TOURING LECTURES T.C. GROUND IMPROVEMENT AUSTRALIA Perth, Adelaïde, Melbourne, Hobart, Sydney, Newcastle, Brisbane

ConceptConcept andand ParametersParameters relatedrelated toto GroundGround ImprovementImprovement illustratedillustrated byby CaseCase HistoriesHistories

Presented by Serge VARAKSIN Chairman of T.C.G.I. State of the Art Report

17TH International Conference on Mechanics &

State of the Art Report

Construction Processes Procédés de Construction

Jian Chu Nanyang Technological University, Singapore Serge Varaksin Menard, France Ulrich Klotz Zublin International GmbH, Germany Patrick Mengé Dredging International n.v., DEME, Belgium

Alexandria, Egypt 5-9 October 2009

NOTA : TC 17 meeting ground improvement – 07/10/2009 Website : www.bbri.be/go/tc17

Touring lectures 2010 2 Category Method Principle A1. Dynamic compaction Densification of granular soil by dropping a heavy weight from air onto ground. A. Ground A2. Vibrocompaction Densification of granular soil using a vibratory probe inserted into ground. improvement A3. Explosive compaction Shock waves and vibrations are generated by blasting to cause granular soil ground without to settle through liquefaction or compaction. admixtures in non-cohesive A4. Electric pulse compaction Densification of granular soil using the shock waves and energy generated by electric or fill pulse under ultra-high voltage. materials A5. Surface compaction (including rapid Compaction of fill or ground at the surface or shallow depth using a variety of impact compaction). compaction machines. B1. Replacement/displacement (including Remove bad soil by excavation or displacement and replace it by good soil or rocks. load reduction using light weight materials) Some light weight materials may be used as backfill to reduce the load or earth pressure. B. Ground B2. Preloading using fill (including the use of Fill is applied and removed to pre-consolidate compressible soil so that its improvement vertical drains) compressibility will be much reduced when future loads are applied. without B3. Preloading using vacuum (including Vacuum pressure of up to 90 kPa is used to pre-consolidate compressible soil so that admixtures in combined fill and vacuum) its compressibility will be much reduced when future loads are applied. cohesive soils B4. Dynamic consolidation with enhanced Similar to dynamic compaction except vertical or horizontal drains (or together with drainage (including the use of vacuum) vacuum) are used to dissipate pore pressures generated in soil during compaction. B5. Electro-osmosis or electro-kinetic DC current causes water in soil or solutions to flow from anodes to cathodes which consolidation are installed in soil. B6. Thermal stabilisation using heating or Change the physical or mechanical properties of soil permanently or temporarily by freezing heating or freezing the soil. B7. Hydro-blasting compaction Collapsible soil () is compacted by a combined wetting and deep explosion action along a .

Touring lectures 2010 3 C1. Vibro replacement or stone columns Hole jetted into soft, fine-grained soil and back filled with densely compacted or to form columns. C2. Dynamic replacement Aggregates are driven into soil by high energy dynamic impact to form columns. The C. Ground backfill can be either sand, gravel, stones or demolition debris. improvement C3. Sand compaction piles Sand is fed into ground through a casing pipe and compacted by either vibration, with admixtures dynamic impact, or static excitation to form columns. or inclusions C4. confined columns Sand is fed into a closed bottom geotextile lined cylindrical hole to form a column. C5. Rigid inclusions (or composite Use of piles, rigid or semi-rigid bodies or columns which are either premade or formed , also see Table 5) in-situ to strengthen soft ground. C6. Geosynthetic reinforced column or pile Use of piles, rigid or semi-rigid columns/inclusions and geosynthetic girds to enhance supported the stability and reduce the settlement of embankments. C7. Microbial methods Use of microbial materials to modify soil to increase its strength or reduce its permeability. C8 Other methods Unconventional methods, such as formation of sand piles using blasting and the use of bamboo, timber and other natural products.

Touring lectures 2010 4 g D. Ground D2. Chemical grouting Solutions of two or more chemicals react in soil pores to form a gel or a solid improvement precipitate to either increase the strength or reduce the permeability of soil or ground. with grouting D3. Mixing methods (including premixing or Treat the weak soil by mixing it with cement, lime, or other binders in-situ using a type admixtures deep mixing) mixing machine or before placement D4. Jet grouting High speed jets at depth erode the soil and inject grout to form columns or panels D5. Compaction grouting Very stiff, mortar-like grout is injected into discrete soil zones and remains in a homogenous mass so as to densify loose soil or lift settled ground. D6. Compensation grouting Medium to high viscosity particulate suspensions is injected into the ground between a subsurface excavation and a structure in order to negate or reduce settlement of the structure due to ongoing excavation. E1. or mechanically stabilised Use of the tensile strength of various steel or geosynthetic materials to enhance the E. Earth earth (MSE) of soil and stability of , foundations, embankments, slopes, or reinforcement retaining walls. E2. Ground anchors or soil nails Use of the tensile strength of embedded nails or anchors to enhance the stability of slopes or retaining walls. E3. Biological methods using vegetation Use of the roots of vegetation for stability of slopes.

Touring lectures 2010 5 Why Soil improvement ?

•To increase and stability (avoid failure) •To reduce post construction settlements • To reduce liquefaction risk (seismic area)

Advantages / classical solutions • avoid (price reduction also on structure work like slab on pile) • avoid soil replacement • save time •Avoid to change site •Save money !

Touring lectures 2010 6 Soil Improvement Techniques

Without added With added materials materials 1 Drainage 4 Dynamic Cohesive soil 2 Vacuum replacement , … 5 Stone columns 6 CMC 7 Jet Grouting Soil with 8 Cement Mixing 3 Dynamic consolidation Sand , fill 4 Vibroflotation

Touring lectures 2010 7 Parameters For Concept

-Soil characteristics -Site environment -cohesive or non cohesive -Close to existing structure - blocks ? - , water table position -Height constraints - Organic materials -Soil thickness -Structure to support -Time available to build -Isolated or uniform load -Deformability

Touring lectures 2010 8 Preloading with vertical drains

high fines contents soils

σ=σ’+u

Touring lectures 2010 9 Vertical drains

CONCEPT PARAMETERS

-Stable for surcharge 1 – Depth -Soil can be penetrated 2 – Drainage path -Time available is short 3 – -Some residual settlement is allowed 4 – Consolidation parameters (oedometer, CPT)

eO, CC, CV, CR, Cα, t, CPT dissipation test

Touring lectures 2010 10 Radial & Vertical Consolidation

Touring lectures 2010 11 Vertical drains: material

High fines contents soils

5 cm , PVC Flat drain circular drain vertical drain + geotextile

Touring lectures 2010 12 Vertical Drians

Touring lectures 2010 13 (high fines contents soils)

VACUUM (J.M. COGNON PATENT)

Touring lectures 2010 14 Vacuum Consolidation

CONCEPT PARAMETERS

-Soil is too soft for surcharge 1 – Depth 2 – Drainage path -Time does not allow for step loading 3 – Condition of impervious soil -Surcharge soil not available 4 – Wate rtable near surface 5 - Absence of pervious continuous layer -Available area does not allow for bems 6 – Cohesion 7 - Consolidation parameters (oedometer, CPT)

eO, CC, CV, CR, Cα, t, CPT dissipation test 8 – Theoretical depression value 9 – Field coefficient vacuum 10 – Reach consolidation to effective pressure in every layer 11 – Target approach

Touring lectures 2010 15 Case history – EADS Airbus Plant, Hamburg

Touring lectures 2010 16 Case history – EADS Airbus Plant, Hamburg General overview of Airbus site

Touring lectures 2010 17 Basic design and alternate concept of Moebius–Menard

Temporary sheet pile wall – in 5 month – dyke construction in 3 years

Settlement ≥ 2,0 – 5,5 m Settlement ≥ 2,0 – 5,5 m

Dyke construction to +6.5 in 8.5 month and to + 9.00 in 16 month

Dyke construction to +6.5 in Columns8.5 GCCmonth andSettlement to + 0,7 –9.00 1.84 m in 16 month

Settlement 0,7 – 1.84 m Columns GCC

Touring lectures 2010 18 Subsoil characteristics

Touring lectures 2010 19 Case history – EADS Airbus Plant, Hamburg

How to move on the mud !

Touring lectures 2010 20 Case history – EADS Airbus Plant, Hamburg

Touring lectures 2010 21 Case history – EADS Airbus Plant, Hamburg

Touring lectures 2010 22 PORT OF BRISBANE – PADDOCK S3B

PROJECT OVERVIEW

• Located at the mouth of the Brisbane river; • New reclamation area: 234 ha enclosed in the Port Port of Brisbane Expansion Seawall; Sydney 1000 km • Part of the new reclaimed area to be ready in 5years; • Seawall construction completed in 2005;

Touring lectures 2010 23 PORT OF BRISBANE – PADDOCK S3B

GEOTECHNICAL LONG SECTION

Touring lectures 2010 24 PORT OF BRISBANE – PADDOCK S3B

GEOLOGICAL PARAMETERS

Upper Upper Lower Dredged Parameter Unit Holocene Holocene Holocene Material Sand Clay Clay

Cc/(1+e0) [-] 0,235 0,01 0,18 0,235

Cα/(1+e0) [-] 0,0059 0,001 0,008 0,0076 γ [kN/m3]14191616

Cv [m²/y] 1 10 10 0.9

Ch [m²/y] 1 10 10 1.8

Su [kPa] 4 - 20 28

Su / σ’v [-] 0,25 0,3 0,3 0,2

Touring lectures 2010 25 PORT OF BRISBANE – PADDOCK S3B

GEOLOGICAL SOIL PROFILE

Touring lectures 2010 26 PORT OF BRISBANE – PADDOCK S3B

DESIGN CRITERIA & ASSUMPTIONS

Service Load: Zone 1: 36kPa Zone 2: 25kPa VC4 Zone 3: 15kPa Zone 4: 5kPa CORRIDOR VC2A VC3A VC5 VC6 Residual Settlement (20y): Zone 1 to 3: 150mm VC2B VC3B Zone 4: 300mm

Vacuum pumping operation: VC8 VC1 18 months VC7

Vacuum depressure: 75.0 kPa

Touring lectures 2010 27 PORT OF BRISBANE – PADDOCK S3B

DESK STUDY – NUMERICAL ANALYSIS USING EXCEL SPREADSHEET SETTLEMENT CALC.XLC

Calculation of primary and secondary settlement; •Secondary settlement to commence after primary settlement; •Change in vertical stress is constant over the depth of the stratum; •Buoyancy effect on the fill below the groundwater level due to settlement •Fill to be removed instantaneous at the end of preloading period; •Design load immediately applied at end of pre- loading period;

Touring lectures 2010 28 PORT OF BRISBANE – PADDOCK S3B

Initial Service Consolidation ANALYSIS METHOD Stress Load Load

σ’o σ’o+Δσ’f σ’o+Δσ’pxU% Δlogσ’

•Secondary Settlement eo Primary Program uses a method based Consolidation (Pore Pressure on Bjerrum’s concept to e1 Dissipation) calculate instantaneous and ΔH primary Cc ⎛ o Δ+ σσfinal '' ⎞ delayed consolidation (Bjerrum, e2 = log⎜ ⎟ H 1+ e ⎜ σ ' ⎟ 1967). o ⎝ o ⎠ t=1d e3 t=To

Δe t=To+20y

Secondary Consolidation (Long term Creep)

⎛ 20years ⎞ =Δ Ce log⎜ ⎟ α e ⎜ ⎟ ⎝ Tp ⎠

Touring lectures 2010 29 PORT OF BRISBANE – PADDOCK S3B

CONSTRUCTION SEQUENCE

2ND1ST SURCHARGESURCHARGE PLACEMENTPLACEMENT

VACUUM SEALING BY MEMBRANE HDPE 1mm VACUUM UNITS BENTONITE PROTECTIONVERTICAL TRANSMI FILL SSION UNITS PIHORIZONTALPES INSTALLATION TRANSMISSION PIPES INSTALLATION

PERMEABLE LAYER

SOIL BENTONITE VERTICAL -OFF WALL MEMBRANE Impermeable Strata

Touring lectures 2010 30 PORT OF BRISBANE – PADDOCK S3B

Touring lectures 2010 31 PORT OF BRISBANE – PADDOCK S3B

Touring lectures 2010 32 PORT OF BRISBANE – PADDOCK S3B

Touring lectures 2010 33 Stress path for Vacuum Process

Vacuum Surcharge σ’1= 80kPa p’ = σ’1 ;Ko = 1 Isotropic p’ = 2/3 σ’1 σ’ = 80kPa Ko = 0.5 σ’1= 80kPa 2 σ’3 = 80kPa K (failure line) σ’2 = 40kPa f

σ’3 = 40kPa Active Zone

εh < 0 Surcharge Ko (εh = 0)

Passive Zone

εh > 0 DeviatoricDeviatoric Stress Stress (q) (q)

Deviation Stress (q’) Vacuum Consolidation

Mean Stress (p’)

Touring lectures 2010 34 Case history : Kimhae (Korea) - 1998

Touring lectures 2010 35 Soil Improvement Techniques

Without added With added materials materials 1 Drainage 4 Dynamic Cohesive soil 2 Vacuum replacement Peat , clay … 5 Stone columns 6 CMC 7 Jet Grouting Soil with 8 Cement Mixing friction 3 Dynamic consolidation Sand , fill 4 Vibroflotation

Touring lectures 2010 36 Paramaters for Concept

CONCEPT PARAMETERS

FILL FILL+UNIFORM LOAD FILL+ LOAD SBCσ’z SBCσ’z SBCσ’z - Age if fill saturated or not GWT GWT GWT 2 -PL 4 80 % 6 -Selfbearing level 50 8 % -∅ 1 σ’ 30% z 10 -EP or EM SB σ’z FILL2 FILL FILL Depth Depth Depth -QC, FR, (m) (m) (m) -N t (about 10 years) -R.D. (???) DC : h(m) = δ EC 90% (SBC) 1 C(menard) = 0.9-1 -Shear wave velocity 80% (SBC) C(hydraulic) = 0.55 2 -Seismic parameters 3 60% (SBC) δ SBC = 0.9-1 (SILICA SAND) -Grain size δ 4 LOAD = 0.4-0.6 (SILICA SAND) 50% (SBC) S (%) 30% (SBC) S.B.C. = Self Bearing Coefficient S.B.C. = S(t)

S( ∞¥ )

Touring lectures 2010 37 Case History

Nice Airport runway consolidation Granular soil

Very high energy (170 t, 23 m)

Touring lectures 2010 38 KAUST PROJECT

Concept and application of ground improvement for a 2,600,000 m²

Touring lectures 2010 39 Typical Master Plan

Touring lectures 2010 40 Discovering the Habitants

Touring lectures 2010 41 Areas to be treated

Areas to be treated

•Al Khodari 1,800,000 m2 •Saudi Bin Ladin 720,000 m2

Schedule

•8 months

Touring lectures 2010 42 Dynamic Consolidation

Wave Type Percent of Total Energy Rayleigh 67 Shear 26 Compression 7

After R.D. Woods (1968)

Touring lectures 2010 43 Specifications

•Isolated footings up to 150 tons

•Bearing capacity 200 kPa

•Maximum footing settlement 25 mm

•Maximum differential settlement 1/500

•Footing location unknown during soil improvement phase

Touring lectures 2010 44 Concept

150 TONS Depth of footing = 0.8m Below G.L.

Engineered fill + 4.0

σz = 200 kn/m² 2 meters arching layer + 2.5 Working platform (gravelly sand) + 1.2

Compressible layer from loose 0 to 9 meters sand to very soft sabkah

Touring lectures 2010 45 Selection of technique

0,80 Preloading FPL

DR (Dynamic WPL > 2,80 Replacement) Design Working Platform NGL GWT HDR (High Energy Dynamic Replacement) +

Surcharge > 4,50 Soil Conditions BSL (variable)

Touring lectures 2010 46 Typical Site Cross Section of Upper Deposit

Touring lectures 2010 47 Variation in soil profile over 30 meters

Touring lectures 2010 48 Typical surface conditions

Touring lectures 2010 49 Touring lectures 2010 50 Analysis of improvement

ANALYSIS OF (PL-Po) IMPROVEMENT AS FUNCTION OF ENERGY AND FINES

K.A.U.S.T. – Saudi Arabia

BASIS PL-Po (MPa) •60 grainsize tests 10% I = 8 •180 PMT tests 1.6 SI = 4,7

1.4 PARAMETERS

I = 6,25 •PL –Po = pressuremeter limit pressure 1.2 20% SI = 2,3 •kJ/m3 = Energy per m3 (E) •% = % passing n°200 sieve 1 KAUST KAUST P •I = improvement factor LF P I = 5,5 Li I ×100 0.8 30% •S.I : energy specific improvement factor DC SI = 1,5 E 0.6 DOMAIN DR LEGEND 0.4 40% I = 3,1 DOMAIN SI = 0,72 Average pre-treatment values 0.2 Average values between phases 50% I = 3 Average post-treatment values 0 SI = 0,56 Energy (kJ/m3) 0 100 200 300 400 500

Touring lectures 2010 51 Provisionnal master plan

Touring lectures 2010 52 It can be assumed that those impacts du For the considered case, generate a pore pressure at least equal to the du = UΔσ pore pressure generated by the embankement load. and thus t’f = U1t1 + (1-U1)tf This new consolidation process with the final at a time t’f, where The Table allows to compare the gain in consolidation time, at different degrees of ()−tt'C' TC 0,848T == + 1v11v consolidation. V H² H²

U1 10% 20% 30% 40% 50% 60% 70% 80% 90% With t1/tf 0.009 0.037 0.083 0.148 0.231 0.337 0.474 0.669 1.00 ⎡ du ⎤ t’1/tf 0.901 0.807 0.725 0.659 0.615 0.602 0.632 0.735 1.00 VV ⎢1CC' += ⎥ ⎣⎢ Δσ(1− U1) ⎦⎥ Supposing primary consolidation completed The following equation allows to compare U = 0.9 or T = 0.848 if du=U Δσ, the respective times of consolidation being : 1 then t’f = U1t1 + (1-U1)tf t’f with impact t without impact f The optimal effectiveness occurs around

U1 = 60%. du Δσ(1− 1)U ft' = t1 + t f One can thus conclude that, theoretically the Δσ(1du −+ 1)U Δσ(1du −+ 1)U consolidation time is reduced by 20% to 50%, what is for practical purpose insufficient.

Touring lectures 2010 53 Dynamic surcharge

Touring lectures 2010 54 Touring lectures 2010 55 VIBROFLOTS

Amplitude 28 – 48mm

Touring lectures 2010 56 PORT BOTANY EXPANSION PROJECT GROUND COMPACTION WORKS

PORT BOTANY EXPANSION PROJECT GROUND COMPACTION WORKS EXTENSION PORT

EXISTING PORT

Touring lectures 2010 57 PORT BOTANY EXPANSION PROJECT GROUND COMPACTION WORKS

EARLY WORKS

600 M

GENERAL ARRANGEMENT NEW TERMINAL WORKING NEW TERMINAL AREA AREAS

TRENCH FOUNDATIONS / COUNTERFOURT BACKFILL 1300 M

Touring lectures 2010 58 PORT BOTANY EXPANSION PROJECT GENERAL ARRAGEMENT COUNTERFORTS INCLUDING RECLAMATION

Touring lectures 2010 59 PORT BOTANY EXPANSION PROJECT RESUME / QUANTITIES

PHASE AREA (M2) VOLUME (M3) TECHNIQUE

EARLY WORKS 90,000 650,000 DYNAMIC COMPACTION / VIBRO COMPACTION

TRENCH FOUNDATIONS 64,000 800,000 OFFSHORE VIBROCOMPACTION

COUNTERFOURT BACKFILL 92,000 1,330,000 ONSHORE TANDEM VIBRO COMPACTION

NEW TERMINAL AREA 404,000 5,250,000 DYNAMIC COMPACTION

TOTAL 650,000 8,000,000 DC / VC

Touring lectures 2010 60 PORT BOTANY EXPANSION PROJECT

Dynamic Compaction & Vibro Compaction

POUNDER WEIGHT 25 TON / 23 METERS DROP HEIGHT 5 m X 5 m GRID / 3 PHASES – 10 BLOWS

Touring lectures 2010 61 PORT BOTANY EXPANSION PROJECT

VIEW OF LOAD OUT WHARF – DC / VC WORKING

Touring lectures 2010 62 PORT BOTANY EXPANSION PROJECT

Touring lectures 2010 63 Pasir Panjang Container Terminal, Singapore

Touring lectures 2010 64 Pasir Panjang Container Terminal, Singapore RESULTS

1. Except for the upper 50 cm, the

combination of VC and DC satisfied the qc of 15 MPa (upper 0.5 m requires surface roller compaction). 2. Enforced settlement: After VC – 47 cm After DC – 27 cm Total – 74 cm (~ 10% of treatment depth)

Compaction was less effective in this layer!

stiff clay

Touring lectures 2010 65 Soil Improvement Techniques

Without added With added materials materials 1 Drainage 4 Dynamic Cohesive soil 2 Vacuum replacement Peat , clay … 5 Stone columns 6 CMC 7 Jet Grouting 8 Cement Mixing Granular soil 3 Dynamic consolidation Sand , fill 4 Vibroflotation

Touring lectures 2010 66 Dynamic Replacement

CONCEPT PARAMETERS

-Very soft to stiff soils -C, ∅, μ, Ey of soil, column and arching

-Unsaturated soft clays layers, grid

-Thickness of less than 6 meters -or PL, EP, µ of soil, column and

-Arching layer available arching layers, grid

Touring lectures 2010 67 Stone Columns – Bottom Feed

Vibrator penetration Material feeding Vibration of material during extraction Principle of the technology - bottom feed with air tank

Touring lectures 2010 68 Stone Columns – Bottom Feed

Stone Columns bottom feed to 22 m depth

Touring lectures 2010 69 Stone Columns

CONCEPT PARAMETERS

-Soft to stiff clays -C, ∅, μ, Ey of soil, column and arching

-Thickness up to 25 meters layers, grid

-Arching layer available -or PL, EP, µ of soil, column and arching

layers, grid

Touring lectures 2010 70 DCM : Deep Cement Mixing

CONCEPT

Touring lectures 2010 71 CMC – Execution

Fleet of specialized equipment Displacement auger Æ quasi no spoil High torque and pull down Fully integrated grout flow control

Grout flow

Soft soil

Touring lectures 2010 72 CMC – Typical Testing

ƒ on isolated CMC ƒ Checking of individual capacity, ƒ Checking of adequate soil parameters taken into account.

ƒ Compression tests on material ƒ Checking of good grout resistance

ƒ Data recording system during execution ƒ Recording of drilling parameters Æ Checking of anchorage, ƒ Recording of grouting parameters Æ No necking

Touring lectures 2010 73 RIGID INCLUSIONS - PARAMETERS

SOIL INCLUSION

-C’, ∅’, Ey, μ, γ, ϕ -Ey, μ, γ, D (non porous medium)

-Kv, Kh if consolidation is considered

Touring lectures 2010 74 CMC Principle

ƒ Create a composite material Soil + Rigid Inclusion (CMC) with: ƒ Increased bearing capacity ƒ Increased elastic modulus ƒ Transfer the load from structure to CMC network with a transition layer

Transition Stress layer concentration

Residual stress Arch effect between the columns CMC CMC

Touring lectures 2010 75 CMC - Basic behavior under uniform load

ƒ Negative skin friction allows to develop a good arching effect

Settlement Stress in the column

Negative skin friction Neutral point Soil

Positive skin friction Column

Depth

Touring lectures 2010 76 CMC Design - Principle

Axi-symmetric FEM calculation with one CMC and the soil Æ eq. Stiffness

Global axi-symmetrical

calculation by modelling the Complex Soil + CMC with improved ground by material improved characteristics having an improved stiffness

Touring lectures 2010 77 CMC Design – Global Modulus evaluation

Good arching

H H Quasi flat settlement

ƒ Checkings: Thestructure «see»the ƒ Quasi flat settlement complex [soil + CMC] as a ƒ Good arching as shown by principal uniform soil with improved stress direction parameters

Touring lectures 2010 78 CMC Design – Specific case of non vertical loading

ƒ Calculation principle

1. Estimation of the vertical stress in the column (% of the embankment load) 2. Thus maximum momentum so that M / N ≤ D / 8 (no traction in the mortar) 3. Thus maximum shear force taken by the inclusion (similar to a pile to which a displacement is applied) 4. Modelling of the CMC as nails working in compression + imposed shear force under Talren (or equivalent)

R i δ

Ti

Touring lectures 2010 79 CMC Design – Benefits for the structure

ƒ Structure shall be designed as if soil was of good quality

ƒ Specialist contractor provides structural designer with bearing capacity, k, etc…

ƒ No connection between foundation and structure

ƒ Structure is less complex to be designed, ƒ No stiff connection, thus no increase under seismic analysis, ƒ Structure very simple to be built: footings and slab on , no pile cap, thus benefit in terms of cost and speed of execution

Touring lectures 2010 80 New Developement - CMC Compaction - Principle

ƒ Aim of CMC to compact granular Elast P ic 0 material to decrease liquefaction Plastic P potential f σ ƒ Method of densification c ρf ƒ Injected mortar used to displace and compact the soil around the injection point ƒ Successive injection according to a regular grid induce a global compaction 2r of the soil c ƒ Mesh and diameter designed so as to rp achieve a given replacement ratio

a

Touring lectures 2010 81 New Developement - CMC Compaction - Design

ƒ Principle: Execution and testing procedure

ƒ Seismic parameters (PGA, Magnitude) Æ qc soil profile to be achieved (NCEER)

ƒ Estimation of replacement ratio to achieve required qc ƒ Execution of Works and testing by CPT ƒ Additional grouting if necessary

Execution of Compaction Grouting as per preanalysis (replacement ratio => mesh and diameter)

Execution of CPT testing Until CPT results are satisfactory

Results OK Results not OK

Execution of additional Compaction Grouting in the problematic layers

Touring lectures 2010 82 New Developement - CMC Compaction - Execution

ƒ Same type of equipment as for CMC ƒ Soil displacement rig and pump,

ƒ Key points ƒ Quality of grout (grain size distribution, workability, consistency) ƒ Injection speed and successive phases

ƒ Final Testing = CPT

Touring lectures 2010 83 New Development - CMC Compaction – Fos LNG Terminal

Touring lectures 2010 84 Future Caisson Stability Analysis

Touring lectures 2010 85 As built conditions

Touring lectures 2010 86 Proposed solution

Layer I

Layer II

15% rock (φ = 45°) + 85% clay (Cu = 50 kPa)

Touring lectures 2010 87 Marine Pounder

Touring lectures 2010 88 View of pounder construction

Touring lectures 2010 89 View of pounder ready to work

Touring lectures 2010 90 General Set up

Touring lectures 2010 91 After compaction actual results

Original rock surface before compaction 0.2m

φ=40 degree φ=40 degree 1.3m φ=48 degree φ=48 degree φ=48 degree Ar=22% Ar=22% Ar=22% C=0kPa C=0kPa C=0kPa Cu=50kPa Cu=50kPa 1.3m Column Dia=2.4m Column Dia=2.4m Column Dia=2.4m

Cu=250kPa

Touring lectures 2010 92 Determination of Friction Angle by PMT

Touring lectures 2010 93 TOURING LECTURES T.C. GROUND IMPROVEMENT AUSTRALIA Perth, Adelaïde, Melbourne, Hobart, Sydney, Newcastle, Brisbane