(STIP) for REGION 02

Total Page:16

File Type:pdf, Size:1020Kb

(STIP) for REGION 02 ** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** Thursday, September 2, 2021 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) Page 1 of 44 for REGION 02 AGENCY PROJECT DESCRIPTION TOTAL 4-YEAR PROGRAM (FFY) FUND SOURCES FFY 4-YEAR PHASE Starting October 01, 2019 PIN PROGRAM FFY FFY FFY FFY in millions 2020 2021 2022 2023 AQ CODE COUNTY TOTAL PROJECT COST of dollars NYSDOT ROUTE 10A OVER CAROGA CREEK BRIDGE REPLACEMENT, TOWN OF STBG-OFF 2020 0.002 ROWINCD 0.002 CAROGA, FULTON COUNTY NFA 2020 0.001 ROWINCD 0.001 200302 STBG-OFF 2020 0.157 DETLDES 0.157 NFA 2020 0.039 DETLDES 0.039 STBG-OFF 2020 0.007 ROWACQU 0.007 NFA 2020 0.002 ROWACQU 0.002 STBG-OFF 2021 0.300 CONINSP 0.300 NFA 2021 0.075 CONINSP 0.075 STBG-OFF 2021 1.840 CONST 1.840 NFA 2021 0.460 CONST 0.460 NFA 2020 0.001 ROWINCD 0.001 STBG-OFF 2020 0.112 PRELDES 0.112 NFA 2020 0.028 PRELDES 0.028 STBG-OFF 2020 0.056 SCOPING 0.056 NFA 2020 0.014 SCOPING 0.014 AQC:N/A FULTON TPC : $2-$4 M TOTAL 4YR COST : 3.094 0.419 2.675 0.000 0.000 NYSDOT THIS PROJECT WILL REPLACE THE STATE ROUTE 51 BRIDGE OVER NHPP 2021 0.264 DETLDES 0.264 STEELE CREEK IN THE VILLAGE OF ILION, HERKIMER COUNTY. STATE NFA 2021 0.066 DETLDES 0.066 200412 ROUTE 51 IS THE PRIMARY NORTH-SOUTH ROUTE THROUGH THE NHPP 2021 0.257 ROWACQU 0.257 VILLAGE OF HERKIMER. THE PROJECT WILL INCREASE THE WATERWAY NFA 2021 0.065 ROWACQU 0.065 NHPP 2021 0.038 ROWINCD 0.038 OPENING TO MINIMIZE FLOODING IN THE VILLAGE. NFA 2021 0.009 ROWINCD 0.009 NHPP 2022 0.350 CONINSP 0.350 NFA 2022 0.087 CONINSP 0.087 NHPP 2022 3.495 CONST 3.495 NFA 2022 0.873 CONST 0.873 AQC:N/A HERKIMER TPC : $4.6-$7.5 M TOTAL 4YR COST : 5.504 0.000 0.699 4.805 0.000 ** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** Thursday, September 2, 2021 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) Page 2 of 44 for REGION 02 AGENCY PROJECT DESCRIPTION TOTAL 4-YEAR PROGRAM (FFY) FUND SOURCES FFY 4-YEAR PHASE Starting October 01, 2019 PIN PROGRAM FFY FFY FFY FFY in millions 2020 2021 2022 2023 AQ CODE COUNTY TOTAL PROJECT COST of dollars NYSDOT THIS PROJECT WILL REHABILITATE 11.65 MILES OF PAVEMENT ON STBG FLEX 2021 0.004 ROWINCD 0.004 STATE ROUTE 162 FROM SCHOHARIE COUNTY LINE TO STATE ROUTE 5S. NFA 2021 0.001 ROWINCD 0.001 200808 THIS PROJECT IS IN THE TOWNS OF CHARLESTON, CANAJOHARIE, AND STBG FLEX 2021 0.114 PRELDES 0.114 ROOT, MONTGOMERY COUNTY. NFA 2021 0.028 PRELDES 0.028 STBG FLEX 2021 0.114 SCOPING 0.114 NFA 2021 0.028 SCOPING 0.028 STBG FLEX 2020 0.110 PRELDES 0.110 NFA 2020 0.028 PRELDES 0.028 STBG FLEX 2020 0.004 ROWINCD 0.004 NFA 2020 0.001 ROWINCD 0.001 STBG FLEX 2020 0.110 SCOPING 0.110 NFA 2020 0.028 SCOPING 0.028 STBG FLEX 2021 0.013 ROWACQU 0.013 NFA 2021 0.003 ROWACQU 0.003 STBG FLEX 2021 0.546 DETLDES 0.546 NFA 2021 0.224 DETLDES 0.224 STBG FLEX 2022 0.956 CONINSP 0.956 NFA 2022 0.239 CONINSP 0.239 STBG FLEX 2022 7.787 CONST 7.787 NFA 2022 2.103 CONST 2.103 AQC:A10 MONTGOMERY TPC : $9.5-15.5 M TOTAL 4YR COST : 12.441 0.281 1.075 11.085 0.000 NYSDOT THIS PROJECT WILL REHABILITATE BRIDGE DECK CARRYING NYS RT 162 STBG FLEX 2022 0.072 PRELDES 0.072 OVER CANYON RD & FLAT CREEK IN THE TOWN OF ROOT, NFA 2022 0.018 PRELDES 0.018 200810 MONTGOMERY COUNTY. STBG FLEX 2022 0.072 SCOPING 0.072 NFA 2022 0.018 SCOPING 0.018 STBG FLEX 2023 0.216 DETLDES 0.216 NFA 2023 0.054 DETLDES 0.054 STBG FLEX 2023 0.144 CONINSP 0.144 NFA 2023 0.036 CONINSP 0.036 STBG FLEX 2023 1.440 CONST 1.440 NFA 2023 0.360 CONST 0.360 AQC:A10 MONTGOMERY TPC : $2-$4 M TOTAL 4YR COST : 2.430 0.000 0.000 0.180 2.250 ** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** Thursday, September 2, 2021 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) Page 3 of 44 for REGION 02 AGENCY PROJECT DESCRIPTION TOTAL 4-YEAR PROGRAM (FFY) FUND SOURCES FFY 4-YEAR PHASE Starting October 01, 2019 PIN PROGRAM FFY FFY FFY FFY in millions 2020 2021 2022 2023 AQ CODE COUNTY TOTAL PROJECT COST of dollars NYSDOT THIS PROJECT WILL ADDRESS CULVERT DEFICIENCIES THROUGH NHPP 2020 0.048 CONINSP 0.048 REHABILITATION OF THE ROUTE 12 CULVERT (C260154) IN THE NFA 2020 0.012 CONINSP 0.012 201679 VILLAGE OF BOONVILLE, IN ONEIDA COUNTY NHPP 2020 0.400 CONST 0.400 NFA 2020 0.100 CONST 0.100 NHPP 2020 0.040 DETLDES 0.040 NFA 2020 0.010 DETLDES 0.010 AQC:N/A ONEIDA TPC : $0.6-$1.5 M TOTAL 4YR COST : 0.610 0.610 0.000 0.000 0.000 NYSDOT THIS PROJECT WILL ADDRESS SAFETY ISSUES ON RTE 12 IN BOONVILLE HSIP 2021 0.041 PRELDES 0.041 INCLUDING THE RECONFIGURATION OF THE INTERSECTION WITH RTE NFA 2021 0.004 PRELDES 0.004 201680 12D. VILLAGE OF BOONVILLE, ONEIDA COUNTY HSIP 2021 0.001 ROWINCD 0.001 HSIP 2021 0.041 SCOPING 0.041 NFA 2021 0.004 SCOPING 0.004 HSIP 2022 0.122 DETLDES 0.122 NFA 2022 0.013 DETLDES 0.013 HSIP 2023 0.162 CONINSP 0.162 NFA 2023 0.018 CONINSP 0.018 HSIP 2023 1.350 CONST 1.350 NFA 2023 0.150 CONST 0.150 AQC:N/A ONEIDA TPC : $1.2-$2.5 M TOTAL 4YR COST : 1.906 0.000 0.091 0.135 1.680 NYSDOT THIS PROJECT WILL REPLACE THE STATE ROUTE 28 BRIDGE (BIN NHPP 2021 0.272 DETLDES 0.272 1020280) OVER THE SOUTH INLET OF RAQUETTE LAKE IN THE TOWN NFA 2021 0.068 DETLDES 0.068 201897 OF ARIETTA, HAMILTON COUNTY. THE PROJECT WILL ADDRESS NFA 2022 1.107 CONST 1.107 GEOMETRIC, SAFETY AND OPERATIONAL DEFICIENCIES SUCH AS NHPP 2022 1.041 CONINSP 1.041 2022 0.260 CONINSP 0.260 STOPPING SIGHT DISTANCE. THE ADDITION OF A MULTI-USE TRAIL AND NFA NHPP 2022 6.050 CONST 6.050 BRIDGE JUST SOUTH OF THE NEW BRIDGE WILL PROVIDE ACCESS FOR NFA 2022 1.513 CONST 1.513 RECREATIONAL USE. AQC:N/A HAMILTON TPC : $9.5-15.5 M TOTAL 4YR COST : 10.311 0.000 0.340 9.971 0.000 ** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** Thursday, September 2, 2021 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) Page 4 of 44 for REGION 02 AGENCY PROJECT DESCRIPTION TOTAL 4-YEAR PROGRAM (FFY) FUND SOURCES FFY 4-YEAR PHASE Starting October 01, 2019 PIN PROGRAM FFY FFY FFY FFY in millions 2020 2021 2022 2023 AQ CODE COUNTY TOTAL PROJECT COST of dollars NYSDOT THIS PROJECT WILL MAKE CORRIDOR IMPROVEMENTS ON STATE NHFP 2020 0.151 PRELDES 0.151 ROUTE 5S, ALONG A 1.2-MILE SEGMENT OF ROADWAY BETWEEN NFA 2020 0.038 PRELDES 0.038 202967 APPROXIMATELY 700 FEET WEST OF CR 27 (MAIN STREET) TO 500 FEET NHFP 2020 0.053 ROWINCD 0.053 EAST OF THE HILL MARKES FACILITY ENTRANCE, IN THE TOWN OF NFA 2020 0.013 ROWINCD 0.013 FLORIDA WITHIN MONTGOMERY COUNTY. PROJECT OBJECTIVES NHFP 2022 0.220 CONINSP 0.220 2022 0.055 CONINSP 0.055 INCLUDE: RESURFACING AND WIDENING STATE ROUTE 5S LANES AND NFA NHFP 2022 2.203 CONST 2.203 SHOULDERS IN EACH DIRECTION; ADDITION OF AN EASTBOUND NFA 2022 0.551 CONST 0.551 CLIMBING LANE; AND REALIGNMENT/CONSOLIDATION OF THE CR 27 NHFP 2021 0.173 DETLDES 0.173 (MAIN STREET) INTERSECTION WITH 5S INTO A T SHAPED NFA 2021 0.043 DETLDES 0.043 INTERSECTION. NHFP 2021 0.679 ROWACQU 0.679 NFA 2021 0.170 ROWACQU 0.170 AQC:NON MONTGOMERY TPC : $3.3-$5.6 M TOTAL 4YR COST : 4.349 0.255 1.065 3.029 0.000 NYSDOT THIS PROJECT WILL REHABILITATE THE BRIDGE CARRYING NYS ROUTE STBG FLEX 2021 0.134 DETLDES 0.134 5S OVER CANAJOHARIE CRK, BIN 1002830. THE PROJECT IS LOCATED IN NFA 2021 0.033 DETLDES 0.033 202968 THE VILLAGE OF CANAJOHARIE, MONTGOMERY COUNTY. STBG FLEX 2022 0.167 CONINSP 0.167 NFA 2022 0.042 CONINSP 0.042 STBG FLEX 2022 1.110 CONST 1.110 NFA 2022 0.277 CONST 0.277 NFA 2021 0.002 ROWINCD 0.002 STBG FLEX 2021 0.044 PRELDES 0.044 NFA 2021 0.011 PRELDES 0.011 STBG FLEX 2021 0.044 SCOPING 0.044 NFA 2021 0.011 SCOPING 0.011 AQC:A10 MONTGOMERY TPC : $2-$4 M TOTAL 4YR COST : 1.875 0.000 0.279 1.596 0.000 NYSDOT THIS PROJECT WILL REPLACE THE DECK AND BEARINGS ON THE ROUTE NFA 2021 0.144 DETLDES 0.144 5S BRIDGE OVER AURIES CREEK IN THE T. OF GLEN, MONTGOMERY NFA 2021 0.048 PRELDES 0.048 202971 COUNTY. NFA 2021 0.048 SCOPING 0.048 NHPP 2022 0.144 CONINSP 0.144 NFA 2022 0.036 CONINSP 0.036 NHPP 2022 0.960 CONST 0.960 NFA 2022 0.240 CONST 0.240 AQC:A10 MONTGOMERY TPC : $1.2-$2.5 M TOTAL 4YR COST : 1.620 0.000 0.240 1.380 0.000 ** NEW YORK STATE DEPARTMENT OF TRANSPORTATION ** Thursday, September 2, 2021 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) Page 5 of 44 for REGION 02 AGENCY PROJECT DESCRIPTION TOTAL 4-YEAR PROGRAM (FFY) FUND SOURCES FFY 4-YEAR PHASE Starting October 01, 2019 PIN PROGRAM FFY FFY FFY FFY in millions 2020 2021 2022 2023 AQ CODE COUNTY TOTAL PROJECT COST of dollars NYSDOT THIS PROJECT WILL ADDRESS SAFETY ISSUES ON NORTH GENESEE HPP 2021 0.108 DETLDES 0.108 STREET IN THE CITY OF UTICA IN THE VICINITY OF THE NFA 2021 0.027 DETLDES 0.027 204712 INTERSECTIONS WITH THE NYS THRUWAY EXIT 31 RAMPS TO NORTH HPP 2021 0.042 ROWACQU 0.042 GENESEE ST.
Recommended publications
  • Chautauqua County
    CHAUTAUQUA Greenway Plan COUNTY April 2012 A four season destination for outdoor active living, nurtured by public/private partnerships. Prepared by Pashek Associates in cooperation with Chautauqua County Department of Planning & Economic Development “It is a wholesome and necessary thing for us to turn again to the earth and in the contemplation of her beauties to know of wonder and humility. - Rachel Carson” Photo Credit: Mark Geise All of the photographs in this document were taken at various locations throughout Chautauqua County. ACKNOWLEDGEMENTS A special thank you goes out to the citizens and organizations of Chautauqua County for their enthusiasm and input during this study. Also, the time commitment, wealth of knowledge, decision-making ability, and dedication of the following individuals made the Chautauqua County Greenway Plan possible. Chautauqua County Gregory J. Edwards ........................................................... County Executive Chautauqua County Department of Planning & Economic Development William Daly ...................................................................................... Director Mark Geise ........................................................................... Deputy Director Christine Kinn .........................................................................Senior Planner Don McCord ............................................................................Senior Planner Jeffrey Diers .............................................................Watershed Coordinator Debbie Liliestedt
    [Show full text]
  • Mid Montgomery County LWRP Final Plan
    MID-MON TGOMERY COUN TY LOCAL WATERFRON T REVITALIZATION PROGRAM TOWN OF G LEN V ILLAGE OF FULTON VILLE TOWN OF M OHAWK V ILLAGE OF FON D A This document was prepared for the New York State Department of State with funds provided under Title 11 of the Environmental Protection Fund. MID – MONTGOMERY COUNTY LOCAL WATERFRONT REVITALIZATION PROGRAM Prepared for the: Town of Glen Village of Fultonville Town of Mohawk Village of Fonda FINAL PLAN FEBRUARY 19, 2009 This document was prepared for the New York State Department of State with funds provided under Title 11 of the Environmental Protection Fund. Consulting services provided by Laberge Group Laberge Group Project Number 27045 Acknowledgments The Towns of Glen and Mohawk and the Villages of Fultonville and Fonda would like to recognize and thank the many people and organizations whose assistance has made the completion of this Waterfront Revitalization Program a reality. First and foremost, the communities would like to thank the New York State Department of State, Division of Coastal Resources for guiding the planning process and financing it with an Environmental Protection Fund - Local Waterfront Revitalization Program Grant. The communities would also specifically like to thank the following individuals: Waterfront Revitalization Advisory Committee John B. Thomas, Town of Glen Supervisor Robert Headwell Jr., Village of Fultonville Mayor Edward Patton, Town of Mohawk Supervisor Rodney Simonds, Village of Fonda Mayor Sharon Leighton, New York State Canal Corporation Fred Miller, Executive Director, Mohawk Valley Heritage Corridor Commission Deborah Auspelmyer, Executive Director, Montgomery County Chamber of Commerce Tony Bruno, Montgomery County Lions Club Kevin Millington, New York State Department of State, Division of Coastal Resources Ken Rose, Director of Montgomery County Economic Development and Planning Doug Greene, Senior Planner/Project Coordinator, Montgomery County Economic Development and Planning Town of Glen Town Board John B.
    [Show full text]
  • Regular Meeting of the Town Board
    Tn Brd Mtg 3-4-2020 MEETING OF THE TOWN BOARD TOWN OF GLENVILLE MARCH 4, 2020 AT THE GLENVILLE MUNICIPAL CENTER 18 GLENRIDGE ROAD, GLENVILLE, NEW YORK Supervisor Koetzle called the meeting to order at 7:00 PM; Supervisor Koetzle asked the Town Clerk, Linda C. Neals, to call the roll. Present: Supervisor Christopher A. Koetzle, Councilmen, James M. Martin, Michael Aragosa, Michael R. Godlewski and Councilwoman Gina M. Wierzbowski Absent: None Also present were Earl T. Redding, Attorney for the Town; Jason Cuthbert, Comptroller and Melissa Cherubino, Director of Community Development and Vicki Hillis, Director of Human Services Town Council Reports: Councilman Godlewski – “There is a fund raiser tomorrow night at Wolf Hollow from 5:30 to 7:30 for Scotia Relief. Scotia Relief helps families in need. It was a great event last year.” Councilwoman Wierzbowski – “I attended the most recent meeting of the Glenville Town Chiefs Association last week. It was at Beukendaal Fire Department. It was great to meet a lot of the new officers that were sworn in at the recent banquets that they had. There was a lot of good discussion. Two events that I found out about that I would like to share with everyone here are Saturday morning the Alplaus Fire Department Explorer Post is having a pancake breakfast from 8:00 AM to 11:00 AM at the firehouse and the Beukendaal Fire Department’s Ladies Auxiliary on Sacandaga Road is going to be having their Annual Soups On.” Councilman Martin – “I attended the agenda meeting of the Planning and Zoning Commission last Monday evening just to make a connection between the two boards and to convey our support for what they do and our appreciation for all of their volunteer effort.
    [Show full text]
  • West Hill &West End Revitalization Plan
    WEST HILL & WEST END REVITALIZATION PLAN EXISTING CONDITIONS ANALYSIS - DRAFT Working Document Submitted to the City of Albany July 21st, 2016 DRAFT ReImagine West Hill / West End T A B L E O F C O N T E N T S CHAPTER 1: INTRODUCTION ............................................................................................... 3 SECTION 1.1 - SUMMARY OF FINDINGS .................................................................................................... 5 Section 1.1.1 - Neighborhood Economic Development Existing Conditions ........................................ 5 Section 1.1.2 - Housing Existing Conditions .......................................................................................... 6 Section 1.1.3 - Transportation & Mobility Existing Conditions ............................................................. 7 Section 1.1.4 - Environment & Community Life Existing Conditions .................................................... 7 CHAPTER 2: METHODOLOGY ............................................................................................... 9 SECTION 2.1 - STUDY AREA ....................................................................................................................... 9 SECTION 2.2 - DATA SOURCES .................................................................................................................. 9 SECTION 2.3 - STAKEHOLDER INTERVIEWS ............................................................................................. 10 SECTION 2.4 - MARKET ANALYSIS METHODOLOGY ...............................................................................
    [Show full text]
  • Electric Vehicle Charging Station Plan
    h Capital District Electric Vehicle Charging Station Plan PREPARED BY: IN COLLABORATION WITH: WITH SUPPORT FROM: March 2016 III Capital District Electric Vehicle Charging Station Plan NOTICE This report was prepared by Capital District Clean Communities and Energetics Incorporated in the course of performing work contracted for and sponsored by the New York State Energy Research and Development Authority (hereafter “NYSERDA”). The opinions expressed in this report do not necessarily reflect those of NYSERDA or the State of New York, and reference to any specific product, service, process, or method does not constitute an implied or expressed recommendation or endorsement of it. Further, NYSERDA, the State of New York, and the contractor make no warranties or representations, expressed or implied, as to the fitness for particular purpose or merchantability of any product, apparatus, or service, or the usefulness, completeness, or accuracy of any processes, methods, or other information contained, described, disclosed, or referred to in this report. NYSERDA, the State of New York, and the contractor make no representation that the use of any product, apparatus, process, method, or other information will not infringe privately owned rights and will assume no liability for any loss, injury, or damage resulting from, or occurring in connection with, the use of information contained, described, disclosed, or referred to in this report. NYSERDA makes every effort to provide accurate information about copyright owners and related matters in the reports we publish. Contractors are responsible for determining and satisfying copyright or other use restrictions regarding the content of reports that they write, in compliance with NYSERDA’s policies and federal law.
    [Show full text]
  • Dormitory Authority of the State of New York
    NEW ISSUE (See “Ratings” herein) $224,875,000 DORMITORY AUTHORITY OF THE STATE OF NEW YORK SCHOOL DISTRICTS REVENUE BOND FINANCING PROGRAM REVENUE BONDS $124,120,000 $22,065,000 $27,530,000 $39,840,000 $11,320,000 SERIES 2012A SERIES 2012B SERIES 2012C SERIES 2012D SERIES 2012E Dated: Date of Delivery Due: As shown on the inside cover Payment and Security: The School Districts Revenue Bond Financing Program Revenue Bonds, Series 2012A (the “Series 2012A Bonds”), the School Districts Revenue Bond Financing Program Revenue Bonds, Series 2012B (the “Series 2012B Bonds”), the School Districts Revenue Bond Financing Program Revenue Bonds, Series 2012C (the “Series 2012C Bonds”), the School Districts Revenue Bond Financing Program Revenue Bonds, Series 2012D (the “Series 2012D Bonds”), and the School Districts Revenue Bond Financing Program Revenue Bonds, Series 2012E (the “Series 2012E Bonds” and, together with the Series 2012A Bonds, the Series 2012B Bonds, the Series 2012C Bonds and the Series 2012D Bonds, the “Series 2012 Bonds”), will be special obligations of the Dormitory Authority of the State of New York (the “Authority”), payable solely from and secured by a pledge of payments to be made by certain School Districts (collectively, the “School Districts”) in the State of New York (the “State”) pursuant to the Financing Agreements (collectively the “Agreements”), dated as of April 1, 2012, between the Authority and such School Districts, and all funds and accounts (except the Arbitrage Rebate Fund) authorized under the Authority’s Master School Districts Revenue Bond Financing Program Revenue Bond Resolution adopted May 29, 2002, as amended and supplemented (the “Master Resolution”), and established by the Authority’s Series Resolutions, adopted September 21, 2011, authorizing such Series (individually, the “Series 2012A Resolution,” the “Series 2012B Resolution,” the “Series 2012C Resolution”, the “Series 2012D Resolution,” and the “Series 2012E Resolution” and, together, the “Series 2012 Resolutions”).
    [Show full text]
  • Genesee-Finger Lakes Historic Transportation Gateway Inventory and Assessment August 2009
    Genesee-Finger Lakes Historic Transportation Gateway Inventory and Assessment August 2009 Genesee-Finger Lakes Historic Transportation Gateway Inventory and Assessment August 2009 Genesee/Finger Lakes Regional Planning Council 50 West Main Street • Suite 8107 Rochester, NY 14614 (585) 454-0190 http://www.gflrpc.org [email protected] Financial assistance for the preparation of this report was provided in part by the Federal Highway Administration. Genesee/Finger Lakes Regional Planning Council is solely responsible for its content and the views and opinions expressed herein do not necessarily reflect the official views or policy of the U.S. Department of Transportation. Mission Statement The Genesee/Finger Lakes Regional Planning Council (G/FLRPC) will identify, define, and inform its member counties of issues and opportunities critical to the physical, economic, and social health of the region. G/FLRPC provides forums for discussion, debate, and consensus building, and develops and implements a focused action plan with clearly defined outcomes, which include programs, personnel, and funding. Genesee-Finger Lakes Historic Transportation Gateway Inventory and Assessment August 2009 TABLE OF CONTENTS EXECUTIVE SUMMARY…………………………………………………………….....V 1. INTRODUCTION............................................................................................1 1.1 Survey Team ....................................................................................................................................... 1 2. CONDUCTING THE SURVEY ............................................................................3
    [Show full text]
  • Onondaga County Planning Board February 05, 2020 SYRACUSE-ONONDAGA COUNTY PLANNING AGENCY CONFERENCE ROOM, 1100 CIVIC CENTER 421 MONTGOMERY STREET SYRACUSE, NEW YORK
    Onondaga County Planning Board February 05, 2020 SYRACUSE-ONONDAGA COUNTY PLANNING AGENCY CONFERENCE ROOM, 1100 CIVIC CENTER 421 MONTGOMERY STREET SYRACUSE, NEW YORK I. ATTENDANCE MEMBERS PRESENT STAFF PRESENT GUESTS PRESENT Daniel Cupoli Dan Kwasnowski James Corbett Megan Costa Marty Masterpole Allison Bodine Jim Stelter Robin Coon Marty Voss II. CALL TO ORDER The meeting was called to order at 11:00 AM on February 05, 2020. III. MINUTES & OTHER BUSINESS Minutes from January 15, 2020 were submitted for approval. Marty Voss made a motion to accept the minutes. Marty Masterpole seconded the motion. the votes were recorded as follows: Daniel Cupoli - yes; James Corbett - yes; Marty Masterpole - yes; Jim Stelter - yes; Marty Voss - yes. IV. ACTIONS ON GML SECTION 239 REFERRALS Summary S-20-3 TVanPB No Position S-20-4 TManPB No Position S-20-5 VFayPB No Position With Comment Z-20-13 CSyrZA No Position Z-20-14 CSyrZA No Position With Comment Z-20-15 CSyrPB No Position Z-20-16 CSyrPB No Position Z-20-17 TManTB No Position With Comment Z-20-18 TManTB No Position With Comment Z-20-19 TManPB Modification Z-20-20 TCamTB No Position With Comment Z-20-21 TCamPB No Position With Comment Z-20-22 TCamPB No Position With Comment Z-20-23 TClaPB Modification Z-20-24 CSyrZA No Position Z-20-25 TGedPB No Position Z-20-26 VFayPB Modification Z-20-27 VFayZBA No Position With Comment Z-20-28 TCamTB No Position With Comment Z-20-29 TVanZBA Modification Z-20-30 TLafPB Modification Z-20-31 TClaZBA No Position With Comment Z-20-32 TVanPB Modification Onondaga County
    [Show full text]
  • NY5 Bus Rapid Transit Conceptual Design Study
    NY5 Bus Rapid Transit Conceptual Design Study Executive Summary Washington Broadway Veeder/Nott Steuben McClellan N. Robinson Lawnwood Balltown New Karner Village of Colonie Colonie Center Colvin N. Allen N. Manning Quail Lexington Lark S. Swan Pearl SUNY NewNew YorkYork StateState RouteRoute 55 OverviewOverview For over a century, New York State Route 5 has been one of the main travel corridors in the Capital District. Anchored by the two cities of Albany and Schenectady, the arrow-straight route running 16.5 miles from northwest to southeast has served bicyclists, pedestrians, horsecars, streetcars, automobiles, buses, and trucks. In the post-war era, the character of NY 5 changed, reflecting shifts in employment, land use, transportation modes, and lifestyles. While still a critical transit corridor, with about 10,000 riders per day on CDTA’s buses, most of the roadway is dominated by automobiles, whether in terms of traffic flow, pavement space, or automobile-related land use, making the corridor less attractive Downtown Schenectady - NY5 at Broadway to a more diverse set of uses. Retail redevelopment has occurred in certain places in the corridor, such as at Colonie Center, but other segments of the corridor have lagged economically and need revitalization. Schenectady Troy GE ECD87 NY5 at McClellan St in Schenectady Plant Niskayuna N e ECD890 w 890 Y o rk R O U TE Colonie 87 5 NY5 at Wolf Rd in Colonie 90 90ECD d R d r R e lf rn o a Colonie W K Colonie w Who initiated the NY 5 e Village N Center Study? CDTC began the NY 5 Study in 1998 with the We stern NYSDOT, CDTA, and the Ave State five corridor communities Campus (the Cities of Albany and 90 r Schenectady, the Towns of e Albany iv NY5 east of Colvin Ave in Albany Colonie and Niskayuna and R n o the Village of Colonie) to State s d evaluate land use and u Capitol H transportation issues along Central Avenue and State Street.
    [Show full text]
  • 9.7 Town of Dewitt
    SECTION 9.7: TOWN OF DEWITT 9.7 TOWN OF DEWITT This section presents the jurisdictional annex for the Town of DeWitt. A.) HAZARD MITIGATION PLAN POINT OF CONTACT Primary Point of Contact Alternate Point of Contact Eugene J. Conway, Chief of Police Brian Maxwell, Highway Superintendant 5400 Butternut Drive, E. Syracuse, NY 13057 5400 Butternut Drive, E. Syracuse, NY 13057 (315) 449-3640 (315) 437-8331 [email protected] [email protected] B.) TOWN PROFILE Population 24,403 (estimated 2007 U.S. Census) Location The Town of DeWitt is in east-central Onondaga County, immediately east of the City of Syracuse. The town is a suburb of Syracuse. It is also bordered by the Towns of Cicero to the north, Salina and Onondaga to the east, Lafayette and Pompey to the south, and Manlius to the east. The Village of East Syracuse is wholly within the boundaries of DeWitt. The Town is the site of most of the campus and all of the academic buildings of Le Moyne College. The northern portion of the Town is developed with a mixture of industrial, commercial and residential sections; and the central portion of the Town is primarily residential. The southern, hilly portion of the Town is generally mixed forests and fields with limited residential development and stone quarry operation. The major streams in the Town are Ley Creek and Butternut Creek. Interstate 481 is the major highway in DeWitt crossing the center of the Town, turning northward along the east side of DeWitt. I-481 intersects Interstate 690 in the eastern part of the Town and Interstate 90 (New York State Thruway) in the northern part of the Town.
    [Show full text]
  • Final Public Record for Eminent Domain Public Hearing—April 19
    NOTICE OF PUBLIC HEARING NOTICE IS HEREBY GIVEN that in accordance with Eminent Domain Procedure Law §202, a public hearing will be held virtually via WebEx at 5:00 p.m. on the 19th day of April, 2021, or as soon thereafter as possible, to consider the proposed acquisition, by eminent domain, of portions of a properties identified as Map 8, Parcel 10 (Tax Map ID# 328.008-1-20) (Permenent Easement) and Map 8, Parcel 11 (Tax Map ID# 328.008-1-20) (Fee Title) on the Oneida County Acquisition Map. The purpose of this hearing will be to inform the public, to consider the need and location of the proposed acquisitions, to review the public use to be served, and to assess the impact of the acquisitions on the environment and the residents prior to acquisition of those properties. The acquisition of these properties by the County of Oneida will be for the public purpose of reconstructing Middle Settlement Road in the Town of New Hartford. Persons may appear at the hearing virtually themselves or by agent and will be given the opportunity to present oral or written statements and to submit other documents or information concerning the proposed acquisition. The meeting will be hosted from the Oneida County Office Building, 800 Park Avenue in the City of Utica, but due to the COVID-19 pandemic, physical attendance is not allowed pursuant to Governor Cuomo’s Executive Order 202.15, as continued by 202.29, 202.39, 202.49, 202.55, 202.60, 202.67, 202.72, 202.79, 202.87, 202.92, 202.93, 202.94, 202.95 and 202.99.
    [Show full text]
  • River Corridor Bus Rapid Transit Albany, New York Small Starts Project Development (Rating Assigned November 2017)
    River Corridor Bus Rapid Transit Albany, New York Small Starts Project Development (Rating Assigned November 2017) Summary Description Proposed Project: Bus Rapid Transit 16.0 Miles, 30 Stations Total Capital Cost ($YOE): $40.88 Million Section 5309 Small Starts Share ($YOE): $32.70 Million (80.0%) Annual Operating Cost (opening year 2020): $2.95 Million Existing Corridor Ridership (Warranted): 10,500 Daily Linked Trips Overall Project Rating: Medium Project Justification Rating: Medium Local Financial Commitment Rating: Medium Project Description: The Capital District Transportation Authority (CDTA) proposes to implement bus rapid transit (BRT) along the Hudson River connecting Waterford in the north to Downtown Albany in the south via Troy, Watervliet, and Menands. The project includes uniquely branded buses and stations, transit signal priority, replacement of 10 traffic signals, queue bypass lanes in three locations, real-time bus arrival information, and construction of two park and ride facilities. CDTA anticipates purchasing 20 vehicles and expanding an existing maintenance and storage facility to accommodate the additional vehicles. The project is planned to intersect with the existing BusPlus Red Line BRT that connects the downtowns of Albany and Schenectady via New York State Route 5. Project Purpose: The project is intended to provide faster, more direct, and more reliable north‐south transit service connecting major activity centers and accommodating an increasing ridership along the River Corridor. The project is also intended to improve existing pedestrian access at station locations by providing safer crossings for pedestrians and transit riders. Project Development History, Status and Next Steps: CDTA selected a locally preferred alternative and had it added to the financially constrained long range plan in September 2014.
    [Show full text]