10 years of success 2013-2014 Ayesa’s involvement in ’s metro sector picks up speed with 2017-2018 Now with extensive experience in various types of it securing a detailed engineering contract for the Kolkata transport projects in India, between 2017 and 2018 Ayesa Metro, specifically the north-south line connecting secures even more projects in the country, this time Noapara-Baranagar-Dakshineswar. This is India’s oldest metro involving the and Pune metros. Here, the in system, opening in 1984, and one of its largest. Ayesa is also India company showcases all its expertise and awarded a contract to provide architecture and supervision disciplines through a number of contracts which services for the structural engineering involved in the second include design, architecture, specialist services phase of the Pink Line, which includes the tourist stations for underground construction work, Chhoti Chaupar and Badi Chaupar. electromechanical services, and safety and fire protection systems. In 2018, Ayesa also wins the supervision contract for the Purvanchal Expressway (packages V-VIII) and the detailed engineering contract for phase IV of the . A number of major projects are opened, such as the and the Magenta Line of the Delhi Metro. In 2018, our team in India reaches 300 and our offices in Noida are joined.

The firm2010 is awarded its first contract for the supervision of maintenance work for the Sister Nivedita Bridge in Kolkata. Following this, it makes its début in the country’s rail sector, designing and supervising a 17-km stretch of the Obulavaripalle-Venkatachalam line, in the state of Andhra Pradesh.

The company2015 is responsible for the project management of the Agra Lucknow Expressway, India’s longest at 300 kilometres. New multi-disciplinary contracts are signed for metro systems, such as the one joining the cities of Noida and Greater Noida, in the state of Uttar Pradesh, which spans 30 kilometres and has 21 stations (Aqua Line).

2019Ayesa is awarded the contract to design four stations and provide technical assistance for 2011-2012Ayesa secures its position as a leading international engineering India’s first semi high-speed rail system, with a firm in India with its first major metro project - a contract to design 2016Lucknow Metro Rail Corporation (LMRC) design speed of 180 km/hour, linking Delhi and 26 stations for the Delhi Metro (phase III of the Janakpuri-Botanical awards Ayesa its first technical Meerut. This is Ayesa’s most important project to Garden line). The Magenta Line is the country’s first to feature assistance contract for a full phase of date in the country. Also in 2019, one of our flagship driverless technology. Moreover, with private clients the company the north-south line of the Lucknow projects, the Noida - Greater Noida line, is opened also participates in important tenders. Metro, which opens in record time just and our team in India reaches 400. 2009Ayesa opens its first office in Gurgaon with two years later. It is subsequently the clear aim of establishing a permanent certified with the highest green rating presence in the country, this being part of (Platinum) by the Indian Green Building its internationalisation strategy. Council. Ayesa’s achievements continue with the design of four underground stations for Line 3 of the and supervision of Line 7 and 2B, spanning 17 km and involving 13 stations.