N :Clogging Point

Bacoor 17 4 18 5 Kawit 7 12 9 10 8 11 19

IRRIGA

TION C

ANAL 13

6 IRRIGA

TION C 14 3 ANAL 20 Rosario 2

IRRIGA

TION C 15 ANAL

16 1

Tanza

General Trias

Dasmarinas

:River(Main) :River(Trib.Other) :Municipal Boundary :Main Irrigation Canal :Study Area

THE STUDY ON 図 9.1 COMPREHENSIVE FLOOD MITIGATION FOR LOWLAND AREA 流下物の堆積により断面が阻害されている CTI Engineering International Co., Ltd ローランドエアリア内の河川及び水路 Nippon Koei Co., Ltd

F - 9 - 1

THE STUDY ON 図 9.2 (1/3) COMPREHENSIVE FLOOD MITIGATION 河道内への侵入が顕著な地域 FOR CAVITE LOWLAND AREA CTI Engineering International Co., Ltd. (Imus 川, 川及び Julian 川) Nippon Koei Co., Ltd

F - 9 - 2

THE STUDY ON 図 9.2 (2/3) COMPREHENSIVE FLOOD MITIGATION 河道内への侵入が顕著な地域 FOR CAVITE LOWLAND AREA CTI Engineering International Co., Ltd. (San Juan 川) Nippon Koei Co., Ltd

F - 9 - 3

THE STUDY ON 図 9.2 (3/3) COMPREHENSIVE FLOOD MITIGATION 河道内への侵入が顕著な地域 FOR CAVITE LOWLAND AREA CTI Engineering International Co., Ltd. (Canas 川) Nippon Koei Co., Ltd

F - 9 - 4

COMPREHENSIVE FLOOD MITIGATION FLOOD COMPREHENSIVE CTI EngineeringInternationa Co., Ltd. FOR CAVITE LOWLAND AREA Nippon Koei Co., Ltd THE STUDY ON F -95 図 9.3 洪水避難指定地区 現況の洪水リスク潜在地区と

THE STUDY ON 図 11.1 COMPREHENSIVE FLOOD MITIGATION FOR CAVITE LOWLAND AREA 河川洪水対策のための CTI Engineering International Co., Ltd. マスタープランの内容 Nippon Koei Co., Ltd

F - 11 - 1

THE STUDY ON 図 11.2 COMPREHENSIVE FLOOD MITIGATION FOR CAVITE LOWLAND AREA 内水排除のための CTI Engineering International Co., Ltd. マスタープランの内容 Nippon Koei Co., Ltd

F - 11 - 2 Retarding Basin

Daan Bukid Creek

(50)(50) (75) (50) (100) 35 50 70 20 70 Bacoor River

Habay Bridge Palico Bridge

Muntino Bridge

(65) 65 Triburary NIA Canal

Triburary Island Cove Banalo Bridge Bridge (80) 50 Balsahan Bridge Imus Bridge Anabu Dam

470 470 390 250 430 Taclong II Bridge Imus River 95 110 110 180 120 Bacoor Bay (120) (130) (130) (180) (140) (15) 15 Julian River

(35) 30 Bacoor River : 2年確率洪水時の流量 Triburary Julian River : 5年確率洪水時の流量 ( ) : 10年確率洪水時の計算流量(氾濫あり)

NIA Canal

Ylang-Ylang River Pasong Kastila Bacoor Bay Dam Panamitan Bridge 240 430

Panamitan River 280 San Juan Ilang-Ilang Bridge Bridge 240 Bayan Diversion Dam 460 460 260 140 340 Diversion San Juan River point

THE STUDY ON 図 11.3 COMPREHENSIVE FLOOD MITIGATION FOR CAVITE LOWLAND AREA 最適案における河川流量配分 CTI Engineering International Co., Ltd. Nippon Koei Co., Ltd F - 11 - 3

COMPREHENSIVE FLOOD MITIGATION FLOOD COMPREHENSIVE

CTI EngineeringInternational Co., Ltd. Member of Flood

FOR CAVITE LOWLAND AREA Mitigation Committee JICA Study PPDC Team Chairman Nippon Koei Co., Ltd THE STUDY ON

District Engineer. Head of PEO Head of Head of District Engineer Provincial of DPWH PHUDO PG-ENRO of DENR Director of PNP

Organizations to be coordinated by FMC

Task Force for DPWH Central PEO, MEOs & PPDO, CPDO, Members of PDCC, CDCC/ Relocation of Oplan Linis MDCC & F -11 -4 Office of /Project Resident MPDO Informal Cavite BDCC Office Association Dwellers 図 11.4 11.4 図 洪水対策委員会の提案組織概要 Principal Works to be coordinated by FMC

Construction of Land Acquisition IEC on Cleanup Execution and O&M of Flood Cleanup of Control of Flood for Flood of Waterway IEC of Flood Mitigation Encroachment Excessive Land Mitigation Mitigation and Removal of Warning and Structures in River Area Development Structures Structures Garbage Evacuation

THE STUDY ON 図 11.5 COMPREHENSIVE FLOOD MITIGATION FOR CAVITE LOWLAND AREA プロジェクト実施時における CTI Engineering International Co., Ltd. 収用家屋移転候補地 Nippon Koei Co., Ltd

F - 11 - 5 THE STUDY ON 図 11.6 COMPREHENSIVE FLOOD MITIGATION 本計画実施時の FOR CAVITE LOWLAND AREA CTI Engineering International Co., Ltd. 戦略的移転計画の提案図 Nippon Koei Co., Ltd

F - 11 - 6