaled 126 Ha dated 11/10/1993 by Head of Land Office of Sarolangun Bangko Regency, Jambi Province. EXPIRED 04/11/2011. KARANG BERAHI

HGB No. 06.04.10.06.3.00002 totaled 103 Ha dated 11/10/1993 by Head of Land Office of Sarolangun Bangko Regency, Jambi Province. EXPIRED 04/11/2011. JELATANG

MOST CURRENT HGB:

HGB No. 06.04.02.05.3.00003 totaled 74.940 M2 dated 10/10/2012 by Land Office of Merangin Regency, Jambi Province.

HGB No. 06.04.02.05.3.00004 totaled 49.862 m2 dated 10/10/2012 by Land Office of Merangin Regency, Jambi Province.

HGB No. 06.04.02.05.3.00005 totaled 74.890 M2 dated 10/10/2012 by Land Office of Merangin Regency, Jambi Province.

Application for change of HGB into HGU dated 24-10-2011 by PT. KDA totaled 130,73 Ha, with attachment of the HGB No. 06.04.10.05.3.00002 of 126 Ha dated 11-10-1993 by Land Office of Sarolangun Bangko Regency, Jambi Province, is different in the total land area with that of the existing HGB.

SIUP (Business License) No. 929/1369-P/09-01/PB/II/99 dated 2 March 1999.

Plantation Business Registration Letter No. 960/Menhutbun-VII/2000 of Jakarta Forestry and Plantation Department dated 08-08-2000.

- Land area : 8.359 Ha - Location : Sarolangun, Bangko and Pamenang Districts, Sarko Regency, Jambi Province Product Processing Unit (UPH)

- Type : Mill - Quantity : 3 (three) units - Permit capacity : 30 ton/hour, 60 ton/hour and 60 ton/hour - Installed capacity : 30 ton/hour, 60 ton/hour and 60 ton/hour Limited Liability Company Registration Certificate No. 09.05.1.51.37878, valid until 01/09/2013.

The company is formerly known as PT. Kresna Duta Agro-Industri and renamed PT. Kresna Duta Agroindo. Change of company name was strengthened by the Notary Deed dated 25 November 1986 (John Leonard Waworuntu) and strengthened in Decree of the Ministry of

Sucofindo ICS FRM 3.04 Issue 04 Rev. 6 23of 106

SUCOFINDO INTERNATIONAL CERTIFICATION SERVICES

Justice No. C2-6196HT.01.01.Th87. 28 September 1987.

 Checking of the BPN boundary markers was carried out during field visit stage 1, among others : a. Sample BPN/KDA 06/XXXIV marker with coordinates of 206629,39 E and 9768421,78 N UTM b. The sample BPN/KDA XXV marker is a supporting marker with coordinates of 206027.05 E and 9769049.28 N UTM. Because the position of BPN/KDA XXV marker is adjacent to the community estate land, and during the field checks there was a shift of ± 4 meters from its original position into the community estate land. The company moved the marker into the area of PT KDA. The company should make minutes of BPN/KDA XXV marker relocation to avoid conflicts that may occur in the future. At stage 2 the company has made Relocation Minutes of BPN Marker No. XXV based on the letter from Mr. Arfandi Ibn Hajar (owner of the adjacent land) on 3 December 2011, concerning the position of marker on the border area between PT KDA and its adjacent area, so the PT KDA shifted the BPN markers approximately three (3) meters towards the area of PT. KDA with coordinates of 2°5’14.60’’ S and 102°21’26.404’’ E signed by the Legal & Environment and Estate Manager. c. The sample BPN/KDA 08 marker coordinates is 205173.39 E and 9766942.96 N but the proper coordinates should be 205177.012 E and 9766939.095 N. It was found in the field that BPN/KDA 08 marker was not placed properly, because at the same time the older BPN marker was found. BPN/KDA 08 marker should be placed at the position of marker as determined by BPN. In stage 2 the company has had the record of Minutes of BPN Marker Relocation on Saturday, 05-10-2013 located at Division 5 of Bangko Estate. The Original Coordinates of 2°6’23’’ S and 102°20’59’’ E have moved to coordinates of 2°6’21.898’’ S and 102°20’58.985’’ E. It is signed by HCV Officer, Legal Officer and Estate Manager. The documentation photographs of marker relocation are available.  The company has the Record of Maintenance of Bangko Estate (BNGE) Boundary Marker 2013 with criteria : a. Checklist implementation b. Marker repairs c. Painting d. Marker location clearing

The company is advised to add Marker Coordinate Monitoring criteria to avoid shifting or moving of the marker. In the stage 2 the company has added the criteria of Coordinate Point Monitoring on the Form of BPN Marker Maintenance.

 BPN boundary marker check has been conducted during site visit stage 2 as follows: a. Marker of BPN HGU KDA002 Division 4 with coordinates of S 02°03’37.7’’ E 102°28’38.8’’ located nearBlock B10 b. Marker of BPN HGU KDA003 Division 4 with coordinates of S 02°03’44’’ E 102°28’40’’ located nearBlock B09 c. Marker of BPN HGU KDA004 Division 4 with coordinates of S 02°04’09’’ E 102°28’40.7’’ located nearBlock B02 d. Marker of BPN HGU KDA015 Division 4 with coordinates of S 02°04’08’’ E 102°28’40.9’’ located nearBlock B05 e. Marker of BPN HGB KDA002 Division 4 with coordinates of S 02°04’32.9’’ E 102°28’53.1’’ located nearBlock C02 f. Marker of BPN HGB KDA006 Division 4 with coordinates of S 02°04’32.5’’ E Sucofindo ICS FRM 3.04 Issue 04 Rev. 6 24of 106

SUCOFINDO INTERNATIONAL CERTIFICATION SERVICES

102°29’07.4’’ located nearBlock A04 g. Marker of BPN HGB KDA009 Division 4 with coordinates of S 02°04’19.6’’ E 102°29’07.9’’ located nearBlock A05  The company has data of BPN HGB marker points and advised to maintain markers that exist in company area, not the BPN HGU markers only. It is because during the field visit stage 2 the BPN HGB markers were found dull and marker identification number was missing.

During preliminary auduit, it was found that the company does not have a HGU for the estate at division 4 of Bangko Estate of 218 HA. The company has submitted an application for HGU of 109.73 Ha and 87.35 Ha. Recent data available is cadastral measurement map. (Major Stage 1 & 2).

The company has made the corrective action by getting the HGU from Prov.of Jambi issued on 20January2014, with a total area of 218.08 hectares. They are :

1. HGU No. 01/HGU/BPN.15/2014datedJanuary 20, 2014is locatedinKarang Berahi Village, Pamenang, Merangin District, Jambi Province with area details: - NIB 06.04.00.00.00014 total area 92,89 hectares - NIB 06.04.00.00.00016 total area 33,07 hectares Located in the Jelatang village, Pamenang, Kab. Merangin District, Jambi Province with area details: - NIB 06.04.00.00.0001 total area 81,56 hectares

2. HGU No. 02/HGU/BPN.15/2014datedJanuary 20, 2014is locatedinKarang Berahi and Jelatang Village, Pamenang, Merangin District, Jambi Province with area details:

- NIB 06.04.00.00.00020 total area 4,76 hectares - NIB 06.04.00.00.00021 total area 5,80 hectares

Total HGU’s are 218, 08 hectares

Compliance Status : Compliance 2.3 Use of land for oil palm does not diminish the legal rights, or customary rights, of other users, without their free, prior and informed consent.

There is SOP for Land Conflict Settlement (SOP/SPO/SMRT/LH-04). So far the company and meetings with stakeholders provide information that there is no dispute in the period of 2010 until the present time in the area around the company. It has been stated in the SOP to prioritize deliberation over legal action.

Compliance Status: Compliance

3 COMMITMENT TO LONG-TERM ECONOMIC AND FINANCIAL VIABILITY

3.1 There is an implemented management plan that aims to achieve long-term economic and financial viability

Sucofindo ICS FRM 3.04 Issue 04 Rev. 6 25of 106

SUCOFINDO INTERNATIONAL CERTIFICATION SERVICES

The company has a long-term plan in the form of the 2010 – 2020 projection. The document has projected the following: - Projected Profit - Production assumptions of CPO, PK & FFB - Cost assumptions - Cost of production for Estate & Mill and cost/ton of FFB calculation has been carried out. Company’s short term plan sets out annual budget. The document of Budget 2013 has been available for mills & estates. Review is carried out every 4 months of the target set to check its realization. Corporately, the company performs a review annually. The company reports the realization of operations on a monthly basis and corporately reports annually. The oldest plants are those planted in 1997. Based on the projection data and taking into consideration of the fact that the number of stands is over 125 trees per hectare and the production is over 16 ton/ha there is no replanting plan until 2020 since it is considered economically still profitable. Compliance Status: Compliance

4 USE OF APPROPRIATE BEST PRACTICES BY GROWERS AND MILLERS

4.1 Operating procedures are appropriately documented and consistently implemented and monitored The company has Land Preparation Technical Guideline SOP (Oil Palm) which is a collection of SOP and WI related to new planting preparation. Issued on 01/07/2010.

The company has had SOP-WIfor Oil Palm Cultivating Techniques prepared corporately under the management of Smart, Tbk under the Management Committee Agronomy and Research (MCAR), 2012.

The SOP-WIcollection for Oil Palm Cultivating Techniques covers the following activities:

- CHAPTER I New Planting Plan SOP – SOP/SMART/MCAR/I/TA-PPA - CHAPTER II Replanting Plan SOP – SOP/SMART/MCAR/II/TA-PRP - CHAPTER III Nursery SOP – SOP/SMART/MCAR/III/TA-BBT - CHAPTER IV New Land Clearing SOP – SOP/SMART/MCAR/IV/TA-PLB - CHAPTER V Planting SOP – SOP/SMART/MCAR/V/TA-TNM - CHAPTER VI Replanting SOP – SOP/SMART/MCAR/VI/TA-RPL - CHAPTER VII Plant Disease and Pest Control SOP – SOP/SMART/MCAR/VII/TA-HPT - CHAPTER VIII Weed Control SOP – SOP/SMART/MCAR/VIII/TA-PGM - CHAPTER IX Fertilizing SOP – SOP/SMART/MCAR/IX/TA-PPK - CHAPTER X TBM Maintenance SOP– SOP/SMART/MCAR/X/TA-PTB - CHAPTER XI Preparation for Harvest SOP – SOP/SMART/MCAR/XI/TA-PMP - CHAPTER XII TM Maintenance SOP– SOP/SMART/MCAR/XII/TA-PTM - CHAPTER XIII Harvest SOP – SOP/SMART/MCAR/XIII/TA-PNN - CHAPTER XIV FFB Loading and Transport SOP – SOP/SMART/MCAR/XIV/TA-PPT - CHAPTER XV Rainfall Measurement with Ombrometer SOP – SOP/SMART/MCAR/XV/TA- PCH - Land Clearing SOP (SOP/SMART/MCAR/IV/TA-PLB), rev.0, issued 1/9/2012. On the point 2.2.6 Shaping regulates on: terracing and horse-shoe shaping.

Sucofindo ICS FRM 3.04 Issue 04 Rev. 6 26of 106

SUCOFINDO INTERNATIONAL CERTIFICATION SERVICES

- There is a Circular Letter No. 071/SMD OPS/IX/2007 dated 04-09-2007 concerning Prohibition to clear lands by burning relating to the letter of the Minister of Agriculture No. 184/LB.130/M/8/2007 concerning prohibition of land clearing by burning. The circular letter provides: a) Wild fire prevention patrol b) Prepare fire squad and fire extinguishing facilities c) Assist Local Government should a fire occur in the estate location d) Make fire hazard warning signs e) Don’t clear land or cultivate land by burning Land Preparation Activity includes :

- Clearing-Blocking IK/SMART/MCAR/IV/TA-PLB/01- Clearing Blocking - Road Making SOP/SMART/MCAR/I/TA-PPA and IK/SMART/MCAR/1/TA-PPA/02-Road Making - Drainage Making IK/SMART/MCAR/1/TA-PPA/01-Drainage - Ex Lalang Land Preparation - Chemical System, Extermination of lalang chemically using glifosat or sulfosat with recommended dose of 6-10 liter/Ha, IK/SMART/MCAR/IV/TA-PLB/02 - Preparation of Ex Mineral Secondary Forest Land (Slashing, Felling, Piling, Heaping, Path Clearing, Terracing). Terracing includes :

Contour Terracing on hilly areas with a gradient of 9°-22°. Contour terraces of 4.5 m to 3 m wide are made mechanically; SOP/SMART/MCAR/I/TA-PPA and IK/SMART/MCAR/I/TA- PPA/03. From the samples taken during the field visit in Block 04 planting year 1994 Division 5 BNGE known that the slope is 20%, using a clinometer measurements. This result is suitablewith thecompany record that that block is a hilly area.

Horse-shoe shaped, certain parts of areas possible for planting but unable to be contour terraced should be horse-shoe shaped of 2.5 m wide to follow the contour.

Nursery SOP is available (SOP/SMART/MCAR/III/TA-BBT, rev. 00, 1/9/2012) and IK/SMART/MCAR/III/TA-BBT/06, Seedling Acceptance and Planting, covering the following activities:

- Establish oil palm nursery in which nursery is undertaken in stages of Pre Nursery (PN) of 3-4 months, Main Nursery (MN) of 11-13 months and Advance Planting Material (APM) a cultivation period until 38 months old. - Nursery site determination, Nursery area calculation, Land preparation, Irrigation system, Planting media preparation, Seedling acceptance and planting, Watering, Weed Control, Pest and Disease Control, Fertilizing, Selection. - Selection-Culling. If seedlings stay in the nursery for a longer period, they should have a final selection before being loaded and transported to the field. - The company has issued a Memorandum from RC Jambi 1 No. 067/RC-MNGR/08/2013 dated 10 August 2013 regarding the use of certified seedlings as a proof of commitment to the established SOP and WI (conformance). It confirms that seedlings to be planted must be those seedlings that have obtained recognition from the government and with certificate issued by authorized agencies. - There is form of Oil Palm Seedling Selection Sheet (FORM/III/TA-BBT/06-Seedling Acceptance and Planting/01 Selection.

Sucofindo ICS FRM 3.04 Issue 04 Rev. 6 27of 106

SUCOFINDO INTERNATIONAL CERTIFICATION SERVICES

- IK/SMART/MCAR/III/TA-BBT/08-Selection PN (Pre Nursery) - There is form of Pre Nursery Oil Palm Seedling Selection Sheet (FORM/III/TA-BBT/08- Selection PN/01, rev.00, Rejected seedlings are classified into: RL, C, TS, CM, TS, etc. - The seed used is in principle of Marihat Variety of 140.398 Seedlings (BNGE Division 4 is 27.045 seedlings and BNGE Division 5 is 113.353 Seedlings). It is strengthened by a Certificate from the Plantation and Forestry Service of Merangin Regency with Certificate No: 525/857/Disbunhut/XI/2013 stating that oil palm seedlings used by PT. Kresna Duta Agroindo, Bangko estate from 1993 are seedlings from certified seedling sources that have obtained recognition from government. It is because after tracing the seedling certificate of the previous owner of the estate was not found. - PT. KDA BNGE does not have a nursery site, the seedlings are supplied from Pelakar Estate Nursery, and thereby BNGE does not have documentation concerning the treatment of seedlings that are not meeting the requirements. - The company has Form of Oil Palm Seedling Selection that explains about the types of rejects, including: . TJ = Unclear radikula (white) and/or plumula (yellow) . RB = Rotten Radikula or rotten Plumula . RS = Parallel Radikula and Plumula . J = Fungi . TN = Abnormal or damaged

Plant Cultivation SOP, covering :

SOP OF CULTIVATION OF NONPRODUCTIVE PLANTS SOP/SMART/MCAR/X/TA-PTB IK/SMART/MCAR/X/TA-PTB/01-Sensus WORK INSTRUCTION OF TREE CENSUS Pohon WORK INSTRUCTION OF INSERTING IK/SMART/MCAR/X/TA-PTB/02-Penyisipan WORK INSTRUCTION OF MEASURING IK/SMART/MCAR/X/TA-PTB/03-Pengukuran PLANT GROWTH Pertumbuhan Tanaman WORK INSTRUCTION OF HARVESTING PLATFORM CONSTRUCTION AND IK/SMART/MCAR/XI/TA-PMP/04-Pembuatan INSTALLATION dan Pemasangan Titi Panen WORK INSTRUCTION OF PALM CIRCLE, HARVESTING PATH, CONTROL PATH AND IK/SMART/XII/TA-PTM/01-Perawatan piringan COLLECTION PATH MAINTENANCE jalan rintis, jalan kontrol dan TPH SOP OF PREPARATION FOR HARVEST SOP/SMART/MCAR/IX/TA-PMP WORK INSTRUCTION OF INSECT IK/SAMRT/MCAR/XI/TA-PMP/01- POLLINATOR DEVELOPMENT Pengembangan Serangga Penyerbuk WORK INSTRUCTION OF CASTRATION IK/SAMRT/MCAR/XI/TA-PMP/02- Kastrasi WORK INSTRUCTION OF SANITATION IK/SAMRT/MCAR/XI/TA-PMP/03-Sanitasi WORK INSTRUCTION OF HARVESTING PLATFORM CONSTRUCTION AND IK/SAMRT/MCAR/XI/TA-PMP/04-Pembuatan INSTALLATION dan Pemasangan Titi panen WORK INSTRUCTION OF PALM CIRCLE, HARVESTING PATH, CONTROL PATH AND IK/SMART/MCAR/XII/TA-PTP/01- Perawatan COLLECTION PATH MAINTENANCE piringan, jalan rintis, Jalan kontrol dan TPH Sucofindo ICS FRM 3.04 Issue 04 Rev. 6 28of 106

SUCOFINDO INTERNATIONAL CERTIFICATION SERVICES

SOP OF CULTIVATION OF PRODUCTIVE PLANTS SOP/SMART/MCAR/XII/TA-PTM IK/SMART/MCAR/X/TA-PTB/01-Sensus WORK INSTRUCTION OF CENSUS Pohon WORK INSTRUCTION OF PALM CIRCLE, HARVESTING PATH, CONTROL PATH AND IK/SMART/MCAR/XII/TA-PTP/01- Perawatan COLLECTION PATH MAINTENANCE piringan , jalan rintis, Jalan kontrol dan TPH SOP OF FROND STACKING MAINTENANCE SOP/SMART/MCAR/VIII/TA-PGM SOP OF WEED EXTERMINATION SOP/SMART/MCAR/VIII/TA-PGM SOP OF ROAD, TRENCH AND BRIDGE SOP Pembukaan lahan Baru MAINTENANCE SOP/SMART/MCAR/IV/TA-PLB SOP OF PEST AND DISEASE CONTROL SOP/SMART/MCAR/VII/TA-HPT WORK INSTRUCTION OF PRUNING AND IK/SMART/MCAR/XII/TA-PTM/02-Penunasan FROND ARRANGING dan penyusunan pelepah SOP OF FERTILIZING SOP/SMART/MCAR/IX/TA-PPK SOP OF HARVESTING SOP/SMART/MCAR/XIII/TA-PNN ATTACHMENT WORK INSTRUCTION OF LAMP/XIII/TA-PNN/01-Criteria Kematangan MILL CRITERIA OF RIPE FRUITS Buah di PKS WORK INSTRUCTION OF HARCESTING IK/SMART/MCAR/XIII/TA-PNN/01-Panen SOP OF LOADING AND TRANSPORTING FFB SOP/SMART/MCAR/XIV/TA-PPT SOP/SMART/MCAR/XIV/TA-PPT/01- WORK INSTRUCTION OF FFB LOADING Pemuatan FFB WORK INSTRUCTION OF FFB SOP/SMART/MCAR/XIV/TA-PPT/02- TRANSPORTING Pengangkutan FFB WORK INSTRUCTION OF NET AND SEAL SOP/SMART/MCAR/XIV/TA-PPT/03- INSTALLATION Pemasangan jaring dan segel - Non-Productive Plant (TBM) Cultivation no longer exist because the youngest is of the planting year 1997. - Productive Plant Cultivation (TM)includes : (1) Tree census, (2) Maintenance of Palm circle, harvesting path, control path, and TPH (3) Frond stacking maintenance (4) Weed extermination (5) Road and bridge maintenance (6) Pest and disease control (7) Pruning and Frond Arrangement Cultivation activities are recorded on: - Foreman Activity Log Book (BKM)– daily, there is BKM dated 12/09/2013 at Division 5 of cultivation activities. - Work Production Log Book (BHK) – contract work. - For the Core, the result of BKM and BHK is entered into Checkroll program (SAP). For Plasma, BKM is recapitulated into Plant Cultivation Report. - Data is available on Biological Control Agent Cultivation of Turnera Subulata planting that includes: . Division 4 BNGE, Planting Year 1993, Block G01, October 2013, Actual area of 64 Ha. . Division 4 BNGE, Planting Year 1995, Block D02, October 2013, Actual area of 106 Ha. - Records are available on Tyto Alba (Owl) Care Monitoring of September 2013, at Division 4 of Sucofindo ICS FRM 3.04 Issue 04 Rev. 6 29of 106

SUCOFINDO INTERNATIONAL CERTIFICATION SERVICES

BNGE in the 4th Week it has a total of 14 Tyto Alba (Owl) eggs, 13 Young Owls and 4 adult owls. - Records are available on rat census of October 2013. As samples, at Division 4 the number of trees attacked are 25 (0.9 %) out of 2665 trees censuses. From the outcome it can be concluded that the attack remains below the critical threshold limit of 5 % for Productive Plant. IK/SMART/MCAR/VII/TA-HPT/07- Census and Rat Control. The company has had records of plant cultivation in the productive plant (TM), including: - UPDKS detection - Palm circle spraying, harvesting path and TPH - Spraying anak kayu weeds - Manual Circle Weeding - Fertilizing - Host plant cultivation Pruning (Records are available of Maintenance Pruning Program and Realization 2011, 2012 and 2013 on a monthly basis).

During the visit there was no fertilizing activity because fertilizing activity for 2013 semester 2 has completed in September 2013. This can be seen from the Monthly Work Plan of October 2013 and December 2013 where there were no fertilizing activities found.

FFB Acceptance Jelatang Mill Parameters for the penalty include: 1. Unripe fruit, 5 kg per bunch penalty 2. Long staks (above 2.5 cm) : 2 kg per bunch penalty 3. Unfresh fruitlet, the total is estimated in kg 4. Artificially ripening fruit: 5 kg per bunch penalty 5. Rotten fruit is returned 6. Garbage: the total is estimated in kg

Price as of 2 October 2013 was Rp. 1370 / kg, whereas the price from the Plantation Service was 1387/kg for 18.26 % yield.

Price information is passed by the organization to plasma manager through short messages and the manager of plasma passes it to the KUD through short messages. The price information is displays in the KUD office.

Data of FFB processed in 2012 is 137,584,710 kg with details as follows: Bangko Estate 6,142,420 kg TSRA (KKPA) 11,464,450 kg KUJP (plasma) 14,081,600 kg Pamenang Plasma 61,882,040 kg Bangko Plasma 7,097,950 kg BBNA Plasma 34,119,870 kg Batang Gading Estate (core) 2,796,380 kg

CPO and Palm Kernel Production of CPO in 2012 was 28,645,162 kg (20.82%), palm kernel was 6,151,222 kg (4.47%). The detail of Jelatang Mill performance as of 18 November 2013 is as follows:

Sucofindo ICS FRM 3.04 Issue 04 Rev. 6 30of 106

SUCOFINDO INTERNATIONAL CERTIFICATION SERVICES

Parameter Today Up to this Year to date Target month FFB (kg) 278.190 4.882.990 89.032.260 OER (%) 19,46 20,87 20,56 21,75 Empty fruit 0,023 0,023 0,023 0,050 bunches (%) EFB oil (%) 0,329 0,324 0,330 0,300 Fiber oil (%) 0,569 0,597 0,607 0,580 Nut oil (%) 0,054 0,044 0,043 0,050 CPO (kg) 54.149 1.012.621 18.307.040 %FFA 3,433 3,615 3,441 < 3,000 Kernel (kg) 10.571 189.462 3.866.217 % kernel 3,80 3,90 4,34 4,75 throughput 30,91 29,79 29,75 29,70

The processing procedure is contained in SOP-Pengolahan/review/MCMD#1/2010 (from FFB receipt to storage). The process is outlined as follows:

Loading ramp The fruit was received at the loading ramp, and then using a lori it is sent to the sterilization.

Boiling and threshing The boiling uses 3 peaks, the first peak is at 1.5 bar, the second peak is at 2.5 bar and the third peak is at 3 bar, held for 46 minutes. Total boiling time is 85 minutes. The setup of boiling time and pressure is regulated by PLC.

Fruit in the lorries after boiling is transported using a hoisting crane to the thresser.

After the thresser, empty fruit bunches are also sampled, and their unstrip bunch is analyzed with a standard maximum of 2.5%. This is, among other things, to find out how well the boiling process works. High unstrip bunch may indicate that the process of boiling is not complete so that many of the fruit is unstripped. Level of oil in the empty bunch after thressing is also analyzed with the standard maximum of 1.8 percent, this is to find out how well the disposal process of condensate works, otherwise if it is not well disposed the fruit bunches/ffb will be saturated with the condensate. Now the condensate is not sampled anymore because it is reused as dilution water.

Extraction Cake (mixture of fibers and kernels after pressing) is also sampled. The parameters measured are oil dry base in fibers with standard not exceeding 7 percent, nut oil losses with standard not exceeding 1 percent, and also the broken nut with the standard of 14%. Both aim to see if pressure of the pressing has been optimum. Pressing with too low pressure will result in high oil level in the fibers, while too high pressure will produce high broken nuts. Currently used pressure norm is 50 psi.

Purification Samples are also taken at vibrating screen to ensure the composition of oil and water in the right proportion, as the basis for dilution in order to facilitate the separation of oil and water in the CST

Sucofindo ICS FRM 3.04 Issue 04 Rev. 6 31of 106

SUCOFINDO INTERNATIONAL CERTIFICATION SERVICES

(continous settling tanks). The parameters analyzed are water content where it is kept in the range of 20 – 30%, and the oil is kept in the range of 40%.

Samples are also taken from under flow, the oil content must be < 10% to ensure that more sludge is resulted to be separated later at slugde centrifuge.

To ensure the sludge centrifuge is well functioned, sludge samples are taken after sludge centrifuge. Oil level in the sludge after the centrifuge should be less than 12 percent, meaning the equipment is functioning properly in separating oil and sludge.

Production oil is sampled after vacum drier for the FFA quality. Before and after the vacum drier samples are taken for the moisture content to ensure that drying process in a vacum has worked properly.

The final quality of CPO can be seen from FFA, water content and impurities parameters. Samples are taken from one of the CPO tanks.

Nut processing Nut shells are broken on ripple mill. To see the efficiency of the ripple mill the output of ripple mill is sampled. The output measured is whole nut, broken nut, whole kernel and broken kernel. This is to determine or adjust the opening of ripple mill, if too tight there will be a lot of broken nut, broken kernel, if too loose there will be many whole nut or unbroken nut.

Nuts that have been broken into shell and kernel are then separated using claybath. A sample is taken after the clay bath before entering the silo kernel at hydro shell, which is the broken kernel, with the standard of no more than 1 percent. This is to find out how much the broken kernel carried with the shell.

Boiler Jelatang Mill has one unit of boiler operated at 19 kg/cm2, the permit is at 20.28 kg/cm2. The steam production is 20 ton per hour, the setting of parameters on the boiler has been using a PLC. Every 15 minutes it will be shoot blowing automatically. From field observations, the boiler is operated in a safe manner as seen from the pressure in the combuston chamber which is at– 1 inch H2O.

Power plant Electricity is generated by 2 units of steam turbines and one unit of diesel generator. During the audit the quality of electricity generated is good as seen from the voltage at 380 V, the frequency at 50 Hz in and the cos phi at 0.9, and at the load of 600 KW during the field visit looked working properly.

BPV (Back Pressure Vessel) Back Pressure Vessel is used as a place for storing steam coming out from the steam turbine that will be used for other purposes especially for boiling. During the audit it is seen to use the pressure of 2.5 Kg/cm2 (below the permitted pressure of 3 kg/cm2).

Maintenance The schedule of general maintenance is listed in the schedule of maintenance 2013, which also specifies the daily, weekly and monthly maintenance.

Sucofindo ICS FRM 3.04 Issue 04 Rev. 6 32of 106

SUCOFINDO INTERNATIONAL CERTIFICATION SERVICES

Special maintenance was carried out by third party in the form of a services contract such as the maintenance of hoisting cranes, boilers, and turbines.

The examination of hoisting crane through a service contract is carried out 3 times a year. In 2013 it was implemented on 09 November for both cranes, based on service report no. 11518 and 11517 from the person who perform the maintenance. In addition, maintenance was also performed on 18 July 2013 (No. 1), crane 2 on 17 July 2013, no.3 on July 17, 2013. The inspection was conducted by the MHE Demag Indonesia.

The inspection of Boiler, sterilizer and BPV, deareator : PT. Multi Ganda; instrument inspection is 2 times a year in 2013 i.e. in Februari-March and early in September.

Steam turbine is inspected 2 times a year; last inspected in April 2013. Point of inspection has covered the function of manual hand trip, overs peed trip, load test and low oil pressure test. Load test is carried out on a load of 400 KW. It has been technically suitable because the load test was performed on the load above the paralytic load (30 percent of the maximum load).

Compliance Status: Compliance 4.2 Practices maintain soil fertility at, or where possible improve soil fertility to, a level that ensures optimal and sustained yield

- SOP/SMART/MCAR/V/TA-TNM, 1/9/2012. Planting SOP - There is IK/SMART/MCAR/V/TA-TNM/01- Lining of Flat to Wavy Areas. - SOP and or WI sets 136/ha density. The SOP mentions that the density of plant is 136 trees/Ha, the space between trees (equilateral triangle) is 9.21 m and the distance between the perpendicular line is 7.98 m. - There is IK/SMART/MCAR/IV/TA-TNM/02: Lining of Hilly Area, containing information of Table of Terrace Distance, Planting Space within Terrace and Tree Population. - There is no data of planting plan and realization because there are no planting activities throughout the Bangko Estate (BNGE). The company has had the records of realized planting of oil palm that contains information about estate name, year of planting, planted area. Planting based on recent data of October 2013 is: Division 4 BNGE  Year 1993 : 103.30 ha  Year 1995 : 100.00 ha Thereby the total of TM planting area for Division 4 BNGEis 203.30 Ha. There is a memorandum of Laboratory Analysis Result ref. 019/TANAH/LAB-SMARTRI/I/2013 dated 25 January 2013 concerning Soil Sample Analysis Result of Soil Sampling Unit (SSU) BNGE with a total of 84 samples (No. Lab. 11243-11326) with request for routine analysis without texture + Cu, Zn, Fe, Mn, B. There is the Result of Soil Sample Analysis carried out by SMART Research Institute-Analytical Laboratory. There is a memorandum of Laboratory Analysis Result ref. 110/DAUN/LAB-SMARTRI/III/2013 dated 16 March 2013 and 205/DAUN/LAB-SMARTRI/IV/2013 dated 6 April 2013 concerning Leaf Sample Analysis Result of Leaf Sampling Unit (LSU) BNGE with a total of 37 samples (No. Lab. 3107-3133 and 4461-4470) with request for the analysis of N, P, K, Mg, Ca, B, Cl. Based on the result of soil and leaf analysis a fertilizing recommendation was issued in 2012, for example:

Sucofindo ICS FRM 3.04 Issue 04 Rev. 6 33of 106

SUCOFINDO INTERNATIONAL CERTIFICATION SERVICES

Block A1 of Division 4 has a fertilizer dosage of DAP of 0.5 Kg/Tree/Year, RP 1 Kg/Tree/Year, MOP 0.5 Kg/Tree/Year, Borate 0.075 Kg/Tree/Year and Compost 70 Kg/Tree/Year. During the visit there were no fertilization activities because the fertilization activities of semester 2 - 2013 were completed in September 2013. It can be seen from the Monthly Work Plan of October 2013 and November 2013 where the fertilization activities are no longer found. During the visit there was no fertilizing activity because fertilizing activity for 2013 semester 2 has completed in September 2013. This can be seen from the Monthly Work Plan of October 2013 and December 2013 where there were no fertilizing activities found.

Compliance Status: Compliance 4.3 Practices minimize and control erosion and degradation of soils

The company has Erosion Measurement SOP, PT KDA – BNGE/SOP/28, Revision: 00, effective date 1 August 2013 for Bangko Estate (BNGE) area. There is River Border Protection SOP of SOP/SPO/SMART/LH-06, effective date 1 July 2010 revision: 01 There is River Border Protection SOP of SOP/SPO/SMART/LH-07, effective date 1 July 2010 revision: 01 There is Circular Letter from RC Jambi 1 No. SE-RC/KDA/10/2013 dated 1 October 2013 concerning Watershed Protection that specifies palm oil free zone of 50 meter from river banks. Information dissemination to workers and community/farmers around the estate is notice boards on the prohibition to use river, e.g. no fishing, no fire, no planting. The company has had a Semi detailed Land Map, Site Map, soil type map, solumn depth, drainage, soil suitability class and Topographic map of 1:75.000 scale no. reg : 540/202/PMNP/IV/12 and River Map of PT. KDA Area No. Reg. 1359/214/PMNP/XI/13 of 1:40.000 scale. River Border Protection is to clear from oil palm trees the areas 50 meters from river edges, and the river banks are planted with bamboo species to prevent erosion. Information dissemination to workers and community/farmers around the estate is by means of notice boards prohibiting the use of river, e.g. no fishing, no fire, no planting. Type of activities includes: - Terresan - Pit Pond - Establishment of LCC - Weed Management - Frond Arrangement - Empty Bunch Mulch Company policy related to soil and water conservation includes : - Prohibit the planting of palm in the river boundary area of 50 meter to the left and right of the river. In the estate, Mampun River and Blengo River have width < 7 meter. - Prohibit the cultivation of land in the river boundary area by placing notice boards. - Build a bordering road between the planted/managed area and the protected area. - Make a prohibition related to river boundary area (50 to the left and right of the river) planted and maintained manually and free from chemicals.

The principle 4.1 describes that: Preparation of Former Mineral Secondary Forest Land (Slashing, Felling, Piling, Heaping, Path Clearing, Terracing). Terracing includes:

Sucofindo ICS FRM 3.04 Issue 04 Rev. 6 34of 106

SUCOFINDO INTERNATIONAL CERTIFICATION SERVICES

Contour Terrace Contour terrace of 4.5 m to 3 m wide is made mechanically on a hilly area with slope gradient of 9°- 22° SOP/SMART/MCAR/I/TA-PPA and IK/SMART/MCAR/I/TA- PPA/03. Horse shoe (Tapak Kuda), certain parts of the area possible for planting but unable to be contour terraced should be horse-shoe shaped of 2.5 m wide following the contour.

There is Work Instruction of IK/SMART/MCAR/III/TABDT/06- Peat Land Cultivation WI Rev.00 dated 26 March 2012. However, the area of PT. KDA has no peat land. There is Memorandum of Prohibition to Clear Peat and Primary Forest Area No. 039/SMD OPS/III/2010 dated 26 March 2010. There is no Peat land in the area of PT. Krishna Duta Agroindo which is evidenced by semi detailed map indicating that all of the area is mineral soil, which was confirmed during the site visit where no peat area was found. There is no Peat land in the area of PT. Krishna Duta Agroindo which is evidenced by semi detailed map indicating that all of the area is mineral soil, which was confirmed during the site visit where no peat area was found.

Compliance Status : Compliance

4.4 Practices maintain the quality and availability of surface and groundwater. The company has identified the source of water in the estate and mill areas i.e. Mampun River and Belango River. Protection of watersheds is by setting 50 m wide to the left and right of the rivers as a conservation area. Alongside 5 trees to the left and right is not sprayed. Among those realized are the instalation of notice board that read PROTECTED RIVER BOUNDARIES.

Management programs for river water in the area of Langling Mill are Mampun River water quality monitoring. The testing parameters for river water measurement refer to the Government Regulation 82/2001. River water quality testing was carried out by BLHD of Jambi Province on 5 June 2013 for Mampun River Upstream & Downstream. The test results show that pH and BOD values are above the quality standard for water quality class II. RKL/RPL report has evaluated this condition i.e. low pH which is due to acidic soil in the initial condition and BOD which is due to activities outside the oil palm estates & mills.

In managing Mill’s liquid waste, the company built a WWTP with a capacity of 68,000 m3 (52,000 is active and 16,000 is Non-active). None of the waste is dumped into a water body or soil since the waste is applied on land. Liquid waste utilization permit for land application has been issued by the local Government of Merangin Regency with no. 18/LH/2012 concerning the extension of permit to utilize mill’s liquid waste that has been researched to the PT KDA Jelatang estate area. Monthly observation of waste quality is carried out by external laboratory of BLHD of Jambi Province with sampling points at the pond outlet 5. Testing parameters are BOD, COD, pH, oil- grease, Pb, Cu, Cd, Zn, which refer to Decree of the Minister of Environment No. 28/2003. The test result of January – July 2013 shows that BOD & pH complies with the quality standards.

Every 3 months an analysis is carried out on the water quality of monitoring well I, II and III (wells located at residential area). Parameters measured are BOD, DO, pH, NO3, NH3, Cd, Cu, Pb, Zn, Cl and SO4. The result of recent test was that of 5 June 2013. The results for monitoring well I, II and III show that BOD and pH comply with the quality standards. The result of test for residential wells 1 and 2 at worker housing is below the quality standard for pH. It is for MCK (bathing, washing and toileting) only, while for drinking the clean water from the mill is used.

Sucofindo ICS FRM 3.04 Issue 04 Rev. 6 35of 106

SUCOFINDO INTERNATIONAL CERTIFICATION SERVICES

Daily measurements of internal Jelatang Mill parameters include pH, Alkalinity, and VFA. Compliance Status: Compliance 4.5 Pests, diseases, weeds and invasive introduced species are effectively managed using appropriate Integrated The company establishes a procedure for handling agrochemicals in the SOP of Pest and Disease Control (SOP/SMART.MCAR/VII/TA-HPT, 1/9/2012). List of agrochemicals used by the company has been available covering brand, active ingredient and permit for circulation in Indonesia. Monthly use of pesticides has been recorded in the report of agrochemical toxicity data. The report has included amount of application, total active ingredient, FFB production and toxicity unit. During the field visit to Division 5, block B-3, Glyphosat and Methyl Metsufuron was being applied. The dosage has been in compliance with the recommendation.

The use of restricted pesticides like paraquat is still found but the company has a policy to reduce the application of paraquat herbicide. Chemicals used by the estate have no paraquat active ingredient of Dichloride, Glyphosate Isopropyl Amine, Methyl Metsufuron, Triklopir Putoksil Ethyl Ester, and Deltametrin.

Training programs on Restricted Pesticide are available dated 10-10-2011, attended by 12 participants who have signed the attendee list. Training materials, training evaluation and training-related photo documentation are available. The certificate has a validity period of 5 years (Valid until 31 October 2016) issued by the Commission for Fertilizer and Pesticide Control of Jambi Province.

A record shows that the recent Integrated Pest Control Training was carried out in Jelatang on 23 September 2013, attended by 21 cultivation workers. Materials presented were Integrated Pest Control (PHT), Palm Leaf Eating Caterpillar (UPDKS), Rat Census and Pesticide Management.

Recapitulation is available of Rat Pest Attack Census results in the area of Productive Plant which is conducted every 3 months with the census result for Division 4 is a total of 24 trees are attacked by rat pest and for Division 5 a total of 235 trees are attacked by rat pest with the total attacks of 261 Trees.

Census personnel are 1-2 for Division 4. Spraying personnel, Bangko Estate has 1 Spraying Team with 17 members: Spraying Foreman : 1 Spraying personnel : 15 Operator taking Agrochemical to the site : 1

At stage 2 a site visit was made for Circle Spraying activities, harvesting path and TPH at the BNGE block B08 in the planting year 1994 (S 02°06’10.3’’ E 102°21’55.4’’), Spraying Team i.e. Spraying Foreman Sdr. Suhar with his 8 members (5 spraying personnel, refilling personnel and mixing personnel). PPE used by spraying personnel includes: Rubber gloves, Apron, Spraying Coat, Boots, Mask and Face shield. Extra pudding of milk is given prior to spraying. Doses used in spray are 160 ml. The practice of spraying in the field conforms to the specified procedure, for 2 meter circle the spraying is carried out around the tree and 1.5 meters for harvesting path. Naming and location of Block has conformed to the company’s map. During the field visit and interviews at stage 1 with spraying personnel it is found that the Sucofindo ICS FRM 3.04 Issue 04 Rev. 6 36of 106

SUCOFINDO INTERNATIONAL CERTIFICATION SERVICES

spraying with Agrochemicals is carried out on trees located on trench banks. This is indication of pollution in water bodies. The company should ensure that trenches in plantation area do not drain directly to the river although the dosage used is very small. At stage 2 the company has conducted sampling and sent the samples to the BLHD Lab. on 8 October 2013, the result from the Jambi BLHD Lab has been available. There is Kebun Bangko Trench Test Certificate No. 006/EL/KDA-KLH/IX/2013 dated 15-11-2013 stating the results of test for parameters which test is completed, while for parameters which test is not yet completed will be immediately delivered to the company along with the Test Certificate.

There is a test report no. 843/LHU/LABLING/X/13 dated 12 November 2013 with the result of pH 7.55; BOD5 3 mg/L; COD 20 mg/L; Total Phosphate (PO4-P) 0.02 mg/L; Nitrate (NO3) 0.169 mg/L; Nitrite (NO2) 0.028 mg/L; E-Coli 400 jml/100; Total Coliform 1100 jml/100 that comply with Government Regulation No. 82/2001. There is Data of Biological Control Agent Cultivation (Useful Weed) in 2013 of Turnera subulata planting provided with planting and cultivation map of Turnera subulata at Bangko Estate (BNGE). There is Data of Detected Oil Palm Leaf Eating Caterpillar (UPDKS) at Bangko Estate (BNGE) Block B03 Division 4 dated 3 July 2013 stating that there is no tree attacked. For Antigonon planting activities a record of Planting Map of Antigonon sp. is presented

Compliance Status : Compliance

4.6 Agrochemicals are used in a way that does not endanger health or the environment. There is no prophylactic use of pesticides, except in specific situations identified in national Best Practice guidelines. Where agrochemicals are used that are categorized as World Health Organization Type 1A or 1B, or are listed by the Stockholm or Rotterdam Conventions, growers are actively seeking to identify alternatives, and this is documented The company establishes a procedure for handling agrochemicals in the SOP of Pest and Disease Control (SOP/SMART.MCAR/VII/TA-HPT, 1/9/2012). List of agrochemicals used by the company has been available covering brand, active ingredient and permit for circulation in Indonesia. Monthly use of pesticides has been recorded in the report of agrochemical toxicity data. The report has included amount of application, total active ingredient, FFB production and toxicity unit. During the field visit to Division 5, block B-3, Glyphosat and Methyl Metsufuron was being applied. The dosage has been in compliance with the recommendation. The use of restricted pesticides like paraquat is still found but the company has a policy to reduce the application of paraquat herbicide. Chemicals used by the estate have no paraquat active ingredient of Dichloride, Glyphosate Isopropyl Amine, Methyl Metsufuron, Triklopir Putoksil Ethyl Ester, and Deltametrin. The management of used pesticide containers has been regulated in the procedure of Used Pesticide Container Washing WI (IK/BNGEL/LBH/01, revision 1 dated 30 Jan 2013). The work instruction regulates that used pesticide containers of plastic jerrycans and bottles are managed by means of collecting them in a special warehouse and washed 3 times. Used washing water is reused for the next mixing process and if necessary the used containers that have been washed are returned to the Supplier or handed over to licensed third parties. The company has provided pesticide mixing, used pesticide container washing, used fertilizer bag washing, pesticide apron washing, and spraying personnel bathroom facilities. A record shows that the recent Integrated Pest Control Training was carried out in Jelatang on 23 September 2013, attended by 21 cultivation workers. Materials presented were Integrated

Sucofindo ICS FRM 3.04 Issue 04 Rev. 6 37of 106

SUCOFINDO INTERNATIONAL CERTIFICATION SERVICES

Pest Control (PHT), Palm Leaf Eating Caterpillar (UPDKS), Rat Census and Pesticide Management. The company has established policies for women workers through Circular Letter No. 02/VPA- 1/1/2009 dated 13 January 2009 concerning Female Workers i.e. spraying job is prohibited for pregnant or breastfeeding women. The company provides bathing facilities to the spraying team at Bangko Estate. The facility for the disposal of bathroom waste water which is contaminated by spray substance regardless its small amount is still exposed, no safeguarding barriers or fences, and warning signs are found. And it is necessary to conduct water quality testing on the effluent in order to meet the effluent quality standard.

At the time of preliminary audit, company has not conducted special health examination of the workers spraying in 2012 according Regulation of the Minister of Manpower No.3/1996 that requires the examination to be conducted once every 6 months. During the final audit, the company has conducted health examination to the entire workforce as audiometry, spirometry and colinesterase in October 2013. For year 2014, the company has made the program for health examination to be conducted twice a year.

At the prelimenary audit, there was no pregnancy test conducted for female spraying workers section on a monthly basis. During the final audit, the pregnancy test has been conducted for female workers spraying.

Compliance Status: Compliance 4.7 An occupational health and safety plan is documented, effectively communicated and implemented Agrochemical Warehouse Agrochemical warehouse and washing facilities at Division 5 and warehouse for temporary storage of herbicide have good air circulation, which is provided with a secondary containment.

The washing of cap (spray tube) is carried out in the washing place, which has a shape of bath/washing pond. The washing of spraying personnel clothes, apron is also carried out in the clothes washing place. Clothes are washed using water only. Used washing water is reused as dilution water. The mixing personnel at chemical warehouse of Division 5 have been provided with a cartridge chemical mask provided on 09 October 2013.

Bangko Estate Central Warehouse In the Bangko estate central warehouse there are oil, medicine, rice supply, auto parts, and agricultural chemicals stored. Chemicals storage area has been equipped with exhaust fans.

Work Environment Inspection In Jelatang Mill the levels of chemicals in the workplace was measured on 27 June 2013, noise was on 22 February 2011, and heat stress, dust, lighting, vibration, gas have also been measured on 30 October 2013.

Emergency handling Emergency procedures in Bangko Estate and Jelatang Mill are regulated in emergency handling procedure no. SOP/17/SMART/LH-09. Emergency handling is implemented as follows:

Sucofindo ICS FRM 3.04 Issue 04 Rev. 6 38of 106

SUCOFINDO INTERNATIONAL CERTIFICATION SERVICES

Bangko estate emergency response team has been established, including the first aid team. Emergency simulation in the office was held on 30 September, but it was not provided with its evaluation yet. The inspection of portable fire extinguishers is carried out monthly. There are 34 portable fire extinguishers. The monitoring of land fire extinguishers is carried out monthly, data taken is data of September 2013; suction hose is not available; fire flapper, axe, chainsaw are not provided yet (not listed in the checklist yet) (obs).

Emergency response team has been established, the organization has also planned to establish and train fire emergency response team according to Decree of the Minister of Manpower 186/men/1999 for Jelatang Mill for class D officer training on 26-27 November 2013 based on information from PJK3 of PT. Elbana Industrial Supply dated 04 October 2013. Fire simulation in the estate housing was held on 28 September 2013, Mill fire simulation was on 21 September 2013; their evaluation has been available. Inspection of emergency handling equipment of portable fire extinguisher, hydrant, and traditional extinguishers is carried out monthly. (July samples).

Equipment certification ; The organization has certified some equipment that became the object of Manpower Service’s supervision with evidence as follows :  Grader : 560/279/PHIPK/PAA/SOSNAKERTRANS/2012 : June 2012, last inspected and tested on 19 July 2013  Tractor : 560/278/PHIPK/PAA/SOSNAKERTRANS/2012 : June 2012, last inspected and tested on 19 July 2013  Pressure vessel : 560/281/PHIPK/BJ/SOSNAKERTRANS/2012 : June 2012, last inspected and tested on 19 July 2013  Boiler : 05/D.0001 pressure 20.28 kg/cm2, inspected and tested on 13 May 2013  Boiler : 05/D.0002 pressure 3.5 kg/cm2, inspected and tested on 31 October 2012  Boiler : 05/D.0003 pressure 3.5 kg/cm2, inspected and tested on 13 May 2013  BPV : 560.475.1/42/TU/NKR pressure 3.5 kg/cm, inspection was on 13 May 2013  Steam turbine : S.I.37/KW5/KD2-5/2000 inspected and tested on 13 May 2013  Steam turbine : S.I.36/KW5/KD2-5/2000 inspected and tested on 13 May 2013  Diesel : 107/W.5/E3/MD/1997 inspected and tested on 28 February 2013  Diesel : 560/202/HISK/SNKT/2011 inspected and tested on 30 July 2013  Hoisting crane : 102/W.5/E3/PA/1997 inspected and tested on 28 February 2013 5 ton  Hoisting crane : 28/H.C/PENG.H.S/2004 5 ton; 28 February 2013  Loader : 560/49/PHIPK/PAA/SOSNAKERTRANS/2011 25 February 2013  Pressure vessel : 560/201/HISK/SNKT/2011 8 KG/CM2 26 February 2013  Pressure vessel : 560/200/HISK/SNKT/2011 8 KG/CM2 26 February 2013  Hydrant : no. 560/554/PHIPK/PK/SOSNAKERTRANS/2011 30 July 2013  Petir : 137/W.5/E3/IP/1996 28 February 2013  IL : 136/W.5/E3/IL/1996 28 February 2013  Scarab : equipment to turn compost over: 566/247/nakertrans/PP/2007 inspected on 23 February 2013

Operator license Organization has had workers required to have a license in order to perform their tasks. The evidence of its fulfillment is as follows:

Sucofindo ICS FRM 3.04 Issue 04 Rev. 6 39of 106

SUCOFINDO INTERNATIONAL CERTIFICATION SERVICES

1. Scarab operator in compost unit is valid until 10 February 2017 2. Wheel loader operator is valid until 2015 3. Crane operator is valid until 2015 and 2017 4. 2 boiler operators is valid until 13 December 2012

The application for the extension of SIO no. 38/JLTM-Disnakertrans/09/2013 was submitted on 20 September 2013 to Manpower Service of Jambi Province.

Estate Clinic In the estate there is a clinic for employee health service. This clinic provides certain medicine, including:

First aid First aid box is available at block B6 of Division 5 and kept by harvest foreman. First aid box is also available in the block B3 of Division for 5 spraying personnel, and kept by spray foreman. P2K3 (K3 Organization) Jelatang Mill has implemented SMK3 and has been certified by the Ministry of Manpower and obtained the certificate on 23 April 2012. P2K3 has obtained legalization from local Manpower Service with No.: 46/2013 from Head of Social, Manpower and Transmigration Service of Merangin Regency.

Bangko Estate P2K3 has been legalized with legalization no. 23/2103 from Head of Social, Manpower and Transmigration Service of Merangin Regency.

Risk Management The organization has made hazard identification and risk assessment with following evidence:

1. In Jelatang Mill, hazard identification records were updated on 07 January 2013 2. In Bangko Estate, risk management records were updated on 07 January 2013. At block B3 (Division 5) there are oil palm trees under the electricity network and the hazards have been identified Based on the results of field observations in block B6 (2º 6.05’ LS and 102º 2.17 BT) harvesting personnel cuts the frond in an upright position and frond is falling on position of less than half a meter from him because he is not sufficiently extending his pole. Because of this the socialization was conducted on how to harvest safely on 10 October 2013.

From the result of interviews with the spraying personnel in block B08 of division 5 it is revealed that the weight of cap is 15 kg and currently there has been no complaint from the spraying personnel as a result of lifting such load. Worker health examination The examination of occupational health of the workers in Bangko Estate also included audiometry tests on 30 October 2013. In Jelatang on 30 October 2013 there were 12 personnel who are experiencing declines in hearing ability and for this reason a work plan for further examination should be made. Medical examination in the Jelatang included lead content in blood and spirormetry on 30October 2013. Pregnancy check was also carried out in October and the organization has a program to do the

Sucofindo ICS FRM 3.04 Issue 04 Rev. 6 40of 106

SUCOFINDO INTERNATIONAL CERTIFICATION SERVICES

pregnancy checks for the spraying personnel once a month.

Workers’ social security (Jamsostek) 1. 127 workers in Jelatang Mill (consisting of 113 workers Jelatang Mill and 14 workers in composting unit) have been included in Jamsostek. Proof of payment no 2013 36/JSTK/FM.JLTM/IX dated 03 September 2013 to Jamsostek of Muara Bungo, Jambi, cab 2 2. In Bangko Estate there were 196 workers included in Jamsostek program based on proof of payment of 189 workers (seven people were out) on 02 September 2013, Jambi branch II of Muara Bungo through Bank Mandiri with additional three workers. Those who have not participated in Jamsostek program have been registered starting August 2013. Payment of premium in October for Jamsostek PKWT BHL are 147 people as listed in the evidence of PKWT BHL records by Manpower and Transmigration Service has been paid on 08 October 2013 amounting to Rp. 1.254.516 (0.84%) For BHL spraying personnel the JKK-JKM payments to the Jamsostek has not been made yet because they have their participation in Jamsostek registered just recently to the local Manpower Service on 25 September 2013, based on the letter from Manpower Service 560/419HISK/SNKT/2013 and have been submitted to the Jamsostek through the letter No. 138/BNGE-Jams/x-2013 on 27 September 2013. As long as not yet registered they become the responsibility of the company based on a circular letter No. 041/CE01-SE/02/2011 that compensation for the accident become the responsibility of the company. Incident reporting and investigation Reporting and investigation of work accidents both for Jelatang Mill and Bangko Estate are regulated in the procedure of SOP/SMK3/SMART/LH-10, and has been reported at regular intervals based on the following: 1. Jelatang Mill : there is monthly report containing annual recapitulation of SR and FR, 2. Bangko Estate : there is monthly report containing annual recapitulation of SR and FR , During prelimenary audit, it was found at the clinic that the anti snake venom is expired in August 2013 and it has not been discarded. When the final audit, the anti snake venom has been removed from the clinic's stock and send to a medical waste disposal facility of the Bangko Regional Hospital. As evidence of the corrective action such as Disposal report of expired bottles of anti-snake venom and document shipments of medical waste to the Regional Hospital Bangko

Compliance Status: Compliance 4.8 All staff, workers, smallholders and contractors are appropriately trained.

The company set a training program for 2013 in the form of Proposed Training Program of Jambi Region 2013 for the mill and estate personnel. In addition, the company also established a training program of environmental and K3 management system. The management of training refers to HRD Training SOP No. Doc: SOP/SPO/SMART/LH-10.

The realization of training 2013 has been recorded such as first aid training for foreman on 28 September 2013 in the office of Division 5, EMS training for staff on 22 August 2013, HCV Training on 14 June 2013 and PHT training on 23 September 2013 in Jelatang.

SOP for Control of Contractors has been available (SOP/SMK3/SMART/LH-26) but it just sets

Sucofindo ICS FRM 3.04 Issue 04 Rev. 6 41of 106

SUCOFINDO INTERNATIONAL CERTIFICATION SERVICES

the requirements for K3 aspect, not the requirements to determine employment aspect and determine the use of a trained contractor. The company has had a list of contractors both in theJelatang Mill and Bangko Estate.

During the preliminary audit, sampling had found that there was no evidence that the selection of trained contractors was implemented so that this was issued as a major finding.

Sampling in the Bangko Estate of SPK No. BNGP/PLASMA/06/13/005 for Plasma FFB Purchasing Cooperation in which it requires licenses such as driving license (SIM), vehicle ownership certificate (BPKP), motor vehicle license (STNK) and motor vehicle inspection certificate before being contracted by the company. This is stated in article 8 paragraph 2 of the SPK. The company has conducted SIM and STNK inspection but it is advisable to ensure that motor vehicle inspection is done as required by the SPK.

SOP for Control of Contractors has been available (SOP/SMK3/SMART/LH-26) but it just sets the requirements for K3 aspect, not the requirements to determine employment aspect and determine the use of a trained contractor. It should be ascertained that every SOP has set the requirements for employment aspect and trained contractors.

Compliance Status: Compliance 5 ENVIRONMENTAL RESPONSIBILITY AND CONSERVATION OF NATURAL RESOURCES AND BIODIVERSITY

5.1 Aspects of estate and mill management, including replanting, that have environmental impacts are identified, and plans to mitigate the negative impacts and promote the positive ones are made, implemented and monitored, to demonstrate

The company has had the environmental and K3 aspect identification, SOP/SPO/SMART/LH-11, with endorsement date of 1 July 2010.

The impact analysis is available in the UKL/UPL Document of Langling Mill, located in Bangko District and Perwakilan Pamenang District, Sarolangun Bangko Regency, Jambi Province, which was approved by the Regent of Sorolangun Bangko No. 731/BA.5/XI/1995 dated 23 November 1995. The environmental document states that the mill capacity is 60 ton/hour with the core estate of 620 hectares. But a change has occurred to the core land area, where this change has not been accompanied by changes in the UKL/UPL document.

Jelatang Mills have 2 Environmental documents i.e. UKL/UPL and AMDAL. There is a recommendation letter from the Ministry of Environment concerning the Langling and Jelatang Mills’ environmental documents that the company is allowed to use the existing UKL/UPL until further decision will be made by Ministry of Environment. The company has the chronologies document of correspondence between PT. KDA and the Ministry of Environment.

Measurement of environment and new working environment was just carried out in October 2013 by Balai Hiperkes K3 Medan. Delay in measuring environmental parameters was due to the testing laboratory’s time constraint. The RKL/RPL report was submitted to the Ministry of Environment on 2 September 2013, to the BLHD of Jambi Province on 28 August 2013, to KLH of Merangin Regency on 14 September 2013 and to Pekanbaru Ecoregions on 14 September 2013. However, it is advisable to improve the consistency in reporting time, i.e. every 6 months

Sucofindo ICS FRM 3.04 Issue 04 Rev. 6 42of 106

SUCOFINDO INTERNATIONAL CERTIFICATION SERVICES

in accordance with the applicable regulations.

In the next period, the quality standard measurements will be in frequency as specified in the RPL document; the delay was due to the problem in the Laboratory of Jambi Province BLH so that the delivery of the result was delayed, about 1 – 2 months after the samples were sent.

Decree No. 28/LH/2013 for Jelatang Mill, Jelatang Village, Pamenang District, Merangin Regency, Jambi Province is all with 180 day permit because the disposal capacity does not exceed 50 kg a day.

Jelatang Mill’s UKL UPL No. 419/BA.5/IX/1996 dated 19 September 1996 is 30 ton/hour capacity with the core area of 229 Ha and the plasma area of 5,580 Ha.

There is a permit of Decree of the Regent of Merangin No.: 17/LH/2012 regarding Extension of permit to utilize oil palm mill liquid waste that has been checked to the PT KDA Jelatang Estate area, dated 17 October 2012.

Furthermore, the company established the document of Jelatang Mill environmental aspect and impact list and evaluation in August 2013. The identification of impact aspect refers to the Environmental and Safety Aspect Identification SOP No.: No: SOP/SPO/SMART/LH-11. Records of environmental management reporting have been made every 6 months through RKL/RPL report. The RKL/RPL report of semester I – 2013 has included the following:

- Liquid waste quality monitoring: records of liquid waste test results of January – June 2013. The measurement results comply with the quality standard set out in the regulations. - Air quality monitoring: records of emission and ambient air test results of June 2013. The measurement results comply with the quality standard set out in the regulations.

The measurement of environment and new working environment is just carried out in October 2013 by Balai Hiperkes K3 Medan. Delay in measuring environmental parameters was due to the testing laboratory time constraint. The RKL/RPL report was submitted to the Ministry of Environment on 2 September 2013, to the BLHD of Jambi Province on 28 August 2013, to KLH of Merangin Regency on 14 September 2013 and to Pekanbaru Ecoregions on 14 September 2013. However, it is advisable to improve the consistency in reporting time, i.e. every 6 months in accordance with the applicable regulations.

In the next period, the quality standard measurements will in frequency as specified in the RPL document; the delay was due to the problem in the Laboratory of Jambi Province BLH so that the delivery of the result was delayed, about 1 – 2 months after the samples were sent.

The company has UKL / UPL document of Langling Mill and Jelatang Mill and has undergone extensive changes in croplands. The company is in the process of changing those document and didn't finish yet because of the authority problem between the local and the central government to provide the final solution.

Compliance Status: Compliance

5.2 The status of rare, threatened or endangered species and high conservation value habitats, if any, that exist in the estate or that could be affected by estate

Sucofindo ICS FRM 3.04 Issue 04 Rev. 6 43of 106

SUCOFINDO INTERNATIONAL CERTIFICATION SERVICES

or mill management, shall be identified and their conservation taken into account in management plans and operations

PT. Kresna Duta Agroindo has had SOP of Protection of flora and fauna in plantation environment which is contained in SOP of Identification and Management of HCV, No.: SOP/NP/SMART/IV/LH 001 effective on 1 July 2010 Revision No. 01. The company has had the document of Environmental Management Effort (UKL) and Environmental Monitoring Effort (UPL) of PT. Kresna Duta Agroindo Langling Palm Oil Estate and Mill that covers environmental condition associated with flora and fauna. Based on information on ANDAL document before planting, oil palm estate and oil palm mill it was a secondary forest of Meranti (Shorea sp.) and Keruing (Dipterocarpus sp.),the natural vegetation it contains is the vegetation type of tropical rain forest. Protected species include burung (Durio carinatus) and Jelutung (Dyera costulata). UKL UPL of Jelatang Mill No. 419/BA.5/IX/1996 dated 19 September 1996 with a capacity of 30 ton/hour with a core area of 229 Ha and plasma area of 5.580 Ha. UKL UPL of Langling Mill No. 731/BA.5/IX/1995 dated 23 November 1996 with a capacity of 60 ton/hour with a core area of 620 Ha and plasma area of 5.229 Ha. Information on UKL-UPL document before planting, flora identified is commercial crops such as meranti (Shorea sp) and keruing (Dipterocarpus sp); there is the identification of flora and fauna before planting. The UPL-UKL document contains information on flora and fauna when it was a secondary forest. Information on flora and fauna are described in detail in the document of Environmental Management Effort (UKL) and Environmental Monitoring Effort (UPL) of Langling Palm Oil Estate and Mill, Bangko District and Perwakilan Pamenang District, Sarolangun- Bangko Regency, Jambi Province in 1995. Data of flora diversity consists of :

Natural Vegetation Species No. Local/Regional Name Scientific/Latin Name 1. Areng-areng Cratoxylon celebicum 2. Buta-buta Exoecarid agallocha 3. Anggung Trema agallocha 4. Durian burung Durio carinatus* 5. Gurah Sapium indicum 6. Jelutung Dyera costulata* 7. Kapur Aryobanops aromatic 8. Kulim Scorodocarpus boornensis 9. Laban Vitex pubescens 10. Mahang/Benuas Macaranga priinosa 11. Medang Litsea sp 12. Merawan Hopea sangal 13. Nyatoh Paloguium sp 14. Nibung Oncosperma filamentosum 15. Meranti Shorea sp 16. Pulai Alstonia scholaris 17. Punak Tetramerista glabara Remarks : * = Protected

Shrub Vegetation Species in the Study Area No. Local/Regional Name Scientific/Latin Name 1. Alang-alang Imperata cylindrical 2. Brajewangi Sikania cordata Sucofindo ICS FRM 3.04 Issue 04 Rev. 6 44of 106

SUCOFINDO INTERNATIONAL CERTIFICATION SERVICES

3. Alamanda Alamanda cathartica 4. Kembang Penjit Yussica perruviana 5. Gelagah Hyptis brevipes 6. Tembelekan Saceharum spontaneum 7. Lantana Lantana camara 8. Jarong Stachyarpeta indica

Data of terrestrial fauna diversity in the location of project of PT. KDA before planting includes : Shrub Vegetation Species in the Study Area No. Local/Regional Name Scientific/Latin Name MAMMAL 1. Teledu Mydaus javanensis 2. Berang-berang Lutra sp 3. Linsang Prinodon linsang 4. Musang Paradoxurus hermaphrodites 5. Kelelawar Roussettus amplexicaudatus 6. Landak Hystrix branchura 7. Tikus Jantung Maxomys rajah REPTILIA 1. Ular Sendok Naja Hannah 2. Ular Sawah Phyton sp 3. Varanus salvator AVES 1. Alap-alap Falco peregrinus* 2. Puyuh Turnix suscitator 3. Punguk Otus bakkamoena* 4. Elang Bondo Haliastur indus* 5. Kucica Turdus obscunis 6. Belatuk kanih Dryocopus javeusis* 7. Perkutut Geopelia striata 8. Betet Sitlaacula 9. Sriwang Terpsiphe paradise 10. Cocup Anthrreptes* Remarks : * = Protected

List of fauna after planting is contained in the Report of Identification of Management and Monitoring Plan of High Conservation Value (HCV) at Bangko Estate (BNGE) i.e. Endangered/protected species that belong to the list in Government Regulation No. 7/1999 (Protected) and CITES include :

No. Local/Regional Name Scientific/Latin Name 1. Raja Udang Meninting Alcedo meninting 2. Burung Elang Ular Bido Spilornis cheela 3. Cekakak Belukar Halycon smyrnensis 4. Macan Akar Felis bengalensis 5. Monyet Ekor Panjang Macaca fascicularis 6. Lutung Kelabu Presbytis cristata 7. Lutung Simpai Presbytis malalophos 8. Biawak Varanus sp

Sucofindo ICS FRM 3.04 Issue 04 Rev. 6 45of 106

SUCOFINDO INTERNATIONAL CERTIFICATION SERVICES

The company has a specialized and trained officer in the company structure to oversee the plan and activities of HCV/NKT i.e. Sdr. Ramlan Situngkir (PIC HCV/NKT). The company has installed rare animal socialization boards in strategic places in the form of pictures of rare animals identified in the area of PT. Kresna Duta Agroindo. Records are available of socialization to the public in the form of socialization photo documentation in the afdeling office, warning sign boards of protected flora and fauna, warning sign boards of tree cutting prohibition in a conservation area which are found in the field in strategic areas. In addition, socialization in the form of meetings at Bangko Estate of PT. Kresna Duta Agroindo has been conducted where the participants has signed the attendee list. The company has the Report of Identification of Management and Monitoring Plan of High Conservation Value (HCV) at Bangko Estate carried out by the Environmental Department of PT. SMART, Tbk in 2011. Peer review is by Dr. Kunkun Jaka Gurmaya (Listed on the Assessor of the RSPO and Founder of the FISPO) an independent body approved to perform peer review on high conservation value (HCV). At Bangko Estate it covers Belengo River border area, Mampun River border area , reptile (biawak), mammal (macan akar, babi hutan), Aves, and so on. The protection of river border area is to clear an area from oil palm trees 50 meters from the edge of the River, and the river border is planted with vertiper grass (Block B11 and A7) totaled 80 clusters in July 2013 and 62 clusters in September 2013 and with fruit trees (Block B11, A9, A7 and A10) totaled 28 Trees (July 2013) and 70 Trees (September 2013) in order to prevent erosion. For the protection of fauna, the company provides communications boards of hunting prohibition in some areas where fauna identified to appear. In the BNGE there are HCV/NKT 1.1, 4.1 of Belengo River Border, Mampun River Border and freshwater Marshes. There are records of socialization on HCV meaning, HCV types, HCV management types and HCV monitoring types by PT. KDA carried out on: 25 September 2013 located at Division V BNGE with the speaker PIC HCV/NKT (Ramlan Situngkir) and Division 5 Field Assistant and attended by 30 employees of PT KDA and 17 Security personnel. After field checks it is found that socialization is only done to spraying workers and security personnel while other employees has not received the socialization about the NKT/HCV. The company should perform socialization to all of PT KDA employees and the surrounding community. At stage 2 the company has carried out socialization to all of PT KDA employees and the surrounding community. Records are available on the Minutes of Public Consultation held on Wednesday, 23-10-2013 and attended by Village Head, KUD, Police as well as 44 personnel from PT KDA who have signed the attendee list and the documentation photos are available. The socialization of NKT/HCV has also been implemented at Bangko Estate Division 5 dated 09-10-2013 which was attended by 33 people, dated 25-09-2013 which was attended by 30 people, dated 16-11-2013 at Bangko Estate Division IV which was attended by 44 people, dated 16-11-2013 at Jelatang Mill which was attended by 28 people and dated 13-11-2013 at Langling Mill which was attended by 35 people and have signed attendee list and the documentation photos are available. There are 20 boundary marks of NKT 1.1 and NKT 4.1 of river borders and swamps, made of concrete-filled PVC pipe of 4 inches in diameter and 1.5 m long with a height of 1 m above the ground and a depth of 50 cm. They are placed in easily visible areas. There is the report of maintenance of high conservation value boundary marks; the last time was 20/09/2013 20 markers with the activity of clearing the site from shrubs at each marker.

Sucofindo ICS FRM 3.04 Issue 04 Rev. 6 46of 106

SUCOFINDO INTERNATIONAL CERTIFICATION SERVICES

Spray boundary marks are the red letter X painted on Palm tree approximately 1 meter from the ground, this sign is made along the river border on each Palm tree having a distance of 50 meters or 5 Palm trees from the river bank. It is explained in a circular letter from RC Jambi 1 No. SE-RC/KDA/10/2013 dated 1 October 2013 concerning the protection of Watersheds.

During field visit the HCV/NKT Markers were checked, including: 1. Marker of NKT 1.1, 4.1 B11/24 coordinates 02°05’59” S and 102°22’24” E. 2. Marker of NKT 1.1, 4.1 B11/25 coordinates 02°05’56” S and 102°22’21” E. 3. Marker of NKT 1.1, 4.1 B11/31 coordinates 02°05’07” S and 102°21’19” E 4. Marker of NKT 1.1, 4.1 B11/33 coordinates 02°05’05” S and 102°21’19” E. After checking the estate internal documents it is known that the position of B11/31 marker got exchange with the B11/33, the marker should be immediately corrected in accordance with the internal document of HCV/NKT marker coordinates of PT KDA. At stage 2 the company has conducted the relocation and adjusted with the proper data, there is the Minutes and photo documentation of Changes to Coordinates Markers of HCV/NKT 1.1; 4.1 with marker number F1/33 and F1/34 on Tuesday, 15-10-2013 and signed by the HCV Officer and Estate Manager with following details: 1. Marker of NKT 1.1;4.1 F1/33 from the original 02°05’05” S and 102°21’19” E into 02°05’07” S and 102°21’21” E. 2. Marker of NKT 1.1;4.1 F1/33 from the original 02°05’07” S and 102°21’19” E into 02°05’09” S and 102°21’21” E. There is patrol report of High Conservation Value; the last one was on 21/09/2013 with a team of M. Anip and Suhardi. There is the Minutes of warning installation of River Border Area Management dated 02/05/2012 located at Division V PT. KDA BNGE block A7 and block F1 (1 warning each). There is the Minutes of warning installation of Protected River Border Marker dated 02/05/2012 located at Division V PT. KDA BNGE block A7, A9, A10, B11, C2, F1 and F2 (1 warning each). The company has had SOP of HCV/NKT Identification and Management, No.: SOP/NP/SMART/IV/LH 001 effective 1 June 2010 Revision No. 01. The following is details of Identification and Analysis of Residential Area with High Conservation Value (HCV/NKT) of Bangko Estate (BNGE) :

Division/Block/ Type of Area Field Identification Results HCV Location of (Ha) Finding

Bangko Estate

Belengo River Areas having or providing biodiversity supporting 2.05 Border 1.1 function to protected and/or conservation areas. Mampun River 49.62 Border

1.2 Endangered/protected species that come under the Bangko Estate - list in Government Regulation No. 7/1999 Area (Not Sucofindo ICS FRM 3.04 Issue 04 Rev. 6 47of 106

SUCOFINDO INTERNATIONAL CERTIFICATION SERVICES

(Protected), CITES and IUCN LC ver 3 (2010), socialized to including : workers and a. Raja Udang Meninting (Alcedo meninting) community to b. Burung Elang Ular Bido (Spilornis cheela) avoid hunting of c. Cekakak Belukar (Halycon smyrnensis) endangered d. Macan Akar (Felis bengalensis) species) e. Monyet Ekor Panjang (Macaca fascicularis) f. Lutung Kelabu (Presbytis cristata) g. Lutung simpai (Presbytis malalophos) h. Biawak (Varanus salvator)

- Belengo River 2.05 Area or ecosystem that is critical as a water supply Border and flood control to the community downstream. - Mampun River 4.1 49.62 Border - Freshwater 4.13 marshes

The company has had maps of estate showing the location of areas with high conservation value, including: Map of High Conservation Area of PT. Kresna Duta Agroindo Bangko Estate (BNGE) Division 4 and Map of High Conservation Area of PT. Kresna Duta Agroindo Bangko Estate (BNGE) Division 5. There is the Report of Management and Monitoring of High Conservation Area of PT. Kresna Duta Agroindo Unit Bangko Estate, August 2013, Biodiversity and Conservation Section by Environmental Department of Sustainability Division. Monitoring of HCV/NKT is carried out every 2 weeks. Document used is Patrol Report Book recapitulated into Form of HCV/NKT Monitoring, Document No. F/SMART/LH003/09 every 6 months. Furthermore, there are documents as follows:  Report of the Planting of Erosion Control Plant  Report of the Patrol of HCV/NKT Area  Report of the Maintenance of Marker  Report of Water Level  Socialization Invitation  Report of HCV/NKT Socialization Activity Recommendation for improvement has been mentioned in the HCV/NKT Monitoring Form as a result of monitoring routinely implemented every 2 weeks, but preferably to determines Person in Charge (PIC) and the time limit for the completion of recommendation. At stage 2 the company has added PIC and Time Limit of Activity columns.

Compliance Status: Compliance 5.3 Waste is reduced, recycled, re-used and disposed of in an environmentally and socially responsible manner The company has made the identification of sources of waste and pollution that are contained in the document of environmental aspect and impact identification list, September 2013. The source of waste is from mill site such as POME, Emission, domestic waste, used oil, and EFB, while from the estate is such as used chemical containers, emissions from vehicles, used lamps.

Sucofindo ICS FRM 3.04 Issue 04 Rev. 6 48of 106

SUCOFINDO INTERNATIONAL CERTIFICATION SERVICES

B3(hazardous& toxicwaste) management is regulated in the B3 Waste Management procedure (No. SOP/SPO/SMART/LH-18, 1 July 2013). The procedure has specified the handling of B3 waste, B3 waste spills/drops, emergency situation and reporting. The management of used pesticide containers have been regulated in Used Pesticide Container Washing WI (IK/BNGEL/LBH/01, revision 1 dated Jan 30, 2013).

The company has had B3 Waste Temporary Storage Permit i.e. Decree of the Regent of Merangin No. 15/LH/2010 regarding Extension of Hazardous and Toxic Waste Storage Permit to PT KDA Jelatang Mill unit dated 23 November 2010 which is valid for 3 years. Covered in the permit is used oil, used batteries, used fluorescence lamps, used oil filter, gloves and other B3 contaminated equipment. Reporting is done every 3 months to the KLH of Merangin Regency. The B3 Waste Transport and Collector company is CV Amindy Barokah with license from the State Minister of Environment No. 33/2011 regarding CV. Amindy Barokah B3 Waste Collection Permit dated 21 February 2011 which is valid for 5 years, the transportation permit to CV. Amindy Barokah with Vehicle plate no.: BK 8080 MO and License No.: 309/73/014/DJPD/2012/ 12018005. The recent B3 waste transportation was performed on 15 October 2013. The record of B3 waste transportation activities is the Manifest no.: 0002336 with BK 9552 MN, transport license of 120070432BB-0009. The organization has obtained B3 Waste Storage Permit from the BLH of Jambi Province with No.

B3 waste reporting i.e. B3 waste balance statement and B3 manifest has been carried out every 3 months.

Measurement and analysis of liquid waste, emission air and ambient air have been conducted periodically. Monthly observation of waste quality is conducted with an external laboratory i.e. PT Unilab Perdana with sampling points at pond V (the outlet to LA). Monthly observation of waste quality is conducted with an external laboratory of BLHD with sampling points at pond 4. Testing Parameters are BOD, COD, pH, oil-grease, Pb, Cu, Cd, Zn that refer to Decree of the Minister of Environment No. 28/2003. The result of test in January – October 2013 shows that BOD complies with the quality standards.

Measurements of the genset and boiler air emission show that the result is below the quality standard of Decree of the Minister of Environment No.KEP-13/MENLH/3/2005. The result of ambient air measurement complies with Government Regulation No. 41/1999.

Composting is practiced in Jelatang Mill. Empty fruit bunches are minced and mixed with a substance and dried for 60 days before being applied on the estates as fertilizer. It is a form of reduction in the use of chemical fertilizers, such as urea.

In Jelatang Mill there is an upstream monitoring well behind the housing, LA monitoring well and resident monitoring well near LA for groundwater measurement sampling.

There is a monthly compost delivery report that lists the tonnage of compost to the estates, covering Bangko Estate (BNGE) and the other estates i.e Pelakar Estate (PLKE), Batang Merangin Estate (BMRE), and Sungai Bengkal Estate (SBNE).

Jelatang Mill already has a hazardous waste storage permit (Merangin Regent Decree No. 14/LH/2010 District) with a retention period of 90 days. Based on the existing balance of hazardous waste hazardous waste stored more than 90 days . At the prelimenary audit the Sucofindo ICS FRM 3.04 Issue 04 Rev. 6 49of 106

SUCOFINDO INTERNATIONAL CERTIFICATION SERVICES

Company has applied for an extension of the storage and the response has not been approved by the local government.

The company has coordinated with district BLHD Merangin by sending a second letter and has gained a new license issued with a period of 180 days of storage permits consist of :

1. A letter from BLHD Bangko No.660/264/BLHD/2013 dated 7 October 2013 as a response to Application for Hazardous Waste Storage Extension time from 90 Days to 180 Days. 2. Hazardous Waste Storage Permit based on Decree of the Regent of Merangin Regency No. 28/LH/2013 on Hazardous waste temporary storage permit of PT. KDA, Jelatang Village, Pemenang District. 3. Hazardous Waste Storage Permit based on Decree of the Regent of Merangin Regency No. 29/LH/2013 on Hazardous waste temporary storage permit of PT. KDA, Langling Village, Bangko District.

Compliance Status: Compliance 5.4 Efficiency of energy use and use of renewable energy is maximized The use of renewable energy is such as the use of shell & fiber as fuel for oil palm processing. The use of fiber and shell has been recorded on a daily basis and its efficiency has been analyzed. The use of diesel fuel for estate and mill operations has been recorded and its efficiency against the use of shell & fiber has been calculated. Based on data during the audit, the use of diesel fuel had decreased.

GHG Emissions Mitigation SOP for PT KDA – BNGE/SOP/35.

Data has been available from 2011 up to October 2013 on the use of shell and fiber equivalent to the value of diesel fuel. The outcome depends on the mill condition such as the productivity of machinery and production equipment affecting the efficiency of non-fossil fuel use.

In 2011, 129,085 tons of FFB yielded 16,458 tons of fiber and 7,422 tons of shell, equivalent to 84,518 x 106 kcal energy or equivalent to 8,968 x 103 liters of diesel fuel.

In 2012, 137,585 tons of FFB yielded 17,542 tons of fiber and 7,911 tons of shell, which are 90,064 x106 x103 of energy equivalent or 9.558 x103 of diesel fuel equivalent. From 2013 up to October 2013, 108,833 tons of FFB have yielded 13,876 tons of fiber, 6,258 tons of shell, which are 71,259 x106 energy equivalent or 7561x103 liters of diesel fuel equivalent. Compliance Status: Compliance

5.5 Use of fire for waste disposal and for preparing land for replanting is avoided except in specific situations, as identified in the ASEAN guidelines or other regional best practice. The company does not burn waste and there is no replanting activity. The company has prohibited the use of fire for replanting. The company has also given a warning to employees and local people not to burn domestic garbage.

Land fire is specifically regulated in land fire handling SOP of SOP/NP/SMART/XI/LH002.

Fire point monitoring is performed biweekly. There have been maps of areas prone to fires and fire point inspection. There is a quarterly report to Manpower Office along with P2K3 report. It is

Sucofindo ICS FRM 3.04 Issue 04 Rev. 6 50of 106

SUCOFINDO INTERNATIONAL CERTIFICATION SERVICES

recommended to carry out inspection of barrier trenches not irrigated with water throughout the year. At the prelimenary audit, it was found that emergency simulation drill in the field had not been implemented. Emergency simulation had been implemented (including fire mitigation) but land fire mitigation had not been performed yet. During the final audit, the company has been conducted fire mitigation simulation. Supporting evidence such as attendance list, photos, scenario and evaluation of land fire mitigation simulation. Compliance Status: Compliance

5.6 Plans to reduce pollution andemissions, including greenhouse gases, are developed, implemented, and monitored.

The Organization has established Greenhouse Gas Emission calculation SOP (PT KDA- BNGE/SOP-02, dated 1 August 2013) containing the identification, calculation and reduction efforts of greenhouse gas the company can undertake.

There is Greenhouse Gas Emission Mitigation SOP, PT KDA-JLTM/SOP/22, with effective date: 02/01/2012 covering Jelatang Mill.

Identification of the sources of greenhouse emissions was carried out in September 2013. The report has identified potential sources for mills i.e. Changes in land use, Raw material processing into final product and Transportation of product, while for mills are the use of shells and fibers, the use of electricity, the use of diesel, the use of chemicals, transportation to bulking, and estate transportation for CPO. For the estate, sources identified are FFB transportation from Estates to Mills, fertilizer application, pesticide application, diesel fuel use for genset and POME/WWTP. Total GHG emissions for the Jelatang Mill operations are: 671.18 kgCO2e per ton of CPO for CPO (1 October 2013), while total emissions of mill and supply base are 1,286.00 kgCO2e per ton CPO for CPO.

Bangko Estate (BNGE)’s GHG emissions: 573.61 kgCO2e per ton of CPO.

Records of greenhouse gas emission reduction efforts are in the form of the report of shell and fiber use and the report of empty bunch use.

The organization has a commitment to reduce Greenhouse Gas emissions in the next year period, but it needs to set the measurable targets, e.g. in the form of a percentage (1% of the previous year, etc.).

The organization has maps of land clearing for plantation business (data is in the estate best practice)

Compliance Status: Compliance 6 RESPONSIBLE CONSIDERATION OF EMPLOYEES AND OF INDIVIDUALS AND COMMUNITIES AFFECTED BY GROWERS AND MILLS

6.1 Aspects of estate and mill management that have social impacts are identified in a participatory way, and plans to mitigate the negative impacts and promote the positive ones are made, implemented and monitored, to demonstrate continuous improvement

The company has performed Social Impact Assesment internally in 2012 covering Jelatang Mill, Sucofindo ICS FRM 3.04 Issue 04 Rev. 6 51of 106

SUCOFINDO INTERNATIONAL CERTIFICATION SERVICES

Langling Mill, Bangko Estate, Bangko Plasma, Bukit Bungkul KKPA and Pamenang Plasma. Environmental Impact Assesment has been performed more intensively through the ANDAL (Environmental Impact Analysis) report. The assesment carried out aims, among others, to 1. Identify and describe the social, economic and cultural characteristic of communities around the company; 2. Identify and analyze the positive and negative impacts of company existence on the community and 3. Recommend efforts to manage the negative impact of company existence. Based on the report, there are 18 villages from 5 districts identified. Based on the SIA report and meetings with stakeholders, information is obtained on the positive impacts of company existence. These positive impacts include: workforce absorption, community economic growth through the plasma program, construction of community access roads, CSR assistance (worship, health, and education facilities), and partnership for FFB transportation. Based on SIA reports, information is obtained of the negative impacts of the company existence that include less than expected CSR Assistance, company’s lack of socializing with surrounding communities, company’s lower purchase price for community’s FFB that leads to community selling to other Mills, complaint about dust generated by FFB and CPO trucks passing through the residential areas, smoke pollution from the Mill to the community settlements at Langling and Jelatang villages. The company has developed a program as of September 2013 to minimize and or eliminate such negative impacts by conducting regular coordination meetings and fostering with cooperatives, plasma managers and farmers. Complaints about dust are responded by means of circular letters to contractors, vendors (No. 167/RC-Jambi 1/10/2013 dated 1 October 2013) concerning the provision of maximum speed of the trucks i.e. max. 25 km/hour, installation of speed limit signs, provide watering trucks and regular road watering, monitoring activities and visits to the community. During a meeting with the stakeholders it was confirmed that dust had reduced significantly with the restriction of motor vehicle speed and the regular road watering. The company has procured watering trucks with a capacity of 5 tons that perform watering from Langling to Bangko Estate i.e. at residential areas. Information on motor vehicle speed limit has been disseminated gradually to reduce the potential road dust and started from 15 October 2013. Compliance Status: Compliance

6.2 There are open and transparent methods for communication and consultation between growers and/or mills, local communities and other affected or interested parties

The company has had SOP for Information and Request Response (SOP/SPO/SMART/LH-01). A list of information that can be accessed by relevant stakeholders has been available. Any request for information that is not listed in the list will require asking for Top management consideration and approval. A list of stakeholders has been available for each unit and consists of, among others, Customary leaders /community leaders, Muspida and village chief, Company trade unions, Contractors and suppliers. As a holding company, SMART has SOP of Communication and Consultation (SMART/XIV/MCAR003) where any request for information will be responded no longer than 5 weeks (1 month). The company has established a list of stakeholders and documents that can be accessed by stakeholders based on their relevance. The company has appointed SPO officer responsible for providing communication and Sucofindo ICS FRM 3.04 Issue 04 Rev. 6 52of 106

SUCOFINDO INTERNATIONAL CERTIFICATION SERVICES

consultation with stakeholders. For Jelatang Mill, the officer responsible for communication with stakeholders is Bp. Agung (Askep Mill) with the letter No. 03/PC/LNGM/VII/13. For Bangko Estate is Bp. Edi Sujono with the letter No. 01/RC/BNGE/VII/13. Compliance Status: Compliance

6.3 There is a mutually agreed and documented system for dealing with complaints and grievances, which is implemented and accepted by all parties

The company has SOP of Grievance and Complaint Handling (SOP/NP/SMART/XII/MCAR001). Any complaint coming from the company’s internals can be expressed through the suggestion box, representatives of trade unions or to the company and will be recorded in the Grievance and Complaint Book. So far, any reports from company’s internals have not been found. Complaints coming from external parties are recorded in the communication and consultation book. Based on records and meetings with stakeholders, information is obtained that there is no complaint that is not responded, and there is no compensation process in the last few years. The last compensation process performed by the company was in 1999. Compliance Status: Compliance

6.4 Any negotiations concerning compensation for loss of legal or customary rights are dealt with through a documented system that enables indigenous peoples, local communities and other stake holders to express their views through their own representative institutions

There is SOP of Land Conflict Settlement (SOP/SPO/SMRT/LH-04). The SOP states that deliberation is prioritized over legal action. Based on the company information there is no conflict with the community related to land ownership. The last compensation process carried out was in 1999. Sampling conducted at a meeting with local people in Pulau Tujuh Village provides information that there is no land conflict between the company and the local community. Compliance Status: Compliance

6.5 Pay and conditions for employees and for employees of contractors always meet at least legal or industry minimum standards and are sufficient to provide decent living wages Wages Decree of Governor No.626/Kep.Gub/DISOSNAKERTRANS/2012 concerning Jambi UMP 2013 of Rp. 1.300.000,00 (Rp 52.000) and BKS PPS no. 04/BL-PPS/2013 dated 01 January 2013 of Rp. 1.324.000 per month (Rp. 52.960 / day) and excluding rice supply for permanent daily worker and monthly daily.

Casual Workers (Bangko Estate) Wage of casual worker (BHL) PKWT(Perjanjian Kerja Waktu Tertentu)-Contracted Worker is regulated by Decree of SK CEO no. 017/ceo 1/HR PSM1/01/13 concerning casual worker wages in 2013, the wage is Rp. 52.960 / day.

The organization has made a list of names for the casual worker in Bangko Estate. There are approximately 164 BHL (as of 1 November 2013) who work in Bangko Estate for the job as spraying personnel, harvesting personnel, fruit picking. Worker data is updated every 3 months.

The organization has registered the PKWT (including BHL) to the Social, Manpower and Sucofindo ICS FRM 3.04 Issue 04 Rev. 6 53of 106

SUCOFINDO INTERNATIONAL CERTIFICATION SERVICES

Transmigration Service of Merangin Regency with a proof of registration no. 560/419 HISK/SNKT/2013 on September 25, 2013.

Work agreement 01/ BNGE/PKHL/IX/2013 dated 18 September 2013 with worker representatives rizal effendi who represents other workers and accompanied by the attachments list of 147 workers’ signatures. The number of working time is maximum 20 days a month, 7 hours a day.

There is an additional 17 people, it is planned to make the agreement for them on 26 November 2013.

Based on the results of interview with BHL spraying personnel in Block B08 Division 4 (20o6.27 S and 102o 21.043 E) it is known that they have a BHL PKWT working relationship and paid to Rp. 52.960 per day (conform to the UMR). The spraying personnel are working 6 days a week, starting work at 07: 00 to 14: 00, except Friday it is until 11: 30.

In Jelatang Mill samples were taken of PKWT No. 04/PKWT-JLTM/V/2013 in the name of Ali Akbar on 26 May 2013, the wage was Rp. 1.324.000 per month with 1/25 cuts if absent without notification (article 5) PKWT No. 23/PKWT-JLTM/IX/2013 in the name of Anderson Ginting on 11 September 2013 for sorting job.

For sorting job there are 12 workers, the working relationship is of PKWT and the application for their PKWT registration has been submitted to the Social, Manpower and Transmigration Service of Merangin Regency on 30 September 2013. It has been registered on the letter of Kadisnaker no. 560/528 HISK/SNKT/2013 dated 15 November 2013. The Jamsostek premiums (jkk, age, jkm) have been paid in October 2013 which are covered 2% of the total 6.89% by the company.

Outsourcing workers There is no outsourcing worker at Jelatang Mill and Bangko Estate

Permanent daily worker (Bangko Estate, and Jelatang Mill) The wages are regulated in the Decree of SK CEO no. 018/ceo 1/HR PSM1/01/13 concerning the permanent daily workers’ wage in 2013, the wage is Rp. 1.324.000,00/month.

Based on the results of interviews with one of the harvester at Block B6 (2º 6.05’ S and 102º 2.17 E) Sdr Hariyanto, paid Rp. 1.324 per month. The harvest base is 35 bunches and premium per bunch is Rp. 1.085 per bunch. The work days are 6 days, working hour starts at 07:00 – 14:00 except Friday until 11: 30, but according to his testimony in order to pursue a premium he sometimes can work on Friday until at 13:00.

Bapak Haryanto has been working as a harvester for 8 years, have 2 children aged 9 and 3 years. According to the interview the children have never helped him with the harvest in the estate. The oldest child is in the elementary school grade 3 and the youngest child is left at the day care in the estate because his wife also harvests the fruit.

Based on the results of interviews with other harvesters at block B-4 Division 4 it is known that this harvester works as a harvester with the working relationship of Daily SKU with wages of Rp. 1.324.000 a month. The harvest base is 35 bunches and the premium per bunch is Rp. 1.085 per bunch. He usually accomplishes this harvest base within 3 hours of work. Sucofindo ICS FRM 3.04 Issue 04 Rev. 6 54of 106

SUCOFINDO INTERNATIONAL CERTIFICATION SERVICES

The work day is 6 days, working hours start at 07:00 – 14:00 except on Sunday until 11: 30. The other wages are premium for pruning that is paid every 3 months at Rp 420 per tree.

Monthly workers (Bangko Estate) The wage is regulated in the decree of SK CEO no. 019/ceo 1/HR PSM1/01/13 concerning SKU monthly wages in 2013, the wage is Rp. 1.380.000,00/month (the lowest is G1 group) and the highest is Rp. 2.196.000.200 (for A8 group). Allowances (beyond wages, are given in kind) are housing facility, clean water, electricity subsidies, rice allocation, health facilities of estate clinic, school transportation. Sample of payment for rice allocation in November 2013. For men including the family consist of 15 kg/month for this worker, 9 kg/month for the wife, the child up to the third child is 7.5 kg/month (regulated in BKS PPS 2012.

Daily contract workers (Bangko Estate) During audit, it was found that there are contract workers who do not belong to PKWT. The contract agreement is not made with the service provider having legal entity status and this does not comply with Law No. 13/2003 article 65. The job is not including jobs that can be outsourced as set forth in the Regulation of the Minister of Manpower and Transmigration No. 19/2012 chapter III article 17 paragraph 3 and as described in the attachment of SE. 04/MEN/VIII/2013 chapter III letter B point 2

Article VI of BKS PPS 2012 concerning work contract paragraph 3 states that a worker on his preferences working less than 7 hours in a day or finishing less than a daily volume specified for him will receive a portion of daily wage, according to the ratio of work time to completed contract.

The company response is that work chartering allowed by PKB BKS-PPS which is followed by all the companies that are on Sumatra is a member of BKS-PPS and PKB BKS-PPS is an agreement and agreement between the company and SPSI then passed by Department of Labour. This means that all members of the company BKS-PPS follow PKB taht had been approved by the Government. In this case the company filed an objection with the auditor's findings and requested that this be a record of legality that must be resolved between the commission / certification with government executives and BKS-PPS. The evidence such as Chartering Worker provisions in accordance with BKS-PPS (ALL PLANTATION COMPANY in SUMATRA) is still valid until November 2014

This contract work agreement is regulated in work contract agreement No. 055/BNGE/SPPP/2013 between KDA and Astri Ayuningtyass and the name of the worker as contained in the attachment for the work of harvest and fruit collector or other jobs which payment is based on the quantity of work with a particular unit according to agreement. The contract value, for example, for fruit collector is based on VPA-1 No. 03/VPA/2013 which consists of group 0 (the prime harvest) of Rp. 370/kg, Group VI (less than 4 meters) of 280/kg and the group (I-V) of 260/kg.

In block B6 there is a woman with task of harvesting the fruit and being paid based on volume, i.e. Rp 260 per kg. In a day she collects about 20 buckets and the weight per bucket is about 6 kg. The salary is paid monthly. Working hours start at 07:00 – 14:00.

Overtime Overtime calculations are contained in the decision of the Director General of Industrial Relations and Jamsostek no. 191/PHIJSK-PKKAD/PKB/XII/2012 between BKS – PPS and Sucofindo ICS FRM 3.04 Issue 04 Rev. 6 55of 106

SUCOFINDO INTERNATIONAL CERTIFICATION SERVICES

PP.FSP, PP-SPSI). The first hour is 1.5 times, the next hour is 2 times an hour wage (article x).

A driver overtime in Jelatang Mill in the name of Sabli NIK 20043 26 September – 25 October period of 25 hours the overtime calculation has conformed to its respective multiplier.

Housing Facility Based on the results of interviews with other harvesters at block B-4 Division 5 it is known that this harvester has a wife with 2 children and he and his family are provided a house with 2 bedrooms, 1 bathroom and a well that is used together with the coupling home next door.

The organization provides facilities for the workers in the form of housing. Based on the result of interviews with the spraying personnel whose husband works as a janitor in an Office, it is known that they get a house with two rooms.

A visit to the housing facility was carried out at Division 5 to the house of Ibu Hartini. The house consists of 2 rooms. Clean water is available.

Day care facility Bangko Estate is provided with a day care for the children whose mother works in the estate. During the audit visit there were 22 children taken care of by 3 sitters. The age of child who was left in the day care based on the result of interviews with the caregiver ranged from 11 months to 7 years. Usually the mother took her child back at around 15:00.

Meals for children at the day care are not provided by the company but by their parents for breakfast or lunch including milk for children aged 11 months.

The day care is divided into 3 rooms. One room is provided for children bedding. Children of different ages are placed in one room together and not separated by age of the child. The day care has not provided toys for children to play with.

Contractors It was found that there is contractor control procedure (SOP/SMK3/SMART/LH-26) but it only requires HSE aspect and not included ensuring compliance with labor and the use of a trained contractor. There is a list of contractors of the Bangko Estate and randomly found there are contract that did not include the requirement of compliance with applicable regulations in employment.

The company has made the corrective action by published new of SOP : Controlled about Contractor. Evidance is Scan Copy Cover New Publised SOP. Controlled about Contractor No. SOP/SMART/UMUM/SADV/I/006

Compliance Status: Compliance 6.6 The employer respects the right of all personnel to form and join trade unions of their choice and to bargain collectively. Where the right to freedom of association and collective bargaining are restricted under law, the employer facilitates parallel means of independent and free association and bargaining for all such personnel

Bangko Estate :

Sucofindo ICS FRM 3.04 Issue 04 Rev. 6 56of 106

SUCOFINDO INTERNATIONAL CERTIFICATION SERVICES

Freedom of association has existed through the Circular Letter from the Head Office to the entire management of PSM unit dated 15 November 2010 No. 218/CEO1-SE/11/2010. There is already a Bylaw No. 005/KONGRES/V/KSPSI/VIII/2007 for the Confederation of All Indonesian Worker Unions (KSPSI). All PT KDA refer to the bylaw of KSPSI for companies that have formed trade unions.

The formation and appointment of the board of Bangko Estate Trade Union is determined through work unit deliberation carried out on 30 June 2010 and strengthened by Decree No. 55/PD F.SPPP-SPSI/JAMBI/IV/2011 that legalized the composition and personnel of the Union’s Board.

The company has had a trade union but during the preliminary audit the union’s bylaw was found not available. There was no record found of meetings with the unions (meeting minutes and data of expression of aspiration to the management).

So far, complaints are expressed verbally to the union’s board and any complaint to be conveyed formally will be done through a mechanism in the company’s existing SOP of grievance and complaint.

During the audit certification, there was a record of a meeting between the unions and the company on 1 August 2013 related to a request for information about the provision of THR (Tunjangan Hari Raya – Hari Raya Allowance)to the workers of a Daily Laborer (BHL) status. The company had given a response by stating that it would give THR in the form of basic necessities (rice, sugar, cooking oil and biscuits). There was no record of the union’s internal meetings.

There have been meetings between the company and the SPSI dated 11 November 2013 to discuss the issue of overtime, fingerprint and other. List of the union’s membership had been available and also with the evidence of cuts on the salary slips. Sampling conducted in the name of Bpk Suharyanto, there was Rp.2000 reduction in his salary slip for the union’s September 2013 contribution

Compliance Status: Compliance

6.7 Children are not employed or exploited. Work by children is acceptable on family farms, under adult supervision, and when not interfering with education programs. Children are not exposed to hazardous working conditions The company has had a policy regarding worker age requirements based on the Government Regulation No. 13/2003 and not to employ children under 18 years old as contained in the circular letter of 26 March 2013 from the SMD operation to all companies under the SMART group. (Agar ditanyakan ke PSM 1 siapa yang buat surat nya?)

Bapak Haryanto has been working as a harvester for 8 years, have 2 children aged 9 and 3 years. According to the interview the children have never helped him with the harvest in the estate. The oldest child is in the elementary school grade 3 and the youngest child is left at the day care in the estate because his wife also harvests the fruit. (RSPO 6.7). The company has had SOP of Manpower Recruitment (SDM A-004-00) but it has not specified worker minimum age requirements, only a maximum age requirement i.e. 45 years old. The company has made Circular Letter to all the Unit Heads No. 002/SE-HRDV/03/09 establishing requirements for manpower recruitment with the minimum age of 18 years old. It is advisable to include employment minimum age in the SOP that follows the requirements i.e. over 18 years Sucofindo ICS FRM 3.04 Issue 04 Rev. 6 57of 106

SUCOFINDO INTERNATIONAL CERTIFICATION SERVICES

old. During the preliminary audit, sampling carried out on the list of BHL workers in Bangko Estate, there was still a worker when recruited aged less than 18 years old. The data was in the name of Agus in the maintenance section and was born 08.08.1995 and employed on 04.01.2013 so that his age when employed was 17 years 7 months, thereby a minor finding was issued. During the certification audit, the company showed that there was an error in entering data on the database where the copy of the worker’s identity card showed that he was born in 1985, so the worker’s age was 27 years 7 months.

Compliance Status: Compliance

6.8 Any form of discrimination based on race, caste, national origin, religion, disability, gender, sexual orientation, union membership, political affiliation, or age, is prohibited

The company provides equal opportunities to everyone to be employed in the company. On the document: (1) HRD policy No. A-001-00, effective on 1/9/2005 issued by the Managing Director Strategic, item 2, it is stated that the organization in principle employs individuals who are competent according to the requirements for their position without discriminating based on ethnic, race, and religion". (2) Employment Policy: Conditions of Recruitment and Selection Outside Jakarta (no. SDM A-006-00, dated 1/9/2005), regulates that the employment recruitment does not specify certain ethnic, gender, or religious requirements. The point is to meet the requirements for the position and aged at least 18 years old. Compliance Status: Compliance

6.9 A policy to prevent sexual harassment and other forms of violence against women and to protect the reproductive rights is developed and applied The company has had policies related to sexual harassment by creating a Committee on Gender. Socialization has been conducted in several places but based on sampling in the preliminary audit the workers have not received the socialization. This was found in the district 4 block b1-c1 on harvesters and fruitlet collectors and division 5 Block 6 – the fruitlet collectors. This has been corrected by carrying out re-socialization to the workers in all divisions in September and October 2013. During the certification audit, there are still harvesters and fruitlet collectors in the District 4 block B4 found not understand correctly the meaning of sexual harassment. Based on the results of interviews with spraying personnel in Block B3 Division 5 (2º 6.27 S and 102º21.043 E) they appear to have known about sexual harassment, sexual harassment definition and know how to report if sexual harassment occurs. They know Ny Mary as Chairman of Commission on Gender.

The company has had policies related to sexual harassment by creating a Committee on Gender. Socialization has been conducted in several places but based on sampling it is found in the division 4 block B1-C1 on harvesters and fruit collectors and division 5 Block 6 – the fruit collectors, the workers have not received the socialization but the socialization has been carried out on 4 October 2013.

The company has followed up by conducted re-Socialization Sexual Harassment to all workers. The evidence such as documentation socialization Sexual Harassment

Sucofindo ICS FRM 3.04 Issue 04 Rev. 6 58of 106

SUCOFINDO INTERNATIONAL CERTIFICATION SERVICES

Compliance Status : Compliance Growers and mills deal fairly and transparently with smallholders and other 6.10 local businesses. The company currently makes cooperation with cooperatives and or farmer groups. There are 5 cooperatives and 16 farmer groups who cooperate with the company. During the preliminary audit, an SPK was found not conform to the implementation in the field. The SPK states that the cooperation pattern is ‘full management ' while in reality it is just cooperation for FFB purchases. Likewise any guidance/criteria on fruit maturity by means of indicator/medium understood by all parties are not yet available.

The company has revised the SPK with 5 KUD and 16 Farmer Group that ensures a cooperation pattern of FFB purchases. The method of penalty has been set and in compliance with the Government provisions. The criteria of fruit maturity has been made in the form of pictures and socialized to the KUD and local farmer groups.

Sampling of SPK with KUD i.e. NO BNGP/PLASMA/06/13/001 between H. Edy Sujono and H. Damanik and the SPK is valid from 01 June 2013 to 31 May 2013.

During a meeting with the cooperative and the plasma members, it was confirmed that the method of payment had been agreed i.e. a cash and carry in accordance with the SPK. Transparency in the price of FFB and the method of FFB sorting and the penalty understood and agreed upon by both parties had been applicable.

Compliance Status: Compliance 6.11 Growers and millers contribute to local sustainable development wherever appropriate

The company has had an annual CSR program and a five-year program categorized as a 5 year strategic plan. There are 3 sources in the planning of CSR program i.e. 1. Programs from the head office, 2. based on the SIA identification and 3. Community proposal. The CSR program developed for a year has included Jelatang Mill and Bangko Estate. During the preliminary audit it was found that CSR program 2013 consisted of 6 programs but some of the programs were not realized, among others, the installation of conblok in the SD 299, the construction of SD AL-Husnah in Mampun Village. The method of evaluation for the planned program is not found. During the certification audit, the company had developed the evaluation methods for the realized program. There were still programs not yet realized due to the budget proposals and the replacement of CSR programs related to adjustment in budget. This leads to uncertainty about the previously developed CSR plan. The company should ensure the planned CSR programs, starting from identification, planning, and budgeting and ensure the realization of the plan and its periodic evaluation. The company has the 5 year CSR Annual Strategic Plan for PT KDA and has been revealed to be an annual program. For the implementation of CSR programs in proses.because there are several CSR activities not all be realized in the year 2013, so that should carry over to 2014 or there are other activities that are converted to more mainstream. The company has made the improvement by making CSR Semester Evaluation Program yearly. Compliance Status: Compliance

Sucofindo ICS FRM 3.04 Issue 04 Rev. 6 59of 106

SUCOFINDO INTERNATIONAL CERTIFICATION SERVICES

7 RESPONSIBLE DEVELOPMENT OF NEW PLANTINGS

7.1 A comprehensive and participatory independent social and environmental impact assessment is undertaken prior to establing new plantings or operations, or expanding existing ones, and the results incorporated into planning, management, and operations Not Applicable 8 COMMITMENT TO CONTINUOUS IMPROVEMENT IN KEY AREAS OF ACTIVITY

8.1 Growers and millers regularly monitor and review their activities and develop and implement action plans that allow demonstrable continuous improvement in key operations The company has conducted Internal Audit (Mill Audit & Advisory) and Agronomy Audit & Advisory per semester. The internal audit has discussed issues related to best practices as well as determination of the standard specified by the company.

The company has established innovation program to ensure there is a program that shows any improvement. For example the reduction in the use of CACO3 in the mill, efficiency in the use of diesel fuel to shell and water use efficiency,

In an effort to perform monitoring and review the operational activities of mill and estate and an effort to do the improvement, the company has internal audit activities carried out per semester.

Internal Audit refers to the RSPO Internal Audits Procedure No: SOP/SPO/SMART/LH-16, revision 01, issued on 1 July 2010. The Internal Audit Team: Agus Gunawan (Lead Auditor), Adhi Wiratmoko, Firmansyah, Hanita, Vira Permata Sari. The appointment of the team was by Regional Controller on 15 June 2013 through the letter No.: 066/RC-JAMBI1/06/2013. The Lead auditor attended auditor training on 19 – 20 November 2012. Audit was carried out on 24 – 28 June 2013. Records of audit implementation such as audit schedule and checklist are available. Internal audit results are 8 nonconformities for Bangko Estate; and all nonconformities have been followed up.

Agronomic Audit & Advisory for Estate Bangko was on 25 January 2013 (Period 1 2013), increasing the control, officers should control the field application of POME and to seal the leaked bed; the compost application should be accurate in dossage.

The company has a commitment through a memorandum No.: SW-0228/VPA-1/1/2009 from the VPA-PSM1 on 5 January 2013 to reduce paraquat and other restricted herbicides and must decrease each year.

Compliance Status: Compliance

Sucofindo ICS FRM 3.04 Issue 04 Rev. 6 60of 106

SUCOFINDO INTERNATIONAL CERTIFICATION SERVICES

Sucofindo ICS FRM 3.04 Issue 04 Rev. 6 61of 106

SUCOFINDO INTERNATIONAL CERTIFICATION SERVICES

List of Abbreviation

BNGE Bangko Estate CPO Crude Palm Oil CSR Corporate Social Responsibility DOE Department of Environment EFB Empty Fruit Bunch EIA Environment Impact Assessment FFB Fresh Fruit Bunch FSMS Food Safety Management System GMP Good Manufacturing Practice GPS Global Positioning System HACCP Hazard Analysis and Critical Control Point HCV High Conservation Value HCVF High Conservation ValueForest HGU Hak Guna Usaha IEMA Institute of Environmental Management and Assessment IPM Integrated Pest Management IRCA International Register of Certified Auditor ISCC International Supply Chain Certification JLTM Jelatang Mill KDA Kresna Duta Agroindo LNGM Langling Mill MOU Memorandum of Understanding MSDS Material Safety Data Sheet NA Not Applicable NC Non Conformity NCR Non Conformity Register OSH Occupational Safety and Health OSHAS Occupational Safety and Health Assessment Scheme P&C Principle and Criteria

Sucofindo ICS FRM 3.04 Issue 04 Rev. 6 63of 106

SUCOFINDO INTERNATIONAL CERTIFICATION SERVICES

PK Palm Kernel PKO Palm Kernel Oil

POM Palm Oil Mill POME Palm Oil Mill Effluent PPE Personal Protective Equipment

RSPO Roundtable on Sustainable Palm Oil RSPO NI Roundtable on Sustainable Palm Oil National Interpretation SA8000 Social Accountability 8000

SIA Social Impact Assessment SIO Surat Izin Operator SOP Standard Operating Procedure

UKL Upaya Pengelolaan Lingkungan UPL Upaya Pemantauan Lingkungan WWTP Waste Water Treatment Plant

WHO World Health Organization

Sucofindo ICS FRM 3.04 Issue 04 Rev. 6 64of 106

SUCOFINDO INTERNATIONAL CERTIFICATION SERVICES

APPENDIX -1 MAP

Sucofindo ICS FRM 3.04 Issue 04 Rev. 6 65of 106

SUCOFINDO INTERNATIONAL CERTIFICATION SERVICES

Sucofindo ICS FRM 3.04 Issue 04 Rev. 6 66of 106

SUCOFINDO INTERNATIONAL CERTIFICATION SERVICES

Sucofindo ICS FRM 3.04 Issue 04 Rev. 6 67of 106

SUCOFINDO INTERNATIONAL CERTIFICATION SERVICES

Sucofindo ICS FRM 3.04 Issue 04 Rev. 6 68of 106

SUCOFINDO INTERNATIONAL CERTIFICATION SERVICES

Sucofindo ICS FRM 3.04 Issue 04 Rev. 6 69of 106

SUCOFINDO INTERNATIONAL CERTIFICATION SERVICES

Sucofindo ICS FRM 3.04 Issue 04 Rev. 6 70of 106

SUCOFINDO INTERNATIONAL CERTIFICATION SERVICES

APPENDIX- 2

NCR

Sucofindo ICS FRM 3.04 Issue 04 Rev. 6 71of 106

SUCOFINDO INTERNATIONAL CERTIFICATION SERVICES

SUCOFINDO INTERNATIONAL CERTIFICATION SERVICES

* Please send your response(s) to this Non Conformitie(s) + obs also in softcopy Non Conformity / Observation Report Organization Audit 04-10-2013 (TSS, GGU, GIA, NS, ) No. No. Standard. Audit Date : RSPO 00005 1 (1) RSPO (Preliminary) ATL / Auditor :

……………………………………….(signature)

Organization Rep. :

……………………………………….(signature) Audit Root Cause Corrective Action & Audit Team No. Category Clause Std or Description Investigation* Evidence* Review (1) (2) (3) (4) (5) (6) (7) (8) (9) 1 Observasi 1.1 1 TSS The company should There were letters in Corrective Action: Closed ensure that all letters the request and All letters have been concerning requests response book not yet ensured to have been and their corresponding responded. responded and within the responses are time set in the SOP. registered in a register book and ensure that Evidence : the response is All letters in the request provided within the time and response book have as set in the relevant been responded. SOP. All incoming and outgoing letters should be retained and the retention time be defined according to

Sucofindo ICS FRM 3.04 Issue 04 Rev. 6 72of 106

SUCOFINDO INTERNATIONAL CERTIFICATION SERVICES

requirement.

2 Observasi 2.1 1 TSS The company should There was security Corrective Action: Closed ensure the compliance personnel with There has been a permit for with the Ministry of overtime longer than 3 deviation from the Working Manpower regulations hours/day. Hours of Merangin related to working hours Regency. (40 hours/week) and overtime (max. 14 Evidence: hours/week). Document of permit to deviate from Working Hours. Recapitulation of workers’ overtime data.

Sucofindo ICS FRM 3.04 Issue 04 Rev. 6 73of 106

SUCOFINDO INTERNATIONAL CERTIFICATION SERVICES

3 Observasi 2.2 1 GGU The BPN/KDA XXV There was a BPN Corrective Action: Closed marker at coordinates marker that was not at Minutes of changes in a 206027.05 E and the coordinate point as marker position from its 9769049.28 N UTM had it should be. proper place. moved. The company should make the Evidence: minutes of changes in Minutes of Changes in the BPN/KDA XXV Marker Position. marker position to prevent possible conflicts.

4 Observasi 2.2 1 GGU The BPN/KDA 08 There was a BPN Corrective Action: Closed marker with the marker not at the The relocation of Marker coordinate of correct coordinates. has been done. 205177.012 E and The minutes of marker 9766939.095 N had not position that is not in the correctly positioned, correct position have been because there was also made. the BPN old peg. The BPN/KDA 08 marker Evidence: should be placed at the Minutes of Marker position determined by Relocation. BPN.

Sucofindo ICS FRM 3.04 Issue 04 Rev. 6 74of 106

SUCOFINDO INTERNATIONAL CERTIFICATION SERVICES

5 Observasi 2.2 1 GGU The company had the Form of marker Corrective Action: Closed record of Bangko Estate maintenance has been The form of marker (BNGE) Boundary available but the form maintenance has been Marker Maintenance needs to include the added with an item 2013 with the criteria: a. marker’s coordinates. concerning the marker’s Run the checklist, b. coordinates. Marker Repair c. Painting, d. Marker Site Evidence: clearing. The company The new form of Marker should add Marker Maintenance has been Coordinate Monitoring added with Marker to the criteria to prevent Coordinate Monitoring changes in the marker’s criteria to prevent changes position. in marker position.

6 Major 2.2 1 TSS The company did not The Bangko Estate Corrective Action: Open have HGU for Division 4 Division 4 with a total Documentation that the estate in the Bangko land area of 218 Ha processing of HGU has Estate with a total area has a HGB. However, been in the Committee B of 218 HA. Until then the HGU is under the company had process by Committee Evidence : submitted the B. The HGU processing application for HGU of documents are available. 109.73 Ha and 87.35 Ha. The latest data available was cadastral measurement maps.

Sucofindo ICS FRM 3.04 Issue 04 Rev. 6 75of 106

SUCOFINDO INTERNATIONAL CERTIFICATION SERVICES

7 Minor 4.6 1 GIA The company had not Annual general check- Corrective Action: Closed implemented special up has been Special health examination health examination on conducted but special was carried out in 2013, In the spraying personnel health examination 2014 regular check-up will for 2013 and not yet was not conducted in be programmed twice a conducted according to 2012. year. Regulation of the Minister of Manpower Evidence : No.3/1996 that requires Results of Audiometry, the examination to be Spirometry, Cholinesterase conducted once every 6 in October 2013. months.

8 Observasi 4.6 1 GIA Health examination of Pregnancy tests for Corrective Action: Closed female spraying female spraying 1. Pregnancy examination workers in order to workers had not been has been conducted using ensure they are not implemented. Test Pack pregnant should be 2. Develop pregnancy carried out monthly. examination program for female spraying workers.

Evidence: 1. Pregnancy test results 2. Pregnancy Test Certificate for Workers involved in Herbicide use.

Sucofindo ICS FRM 3.04 Issue 04 Rev. 6 76of 106

SUCOFINDO INTERNATIONAL CERTIFICATION SERVICES

9 Observasi 4.6 1 GIA/ At the time of site visit Ditches are not a Ditches are not a water Closed GGU and interviews with water body. body. spraying personnel it was found that Agrochemical spraying was applied on the oil palm trees located adjacent to the ditch. This indicates water body’s pollution. The company should ensure that ditches within the estate area are not directly drained to the River regardless small dosage in use.

10 Observasi 4.7 1 NS There was one vial of The opened vial was Corrective Action: Closed anti snake venom used not disposed into Expired vials of anti snake and expired in August medical waste bin. venom have been removed 2013 not yet disposed. from the clinic’s stock and disposed into the clinic’s medical waste bin and submitted to the medical waste disposal facility of Bangko Regional Hospital

Evidence : 1.Minutes of expired anti snake venom vial disposal,

2.Document of medical

Sucofindo ICS FRM 3.04 Issue 04 Rev. 6 77of 106

SUCOFINDO INTERNATIONAL CERTIFICATION SERVICES

waste delivery to the Bangko Regional Hospital

11 Observasi 4.7 1 NS The revision of When harvesting the Corrective Action: Closed harvesting SOP or harvesters were not Socialization/training has creating longer extending the stickpole been conducted in good stickpoles needs to be to its full length. harvesting practices, and considered, because working equipment has from field observations been ensured to function at B6 Block (2o 6.05’ S properly. and 102o 2.17 E) the harvesters were cutting Evidence: the frond at upright Photos and attendee list of position and the frond good harvesting practice was drop less than half socialization. a meter from the harvesters.

Sucofindo ICS FRM 3.04 Issue 04 Rev. 6 78of 106

SUCOFINDO INTERNATIONAL CERTIFICATION SERVICES

12 Minor 4.7 1 NS The personnel who do When mixing Corrective Action: Closed the mixing in the Herbicide the The masks used during Division 5’s chemical personnel were mixing of chemical have warehouse had not wearing cloth masks. been replaced with been equipped with inorganic chemical chemical cartridge cartridge masks. masks. Evidence: Cartridge acceptance photos and minutes.

13 Minor 4.7 1 NS The organization was General check-up is Corrective Action: Closed not consistently performed annually but For 2013 special health implementing regular special health examination has been and special health examination was not conducted. For 2014 a examination every year, performed in 2012. regular examination will be such as audiometry and programmed twice a year. spirometry were conducted on 22 Evidence: February 2013, but in The results of Audiometry, 2012 they had not been Spirometry, Cholinesterase carried out, and in 2013 examination in October was still in process. 2013.

14 Observasi 4.7 1 NS Fire mitigation It had been listed in Corrective Action: Closed personnel at Jelatang the training program The fire warden training Mill did not comply with but the vendor to complies with Decree of the the annex III of Decree provide the training Minister of Manpower of the Minister of had not been obtained. No.186/1999 and has been Manpower no. included in the training 186/MEN/1999. program.

Evidence:

Sucofindo ICS FRM 3.04 Issue 04 Rev. 6 79of 106

SUCOFINDO INTERNATIONAL CERTIFICATION SERVICES

Training program at JLTM

15 Major 4.8.3 1 TSS The company had a FFB Grading methods Corrective Action: Closed SOP for selecting had not been The socialization has been trained contractors. socialized. conducted. However, from sampling there was no evidence Evidence: found that trained Attendance list, photos, contractor selection had training. been done.

Sucofindo ICS FRM 3.04 Issue 04 Rev. 6 80of 106

SUCOFINDO INTERNATIONAL CERTIFICATION SERVICES

16 Minor 5.1 1 GIA Jelatang Mill had in Langling and Jelatang Corrective Action: Open place the UKL/UPL with Mills have 2 Develop a chronology of approval Environmental correspondence between No.419/BA.5/IX/1996 documents i.e. PT. KDA and the Ministry of year 1996. However, UKL/UPL and AMDAL Environment. the core land area had and there is a letter changed and the from the Ministry of Evidence: UKL/UPL document Environment 1. Document on the was not revised yet. concerning the chronology of Langling and Jelatang correspondence between Mills’ environmental PT. KDA and the Ministry of documents that the Environment. company is to use the existing UKL/UPL until 2. Hard Copy of the further decision from Document of the Ministry. correspondence between PT. KDA and the Ministry of Environment in 2011-2013.

Sucofindo ICS FRM 3.04 Issue 04 Rev. 6 81of 106

SUCOFINDO INTERNATIONAL CERTIFICATION SERVICES

17 Observasi 5.2 1 GGU NKT/HCV socialization Socialization was not Corrective Action: Closed was delivered to made to all PT. KDA’s 1. Intensify socialization to spraying workers and workers and the all workers that represent security personnel only surrounding the estate, mill and support and such socialization community. workers. was not received by other workers. The 2. Conduct socialization or company should public consultation by conduct socialization to inviting village leaders and all PT. KDA’s workers District Leader Forum and the surrounding (Muspika) community. Evidence: HCV socialization photos, attendance list, materials.

18 Observasi 5.2 1 GGU The company had the Exchanges in the Corrective Action: Closed record of NKT/HCV position of HCV To check that the position markers. However, the markers have of HCV markers are position of B11/31 occurred. matching with their marker was in the corresponding coordinates. position of B11/33 marker and vice versa. Evidence: This should be promptly Photos and Minutes. corrected according to the internal document of NKT/HCV BNGE marker’s coordinates.

Sucofindo ICS FRM 3.04 Issue 04 Rev. 6 82of 106

SUCOFINDO INTERNATIONAL CERTIFICATION SERVICES

19 Observasi 5.2 1 GGU The HCV/NKT The monitoring form Corrective Action: Closed Monitoring Form has does not have PIC and Add the HCV monitoring incorporated deadline columns. report of 2012 and 2013 improvement period with PIC and recommendation as well deadline for completion . as recommendation as a result of routine Evidence : monitoring every 2 The revised monitoring weeks. However, the form which includes PIC Person in Charge (PIC) and Deadline columns. and the deadline for completion of the recommendation should be determined.

20 Minor 5.3 1 GIA Jelatang Mill already As the stored Corrective Action: Closed had a hazardous waste hazardous waste 1. It has been coordinated storage permit (Decree quantity was small, with the Merangin Regency of the Regent of storage extension was BLHD by sending the Merangin Regency No. applied to the BLHD of second letter. The transport 14/LH/2010) with 90 Merangin Regency. of the Semester 2 had been days storage period. However, until that done. Based on hazardous time no response had waste balance there been received to the 2. New permit has been was hazardous waste application from the issued with 180 days stored more than 90 BLHD of Merangin storage period. days. The application Regency. Evidence: for storage extension 1. A letter from BLHD had not yet been Bangko responded and No.660/264/BLHD/2013 approved by the local dated 7 October 2013 as a Government. response to Application for

Sucofindo ICS FRM 3.04 Issue 04 Rev. 6 83of 106

SUCOFINDO INTERNATIONAL CERTIFICATION SERVICES

Hazardous Waste Storage Extension time from 90 Days to 180 Days.

2. Hazardous Waste Storage Permit based on Decree of the Regent of Merangin Regency No. 28/LH/2013 on Hazardous waste temporary storage permit of PT. KDA, Jelatang Village, Pemenang District.

3. 2. Hazardous Waste Storage Permit based on Decree of the Regent of Merangin Regency No. 29/LH/2013 on Hazardous waste temporary storage permit of PT. KDA, Langling Village, Bangko District.

21 Minor 5.5 1 NS Emergency simulation Emergency simulation Corrective Action: Closed drill in the field had not had been implemented Land fire mitigation been implemented. (including fire simulation has been mitigation) but land fire implemented. mitigation had not been performed. Evidence: Attendance list, photos, scenario and evaluation of

Sucofindo ICS FRM 3.04 Issue 04 Rev. 6 84of 106

SUCOFINDO INTERNATIONAL CERTIFICATION SERVICES

land fire mitigation simulation.

22 Observasi 6.2 1 TSS The company has Not all of the Corrective Action: Closed developed the list of information in the list The list of information for stakeholders and of information for stakeholders has been documents accessible stakeholders can be revised as to the to relevant accessed by information accessible to stakeholders. The list stakeholders. stakeholders. However, should be ensured to information on financial include the list of transaction cannot be information that can be included in this list of

accessed by the information for surrounding community stakeholders. according to its relevance.

23 Minor 6.5 1 TSS The company had SPKs Plasma FFB Corrective Action: Closed with contractors. transportation SPK did An article has been However, from sampling not require contractors incorporated into the SPK it was found there were to comply with that requires contractors to some SPKs without applicable manpower comply with applicable contractor requirements regulations. manpower regulations. to comply with applicable manpower Evidence: regulations. Plasma SPK has contained an article that requires contractors to comply with applicable manpower regulations. Documentation of Plasma

Sucofindo ICS FRM 3.04 Issue 04 Rev. 6 85of 106

SUCOFINDO INTERNATIONAL CERTIFICATION SERVICES

SPK socialization.

24 Minor 6.6 1 TSS The company had a (Bylaw and minutes of The trade union’s bylaw Closed trade union. However, meeting were not has been documented in the trade union’s bylaw available) the company was not found. Records documentation and the of meetings with the minutes of meeting with the trade union were not union have been found (minutes of documented as well. meeting and data of conveying aspirations to the management).

Sucofindo ICS FRM 3.04 Issue 04 Rev. 6 86of 106

SUCOFINDO INTERNATIONAL CERTIFICATION SERVICES

25 Minor 6.9 1 TSS The company had a Socialization on sexual Corrective Action: Closed policy related to sexual harassment had not Socialization on sexual harassment by creating been carried out. harassment has been a Gender Committee. carried out. Socialization had taken place in several Evidence. locations. However, Sexual harassment from sampling it was socialization attendance found that the workers list, photos, activities, and in the District 4 Block materials. b1-c1 – harvester and fruit collector and the District 5 Block 6 – fruit collector had not received such socialization.

26 Minor 6.9 1 TSS The company had a Data entry personnel Corrective Action: Closed policy on worker’s age had made some It has been checked that it requirements in mistakes when was an administrative error accordance with inputting data in the because after rechecking it Government Regulation name of Agus. was found the worker had no. 13/2003 not to been above 18 years old employ children under when employed. 18 years old as It has been ensured that contained in the Circular administrative data entry dated 26 March 2013 has been correct. from the SMD operation to all companies under Evidence: SMART group. From After the Payroll personnel sampling of BHL has completed worker’s workers it was found data entry the KTU will

Sucofindo ICS FRM 3.04 Issue 04 Rev. 6 87of 106

SUCOFINDO INTERNATIONAL CERTIFICATION SERVICES

that there were workers verify the data. under 18 years old when recruited. Data was in the name of Agus in the maintenance section with date of birth 08.08.1995 and employed on 04.01.2013 so that his age when employed was 17 years 7 months old.

27 Minor 6.10 1 TSS The company had There was no SPK Corrective Action: Closed cooperated with 5 KUDs that ensures agreed SPK has been established and 16 Farmer groups. cooperation scheme with KUD/Farmer Groups However, the company on FFB delivery to the concerning the cooperation did not have SPK that Mill. scheme on FFB delivery to ensures agreed the Mill. cooperation scheme on FFB delivery to the Mill. Evidence: The Sop methods of SPK between Mill and KUD sorting and penalty and on FFB delivery its implementation did cooperation scheme. not ensure compliance with the government provisions.

Sucofindo ICS FRM 3.04 Issue 04 Rev. 6 88of 106

SUCOFINDO INTERNATIONAL CERTIFICATION SERVICES

28 Observasi 6.10 1 TSS The company should There was fruit Corrective Action: Closed develop acceptance criteria but The criteria of ripe fruits indicator/criteria on the not documented in the has been produced and ripeness of oil palm fruit form of fruit ripeness displayed at strategic using a system criteria. locations to enable FFB understandable to all driver/supplier to parties. For instance by understand better. creating images of whole FFB for unripe Evidence: and over ripe fruits. Notice on fruit ripeness criteria.

29 Minor 6.11 The company had The company does not Corrective Action: Closed conducted SIA of have a time plan of Social impact management December 2011 – social impact and monitoring plan has March 2012 period. management and been developed. From this report monitoring. negative impacts are Evidence: identified such as the There are RKS RPS cooperative roles that documents. are not maximum, complaint about dust from transportation activities, mill’s smoke that pollutes the surrounding villages. The company does not have a time plan of social impact management and monitoring with community participation

Sucofindo ICS FRM 3.04 Issue 04 Rev. 6 89of 106

SUCOFINDO INTERNATIONAL CERTIFICATION SERVICES

to be carried out regularly.

30 Minor 6.11 1 TSS CSR Program 2013 The CSR program Corrective Action: Closed consists of 6 programs. implementation has The existing CSR program However, some not been monitored has been monitored and programs are not and evaluated. evaluated. realized including conblock paving in the Evidence: SD 299, the There is the CSR program construction of SD AL- monitoring and evaluation. Husnah, Mampun Baru Village, cleft-lip, hernia and cataract surgery. No evaluation of the planned programs was found.

Sucofindo ICS FRM 3.04 Issue 04 Rev. 6 90of 106

SUCOFINDO INTERNATIONAL CERTIFICATION SERVICES

31 Observasi 8.1 1 GIA The management The management Corrective Action: Closed review should not only review did not address The Management Review (Pada address the result of the internal audit will address social impacts, pembaha internal audit but also results; instead it pollution and emission, san di atas address the agenda addressed the agenda waste reduction, Complian required in the standard required in the environmental impacts and ce) such as social impacts, standard such as reduction of certain pollution and emission, social impacts, chemicals. waste reduction, pollution and emission, environmental impacts waste reduction, and reduction of certain environmental impacts Evidence: chemicals. and reduction of Discussion on social certain chemicals. impacts, pollution and emission, waste reduction, environmental impacts and reduction of certain chemicals in the Management Review.

Sucofindo ICS FRM 3.04 Issue 04 Rev. 6 91of 106

SUCOFINDO INTERNATIONAL CERTIFICATION SERVICES

SUCOFINDO INTERNATIONAL CERTIFICATION SERVICES

* Please send your response(s) to this Non Conformitie(s) + obs also in softcopy Non Conformity / Observation Report Organization Audit 04-10-2013 (TSS, RQ, GGU,NS, ) No. No. Standard. Audit Date : RSPO 00005 2 (1) RSPO (Certification) ATL / Auditor :

……………………………………….(signature)

Organization Rep. :

……………………………………….(signature) Audit Root Cause Corrective Action & Audit Team No. Category Clause Std or Description Investigation* Evidence* Review (1) (2) (3) (4) (5) (6) (7) (8) (9) 1 Major 2.1 1 TSS Based on information The company has The evidence of Minor from the Langling Mill issued Circular Letter implementation of the letter Union Leader and by Director of Human will be sought on the next overtime report in Resources No. surveillance audit. November 2013, still 004/HR Ops/2014 found the employee stated that the (See appendix 4.2) who work over the time overtime system limits specified by should be met with the Depnaker (max 14 government regulation. hours a week). The overtime job Sampling is done on should also agreed of employees in the lab both parties and the Boiler at Jelatang Mill

Sucofindo ICS FRM 3.04 Issue 04 Rev. 6 92of 106

SUCOFINDO INTERNATIONAL CERTIFICATION SERVICES

2 Major 2.2 1 TSS The company does not Division 4 Bangko Corective Action: Closed have the HGU yet for Estate area of 218 The company already have estate in division IV hectares has HGB are Legal decree (HGU) from BPN . Bangko Estate area of currently in process

218 hectares. So far the into the legal decree Evidences: company has applied (HGU) by BPN. 1. HGU No. for the concession area 01/HGU/BPN.15/2014dated of 109.73 ha and 87.35 January 20, 2014is ha. The latest data that locatedinKarang Berahi

available is an invitation Village, Pamenang, Merangin District, Jambi from Jambi BPN no. Provincewithareadetails: 108/1.5-300.9/X/2013 - NIB 06.04.00.00.00014 which invites the total area 92,89 company to attend a hectares meeting with B - NIB 06.04.00.00.00016 committee on October total area 33,07 30, 2013. hectares

Located in the Jelatang village, Pamenang, Kab. Merangin District, Jambi Provincewithareadetails: - NIB 06.04.00.00.0001 total area 81,56 hectares

2. HGU No. 02/HGU/BPN.15/2014dated January 20, 2014is locatedinKarang Berahi and Jelatang Village, Pamenang, Merangin District, Jambi Provincewithareadetails:

Sucofindo ICS FRM 3.04 Issue 04 Rev. 6 93of 106

SUCOFINDO INTERNATIONAL CERTIFICATION SERVICES

- NIB 06.04.00.00.00020 total area 4,76 hectares - NIB 06.04.00.00.00021 total area 5,80 hectares

Total HGU’s are 218, 08 hectares Valid 35 years.

(See Appendix 4.1)

3 Major RSPO TSS In identification and Mass balance Revised the report per tri- Closed SCC traceability procedure calculation report is monthly and yearly bases. Std E (SOP / JLTM / SIK), issued per monthly 3.3 Mass Balance and yearly bases included in the calculation of monthly, quarterly and yearly. At the time of the audit, the company doesn't have quarterly report to the recording and balance of certified FFB and CPO.

4 Observasi 2.2 1 GGU The company has Schedule maintenance Corrective Action: Closed data of BPN HGB and painting boundary The company has made marker points and HGU and HGB due in the correction by painting advised to maintain November 2013. and numbering the border When the audit visits stone dated on 20

Sucofindo ICS FRM 3.04 Issue 04 Rev. 6 94of 106

SUCOFINDO INTERNATIONAL CERTIFICATION SERVICES

markers that exist in all stakes HGU already November 2013. company area, not completed.

the BPN HGU Evidance: markers only. It is The company has made because during the the checklist in maintaining field visit stage 2 the all the border stone with BPN HGB markers certain frequency (every 2 were found dull and weeks) marker identification number was missing.

Sucofindo ICS FRM 3.04 Issue 04 Rev. 6 95of 106

SUCOFINDO INTERNATIONAL CERTIFICATION SERVICES

5 Major 5.1 1 RQ The company has UKL / LNGM and JLTM have Corective Action: Closed UPL document of 2 environmental Conduct appropriate follow- Langling Mill and document that UKL / up letter No. KLH. Jelatang Mill and has UPL and EIA, where B8884/DEP. undergone extensive there is a letter from I/LH/PDAL/08/2013 with changes in croplands. the Ministry of certainty petition for The company is in the Environment of the determination of document process of changing Environmental those document and Document owned didn't finish yet because Langling Mill and Evidance: of the authority problem Jelatang Mill, the -Available Letter No. KLH. between the local and contents of which the B8884 / DEP.I / LH / the central government Company temporarily PDALs / 08/2013 to provide the final re-use the UKL / UPL Clarification regarding the solution. to the Ministry Decides environmental document subsequent decision. PT. KDA await further policy of the Ministry of Environment. -Company Sent letter to KLH on rule-setting documents that must be made and arranged for a company that has been in operation but have not had the environmental document. 6 Observasi 5.6 1 RQ The company The company Corrective Action: Closed conducted tresshold of conducted tresshold of The company has been emition from efb furnace emition from efb conducted monitoring at Jelatang mill, the furnace at Jelatang emission 2nd semester result is comply to mill, The result is periodicly 2013, dated on regulation but when comply to regulation 28 November 2013

Sucofindo ICS FRM 3.04 Issue 04 Rev. 6 96of 106

SUCOFINDO INTERNATIONAL CERTIFICATION SERVICES

visiting the facility (the but when visiting the byUPTB Lab BLHD Prov EFB furnace) has the facility (the EFB South Sumatera Island. thig smoke that could furnace) has the thig not comply the treshod smoke that could not Evidance : regulation. comply the treshod Taking Minutes Sample regulation. Boiler and Furnace Fuel The company needs emissions necessary to measure The company needs the emition on abnormal necessary to measure condition, like feeding the emition on the EFB to the furnace abnormal condition, in the begining process, like feeding the EFB to and when the furnace the furnace in the not optimal to burn the begining process, and EFB, and so on. when the furnace not optimal to burn the EFB, and so on.

7 Minor 6.5 1 NS There are workers who Work chartering Corrective Action: Closed are not included in allowed by PKB BKS- Chartering Worker PKWT, but not doing PPS which is followed provisions in accordance chartering agreements by all the companies with BKS-PPS (ALL with working service that are on Sumatra is PLANTATION COMPANY providers that have a member of BKS-PPS in SUMATRA) is still valid legal entity. This is not and PKB BKS-PPS is until November 2014 suitable with UU no. 13 an agreement and 2003 article 65. Those agreement between work doesn't include the the company and SPSI Evidance: work that can be then passed by 1.Documen BKS-PPS outsourced according to Department of Labour. Permenakertrans no. This means that all 19/2012 chapter III members of the article 17 paragraph 3 company BKS-PPS

Sucofindo ICS FRM 3.04 Issue 04 Rev. 6 97of 106

SUCOFINDO INTERNATIONAL CERTIFICATION SERVICES

and as described in follow PKB taht had attachment been approved by the SE.04/MEN/VIII/2013 Government. In this section III letter B point case the company filed 2. However, article VI an objection with the paragraph 3 in BKS auditor's findings and 2012 regarding requested that this be wholesale work states a record of legality that that the worker who must be resolved work on his own less between the than 7 hours a day or commission / settling for less than the certification with daily volume set for him, government will receive a portion of executives and BKS- the daily wages, ie PPS. scaled time work in this case. Volume is resolved 8 Minor 6.5 1 TSS There is a list of Because this SOP. Corrective Action: Closed contractors of the Only controlled about will be Publised New Of Bangko Estate and Contractor regarding SOP. Controlled about randomly found there Health And Safety Contractor are contract that did not Implemetation and not include the requirement yet update for Evidance of compliance with employment Scan Copy Cover New applicable regulations in Publised SOP. Controlled employment about Contractor No. SOP/SMART/UMUM/SADV /I/006

Sucofindo ICS FRM 3.04 Issue 04 Rev. 6 98of 106

SUCOFINDO INTERNATIONAL CERTIFICATION SERVICES

There is contractor control procedure (SOP/SMK3/SMART/LH -26) but it only requires HSE aspect and not included ensuring compliance with labor and the use of a trained contractor.

9 Observasi 6.9 1 TSS The company already Not yet employees Corective Action: Closed has a policy regarding know and understand Re-Socialization Sexual sexual harassment by about sexual Harassment will forming a gender harassment that has implemented committee. Socialization been done previously has been done in some socialized places but the Evidance: socialization should be Documentation done thoroughly. socialization Sexual Randomly found in Harassment block 4 division 4 "berondol" collectors who have not properly understood the meaning of sexual harassment

10 observasi 6.11 1 TSS The company already 5 year CSR Annual Corrective Action: Closed has an annual and five- Strategic Plan for PT Making CSR Semester year annualized CSR KDA has been made Evaluation Program program basis. CSR which is then revealed programs should be to be an annual Evidance: made systematically, program. For the Documents Semester starting from implementation of

Sucofindo ICS FRM 3.04 Issue 04 Rev. 6 99of 106

SUCOFINDO INTERNATIONAL CERTIFICATION SERVICES

identification of needs - CSR programs in evaluation of CSR planning - submission proses.because There and approval of a plan - are several CSR budget - implementation activities not all be -evaluation. From the realized in the year CSR data doesn't found 2013, so that should any approved CSR carry over to 2014 or budget proposal for there are other CSR activities in 2013 activities that are and therefore can not converted to more be ensured mainstream implementation of the plan

Sucofindo ICS FRM 3.04 Issue 04 Rev. 6 100of 106

SUCOFINDO INTERNATIONAL CERTIFICATION SERVICES

APPENDIX - 3

PT.KRESNA DUTA AGROINDO –JELATANG MILL RSPO SUPPLY CHAIN CHECKLIST – MASS BALANCE MODUL

PT. Kresna Duta Agroindo – Jelatang Mill (JLTM) is implemented the supply chain system procedures as required in RSPO certification. The company has set the supply chain system categorized as Mass Balance scheme.

A. Documented Procedures 1.1 Complete and up to date procedures covering the implementation of all the elements in these requirements.

Records/Evidence: There is procedure SOP Supply Chain Produk RSPO Model Mass Balance PT KDA-JLTM/SOP/24 dated. 01/03/2014 The name of the person having overall responsibility for and authority over the implementation of these requirements and compliance with all applicable requirements. This person shall be able to demonstrate awareness of the facilities procedures for the implementation of this standard.

Records/Evidence: Management Representative related to RSPO-SCCS implementation Traceability Officer related to RSPO‐SCCS implementation JLTM: Decree No. 04/FM‐JLTM/VIII/2013 dated. 01 August 2013 Document Controller - SPO Officer related to RSPO‐SCCS implementation JLTM: Decree No. 05/FM‐JLTM/VIII/2013 dated. 01 August 2013 1.2 The facility shall have documented procedures for receiving and processing certified and non- certified FFBs.

Records/Evidence:  SOP Identifikasi dan kemampuan-telusuran (SOP Identification and Traceability) SOP/JLTM/SIK Rev.01 dated. 10 January 2013. The prpocedure covers from receiving FFB from main estate until CPO Dispatch.  Surat Pengantar Buah (Fruit Delivery Letter) (BNGE) with ‘’Mass Balance’’ mark JLTM: Form Rekap Penerimaan TBS Per Unit (FFB Receiving Resume Form each Unit)  CPO Production Report Total 1,279.365 Ton/Year (with average OER : 20.68) Recapitulation data of FFB certified received/Process & CPO Production from January to December 2012  PK Monthly Production Report Total 274.138 Ton/Year (with average KER : 4.43) Recapitulation data of FFB certified received/Process & CPO Production from January to December 2012  CPO Dispatch Report Total 30,668.270 Ton/Year (Total from all supply CPO year 2012, certified and non-certified)  PK Dispatch Report

Sucofindo ICS FRM 3.04 Issue 04 Rev. 6 101of 106

SUCOFINDO INTERNATIONAL CERTIFICATION SERVICES

Total 5,928.680 Ton/Year (Total from all supply CPO year 2012, certified and non-certified)

B. Purchasing and goods in 2.1 The facility shall verify and document the volumes of certified and non-certified FFBs received.

Records/Evidence:  There is procedure SOP Identifikasi dan kemampuan-telusuran (SOP Identification and Traceability) SOP/JLTM/SIK Rev.01 dated. 10 January 2013  There is a database system called Weighbridge Computerized Program which has been designed to separate incoming FFB from own estate, Scheme small holders and independent small holders with the specific code in database. 2.2 The facility shall inform the CB immediately if there is a projected overproduction. Records/Evidence:

In the SOP Identification and Traceability (SOP/JLTM/SIK Rev.01 dated. 01 November 2013) has been stated if there is a projected over production then the action will be taken as belows :  Inform related RSPO certification Body and RSPO IT System.  Re – analyze production data and mass balance report  Calibrated and recheck for the bridge and supporting equipment.  To define the projection of certified product considering the error rate (contamination) for maximum 5% from the total projection data. C. Record keeping 3.1 The facility shall maintain accurate, complete, up-to-date and accessible records and reports covering all aspects of these requirements.

Records/Evidence:  Surat Pengantar Buah (Fruit Delivery Letter) (BNGE) with ‘’Mass Balance’’ mark JLTM: Form Rekap Penerimaan TBS Per Unit (FFB Receiving Resume Form each Unit)  CPO Production Report (daily, monthly and annual) All documents and records have been in controlled according to SOP Pengendalian Dokumen dan Rekaman (SOP Document Control and Record Control). SOP Pengendalian Dokumen (SOP Document Control) JLTM : PT KDA-JLTM/SOP/18 Rev.00 dated.02/01/2012 SOP Pengendalian Catatan (SOP Record Control) JLTM : PT KDA-JLTM/SOP/12 Rev.00 dated.02/01/2012 3.2 Retention times for all records and reports shall be at least five (5) years.

Records/Evidence: Retention times of all records have been determined in SOP Pengendalian Dokumen dan Rekaman (SOP Document Control and Record Control). Retention time for all records and reports of PT. Kresna Duta Agroindo is 10 years. 3.3 The facility shall record and balance all receipts of RSPO certified FFB and deliveries of RSPO certified CPO, PKO and palm kernel meal on a three-monthly basis.

Records/Evidence:

Sucofindo ICS FRM 3.04 Issue 04 Rev. 6 102of 106

SUCOFINDO INTERNATIONAL CERTIFICATION SERVICES

The company has the monthly and annual report which contain record and balance all receipts of RSPO certified FFB and deliveries of RSPO certified CPO and PK. The company has no data record and balance all receipts of RSPO certified FFB and deliveries of RSPO certified CPO and PK on a three-monthly basis. This lack of this report has been issued as a major nonconformance. All volumes of palm oil and palm kernel oil that are delivered are deducted from the material accounting system according to conversion ratios stated by RSPO.

Records/Evidence: There is a database system called Weighbridge Computerized Program which has been designed to align and integrate from the material accounting system according to conversion ratios stated by RSPO. The supporting data such as :  Mass Balance Report ; Daily, Monthly, and Annually CPO Production Report  Surat Pengiriman CPO dengan Cap „‟ Massa Balance‟‟ (CPO Dispatch Letter with “Mass Balance” Mark)  Tiket Timbang Pengiriman CPO dengan Cap „‟Mass Balance‟‟ (CPO Dispatch Weight Ticket with “Mass Balance” Mark) The facility can only deliver Mass Balance sales from a positive stock. However, a facility is allowed to sell short.

Records/Evidence: Can be trace down in CPO Stock Report and in CPO Dispatch Report 3.4 The following trade names should be used and specified in relevant documents, e.g. purchase.

Records/Evidence: Can be trace down in Sales Contract D. Sales and good out 4.1 The facility shall ensure that all sales invoice issued for RSPO certified products delivered include the following information: a) The name and address of the buyer; b) The date on which the invoice was issued; c) A description of the product, including the applicable supply chain model (Segregated); d) The quantity of the products delivered; e) Reference to related transport documentation.

Records/Evidence: The available evidence is the invoice of oil delivery in form of Delivery Order (DO) document issued for every oil delivery. The information written on the Delivery Order document are: delivery no, delivery date, reference no, reference date, name and address of buyer, ordered product details (name and total amount), and the transportation system for product transportation. E. Training 5.1 The facility shall provide the training for all staff as required to implement the requirements of the Supply Chain Certification Systems. Records/Evidence:  SOP Training Pengembangan Sumber Daya Manusia (SOP Training and Human Resources Development) Document No.: SOP/SPO/SMART/LH-10, Rev.01 issued 01/07/2010  RSPO – SCCS Training material is available in Identification Matrix Needs  Invitation, Attendance List, Socialization Training Material on RSPO –SCCS, dated 16 November 2013 F. Claims 6.1 The facility shall only make claims regarding the use of or support of RSPO certified palm oil Sucofindo ICS FRM 3.04 Issue 04 Rev. 6 103of 106

SUCOFINDO INTERNATIONAL CERTIFICATION SERVICES

that are in compliance with the RSPO Rules for Communication and Claims.

Records/Evidence: JLTM have 7 Declaration of RSPO SCCS 1. Deklarasi RSPO‐SCCS (RSPO SCCS Declaration) 2. Deklarasi Prosedur RSPO‐SCCS Mass Balance (RSPO-SCCS Mass Balance Procedure) 3. Deklarasi Penilaian RSPO (RSPO Valuation Declaration) 4. Deklarasi Penjualan dan Pengeluaran Produk (Sale and Product Output Declaration) 5. Deklarasi Penyimpanan dan dokumentasi rekaman (Retention and Record Documentation Declaration) 6. Deklarasi Nama Produk (Product Name Declaration) 7. Deklarasi Klaim/Pernyataan (Claim Declaration)

Sucofindo ICS FRM 3.04 Issue 04 Rev. 6 104of 106

SUCOFINDO INTERNATIONAL CERTIFICATION SERVICES

APPENDIX– 4

SUPPORTING DOCUMENT

Appendix 4.1. Legal Decree (HGU) PT. Kresna Duta Agroindo

Sucofindo ICS FRM 3.04 Issue 04 Rev. 6 105of 106

SUCOFINDO INTERNATIONAL CERTIFICATION SERVICES

Appendix 4.2.Circular Letter by Director of Human Resources PT. Kresna Duta Agroindo

Sucofindo ICS FRM 3.04 Issue 04 Rev. 6 106of 106