State Environmental Impact Assessment Authority (SEIAA) Environment Department, Room No
Total Page:16
File Type:pdf, Size:1020Kb
18.12.2015 State Environmental Impact Assessment Authority (SEIAA) Environment Department, Room No. 217, 2nd floor, Annex building, Mantralaya, Mumbai, 400032 State: Maharashtra FORM – 1 & 1A Amendment in Environmental Clearance for “PERMANENT MAGNET” At CTS NO.162/A Datta Pada Road, Village Magathane, Taluka Borivali, Borivali (E) By M/s. SAMEER N. BHOJWANI. Samir Complex, 1st,2nd floor, St. Andrews Road, Holy Family Hospitals, Bandra (W), Mumbai- 400 050 FORM – 1 Amendment in Environmental Clearance for “PERMANENT MAGNET” At CTS NO.162/A Datta Pada Road, Village Magathane, Taluka Borivali, Borivali (E) By M/s. SAMEER N. BHOJWANI. Samir Complex, 1st,2nd floor, St. Andrews Road, Holy Family Hospitals, Bandra (W), Mumbai- 400 050 APPENDIX - I (See paragraph - 6) FORM 1 (I) Basic Information Sr.No. Item Details 1. Name of the project/s Amendment in Environmental Clearance for “PERMANENT MAGNET” at Borivali (E). State- Maharashtra 2. S. No. in the schedule 8 (B2) 3. Proposed Total plot area: 11671.4 Sq. m. capacity/area/length/tonnage to Built up area as per FSI: 27688.28 Sq. m. (Including fungible area) be handled/command area/lease Total construction built-up area: 80750.60 Sq. m. area/number of wells to be Project proposal: drilled One Residential Building: Flats: 241 1Basement + Stilt + 2 Podia + 45 upper floors 4. New/Expansion/Modernization Amendment in Environmental clearance 5. Existing Capacity/ Area etc. Received earlier EC dated 28th September 2011. Earlier Environmental clearance enclosed as Enclosure 1. 6. Category of project i.e.’ A’ or 8 (B2) ‘B’ 7. Does it attract the general Not Applicable condition? If yes, please specify. 8. Does it attract the specific Not Applicable condition? If yes, please specify. 9. Location Data Pada road, Borivali (Mumbai) Plot/Survey/Khasra No. C.T.S. No. 162/A Village Magathane Tehsil Borivali District Mumbai Suburban District State Maharashtra 10. Nearest railway station Borivali Railway Station: Within 2 km. (Road distance) Nearest airport Airport : Mumbai Chhatrapati Shivaji Terminals : Within 16 km (Road distance) 11. Nearest Town, city, District Borivali (Mumbai) headquarters along with distance in kms. 12. Village Panchayats, Zilla Municipal Corporation of Greater Mumbai (M.C.G.M.) Parishad, Municipal Corporation, Local body (complete postal address with telephone nos. to be given) 13. Name of the applicant Mr. SAMIR N. BHOJWANI 14. Registered Address Samir Complex,1st , 2nd floor, St. Andrews Road, Holy Family Hospital, Bandra (W), Mumbai- 400 050 15. Address for correspondence Samir Complex,1st ,2nd floor, St. Andrews Road, Holy Family Hospital, Bandra (W), Mumbai- 400 050 Name Mr. Samir N. Bhojwani Designation Owner (Owner/Partner/CEO) Address Samir Complex,1st ,2nd floor, St. Andrews Road, Holy Family Hospitals, Bandra (W), Mumbai- 400 050 Pin Code 400 050 E-mail [email protected] Form 1- Amendment in Environmental Clearance for “PERMANENT MAGNET”, Borivali 1 Telephone No. 66416000 Fax No. 66416014, 66416050 16. Details of Alternative Sites Not Applicable examined, if any. Location of these sites should be shown on a topo-sheet. 17. Interlinked Projects Not Applicable 18. Whether separate application of Not applicable interlinked project has been submitted? 19. If yes, date of submission Not applicable 20. If no, reason Not applicable 21. Whether the proposal involves approval/clearance under: if yes, details of the same and their status to be given. (a) The Forest (Conservation) Act, Not applicable 1980? (b) The Wildlife (Protection) Act, Applicable. ( to be applied for NOC from NBWL) 1972? (c) The C.R.Z Notification, 1991? Not applicable 22. Whether there is any No. Government Order/Policy relevant/ relating to the site? 23. Forest land involved (hectares) Not applicable 24. Whether there is any litigation No pending against the project and/or land in which the project is propose to be set up? (a) Name of the Court (b) Case No. (c) Order /directions of the Court, if any and its relevance with the proposed project. (II) Activity 1. Construction, operation or decommissioning of the Project involving actions, which will cause physical changes in the locality (topography, land use, changes in water bodies, etc.) Sr. Information/Checklist Yes Details thereof (with approximate quantities /rates, No. confirmation / No wherever possible) with source of information data 1.1 Permanent or temporary change in No Previously there was engineering unit on site. Received NOC land use, land cover or topography for conversion of land use from Industrial to Residential (I to including increase in intensity of R) and same is attached as Enclosure 2. Now the land shall land use (with respect to local land be developed as residential development. use plan) 1.2 Clearance of existing land, Yes Demolition of existing structure is involved. vegetation and building? 1.3 Creation of new land uses? No -- 1.4 Pre-construction investigation e.g. Yes Geotechnical Investigation has been carried out and same is bore houses, soil testing? attached as Enclosure 3. Form 1- Amendment in Environmental Clearance for “PERMANENT MAGNET”, Borivali 2 Sr. Information/Checklist Yes Details thereof (with approximate quantities /rates, No. confirmation / No wherever possible) with source of information data 1.5 Construction works? Yes Residential development. 1.6 Demolition works? Yes Debris shall be partly reused on site and partly disposed to authorized sites by authorized contractors. 1.7 Temporary sites used for Yes Temporary hutments with facilities like drinking water, construction works or housing of toilets etc. shall be provided. construction workers? 1.8 Above ground building, structures or Yes Excavated material partly shall be reused for backfilling if earthworks including linear possible and partly shall be disposed to authorized landfill structures, cut and fill or excavations site with prior permission of M.C.G.M. Construction waste generated during construction activity shall be partly reused on site and partly disposed to authorized landfill site with permission of M.C.G.M. 1.9 Underground works including Yes Construction of 1 basement only. mining or Tunneling? 1.10 Reclamation works? No -- 1.11 Dredging? No -- 1.12 Offshore structures? No -- 1.13 Production and manufacturing No -- processes? 1.14 Facilities for storage of goods or Yes Temporary storage facilities to store the construction raw materials? material. 1.15 Facilities for treatment or disposal of Yes • STP for treatment of sewage solid waste or liquid effluents? • Solid waste will be segregated into non biodegradable and biodegradable garbage • Biodegradable waste will be treated in Organic Waste Converter and the non-biodegradable waste will be segregated into recyclable & non recyclable. Recyclable waste shall be handed over to M.C.G.M. and non recyclable waste will be handed over to recyclers. • Dried sludge from STP will be used as manure for gardening 1.16 Facilities for long term housing of Yes Cabins for Watchmen / Gardener etc. operational workers? 1.17 New road, rail, or sea traffic during No -- construction or operation? 1.18 New road, rail, air waterborne or No -- other transport infrastructure including new or altered routes and stations, ports, airports etc? 1.19 Closure or diversion of existing No -- transport routes or infrastructure leading to changes in traffic Movements? 1.20 New or diverted transmission lines No -- or pipelines? 1.21 Impoundment, damming, culverting, No -- realignment or other change to the hydrology of watercourses or aquifers? 1.22 Stream crossings? No -- Form 1- Amendment in Environmental Clearance for “PERMANENT MAGNET”, Borivali 3 Sr. Information/Checklist Yes Details thereof (with approximate quantities /rates, No. confirmation / No wherever possible) with source of information data 1.23 Abstraction or transfers of water No -- from ground or surface waters? 1.24 Changes in water bodies or the land Yes By considering the runoff prior to development and runoff surface affecting drainage or run- after development there is some increment in runoff of storm off? water. Incremental Runoff = 0.11 m3/sec 1.25 Transport of personnel or materials Yes Transport of construction materials. Precautions will be for construction, operation or taken to reduce the impact of the vehicular movement by decommissioning? trying to avoid the vehicular trips during peak hours. 1.26 Long-term dismantling or No -- decommissioning or restoration works? 1.27 Ongoing activity during No -- decommissioning which could have an impact on the environment? 1.28 Influx of people to an area in either Yes There will be influx of ~1205 persons. temporarily or permanently? 1.29 Introduction of alien species? No -- 1.30 Loss of native species or genetic No -- diversity? 1.31 Any other actions? No -- 2. Use of Natural resources for construction or operation of the Project (such as land, water, materials or energy, especially any resources which are non-renewable or in short supply): Sr. Information/checklist Yes / Details thereof (with approximate quantities /rates, wherever No. confirmation No possible) with source of information data 2.1 Land especially undeveloped or No The land is in developed infrastructure area. agricultural land (ha) 2.2 Water (expected source & Yes During Construction Phase - competing users) unit : KLD For Workers : M.C.G.M: 12 KLD For Construction : From Water tankers : 15 - 20 KLD (Depending upon the activity). During Operational Phase – During Non Monsoon Fresh water from M.C.G.M. = 108 KLD (for Domestic purpose) 2.3 Minerals (MT) No -- 2.4 Construction material – stone, Yes Quantity : As per requirement aggregates, and / soil (expected Stone aggregates demand will be met from the clay/soil source – MT) generated after excavation and from open market. Sources: The material required for construction activities shall be procured from company’s authorized / approved vendors only. The vendor’s performance will be monitored periodically. In case of urgency or non-availability of materials from authorized / approved vendors, it will be procured from the open market. 2.5 Forests and timber (source – Yes Timber will be required for doors.