Operations Integrity Management System

Total Page:16

File Type:pdf, Size:1020Kb

Operations Integrity Management System Operations Integrity Management System Operations Integrity Management System: Chairman’s message 3 Imperial remains steadfast in its commitment To drive continuous improvement, the to excellence in safety, security, health and framework is periodically updated. This environmental (SSH&E) performance, referred revision strengthens framework expectations to collectively as operations integrity. with respect to leadership, process safety, We recognize that while we play a vital environmental performance, and the role in providing the energy the world relies assessment of OIMS effectiveness and is on, many of our operations and products intended to: present potential risks to people and to • Reinforce our belief that all safety, health and the environment. environmental incidents are preventable. Clearly identifying these risks is intrinsic in • Promote and maintain a work environment our business, and we believe the best way to in which each of us accepts personal meet our commitment to excellence in SSH&E responsibility for our own safety and that of performance is through a capable, committed our colleagues, and in which everyone actively workforce, as well as practices designed intervenes to ensure the safety, security and to enable safe, secure and environmentally wellness of others. responsible operations. We accomplish this through clearly defined policies and practices, We believe these enhancements will help and with rigorously applied management drive Imperial ever closer to our vision of a systems designed to deliver results. workplace where nobody gets hurt, where security is everybody’s business, and where The Operations Integrity Management System our environmental performance meets our (OIMS) represents the foundation of our expectations to Protect tomorrow. Today. commitment to managing SSH&E risk and achieving excellence in performance. Since Rich Kruger the inception of OIMS in 1992, our SSH&E Chairman, president and chief executive officer performance has improved substantially. Imperial’s safety performance is among the best in Canadian industry, and we have been cited by Lloyd’s Register Quality Assurance for “being among the leaders in the extent to which environmental management considerations have been integrated into our ongoing business practices.” All operating organizations are required to maintain the systems and practices needed to conform to the expectations described in the OIMS framework. This common framework for all of Imperial encourages the sharing of best practices and assists us as an organization in meeting our SSH&E objectives. 4 Operations Integrity Management System: The framework Imperial is committed to conducting business Imperial’s OIMS framework establishes in a manner that is compatible with the common expectations for addressing risks environmental and economic needs of the inherent in our business. The term operations communities in which we operate, and that integrity (OI) is used by Imperial to address protects the safety, security, and health of all aspects of its business that can impact our employees, those involved with our personnel and process safety, security, operations, our customers, and the public. health, and environmental performance. These commitments are documented in our safety, security, health, environmental, and product safety policies. These policies are put into practice through a disciplined management framework called the Operations Integrity Management System (OIMS). Operations Integrity Management System: The framework 5 The OIMS framework includes 11 elements. Each element contains an underlying principle and a set of expectations. The OIMS framework also includes the characteristics of, and processes for, evaluating and implementing OI management systems. Application of the OIMS framework is required across all of Imperial, with particular emphasis on design, construction and operations. Management is responsible for ensuring that management systems satisfying the framework are in place. The scope, priority and pace of management system implementation should be consistent with the risks associated with the business. …the way we work! OIMS 11 elements “operations” driver 2. Risk assessment and management evaluation 3. Facilities design and construction 4. Information/documentation 5. Personnel and training 1 Management leadership, 11. Operations integrity commitment and 6. Operations and maintenance assessment and accountability 7. Management of change improvement 8. Third-party services 9. Incident investigation and analysis 10. Community awareness and emergency preparedness 6 Operations Integrity Management System: Elements 1 and 2 Element 1: management 1.9 Performance is evaluated, and the degree to which expectations are met is leadership, commitment assessed. The results are stewarded to and accountability corporate management. Management establishes policy, provides 1.10 Managers responsible for businesses perspective, sets expectations and provides the operated by others (OBO) communicate OIMS resources for successful operations. Assurance principles to the operator and encourage the of operations integrity requires management adoption of OIMS or similar systems. leadership and commitment visible to the organization, and accountability at all levels. Element 2: risk assessment 1.1 Systems for operations integrity and management management are established, communicated Comprehensive risk assessments can reduce and supported at every level in the organization. safety, health, environmental and security 1.2 Managers and supervisors credibly risks and mitigate the consequences of demonstrate commitment and personal incidents by providing essential information accountability for operations integrity, promote for decision-making. an open and trusting environment, and 2.1 Risk is managed by identifying hazards, understand how their behaviours impact others. assessing consequences and probabilities, Commitment is demonstrated through active and evaluating and implementing prevention and visible participation. and mitigation measures. 1.3 Manager and supervisor knowledge and 2.2 Risk assessments are conducted for skills, including leadership skills and behaviours, ongoing operations, for projects and for are developed to effectively apply operations products in order to identify and address integrity management tools and systems. potential hazards to personnel, facilities, 1.4 Management establishes the scope, priority the public and the environment. and pace for system implementation and 2.3 Periodic risk assessments are performed by improvement, considering the complexity qualified personnel, including expertise from and risks involved with their operations outside the immediate unit, as appropriate. and products. 2.4 Risk assessments are updated at specified 1.5 Roles, responsibilities, authorities intervals and as changes occur. and accountabilities within the systems are known and exercised. 2.5 Assessed risks are addressed by specified levels of management appropriate to the nature 1.6 Clear goals and objectives are and magnitude of the risk, and decisions are established for the systems, and clearly documented. performance is evaluated against these goals and objectives. 2.6 A follow-up process is in place to ensure that risk management decisions 1.7 Expectations are translated into procedures are implemented. and practices. 1.8 The workforce is actively engaged in the operations integrity process, and relevant learnings are shared across the organization. Operations Integrity Management System: Element 3 7 Element 3: facilities design 3.4 Deviation from approved design practices and standards, or from the approved design, and construction is permitted only after review and approval by the designated authority, and after the rationale Inherent safety and security can be for the decision is documented. enhanced, and risk to health and the environment minimized, by using sound 3.5 A process is in place for evaluating the standards, procedures and management application of new or updated standards systems for facility design, construction with operations integrity implications for and startup activities. existing facilities. 3.1 Project management procedures are 3.6 Quality-assurance processes are in place, documented, well understood and executed which ensure that facilities and materials by qualified personnel. received meet design specifications and that construction is in accordance with the 3.2 Criteria are established and procedures are applicable standards. in place for conducting and documenting risk assessments at specific project stages to ensure 3.7 A pre-startup review is performed and that operations integrity objectives are met. documented to confirm that: 3.3 The design and construction of new • Construction is in accordance with or modified facilities use approved design specifications. practices and standards that: • Operations integrity measures are in place. • Meet or exceed applicable regulatory • Emergency, operations and maintenance requirements. procedures are in place and adequate. • Embody responsible requirements where • Risk-management recommendations have regulations are not adequately protective. been addressed and required actions taken. • Address other important operations integrity • Training of personnel has been accomplished. considerations, including environmental aspects and human factors. • Regulatory and permit requirements are met. 8 Operations Integrity Management System: Elements 4 and 5 Element 4: information/
Recommended publications
  • Organizational Culture and Knowledge Management Success at Project and Organizational Levels in Contracting Firms
    View metadata, citation and similar papers at core.ac.uk brought to you by CORE provided by PolyU Institutional Repository This is the Pre-Published Version. Organizational Culture and Knowledge Management Success at Project and Organizational Levels in Contracting Firms Patrick S.W. Fong1 and Cecilia W.C. Kwok2 ABSTRACT This research focuses on contracting firms within the construction sector. It characterizes and evaluates the composition of organizational culture using four culture types (Clan, Adhocracy, Market, and Hierarchy), the strategic approach for knowledge flow, and the success of KM systems at different hierarchical levels of contracting organizations (project and parent organization level). Responses from managers of local or overseas contracting firms operating in Hong Kong were collected using a carefully constructed questionnaire survey that was distributed through electronic mail. The organizational value is analyzed in terms of the four cultural models. Clan culture is found to be the most popular at both project and organization levels, which means that the culture of contracting firms very much depends on honest communication, respect for people, trust, and cohesive relationships. On the other hand, Hierarchy 1 Associate Professor, Department of Building & Real Estate, The Hong Kong Polytechnic University, Hung Hom, Kowloon, Hong Kong (corresponding author). T: +(852) 2766 5801 F: +(852) 2764 5131 E-mail: [email protected] 2 Department of Building & Real Estate, The Hong Kong Polytechnic University, Hung Hom, Kowloon, Hong Kong. 1 culture, which focuses on stability and continuity, and analysis and control, seems to be the least favored at both levels. Another significant finding was that the two main KM strategies for knowledge flow, Codification and Personalization, were employed at both project and organization levels in equal proportion.
    [Show full text]
  • Project Management © Adrienne Watt
    Project Management © Adrienne Watt This work is licensed under a Creative Commons-ShareAlike 4.0 International License Original source: The Saylor Foundation http://open.bccampus.ca/find-open-textbooks/?uuid=8678fbae-6724-454c-a796-3c666 7d826be&contributor=&keyword=&subject= Contents Introduction ...................................................................................................................1 Preface ............................................................................................................................2 About the Book ..............................................................................................................3 Chapter 1 Project Management: Past and Present ....................................................5 1.1 Careers Using Project Management Skills ......................................................................5 1.2 Business Owners ...............................................................................................................5 Example: Restaurant Owner/Manager ..........................................................................6 1.2.1 Outsourcing Services ..............................................................................................7 Example: Construction Managers ..........................................................................8 1.3 Creative Services ................................................................................................................9 Example: Graphic Artists ...............................................................................................10
    [Show full text]
  • Designing, Developing and Implementing a Management System: an Overview (April 2010)
    Designing, Developing and Implementing a Management System: An Overview (April 2010) Host: Emily Smorol, Corporate Environmental Affairs Speakers: Patrick Aurrichio, Program Manager, Corporate Environmental Affairs Emily: Welcome to our IBM Podcast titled, “Designing, Developing, and Implementing a Management System: An Overview.” My name is Emily Smorol and I work in IBM’s Corporate Environmental Affairs and Product Safety organization. There is an accompanying presentation available to download for this Podcast. For those following along with the presentation slides, please go to slide 2. The purpose of this Podcast is to discuss what a management system is and to provide an overview of its basic components. This Podcast is not meant to be all-inclusive but rather provide an approach to designing, developing, and implementing a management system in a sustained manner that has been successful for us – and which also may prove to be helpful to others setting out to do similarly. Today, we are going to be speaking with IBM’s Corporate Environmental Affairs Program Manager, Patrick Aurrichio. Patrick was instrumental in developing and implementing IBM’s global Environmental Management System. Recognizing that our audience comes from a diverse background – those with experience or familiarity with management systems and those for whom this may be a new concept – Patrick, how would you describe what a management system is? Patrick: Thank you Emily – and welcome to those joining the podcast. If you’re following along with the slide presentation, please turn to slide 3. First I’d like to mention and want you to understand that there is nothing overwhelmingly special or difficult with designing or developing a management system.
    [Show full text]
  • Project Information Management PROJECT MANAGEMENT for DEVELOPMENT ORGANIZATIONS Project Information Management
    pm4dev, 2016 –management for development series © Project Information Management PROJECT MANAGEMENT FOR DEVELOPMENT ORGANIZATIONS Project Information Management PROJECT MANAGEMENT FOR DEVELOPMENT ORGANIZATIONS A methodology to manage development projects for international humanitarian assistance and relief organizations © PM4DEV 2016 Our eBook is provided free of charge on the condition that it is not copied, modified, published, sold, re-branded, hired out or otherwise distributed for commercial purposes. Please give appropriate citation credit to the authors and to PM4DEV. Feel free to distribute this eBook to any one you like, including peers, managers, and organizations to assist in their project management activities. www.pm4dev.com Project Information Management INTRODUCTION “If you fail to plan, you plan to fail.” “.. A major weakness is the ability of project staff to utilize their logframe for designing a coherent and integrated, overall information system, where a manageable and limited number of feasible information activities are planned, which together will ensure that effective effect and impact level monitoring will occur. It is typical for projects to end up collecting too much rather than too little information. Frequently though, much of this information is not relevant to monitoring the results and impacts for which the project is accountable, and that which is, is not collected sufficiently reliably or regularly. By restricting the number, but improving the quality and reliability of their major information gathering activities, projects will much improve their information systems.” CARE International EDIAIS Case Study Project Information Management Plan Detailed planning is critical to the development of usable, high quality information deliverables that meet the needs of internal and external information users.
    [Show full text]
  • LFS – Logistics Focused Solutions Integrated Total Solutions
    LFS – Logistics Focused Solutions Integrated total solutions EPS – Ehrhardt + Partner Solutions DWC-LLC | Software Systems for Warehouse Logistics P.O.Box 644 300 | Dubai, UAE | Phone (+971) 4-870 1000 | Fax (+971) 4-870 1050 [email protected] | www.ehrhardt-partner.ae Warehouse-Management by E+P The internationally leading expert for warehouse logistics Ehrhardt + Partner GmbH & Co. KG | Software Systems for Warehouse Logistics Alte Römerstraße 3 | D-56154 Boppard-Buchholz | Germany | Phone (+49) 67 42-87 27 0 | Fax (+49) 67 42-87 27 50 [email protected] | www.ehrhardt-partner.com Contents LFS – Logistics Focused Solutions ................................................................................... 3 A system for all requirements The warehouse management system for all platforms Open system solution for your IT architecture LFS as a central solution for your warehouse logistics .................................................... 6 The total solution for your individual task definitions Central software installation for different countries and warehouses LFS as a hosting and cloud solution Setting standards with innovations ................................................................................... 8 Pick-by-Voice Voice service and support RFID Multi-order picking LFS – a system solution all types of work ...................................................................... 10 Professional connection of automatic warehouse units Systematic warehouse modernisation Sound advice and scheduled implementation
    [Show full text]
  • LNCS 8407, Pp
    Knowledge Management: Organization Culture in Healthcare Indonesia Dana Indra Sensuse1, Yudho Giri Sucahyo1, Siti Rohajawati2, Haya Rizqi1, and Pinkie Anggia1 1 Computer Science Faculty, University of Indonesia, Depok, Indonesia {dana,yudho}@cs.ui.ac.id, {pinkie.anggia.id,cold.ryz}@gmail.com 2 Dept. of Information System, Bakrie University, Jakarta, Indonesia [email protected] Abstract. Nowadays organizations realize that knowledge is an important asset to achieve a competitive advantage. In the favor of that, it is necessary for or- ganizations to manage and utilize the knowledge as much as possible through knowledge management (KM). KM concept is not only used in large compa- nies, but also has begun to be adopted by healthcare organization in an effort to improve the quality of services. Managing knowledge is not easy, a lot of factors to consider, one of which is the culture of the organization. Organiza- tional culture is defined as a set of practices, values, and assumptions held by members of the organization and are able to influence the behavior of the organization [12, 13]. According to Kim Cameron and Robert Quinn (2006), organizational culture can be examined using ‘Organizational Culture Assess- ment Instrument’ (OCAI) which has a framework, called the competing value framework (CVF). This framework consists of four culture types i.e. clan, adhocracy, market, and hierarchy. In this research, we found that healthcare organization in Indonesia have developed a dominant culture-style. It is a mix of the market and hierarchy. In addition, we also discuss the relationship of four culture types with KM, and six dimensions of organizational culture.
    [Show full text]
  • The Intelligent Management System: an Overview
    The Intelligent Management System: An Overview Mark S. Fox The Robotics Institute Carnegie-melt on University Pittsburgh, Pennsylvania 15213 . 7 becember 1982 Abstract: This paper describes the Intelligent Management System (IMS) project, which is part of the Factory of the Future project in the Robotics Institute of Carnegie-Mellon University. IMS is a long term project concerned with applying artificial intelligence techniques in aiding professionals and managers in their day to day tasks. This report discusses both the long term goals of IMS, and current research. It describes research in the modeling of organizations, constraint- based job-shop scheduling, organization simulation, user interfaces, and system architecture. Examples of working systems are provided. Copyright @ 1982 Intelligent Systems Lab., CMU Robotics Inst. This research was supported by the Robotics Institute, Carnegie-Mellon University, and, in part, by the Westinghouse Corporation. To appear in: "Processes and Tools For Decision Support", [H.Sol- Editor] Netherlands: North-HollandCompany, 1982. Revised Version. -. .. .- .. Intelligent Management System Table of Contents 1 1. Introduction 2. Functional Goals 2 3. Architectural Goals 5 7 c 4. Organization Modelling 4.1. Introduction 7 4.2. Basic Modetling System 10 4.3. Model Accessibility and Extensibility 14 4.4. Flow-Shop Modelling 17 4.5. Job-Shop Modelling 19 4.6. Machine Modelling 20 5. Organization Analysis 20 5.1. Introduction 20 5.2. Simulation 21 5.3. Structure Analysis 23 6. Organization Operation and Management 24 6.1. Introduction 24 6.2. Job-Shop Scheduling 24 6.3. Factory Monitoring 28 6.4. Process Diagnosis 28 7. User Interfaces 28 7.1.
    [Show full text]
  • Understanding How to Improve Team Collaboration Within Intensive Care Unit Transitional Care from the Perspective of Quality Management
    Understanding How to Improve Team Collaboration Within Intensive Care Unit Transitional Care from the Perspective of Quality Management Lilly-Mari Sten Main supervisors: Associate Professor Pernilla Ingelsson Co-supervisor: Associate Professor Marie Häggström Faculty of Science, Technology and Media Thesis for Licentiate degree in Quality Technology Mid Sweden University Sundsvall/Östersund, 2021-06-16 Akademisk avhandling som med tillstånd av Mittuniversitetet i Östersund framläggs till offentlig granskning för avläggande av licentiatexamen onsdagen, 16 juni 2021, kl. 9:30, Q221/Zoom, Mittuniversitetet Östersund. Seminariet kommer att hållas på svenska. Understanding How to Improve Team Collaboration Within Intensive Care Unit Transitional Care from the Perspective of Quality Management © Lilly-Mari Sten, 2021-06-16 Printed by Mid Sweden University, Sundsvall, Sweden ISSN: 1652-8948 ISBN: 978-91-89341-10-4 Faculty of Science, Technology and Media Mid Sweden University, SE-831 25 Östersund Phone: +46 (0)10 142 80 00 Mid Sweden University Licentiate Thesis 182 “If everyone is moving forward together, then success takes care of itself.” Henry Ford Acknowledgement This thesis has been another step toward reaching one of my goals, and this far it has certainty been a wonderful journey of knowledge. I love this! First, I would like to thank my main supervisor Pernilla Ingelsson for her professional guidance and support along the path of writing this thesis. I also want to express my appreciation to my co-supervisor Marie Häggström for her wisdom and advice. In addition to these two strong women, I want to thank Ingela Bäckström, who leads the project of which I am a part.
    [Show full text]
  • Quality Assurance Management System Guide for Use with .
    Preamble to DOE G 414.1-2A, Quality Assurance Management System Guide, dated 6-17-05 Quality Assurance (QA) Management System Guide Enhancements DOE elements and DOE contractors should consult this Guide to develop and implement effective management systems that are consistent with the Department’s quality expectations of the QA Rule, 10 CFR 830 Subpart A, and DOE O 414.1C, Quality Assurance, dated 6-17-05, and that support the Safety Management System Policy, DOE P 450.4, dated 10-15-96. The revised QA management system guide includes enhancements arising from experience with implementing the DOE QA Rule and DOE O 414.1C. The Guide was evaluated in light of key policy initiatives, Directive changes, and other changes that have occurred within DOE since the Guide was last issued. Evaluation and coordination with user groups have identified specific major improvements to the guide as follows. • Clarified the scope of the guidance to include the QA Order, DOE O 414.1, and the QA Rule, 10 CFR 830 Subpart A. • Incorporated review guidance for use by DOE in evaluating site office or contractor quality management systems for approval (it may also be tailored for use by contractors to review subcontractor QAPs). • Incorporated a new QA Assessment Template for use in conducting assessments of QA Program implementation. • Incorporated hyperlinks to the expanded guidance. • Discussed the use of third party management system validation. • Updated information pertaining to the identification and control of suspect/counterfeit items (S/CIs) and links to expanded guidance for S/CIs. • Expanded information on the grading process to include programmatic and mission-critical considerations and a description of the steps in implementing the grading process.
    [Show full text]
  • Quality Management System (QMS) for Apis
    Quality Management System (QMS) for Active Pharmaceutical Ingredients (API) Manufacturers integrating GMP (ICH Q7a) into ISO (9001: 2000) September 2005 APIC / CEFIC Quality Management System - integrating GMP (ICH Q7a) into ISO (9001: 2000) Page 2 of 73 Table of Contents I. Introduction II. Objective and Scope III. Quality Management Systems for API manufacturers 1. Quality Management System 2. Management responsibility 3. Resource management 4. Product realization (Manufacturing Operations) 5. Measurement, analysis and improvement (Evaluation Activities) IV. Supplementary Information 1. Identification of system approaches in Q7a 2. Description of processes 3. Structure of a Quality Manual 4. Cross-reference of APIC QMS documents (from “old” to “new”) 5. Assistance for implementation of a QMS 6. Matrix GMP(Q7a) / ISO (9001:2000) V. Glossary VI. Abbreviations VII. References VIII. Acknowledgements APIC / CEFIC Quality Management System - integrating GMP (ICH Q7a) into ISO (9001: 2000) Page 3 of 73 I. Introduction The changing regulatory environment In a Science Board Meeting held in November 2001, FDA raised some concerns regarding the efficiency of the pharmaceutical industry. The factors contributing to this situation were identified as follows: • Pharmaceuticals are complex, multivariate physicochemical systems that are - Often treated (during development) as univariate systems (one-factor-at-a-time, trial- and-error experimentation) - Physical properties of materials normally not well characterized - Equipment selection based on tradition - Process factors are not well understood • Development is done under time crunch • Post approval changes require regulatory oversight It was said that a higher efficiency is required in order to provide high quality drugs to the market in a timely manner, to successfully take advantage of the new drug development opportunities offered by advances in chemistry and biology.
    [Show full text]
  • Top 10 Elements in an Environmental Management System
    Top 10 Elements in a Successful Environmental Management System For maximum environmental and economic benefits from an environmental management system and to help comply with the EMS requirement under the Toxics Use & Hazardous Waste Reduction law, a business should include the following 10 elements in its system. These elements can apply to many different EMS models, including ISO 14001. Use this checklist to be sure your system includes all 10 and keep it on site. 1. Environmental Policy Reflects how the organization feels about the environment Identifies environmental impacts of processes and products Ensures compliance with environmental requirements Commits organization to prevent pollution, reduce environmental risks and share information with external stakeholders 2. Environmental Requirements and Voluntary Initiatives Employees understand their roles in meeting environmental requirements Identify management and manufacturing practices that affect the organization's ability to meet requirements Identify and work with programs that encourage preventing pollution 3. Objectives/Targets Set the following environmental objectives: comply with environmental requirements; continuous improvement in regulated and non-regulated areas; prevent pollution Make objectives specific to the organization Set timeframes to meet objectives Update objectives as environmental requirements evolve 4. Structure, Responsibility and Resources Ensure the organization has the personnel and resources needed to meet objectives Make managers responsible for
    [Show full text]
  • Organizational Culture Types That Academicians Associate with Their Institutions
    http://ijhe.sciedupress.com International Journal of Higher Education Vol. 7, No. 6; 2018 Organizational Culture Types that Academicians Associate with Their Institutions Semra Kıranlı Güngör1 & Hakan Şahin2 1 Eskişehir Osmangazi University, Faculty of Education, Educational Sciences, Turkey 2 Directorate of National Education, Eskişehir, Turkey Correspondence: Semra Kıranlı Güngör, Faculty of Education, Educational Sciences, Eskişehir Osmangazi Univesity, Eskişehir, Turkey. E-mail: [email protected] Received: November 24, 2018 Accepted: December 18, 2018 Online Published: December 20, 2018 doi:10.5430/ijhe.v7n6p161 URL: https://doi.org/10.5430/ijhe.v7n6p161 This study is produced of the Hakan Şahin’s Eskisehir Osmangazi University Institute of Educational Sciences, Department of Higher Education Administration and Policy Master Thesis work that was carried out on May 29, 2018, defended and resulted in success with Consultancy of Assistant Prof. Dr. Semra KIRANLI GÜNGÖR. Abstract This study, considering the sample of a university located in central Anatolia region, Turkey, aims to identify culture types that the academicians perceive in relevant with their institutions according to the 4 types of cultures (Clan, Adhocracy, Hierarchy, and Market) given in the Competing Values Framework by Cameron and Quinn. The study includes 205 academicians from different faculties and vocational schools as participants. The data was obtained from the Organizational Culture Assessment Instrument (OCAI) that has been prepared particularly for the research group. Analyzes of the data obtained in the study were carried out with statistical package programs as IBM SPSS Statistics 23 and Interactive Lisrel SSI 8.72. The demographic features of the academicians were determined with percentage and frequency analyzes and the mean and standard deviation statistics were used in determining the perception levels of organizational culture types which academicians associate with their universities.
    [Show full text]