Section 19 Investigation Report

Total Page:16

File Type:pdf, Size:1020Kb

Section 19 Investigation Report Section 19 Investigation Report Stockport Metropolitan Borough Council June 2016 Flood Events D02 | V02 December 2016 131251 June 2016 Flo od Eve nts Stockpor t M etro polita n Bor oug h Cou ncil June 2016 Flood Events Section 19 Investigation Report Project No: B2278700 Document Title: June 2016 Flood Events Document No.: D02 Revision: V02 Date: December 2016 Client Name: Stockport Metropolitan Borough Council Client No: 131251 Project Manager: Chris Isherwood Author: Tim Diesner File Name: 2016-12-07_B2278700_S19InvestigationReport_Wrk_V10.docx Jacobs U.K. Limited 4th Floor, Metro 33 Trafford Road Salford M5 3NN United Kingdom T +44 (0)161 873 8500 F +44 (0)161 873 7115 www.jacobs.com © Copyright 2016 Jacobs U.K. Limited. The concepts and information contained in this document are the property of Jacobs. Use or copying of this document in whole or in part without the written permission of Jacobs constitutes an infringement of copyright. Limitation: This report has been prepared on behalf of, and for the exclusive use of Jacobs’ Client, and is subject to, and issued in accordance with, the provisions of the contract between Jacobs and the Client. Jacobs accepts no liability or responsibility whatsoever for, or in respect of, any use of, or reliance upon, this report by any third party. Document history and status Revision Date Description By Review Approved D01 19/10/2016 Draft report issued to client for comment T Diesner C Isherwood C Isherwood D02 09/12/2016 Draft report issued to client for comment T Diesner C Isherwood C Isherwood D02 i June 2016 Flood Events Contents 1. Introduction ..........................................................................................................................................1 1.1 Flood Event Overview ............................................................................................................................1 1.2 Section 19 Investigation Requirements ...................................................................................................2 1.3 Purpose .................................................................................................................................................2 1.4 Relevant Risk Management Authorities ..................................................................................................3 2. Overview of Flood Events ....................................................................................................................5 June 2016 ..............................................................................................................................................5 2.1 5 2.2 Property Impacts ....................................................................................................................................7 2.3 EA Flood Alerts .................................................................................................................................... 12 3. Bramhall Green .................................................................................................................................. 13 3.1 Site Overview & Flooding Impacts ........................................................................................................ 13 3.2 Flooding Analysis ................................................................................................................................. 13 3.3 RMA Responses .................................................................................................................................. 16 4. Hazel Grove ........................................................................................................................................ 17 4.1 Site Overview & Flooding Impacts ........................................................................................................ 17 4.2 Flooding Analysis ................................................................................................................................. 18 4.3 RMA Responses .................................................................................................................................. 21 5. Offerton Green ................................................................................................................................... 22 5.1 Site Overview & Flooding Impacts ........................................................................................................ 22 5.2 Flooding Analysis ................................................................................................................................. 23 5.3 RMA Responses .................................................................................................................................. 25 6. Edgeley ............................................................................................................................................... 27 6.1 Site Overview & Flooding Impacts ........................................................................................................ 27 6.2 Flooding Analysis ................................................................................................................................. 27 6.3 RMA Responses .................................................................................................................................. 29 7. Reddish .............................................................................................................................................. 30 7.1 Site Overview & Flooding Impacts ........................................................................................................ 30 7.2 Flooding Analysis ................................................................................................................................. 30 7.3 RMA Responses .................................................................................................................................. 31 8. Cheadle ............................................................................................................................................... 32 8.1 Site Overview & Flooding Impacts ........................................................................................................ 32 8.2 Flooding Analysis ................................................................................................................................. 32 8.3 RMA Responses .................................................................................................................................. 33 9. Heald Green ........................................................................................................................................ 34 9.1 Site Overview & Flooding Impacts ........................................................................................................ 34 9.2 Flooding Analysis ................................................................................................................................. 34 9.3 RMA Responses .................................................................................................................................. 35 10. Other Local Incidents and Impacts ................................................................................................... 37 10.1 Local Property Impacts ......................................................................................................................... 37 10.2 Infrastructure Impacts........................................................................................................................... 40 D02 ii June 2016 Flood Events 11. Recommended & Ongoing Actions ................................................................................................... 42 11.1 Recommended & Ongoing Actions across Stockport ............................................................................ 42 11.2 Next Steps ........................................................................................................................................... 43 12. Conclusion ......................................................................................................................................... 44 D02 iii June 2016 Flood Events 1. Introduction 1.1 Flood Event Overview In June 2016, the borough of Stockport received approximately double the long-term average amount of rainfall through prolonged and intense rainfall. On ground already saturated through May, this resulted in three noticeable flood events across many areas of Stockport on the 8, 11 and 16 June. On the 8 June, extreme rainfall overloaded local drains and sewers, which caused surface water flooding that affecting 102 properties, with the worst affected areas including Offerton Green, Reddish and Cheadle. Three days later on the 11 June, prolonged and heavy rainfall caused river levels to rise and local drainage systems to become overwhelmed affecting Bramhall Green, Hazel Grove, Heald Green and again in Offerton Green, with a total of 186 properties affected. Later on the 16 June, a third intense rainfall event also overloaded local drains and sewers, principally in Edgeley and Cheadle. During the event, surface water flooding affected 77 properties. As a result, 291 properties suffered internal and external flooding, with some properties flooded on more than one occasion. A number of roads also became impassable (See Figure 1.1) and a landslip caused significant disruption to the local railway network. Stockport Metropolitan Borough
Recommended publications
  • Self-Contained Offices for Sale Or to Let Styal Road Heald Green South
    Self-contained offices for sale or to let Styal Road Heald Green South Manchester Ashbrook Office Park brings together all the key elements required to meet the expectations of today’s discerning business occupiers. High specification offices – with plenty of car parking – are set within a safe and mature parkland environment, complemented by the park’s proximity to extensive amenities and unparalleled transport connectivity. STYAL ROAD (B5166) PHASE TWO Pre-let up to 28,000sqft 3 2 RESIDENTIAL/ 4 APARTMENTS 1 5 11 PHASE ONE 10 6 7 Footpath 8 9 IRWIN DRIVE PHASE TWO Pre-let up to 35,000sqft HEALD GREEN BEEFEATER PREMIER INN HEALD GREEN STATION FINNEY LANE HEALD GREEN VILLAGE location Just two miles east of Manchester Airport and alongside the established business community of Styal Road, Ashbrook Office Park is an easy daily commute from neighbouring towns and villages such as Wilmslow, Didsbury and Altrincham – by car, train or bus. With excellent retail and leisure facilities including John Lewis, Sainsbury’s and David Lloyd Fitness just a mile away at Cheadle Royal, Ashbrook Office Park ensures an effective work-life balance. the scheme Stylishly integrated into the site to complement the Just two miles from the M56, Ashbrook is an easy commute landscaped environment, eleven architecturally striking from South Manchester’s prosperous towns and villages. buildings have been configured and specified to meet A new footpath links the office park to Heald Green railway occupiers’ demands for high quality accommodation. station which lies on the Wilmslow to Manchester Piccadilly Internally, an exceptional standard of finish has been applied; line; bringing both the city centre and Wilmslow within an with bright reception areas, air-conditioning, raised access easy 15-minute journey.
    [Show full text]
  • Download Brochure
    DISCOVER MORE CONTENTS DESCRIPTION 3–4 MASTER PLAN 5–6 LIFESTYLE 7 AMENITIES 8 SPECIFICATION 9 AVAILABILITY 10 PLANS 11–13 LOCATION 14 DEMOGRAPHICS 15 GALLERY 16 CONTACT 23 © DESCRIPTION Trident provides high quality Grade A office accommodation, comprising clear open floor plates from 9,527 sq ft (885 sq m) to an entire building of up to 29,002 sq ft DESCRIPTION (2,694 sq m). All the buildings are connected and total 88,000 sq ft (8175 sq m). The MASTER PLAN buildings are combined with a new feature glass entrance. This impressive corporate entrance includes a business concierge desk and incorporates a coffee and food LIFESTYLE amenity with break out space. Each self contained office building has its own secure AMENITIES entrance through the reception space. SPECIFICATION Externally there is extensive car parking and grounds that have been adapted AVAILABILITY and constructed to provide staff amenity space, including cycle storage, shower, PLANS changing facilities and tenant only gym. An exclusive Trident shuttle bus will be available to occupiers, running at peak times to and from the Airport and Metrolink LOCATION and Heald Green. DEMOGRAPHICS GALLERY CONTACT © DESCRIPTION DESCRIPTION MASTER PLAN LIFESTYLE AMENITIES SPECIFICATION AVAILABILITY PLANS LOCATION DEMOGRAPHICS GALLERY CONTACT © MASTER PLAN M56 DESCRIPTION J5 MASTER PLAN LIFESTYLE AMENITIES PEEL HALL SPECIFICATION J5 AVAILABILITY PLANS M56 M56 HEALD GREEN LOCATION SHADOW MOSS DEMOGRAPHICS GALLERY MANCHESTER INTERNATIONAL AIRPORT CONTACT TRIDENT SHUTTLE BUS METROLINK RAILWAY SEMMMS ROUTE © MASTER PLAN DESCRIPTION MASTER PLAN LIFESTYLE AMENITIES SPECIFICATION TRIDENT TRIDENT AVAILABILITY TWO THREE PLANS LOCATION DEMOGRAPHICS GALLERY TRIDENT CONTACT ONE © LIFESTYLE We take great pride in our assets and strive The Trident tenant programme and on-site facilities include: to create a first-class business location for our occupiers.
    [Show full text]
  • 53 Syddall Avenue Heald Green SK8 3AA Or Nearest Offer £325,000 53 Syddall Avenue Heald Green SK8 3AA Or Nearest Offer £325,000
    53 Syddall Avenue Heald Green SK8 3AA Or nearest offer £325,000 53 Syddall Avenue Heald Green SK8 3AA Or nearest offer £325,000 A deceptively spacious three bedroom detached bungalow backing onto open farm land. This beautiful detached bungalow lies off Wilmslow • Three Good Sized Bedrooms Road (A34) in a sought after location. It stands on a • Fitted Kitchen/Dining Room wide plot which is easily maintained. At the rear are • Gas Central Heating enclosed gardens with lawn and sun patio. Close by • Pvcu Double Glazing are local shops, schools and transport. Within four • Cavity Wall Insulation miles are the M56/60 Motorways as well as • Loft Insulation Manchester International Airport. Also within the • Nuaire Drymaster Air Circulator area are local sporting and recreational facilities. • Burglar Alarm Entrance Porch 6'4" x 5'3" The property offers: Entrance porch, large hallway, Impressive Hallway 29'4" x 11'9" to 4'7" + Recess lounge, fitted kitchen into dining room, three good Lounge 16'2" x 12'6" bedrooms, bathroom/WC/shower. Feature Fireplace Kitchen/Dining Room 24'4" x 10' Outside: Walled garden to the front with electric French Doors metal gates, off road parking and gardens to the front Bedroom One 14'11" x 14'2" and rear. Fitted Wardrobes Bedroom Two 12'5" x 8'10" This is a lovely home and an early viewing is highly Bedroom Three 13'2" x 9' recommended. Door To Store Room Bathroom/WC 11'3" x 5'5" Jacuzzi and Shower Cubicle Outside: Gardens, off road parking, walling, hedging, patio etc.
    [Show full text]
  • Final Recommendations on the Future Electoral Arrangements for Stockport
    Final recommendations on the future electoral arrangements for Stockport Report to The Electoral Commission September 2003 © Crown Copyright 2003 Applications for reproduction should be made to: Her Majesty’s Stationery Office Copyright Unit. The mapping in this report is reproduced from OS mapping by The Electoral Commission with the permission of the Controller of Her Majesty’s Stationery Office, © Crown Copyright. Unauthorised reproduction infringes Crown Copyright and may lead to prosecution or civil proceedings. Licence Number: GD 03114G. This report is printed on recycled paper. Report no. 355 2 Contents Page What is The Boundary Committee For England? 5 Summary 7 1 Introduction 11 2 Current electoral arrangements 13 3 Draft recommendations 17 4 Responses to consultation 19 5 Analysis and final recommendations 21 6 What happens next? 45 Appendices A Final recommendations for Stockport: Detailed mapping 47 B Guide to interpreting the first draft of the electoral change Order 49 C First draft of the electoral change Order for Stockport 51 3 4 What is The Boundary Committee for England? The Boundary Committee for England is a committee of The Electoral Commission, an independent body set up by Parliament under the Political Parties, Elections and Referendums Act 2000. The functions of the Local Government Commission for England were transferred to The Electoral Commission and its Boundary Committee on 1 April 2002 by the Local Government Commission for England (Transfer of Functions) Order 2001 (SI 2001 No. 3692). The Order also transferred to The Electoral Commission the functions of the Secretary of State in relation to taking decisions on recommendations for changes to local authority electoral arrangements and implementing them.
    [Show full text]
  • Neighbourhood Action Plan SUMMARY April 2011 - March 2012
    Neighbourhood Action Plan SUMMARY April 2011 - March 2012 Shaw Heath, Cheadle, Cheadle Hulme, Gatley, Heald Green and Bramhall Introduction This Neighbourhood Action Plan (NAP) has been Place, Shaw Heath; Queens Gardens, Cheadle developed for Shaw Heath, Cheadle, Cheadle and Avon Road, Heald Green and there are also Hulme, Bramhall, Heald Green and Gatley by a number of dispersed properties covered by Stockport Homes in partnership with customers, the NAP within these areas, including Gatley. services and organisations working and living in the neighbourhood. The neighbourhood is NAPs are developed in order to identify the located within Stockport Homes’ West Area key issues in a neighbourhood and to develop Housing Team, the area is managed by two actions to address these issues. NAPs Neighbourhood Housing Officers (NHOs) and can cover a range of social, economic and contact details are shown on the front page. environmental issues, which includes housing, the environment, community safety, leisure and This NAP covers a dispersed number of access to services and facilities. The NAPs properties, the following describes the facilities are influenced by a range of existing polices, within the three main residential areas; Randolph strategies and action plans at national, regional Contact Details: West Area Housing Team Neighbourhood Housing Officer: Melinda Waterhouse Telephone: 0161 218 1526 Email: [email protected] Neighbourhood Housing Officer: Val Percy Telephone: 0161 474 4371 Email: [email protected] and local levels. The information used Neighbourhood Activity to develop the plan links to Stockport 2010-2011 Council’s strategic plans and supports the Council’s Place and People strategic A range of projects have been delivered in • Garages at Willow Avenue, Cheadle Hulme objectives.
    [Show full text]
  • List of Commumity Toilets
    Correct as of 20th June 2019 Town Centre Facilities Business/Organisation Location Facilities Opening times St Peters Square, Petersgate, Male / Female Tuesday to Friday Stockport 11:00 to 14:00 St Peters Church Every 2nd Saturday in the month 10:00 to 13:00 Central Library Community Wellington Road South Male / Female / Monday 10:00 to Toilet Scheme Disabled Access / 19:00 Stockport SK1 3RS Baby changing Tuesday 10:00 to 19:00 Wednesday & Thursday 09:00 to 17:00 Friday 09:00 to 19:00 Saturday 09:00 to 16:00 Bus Station, Public Daw Bank, Stockport Town Male / Female / The toilets at the Convenience Centre Disabled Access / Bus Baby changing Station, Stockport Town Centre are open 7 days a week. Fred Perry House Piccadilly / Edward Street, Male / Female / Monday to Friday Stockport, SK1 3UR Disabled Access / 08.30 to 17.00 Baby changing Disability Stockport 23 High Street, Stockport, SK1 Male / Female / Monday to Friday 1EG Disabled Access 09.00 to 16.00 Vernon Park Museum Turncroft Lane, Offerton, Male / Female / Monday to Sunday Stockport, SK1 4AR Disabled Access / 10:00 to 16:00 Baby changing Bramhall Facilities Business/Organisation Location Facilities Opening times The Mounting Stone 8 Woodford Rd, Bramhall, SK7 Male/Female/Disabled Mon Tues 4pm to 1JJ Access/Baby 10.30pm Changing Weds 2pm to 10.30pm Thurs 2pm to 11pm Fri/Sat 12.00pm to 11pm Sun 12pm to 10.30pm Costa Coffee, Community Toilet 10 – 12 Bramhall Lane South, Male / Female / Monday to Friday Scheme Bramhall, Stockport, SK7 1AF Disabled Access / 07:00 am to Baby changing
    [Show full text]
  • 282 Styal Road, Heald Green, Cheadle, Cheshire, SK8 3TX
    282 Styal Road, Heald Green, Cheadle, Cheshire, SK8 3TX PURCHASE PRICE: £450,000 DESCRIPTION: Viewing an absolute must! A truly beautiful detached home exuding an atmosphere of traditional character and boasting an approximately 250ft long rear garden. The accommodation is beautifully presented throughout and retains many original features to provide a stunning family home. In brief the accommodation comprises, porch, entrance hall, attractivre lounge with inglenook overlooking the stunning rear garden, dining room with bay window, fitted kitchen, utility porch with w.c, 4 beds, and modern wet room room style bathroom. Outside there is a detached garage and truly breathtaking gardens the rear of which must be seen. A fantastic opportunity!! LOCATION: The property is conveniently situated for Heald Green and Gatley which offers a good selection of shops, pubs and restaurants and provides excellent educational facilities for children of all ages. Cheadle Royal shopping centre, Handforth Dean and Stanley Green retail parks are within easy reach as is the A34 bypass and motorway access. Gatley and Heald Green railway stations provide a direct link to Manchester City Centre and Manchester International Airport which is also nearby and the nearby bus route also provides very convenient access. DIRECTIONS From our Cheadle office proceed along Gatley Road towards Gatley, continue straight ahead at the junction with Kingsway. Turn left into Church Street, continue through Gatley village, then at the end turn left into Styal Road. Continue along Styal Road and the property can be found on the right hand side. PORCH 9 Gatley Road Cheadle Cheshire SK8 1LY Tel: 0161 428 1488 Opening Hours: Mon-Fri 9am-5.30pm, Sat 9am – 4pm, Out Of Hours: www.andrewdawson.co.uk ENTRANCE HALL Wood flooring, radiator, stairs to first floor, wood panelled walls, feature stained/leaded glass window, cloaks cupboard, ornamental plate rack.
    [Show full text]
  • 'After Housing Costs' Child Poverty Rate from Highest to Lowest
    Notes: This spreadsheet ranks wards in Greater Manchester by their 'after housing costs' child poverty rate from highest to lowest. This is done using data published by End Child Poverty in 2019. The data also ranks areas based on the proportion of the population in a ward classified as black and minority ethnic (BAME) in census data. The higher the proportion of people who are BAME in a ward the higher the rank. This data shows that areas with the highest BAME populations in Greater Manchester are often the areas with the highest rates of child poverty. Local Ward GM Child poverty rank GM BAME authority area (after housing costs) rank Oldham Werneth 1 1 Oldham St Mary's 2 6 Oldham Coldhurst 3 3 Manchester Longsight 4 4 Salford Ordsall 5 48 Manchester Cheetham 6 9 Rochdale Central Rochdale 7 10 Manchester Hulme 8 16 Rochdale Milkstone and Deeplish 9 2 Manchester Gorton South 10 17 Rochdale Kingsway 11 23 Salford Broughton 12 47 Bolton Great Lever 13 13 Manchester Rusholme 14 11 Salford Kersal 15 82 Oldham Alexandra 16 25 Oldham Medlock Vale 17 22 Salford Irwell Riverside 18 55 Manchester Crumpsall 19 15 Manchester Ardwick 20 12 Manchester Bradford 21 29 Manchester Miles Platting and Newton Heath 22 52 Tameside St Peter's 23 30 Bolton Rumworth 24 7 Salford Langworthy 25 72 Manchester Gorton North 26 27 Bury Sedgley 27 56 Bolton Harper Green 28 37 Bolton Halliwell 29 20 Manchester Ancoats and Clayton 30 40 Rochdale Smallbridge and Firgrove 31 36 Manchester Levenshulme 32 18 Trafford Clifford 33 8 Manchester Moss Side 34 5 Manchester Fallowfield
    [Show full text]
  • Where Can I View Documents and Respond to the Greater Manchester Bus Consultation?
    Where can I view documents and respond to the Greater Manchester bus consultation? All documents relating to the consultation and links to the long-form and short-form questionnaires can be accessed online at gmconsult.org. Hard copies of the documents can be viewed at public buildings across Greater Manchester, which are listed below. Long-form and short-form questionnaires and freepost envelopes will also be available for you to submit a response to the consultation. Bolton Bolton Town Hall, Victoria Square, Bolton, BL1 1RU One Stop Shop Bolton Council, Victoria Square, Bolton, BL1 1RJ Blackrod Library, Church Street, Blackrod, Bolton, BL6 5EQ Breightmet Library, Breightmet Fold Lane, Breightmet, Bolton, BL2 6NT Bromley Cross Library, Toppings Estate, Bromley Cross, Bolton, BL7 9JU Central Library, Le Mans Crescent, Bolton, BL1 1SE Farnworth Library, Market Street, Farnworth, Bolton, BL4 7PG Harwood Library, Gate Fold, Harwood, Bolton, BL2 3HN High Street Library, High Street, Bolton, BL3 6SZ Horwich Library, Jones Street, Horwich, Bolton, BL6 6SZ Little Lever Library, Coronation Square, Little Lever, Bolton, BL3 1LP Westhoughton Library, Library Street, Westhoughton, Bolton, BL5 3AU Bury Bury Town Hall, Knowsley Street, Bury, BL9 0ST Bury Library, Manchester Road, Bury, BL9 0DG Prestwich Library, Longfield Centre, Prestwich, Bury, M25 1AY Radcliffe Library, Stand Lane, Radcliffe, Bury, M26 1JA Ramsbottom Library, Carr Street, Ramsbottom, Bury, BL0 9AE Tottington Centre, Market Street, Tottington, Bury, BL8 3LL Manchester Manchester
    [Show full text]
  • Stockport Authority Monitoring Report 2015-2016
    Stockport Metropolitan Borough Council Local Development Framework Authority’s Monitoring Report (AMR) st st For the period 1 April 2015 to 31 March 2016 Documents and any related literature are available in a variety of formats e.g. Braille, large print or audio format. If you require documents in another format please contact: Technical Policy & Planning (Policy Performance & Reform) Tel: 0161 474 4395 Corporate and Support Services Email: [email protected] Stockport Metropolitan Borough Council Stopford House Piccadilly Stockport SK1 3XE Contents 1 Executive Summary 2 2 Introduction 6 3 Background 8 4 Development Plan Production 10 5 Monitoring of Policy Performance 24 Overarching Principles 29 Providing a Decent Home for Everyone 50 Access to Services 68 Accommodating Economic Development 90 Safeguarding and Improving the Environment 100 Transport 119 Stockport Town Centre Strategic Location 123 Woodford Aerodrome Opportunity Site 127 6 Planning Obligations 140 7 Conclusions 141 8 Future Monitoring & Reporting 145 2 1 Executive Summary 1 Executive Summary Background 1.1 This annually produced Authority's Monitoring Report (AMR) collates information which allows assessment of the performance of planning policies over the period 1st April 2015 to 31st March 2016. This is the fifth monitoring report since the adoption of Stockport's Core Strategy, which replaced large parts of the the Unitary Development Plan (UDP) from the start of April 2011. 1.2 This Executive Summary highlights the various elements of monitoring reporting on delivery of employment development, employment levels, retail & leisure development, housing provision and a range of environmental indicators around biodiversity, flood risk, low carbon development and Green Belt.
    [Show full text]
  • Stockport Annual Monitoring Report 2012-2013
    Stockport Metropolitan Borough Council Local Development Framework Authority’s Monitoring Report (AMR) st st For the period 1 April 2012 to 31 March 2013 If you would like this leaflet in large print, on audio tape, in Braille or on disk, please contact 0161 474 4395. Contents 1 Executive Summary 2 2 Introduction 6 3 Background 8 4 Development Plan Production 10 5 Monitoring of Policy Performance 24 Overarching Principles 29 Providing a Decent Home for Everyone 44 Access to Services 55 Accommodating Economic Development 74 Safeguarding and Improving the Environment 87 Transport 108 Stockport Town Centre Strategic Location 120 Woodford Aerodrome Opportunity Site 124 6 Planning Obligations 125 7 Conclusions 126 8 Future Monitoring & Reporting 129 2 1 Executive Summary 1 Executive Summary Background This annually produced Authority's Monitoring Report (AMR) collates information which allows assessment of the performance of planning policies over the period 1st April 2012 to 31st March 2013. This report is the second monitoring report since the adoption of Stockport's Core Strategy, which replaced large parts of the the Unitary Development Plan (UDP) from the start of April 2011. This Executive Summary highlights the various elements of monitoring reporting on delivery of employment development, employment levels, retail & leisure development, housing provision and a range of environmental indicators around biodiversity, flood risk, low carbon development and Green Belt. In addition the report comments on minerals and waste related development, preservation of conservation and heritage assets as well as the overarching management and delivery of transport infrastructure. Section 7 'Conclusions' provides a more detailed overview.
    [Show full text]
  • 204-210 Wilmslow Road, Heald Green, Cheshire, SK8 3BH “ to LET “ Highly Visible Main Road CAR SHOWROOM - 960 SQ FT Position on 0.33 Acres OTHER USES CONSIDERED
    www.willsill.co.uk 204-210 Wilmslow Road, Heald Green, Cheshire, SK8 3BH “ TO LET “ Highly visible main road CAR SHOWROOM - 960 SQ FT position On 0.33 acres OTHER USES CONSIDERED t: 01625 800 066 t: 01565 260 000 www.willsill.co.uk LOCATION FLOOR AREA SERVICES The property is prominently located in Showroom and office – 960 sq ft The site is currently serviced by water Heald Green on Wilmslow Road next and electricity. to the junction of Mableden Close. OTHER USES Heald Green village is approximately The site could be used for a wide LEGAL COSTS a 3 minute drive from the property. range of uses including car Each party will be responsible for Wilmslow Road is a busy road linking showroom, showroom, retail or their own legal costs. Handforth with Cheadle, Gatley, leisure (subject to planning) Cheadle Royal and Manchester BUILDING INSURANCE Airport. RENTAL The tenant will be responsible for the £30,000 per annum + VAT reimbursement of the landlords DESCRIPTION insurance costs. The site totals approximately 0.33 RATES acres which includes a concrete Rateable value £31,500 EPC forecourt, showroom offices and An EPC is available on request. canopy. It is understood that there is LEASE planning for 26 cars on the site. To The premises are available by way of VIEWINGS the rear there is a MOT centre which an FR&I lease for a term of years to Strictly by appointment with is currently occupied. be agreed incorporating rent reviews Williams Sillitoe on 01625 800066 or The showroom office includes at the appropriate intervals.
    [Show full text]