Internal Circulation Only

ICT LIBRARY UPDATE

Bi-monthly Jan. – Feb. 2014 Vol. XII : No. 1

Contents

- Articles - Pages (Subject wise alphabetically indexed) - 2-6

- Addition of Books - 7

- Reports - 8-13

Prepared by : Neeru Saini

Librarian

1

Articles Architecture 1 Architectural Response to the changing Times : (Architecture + Design: Feb. 2014)

Asphalt Pavements 1 Asphalt paving : new machines are coming to market while equipment from major manufactures has been used to carry out complex asphalt paving work at …(World Highways : Nov. Dec. 2013)

Aviation 1 Low Cost airports : Potential engines of growth : (Indian Infrastructure : Dec. 2013). 2 Airport issues : (Cruising Heights : Jan. 2014)

Business Development 1 The New Patterns of innovation, how examining the data and analytic tools you already have can generate new business ideas and new business models …( Harvard Business Review : Jan. – Feb. 2014)

Building 1 Innovative Exterior Lattice shell tune Buildings Subjected to Wind and seismic loading…NBM & CW : Jan. 2014

2

Bridge 1 Guidelines for selection and application expansion joint systems for bridges : (The bridge and structural engineer). 2 Importance of quality control measures for structural bearings and expansion joints - An introspection : ( The bridge and structural Engineer).

Concrete 1 Mechanical properties of ultra-high performance concrete using conventional materials in : (The Indian Concrete Journal Dec. 2013). 2 Shrinkage of ultra-high strength concrete : (The Indian Concrete Journal : Dec. 2013). 3 Polished concrete – The future of industrial flooring : (NBM & CW: Dec. 2013). 4 Influence of sustained elevated temperature on flu ash concrete : (The Indian Concrete Journal : Jan. 2014) 5 New Technology is coming to the sector at the same time that robust global demand for cement is forecast : (International construction : Dec. 2013)

Environment 1 Climate Change and its Impact on Water Resources and Agriculture : (Environmental Pollution Control Journal : Dec. 2013). 2 The need of the hour (Environmental Pollution Control Journal : Dec. 2013).

Energy 1 Propelling growth : the proposed wind energy mission aims to resolve a series of challenges and prepare a robust eco- system… ( Energy next : Feb. 2014) 2 Re is the future ever growing significance of renewable energy the world over : (Energy next : Feb. 2013)

3

General 1 Thousands die of Hepatitis C, but government does not blink (Down to Earth : Jan .16-31, 2014) 2 scientists find link between pesticide and breast cancer : ( Down to Earth- Jan. 16-31 , 2014) 3 How E-Cigarettes are doing more harm than good : (Down to Earth – Feb. 1-15, 2014)

Human Resource 1 Speared your employee’s career feel your employee s pulse before they begin to repulse you because career development is … (Human Capital : Dec. 2013) 2 Management Control Systems : A consultant’s Perspective (Consultancy Development Centre : Jan. 2014) 3 The big lie of strategic planning many be an excellent was to cope with fear of the unknown, but its………… ( Harvard Business Review : Jan. – Feb. 2014) 4 Nurturing talent … stuck in the middle (Human Capital : Jan. 2014)

Material 1 Utilization of different types of manufactured sand as fine aggregate in cement mortar : Indian Concrete Journal : Jan. 2014) Ministry 1 Steady progress : NHAI receives positive response for OMT projects : (Indian Infrastructure : Dec. 2013) 2 Operator viewpoint contracting OMT concessions to specialized companies reduces cost : (Indian Infrastructure : Dec. 2013) Parking 1 Parking matters our global picture showcases the latest news and technologies from the international parking sphere : ( Traffic Technology International : Jan. 2014)

4

Project Briefs 1 Infrastructure Development : (NBM & CW: Dec. 2013) 2 Road & Highways Project : (NBM & CW: Dec. 2013) 3 Power Projects : (NBM & CW: Dec. 2013) 4 Railways & Metro Projects : (NBM & CW: Dec. 2013) 5 Airport Projects : (NBM & CW: Dec. 2013) 6 Port Projects : (NBM & CW: Dec. 2013)

Road and Highways

1 Road Development Ecosystem for the North East Region : (Traffic Infra Tech : October-November : 2013). 2 Hurdles in highway construction : the PPP Perspective : (Traffic Infra Tech : October-November : 2013) 3 The future impact of self – driving cars : (Traffic Infra Tech : October-November : 2013) Structures 1 Repairs and rehabilitation of structure - Causes of distress and its solutions : NBM & CW : Feb. 2014) 2 Tall Structures : Planning and design of tall structures : (NBM & CW : Jan. 2014)

Steel 1 Steel Corrosion : Estimation of initiation and propagation periods related to steel corrosion in concrete mixed with seawater : (NBM & CW : Feb. 2014) 2 Design with steel - : (Steel structure & metal buildings : Jan. 2014)

Transportation 1 Cost-Benefit Analysis for transport projects : (Traffic Infra Tech : Oct. Nov. 2013) 5

Tunnel 1 Airless tunnel type shot blasting machine : (Steel structures & Metal buildings – Jan. 2014)

Water 1 1 The importance of water resource management in manufacturing : (Environmental Pollution Control Journal : Dec. 2013).

6

ADDITIONAL OF BOOKS

1 17361 : Indian Highways, Ministry circulation : Jan. 2009 to Dec. 2013 2 17362 : Manual on sewerage & sewage treatment 2nd ed. 3 17363 : waste water engineering treatment and reuse…. 4 17364 : 10th national conference technological innovations in India Retrospect and prospect : Nov. 29, 2012 5 17365 : Assocham : Construction and real estate : Directory 2013-14 6 17366 : Policy circulars/ advisory letters issued to all states urban transport April 2008 . Oct.2008 7 17367 : planning and design for sustainable urban mobility global report on human settlement 2013 8 17368 : IS – 5229 : 2003 – Aerial ropeways for transport of passengers continuous movement 9 17369 : IS – 5228 : 2003 – continuous movement monocable ropeways with fixed girps … 10 17370 : Aerodromes Vol. I : Aerodromes design and operations annex 14 : July 2013 11 17371 : Aerodromes Vol. II : Heliports, annex 14 : July 2013 12 17372 : IS 3844 – 1989 : Code of practice fir installation and maintenance of internal fire … 13 17426 : IRC : 6 – 2014 : Standard specifications and code of practice for road bridge 14 17427 : IRC : 78 – 2014 : Standard specifications and doe of practice 15 17428 : IRC : 115 – 2014 : guidelines for structural evaluation and strengthening of flexible road pavement …. 16 17429 : IRC : SP :55 – 2014 : guidelines on traffic management in work zones 17 17430 : IRC : SP : 62 - 2014 : guidelines for design and construction of cement concrete pavements for low …. 18 17431 : IRC : SP : 100 – 2014 : use of cold mix technology in construction and maintenance of road using bitumen 19 17464 : Diplomatic mission part I,II,III, International organizations and other … 20 17478 : standard specifications for road and bridges works for state road …..

7

Project Report

Sl. Projects Name Acc. No. Title of the Report (Hard Copy) Soft Year No. Copy 17317 QPR No. 12 : Oct. 2013

17318 Inspection report : Nov. 2013 17319 MPR No. 37 : Nov. 2013 NH-77 (HM) : Four laning of Hajipur - Muzaffarpur section of 1 ……. 17381 MPR No. 36 : Oct. 2013 17382 Inspection report : Dec. 2013 17456 MPR : No. 41 : Jan. 2014 17354 Operation and maintenance report No. 8 : Nov. 2013 NH-8 (SD) : Six laning of Surat – Dahisar section of NH-8 17376 Operation and maintenance report No. 9 : 2 from km 263.000 to km. 502.000….. Dec. 2013 17444 Operation and maintenance report No .10 :Jan. 2014 17314 Monthly Inspection Report Nov. : 2013 17315 Quarterly Inspection Report No. 9 : 2013

NH-77 (MS) : Independent engineer services for two laning of 17316 MPR :Nov. 2013 3 Muzaffarpur – Sonbarsa section of NH-77 …… 17415 MPR No. 38 : Dec. 2013 17457 MPR : Dec. 2013 17475 MPR : Jan. 2014 17355 MPR No. 25 : Nov. 2013

NH-8 (D) : Independent engineering services for the four 17421 MPR No. 26 : Dec. 2013 4 laning of Jetpur Somnath section from ….. 17422 QPR No .8 : Dec. 2013 17468 MPR No. 27 : Jan. 2014 6 NH-54 (MN) : Four laning from km. 126/450 to km. 140/700 17326 MPR : Nov. 2013

8

and km. 164 /080 to km. 165/400 Section of 17377 Monthly Progress Report : Dec. 2013 17448 MPR : Jan. 2014 17347 Monthly Inspection Report No. 49 : Nov. NH-8 (Gomti): Independent engineering services for 2013 7 development and operation of Beawar- Gomti section of ….. 17348 Monthly Inspection Report No. 50 : Dec. 2013 17330 O & M inspection report : Oct. 2013 17407 O & M Inspection report : Nov. 2013 NH-22 (Punjab) : Independent consultancy services for 4/6 8 17408 MPR No. 69 : Dec. 2013 laning of Zirakpur – Oarwanoo section of ….. 17331 QPR No. 23 : Dec. 2013 17469 MPR No. 70 : Jan. 2014 17349 MPR : Nov. 2013

NH- 10 (Hary.) : Independent engineering services for 4/6 17394 MPR : Dec. 2013 9 laning of /Haryana to Rohtak section on ……. 17395 QPR : Dec. 2013 17445 MPR : Jan. 2014 17332 Operation and maintenance inspection report : Oct. 2013 17333 Operation and maintenance inspection report : Nov. 2013 NH-47:(KL-1) : 4/6 laning of national highway from Thrissur 17414 Operation and maintenance inspection report 10 to Edapally section of NH-47 , Kerala on north-south corridor : Dec. 2013 ….. 17455 Operation & Maintenance inspection :Jan. 2014 17466 Operation & Maintenance Inspection Report : Sept. 2013 17357 Cross learning and state specific workshop report ADB : RRNMU (TA No. 8110) : Institutional development for 17387 QPR No. 2 : Jan. 2014 11 rural road asset management support to the establishment of 17388 Chhattisgarh preliminary state specific report rural road network.. on establishment of RCTRC : Jan. 2014 17389 West Bengal preliminary state specific report on establishment of RRNMU : Jan. 2014 9

17399 Odisha preliminary state specific report on establishment RCTRC : Jan. 2014 17400 Madhya Pradesh preliminary state specific report on establishment RCTRC : Jan. 2014 17401 Madhya Pradesh preliminary state specific report on establishment RRNMU : Jan. 2014 17402 Assam preliminary state specific report on establishment RCTRC : Jan. 2014 17403 Odisha preliminary state specific report on establishment RRNMU : Jan. 2014 17404 Assam preliminary state specific report on establishment RRNMU : Jan. 2014 17405 Chhattisgarh preliminary state specific report on establishment RRNMU : Jan. 2014 17406 West Bengal preliminary state specific report on establishment RCTRC : Jan. 2014 MP (2736) : Construction of ADB assisted with highway 17378 MPR No. 29 : Dec. 2019 12 corridors under ADB Loan no. 2736. 17436 MPR :Jan. 2014 17385 MPR : Nov. 2013

Bihar (BSRDC) : Supervision consultancy of civil project of 17391 MPR : Dec. 2013 13 contract package …. 17411 QPR : Dec. 2013 17454 MPR :Jan. 2014 17359 MPR : Oct. 2013 MP (2154) : Consulting services for construction supervision of 14 17437 MPR No. 87 : Jan. 2014 package No. 3 ….. 17438 QPR : Dec. 2013 NH-4 (TC) : Six laning of tumkur – Shitradurga section of NH- 17350 Road safety audit report : Dec. 2013 15 4 from km. 75+000 to ….. 17344 MPR No. 39 : Dec 2013

NH-15 (PA) : Independent engineer for 4 laning of Pathankot 17345 MIR No. 31 : Dec. 2013 16 - Amritsar section from ….. 17424 QPR No. 13 : Dec. 2013 17425 MPR No. 40 : Dec. 2013

10

17477 MPR No. 41 : Jan. 2014 17462 MIR No. 32 : Jan. 2014 17341 MPR : Nov. 2013 17342 MIR : No. 2 : Nov. 2013 17343 MIR : No. 3 : Dec.2013 NH-30 (Mohania) : Independent engineering consultancy 17 services for the project of construction of four laning of 17390 QPR : Dec. 2013 Mohania Ara …….. 17409 MPR : Dec. 2013 17449 MPR : Jan. 2014 17450 MIR Ni. 4 : Jan. 2014 17325 MPR : Nov. 2013

NH-54 (AS-1) : 4 laning of silchar to balachera section of NH- 17417 QPR : Dec. 2013 18 54 from …… 17418 MPR : Dec. 2013 17446 MPR : Jan. 2014 17323 MPR : Nov. 2013 MP (JJK) : Two laning with/without paved shoulders of 19 17397 MPR : Dec. 2013 Jhabua …… 17440 MPR : Jan. 2014 NH-58/72 : Independent engineering services for 4 laning of 17351 MPR : Oct. 2013 20 Haridwar – Dehradun section from km. 211.000 to ….. 17336 MPR : Oct. 2013 17337 MPR : Nov. 2013 NH-25/26 (JL) : NH-26 : Jhansi to Lalitpur in the state of uttar 21 17379 QPR : Oct. 2013 Pradesh NSI/BOT/UP-2… 17380 MPR : Dec. 2013 17436 MPR : Jan. 2014 17320 MPR : Oct. 2013

MP (DI ) Intermediate two laning with without paved shoulders 17321 MPR : Nov. 2013 22 of dehrdha ishagarh…. 17441 MPR : Jan. 2014 17465 MPR : Dec. 2013 11

17322 MPR : Nov. 2013 MP : (Thandla – Limdi) : intermediate/ two laning with without 23 17396 MPR : Dec. 2013 paved shoulders of thandla limdi … 17442 MPR : Jan..2014 17324 MPR : Nov. 2013

NH-54 (E) : 4 laning of national highways from mailbang 17419 MPR : No. 37 : Nov. 2013 24 harangajao section of …. 17420 MPR : Oct. 2013 17471 MPR : Jan. 2014 17327 MPR : Sept. 2013 25 Nippo : Corporation C/o maruti Suzuki ….. 17328 MPR : Oct. 2013 17423 MPR : Nov. 2013 17329 Monthly Report No. 74 : Nov. 2013

NH-21(Punjab) : Independent consultancy services for 4 laning 17383 Monthly Report No. 75 : Dec. 2013 26 of kurali kiratpur 17384 Quarterly Report No. 25 : Dec. 2013 17439 Monthly Report No. 76 : Jan. 2014 17334 MPR : Oct. 2013

J & K (2151) : Multisector project for infrastructure 17335 MPR : Nov. 2013 27 rehabilitation in Jammu & Kashmir 17386 MPR : Dec. 2013 17463 MPR : Jan. 2014 17338 Quarterly Report No. 14 : Nov. 2013 17339 Monthly Report : Oct. 2013 17340 Monthly Report : Nov. 2013 NH-9 (HV) : Independent consultancy services for design, 28 engineering construction development finance operation and 17346 MPR : Nov. 2013 maintenance of …. 17392 Monthly Report : Dec. 2013 17393 MPR : Dec. 2013 17467 Monthly Report : Jan. 2014 29 NH-25 (EW) : North South and East West corridors…. 17352 MPR : Oct. 2013

12

17353 MPR : Oct. 2013 17451 MPR : Dec. 2013 17356 MPR : Nov. 2013 NH-28/31: Independent engineering services for the project of 17412 MPR : Dec. 2013 30 development of greenfield bridges across river ganga and its 17413 QPR : Dec. 2013 approaches connecting … 17447 MPR : Jan. 2014 Bihar (SH) : rehabilitation upgradation and strengthening of SH 17354 Operation and maintenance report No. 8 : 31 82 , Bhabhua- Adhaura …. Nov. 2013 ADB/ADF : African development bank…/ study on quality of 17373 Progress Report : 4 : Dec. 2013 32 bank financed road projects Ethiopia (Yalo Abala) : Consultancy services for the design 17374 Annexure III : Lot II 33 review and construction supervision of yalo abala road 17375 Annexure II : Lot I construction project …. NH-229 : Widening of existing road to 2 lane NH standards 17410 Quarterly Report : Dec. 2013 34 along with improvement and realignment from ADB (TA : 8019): Advanced project preparedness for poverty 17432 Inception Report : Feb. 2014 35 reduction preparing state road project ….. Sone- geotechnical exploration work for sone bridge site 17433 Inception Report : Feb. 2014 36 at dehri on sone in bihar …… 17434 Soil investigation report : Dec,2013 37 Ethiopia (Kom- Bati) : 17435 Draft Design review report 17452 Final conceptual report : Feb. 2014 Lesotho (Air) Consultancy services for the economic feasibility 38 preliminary and detailed engineering design, …. 17453 Detailed design report Vol. I : Main Report : Feb. 2014 NH-6 (BS _ Orissa) : Independent engineers services for 4 17470 MPR No. 34 : Nov. 2013 39 lanning of Sambalpur Bargarh Orissa …. Manipur consultancy services for feasibility study and 17472 Inception Report : March 2014 40 preparation of detailed project report for proposed 17473 Quality Assurance Plan. : March 2014 ADB (Fun ): ADB : Stidy on quality of bank financed road 17474 Draft Final Report : Feb. 2014 41 projects

13