Sample Specifications for New Single Family Detached Homes

Total Page:16

File Type:pdf, Size:1020Kb

Sample Specifications for New Single Family Detached Homes Sample Specifications for New Single Family Detached Homes Introduction Kentucky Housing Corporation (KHC) has created the following sample residential construction specifications to assist you in building safe, decent, affordable housing. The sample specifications cover many - but not all - aspects of the 2006 Kentucky Residential Code (KRC). These specifications meet Minimum Design (MD), Universal Design (UD) and exceed the KRC. KHC encourages you to use this document as an informational tool as well as become familiar with the KRC and refer to all manufacturers’ instructions. If you have any questions about these specifications, please contact a member of KHC’s Department of Design and Construction Review for your area. The names and phone numbers for KHC’s Construction Specialists are listed below. Dwayne Shepherd (800) 633-8896 or (502) 564-7630 cell phone – (502) 545-0373 (Eastern KY) Allison Thomas (800) 633-8896 or (502) 564-7630 cell phone – (502) 544-9817 (Central KY) Tad Douglas (800) 633-8896 or (502) 564-7630, ext. 325 cell phone – (502) 545-3344 (Western KY) Andy Coyle (800) 633-8896 (Home) (606) 674-6891 cell phone – (606) 210-3328 (North Central KY) Project Name: _______ ____________________________________________________ Project Location: _________________________________________________________ 1) PDF = KHC Sample Specifications Approved As Written □ 2) Word = KHC Sample Specifications Approved With Modifications □ KHC Representative ______________________________ Date _____________ 11/5/10 Sample Specifications For New Single Family Detached Homes To assist you, section and tables references from the Kentucky Residential IRC Code (KRC) are provided throughout these sample specifications. Look for these references in bold and parentheses. Section 1 Footings A. Soil tests. In areas likely to have expansive, compressible, shifting or other unknown soil characteristics, KHC may require a soil test to determine the soil’s characteristics at a particular location. This test shall be made by an approved agency using an approved method. (Table R401.4.1 IRC) B. Compressible or shifting soil. When top or subsoils are compressible or shifting, such soils shall be removed to a depth and width sufficient to assure stable moisture content in each active zone and shall not be used as fill or stabilized within each active zone by chemical, dewatering or presaturation. (Section R401.4.2 IRC) C. Site should be excavated and the foundation designed to allow a minimum of 18" crawlspace headroom and a minimum of 6" clearance between the bottom of the exterior vinyl siding and the finished exterior grade. All below grade block foundation is to be coated with foundation coating/damp proofing. (Section R406.1 IRC) D. Surface drainage shall be diverted to a storm sewer conveyance or other approved point of collection so as to not create a hazard. Lots shall be graded so as to drain surface water away from foundation walls. The grade away from foundation walls shall fall a minimum of 6" within the first 10'. (Section R401.3) Exception: Where lot lines, walls, slopes or other physical barriers prohibit 6" (152 mm) of fall within 10', drains or swales shall be provided to ensure drainage away from the structure. The ground under the dwelling shall be cleared of all vegetation and leveled (with the thought of positive drainage). (Section R408.5) If necessary, because of the location, at least one perforated drainpipe will be installed in the crawlspace area and run under the ground through the foundation wall at a slope away from the dwelling. E. Footings are to have the base of said footing below the frost line, and shall be constructed using minimum 2,500-psi concrete. The frost line is 24" below the proposed finished grade (Table R403.1.4) as listed in the table below. 2 Table R403.1.4 MINIMUM FROST PROTECTION DEPTH FOR KENTUCKY County Frost Depth d, (inches) Bell 27 Boone 30 Breathitt 30 Campbell 30 Clay 27 Floyd 33 Harlan 30 Johnson 30 Kenton 30 Knott 33 Knox 27 Lawrence 27 Leslie 30 Letcher 33 Magoffin 30 Martin 33 Owsley 27 Perry 30 Pike 33 All other KY counties 24 F. Concrete shall conform to the latest revised Standard Specification for Portland Cement, ASTM C595-03. All concrete, except footers, shall have a minimum 28-day compressive strength of 4,000 psi and be entrained with five percent air with a minimum cement content of 520 lb. per cubic yard (5.5) sacks. The minimum concrete thickness is 3 ½". Follow American Concrete Institute (ACI) 318-05. Provide a crushed rock base with a minimum 4" thickness. G. All exterior walls shall be supported on continuous solid or fully grouted masonry or concrete footings, or other approved structural systems which shall be of sufficient design to accommodate all loads according to Section R301 and to transmit the resulting loads to the soil within the limitations as determined from the character of the soil. Footings shall be supported on undisturbed natural soils or engineered fill. Footings are to be as required for your area for a standard frame house with 8" concrete block foundations. Footings will contain two parallel runs of ½" rebar, three inches from the ground and staked and saddled. Rebar should be lapped a minimum of 12" and bent around corners and footer steps. (Section R403.1) 3 H. The dwelling site shall be treated by a licensed exterminator to eradicate termites. The exterminator shall provide a contract, which the homeowner, at his option, can keep in effect for a period of five years. 4 Foundations A. Foundation construction shall be capable of accommodating all loads according to Section R301 and of transmitting the resulting loads to the supporting soil. Fill soils that support footings and foundations shall be designed, installed and tested in accordance with accepted engineering practice. B. The foundation walls shall be 8" x 8" x 16" (for houses with brick veneer, use 8" x 12" x 16") concrete block securely constructed using masonry materials. All joints will be troweled and smoothed. The foundation shall have a framed, closeable access door with at least 18" x 24" clearance outside and through the foundation wall. (Section R408.4 IRC) C. Beam pockets will be filled with concrete from surface to footer. Beam-ends will be located to allow ½-inch space between beam-ends and surrounding masonry. (Except for bearing surface on the pillars) [Section R319.1 number 4 IRC] The foundation vents shall be placed within 3' of each corner. (Section R408.1 & R408.2 IRC). D. The anchor bolts shall be embedded at least 7" in concrete within an open block cell, beginning one foot from each corner, then 6' on center (o.c.), and at the end of each sill plate. Foundation straps may also be used when installed according to the manufacturer’s directions. There shall be two bolts per each section of the plate. (Section R403.1.6) Sill plate is to be 2" x 8" SYP #2 KD ACQ (0.25 lbs/CuFt.) treated SYP. NOTE: The treated sill plate also serves as a termite shield; therefore, if 12" blocks are used, the sill plate will need to be increased to a 2 x 12, or the cells in the top run of blocks will be filled solid with concrete or an acceptable metal termite shield will have to be installed. [Section R319.1 number 2] E. Support columns for center beam shall have concrete footers (piers) constructed using the same minimum 2,500-psi concrete. The columns shall be constructed of 16" x 16" concrete blocks or properly laid 8" x 8" x 16" concrete blocks. When there are four blocks or less, piers shall be capped with solid 4" blocks or the top section of blocks is to be filled solid with concrete. When there are five blocks or more, all cores are to be filled solid to the base. Steel is the only acceptable type of shim. NOTE: If floor trusses are used, piers are not required, but an engineered, stamped plan for the trusses must be provided to the agency. Columns shall be a maximum of 8' on center. (Sections R606.6 – 606.6.1) The size of the footer will conform to the size of the pier. F. The foundation perimeter drain will be installed, consisting of a 4" perforated plastic pipe bedded in gravel and surrounding the entire house. This drain will slope away from the dwelling to the level necessary for complete drainage and will have the terminal end daylighted. (Section R405.1) All openings in the sub-floor must be sealed with caulk or foam insulation. This includes the plumbing pipe openings, furnace ductwork openings and electrical wire openings. 5 G. Dampproofing. Except where required to be waterproofed by Section R406.2, foundation walls that retain earth and enclose habitable or usable spaces located below grade shall be dampproofed from the top of the footing to the finished grade. Masonry walls shall have not less than 3/8" (9.5 mm) Portland cement parging applied to the exterior of the wall. The parging shall be dampproofed with a bituminous coating, three pounds per square yard (1.63 kg/m2) of acrylic modified cement, 1/8" (3.2 mm) coat of surface-bonding mortar complying with ASTM C 887 or any material permitted for waterproofing in Section R406.2. Concrete walls shall be dampproofed by applying any one of the above listed dampproofing materials or any one of the waterproofing materials listed in Section R406.2 to the exterior of the wall. (Section R406.1) H. The crawlspace will be covered completely with 6 mil. Polyethylene plastic as a vapor barrier/ground cover, with the sides extending 6" up each foundation wall.
Recommended publications
  • Basic Technical Rules the Nubian Vault (Nv)
    PRODUCTION CENTRE INTERNATIONAL PROGRAMME BASIC TECHNICAL RULES v3 BASIC TECHNICAL RULES THE NUBIAN VAULT (NV) TECHNICAL CONCEPT THE NUBIAN VAULT ASSOCIATION (AVN) ADVICE TO MSA CLIENTS Version 3.0 SEASON 2013-2014 COUNTRY INTERNATIONAL Association « la Voûte Nubienne » - 7 rue Jean Jaurès – 34190 Ganges - France February 2015 www.lavoutenubienne.org / [email protected] / +33 (0)4 67 81 21 05 1/14 PRODUCTION CENTRE INTERNATIONAL PROGRAMME BASIC TECHNICAL RULES v3 CONTENTS CONTENTS.............................................................................................................2 1.AN ANCIENT TECHNIQUE, SIMPLIFIED, STANDARDISED & ADAPTED.........................3 2.MAIN FEATURES OF THE NV TECHNIQUE........................................................................4 3.THE MAIN STAGES OF NV CONSTRUCTION.....................................................................5 3.1.EXTRACTION, FABRICATION & TRANSPORT OF MATERIAL....................................5 3.2.CHOOSING THE SITE....................................................................................................5 3.3.MAIN STRUCTURAL WORKS........................................................................................6 3.3.1.Foundations........................................................................................................................................ 6 3.3.2.Load-bearing walls.............................................................................................................................. 7 3.3.3.Arches in load-bearing
    [Show full text]
  • FEMA P-361, Safe Rooms for Tornadoes And
    Safe Rooms for Tornadoes and Hurricanes Guidance for Community and Residential Safe Rooms FEMA P-361, Third Edition / March 2015 All illustrations in this document were created by FEMA or a FEMA contractor unless otherwise noted. All photographs in this document are public domain or taken by FEMA or a FEMA contractor, unless otherwise noted. Portions of this publication reproduce excerpts from the 2014 ICC/NSSA Standard for the Design and Construction of Storm Shelters (ICC 500), International Code Council, Inc., Washington, D.C. Reproduced with permission. All rights reserved. www.iccsafe.org Any opinions, findings, conclusions, or recommendations expressed in this publication do not necessarily reflect the views of FEMA. Additionally, neither FEMA nor any of its employees makes any warrantee, expressed or implied, or assumes any legal liability or responsibility for the accuracy, completeness, or usefulness of any information, product, or process included in this publication. Users of information contained in this publication assume all liability arising from such use. Safe Rooms for Tornadoes and Hurricanes Guidance for Community and Residential Safe Rooms FEMA P-361, Third Edition / March 2015 Preface ederal Emergency Management Agency (FEMA) publications presenting design and construction guidance for both residential and community safe rooms have been available since 1998. Since that time, thousands Fof safe rooms have been built, and a growing number of these safe rooms have already saved lives in actual events. There has not been a single reported failure of a safe room constructed to FEMA criteria. Nevertheless, FEMA has modified its Recommended Criteria as a result of post-disaster investigations into the performance of safe rooms and storm shelters after tornadoes and hurricanes.
    [Show full text]
  • Types of Foundations
    Lecture Note COSC 421 1 (M.E. Haque) TYPES OF FOUNDATIONS Foundation Systems Shallow Foundation Deep Foundation Pile Foundation Pier (Caisson) Foundation Isolated spread Wall footings Combined Cantilever or footings footings strap footings Raft or Mat foundation Lecture Note COSC 421 2 (M.E. Haque) Shallow Foundations – are usually located no more than 6 ft below the lowest finished floor. A shallow foundation system generally used when (1) the soil close the ground surface has sufficient bearing capacity, and (2) underlying weaker strata do not result in undue settlement. The shallow foundations are commonly used most economical foundation systems. Footings are structural elements, which transfer loads to the soil from columns, walls or lateral loads from earth retaining structures. In order to transfer these loads properly to the soil, footings must be design to • Prevent excessive settlement • Minimize differential settlement, and • Provide adequate safety against overturning and sliding. Types of Footings Column Footing Isolated spread footings under individual columns. These can be square, rectangular, or circular. Lecture Note COSC 421 3 (M.E. Haque) Wall Footing Wall footing is a continuous slab strip along the length of wall. Lecture Note COSC 421 4 (M.E. Haque) Columns Footing Combined Footing Property line Combined footings support two or more columns. These can be rectangular or trapezoidal plan. Lecture Note COSC 421 5 (M.E. Haque) Property line Cantilever or strap footings: These are similar to combined footings, except that the footings under columns are built independently, and are joined by strap beam. Lecture Note COSC 421 6 (M.E. Haque) Columns Footing Mat or Raft Raft or Mat foundation: This is a large continuous footing supporting all the columns of the structure.
    [Show full text]
  • SOHO Design in the Near Future
    Rochester Institute of Technology RIT Scholar Works Theses 12-2005 SOHO design in the near future SooJung Lee Follow this and additional works at: https://scholarworks.rit.edu/theses Recommended Citation Lee, SooJung, "SOHO design in the near future" (2005). Thesis. Rochester Institute of Technology. Accessed from This Thesis is brought to you for free and open access by RIT Scholar Works. It has been accepted for inclusion in Theses by an authorized administrator of RIT Scholar Works. For more information, please contact [email protected]. Rochester Institute of Technology A thesis Submitted to the Faculty of The College of Imaging Arts and Sciences In Candidacy for the Degree of Master of Fine Arts SOHO Design in the near future By SooJung Lee Dec. 2005 Approvals Chief Advisor: David Morgan David Morgan Date Associate Advisor: Nancy Chwiecko Nancy Chwiecko Date S z/ -tJ.b Associate Advisor: Stan Rickel Stan Rickel School Chairperson: Patti Lachance Patti Lachance Date 3 -..,2,2' Ob I, SooJung Lee, hereby grant permission to the Wallace Memorial Library of RIT to reproduce my thesis in whole or in part. Any reproduction will not be for commercial use or profit. Signature SooJung Lee Date __3....:....V_6-'-/_o_6 ____ _ Special thanks to Prof. David Morgan, Prof. Stan Rickel and Prof. Nancy Chwiecko - my amazing professors who always trust and encourage me sincerity but sometimes make me confused or surprised for leading me into better way for three years. Prof. Chan hong Min and Prof. Kwanbae Kim - who introduced me about the attractive
    [Show full text]
  • Marina Bay Sands Hotel Arch 631 Kayla Brittany Maria Michelle Overall Information
    Marina Bay Sands Hotel Arch 631 Kayla Brittany Maria Michelle Overall Information Location: Singapore Date of Completion: 2010 Cost: $5.7 billion Architect: Moshe Safdie Executive Architect: Aedas, Pte Ltd. Structural Engineer: Arup Landscape Architects: Peter Walker and Partners Landscape Architects Height: 57 Stories (197 m, 640 ft) Design Concept • General parameters of the design were • EXPLORE (new living and lifestyle options) • EXCHANGE (new business ideas) • ENTERTAIN (rich cultural experiences) • 55 Stories of hotel • Garden on top of 1 hectare • 150 m (492 ft) infinity pool • Primary driving element of design was the need for a continuous atrium running along all three towers • Tapering of the building was then conceived Foundation Design • Built on reclaimed land • http://vimeo.com/18140 564 • Layers • Deepest layer is stiff-to-hard Old Alluvium (OA) • Middle layer (5m- 35m thick) is Kallang Formation made of deep soft clay marine deposits with some firm clay and medium dense sand of fluvial origin mixed in • Top layer (12m-15m thick) is sand infill Old Alluvium (OA) Layer • Used a forest of barrettes and 1m-3m diameter bored piles • Average excavation depth was 20m • 2.8 cubed Mm of fill and marine clay taken from site Cofferdams • Diaphragm walls used for minimum strutting • 5 reinforced concrete cofferdams – Circular • 2-120m diameter • 1-103 diameter – Peanut shaped (twin-celled) • 75m diameter – Semi-circular • 65m radius • Each was a dry enclosure – Construction carried out without need for conventional temporary support
    [Show full text]
  • In the Greeting That Arch Klumph Made to the Rotarians at the 1917 Rotary International Convention in Atlanta, He Said
    VISIT DISTRICT 6630's FOUNDATION CENTENNIAL WEBSITE AT TRF100.ORG In the greeting that Arch Klumph made to the Rotarians at the 1917 Rotary International Convention in Atlanta, he said “We are gathered here today, a band of loyal, tired, and true members of the most worthy organization, Consecrated to the doctrine of service in all that the word implies.” Arch C. Klumph believed that Rotary would Brighten all eternity when he proclaimed in December 1928 “The Rotary Foundation is not to build monuments of brick and stone. If we work upon marble, it will perish; if we work on brass, time will efface it; if we raise temples they will crumble into dust; but if we work upon immortal minds…we are engraving on those tablets something that will brighten all eternity. Rotary is built by men made of good stuff; the ideal of service is developing into practice. As a consequence, the organization will never stand still.” — The Father of The Rotary Foundation was A Rotarian with a dream. A dream that he followed for 30 years, telling Rotarians what an endowment fund could do for Rotary and the communities of the world. Arch C. Klumph was a charter member and past president of the Rotary Club of Cleveland. He was Rotary International’s sixth president, creator of the district system for Rotary Clubs and the Father of The Rotary Foundation of Rotary International. This is the Arch Klumph that you all know. I would like to introduce you to the real Arch Klumph: He was born in Conneautville, Pennsylvania on the 6th of June 1869, and he is a direct descendent on the maternal side of James Fenimore Cooper, the American novelist.
    [Show full text]
  • Types of Deep Foundations -Timber Piles - Reinforced Concrete Piles - Pifs - Steel Piles - Composite Piles - Augercast Shafts - Drilled Shafts
    Foundation Engineering Lecture #14 Types of Deep Foundations -Timber piles - Reinforced Concrete piles - PIFs - Steel piles - Composite piles - Augercast shafts - Drilled shafts L. Prieto-Portar 2009 Surface soils with poor bearing may force engineers to carry their structural loads to deeper strata, where the soil and rock strengths are capable of carrying the new loads. These structural elements are called “deep foundations”. The oldest known deep foundation was a “pile”. Originally, piles were simply tree trunks stripped of their branches, and pounded into the soil with a large stone, much like a carpenter hammers a nail into a wooden board. Pile driving machines have been found in Egyptian excavations, consisting of a simple "A" frame, a heavy stone and a rope. Roman military bridge builders used a similar technique. Both were early examples of “driven” piles. In 1740 Christopher Phloem invented pile driving equipment using a steam machine which resembles today’s pile driving mechanisms. This method evolved by using steam to raise the weights (in lieu of human power) during the late 1800’s, and then diesel hammers were developed in Germany during WWII. The most recent advance in pile placing is the hydraulic hammer. Steel piles have been used since 1800’s and concrete piles since about 1900. In contrast, shafts or placed deep foundations are screwed (“augered”) into the soil, much like a carpenter places a screw into a wooden board. Similarly to the contrast between nailing versus screwing, the shafts are usually a quiet operation that tends to improve the soil and rock texture to carry the load.
    [Show full text]
  • Setting up Shop Ways to Manage Your Family Foundation
    Managing in Support of the Charitable Mission ..........................117 CONTENTS Assessing What Work Must Be Done ..........................................117 Deciding How the Work Can Be Done ........................................118 Recruiting Family Volunteer Staff ........................................119 Deciding to Hire Paid Staff..................................................121 Should the Foundation Pay Compensation or Reimbursement?................................................................122 What the Law Says ............................................................122 What the Law Means ..........................................................123 Questions for the Board........................................................123 Family Participation ............................................................124 Developing a Compensation and Reimbursement Policy ....124 Finding an Alternative to Compensation ............................125 On the Outside Looking In ................................................126 Sharing Staff ........................................................................126 Using Consultants................................................................128 Moving to a Full-Time Paid Executive Director ................129 Determining Where the Work Will Be Done ................................129 Using a Home Office ..........................................................129 Using the Family Office ......................................................130 Relying on the
    [Show full text]
  • The Influence of the Arch
    The Influence of the Arch The Influence of the Arch by ReadWorks The lasting influence of ancient Rome is apparent in many areas of our contemporary society. Sophisticated elements of law, engineering, literature, philosophy, architecture, and art can all be traced back to the Roman Empire. But perhaps one of the most lasting contributions from Roman civilization is something we see nearly every day: the Roman arch. An arch is a curved structure designed to support or strengthen a building. Arches are traditionally made of stone, brick, or concrete; some modern arches are made of steel or laminated wood. The wedge-shaped blocks that form the sides of an arch are called voussoirs, and the top center stone, called the keystone, is the last block to be inserted. During construction, the arch is supported from below before the keystone is put in. The curve of an arch may take different shapes, but it is often a rounded or pointed semicircle. Although the Romans revolutionized the arch, the structure has been around since before them. The Assyrians used arches to construct vaulted chambers or underground drains. However, these early arches were only suitable for small structures. The designs weren't sophisticated enough to support larger edifices, like palaces or government buildings. The Romans, however, improved the arch and made it strong enough for large-scale, widespread use. By developing an arch capable of supporting huge amounts of weight, they laid the groundwork for some of the most important advancements in architectural history. The arch became a vital feature of bridges, gates, sewers, and aqueducts, which in turn were integral to the modernization of cities.
    [Show full text]
  • Wood Tornado Shelter - Construction Guide November 2018
    The Wood Tornado Shelter - Construction Guide November 2018 The Wood Tornado Shelter Prepared by Home Innovation Research Labs for the Forest Products Laboratory Table of Contents Introduction Introduction This 8 foot by 8 foot tornado shelter was developed Design Information by engineers at the US Department of Agriculture’s Siting Forest Products Laboratory to provide a design that Lumber Requirements is adaptable for existing construction and that is Safety easily constructed. Sequence of Construction Materials and Tools Design Information Section 1: Cutting the Lumber The tornado shelter presented here was laboratory Section 2: Constructing the Beams tested to meet impact and wind pressure Section 3: Building the Walls requirements. The following information may be Section 4: Constructing the Ceiling required with construction documents. Section 5: Attaching the Sheathing Section 6: Building and Hanging the Door • Type of shelter: Residential tornado Section 7: Providing Ventilation • The design meets the impact and wind Section 8: Anchoring the Shelter pressure requirements of ICC 500-2014: Standards for the Design and Construction of Storm Shelters. • Design Wind Speed: 250 mph Note to Reader • Wind Exposure Category: C Before ordering materials or starting construction: • Internal pressure coefficient, GCpi: +-0.55 • Read all instructions as construction • Topographic factor, Kzt: 1.0 options can affect quantity and size of • Directionality factor, Kd: 1.0 materials needed. Many steps are not • A statement must be provided that the reversible, so having a complete floor of the shelter has been constructed understanding of the construction process above the highest recorded flood elevation prior to starting will minimize costly if a flood hazard study has been conducted mistakes.
    [Show full text]
  • Raised Wood Floor Design & Construction Options
    Raised Wood Floor Design & Construction Options Presented by: Bruce Cordova Innovative Design Alternative NAHB Consumer Preference Study . 42% of consumers prefer wood framed first floors . 25% prefer concrete slabs Photos show Habitat for Humanity homes in Gulfport, MS. Raised Floor Benefits Champion Homes “They choose the raised one…” – Billy Ward Champion Builders, Port Allen, LA President, Baton Rouge HBA Tilson Homes “Our focus study revealed that homebuyers in Texas believe a RWF is a custom upgrade…a slab house gives a production builder feel.” – Robert Kennedy, Tilson Homes, Houston, TX Raised Wood Floor Benefits . Curb Appeal . Comfortable Walking Surface . Classic Style . Traditional Neighborhood Streetscapes . Decks & Porches Extend Living Space . Simplified Future Repairs and Renovations . Increased Resale Values “A home should have a top, middle, and a base.” – Kevin Harris, Architect Numerous Advantages Simple inspections Easy maintenance Less & improvements expensive to repair than slab Builders RWF Cost Assumptions “I like raised wood floors, but they’re $10,000 – $15,000 more than slab-on-grade.” – Mike Feigin Design Tech Homes, Houston, TX “We only offer raised wood floors because they are more cost effective than slab-on-grade. It’s the lowest cost method we can build.” – Lowell Pinnock, United-Bilt Homes, Houston, TX B.C. Daniels Incorporated Mobile, AL APA and CAWS launched a cost study to be conducted by NAHB – Research Center: .3 Raised Wood Floors .3 Slab-On-Grade .3 Elevated Slabs The 99K House Houston, TX www.the99khouse.com Jimmy & Rosalynn Carter Build Cows choose Raised Wood Floors Top 3 Federal Flood Disasters Before Katrina/Rita Storm Date Payout Claims TS Allison 6/2001 $1.1 billion 30,274 H.
    [Show full text]
  • Foundation Decision Tree Options for Improving Basements and Crawlspaces
    FOUNDATION ENERGY SAVING RECIPE Foundation Decision Tree Options for Improving Basements and Crawlspaces Basement and Crawlspace Definitions Unconditioned – The The Thermal Envelope location is not mechanically Determine where the best location for the thermal conditioned. Any ducts in the envelope exists in your home with a basement space must be insulated. and/or crawlspace by assessing the objectives for Conditioned – The location the space. Do you want to safely store objects in a is mechanically conditioned. space with low humidity and temperature swings? Ductwork in the space is If so, then consider sealing and insulating the wall usually insulated but it is not system - making the space indirectly-conditioned. required to be. If the space dictates a ventilated approach then seal and insulate the floor to mitigate water and Indirectly Conditioned – humidity issues. The location is not directly mechanically conditioned but is indirectly conditioned due to thermal connectivity with directly conditioned spaces. Uninsulated ductwork in the Basements and crawlspaces represent two of the three main foundation choices for homes; the third option being space may cause it to be slab on grade foundations. indirectly conditioned. Framed floor assemblies over basements and crawlspaces date back to a time before concrete slab foundations were Finished Space – Full common and are still employed today. The fundamental details usually consist of a wood framed joist assembly with height locations that are subfloor material (e.g., diagonal 1x or plywood/OSB) and finished flooring material which serves as the main floor of livable. Finished spaces are the building. usually directly mechanically conditioned. Basements conditioned or indirectly conditioned.
    [Show full text]