CANTONMENT BOARD

Proceedings of Ordinary Cantonment Board Meeting held on 13.10.2020 at 1100 hours in the Conference Room of the Cantonment Board Office, Delhi Cantonment.

MEMBERS PRESENT

1. Brig. R.K. Chaudhary President 2. Smt. Kadiyan Rachna Vice-President 3. Sh. S.V.R. Chandra Sekhar, CEO Member–Secretary 4. Brig. S.S. Jaiswal, SEMO Ex-officio Member 5. Lt. Col. Sandeep Singh Nominated Member 6. Col. Parshant Kandpal, CO (DAPU) Nominated Member 7. Col. Brajesh Kumar, SO(Cantt) Nominated Member 8. Maj. Amit Bhardwaj, GE (Central) Ex-officio Member 9. Smt. Jain Kavita Elected Member 10. Sh. Jagat Singh Elected Member 11. Sh. Beniwal Nand Kishore Elected Member 12. Col. Narender Chaudhary (Retd) Elected Member 13. Sh. Vimal Chowdhary Elected Member 14. Smt. Chaudhary Priyanka Elected Member

MEMBERS ABSENT

1. Sh. D. Karthikeyan, ADM Nominated Member 2. Sh. Tanwar Sandeep Elected Member

SPECIAL INVITEE PRESENT

1. Sh. Virender Singh Kadian, Hon’ble MLA

SPECIAL INVITEE ABSENT

1. Smt. Meenakashi Lekhi, Hon’ble MP

National Anthem was played before proceeding with the meeting.

Before start of the proceedings, Board Members stood in silence for two minutes to pay condolences to Brig. B.K. Rattanpal, Ex- President, Cantt Board Delhi who had expired recently due to illness.

1. OATH

Oath of the Member-Secretary, Delhi Cantonment Board under section 17 of the Cantonments Act, 2006.

Page 1 of 210

1. Sh. S.V.R. Chandra Sekhar, CEO, Delhi Cantonment Board took oath of the allegiance to the Constitution of as provided in Section 17 of the Cantonments Act, 2006. The President, Vice-President and all Members of Cantt Board Delhi congratulated the CEO, Member-Secretary for taking over the assignment of CEO, Member-Secretary. Sh.Vimal Chowdhary on behalf of all Members of the Board assured the CEO, Member-Secretary of their best cooperation and stated that Cantt Board is looking forward for holistic development of Cantt under his administrative command. He also on behalf of all Members congratulated Ms. Shilpa Gual, Jt. CEO for her posting as Chief Executive Officer, Lansdowne Cantt Board and offered her best wishes and welcomed Sh. Ramesh. N for his posting to Cantt Board Delhi as Jt. CEO.

Lt. Col. Sandeep Singh, Adm Commandant & Col. Brajesh Kumar, SO (Cantt) took oath of the allegiance to the Constitution of India as provided in Section 17 of the Cantonments Act, 2006. The President, CEO, Member-Secretary, Vice-President and all Members of Cantt Board Delhi congratulated the Nominated Members for taking over the assignment.

2. RESUME

To note the proceedings of Ordinary Cantonment Board Meeting held on 21.3.2020 &Special Cantonment Board Meeting held on16.06.2020.

2. Noted.

3. CIRCULAR RESOLUTION

To note Circular Resolution dated 01.07.2020.

CIRCULAR AGENDA

SUB : PUBLICATION OF ELECTORAL ROLLS – 2020

Electoral Rolls for 08 wards of the Delhi Cantonment in Form I have been prepared in the manner prescribed in Chapter II of the Cantonment Electoral Rules, 2007 (CER, 2007). The Board may approve for publication of the same on 01.07.2020 as envisaged under Rule 10 of the aforesaid CER, 2007.

The Electoral Rolls for all 8 wards for the year 2020 will be displayed in office of Delhi Cantt Board for inspection of all concerned. Further, in terms of Rule 13 of CER, 2007 every claim for the inclusion of a name in the electoral roll and every objection to an entry therein shall be made within a period of twenty days from the date of publication of the Notice referred in Rule 12 of CER, 2007. The Forms for claim in Form III and for objection in Form IV would be available in the office of Delhi Cantonment Board for the said purpose. The list of locations where the Notice to file claims and objections will be displayed is also enclosed herewith as Annexure – I.

Page 2 of 210

Sd/- Chief Executive Officer Delhi Cantonment (Puspendra Singh) Dated: 01st July, 2020

RESOLUTION:

Noted & approved.

1. Brig. R.K. Chaudhary President ------Sd/------

2. Smt. Kadiyan Rachna Vice President ------

3. Shri Puspendra Singh, CEO Member-Secretary ------Sd/------

4. Brig. S.S. Jaiswal, SEMO Ex-Officio Member ------Sd/------

5. Col. A.K.S Patial, Adm. Comdt. Nominated Member ------

6. Col. Parshant Kandpal, CO (DAPU) Nominated Member ------

7. Col. Yudishthir Moza, SO (Cantt) Nominated Member ------Sd/------

8. Maj. Amit Bhardwaj, GE (Central) Ex-Officio Member ------

9. Shri D. Karthikeyan, ADM Nominated Member ------Sd/------

10. Sh. Tanwar Sandeep Elected Member ------Sd/------

11. Smt. Jain Kavita Elected Member ------Sd/------

12. Sh. Jagat Singh Elected Member ------Sd/------

Page 3 of 210

13. Sh. Beniwal Nand Kishore Elected Member ------

14. Col. Narender Chaudhary (Retd) Elected Member ------

15. Sh. Vimal Chowdhary Elected Member ------Sd/------

16. Smt. Chaudhary Priyanka Elected Member ------Sd/------

3. Noted.

Col (Retd) Narender Chaudhary, Member stated that due to spread of COVID-19 names of some electors could not be registered in the Electoral Rolls prepared by the Cantt Board Delhi during the year. The CEO, Member-Secretary informed the Board that the issue will be examined in the light of provisions contained in Cantonment Electoral Rules, 2007.

4. CIRCULAR RESOLUTION

To note Circular Resolution dated 07.07.2020.

CIRCULAR AGENDA

1. EXTENSION OF CONTRACT PERIOD OF CONTRACTUAL STAFF ENGAGED IN CANTONMENT GENERAL HOSPITAL

The CMO (I/c) vide note dated 07.07.2020 has reported that the tenures of the following doctors/ other hospital staff already engaged in the Cantonment General Hospital are expiring shortly/have expired and he has recommended for further extension as given below:-

S.N Name of Designation Date of Date of Tenure Current / Pro-posed Staff initial contract Applicable extension joining & ending Remuneratio of Tenure renewal n per month of 11 months from 1 Dr. Suruchi Oral 17.06.2019 16.06.2020 1 yr 825/- per 11 mths Dogra Maxillofacial hour from Kapoor Surgeon 10.07.20 2 Dr.Ambika Periodontist 09.06.2015 08.06.2016 1 yr 866/- per 11 mths Sharma 11.06.2016 10.06.2017 1 yr hour from 13.06.2017 12.06.2018 1 yr 10.07.20 22.06.2018 21.06.2020 2 yrs 3 Dr. P.C. Jain Spl. 05.09.2011 07.08.2013 1 yr 874.81/- per 11 mths Pediatrician 337 days hour from 08.08.2013 22.03.2015 1 yr 08.07.20 Page 4 of 210

227 days 23.03.2015 22.03.2016 1 year 29.03.2016 28.03.2017 1 year 31.03.2017 30.06.2017 92 days 03.07.2017 02.07.2018 1 year 05.07.2018 04.07.2020 2 years 4 Reena Nurse Grade 08.03.2014 07.03.2015 1 yr 55,676- 11 mths Kumari A 08.03.2015 07.03.2016 1 yr from 10.03.2016 09.03.2017 1 yr 08.07.20 14.03.2017 30.06.2017 109 days 03.07.2017 02.07.2018 1 yr 05.07.2018 04.07.2020 2 years 5 Rinki Gaur Nurse 05.03.2014 04.03.2015 1 yr 55,676- 11 mths Grade A 05.03.2015 04.03.2016 1 yr from 07.03.2016 06.03.2017 1 yr 08.07.20 09.03.2017 30.06.2017 1 yr 03.07.2017 02.07.2018 114 days 05.07.2018 04.07.2020 02 years 6 Vishal Lab 04.07.2018 03.07.2019 1 yr 33,196- 11 mths Technician 06.07.2019 05.07.2020 1 year from 09.07.20 7 Babita Lab 04.07.2018 03.07.2019 1 yr 33,196- 11 mths Technician 06.07.2019 05.07.2020 1 year from 09.07.20 8 Teena Nurse Grade 18.07.2012 17.07.2013 1 yr 55,676- 11 mths Thomas A 18.07.2013 17.07.2015 2 years from 18.07.2015 17.07.2016 1 yr 27.07.20 20.07.2016 19.07.2017 1 yr 22.07.2017 21.07.2018 1 yr 24.07.2018 23.07.2020 02 years 9 Sheebamol OT Nurse 23.07.2014 22.07.2015 1 yr 55,676- 11 mths P.S. 23.07.2015 22.07.2016 1 yr from 25.07.2016 24.07.2017 1 yr 03.08.20 27.07.2017 26.07.2018 1 yr 30.07.2018 29.07.2020 02 years 10 Manjeet Dental Hygie- 01.08.2012 31.07.2013 Full 40,812- 11 mths Singh nist 01.08.2013 15.07.2015 Time from 01.08.2015 31.07.2016 2 years 10.08.20 03.08.2016 02.08.2017 05.08.2017 04.08.2018 07.08.2018 06.08.2020 02 years

In view of the requirement of the duties and recommendation of the CMO (I/c), it is requested that the approval may please be granted to extend the contract.

The financial effect of engagement of these personnel for 11 months would beRs. 50,84,035- (approx.).

It is recommended to enhance the tenure to 11 months with break of 03 days for all the staff.

Page 5 of 210

2. REPAIR OF ‘OT TABLE (MODEL DR.MAX 7000SFPB/SR NO. A122-L9-0011 MACHINE INSTALLED IN CGH, D/CANTT.-10.

The OT TABLE (Electro hydraulic) (Model- Dr. Max 7000SFPB Beng Medical, Taiwan) for Major OT was procured through tender process as per work order No. DCB/OT/Table(Electro hydraulic)/2012 dated 29.05.2013 and Agreement was made on 27.05.2013 between the supplier M/s. Bet Medical Pvt. Ltd. and Cantonment Board, Delhi Cantt. The OT Table (Electro hydraulic) was installed on 16.07.2013. It was under 03 years of AMC after two years comprehensive warranty, which was expired on 15.07.2018. After completion of five years, AMC of ‘OT TABLE (MODEL DR. MAX 7000 SPFB/SR.NO.A122-L9- 0011 MACHINE INSTALLED IN CGH, D/CANTT-10, was awarded to M/s. Bet Medical Pvt. Ltd. vide work order No.CGH/OT/Table/(Electro hydraulic/2012 dated 29.01.2020 for period one year w.e.f. 29.01.2020 to 28.01.2021.

An oil leakage was reported by the Anesthesiologist, OT CGH, from Up-Down Piston of the said machine on 17.3.2020 which needed to be repaired. Hence, the AMC provider, M/s Bet Medical Pvt Ltd. inspected the same and reported that Up-Down Piston required to be changed as per the service report of the company’s technician dated 16.03.2020. As the AMC does not include the part replacement, M/s Bet Medical Pvt. Ltd. (AMC Provider) submitted estimate vide their office letter No.BET/SD/ EST/699/2019-20 dated 16.03.2020 of OT TABLE (MODEL DR. MAX 7000 SPFB/SR. NO.A122-L9-0011 MACHINE Item Description Oil leakage from up Down Piston machine amounting to Rs. 1,25,000/- + Rs. 22,500/- (IGST @ 18%) which comes to total amounting Rs. 1,47,500/- (Inclusive IGST). Till date no major expenses are incurred on repairs of the machine in last 07 years from the time of installation.

In view of the above, it is proposed that approval may be granted for the repair of OT TABLE (Electro hydraulic) (MODEL DR. MAX 7000 SPFB/SR.NO.A122-L9-0011 MACHINE through the AMC provider i.e. M/s Bet Medical Pvt. Ltd. at a total estimated value of amounting Rs. 1,47,500/- (Inclusive IGST). Sd/- Chief Executive Officer Delhi Cantt Board DATED: 07 July 2020

RESOLUTION: Consider and approved.

Item No.1 Item No.2 Signature

1. Brig R K Chaudhary Agreed/ Agreed/ President Not Agreed Not Agreed ____Sd/-____

2. Smt. Kadiyan Rachna Agreed/ Agreed/ Vice President Not Agreed Not Agreed ____Sd/-____

3. Shri Puspendra Singh, CEO Agreed/ Agreed/ Member-Secretary Not Agreed Not Agreed ____Sd/-____

Page 6 of 210

4. Brig. S S Jaiswal, SEMO Agreed/ Agreed/ Ex-officio Member Not Agreed Not Agreed ______

5. Col. A K S Patial, Agreed/ Agreed/ Adm. Commandant Not Agreed Not Agreed ______Nominated Member

6. Col. Parshant Kandpal, Agreed/ Agreed/ CO (DAPU) Not Agreed Not Agreed ____Sd/-____ Nominated Member

7. Col. Yudishthir Moza, Agreed/ Agreed/ SO(Cantt.) Not Agreed Not Agreed ______Nominated Member

8. Maj Amit Bhardwaj, Agreed/ Agreed/ GE (Central) Not Agreed Not Agreed ______Ex-officio Member

9. Shri D. Karthikeyan, ADM Agreed/ Agreed/ Nominated Member Not Agreed Not Agreed ______

10. Shri Tanwar Sandeep Agreed/ Agreed/ Elected Member Not Agreed Not Agreed ____Sd/-____

11. Smt. Jain Kavita Agreed/ Agreed/ Elected Member Not Agreed Not Agreed ____Sd/-____

12. Shri Jagat Singh Agreed/ Agreed/ Elected Member Not Agreed Not Agreed ____Sd/-____

13. Shri Beniwal Nand Kishore Agreed/ Agreed/ Elected Member Not Agreed Not Agreed ____Sd/-____

14. Col. Narender Chaudhary Agreed/ Agreed/ (Retd) Not Agreed Not Agreed ____Sd/-____ Elected Member

15. Shri Vimal Chowdhary Agreed/ Agreed/ Elected member Not Agreed Not Agreed ____Sd/-____

16. Smt. Chaudhary Priyanka Agreed/ Agreed/ Elected Member Not Agreed Not Agreed ____Sd/-____

4. Noted.

5. CIRCULAR RESOLUTION

To note Circular Resolution dated 08.07.2020.

Page 7 of 210

CIRCULAR AGENDA

SUBJECT: PROVISION OF FUNDS FOR CANTOMENT BOARD EMPLOYEES AS A WELFARE MEASURE – GROUP INSURANCE SCHEME

Refer FC/CBR No. 4/2 dated 20.05.2020/16.06.2020.

2. Vide above referred CBR, Board resolved and recommended to authorize the CEO to obtain the quotations from the public sector insurance agencies and after obtaining the quotations place them directly before the Board for approval. Further, Board also resolved that Office/CEO may facilitate any number of Cantonment Boards to get insurance cover for their staff.

3. Accordingly, this office had contacted LIC of India, Oriental Insurance Company Limited, New India Assurance Company Limited and National Insurance Company Limited to provide their proposal for the Group Insurance of the CB employees in wake of Covid- 19.Howver, only the LIC of India vide their letter No. P & GS/2020-21 GINP Fresh dated 22.05.2020 submitted their quotation and quoted premium rate as Rs. 3.50 per thousand Sum Assured plus GST (i.e premium for Rs. 5,00,000/- Sum Assured had come to Rs. 1750/- per person plus GST) (Copy is enclosed as Annexure-‘A’). This office remained in constant touch with LIC of India asking them to reduce the quoted premium rate further. Accordingly, LIC of India vide their letter No. P & GS/2020-21 GINP Fresh dated 30.06.2020 has provided a rate of premium as Rs. 2.00/- (Rs. Two) per thousand Sum Assured plus GST @ 18% (i.e. premium for Rs. 5,00,000/- Sum Assured would come to Rs. 1000/- per person plus GST @ 18%) (Copy is enclosed as Annexure-‘B’). They further informed that they would include the employees whose age is minimum 18 years and maximum 60 year under all level of staff. The (premium) contribution will be 100% by the employer (Board) and it will be yearly. The assurance shall be effected on the life of each member under one year renewable term insurance plan for a sum assured as per flat cover of Rs. Five lakhs. The master proposal and detailed rules submitted by the LIC of India also have been enclosed herewith as Annexure ‘C’.

4. PDDE, WC vide their letter No. 15044/BES/GEN/DE/W/2020-21 dated 18.06.2020 have informed that PDDE, Western Command, as Nodal Principal Directorate, in consultation with the other PDs DE will finalize the Group Insurance scheme, to provide protective cover to CB employees and relief benefit in case of death, to the deceased family. Accordingly, they directed all Cantonment Boards to provide insurance cover of Rs. 5 lakhs both for permanent and contractual staff who are involved in Covid prevention /related activities and get the proposal approved from the Board for the same. They further informed that Delhi Cantonment Board has been designated as Nodal Cantonment Board and all further actions will be carried out by the Nodal Cantonment Board with LIC of India.

5. The premium in respect of other Cantonment Boards will be borne by the respective Cantonment Board.

6. This office vide its letter No. DCB/IT/COVID-19/2020 dated 03.07.2020 sent the proposal of LIC dated 30.06.2020 to the PDDE office who is the Nodal Principal Directorate for the purpose to examine the proposal and issue orders for further course of action. Page 8 of 210

7. The total number of Delhi Cantonment Board employees who are proposed to be brought under the ambit of this insurance cover is 1688 as involved for Covid- prevention/related activities. The total expenditure on account of premium for one year term insurance for Delhi Cantonment Board for the proposed number of employees would come to approximately Rs. 20 lakhs. Accordingly, it is proposed that the Board may consider to provide insurance cover of Rs. 5 lakhs to 1688 personnel (200 permanent employees of different categories & levels and 1488 outsourced/contractual employees of different categories & levels) who have been assigned duties related with Covid- prevention/related activities in Delhi Cantonment, and unfortunately dies. The Board may consider.

Relevant letters/documents are enclosed herewith.

Sd/- Chief Executive Officer Delhi Cantonment Board (Puspendra Singh) Dated: 13th July, 2020

Resolution:

Considered. The Board resolves that providing insurance cover to permanent and contractual/outsourced employees of Delhi Cantonment Board who are engaged in Covid- prevention/related activities is welcome step. This issue has already been considered in FC/CBR No. 4/2 dated 20.05.2020/16.06.2020. The Board further resolves that the Board will procure the one year term insurance for sum assured of Rs. five lakhs (each employee) for the proposed 1688 (permanent 200 nos and outsourced/contractual 1488 nos) employees of different categories and levels of the Board from LIC of India at premium rate of Rupees One thousand plus GST @ 18% (for each employee), the total expenditure coming to Rupees Nineteen lakh ninety one thousand eight hundred forty only (say Rs.20 lakhs approx). The CEO, Member Secretary take necessary action in the matter and execute the agreement for the purpose. The Board also resolves that CEO, Member Secretary will constitute a three members committee to prepare the list of employees to be covered under insurance. The Committee will have one member each from hospital, sanitation and account sections of the Board. Further, the Board also resolves that CEO will consider the proposed number of employee to be brought under insurance cover and slight increase or decrease may be effected by him, if needed. The Board also resolves that Delhi Cantonment Board will facilitate as Nodal Office to get the similar insurance benefits for other Cantonment Boards employees who are involved in Covid- prevention/related activities. The premium amount of such employees will be borne by the respective Cantonment Boards.

1. Brig. R. K Chaudhary President Cantonment Board ------Sd/------

2. Sh. Rachna Kadiyan Vice-President ------Sd/------Page 9 of 210

3. Sh. Puspendra Singh Member-Secretary ------Sd/------

4. Brig. S.S. Jaiswal, SEMO Ex-officio Member ------

5. Col. A.K.S. Patial, Adm Comdt. Nominated Member ------

6. Col. Prashant Kandpal, CO (DAPU) Nominated Member ------

7. Col. Yudishthir Moza, SO (Cantt) Nominated Member ------

8. Sh. D. Karthikeyan, ADM Nominated Member ------

9. Maj. Amit Bhardwaj, GE (Central) Ex-officio Member ------

10. Sh. Sandeep Tanwar Elected Member ------Sd/------

11. Smt. Jain Kavita Elected Member ------Sd/------

12. Sh. Jagat Singh Elected Member ------Sd/------

13. Sh. Beniwal Nand Kishore Elected Member ------Sd/------

14. Col. Narender Chaudhary (Retd) Elected Member ------Sd/------

15. Sh. Vimal Chowdhary Elected Member ------Sd/------

16. Smt. Chaudhary Priyanka Elected Member ------Sd/------

5. Noted.

6. CIRCULAR RESOLUTION

To note Circular Resolution dated 08.07.2020. Page 10 of 210

CIRCULAR AGENDA

SUB : RESTORATION OF SEWERAGE CONNECTION OF VILLAGE NARAINA, DELHI CANTONMENT WITH PERIPHERAL SEWERAGE SYSTEM MAINTAINED BY DELHI JAL BOARD

The Principal Bench of Hon’ble National Green Tribunal (NGT) has time and again issued directions to all civic authorities in Delhi & NCR to ensure that no untreated sewer is discharged into open drains, water bodies etc. The Hon’ble NGT in the matter titled as Manoj Mishra Vs. Union of India &Ors in Original application No.6/2012, vide order dated 11.09.2019 had directed all Municipal bodies/ Delhi Jal Board to ensure proper management of sewerage discharge by 31.12.2019.

It is pertinent to mention here that sewerage discharge of Village Naraina located within Delhi Cantonment limits was connected to Delhi Jal Board trunk sewer line after obtaining prior sanction of the competent authority vide Delhi Water Supply & Sewerage Disposal Undertaking letter No.F-3(081)WZ/EE(P)DR/91/251 dated 08.04.1991. Cantt Board had also made payment towards sewerage connection charges to DJB authorities amounting to Rs.11,36,000/- in this regard.

During the work of Rail at Naraina,the Sewerage connection connecting sewerage discharge of Village Naraina to DJB got damaged and became non functional thereby ceasing proper disposal of sewerage effluent of Village Naraina. The DJB authorities were approached to relay sewerage connection as deposit work on behalf of Cantt Board Delhi vide letters dated 16.07.2019, 10.12.2019, 03.02.2020, 05.05.2020, 18.05.2020 & 09.06.2020.

Further, Hon’ble NGT vide its order dated 05.03.2020 directed Govt. of NCT of Delhi to constitute aIntegrated Drain Management Cell (IDMC) for remediation and management of all drains in Delhi. Accordingly, the Govt. of NCT of Delhi has constituted IDMC under the Chairmanship of Chief Secretary, Govt. of NCT of Delhi who has been coordinating with all municipal bodies/ stake holders and is reporting progress on sewerage/ drainage management to Hon’ble NGT. The issue of restoration of damaged sewer connection of Village Naraina was raised by the CEO, Delhi before the CEO, Delhi Jal Board during IDMC meeting dated 15.05.2020 and it was requested that concerned officials of DJB be directed to immediately take up the work of restoration of sewer connection of Village Naraina for proper disposal of sewerage effluent generated from Village Naraina. With the intervention of CEO, Delhi Jal Board, a site inspection was carried out involving reps of Cantt Board Delhi and DJB on 08.06.2020 and feasibility of connecting sewerage discharge from Village Naraina to DJB trunk line was ascertained. Accordingly, Cantt Board vide letter No.DCB/8/Engg/CETP/2020-21 dated 09.06.2020 had requested Executive Engineer, DJB to forward estimates for the work of restoration of sewerage connection of Village Naraina as deposit work by DJB on behalf of Cantt Board Delhi. The Executive Engineer, DJB vide letter No.DJB/EE(West)-II(AC-39)/2020/98 dated 29.06.2020 has forwarded tentative estimates for the restoration of sewerage connection of Village Naraina with DJB Page 11 of 210

peripheral sewerage line amounting to Rs.15,72,657/-. To comply with the orders issued by Hon’ble NGT dated 11.09.2019, the Engineering branch has recommended release of aforementioned amount of Rs.15,72,657/- in favour of DJB, for execution of work by DJB as deposit work on behalf of Cantt Board Delhi.

The Board may consider release of amount of Rs.15,72,657/- in favour of DJB, New Delhi.

Sd/- Chief Executive Officer Delhi Cantonment (Puspendra Singh)

Dated: 08thJuly, 2020

RESOLUTION:

Considered and resolved to approve release of amount of Rs.15,72,657/- in favour of DJB, New Delhi for restoration of sewer connection of Village Naraina in compliance to orders dated 11.09.2019 issued by the Hon’ble National Green Tribunal.

1. Brig. R.K. Chaudhary President ------Sd/------

2. Smt. Kadiyan Rachna Vice President ------Sd/------

3. Shri Puspendra Singh, CEO Member-Secretary ------Sd/------

4. Brig. S.S. Jaiswal, SEMO Ex-Officio Member ------

5. Col. A.K.S Patial, Adm. Comdt. Nominated Member ------

6. Col. Parshant Kandpal, CO (DAPU) Nominated Member ------

7. Col. Yudishthir Moza, SO (Cantt) Nominated Member ------Sd/------

8. Maj. Amit Bhardwaj, GE (Central) Ex-Officio Member ------

Page 12 of 210

9. Shri D. Karthikeyan, ADM Nominated Member ------

10. Sh. Tanwar Sandeep Elected Member ------Sd/------

11. Smt. Jain Kavita Elected Member ------Sd/------

12. Sh. Jagat Singh Elected Member ------Sd/------

13. Sh. Beniwal Nand Kishore Elected Member ------Sd/------

14. Col. Narender Chaudhary (Retd) Elected Member ------Sd/------

15. Sh. Vimal Chowdhary Elected Member ------Sd/------

16. Smt. Chaudhary Priyanka Elected Member ------Sd/------

6. Noted.

7. CIRCULAR RESOLUTION

To note Circular Resolution dated 07.08.2020.

CIRCULAR AGENDA

SUBJECT:EXTENSION OF TERM OF OFFICE OF ELECTED MEMBERS OF DELHI CANTONMENT BOARD – REGARDING

To note Govt of India, Ministry of Defence letter No.14(8)/2019-D(Q&C) dated 04th August, 2020 to convey the sanction to extend the term of office of all the Elected Members of Delhi Cantonment Board for a period of Six months beyond 10.08.2020 or till the date of constitution of the Board, whichever is earlier.

Letter dated 4th August, 2020 is placed opposite as Annexure “A”.

Sd/- Chief Executive Officer Delhi Cantonment (S.V.R.CHANDRA SEKHAR) Dated: 07TH August, 2020 Page 13 of 210

RESOLUTION: Noted.

1 Brig. R.K.Chaudhary President ------Sd/------

2. Smt. Kadiyan Rachna Vice President ------Sd/------

3. Shri S.V.R.Chandra Sekhar, CEO Member-Secretary ------Sd/------

4. Brig. S.S. Jaiswal, SEMO Ex-Officio Member ------

5. Col. A.K.S Patial, Adm. Comdt. Nominated Member ------

6. Col. Parshant Kandpal, CO(DAPU) Nominated Member ------

7. Col. Yudishthir Moza, SO(Cantt) Nominated Member ------Sd/------

8. Maj. Amit Bhardwaj, GE (Central) Ex-Officio Member ------

9. Shri D Karthikeyan, ADM Nominated Member ------

10. Shri Tanwar Sandeep Elected Member ------Sd/------

11. Smt. Jain Kavita Elected Member ------Sd/------

12. Shri Jagat Singh Elected Member ------Sd/------

13. Shri Beniwal Nand Kishore Elected Member ------Sd/------

14. Col. Narender Chaudhary (Retd.) Elected Member ------Sd/------

15. Shri Vimal Chowdhary Elected Member ------Sd/------Page 14 of 210

16. Smt. Chaudhary Priyanka Elected Member ------Sd/------

7. Noted.

8. CIRCULAR RESOLUTION

To note Circular Resolution dated 18.08.2020.

CIRCULAR AGENDA

SUBJECT: EXPIRY OF CONTRACT PERIOD OF CONTRACTUAL STAFF ENGAGED IN CANTONMENT GENERAL HOSPITAL AND GRANT OF FRESH CONTRACT FOR 11 MONTHS

To consider the report of Chief Medical Officer I/c regarding the expiry of contract of contractual staff engaged in Cantonment General Hospital dated 08 August 2020. As per the report, the contract period of the following staff engaged in Cantonment General Hospital are expiring on the dates indicated against each. The report recommended that a fresh contract for 11 months be given to the staff as indicated below.

S. Name of Designation Date of Date of Tenure Current Proposed No. Staff initial contract Consolidated fresh contract joining & ending Remuneratio of Tenure 11 renewal n per mth* mnths from 1 Manisha Nurse 13.08.2012 12.08.2013 Full Time 55,676- 11 mths from Bhatt Grade A 13.08.2013 12.08.2015 2 year 24.08.2020 13.08.2015 12.08.2016 16.08.2016 15.08.2017 18.08.2017 17.08.2018 20.08.2018 19.08.2020 2 year 2 Dr. Anuradha GDMO 16.08.2012 15.08.2013 1 year 97,300- 11 mths from Bora 16.08.2013 15.08.2015 2 years 26.08.2020 16.08.2015 15.06.2016 1 year 18.08.2016 17.08.2017 1 year 21.08.2017 20.08.2018 1 year 23.08.2019 22.08.2020 1 year 3 Dr. Sunita Spl. ENT 20.09.2016 19.09.2017 1 year 1,15,800- 11 mths from Vishwakarma 22.09.2017 21.09.2018 1 year 27.08.2020 24.09.2018 23.09.2019 1 year 24.09.2019 23.08.2020 11 months 4 Vinod Kumar OT Techni- 24.09.2016 23.09.2017 Full Time 40,812- 11 mths Vishwakarma cian 26.09.2017 25.09.2018 from 28.09.2018 27.09.2019 01 year 31.08.2020 28.09.2019 27.08.2020 11 months 5 Deepak Audiometri 22.09.2014 21.09.2015 Full Time 40,812- 11 mths from Singh st Cum 22.09.2015 21.09.2016 31.08.2020 Speech 24.09.2016 23.09.2017 Therapist 26.09.2017 25.09.2018 28.09.2018 27.09.2019 1 year 28.09.2019 27.08.2020 11 months

Page 15 of 210

6 Rakesh Kr. Opto- 27.08.2012 26.08.2013 Full Time 40,812- 11 mths from Abhay metrist 27.08.2013 26.08.2015 2 years 07.09.2020 27.08.2015 26.08.2016 29.08.2016 28.08.2017 31.08.2017 30.08.2018 04.09.2018 03.09.2020 02 years 7 Dr. Shalini Spl. Pedia- 07.09.2018 06.09.2019 1 year 1,15,800- 11 mths Singh trics 04.10.2019 03.09.2020 11 months from 07.09.2020 8 Manasvi Physiothera 31.08.2015 30.08.2016 Full Time 54,276- 11 mths from Aggarwal pist 02.09.2016 01.09.2017 09.09.2020 04.09.2017 03.09.2018 06.09.2018 05.09.2020 2 year 9 Bela Goel Pharma-cist 28.09.2012 27.09.2013 Full Time 40,812- 11 mths from 28.09.2013 27.09.2015 2 years 11.09.2020 01.10.2015 30.09.2016 03.10.2016 02.10.2017 06.10.2017 05.10.2018 08.10.2018 07.10.2019 01 year 08.10.2019 07.09.2020 11 months 10 Kavita Nurse 01.10.2012 30.09.2013 Full Time 55,676- 11 mths from Grade A 01.10.2013 30.09.2015 2 years 11.09.2020 01.10.2015 30.09.2016 03.10.2016 02.10.2017 06.10.2017 05.10.2018 08.10.2018 07.10.2019 1 year 08.10.2019 07.09.2020 11 months 11 Kunjumole Lab 01.10.2012 30.09.2013 Full Time 40,812- 11 mths from Jose Assistant 01.10.2013 30.09.2015 2 years 11.09.2020 01.10.2015 30.09.2016 03.10.2016 02.10.2017 06.10.2017 05.10.2018 08.10.2018 07.10.2019 1 year 08.10.2019 07.09.2020 11 months 12 Prem ECG Techni- 05.09.2012 04.09.2013 Full Time 40,812- 11 mths from Prakash cian 05.09.2013 04.09.2015 14.09.2020 05.09.2015 04.09.2016 07.09.2016 06.09.2017 09.09.2017 08.09.2018 11.09.2018 10.09.2020 2 years 13 Teena Pharmacist 15.09.2012 14.09.2013 Full Time 40,812- 11 mths from Kumari 15.09.2013 14.09.2015 2 years 25.09.2020 15.09.2015 14.09.2016 17.09.2016 16.09.2017 19.09.2017 18.09.2018 22.09.2018 21.09.2020 02 years *Revised remuneration in fresh contract for para-medical staff shall be as per the prevailing DA at that time.(Sl. No. 1,4,5,6, 8 to 13).

In view of the important vital duties of the hospital staff fresh contract for 11 months may be granted.

The financial effect of engagement of these personnel for 11 months would be Rs.87,58,717- approx (eighty seven lakhs fifty eight thousand seven hundred and seventeen only). Page 16 of 210

If approved, the following staff would be given a fresh contact of 11 months from dates mentioned against each with a break of 3 days

Relevant file is placed on the table for consideration of the Board.

Sd/- Chief Executive Officer Delhi Cantt Board (SVR Chandra Sekhar) DATED: 18th August, 2020

RESOLUTION: Consider and approved.

1. Brig R K Chaudhary President ______Sd/-______

2. Smt. Kadiyan Rachna Vice President ______Sd/-______

3. Shri SVR Chandra Sekhar, CEO Member-Secretary ______

4. Brig. S S Jaiswal, SEMO Ex-officio Member ______

5. Col. A K S Patial,Adm. Commandant Nominated Member ______

6. Col. ParshantKandpal,CO (DAPU) Nominated Member ______Sd/-______

7. Col. YudishthirMoza, SO(Cantt.) Nominated Member _____Sd/-______

8. Maj Amit Bhardwaj, GE (Central) Ex-officio Member ______

9. Shri D. Karthikeyan, ADM Nominated Member ______

10. Shri Tanwar Sandeep Elected Member ______Sd/-______

11. Smt. Jain Kavita Elected Member ______Sd/-______Page 17 of 210

12. Shri Jagat Singh Elected Member ______Sd/-______

13. Shri BeniwalNand Kishore Elected Member ______Sd/-______

14. Col. Narender Chaudhary (Retd) Elected Member ______Sd/-______

15. Shri Vimal Chowdhary Elected member ______Sd/-______

16. Smt. Chaudhary Priyanka Elected Member ______Sd/-______

8. Noted.

9. CIRCULAR RESOLUTION

To note Circular Resolution dated 20.08.2020.

CIRCULAR RESOLUTION

SUB: TERM CONTRACT FOR DEVELOPMENT OF PARKS, GREEN STRIPS, TRAFFIC ISLANDS/JUNCTIONS, CENTRAL VERGE, PLANTERS ETC IN WARD NO. 1 TO WARD NO. 4 DELHI CANTT

Tender for the subject work were called for the second time through e-tendering after advertising in the National dailies. In the first call single tender was received and it was decided to recall the tender. Accordingly tender was re-invited and the critical dates for publishing and receipt of tender for the subject work is as shown below:

1. Date of release of tender through e-procurement : 14.07.2020 at 1500 Hrs 2. Last date & time for downloading : 30.07.2020 upto 1300 Hrs 3. Last date & time submission of e-tenders : 30.07.2020 upto 1300 Hrs 4. Date and time for opening of e-tender : 31.07.2020 at 1330 Hrs

In response to the e-tender for the subject work, bids from three firms were received on 31.07.2020. Out of these three bids, a bid submitted by the M/s Agrisense Landscape was found non responsive as the firm did not deposited EMD and Tender Fee physically (in original) in the tender box. The technical bids of other two firms were found in order and responsive. The amount quoted by the responsive bidders is given as under:

S. No. Name of agency Amount 1 M/s Amit Associates Rs. 1,33,98,750/- 2 M/s Jagjeet Singh Rs. 1,38,90,800/-

Page 18 of 210

In previous tender for the same work the contract amount approved by the Board was Rs.1,24,89,300/-. However in the present contract one additional item of maintenance and upkeep of growing & plantation has been included in the contract and the rates quoted by the lowest tenderer M/s Amit Associates Rs. 1,33,98,750/- are considered reasonable and recommended for acceptance.

Monsoon season has already set in and in this season plantation is considered to be of paramount importance. It is thus proposed to obtain approval of the Board at the earliest through circular resolution. The Board may consider approving lowest tender for the work quoted by M/s Amit Associates amounting to Rs. 1,33,98,750/-.

Sd/- Chief Executive Officer Delhi Cantonment Board (S.V.R Chandra Sekhar) Dated 20thAugust, 2020

Resolution:

Considered and resolved to approve the lowest tender of M/s Amit Associates amounting to Rs. 1,33,98,750/- as brought out on the agenda side.

1. Brig. R.K. Chaudhary President Cantonment Board ------Sd/------

2. Smt. Kadiyan Rachna Vice-President ------Sd/------

3. Sh. S.V.R Chandra Sekhar Member-Secretary ------

4. Brig. S.S. Jaiswal, SEMO Ex-Officio Member ------

5. Maj. Amit Bhardwaj, GE (Central) Ex-Officio Member ------Sd/------

6. Col. A.K.S. Patial, Adm Commandant Nominated Member ------

7. Col. Parshant Kandpal, CO, DAPU Nominated Member ------

8. Col. Yudishthir Moza, SO (Cantt) Nominated Member ------Sd/------

9. Sh. D. Karthikeyan, ADM Nominated Member ------Page 19 of 210

10. Shri Tanwar Sandeep Elected Member ------Sd/------

11. Smt. Jain Kavita Elected Member ------Sd/------

12. Sh. Jagat Singh Elected Member ------Sd/------

13. Sh. BeniwalNand Kishore Elected Member ------Sd/------

14. Col. Narender Choudhary (Retd.) Elected Member ------Sd/------

15. Sh. Vimal Chowdhary Elected Member ------Sd/------

16. Smt. Choudhary Priyanka Elected Member ------Sd/------

9. Noted.

10. CIRCULAR RESOLUTION

To note Circular Resolution dated 20.08.2020.

CIRCULAR RESOLUTION

SUBJECT: TERM CONTRACT FOR DEVELOPMENT OF PARKS, GREEN STRIPS, TRAFFICISLANDS/JUNCTIONS, CENTRAL VERGE, PLANTERS ETC IN WARD NO. 5 TOWARD NO. 8 DELHI CANTT

Tender for the subject work were called for the second time through e-tendering after advertising in the National dailies. In the first call single tender was received and it was decided to recall the tender. Accordingly tender was re-invited and the critical dates for publishing and receipt of tender for the subject work is as shown below:

1. Date of release of tender through e-procurement : 14.07.2020 at 1500 Hrs 2. Last date & time for downloading : 30.07.2020 upto 1300 Hrs 3. Last date & time submission of e-tenders : 30.07.2020 upto 1300 Hrs 4. Date and time for opening of e-tender : 31.07.2020 at 1330 Hrs

In response to the e-tender for the subject work, bids from three firms were received on 31.07.2020. Out of these three bids, a bid submitted by the M/s Agrisense

Page 20 of 210

Landscape was found non responsive as the firm did not deposited EMD and Tender Fee physically (in original) in the tender box. The technical bids of other two firms were found in order and responsive. The amount quoted by the responsive bidders is given as under:

S. No. Name of agency Amount 1 M/s Jagjeet Singh Rs. 1,37,15,800/- 2 M/s Amit Associates Rs. 1,42,15,150/-

In previous tender for the same work the contract amount approved by the Board was Rs.1,12,26,500/-. However in the present contract one additional item of maintenance and upkeep of growing & plantation has been included in the contract and the rates quoted by the lowest tenderer M/s Jagjeet Singh Rs. 1,37,15,800/- are considered reasonable and recommended for acceptance.

Monsoon season has already set in and in this season plantation & development of green belts and parks to be of paramount importance. It is thus proposed to obtain approval of the Board at the earliest through circular resolution. The Board may consider approving lowest tender for the work quoted by M/s Jagjeet Singh amounting to Rs. 1,37,15,800/-. Sd/- Chief Executive Officer Delhi Cantonment Board (S.V.R Chandra Sekhar) Dated 20thAugust, 2020

Resolution:

Considered and resolved to approve the lowest tender of M/s Jagjeet Singh amounting to Rs. 1,37,15,800/- as brought out on the agenda side.

1. Brig. R.K. Chaudhary President Cantonment Board ------Sd/------

2. Smt. Kadiyan Rachna Vice-President ------Sd/------

3. Sh. S.V.R Chandra Sekhar Member-Secretary ------

4. Brig. S.S. Jaiswal, SEMO Ex-Officio Member ------

5. Maj. Amit Bhardwaj, GE (Central) Ex-Officio Member ------Sd/------

Page 21 of 210

6. Col. A.K.S. Patial, Adm Commandant Nominated Member ------

7. Col. Parshant Kandpal, CO, DAPU Nominated Member ------

8. Col. Yudishthir Moza, SO (Cantt) Nominated Member ------Sd/------

9. Sh. D. Karthikeyan, ADM Nominated Member ------

10. Shri Tanwar Sandeep Elected Member ------Sd/------

11. Smt. Jain Kavita Elected Member ------Sd/------

12. Sh. Jagat Singh Elected Member ------Sd/------

13. Sh. Beniwal Nand Kishore Elected Member ------Sd/------

14. Col. Narender Choudhary (Retd.) Elected Member ------Sd/------

15. Sh. Vimal Chowdhary Elected Member ------Sd/------

16. Smt. Choudhary Priyanka Elected Member ------Sd/------

10. Noted.

11. CIRCULAR RESOLUTION

To note Circular Resolution dated 07.09.2020.

CIRCULAR AGENDA

SUB : DEVOLUTION OF POWERS TO VICE PRESIDENT OF THECANTONMENT BOARDS AND CONSTITUTION OF THREE COMMITTEES

Reference CBR No.20 dated 21.03.2020 wherein the Cantonment Board had approved draft Business Regulations of Delhi Cantonment Board as per directions and guidelines circulated vide Dte. General Defence Estates letter No.76/67/Expert Committee/C/DE/2018/ Vol –IV dated 24.12.2019. In the draft Business Regulations the Page 22 of 210

Cantonment Board had provisioned appointment of Finance Committee and Health & Environment Committee, each comprising of 07 (seven) Members and Education Committee comprising of 05 (five) Members, including CEO, Cantt Board as Member- Secretary of each Committee.

Now,the Dte. Defence Estates vide letter No.3/48/Cantt/DE/WC/RMS-30270 dated 03.09.2020 have directed re-preparation of constitution of Finance Committee and Health & Environment Committee which shall have 07 (seven) Members and Education Committee which shall have 05 (five) Members. In addition the Chief Executive Officer shall be the Member-Secretary to the each Committee. Accordingly, it is proposed to amend the constitution of aforementioned three Committees as under:

Committee Clause Constitution of Committee as Amended constitution of the No. per draft Business Committees Regulations approved vide CBR No.20 dated 21.03.2020 Finance 3 (I) The Board shall appoint a The Board shall appoint a Committee Finance Committee Finance Committee consisting consisting of the seven of seven Members to be Members to be Elected by Elected by the Board out of the Board of which, four shall whom 04 (four) shall be be Elected Members and Elected Members and 03 three Nominated Members, (three) shall be Nominated two of which shall be the Members. Out of 04 (four) Chief Executive Officer, Elected Members one shall be Member-Secretary and the the Vice President. Out of 03 Executive Engineer. Vice (three) official Members, 01 President of the Board shall (one) shall be Executive be ispo-facto Member and Engineer. In addition to Chairman of the Finance above 07 (seven) Members, Committee. the Chief Executive Officer shall be the Member- Secretary of the Committee. The Vice-President of the Board shall be the Chairman of the Committee. 3 (II) j. Thereafter the President or Thereafter the President or Presiding Officer shall Presiding Officer shall nominate three Nominated nominate three Nominated Members to be the Members Members to be the Members of the Finance Committee, of the Finance Committee, one one of which shall be of which shall be Executive Executive Engineer and the Engineer. CEO of the Cantonment Board shall be Member- Secretary of the Committee. Health & 4 (I) The Board shall appoint a The Board shall appoint a Environment Health & Environment Health & Environment Page 23 of 210

Committee Committee consisting of the Committee consisting of the seven Members to be Elected seven Members to be Elected by the Board of which, four by the Board out of whom 04 shall be Elected Members (four) shall be Elected and three Nominated Members and 03 (three) shall Members, amongst whom be Nominated Members, one shall be the Health amongst whom one shall be Officer and one Executive Health Officer and one shall Engineer. The CEO of the be Executive Engineer. In Board shall be the Member- addition to these 07 (seven) Secretary, of the Committee. Members, the Chief Executive Officer will be the Member- Secretary of the Committee. The Board or PCB (as authorized by Cantonment Board), shall elect the chairman of the committee. 4 (II) j) Thereafter the Presiding Thereafter the Presiding Officer shall nominate three Officer shall nominate three Nominated Members to be Nominated Members to be the Members of the Health & the Members of the Health & Environment Committee, one Environment Committee, one of which shall be Health of which shall be Health Officer and one Executive Officer and one Executive Engineer and the CEO of the Engineer. Cantonment Board, who shall be the Member-Secretary of the Committee. 4 (II) u) The tenure of the Committee The tenure of the committee shall be one year. shall be one year. The Chairman of the Committee may be removed from his office by the President Cantonment Board, at a special meeting convened for the purpose on a requisition for the same by not less than two-thirds of the total members of the Health & Environment Committee. In that event the President Cantonment Board shall appoint another member of the Health & Environment Committee to be Chairman of the Committee. Education 5 (I) The Board shall appoint a The Board shall appoint an Committee Education Committee Education Committee which Page 24 of 210

consisting of the five shall consist of 05 (five) Members to be Elected by Members to be elected by the the Board of which, three Board out of whom 03 (three) shall be Elected Members shall be the Elected Members and two Nominated and 02 (Two) shall be Members, one of which shall Nominated Members. In be the CEO, Member- addition to these 05 (five) Secretary. Members, the Chief Executive Officer will be the Member- Secretary of the Committee. The Board or PCB (as authorized by Cantonment Board), shall elect the chairman of the committee. 5 (II) j) Thereafter the Presiding Thereafter the Presiding Officer shall nominate two Officer shall nominate two Nominated Members to be Nominated Members to be the the Members of the Members of the Education Education Committee, one of Committee. which shall be the CEO of the Cantonment Board, who shall be Member-Secretary of the Committee. 5 (II) u) The tenure of the Committee The tenure of the Committee shall be one year. shall be one year.The Chairman of the Committee may be removed from his office by the President Cantonment Board, at a special meeting convened for the purpose on a requisition for the same by not less than two-thirds of the total members of the Education Committee. In that event the President Cantonment Board shall appoint another member of the Education Committee to be Chairman of the Committee.

The Board may consider approving above amendments to draft Business Regulations approved by the Board vide CBR No.20 dated 21.03.2020. Sd/- Chief Executive Officer Delhi Cantonment Board (S.V.R. Chandra Sekhar) Dated: 07thSeptember, 2020

Page 25 of 210

RESOLUTION:

Considered. The Board noted the contents of Dte. Defence Estates, Western Command letter No.3/48/Cantt/DE/WC/RMS-30270 dated 03.09.2020. Further Board carefully noted the amendments to draft Business Regulations approved by the Board vide CBR No.20 dated 21.03.2020 and resolved to approve the amendments to draft Business Regulations as brought out on the agenda side. Any other amendments in the draft Business Regulations necessitated due to the changes in constitution of the Committees approved above, may be made with approval of the President Cantonment Board.

1. Brig. R.K. Chaudhary President ------Sd/------

2. Smt. Kadiyan Rachna Vice President ------Sd/------

3. Brig. S.S. Jaiswal, SEMO Ex-Officio Member ------

4. Col. A.K.S Patial, Adm. Comdt. Nominated Member ------

5. Col. Parshant Kandpal, CO (DAPU) Nominated Member ------Sd/------

6. Col. Yudishthir Moza, SO (Cantt) Nominated Member ------Sd/------

7. Maj. Amit Bhardwaj, GE (Central) Ex-Officio Member ------Sd/------

8. Shri D. Karthikeyan, ADM Nominated Member ------

9. Sh. Tanwar Sandeep Elected Member ------Sd/------

10. Smt. Jain Kavita Elected Member ------

11. Sh. Jagat Singh Elected Member ------Sd/------

12. Sh. Beniwal Nand Kishore Elected Member ------Sd/------

Page 26 of 210

13. Col. Narender Chaudhary (Retd) Elected Member ------Sd/------

14. Sh. Vimal Chowdhary Elected Member ------Sd/------

15. Smt. Chaudhary Priyanka Elected Member ------Sd/------

11. Noted.

12. CIRCULAR RESOLUTION

To note Circular Resolution dated 14.09.2020.

CIRCULAR AGENDA

ANNUAL RATE CONTRACT FOR STITCHED UNIFORM (COMPLETE DRESS SET) ETC. CANTONMENT BOARD SCHOOLS CHILDREN, DELHI CANTONMENT BOARD, DELHI CANTT.

Tenders for the subject work were called through e – tendering after advertising in the National dailies. The critical dates of publishing and receipt of tenders for the subject work is shown below. In response to the advertisement two tender were received in two bid system. After technical evaluation by the concerned committee both the agencies were found to be responsive and accordingly price bids were opened on 12.06.2020. The rates quoted by the agencies are tabulated here under.

Date of release of tender through e- procurement : 19.05.2020 Last date & time downloading of tender documents: 09.06.2020 1500 hrs Last date and submission of e- tenders : 09.06.2020 1500 hrs Date and time for opening of e- tenders : 10.06.2020 1530 hrs Period /Term contract of contract : 03 years (2020-21, 2021-22, 2022-23) Yearly extension be given on satisfactory performance of the contractor.

Sl. Item Description Approx. M/s Jinco M/s Gautam No. Qty. Per Industries Fashion Year Wear 1 Readymade School Uniform for students standard Boys KG (Summer/Winter) Full Pant (Poly Viscose-60:40) for summer and Full Pant (Poly Viscose-70:30) for winter and Half Shirt/Full Shirt (Poly Cotton 67:33) with logo (Samples will be Page 27 of 210

provided by this office) including tie, belt and socks (Cotton Lycra) and Sweater (Acrylic woollen) Boys KG Standard 1.01 Full Pant– 12 No. (Summer) 285 215 245 1.02 Half Shirt– 24 No. 285 215 245 1.03 Full Pant – 24 No. (Winter) 285 230 260 1.04 Full Shirt – 24 No. 285 230 260 1.05 Sweater F/S - 26 143 265 295 1.06 Sweater H/S - 26 143 235 265 1.07 Socks -2 No. 285 33 38 1.08 Belt - S Size 285 20 25 1.09 Elastic Tie - 12" 285 18 23 2 Readymade School Uniform for students standard Boys 1st (Summer/Winter) Full Pant (Poly Viscose-60:40) for summer and Full Pant (Poly Viscose-70:30) for winter and Half Shirt/Full Shirt (Poly Cotton 67:33) with logo (Samples will be provided by this office) including tie, belt and socks (Cotton Lycra) and Sweater (Acrylic woollen) Boys 1st Standard 2.01 Full Pant– 14 No. (Summer) 736 225 255 2.02 Half Shirt– 26 No 736 225 255 2.03 Full Pant – 26 No. (Winter) 736 240 270 2.04 Full Shirt – 26 No. 736 240 270 2.05 Sweater F/S - 28 368 275 305 2.06 Sweater H/S - 28 368 245 275 2.07 Socks -3 No. 736 33 38 2.08 Belt - M Size 736 20 25 2.09 Elastic Tie - 12" 736 18 23 3 Readymade School Uniform for students standard Boys 2nd (Summer/Winter) Full Pant (Poly Viscose-60:40) for summer and Full Pant (Poly Viscose-70:30) for winter and Half Shirt/Full Shirt (Poly Cotton 67:33) with logo (Samples will be provided by this office) including tie, belt and socks (Cotton Lycra) and Sweater (Acrylic woollen) Boys 2nd Standard 3.01 Full Pant– 15 No. (Summer) 406 235 265 3.02 Half Shirt–28 No 406 235 265 3.03 Full Pant –28 No. (Winter) 406 250 280 3.04 Full Shirt –28 No 406 250 280 3.05 Sweater F/S - 28 203 275 305 3.06 Sweater H/S - 28 203 245 275 3.07 Socks -4 No. 406 33 38

Page 28 of 210

3.08 Belt - M Size 406 20 25 3.09 Elastic Tie - 12" 406 18 23 4 Readymade School Uniform for students standard Boys 3rd (Summer/Winter) Full Pant (Poly Viscose-60:40) for summer and Full Pant (Poly Viscose-70:30) for winter and Half Shirt/Full Shirt (Poly Cotton 67:33) with logo (Samples will be provided by this office) including tie, belt and socks (Cotton Lycra) and Sweater (Acrylic woollen) Boys 3rd Standard 4.01 Full Pant– 15 No. (Summer) 476 235 265 4.02 Half Shirt– 28-30 No 476 245 275 4.03 Full Pant –28-30 No. (Winter) 476 260 290 4.04 Full Shirt –28-30 No 476 260 290 4.05 Sweater F/S - 30 238 285 315 4.06 Sweater H/S - 30 238 255 285 4.07 Socks -4 No. 476 33 38 4.08 Belt - M Size 476 20 25 4.09 Elastic Tie - 14" 476 20 25 5 Readymade School Uniform for students standard Boys 4th (Summer/Winter) Full Pant (Poly Viscose-60:40) for summer and Full Pant (Poly Viscose-70:30) for winter and Half Shirt/Full Shirt (Poly Cotton 67:33) with logo (Samples will be provided by this office) including tie, belt and socks (Cotton Lycra) and Sweater (Acrylic woollen) Boys 4th Standard 5.01 Full Pant– 15-16No. (Summer) 420 245 275 5.02 Half Shirt– 30-32No 420 255 285 5.03 Full Pant – 30-32 No. (Winter) 420 270 300 5.04 Full Shirt – 30-32 No 420 270 300 5.05 Sweater F/S - 30-32 210 315 345 5.06 Sweater H/S - 30-32 210 285 315 5.07 Socks -4-5 No. 420 38 43 5.08 Belt - L Size 420 25 30 5.09 Elastic Tie - 14" 420 20 25 6 Readymade School Uniform for students standard Boys 5th (Summer/Winter) Full Pant (Poly Viscose-60:40) for summer and Full Pant (Poly Viscose-70:30) for winter and Half Shirt/Full Shirt (Poly Cotton 67:33) with logo (Samples will be provided by this office) including tie, belt and socks (Cotton Lycra) and Sweater (Acrylic woollen) Boys 5th Standard 6.01 Full Pant– 15-16 No. (Summer) 462 245 275 6.02 Half Shirt– 30-32No 462 255 285 6.03 Full Pant –32 No. (Winter) 462 280 310 6.04 Full Shirt –30-32 No 462 280 310 Page 29 of 210

6.05 Sweater F/S - 32 231 315 345 6.06 Sweater H/S - 32 231 285 315 6.07 Socks -4-5 No. 462 38 43 6.08 Belt - L Size 462 25 30 6.09 Elastic Tie - 14" 462 20 25 7 Readymade School Uniform for students standard Boys 6th (Summer/Winter) Full Pant (Poly Viscose-60:40) for summer and Full Pant (Poly Viscose-70:30) for winter and Half Shirt/Full Shirt (Poly Cotton 67:33) with logo (Samples will be provided by this office) including tie, belt and socks (Cotton Lycra) and Sweater (Acrylic woollen) Boys 6th Standard 7.01 Full Pant – 34 No. (Summer) 402 265 295 7.02 Full Pant – 34 No. (Winter) 402 280 310 7.03 Half Shirt– 34 No 402 265 295 7.04 Full Shirt – 34 No 402 280 310 7.05 Sweater F/S - 34 201 400 430 7.06 Sweater H/S - 34 201 370 400 7.07 Socks -5/6 No. 402 38 43 7.08 Belt - L Size 402 25 30 7.09 Tie - 48" 402 28 33 8 Readymade School Uniform for students standard Boys 7th (Summer/Winter) Full Pant (Poly Viscose-60:40) for summer and Full Pant (Poly Viscose-70:30) for winter and Half Shirt/Full Shirt (Poly Cotton 67:33) with logo (Samples will be provided by this office) including tie, belt and socks (Cotton Lycra) and Sweater (Acrylic woollen) Boys 7th Standard 8.01 Full Pant – 36 No. (Summer) 382 280 310 8.02 Full Pant – 36 No. (Winter) 382 295 325 8.03 Half Shirt– 36 No 382 280 310 8.04 Full Shirt – 36 No 382 295 325 8.05 Sweater F/S - 36 191 415 445 8.06 Sweater H/S - 36 191 385 415 8.07 Socks -5/6 No. 382 38 43 8.08 Belt - L Size 382 25 30 8.09 Tie - 48" 382 28 33 9 Readymade School Uniform for students standard Boys 8th (Summer/Winter) Full Pant (Poly Viscose-60:40) for summer and Full Pant (Poly Viscose-70:30) for winter and Half Shirt/Full Shirt (Poly Cotton 67:33) with logo (Samples will be provided by this office) including tie, belt and socks (Cotton Lycra) and Sweater (Acrylic woollen) Boys 8th Standard 9.01 Full Pant – 38 No. (Summer) 390 290 320 Page 30 of 210

9.02 Full Pant – 38 No. (Winter) 390 310 340 9.03 Half Shirt– 38 No. 390 290 320 9.04 Full Shirt – 38 No 390 310 340 9.05 Sweater F/S - 36 195 415 445 9.06 Sweater H/S - 36 195 385 415 9.07 Socks -6/7 No. 390 43 48 9.08 Belt - XL Size 390 28 33 9.09 Tie - 54" 390 32 37 10 Readymade School Uniform for students standard Boys 9th (Summer/Winter) Full Pant (Poly Viscose-60:40) for summer and Full Pant (Poly Viscose-70:30) for winter and Half Shirt/Full Shirt (Poly Cotton 67:33) with logo (Samples will be provided by this office) including tie, belt and socks (Cotton Lycra) and Sweater (Acrylic woollen) Boys 9th Standard 10.01 Full Pant – 38/40 No. (Summer) 374 305 335 10.02 Full Pant – 38/40 No. (Winter) 374 325 355 10.03 Half Shirt– 38-40 No 374 305 335 10.04 Full Shirt – 38-40 No 374 325 355 10.05 Socks -7 No. 374 43 48 10.06 Belt - XL Size 374 28 33 10.07 Tie - 54" 374 32 37 10.08 Sweater F/S - 38-40 187 430 460 10.09 Sweater H/S - 38-40 187 400 430 11 Readymade School Uniform for students standard Boys 10th (Summer/Winter) Full Pant (Poly Viscose-60:40) for summer and Full Pant (Poly Viscose-70:30) for winter and Half Shirt/Full Shirt (Poly Cotton 67:33) with logo (Samples will be provided by this office) including tie, belt and socks (Cotton Lycra) and Sweater (Acrylic woollen) Boys 10th Standard 11.01 Full Pant – 38/40 No. (Summer) 122 305 335 11.02 Full Pant – 38/40 No. (Winter) 122 325 355 11.03 Half Shirt–38-40 No 122 305 335 11.04 Full Shirt –38-40 No 122 325 355 11.05 Sweater F/S - 40 61 445 475 11.06 Sweater H/S - 40 61 415 445 11.07 Socks -7 No. 122 43 48 11.08 Belt - XL Size 122 28 33 11.09 Tie - 54" 122 32 37 12 Readymade School Uniform for students standard Boys 11th (Summer/Winter) Full Pant (Poly Viscose-60:40) for summer and Full Pant (Poly Viscose-70:30) for winter and Half Shirt/Full Shirt (Poly Cotton 67:33) with logo (Samples will be provided by this

Page 31 of 210

office) including tie, belt and socks (Cotton Lycra) and Sweater (Acrylic woollen) Boys 11th Standard 12.01 Full Pant – 40-42 No. (Summer) 300 325 355 12.02 Full Pant – 40-42 No. (Winter) 300 350 380 12.03 Half Shirt–40-42 No 300 325 355 12.04 Full Shirt –40-42 No 300 350 380 12.05 Sweater F/S - 40 150 445 475 12.06 Sweater H/S - 40 150 415 445 12.07 Socks -7 No. 300 43 48 12.08 Belt - XL Size 300 28 33 12.09 Tie - 54" 300 32 37 13 Readymade School Uniform for students standard Boys 12th (Summer/Winter) Full Pant (Poly Viscose-60:40) for summer and Full Pant (Poly Viscose-70:30) for winter and Half Shirt/Full Shirt (Poly Cotton 67:33) with logo (Samples will be provided by this office) including tie, belt and socks (Cotton Lycra) and Sweater (Acrylic woollen) Boys 12th Standard 13.01 Full Pant – 42 No. (Summer) 196 325 355 13.02 Full Pant – 42 No. (Winter) 196 350 380 13.03 Half Shirt– 42 No 196 325 355 13.04 Full Shirt – 42 No 196 350 380 13.05 Sweater F/S - 42 98 460 490 13.06 Sweater H/S - 42 98 430 460 13.07 Socks -7 No. 196 43 48 13.08 Belt - XL Size 196 28 33 13.09 Tie - 54" 196 32 37 14 Readymade School Uniform for students standard Girls KG (Summer/Winter) Full Pant (Poly Viscose-70:30) for winter, Full Pant (Poly Viscose-60:40) for Summer and Half Shirt/Full Shirt (Poly Cotton 67:33) with logo (Samples will be provided by this office) including tie, belt and socks (Cotton Lycra) and Sweater (Acrylic woollen) Girls KG Standard 14.01 Full Pant – 24 No. 200 230 260 14.02 Half Shirt– 24 No 200 215 245 14.03 Full Shirt – 24 No 200 230 260 14.04 Sweater F/S - 26 100 265 295 14.05 Sweater H/S - 26 100 235 265 14.06 Socks -2 No. 200 33 38 14.07 Belt - S Size 200 20 25 14.08 Elastic Tie - 12" 200 18 23 14.09 Skirt/Full Pant-13/24 No. 200 215 245 15 Readymade School Uniform for students standard Girls1st (Summer/Winter) Page 32 of 210

Full Pant (Poly Viscose-70:30) for winter, Full Pant/Skirt (Poly Viscose-60:40) for Summer and Half Shirt/Full Shirt (Poly Cotton 67:33) with logo (Samples will be provided by this office) including tie, belt and socks (Cotton Lycra) and Sweater (Acrylic woollen) Girls 1st Standard 15.01 Full Pant – 26 No. 538 240 270 15.02 Half Shirt– 26 No 538 225 255 15.03 Full Shirt – 26 No 538 240 270 15.04 Sweater F/S - 28 269 275 305 15.05 Sweater H/S - 28 269 245 275 15.06 Socks -3 No. 538 33 38 15.07 Belt - M Size 538 20 25 15.08 Elastic Tie - 12" 538 18 23 15.09 Skirt/Full Pant-14/26 No 538 225 255 16 Readymade School Uniform for students standard Girls 2nd (Summer/Winter) Full Pant (Poly Viscose-70:30) for winter, Full Pant (Poly Viscose-60:40) for Summer and Half Shirt/Full Shirt (Poly Cotton 67:33) with logo (Samples will be provided by this office) including tie, belt and socks (Cotton Lycra) and Sweater (Acrylic woollen) Girls 2nd Standard 16.01 Full Pant – 28 No. 354 250 280 16.02 Half Shirt– 28 No 354 235 265 16.03 Full Shirt – 28/28 No 354 250 280 16.04 Sweater F/S - 28 177 275 305 16.05 Sweater H/S - 28 177 245 275 16.06 Socks -4 No. 354 33 38 16.07 Belt - M Size 354 20 25 16.08 Elastic Tie - 12" 354 18 23 16.09 Skirt/Full Pant 15/28 No. 354 235 265 17 Readymade School Uniform for students standard Girls 3rd (Summer/Winter) Full Pant (Poly Viscose-70:30) for winter, Full Pant (Poly Viscose-60:40) for Summer and Half Shirt/Full Shirt (Poly Cotton 67:33) with logo (Samples will be provided by this office) including tie, belt and socks (Cotton Lycra) and Sweater (Acrylic woollen) Girls 3rd Standard 17.01 Full Pant – 28-30 No. 366 260 290 17.02 Half Shirt–28-30 No 366 245 275 17.03 Full Shirt –28-30 No 366 260 290 17.04 Sweater F/S - 30 183 285 315 17.05 Sweater H/S - 30 183 255 285 Page 33 of 210

17.06 Socks -4 No. 366 33 38 17.07 Belt - M Size 366 20 25 17.08 Elastic Tie - 14" 366 20 25 17.09 Skirt/Full Pant 15/28-30 No. 366 245 275 18 Readymade School Uniform for students standard Girls 4th (Summer/Winter) Full Pant (Poly Viscose-70:30) for winter, Full Pant (Poly Viscose-60:40) for Summer and Half Shirt/Full Shirt (Poly Cotton 67:33) with logo (Samples will be provided by this office) including tie, belt and socks (Cotton Lycra) and Sweater (Acrylic woollen) Girls 4th Standard 18.01 Full Pant – 30-32 No. 332 270 300 18.02 Half Shirt– 30-32 No 332 255 285 18.03 Full Shirt –30-32 No 332 270 300 18.04 Sweater F/S - 30-32 166 315 345 18.05 Sweater H/S - 30-32 166 285 315 18.06 Socks -4-5 No. 332 38 43 18.07 Belt - L Size 332 25 30 18.08 Elastic Tie - 14" 332 20 25 18.09 Skirt/Full Pant 16/30-32 No. 332 255 285 19 Readymade School Uniform for students standard Girls 5th (Summer/Winter) Full Pant (Poly Viscose-70:30) for winter, Full Pant (Poly Viscose-60:40) for Summer and Half Shirt/Full Shirt (Poly Cotton 67:33) with logo (Samples will be provided by this office) including tie, belt and socks (Cotton Lycra) and Sweater (Acrylic woollen) Girls 5th Standard 19.01 Full Pant – 32 No. 334 280 310 19.02 Half Shirt–30-32 No 334 255 285 19.03 Full Shirt –30-32 No 334 280 310 19.04 Sweater F/S - 32 167 315 345 19.05 Sweater H/S - 32 167 285 315 19.06 Socks -4-5 No. 334 38 43 19.07 Belt - L Size 334 25 30 19.08 Elastic Tie - 14" 334 20 25 19.09 Skirt/Full Pant 16/32 No. 334 255 285 20 Readymade School Uniform for students standard Girls 6th (Summer/Winter) Salwar & Suit ( Poly Cotton 67:33) ), Dupatta (Mal Mal Terri Voil) including socks (Cotton Lycra) and Sweater (Acrylic woollen) Girls 6th Standard 20.01 Salwar, Suit & Dupatta – 32 No. 292 700 750 20.02 Socks -5/6 No. 292 38 43 20.03 Sweater F/S – 34 146 400 430 Page 34 of 210

20.04 Sweater H/S – 34 146 370 400 21 Readymade School Uniform for students standard Girls 7th (Summer/Winter) Salwar & Suit ( Poly Cotton 67:33) ), Dupatta (Mal Mal Terri Voil) including socks (Cotton Lycra) and Sweater (Acrylic woollen) Girls 7th Standard 21.01 Salwar, Suit & Dupatta – 34 No. 268 720 770 21.02 Sweater F/S - 36 134 415 445 21.03 Sweater H/S - 36 134 385 415 21.04 Socks -5/6 No. 268 38 43 22 Readymade School Uniform for students standard Girls 8th (Summer/Winter) Salwar & Suit ( Poly Cotton 67:33) ), Dupatta (Mal Mal Terri Voil) including socks (Cotton Lycra) and Sweater (Acrylic woollen) Girls 8th Standard 22.01 Salwar, Suit & Dupatta – 36 No. 230 740 790 22.02 Sweater F/S - 36-38 115 430 460 22.03 Sweater H/S - 36-38 115 400 430 22.04 Socks -6/7 No. 230 43 48 23 Readymade School Uniform for students standard Girls 9th (Summer/Winter) Salwar & Suit ( Poly Cotton 67:33) ), Dupatta (Mal Mal Terri Voil) including socks (Cotton Lycra) and Sweater (Acrylic woollen) Girls 9th Standard 23.01 Salwar, Suit & Dupatta – 36-38 No. 268 760 810 23.02 Sweater F/S - 38-40 134 445 475 23.03 Sweater H/S - 38-40 134 415 445 23.04 Socks -5/6 No. 268 43 48 24 Readymade School Uniform for students standard Girls 10th (Summer/Winter) Salwar & Suit ( Poly Cotton 67:33) ), Dupatta (Mal Mal Terri Voil) including socks (Cotton Lycra) and Sweater (Acrylic woollen) Girls 10th Standard 24.01 Salwar, Suit & Dupatta – 38-30 No. 118 780 830 24.02 Sweater F/S - 40 59 445 475 24.03 Sweater H/S - 40 59 415 445 24.04 Socks -7 No. 118 43 48 25 Readymade School Uniform for students standard Girls 11th (Summer/Winter) Salwar & Suit ( Poly Cotton 67:33) ), Dupatta (Mal Mal Terri Voil) including socks (Cotton Lycra) and Sweater (Acrylic woollen) Girls 11th Standard 25.01 Salwar, Suit & Dupatta – 40-42 No. 112 800 850 25.02 Sweater F/S - 40 56 445 475 25.03 Sweater H/S - 40 56 415 445 25.04 Socks -7 No. 112 43 48 Page 35 of 210

26 Readymade School Uniform for students standard Girls 12th (Summer/Winter) Salwar & Suit ( Poly Cotton 67:33) ), Dupatta (Mal Mal Terri Voil) including socks (Cotton Lycra) and Sweater (Acrylic woollen) Girls 12th Standard 26.01 Salwar, Suit & Dupatta – 42 No. 110 800 850 26.02 Sweater F/S - 42 55 460 490 26.03 Sweater H/S - 42 55 430 460 26.04 Socks -7 No. 110 43 48 27 Gola School Shoe (Black with Velcro) Upper 60 599 649 PVC of Upper Grade, 1 Eva Sole, Size-9 (Small) 28 Gola School Shoe (Black with Velcro) Upper 150 599 649 PVC of Upper Grade, 1 Eva Sole, Size-10 (Small) 29 Gola School Shoe (Black with Velcro) Upper 200 599 649 PVC of Upper Grade, 1 Eva Sole, Size-11 (Small) 30 Gola School Shoe (Black with Velcro) Upper 300 599 649 PVC of Upper Grade, 1 Eva Sole, Size-12 (Small) 31 Gola School Shoe (Black with Velcro) Upper 300 599 649 PVC of Upper Grade, 1 Eva Sole, Size-13 (Small) 32 Gola School Shoe (Black with Velcro) Upper 350 699 749 PVC of Upper Grade, 1 Eva Sole, Size-1 33 Gola School Shoe (Black with Velcro) Upper 350 699 749 PVC of Upper Grade, 1 Eva Sole, Size-2 34 Gola School Shoe (Black with Velcro) Upper 350 699 749 PVC of Upper Grade, 1 Eva Sole, Size-3 35 Gola School Shoe (Black with Velcro) Upper 400 699 749 PVC of Upper Grade, 1 Eva Sole, Size-4 36 Gola School Shoe (Black with Velcro) Upper 450 699 749 PVC of Upper Grade, 1 Eva Sole, Size-5 37 Gola School Shoe (Black with Velcro) Upper 400 799 849 PVC of Upper Grade, 1 Eva Sole, Size-6 38 Gola School Shoe (Black with Velcro) Upper 350 799 849 PVC of Upper Grade, 1 Eva Sole, Size-7 39 Gola School Shoe (Black with Velcro) Upper 350 799 849 PVC of Upper Grade, 1 Eva Sole, Size-8 40 Gola School Shoe (Black with Velcro) Upper 200 799 849 PVC of Upper Grade, 1 Eva Sole, Size-9 (Big) 41 Gola School Shoe (Black with Velcro) Upper 100 799 849 PVC of Upper Grade, 1 Eva Sole, Size-10 (Big) 42 Gola School Shoe (Black with Velcro) Upper 50 799 849 PVC of Upper Grade, 1 Eva Sole, Size-11 (Big) GST extra as GST extra as applicable applicable The analysis of rates have been drawn and the item wise lowest rates per year quoted by the tenderers per year are considered reasonable and recommended for acceptance. Page 36 of 210

Relevant file is placed on the table.

Sd/- Chief Executive Officer Delhi Cantonment (S.V.R. Chandra Sekhar)

Dated: 14th September, 2020

RESOLUTION: Considered and resolved to approve the lowest rates per year quoted by M/s Jinco Industries as brought out on the agenda side and CEO, Member- Secretary is authorised to incur necessary expenditure in this regard.

1. Brig R.K Chaudhary President ------Sd/------

2. Smt.Kadiyan Rachna Vice President ------Sd/------

3. Brig S.S Jaiswal, SEMO Ex-Officio Member ------

4. Col. A.K.S Patial, Adm. Comdt. Nominated Member ------

5. Col.Parshant Kandpal, CO (DAPU) Nominated Member ------Sd/------

6. Col.Yudishthir Moza, SO (Cantt) Nominated Member ------Sd/------

7. Maj. Amit Bhardwaj, GE (Central) Ex-Officio Member ------Sd/------

8. Shri.D.Karthikeyan, ADM Nominated Member ------

9. Sh.Tanwar Sandeep Elected Member ------Sd/------

10. Smt.Jain Kavita Elected Member ------Sd/------

11. Sh.Jagat Singh Elected Member ------Sd/------

Page 37 of 210

12. Sh.Beniwal Nand Kishore Elected Member ------Sd/------

13. Col.Narender Chaudhary (Retd) Elected Member ------Sd/------

14. Sh.Vimal Chowdhary Elected Member ------Sd/------

15. Smt.Chaudhary Priyanka Elected Member ------Sd/------

12. Noted.

13. CIRCULAR RESOLUTION

To note Circular Resolution dated 14.09.2020.

CIRCULAR AGENDA

ANNUAL RATE CONTRACT FOR SUPPLY OF DENTAL MATERIAL & INSTRUMENTS FOR THE CANTONMENT GENERAL HOSPITAL, DELHI CANTT- 110010.

Tenders for the subject work were called second timethrough e – tendering after advertising in the National dailies. The critical dates of publishing and receipt of tenders for the subject work is shown below. In response to the advertisement two tender were received in two bid system. After technical evaluation by the concerned committee both the agencies were found to be responsive and accordingly price bids were opened on 12.06.2020. The rates quoted by the agencies are tabulated here under.

Date of release of tender through e- procurement : 18.05.2020 Last date & time downloading of tender documents : 09.06.2020 1500 hrs Last date and submission of e- tenders : 09.06.2020 1500 hrs Date and time for opening of e- tenders : 10.06.2020 1530 hrs

Sl. Item Description Quantity Units Rate M/s M/s No. per Hosta Medicago Units Medicare India 1 3 Bottle Per 6949 7190 Euginol (1 Ltr. Bottle) Bottle 2 Disposable Needles ½ inch, 3 Pkt. Per 700 715 26,28,30 gauge (03 Pkts. of 50 Pkt. each) 3 3 M Single Bond 5 pkt. Per 3111 3200 Size- 6gm Pkt. 4 Air Rotor Hand Piece, Push 5 Nos. Per No. 12946 13500 Page 38 of 210

Bottonkavo/W&H/NSK / Bien- Air 5 Air Rotor Burs S.S. 50 Nos. Per No. 334.80 350 White/Zota/Dentsply • Round – Small/Medium/Dentsply 6 Air Rotor Burs S.S. 50 Nos. Per No. 334.80 350 White/Zota/Dentsply • Tapered – Small/Medium/Dentsply 7 Air Rotor Burs S.S. 50 Nos. Per No. 334.80 350 White/Zota/Dentsply • Inverted Cone – Small/Medium/Dentsply 8 Air Rotor Burs S.S. 50 Nos. Per No. 334.80 350 White/Zota/Dentsply • Cylindrical – Small/Medium/Dentsply 9 Air Rotor Burs S.S. 50 Nos. Per No. 334.80 350 White/Zota/Dentsply • Metal Cutting Burs 10 Air Rotor Burs S.S. 50 Nos. Per No. 334.80 350 White/Zota/Dentsply Zirconium Cutting Burs 11 Sodium Hypochlorite 3% in 500 7 Nos. Per No. 190 200 ml Bottle 12 Diamond Strips (1 Pkt of 5 Pkt. Per 1800 1890 10pcs.) Pkt. 13 C & B Preparation Kit 3 Kit Per Kit 5000 5300 14 Ca (OH)2 Powder 9 Nos. Per No. 83 90 15 Cavity Acess System (Kit) 5 Kit Per Kit NQ NQ 16 Ceram-X Duo kit 2 Set Per Set 14491 14900 17 Chamfer and shoulder cutting 10 Nos. Per No. 339.28 350 burs 18 Resin Based glass Ionomer 50 Nos. Per No. 3450 3550 cement for restoration (G.C./3M/Vivadent)/Dentsply 19 Composite Finishing Burs 5 Set Per Set 339.20 350 20 Dapen Dishes 10 Nos. Per No. 71.43 90 21 Dental X-ray films 20 Pkt. Per 3885 4100 Kodak/Agfa Pkt. 22 Desmoclean Burs 4 Set Per Set NQ NQ 23 Sterilizing Pouch Rolls of 200 6 Nos Per No. 3800 4100 Mtrs.7 ½ inch - 9 ½ inch 24 Nano Hybrid Composite syringe 10 Nos. Per No. 1410 1490 of 3-4 gm 3M/G.C/Vivadent/Dentsply Page 39 of 210

Shade B1,B2, A-2, A3 25 Light cure glass Ionomer resin 30 Nos. Per No. 3450 3550 G/C/Vivadant/3M 26 Examination gloves, 100 Pkt. Per 800 900 Small Pkt. 27 Examination gloves, 100 Pkt. Per 800 900 Large Pkt. 28 Polishing strips 20 Pkt. Per 2250 2350 (G.C./ Dentsply) Pkt. 29 Nano Hybrid Flowable 10 Nos. Per No. 2607 2700 composite syringe of 2 and 4gm , G.C/3M/ivoclar, Shade A-1/A2/A3 30 Hand Piece oil 10 Nos. Per No. 1590 1650 KAVO/NSK 31 Wedges pkt of 100 20 Pkt. Per 2678 2750 Pkt. 32 Mercury 200 gm 5 Pkt. Per 3097 3150 Pkt. 33 Silver Alloy 15 Nos. Per No. 1683 1750 DPI/Septodant 34 Mirror tops (Imported) 100 Pkt. Per 1688 1790 Pkt. 35 Mouth Mirror with tops 100 Nos. Per No. 288 298 36 SensousProfinder No. 10, No. 13 5 Pkt. Per NQ NQ Pkt. 37 Suction tips Disposables pkts 10 Pkt. Per 490 510 100 Pkt. 38 Zinc oxide (110 Gram) 15 Nos. Per No. 105.30 115 DPI 39 Cavity varnish 5 Bottle Per 125 130 Bottle 40 Flowable light cure calcium 10 Pkt. Per 839 950 hydroxide Pkt. Syringe of 2-4gm (10 Pkts of 3 syring) 41 Flowable light cure glass 20 Pkt. Per 839 950 Ionomers, Pkt. Prevest/DMG , syringe of 2-4gm (20 Pkts of 5 syring) 42 Calcium Hydroxide Paste 100 Nos. Per No. 341 360 43 Calcium Hydroxide with 20 Nos. Per No. 742 790 Iodoform 44 EDTA with Carbamide Peroxide 60 Nos. Per No. 477.60 490 Gel 45 EDTA Liquid (3 ml Syringe) 10 Nos. Per No. 477.60 490 46 Resin Based Root Canal Sealer 10 Nos. Per No. 525.89 539 Page 40 of 210

(Dentsply/Sunpharma) 47 Gutta Percha Points 2% Tapers 50 Pkt. Per 272 278 (20,25,30,35) Pkt. 48 Gutta Percha Points 2% Tapers 20 Pkt. Per 272 278 (40,45,50,55,60,80) Pkt. 49 Gutta Percha Points 4% Tapers 50 Pkt. Per 272 278 (20, 25) Pkt. 50 K-Files (8 No., 21 MM) 20 Pkt. Per 272 278 Pkt. 51 K-Files (10-25 No., 21 MM) 20 Pkt. Per 272 278 Pkt. 52 K-Files (30 & 35 No. 21 MM) 20 Pkt. Per 272 278 Pkt. 53 K-Files (45-70 No., 25 MM) 20 Pkt. Per 272 278 Pkt. 54 K-Files (15, 20 Pkt. Per 272 278 20,25,30,35,40,75,80 No. 25 Pkt. MM) 55 H-Files (08 to 40 No.21 MM, 8 10 Pkt. Per 272 278 to 40 25MM) Pkt. 56 H-Files (45 to 80 No. 25 MM) 10 Pkt. Per 272 278 Pkt. 57 PROTAPER FILES (HAND) 30 Pkt. Per 1200 1290 Assorted (21 MM) Pkt. 58 PROTAPER FILES (HAND) 30 Pkt. Per 1200 1290 Assorted (25 MM) Pkt. 59 PROTAPER FILES (ROTARY) 30 Pkt. Per 1200 1290 Assorted (21 MM) Pkt. 60 PROTAPER FILES (ROTARY) 30 Pkt. Per 1200 1290 Assorted (25 MM) Pkt. 61 Hyflex CM (Rotary) 30 Pkt. Per 3312 3390 Assorted (21 MM) Pkt. 62 Hyflex CM (Rotary) 30 Pkt. Per 3312 3390 Assorted (25MM) Pkt. 63 Gutta Percha Protaper (F1-F3) 50 Nos. Per No. 272 278 64 Protaper Retreatment Files 10 Pkt. Per 1200 1290 Pkt. 65 Gutta Percha Solvent 5 Nos. Per No. 477.67 490 Resin Based 66 Gutta Percha Solvent 5 Nos. Per No. 492.85 502 Eugenol Based 67 Spreaders (20-25 MM) 20 Pkt. Per 320 350 Pkt. 68 Finger Pluggers (Dentsply 5 Pkt. Per 641.96 649 Assorted) Pkt. 69 G.G. Drills (Assorted) 30 Pkt. Per 455 462 Pkt. Page 41 of 210

70 Peeso Reamer (Assorted) 30 Pkt. Per 455 463 Pkt. 71 M.T.A (Mineral Trioxide 10 Pkt. Per 24066.9 24160 Aggregrate) Pkt. 6 72 Retreatment Files (Rotary) 20 Pkt. Per 1200 1290 Hero Shapers Pkt. 73 File Removal kit 2 Nos. Per No. NQ NQ (IRM) 74 Cartridge of 2% lidocaine with 50 Pkt. Per 1600 1690 1/80000 epinephrine Pkt. 75 Surgical Blade No. 15 C 10 Pkt. 500 Nos. Per No. 580 592 Of 100 76 Straight Handpiece Burs 200 Nos. Per No. 300 320 (No. 6 rose-head bur (steel or tungsten carbide US: No. 6 round bur) 77 Straight Handpiece Burs 200 Nos. Per No. 300 320 No. 6 tapered-fissure bur (tungsten carbide US: No. 701 tapered fissure bur) 78 0.2% chlorehexidine mouth 300 Nos. Per No. NQ NQ wash ------Ml 79 32Gauze swab 10x10 cm , 200 Nos. Per No. 508.40 NQ sterile resorbable oxidized cellulose 80 Periodontal Dressing Material 15 Pkt. Per 2482.14 2502 (CoePak) Pkt. 81 Bone Grafts 5 Pkt. Per 15900 15600 (DFDB A, Perioglass, TCA+HA + Pkt. Nano Hybrid H.A) Geslitch/Nova Bone/Easy Graft/Fisio Graft (05 Pkts of 2 &1gm each) 82 Suture 12 Boxes Per 6053.57 6075 Vicryl 3-0,5-0(3/8-26mm, Box Reverse cutting needle-2-0, 3-0) (12 Box each of 10) 83 Suture 12 Boxes Per 2721.43 2739 Black silk, 2-0, 3-0, 4-0 (12 Box Box each of 10) 84 Suture 12 Boxes Per 6053.57 6075 (3/8-26mm, round body-3-0) Box (12 Box each of 10) 85 Suture 20 Boxes Per 2592.86 2600 Black silk 30 on (20 Boxes of Box 10) 86 Suture 10 Boxes Per 6053.67 6075 Page 42 of 210

3/8 cutting needle Box (10 Boxes of 10) 87 Suture 10 Boxes Per 5421.43 5440 Proline suture 5/0 and 4/0 (10 Box Boxes of 10) 88 Zinc Phosphate cement (35 5 Pkt. Per 349 355 Gram Pack) Pkt. 89 Sprit lamps 10 Nos. Per No. 900 920 90 Towels Clips 10 Nos. Per No. 423 440 91 Cloth Sleeve (to cover the 100 Nos. Per No. 390 410 patient) Disposable 92 Disposable Plastic irrigating 100 Nos. Per No. NQ NQ syring (20 ml) 93 Sectional matrix bands pkt of 50 5 Pkt. Per NQ NQ bands Pkt. 94 Matrix bands No. 8 & 2 pkt of 10 20 Pkt. Per 80 90 Pkt. 95 Pulp devitalizer 10 Pkt. Per 718.75 729 (Voco/Septadent) Pkt. 96 Matrix Retainer tofflemire 10 Nos. Per No. 464.28 478 97 White Towels 18x12 inch 5 Pkt. Per 120 130 Pkt. 98 Ammonium & poly hexmide 5 Bottle Per NQ NQ disinfectant (5Ltr.) Bottle 99 Resin Based Zinc oxide 15 Pkt. Per 250 261 (Kalzinol) Pkt. 100 Glass beads for glass bead 5 Pkt. Per NQ NQ sterilizer Pkt. 101 Isopropyl alcohol 5 Bottle Per NQ NQ &chlurhexidine disinfectant Bottle (2 Ltr.) 102 Haemostatic alveolar Surgical 5 Nos. Per No. NQ NQ dressing (10 gram pack) 103 Probes st. Extra fine, 30 Nos. Per No. 300 295 Imported/GDC/API 104 Tweezers Imported/G.D.C./API 30 Pkt. Per 312.50 295 Pkt. 105 Metal aspirating cartridge 10 Nos. Per No. 990 980 syring 106 Adson Tissue holding forceps 10 Nos. Per No. 349 330 107 Kilner cheek retractor (US: 10 Nos. Per No. NQ NQ Minnesota retractor) 108 Scalpel handle No. 3 & 5 10 Nos. Per No. 339 330 109 Howarth ‘s periosteal elevator 5 Nos. Per No. 390 382 (Howarth’s Molt No. 9) 110 Straight Handpiece 5 Nos. Per No. 12946 13200 111 Warwick-James’s elevators- 2 Nos. Per No. 990 980 Page 43 of 210

right, left and straight 112 (US: Miller No. 73 and 74) 2 Nos. Per No. 990 980 Coupland ‘s chisels medium and small 113 (US: No. 301 and 34S elevators) 3 Sets Per Set 990 980 2 cryer’s elevators-right and left 114 Rongeurs Bone cutters 3 Nos. Per No. NQ NQ 115 Small mosquito artery forceps 5 Nos. Per No. 418 410 116 Large straight artery forceps 5 Nos. Per No. 418 410 117 Gillies’s needleholder 5 Nos. Per No. 990 980 118 Mayo needleholder 5 Nos. Per No. 490 482 119 Gillie’s tissue forceps 5 Nos. Per No. 919 908 120 Small sharp-pointed scissors 5 Nos. Per No. 390 380 (Mayo’s Scissors) 121 Curettes (Gracey) Hufrdy 2 Sets Per Set 2190 2170 122 Cumin-scaler (Keloid & discoid 5 Nos. Per No. 199 196 ends) 123 Bones Files 3 Nos. Per No. 427 421 124 Needle holder (Small & 5 Nos. Per No. 499 491 large/Long) 125 Nabers Probe 20 Nos. Per No. 338 332 126 UNC-15 Probe & DG 16 Probe 20 Nos. Per No. 250 245 (GDC) 127 Periotome 1 Sets Per Set 3142 3135 128 Suture Cutting Scissors 10 Nos. Per No. 616 610 129 Tissue Cutting Scissors 10 Nos. Per No. 276.70 274 130 Plastic Curettes 2 Sets Per Set NQ NQ 131 Plastic Curettes 2 Sets Per Set NQ NQ 132 Ball Burnisher 10 Nos. Per No. 230 225 133 Condenser (Cylindrical/Round) 10 Nos. Per No. 230 225 134 Composite Filling Instruments 2 Kits Per Kit 8460 8450 Kit (GDC) 135 Plastic Filling Instruments 10 Nos. Per No. 230 225 136 Dental Loupes 3x(with 1 No. Per No. 195000 196500 Illumination) Keeler/Zeiss/Heinz 137 Crown Remover/GDC 3 Nos. Per No. 4250 4240 -----GST extra asapplicable----- The analysis of rates have been drawn and the item wise lowest rates quoted by the tenderers are considered reasonable and recommended for acceptance.

Relevant file is placed on the table.

Sd/- Chief Executive Officer Delhi Cantonment (S.V.R. Chandra Sekhar) Page 44 of 210

Dated: 14thSeptember, 2020

RESOLUTION: Considered and resolved to approve the lowest rates quoted by M/s Hosta Medicare as brought out on the agenda side and CEO, Member- Secretary is authorised to incur necessary expenditure in this regard.

1. Brig R.K Chaudhary President ------Sd/------

2. Smt.Kadiyan Rachna Vice President ------Sd/------

3. Brig S.S Jaiswal, SEMO Ex-Officio Member ------

4. Col. A.K.S Patial, Adm. Comdt. Nominated Member ------

5. Col.Parshant Kandpal, CO (DAPU) Nominated Member ------Sd/------

6. Col.Yudishthir Moza, SO (Cantt) Nominated Member ------Sd/------

7. Maj. Amit Bhardwaj, GE (Central) Ex-Officio Member ------Sd/------

8. Shri.D.Karthikeyan, ADM Nominated Member ------

9. Sh.Tanwar Sandeep Elected Member ------Sd/------

10. Smt.Jain Kavita Elected Member ------Sd/------

11. Sh.Jagat Singh Elected Member ------Sd/------

12. Sh.BeniwalNand Kishore Elected Member ------Sd/------

13. Col.Narender Chaudhary (Retd) Elected Member ------Sd/------

14. Sh.Vimal Chowdhary Elected Member ------Sd/------

Page 45 of 210

15. Smt.Chaudhary Priyanka Elected Member ------Sd/------13. Noted.

14. CIRCULAR RESOLUTION

To note Circular Resolution dated 14.09.2020.

CIRCULAR AGENDA

PURCHASE OF BAR-CODED BIO MEDICAL WASTE BAGS FOR CANTONMENT GENERAL HOSPITAL, DELHI CANTT

Tenders for the subject work were called second time through e – tendering after advertising in the National dailies. The critical dates of publishing and receipt of tenders for the subject work is shown below. In response to the advertisement two tender were received in two bid system. After technical evaluation by the concerned committee one agency were found to be responsive and according price bids were opened on 15.06.2020. The rates quoted by the agencies are tabulated here under.

Date of release of tender through e- procurement : 19.05.2020 Last date & time downloading of tender documents : 09.06.2020 1500 hrs Last date and submission of e- tenders : 09.06.2020 1500 hrs Date and time for opening of e- tenders : 10.06.2020 1530 hrs

Purchase of Bar-Coded Bio Medical Waste Bags for Cantonment General Hospital, Delhi Cantt. Sl. Item Description Quantity Units Per M/s Bio P No. Units Products 1 (Bar-Coded Bio Medical Waste Bags) 2564 kg Per kg. 327 (Colour-Black, Yellow, Blue, Red) (BIODEGRADABLE BAG) SIZE-30” X 15" SPECIFICATION 1. Plastic Bag of HDPL, LLPE, DP (Biohazard, ISO Certificate & Hospital Name Printed) is biodegradable not reused plastic, bags with superior quality of thickness of 50 micron or more thickness, non-chlorinated plastic. 2. Toxicity Test Certification approved by FDA. 3. Bags are Autoclavble& Puncture Proof. 4. Does not emit thick Black smoke in incinerator. 5. Should burn without leaving traces into ashes. 6. Produced by IS/ISO certified under 17088-2008 test complies India Standard. 7. Aerobic Biodegradation in presence of Municipal Sewage Sludge Certification. 8. Anaerobic Biodegradation land fill conditions & all climate Condition certification. 9. The manufacturing firm registered under Pollution Control Board as biodegradable Manufacturer. 10. Baga shall be printed as per specifications of Bio waste Page 46 of 210

Management Committee. 2 (Bar-Coded Bio Medical Waste Bags) 130 kg Per kg. 327 (Colour-Black, Yellow, Blue, Red) (BIODEGRADABLE BAG) SIZE-20” X 15” SPECIFICATION 1. Plastic Bag of HDPL, LLPE, DP (Biohazard, ISO Certificate & Hospital Name Printed) is biodegradable not reused plastic, bags with superior quality of thickness of 50 micron or more thickness, non-chlorinated plastic. 2. Toxicity Test Certification approved by FDA. 3. Bags are Autoclavble& Puncture Proof. 4. Does not emit thick Black smoke in incinerator. 5. Should burn without leaving traces into ashes. 6. Produced by IS/ISO certified under 17088-2008 test complies India Standard. 7. Aerobic Biodegradation in presence of Municipal Sewage Sludge Certification. 8. Anaerobic Biodegradation land fill conditions & all climate Condition certification. 9. The manufacturing firm registered under Pollution Control Board as biodegradable Manufacturer. 10. Baga shall be printed as per specifications of Bio waste Management Committee. 3 (Bar-Coded Bio Medical Waste Bags) 4600 kg Per kg. 327 (Colour-Black, Yellow, Blue, Red) (BIODEGRADABLE BAG) SIZE-42” X 25” SPECIFICATION 1. Plastic Bag of HDPL, LLPE, DP (Biohazard, ISO Certificate & Hospital Name Printed) is biodegradable not reused plastic, bags with superior quality of thickness of 50 micron or more thickness, non-chlorinated plastic. 2. Toxicity Test Certification approved by FDA. 3. Bags are Autoclavble& Puncture Proof. 4. Does not emit thick Black smoke in incinerator. 5. Should burn without leaving traces into ashes. 6. Produced by IS/ISO certified under 17088-2008 test complies India Standard. 7. Aerobic Biodegradation in presence of Municipal Sewage Sludge Certification. 8. Anaerobic Biodegradation land fill conditions & all climate Condition certification. 9. The manufacturing firm registered under Pollution Control Board as biodegradable Manufacturer. 10. Baga shall be printed as per specifications of Bio waste Management Committee. GST extra as applicable The analysis of rates have been drawn and the item wise lowest rates quoted by the M/s Bio P Products is considered reasonable and recommended for acceptance.

Relevant file is placed on the table.

Sd/- Chief Executive Officer Delhi Cantonment (S.V.R. Chandra Sekhar) Page 47 of 210

Dated: 14thSeptember, 2020

RESOLUTION: Considered and resolved to approve the lowest rates quoted by M/s Bio-P Products as brought out on the agenda side and CEO, Member-Secretary is authorised to incur necessary expenditure in this regard.

1. Brig R.K Chaudhary President ------Sd/------

2. Smt.Kadiyan Rachna Vice President ------Sd/------

3. Brig S.S Jaiswal, SEMO Ex-Officio Member ------

4. Col. A.K.S Patial, Adm. Comdt. Nominated Member ------

5. Col.Parshant Kandpal, CO (DAPU) Nominated Member ------Sd/------

6. Col.Yudishthir Moza, SO (Cantt) Nominated Member ------Sd/------

7. Maj. Amit Bhardwaj, GE (Central) Ex-Officio Member ------Sd/------

8. Shri.D.Karthikeyan, ADM Nominated Member ------

9. Sh.Tanwar Sandeep Elected Member ------Sd/------

10. Smt.Jain Kavita Elected Member ------Sd/------

11. Sh.Jagat Singh Elected Member ------Sd/------

12. Sh.Beniwal Nand Kishore Elected Member ------Sd/------

13. Col.Narender Chaudhary (Retd) Elected Member ------Sd/------

14. Sh.Vimal Chowdhary Elected Member ------Sd/------Page 48 of 210

15. Smt.Chaudhary Priyanka Elected Member ------Sd/------

14. Noted.

15. CIRCULAR RESOLUTION

To note Circular Resolution dated 01.10.2020.

CIRCULAR AGENDA

SUBJECT: EXPIRY OF CONTRACT PERIOD OF CONTRACTUAL STAFF ENGAGED IN CANTONMENT GENERAL HOSPITAL AND GRANT OF FRESH CONTRACT FOR 11 MONTHS

To consider the report of Officiating Chief Medical Officer regarding the expiry of contract of contractual staff engaged in Cantonment General Hospital dated 01.10.2020. As per the report, the contract period of the following staff engaged in Cantonment General Hospital are expiring on the dates indicated against each. The report recommended that a fresh contract for 11 months be given to the staff as indicated below.

S.N Name of Designa- Date of Date of Tenure Current Proposed Staff tion initial contract Consolid fresh joining & ending a-ted contract of renewal Rem- Tenure 11 uneratio mnths n per from mth* 1 Dr. Sunil Surgery 03.08.2017 30.10.2017 Full Time 1000/- 11 mths Kumar Spl. 02.11.2017 21.01.2018 per hour from Harish 22.01.2018 21.01.2019 1 year 05.10.2020 28.01.2019 26.04.2019 29.04.2019 26.07.2019 30.07.2019 26.10.2019 31.10.2019 30.09.2020 11 months 2 Dr. Bhawana SR Obst& 04.11.2019 03.10.2020 11 months 1,15,800- 11 mths HJ Gynae from 07.10.2020 3 Gangesh Staff 03.11.2017 30.01.2018 55,676- 11 mths Panwar Nurse 02.02.2018 01.05.2018 from 04.05.2018 31.07.2018 07.10.2020 03.08.2018 02.09.2018 03.09.2018 02.10.2018 03.10.2018 30.10.2018 02.11.2018 29.01.2019 01.02.2019 30.04.2019 03.05.2019 30.07.2019 02.08.2019 29.10.2019 Page 49 of 210

04.11.2019 03.10.2020 11 months 4 Remya Staff 03.11.2017 30.01.2018 55,676- 11 mths Narayanan Nurse 02.02.2018 01.05.2018 from 04.05.2018 31.07.2018 07.10.2020 03.08.2018 02.09.2018 03.09.2018 02.10.2018 03.10.2018 30.10.2018 02.11.2018 29.01.2019 01.02.2019 30.04.2019 03.05.2019 30.07.2019 02.08.2019 29.10.2019 04.11.2019 03.10.2020 11 months 5 Neha Lab 06.08.2019 02.11.2019 33,196- 11 mths Assistant 06.11.2019 05.10.2020 11 months from 09.10.2020 6 Manish Lab 08.08.2019 04.11.2019 33,196- 11 mths Kumar Assistant 08.11.2019 07.10.2020 11 months from Paswan 12.10.2020 7 Anu Dahiya Staff 07.11.2017 03.02.2018 55,676- 11 mths Nurse 06.02.2018 05.05.2018 from 08.05.2018 04.08.2018 09.10.2020 07.08.2018 06.09.2018 07.09.2018 06.10.2018 07.10.2018 03.11.2018 06.11.2018 02.02.2019 05.02.2019 04.05.2019 07.05.2019 03.08.2019 06.8.2019 02.11.2019 06.11.2019 05.10.2020 11 months *Revised remuneration in fresh contract for para-medical staff shall be as per the prevailing DA at that time.(Sl. No. 3 to 7).

In view of the important vital duties of the hospital staff fresh contract for 11 months may be granted.

The financial effect of engagement of these personnel for 11 months would be Rs. 41,95,620- approx (forty one lacs ninety five thousand six hundred and twenty only).

If approved, the following staff would be given a fresh contact of 11 monthsfrom dates mentioned against each with a break of 3 days.

Relevant file is placed on the table for consideration of the Board.

Sd/- Chief Executive Officer Delhi Cantt Board DATED: 01st October 2020

Page 50 of 210

RESOLUTION: Consider and approved.

1 Brig R K Chaudhary President ------Sd/------

2 Smt. Kadiyan Rachna Vice President ------Sd/------

3 Brig. S S Jaiswal, SEMO Ex-officio Member ------

4 Col. A K S Patial, Adm. Commandant Nominated Member ------Sd/------

5 Col. Parshant Kandpal, CO (DAPU) Nominated Member ------Sd/------

6 Col. Yudishthir Moza, SO(Cantt.) Nominated Member ------

7 Maj Amit Bhardwaj, GE (Central) Ex-officio Member ------Sd/------

8 Shri D. Karthikeyan, ADM Nominated Member ------

9 Shri Tanwar Sandeep Elected Member ------Sd/------

10 Smt. Jain Kavita Elected Member ------Sd/------

11 Shri Jagat Singh Elected Member ------Sd/------

12 Shri Beniwal Nand Kishore Elected Member ------Sd/------

13 Col. Narender Chaudhary (Retd) Elected Member ------Sd/------

14 Shri Vimal Chowdhary Elected member ------Sd/------Page 51 of 210

15 Smt. Chaudhary Priyanka Elected Member ------Sd/------

15. Noted.

16. CIRCULAR RESOLUTION

To note Circular Resolution dated 05.10.2020.

CIRCULAR AGENDA

SUB : CREATION OF POST(S) OF POST GRADUATE TEACHER AT DELHI CANTONMENT BOARD SCHOOL

Reference CBR No.13 dated 21.03.2020 wherein the CantonmentBoard had resolved to create 22 Post(s) of PGT and authorized the CEO, Member Secretary to take up the case with the Principal Director, Defence Estate, Western Command, for obtaining the necessary sanction from the Competent Authority. The Board had also resolved that the Principal Director Defence Estates, Western Command and the GOC-in-C be requested to process the creation of this post of PGT (English) at the earliest possible in view of the Hon’ble order dated 18.12.2019 passed in W.P. (C) 870 of 2016.

The proposal for the creation of PGT post(s) was duly forwarded by this office letter No. DCB/12/VI/Apptt/PGT dated 03.04.2020 to the Dt. Defence Estate, Western Command for seeking sanction on PGT post (s) from the Competent Authority.

The Dt. Defence Estate, Western Command vide even letter No. 9506/B/Cantt. Estt/Delhi/PGT/DE/WC/RMS dated 10.06.2020, 15.06.2020, 16.06.2020, 17.06.2020 had raised several queries on the proposal dated 03.04.2020 submitted by this office. One of the specific query of the Dt. Defence Estate, Western Command was on the 22 PGT Post (s) proposed by the Board whereas the Hon’ble Delhi High Court order dated18.12.2019 passed in W.P. (C) 870 of 2016 had only directed for the creation of Post (s) of PGT English. This office vide letter No.DCB/07/LC/2020 dated 11.06.2020 and even letter No. DCB/12/VI/Apptt/PGT dated 13.06.2020 and 20.06.2020 replied to the queries raised by the Dt. Defence Estate, Western Command.

Thereafter, the Dt. Defence Estate, Western Command vide its letter No. 9506/B/Cantt. Estt/Delhi/PGT/DE/WC/RMS dated 16.06.2020 directed this office to seek legal opinion from Supreme Court Advocate on the aspect of filing Special Leave Petition (SLP) before Hon’ble Supreme Court challenging the order dated 18.12.2019 passed by Hon’ble Delhi High Court. Accordingly, legal opinion was sought from Sh. Arvind Kumar Sharma, Supreme Court Advocate vide this office letter No. DCB/07/AR/LC dated 16.06.2020 and Sh. Arvind Kumar Sharma vide his letter No. Nill dated 17.06.2020 opined to file SLP before the Hon’ble Supreme Court. The relevant para of the opinion dated 17.06.2020 is reproduced below: Page 52 of 210

“……….I am of the view that we should approach the Hon’ble Supreme Court as it requires legal interpretation of the issue raised in the LPA. More over it’s a policy decision and the interference by the Hon’ble High Court in policy matter was Un called for more so when the prayers in WP was different then the relief granted. The High Court went beyond its jurisdiction.”

Accordingly, this office filed SLP No. 7969 of 2020 titled as Delhi Cantonment Board Vs. Anuvarsha&Ors. before the Hon’ble Supreme Court of India. The Hon’ble Supreme Court of India vide its order dated 29.06.2020 issued notice and also granted ad-interim stay in the matter. Further, the Hon’ble Supreme Court vide its order dated 28.09.2020 directed this office to submit a formal proposal for creation of posts despite the rejection of the earlier proposal by the Principal Director. The relevant para of the order dated 28.09.2020 is reproduced below:

“In view of above submission, we call upon the petitioner to submit a formal proposal for creation of posts despite the rejection of the earlier proposal by the Principal Director. Such proposal be submitted through proper channel within one week from today to the appropriate authority. Upon receipt of proposal the appropriate authority (proper channel) shall process the proposal within one week therefrom and shall forward it to respondent No.2 for consideration and appropriate decision thereon. Respondent No.2 shall examine the proposal and take final decision preferably within three weeks from the date of receipt in the office of respondent No.2. Needless to observe that the concerned authorities must proceed in the matter in accordance with law.”

This office vide letter No. DCB/LC/AN/2020 dated 01.10.2020 sought legal opinion from Sh. Arvind Kumar Shrama, Advocate on the reason for the Apex Court to note that proposal dated 03.04.2020 has been rejected by PDDE and further course of action available to Board Vis-à-vis the Hon’ble Supreme Court Order dated 28.09.2020, Hon’ble Delhi High Court Order dated 18.12.2019 passed in W.P. (C) 870 of 2016 and CBR No. 13 dated 21.03.2020. Sh. Arvind Kumar Sharma vide his legal opinion dated Nil (received via mail in this office on 02.10.2020) had inter alia opined that the proposal dated 03.04.2020 has been rejected by the PD DE and a fresh proposal approved by the Board has to be forwarded to PD DE within one week from the date of the order i.e 28.09.2020 for further action. The relevant para of the legal opinion dated Nil (received via mail in this office on 02.10.2020) is reproduced below:

“ It is very clear that after issue being raised and after arguing before the Hon’ble Supreme Court apart from other issues that the Cantonment Board is not the competent authority to create the post the Hon’ble Supreme Court was of the view that a fresh proposal be sent by the Delhi Cantonment Board (needless to say that the proposal be related and confined the order of the Ld. Single Judge of Delhi High Court dated 18.12.2019 in Writ Petition (Civil) No.760/2016) to the Prl. Director and the Prl. Director after going through the proposal on merits forward the same to the GOC-in-C i.e, Respondent No. 2, GoC-in-C to take a final decision preferably in 3 weeks from the date of the receipt in the office of Respondent no.2.”

This office vide letter No. DCB/LC/An/2020 dated 02.10.2020 sought clarification from Sh. Arvind Kumar Sharma qua the fresh proposal to be formulated in regards to Page 53 of 210

creation of PGT Post (s) in Delhi Cantonment Board School. Sh. Arvind Kumar Sharma vide his letter No. Nil dated 05.10.2020 clarified that a fresh proposal has to submitted for creation of PGT post (s) English. The relevant para of the legal opinion dated 05.10.2020 is reproduced below:

“Thus, it is very clear, I am of the view, that a fresh proposal to be submitted basing only on the order dated 18.12.2019 was passed by the Hon’ble High Court, Delhi which is very clear for creation of PGT post(s) (English). The order of the Hon’ble Supreme Court is very clear and there is no ambiguity irrespective of proposal of 03.04.2020 passed by the Board fresh proposal has to be submitted by the Board to the Prl. Director, Western Command within one week from the date of the order for PGT post (English) only.”

“As regards to the query, how many post (s) has to be created by the Cantonment Board, I am not in the position as I do not have the number of post(s) PGT ( English) which are required to be created. The direction of the Hon’ble Supreme Court on 28.09.2020 is in regard to PGT post(s) ( English) as per impugned order dated 18.12.2019.”

The Dt. Defence Estates, Western Command vide letter No. 9508/B/Cantt./Estt/Delhi/PGT/DE/WC/RMS-30548 dated 01.10.2020 inter alia directed this office to forward a formal proposal for creation of post with the approval of the Board.

In view of the position explained above and in supersession of the CBR No. 13 dated 21.03.2020, the Board may consider the proposal for the creation of 3 Post(s) of PGT English:- S. Posts No. of Pay Level Mode of Classifi- Whether Educational No. Post Scale recruitment cation selection Qualification requi or non- -red selection post 1. 1. PGT 03 PB-2, 8 75% by Non- Selection Essential Educational English 9300- promotion Supervi Qualifications 34800 failing which sory (i) Master’s Degree in the Plus by direct subject concerned from Grade recruitment. any recognized Pay Rs. University. 4800/- 25% by Degree/ Diploma in Direct training/ Education. Recruitment “Qualification mentioned at S. No. (ii) aboverelaxable in the case of candidates.” Having obtained Ph.D Degree in the subject concerned from a recognized University/ Institution. Or (i) Having obtained First Division in Higher Secondary, Degree and Page 54 of 210

Post Graduate Examination with the Mandatory condition that the candidate will acquire the B.Ed./ B.T. qualification within a period not exceeding three years from the date of his/ her joining the service

Experience:-

Desirable:- 3years’ experience of teaching in a college/ Higher Secondary School/ High School in the subject concerned

Age Limit:- below 36 years

Relaxable: as per Govt. Rules.

The criteria for promotion shall be on the basis of seniority-cum-merit. In this regard, a committee will be constituted by the Chief Executive Officer who shall be the Appointing authority to conduct written test and skill test. The division of marks will be as follows:

Written Test 80 marks Skill Test 20 marks

A list of only those candidates who secure minimum 40% of marks in written test and 40% marks in skill test will be prepared. Thereafter, the candidates will be promoted in the order of seniority, irrespective of anyone among them having obtained more marks.

The financial implication for hiring 03 PGT English teacher will be Rs. 25,67,808/- per annum. If approved, the formal proposal as required would be sent by the CEO to the Principal Director, Defence Estate, Western Command, Chandigarh for obtaining the necessary sanction from the Competent Authority. The earlier CBR no. 16 dtd 21.03.2020 shall stand superseded.

The file alongwith the above referred documents, orders and communication is enclosed.

Sd/- Chief Executive Officer Delhi Cantonment Boar (S.V.R. Chandra Sekhar) Dated: 05th October, 2020 Page 55 of 210

RESOLUTION:

Considered. The Board carefully noted the contents of Dte. Defence Estates, Western Command vide letter No. 9508/B/Cantt./ Estt/Delhi/PGT/DE/WC/RMS-30548 dated 01.10.2020 and the legal opinion of Sh. Arvind kumar Sharma dated 02.10.2020 and 05.10.2020 wherein he has inter alia opined that the fresh proposal be related and confined to the order of the Ld. Single Judge of Delhi High Court dated 18.12.2019 in Writ Petition (Civil) No.870/2016. Further, Board carefully examined all related documents including the Hon’ble Supreme Court orders referred on the agenda side and the order dated 18.12.2019 passed in Writ Petition (Civil) No.870/2016 wherein the Ld. Single Judge of Delhi High Court had directed Delhi Cantonment Board to create regular post(s) of PGT (English) within a period of 08 weeks from the date of the order and with applicable Rules & Regulations for the appointment to such post. Board in supersession of the CBR No. 16 dated 21.03.2020 resolves to approve the proposal for the creation of 3 Post(s) of PGT English as brought out on the agenda side.

The Board further resolves that a case may be taken up accordingly by the CEO with the Principal Director, Defence Estate, Western Command, Chandigarh for obtaining the necessary sanction from the Competent Authority on the proposal as brought out in the agenda side.

1. Brig. R.K. Chaudhary President ------Sd/------

2. Smt. Kadiyan Rachna Vice President ------Sd/------

3. Brig. S.S. Jaiswal, SEMO Ex-Officio Member ------Sd/------

4. Col. A.K.S Patial, Adm. Comdt. Nominated Member ------

5. Col. Parshant Kandpal, CO (DAPU) Nominated Member ------Sd/------

6. Col. Yudishthir Moza, SO (Cantt) Nominated Member ------

7. Maj. Amit Bhardwaj, GE (Central) Ex-Officio Member ------

8. Shri D. Karthikeyan, ADM Nominated Member ------

9. Sh. Tanwar Sandeep Elected Member ------Sd/------Page 56 of 210

10. Smt. Jain Kavita Elected Member ------Sd/------

11. Sh. Jagat Singh Elected Member ------Sd/------

12. Sh. Beniwal Nand Kishore Elected Member ------Sd/------

13. Col. Narender Chaudhary (Retd) Elected Member ------Sd/------

14. Sh. Vimal Chowdhary Elected Member ------Sd/------

15. Smt. Chaudhary Priyanka Elected Member ------Sd/------

16. Noted.

The Board further resolved that the said post of PGT of Delhi Cantt Board be equated with the post of PGT/ lecturer in the Dte. of Education, Delhi Govt.

17. PM STREET VENDOR’S ATMA NIRBHAR NIDHI (PM SVANIDHI)

Reference Spl. CBR No.9 dated 16.06.2020 wherein the Board decided to defer the item to next Board meeting for implementation of PM Street Vendors Atmanirbhar Nidhi(PM SVANidhi) Scheme in Delhi Cantonment area. The Board may consider.

Relevant file is placed on the table.

17. Considered. The CEO, Member-Secretary informed the Board about details of PM Street Vendors Atmanirbhar Nidhi (PM SVANidhi) Scheme in detail and the Committee constituted by the office in this regard for implementation of the scheme. The Board discussed the issue in details and authorized the CEO, Member-Secretary to implement provisions contained in the scheme in Delhi Cantt area. The CEO, Member-Secretary requested the Board Members to inform street vendors operating in Cantonment area to avail benefits of PM Street Vendors Atmanirbhar Nidhi (PM SVANidhi) Scheme. The Board further resolved to authorize the CEO, Member-Secretary to engage any suitable agency or utilize services of any individuals for survey of vendors operating in Delhi Cantonment, if required, and to incur necessary expenditure in this regard.

Page 57 of 210

18. PROMOTION TO THE POST OF REVENUE SUPDT

To consider the office report with regard to the subject matter. As per the said report, the post of Revenue Supdt has fallen vacant consequent to retirement of Shri Vipin Kumar on 05.04.2020.

The post of Revenue Supdt in the pay scale of Level 6 in the 7th CPC pay Matrix (PB-2 with Grade Pay of Rs.4200/ - in the pre-revised scale) in classified as Supervisory Post. In terms of Rule 7(1) of CFSR, 1937 the appointments to all supervisory posts shall be made by the Cantonment Board whereas under rule 7(2) of CFSR 1937, the Chief Executive Officer prescribes the duties of and exercise supervision and control over the acts and proceedings of all C.F. servants.

Shri Vijay Kumar, Pension Supdt in the pre-revised pay scale of Rs.9300-34800 plus grade pay of Rs.4200/ - (Level 6 in 7th CPC Pay Matrix) is the next senior employee in the non-supervisory post, and in line of consideration for promotion to the supervisory Post, though the pay scales of both these posts are identical.

The Cantonment Board is not maintaining the ACRs and hence, for promotion the Seniority list is the criteria to be considered. Shri Vijay Kumar is clear from vigilance angle and no charges are pending him.

The case is put for consideration of the Board regarding promotion of Shri Vijay Kumar, Pension Supdt to the post of Revenue Supdt.

Relevant file is placed on the table.

18. Considered and resolved to approve promotion of Sh. Vijay Kumar as Revenue Supdt. from the post of Pension Supdt.

19. EXPIRY OF CONTRACT PERIOD OF CONTRACTUAL STAFF ENGAGED IN CANTONMENT GENERAL HOSPITAL AND GRANT OF FRESH CONTRACT FOR 11 MONTHS

To consider the report of Officiating Chief Medical Officer regarding the expiry of contract of contractual staff engaged in Cantonment General Hospital dated 05.10.2020. As per the report, the contract period of the following staff engaged in Cantonment General Hospital are expiring on the dates indicated against each. The report recommended that a fresh contract for 11 months be given to the staff as indicated below.

S.N Name of Designation Date of Date of Tenure Current Proposed Staff initial contract Consolida Tenure for joining & ending -ted Rem- fresh renewal uneration contract per mth* 1 Sarukhan Ayur. 13.11.2017 09.02.2018 40,812- 11 mths Pharma. 15.02.2018 14.05.2018 from

Page 58 of 210

17.05.2018 13.08.2018 22.10.2020 18.08.2018 14.11.2018 17.11.2018 13.02.2019 16.02.2019 15.05.2019 20.05.2019 16.08.2019 19.08.2019 15.11.2019 19.11.2019 18.10.2020 11 months 2 Amita Pharmacist 16.05.2017 12.08.2017 40,812- 11 mths Mann 16.08.2017 12.11.2017 from 15.11.2017 11.02.2018 22.10.2020 15.02.2018 14.05.2018 17.05.2018 13.08.2018 16.08.2018 12.11.2018 17.11.2018 13.02.2019 16.02.2019 15.05.2019 20.05.2019 16.08.2019 19.08.2019 15.11.2019 19.11.2019 18.10.2020 11 months 3 Ajimol Staff Nurse 24.05.2016 20.08.2016 55,676- 11 mths Jestine 23.08.2016 19.11.2016 from 22.11.2016 18.02.2017 23.10.2020 21.02.2017 20.05.2017 23.05.2017 19.08.2017 22.08.2017 18.11.2017 21.11.2017 17.02.2018 20.02.2018 19.05.2018 22.05.2018 18.08.2018 21.08.2018 20.09.2018 21.09.2018 20.10.2018 21.10.2018 17.11.2018 20.11.2018 16.02.2019 19.02.2019 18.05.2019 21.05.2019 17.08.2019 20.08.2019 16.11.2019 20.11.2019 19.10.2020 11 months 4 Dr. GDMO 20.04.2018 17.07.2018 Full Time 97,300- 11 mths Rishabh 20.07.2018 16.10.2018 from Dev 20.10.2018 16.01.2019 24.10.2020 Tripathi 19.01.2019 17.04.2019 20.04.2019 17.07.2019 20.07.2019 16.10.2019 19.10.2019 17.11.2019 21.11.2019 20.10.2020 11 months 5 Dr. Sunil Spl. 11.04.2018 08.07.2018 Part Time 1200- 11 mths Kumar Anaesthesi 11.07.2018 07.10.2018 per hour from Bansal a 10.10.2018 06.01.2019 02.11.2020 12.01.2019 10.04.2019 13.04.2019 10.07.2019 13.07.2019 09.10.2019 14.10.2019 12.11.2019 18.11.2019 17.12.2019 23.12.2019 21.01.2020 Page 59 of 210

27.01.2020 26.10.2020 09 months 6 Abhishek Pharma- 19.05.2017 15.08.2017 40,812- 11 mths Gaur cist 18.08.2017 14.11.2017 from 17.11.2018 13.02.2018 24.10.2020 16.02.2018 15.05.2018 18.05.2018 14.08.2018 20.08.2018 16.11.2018 19.11.2018 15.02.2019 18.02.2019 17.05.2019 20.05.2019 17.08.2019 20.08.2019 16.11.2019 21.11.2019 20.10.2020 11 months 7 Jyoti Staff Nurse 23.08.2017 19.11.2017 55,676- 11 mths 22.11.2017 18.02.2018 from 21.02.2018 20.05.2018 26.10.2020 23.05.2018 19.08.2018 23.08.2018 22.09.2018 23.09.2018 22.10.2018 23.10.2018 19.11.2018 22.11.2018 18.02.2019 21.02.2019 20.05.2019 23.05.2019 19.08.2019 22.08.2019 18.11.2019 22.11.2019 21.10.2020 11 months 8 Ancy Staff Nurse 25.08.2017 21.11.2017 55,676- 11 mths Thomas 24.11.2017 20.02.2018 from 23.02.2018 22.05.2018 29.10.2020 25.05.2018 21.08.2018 24.08.2018 23.09.2018 24.09.2018 23.10.2018 24.10.2018 20.11.2018 24.11.2018 20.02.2019 23.02.2019 22.05.2019 25.05.2019 21.08.2019 26.08.2019 22.11.2019 26.11.2019 25.10.2020 11 months 9 Suresh OT Assist 27.02.2017 26.05.2017 33,196- 11 mths Chandra 29.05.2017 25.08.2017 from Singh 28.08.2017 24.11.2017 31.10.2020 27.11.2017 23.02.2018 26.02.2018 25.05.2018 28.05.2018 24.08.2018 27.08.2018 23.11.2018 28.11.2018 24.02.2019 27.02.2019 26.05.2019 29.05.2019 25.08.2019 28.08.2019 24.11.2019 28.11.2019 27.10.2020 11 months 10 Rahul Jr. radio- 03.12.2012 02.12.2013 Full Time 40,812- 11 mths grapher 03.12.2013 02.12.2014 from 03.12.2014 02.12.2015 16.11.2020 05.12.2015 04.12.2016 Page 60 of 210

08.12.2016 07.12.2017 11.12.2017 10.12.2018 13.12.2018 12.12.2019 13.12.2019 12.11.2020 11 months 11 Dr. Dental 10.09.2018 07.12.2018 Part Time 350/- per 11 mths Shreyesee Surgeon 10.12.2018 08.03.2019 hour from Kumari 11.03.2019 07.06.2019 23.11.2020 13.06.2019 09.09.2019 19.09.2019 16.12.2019 20.12.2019 19.11.2020 11 months 12 Archna Sr. Nurse 18.12.2014 17.12.2015 Full Time 55,676- 11 mths Kumari 21.12.2015 20.12.2016 from 23.12.2016 22.12.2017 01.12.2020 26.12.2017 25.12.2018 28.12.2018 27.12.2019 1 year 28.12.2019 27.11.2020 11 months *Revised remuneration in fresh contract for para-medical staff shall be as per the prevailing DA at that time.(Sl. No.1 to 3 & 6 to 10 & 12).

In view of the important vital duties of the hospital staff fresh contract period of 11 months is needed.

The financial effect of engagement of these personnel for 11 months would be Rs. 64,00,000- approx (sixty four lacs only).

If approved, the above staff would be given a fresh contact of 11 months from dates mentioned against each with a break of 3 days.

Relevant file is placed on the table for consideration of the Board.

19. Considered and approved.

The Board further resolved that the CEO, Member-Secretary may consider grant of extension to Medical & Para Medical staff engaged by Cantonment General Hospital as per decision of the Board contained in CBR No.65 dated 24.10.2011 in future.

20. RENEWAL OF ANNUAL MAINTENANCE CONTRACT OF “AUTOMATIC FILM PROCESSOR (TABLE TOP MODEL)" INSTALLED IN X-RAY DEPTT. CGH, DELHI CANTT.

To consider the Officiating CMO’s Office Note dt.07.07.2020, As per the said report ‘Automatic Film processor (Table Top Model)’ installed on 16.07.2010 by M/s. Chayagraphics Pvt. Ltd. through tender process vide work-order No.DCB/8/C-44/2009-10 dated 28th April, 2010, which is out of 2 yrs warranty and 3 years of AMC period on 15.07.2015.

As per AFFIDAVIT dated 26.11.2011 i) Prognosys Medical Systems Pvt. Ltd. is a Subsidiary of Chayagraphics (India) Pvt. Ltd. ii) The Manufacturing and service Division of Chayagraphics (India) Pvt. Ltd, is sold / transferred as a going concern to M/s. Prognosys Medical Systems Pvt. Ltd. vide slump sale agreement dated 1st July 2010. iii) All existing contracts and obligations on the date of transfer stands transferred to Prognosys Medical Page 61 of 210

Systems and effective 1st of July, 2010, it will be responsibility and right of Prognosys to honor all such contracts signed by Chayagraphics with the customers.

The machine has been repaired five times (since its installation on 16.07.2010), for Rs.44,728/- on 27.05.2013, 24.07.2013, 21.09.13, 14.03.2014, 19.07.2018 .

For further AMC of “Automatic Film Processor (Table Top Model)” w.e.f 01.07.2018 to 30.06.2019 was awarded to M/s. Prognosys Medical System Pvt. Ltd. vide Work Order No.DCB/8/C-44/2009-10 dated 27.06.2018 amounting to Rs.20,800/-+ Rs.3,744/- (GST@18%). AMC of one year will expire on 30.06.2019. As reported by Dr. Praveen Pratap Singh, Senior Medical Officer & Sh. Gurvinder Singh, Radiographer the services of the company is satisfactory till date. Therefore we require AMC for continuous maintenance services and also to prevent breakdown / damage to the machine.

Now, M/s. Prognosys Medical Systems Pvt. Ltd, has submitted Proposal of AMC for next three years vide their letter No.PMS/AMC/N597/19-20 dated 28 May, 2020 for ‘Automatic Film Processor (Table Top Model)’ for the following period:

Sl.No. AMC TYPE AMOUNT 1. 1st (2PM calls & any number of Rs.22,880/-+4,118/- Year breakdown calls) Labour will be (IGST@18%) = Rs.26,998/- free, parts will have to be paid in advance. PMS will be done once every 06 months. 2. 2nd (4PM calls & any number of Rs.25,168/-+4,530/- Year breakdown calls)Labour will be free, (IGST@18%) = Rs.29,698/- parts will have to be paid in advance. PMS will be done once every 03 months. 3. 3rd (4PM calls & any number of Rs.27,685/-+4,983/- Year breakdown calls)Labour will be free, (IGST@18%) = Rs.32,668/- parts will have to be paid in advance. PMS will be done once every 03 months.

However the, CMO(Off.),CGH has recommended for one year AMC of ‘Automatic Film Processor (Table Top Model)’ to ensure smooth functioning of the X-Ray Deptt.

Therefore, the matter be placed before the FC/CB for approval of AnnualMaintenance Contract of “Automatic Film Processor’’ in favour of M/s. Prognosys Medical System Pvt. Ltd.

The relevant file placed on the table.

20. Considered and resolved to approve annual maintenance contract of Automatic Film Processor in favour of M/s Prognosys Medical Systems Pvt. Ltd. for a period of three years as per proposal submitted by the company dated 28.05.2020 as brought out on the agenda side. Page 62 of 210

Ms. Priyanka Chaudhary, Member requested Board to consider provisioning of high end latest ultrasound machine in the Cantonment General Hospital. The CEO, Member- Secretary stated that upgradation of diagnostic facilities in Cantt General Hospital is under consideration and requirement of high end latest ultrasound machine will also be examined. Smt. Kavita Jain, Member requested the Board to consider establishing dialysis centre at Cantonment General Hospital. The CEO, Member-Secretary stated that establishing of dialysis centre at Cantonment General Hospital will be considered once emergency facilities with ICU back up are established. Smt. Rachna Kadiyan, Vice President requested the Board to consider providing hearse van (force or equivalent make) for the benefit of Cantonment residents. She requested Sh. Virender Singh Kadian, Hon’ble MLA to consider providing his MLA LAD funds for the same. Hon’ble MLA consented to provide his MLA LAD funds for purchase of hearse van for Cantonment General Hospital and he requested the Board that the estimates in this regard be provided to him for early transfer of funds.

21. IMPLEMENTATION OF CENTRALLY SPONSORED SCHEME IN CANTONMENT AREAS.

To note DGDE letter No.76/67/CS/Schemes/C/DE/2018/Vol-II dated 4th September, 2020 regarding implementation of Centrally Sponsored Schemes in Cantonment areas. The Board may consider.

21. The Board noted the directions contained in DGDE letter No.76/67/ CS/Schemes/C/DE/2018/Vol-II dated 4th September, 2020 and resolved to authorized the CEO, Member-Secretary to take necessary action for implementation of Centrally Sponsored Schemes in Delhi Cantonment area.

22. EXTENSION OF TENURE OF CONSULTANT IN DELHI CANTONMENT BOARD PURELY ON CONTRACT BASIS

The tenure of the following contractual staff already engaged for the Consultant is expired as per the details given below:-

Sl. Name Designation Date of Date of expiry Remunerati No. initial of current on per engagement engagement month (Rs.) 1. Sh.D.S. Khatri Consultant 08.08.2016 23.09.2020 Rs.50,000/- (Cantonment Conservancy) 2. Col. P.K. Dogra Consultant 08.08.2016 21.11.2020 Rs.75,000/- (Retd) (Cantonment Conservancy)

The Board may consider the issue of further extension of the tenure. The financial effect of the engagement of Consultant per year would be Rs.15,00,000/- approximately.

Relevant file is placed on the table. Page 63 of 210

22. Considered and resolved to grant extension to Conservancy Consultants for a period of 11 months or till engagement of new consultants is undertaken whichever is earlier.

23. PURCHASE OF VIDEO CONFERENCING SYSTEM FOR THE OFFICE CONFERENCE HALL

To consider Office Note dated 04.09.2020 of Programmer.

Since the outbreak of Covid-19 pandemic, almost all the Government organizations are holding meetings through Video Conferencing. In order to conduct Video Conference more efficiently & effectively with clear audio and video, it is necessary that existing system should be replaced with the new video conferencing system. The expenditure incurred for setting up of the new video conferencing system will be around 15.0 lakh.

Relevant file is placed on the table.

23. Considered and resolved to approve purchase of Video Conference System for office of the Cantonment Board amounting to Rs.15 lakh as brought out on the agenda side. Sh. Vimal Chowdhary, Member requested the Board to consider replacement of conference table and chairs in the conference hall too. The Board further resolved to approve replacement of conference table, chairs and installation of PA system in the conference hall also and authorized the CEO, Member-Secretary to initiate necessary action in this regard for early procurement of the same and to incur necessary expenditure in this regard. Requisite civil works to accommodate the new equipment may also be carried out.

24. GOOGLE MAP API (ECHHAWANI PORTAL)

As per the advice of Ministry of Defence (MoD), DGDE has taken up an initiative in associationship with BEL (Bharat Electronics Limited) to develop online applications for 62 Cantonment Boards online services “echhawani portal”. Delhi Cantonment Board has been chosen among five Cantonment Boards in Country for the pilot project of echhawani. In continuation to this, it has been decided by BEL and DGDE during implementation of other modules in “echhawani portal” that there is a requirement of Google Map API to be integrated in this portal. Accordingly, DGDE vide email dated 29.09.2020 informed that the recurring charges for Google Maps API shared by Google Reseller Partners are same and present total usage cannot be ascertained at this stage as it is based on pay per usage model. Free credit of 200$ per month will be given by all and charges exceeded by this need to be paid.

Further, BEL has suggested that M/s Media Agility, SCO 43, Old Judicial Complex, Sector-15, Gurugram-122001 appears to be more suitable after analyzing the different vendors for the procurement of Google Map API. M/s Media Agility is also not taking any joining charges and giving maximum time for payment of the invoice.

Accordingly, to integrate the Google Map API, DGDE has directed this office to complete the reseller agreement with M/s Media Agility and further, if charges exceeds the

Page 64 of 210

free credit, recurring charges would also be paid by this office from time to time as and when required. The Board may consider.

Relevant file is placed on the table.

24. Considered. The CEO, Member-Secretary briefed the Board about details of echhawani portal being developed on the behest of MoD, unified portal for all Cantonment Boards for online services and other digital initiatives that the department is taking. The matter was discussed at length and the Board resolved to authorize the CEO, Member- Secretary to execute reseller agreement with M/s Media Agility for development of echhawani portal and for integration of Google Map API with echhawani portal as brought out on the agenda side. The Board further authorized the CEO, Member-Secretary to incur necessary expenditure towards engagement of requisite experts and technicians to ensure that echhawani portal and other initiatives of MoD/ DG DE are implemented smoothly and at the earliest including procurement of hardware/ software, tools and equipments etc.

25. EXTENSION OF CONTRACT : ENGAGEMENT OF CHARTERED ACCOUNTANT FIRM

To note the extension of contract for engagement of Chartered Accountant Firm w.e.f. 21.09.2020 to another one year on the same terms & conditions as M/s Susheel K Gupta requested vide their letter dated 24.08.2020 for extension of contract to another one year after obtaining approval of PCB.

The new Accounting software “Accrual Based Accounting System (ABAS)” has already been implemented in Delhi Cantonment Board with effect from 01 April 2020 and the staff of M/s Susheel K Gupta & Co. are already working on this software and are familiar with new accounting software. Shifting to a new Chartered Accountant firm at this stage will hamper the implementation of the software as per the report of the accounts branch and training of the Cantt Board staff would also take time.

Relevant letter is placed on the table.

25. Noted. Further, the Board appreciates the efforts of the officials in implementing the ABAS software.

The Board considering the shortage of staff, further authorized the CEO, Member- Secretary to engage the services of consultants/ consulting firms, contractual employees etc. to meet administrative exigencies from time to time and to accord extensions to consultants/ consulting firms, contractual employees and contracts undertaken by the Board and also to fix their remunerations and to incur necessary expenditure in this regard.

26. CANCELLATION OF TENDER

To consider Office Note dated 08.09.2020 of Programmer.

It has been reported that the following tender was approved by the Board as detailed below: Page 65 of 210

S.No Name of Work Authority Name of Contractor 1. Hiring of 61 IP based CCTV FC/CBR No. 30/3 dated M/s One Up Cameras system on rental 15.02.2019/05.03.2019 Power System basis for five years.

The agreement and work order could not be executed due to some administrative exigencies. Further, during the last one year, new upgraded specifications have also been available in the markets which are better than the specification mentioned in the said tender. In view of the above, it is proposed to cancel the said tender and call tenders afresh. The Board may consider.

Relevant file is placed on the table.

26. Considered and resolved to cancel tender for hiring of 61 IP based CCTV camera system approved by the Board vide FC/CBR No.30/3 dated 15.02.2019/05.03.2019 in favour of M/s One Up Power System as brought out on the agenda side. The Board further resolved to invite tenders for hiring of CCTV cameras afresh with latest technology and specifications.

27. COMPREHENSIVE MAINTENANCE OF 4 LIFTS INSTALLED AT CB OFFICE AND CG HOSPITAL, DELHI CANTT.

To consider the report of E&M section of engineering branch with respect to subject term contract. As per the said report comprehensive maintenances of 4 lifts installed at CB Office and CG Hospital is being carried out by M/s Evaan Elevators Pvt. Ltd. the manufacturing agency since beginning. Existing rates of the agency for the above work is Rs. 10,500/- plus GST per lift per month. M/s Evaan Elevators Pvt. Ltd. Vide their letter No. DEL/EE/DCB/20 dated 11.06.2020 have submitted offer of comprehensive maintenances of lifts @ 11,025/- plus GST per lift per month which is 5% above the existing rates.

The comprehensive maintenance of lifts is recommended by the section for approval. The Board may consider the offer.

Relevant file is placed on the table.

27. Considered and resolved to approve comprehensive annual maintenance contract of 4 lifts installed at CB Office and Cantonment General Hospital with OEM M/s Evaan Elevators Pvt. Ltd. @ Rs.11,025/- plus GST per lift per month.

28. IMPROVEMENT OF PATH, PAVEMENTS, FOOTPATH AND PARKS AT ANUJ VIHAR, SHANKER VIHAR, DELHI CANTT

To consider report of the Engineering branch for improvement to path, pavements, footpaths and parks at Anuj Vihar colony in Shanker Vihar, Delhi Cantt. In this regard Sh. Jagat Singh, Member, Delhi Cantonment Board vide his letter dated 25.08.2020 has requested for aforementioned improvement works.

The relevant file and office report are placed on the table. Page 66 of 210

28. Considered and resolved to approve improvement to path, pavements, footpaths and parks at Anuj Vihar as requested by Sh. Jagat Singh, Member vide his letter dated 25.08.2020. The Board further resolved to approve estimates amounting to Rs.63,61,000/- for the said works. However execution of work shall be carried out after receipt of working permission from Station HQ, Delhi Cantt.

29. IMPROVEMENT WORKS IN WARD NO.5, DELHI CANTT

To consider report of the Engineering branch with respect to undertaking of following improvement works in Ward No.5, Delhi Cantt.

i) Provisioning of 200 garden benches. ii) Installation of security cameras in park and pond area of Village Jharera. iii) Provisioning of security guards for park and pond area at Village Jharera.

In this regard request has also been received from Sh. Nand Kishore Beniwal, Member, Delhi Cantonment Board vide his letter dated 07.09.2020.

The relevant file and office report are placed on the table.

29. Considered and approved.

Sh. Virender Singh Kadian, Hon’ble MLA stated that the Delhi Govt. has already installed 1300 security cameras in the Cantonment constituency and further Govt. is proposing installalation of 2000 new security cameras in the area. He further stated that Delhi Govt. has proposal to provide precast cement concrete benches in Delhi Cantonment constituency. Hon’ble MLA informed that some of the required security cameras and garden benches for different wards can be obtained through Delhi Govt if found suitable. Sh. Nand Kishore Beniwal, Member stated that security cameras being installed by the Delhi Govt. are not being installed at vulnerable points and work is being done without consulting Elected Ward representatives. Sh. Vimal Chowdhary, Member stated that DVR (control system of cameras) of the security cameras being installed by Delhi Govt. do not provide access to Cantt Board and it should be ensured that access to DVR of the security cameras is available to Cantt Board administration.

The Elected Members requested similar facilities should be provided in all wards. The matter was discussed at length and the Board resolved that the Ward Members may submit the requirement and locations of security cameras and benches to the CEO, Member-Secretary who may explore the possibility of procuring the same through the Delhi Govt as per requirement on the ground. In case the same are not provided within a month, they may be provided by the Board under its own arrangement. The Board also decided that the quality and specification of cameras being installed by Delhi Govt. be ascertained first and installation of these cameras be allowed only if their specifications suit requirement of the Canttt Board. The Board also resolved that in future, names of public representatives/ Elected Members will not be painted on any precast cement concrete benches provisioned in the area.

Page 67 of 210

The CEO, Member-Secretary informed the Board that recently water pond at Village Jharera has been rejuvenated, all drainage sewerage system earlier connected to the pond have now been delinked from the pond and further the area surrounding the pond is being developed aesthetically for the benefit of residents of the area. The Board applauded efforts made by the Staff, Officers and Elected Members for rejuvenation of the pond and aesthetical development of the area.

Smt. Rachna Kadiyan, Vice President requested the Board to consider providing security guards for the Rajpal Park located at Uri Enclave in her ward. The President Cantt Board stated that it will not be feasible for the Board to provide security guards at every park, however, the units responsible for security of the area will be instructed to be more vigilant for security concerns mentioned by the Vice-President.

30. PROVIDING PATH/ PAVEMENTS IN PN MESS QTRS. AT COD, DELHI CANTT

To consider report of the Engineering branch with respect to providing path/ pavements in PN Mess Qtrs. at COD, Delhi Cantt. In this regard a request has also been received from Smt. Rachna Kadiyan, Vice-President, Delhi Cantonment Board vide her letter dated 25.08.2020.

The relevant file and office report are placed on the table.

30. Considered and resolved to approve improvement works in PN Mess Qtrs. as requested by Smt. Rachna Kadiyan, Vice-President, Delhi Cantonment Board vide her letter dated 25.08.2020. The Board further resolved to approve estimates amounting to Rs.12,50,000/- for the said works. However execution of work shall be carried out after receipt of working permission from Station HQ, Delhi Cantt.

31. CONSTRUCTION OF AN OVERHEAD WATER TANK AT VILLAGE MEHRAM NAGAR

To consider report of the Engineering branch with respect to construction of an overhead water tank at Village Mehram Nagar, Delhi Cantt to improve water storage and water distribution system. In this regard Sh. Virender Singh Kadian, Advocate, Hon’ble MLA, Govt. of NCT of Delhi (Delhi Cantt & Member NDMC) vide letter No.VSK/169/07/2020 dated 06.07.2020 has requested execution of work out of his MLA LAD funds.

The relevant file and office report are placed on the table.

31. Considered and approved.

Sh. Nand Kishore Beniwal, Member stated that the Board has already approved his proposal for construction of overhead tank at Village Mehram Nagar and he requested the Board that the overhead tank at Village Mehram Nagar be constructed out of Cantt Board funds. Ms. Priyanka Chaudhary, Member stated that in the past Board has decided that execution of works on proposals submitted by Elected Members or MLA will be considered Page 68 of 210

on first come first basis. Col Narender Chaudhary (Retd), Smt. Kavita Jain & Sh. Jagat Singh, Elected Members endorsed the views shared by Smt. Priyanka Chaudhary. Hon’ble MLA stated that in the past Board has not approved any proposal for construction of overhead tank at Village Mehram Nagar. The matter was discussed at length and the Board decided that the aforementioned deliberations will be examined and execution of work shall be undertaken out of Cantt Board funds/ MLA Funds as per requirement and availability of funds and administrative convenience.

32. DEVELOPMENT OF PARK AT CAPTAIN COLONY, PRATAP CHOWK, DELHI CANTT

To consider report of the Engineering branch for improvement to park at Captain Colony, Pratap Chowk with path, pavements, boundary wall and other misc improvement works. In this regard Smt. Kavita Jain, Member, Delhi Cantonment Board vide her letter dated 01.10.2020 has requested for aforementioned improvement works.

The relevant file and office report are placed on the table.

32. Considered and resolved to approve improvement of park at Captain Colony at the cost of Rs.26,57,000/- as requested by Smt. Kavita Jain, Member, Delhi Cantonment Board vide her letter dated 01.10.2020. However execution of work shall be carried out after receipt of working permission from Station HQ, Delhi Cantt.

33. PROVISIONING OF POLY CLINIC AND LIBRARY AT VILLAGE MEHRAM NAGAR, DELHI CANTT

To consider report of the Engineering branch for provisioning of poly clinic and library at Village Mehram Nagar, Delhi Cantt. For provisioning of the polyc clinic and library, it is proposed to construct a building in Sy. No.276, Village Mehram Nagar classified as B-4 land under the management of DEO, Delhi Circle. In this regard request has also been received from Sh. Virender Singh Kadian, Hon’ble MLA, Govt. of NCT of Delhi (Delhi Cantt & Member NDMC) vide letter No.VSK/247/08/20/DCB dated 02.08.2020 who has intimated that the Delhi Govt. has launched scheme of Mohalla Clinic/ Poly Clinic to provide basic health care facilities in the residential pockets/ villages in Delhi. He has further intimated that the Delhi Govt. is providing Medicines, OPD services and Lab facilities free of cost through these Mohalla Clinics/ Poly clinics. Hon’ble MLA has requested for construction of two/ three storied building at Village Mehram Nagar for the purpose of Mohalla Clinic/ Poly Clinic out of his MLA LAD funds.

The relevant file and office report are placed on the table.

33. Considered and resolved to approve construction of ground plus two storied building for provisioning of poly clinic and library at Village Mehram Nagar at the cost of Rs.1,58,30,000/-. as requested by Sh. Virender Singh Kadian, Hon’ble MLA, Govt. of NCT of Delhi (Delhi Cantt & Member NDMC) vide letter dated 02.08.2020 out of his MLA LAD funds. The execution of work shall however be undertaken after transfer MLA LAD funds to the Board. Page 69 of 210

Smt. Priyanka Chaudhary, Member stated that the Mohalla Clinics provisioned by Delhi Govt. in Cantonment area are not functioning satisfactorily and at most of the times Medical Officers in these Mohalla Clinics are unavailable. Sh. Virender Singh Kadian, Hon’ble MLA stated that the Delhi Govt. has prescribed duty hours for Medical and Para Medical staff engaged for Mohalla Clinics and that the staff is generally available in these Mohalla Clinics as per duty roasters. Sh. Nand Kishore Beniwal, Member stated that Mohalla Clinic is functional at Village East Mehram Nagar close to the proposed poly clinic centre at Mehram Nagar, and as such the requirement of poly clinic at Village Mehram Nagar may be reviewed. Hon’ble MLA stated that poly clinics offer better facilities both in the field of diagnostic and treatment as compared to Mohalla Clinics where only Medical Officers function. The Elected Members stated that due to paucity of vacant land only one facility i.e. either poly clinic or Mohalla Clinic be provisioned and if poly clinic at Village Mehram Nagar is to be established then the Mohalla Clinic at Village East Mehram Nagar be closed. The matter was discussed at length and it was decided that once poly clinic facilities are commissioned at Village Mehram Nagar, closing/ relocation of Mohalla Clinic functioning at Village East Mehram Nagar may be considered.

34. INSTALLATION OF BOOTH/ PORTA CABIN IN CANTONMENT AREA ON TRAFFIC SIGNALS FOR TRAFFIC POLICE

To consider report of the Engineering branch regarding installation of booth/ porta cabin in Cantonment area on traffic signals for traffic police. As per the said report the Board videSpl. CBR No.5 dated 25.01.2019 had considered a request received from Traffic Inspector, Delhi Cantt Circle for grant of NOC for installation of traffic booths at Kirby Place (Station road), Palam Tanki (ThimmayaMArg), and Hanuman Mandir (Thimmaya Marg) and the Board had resolved to a approve the same. Now, Traffic Inspector, Delhi Cantt vide letter No.112/TI/DCC, New Delhi dated 23.09.2020 has requested Cantt Board Delhi to provide traffic booth (porta cabins) at following locations for convenience of ladies staff of Traffic police:-

i) Kirby Place traffic signal ii) Thimmaya Red light iii) Palam Tanki Red light iv) PS Delhi Cantt, Traffic light v) RR Line Traffic signal vi) Hanuman Mandir Traffic signal

The relevant file and office report are placed on the table.

34. Considered and resolved to approve installation of porta cabins (booths) at the locations mentioned on the agenda side at the cost of Rs.8 lakh as requested by Traffic Inspector, Delhi Cantt vide his letter dated 23.09.2020. The Board further resolved to authorize the CEO, Member-Secretary to place work order for installation of traffic booths.

Page 70 of 210

35. PROPOSAL FROM MLA LAD FUNDS

To consider letter No. VKS/180/07/20/DCB dated 13.07.2020 received from Sh. Virender Singh Kadian, Advocate, Hon’ble MLA, Govt. of NCT of Delhi and member, NDMC requesting to carry out the re-boring of following dried up borewells out of MLA LAD funds. ➢ Pump house near pond, village Jharera. ➢ Pump house near dry open well, village Mehram Nagar. ➢ Pump house near metro station, village Mehram Nagar. ➢ Pump house near subzimandi village East Mehram Nagar. The Board may consider.

Relevant file is placed on the table.

35. Considered. Sh. Nand Kishore Beniwal, Member stated that Board has already acted on his proposal for reboring of tubewells mentioned in the proposal submitted by Hon’ble MLA and that the matter is already under consideration of advisory committee headed by DM, New Delhi. He requested the Board that reboring of the tubewells be undertaken from Cantt Funds. The matter was discussed at length and the Board resolved that feasibility of reboring of tubewells out of Cantt Funds be explored first as the proposal is already under the consideration of the Competent authority as informed by the Elected members.

The Members requested that the Board should consider utilizing MLA LAD funds for large projects which require considerable capital investments like development of veterinary centre, infrastructural upgradation to Cantonment Board schools, upgradation of diagnostic facilities at Cantonment General Hospital etc rather than works of reboring/ maintenance and the like. The Board resolved that henceforth out of the approved works needed for development of Cantt area, the Board will decide which works are to be carried out through aegis of MP/ MLA LAD funds, through various Centrally/ State sponsored schemes or Cantt Fund.

36. PROPOSAL FROM MEMBER SH. SANDEEP TANWAR

To consider the proposal received from Sh. SandeepTanwar, Member vide his letter No. M-DCB/07-20/08, and No. M-DCB/07-20/09 both dated 27.07.2020 and letter No. M- DCB/08-20/03 dated 10.08.2020 requesting for the following works.

➢ Toinstall two bore wells near CB-144 and near CB-198 Village Naraina.

➢ Installation of fancy lights in parks of Village Naraina.

The Board may consider.

Relevant file is placed on the table.

Page 71 of 210

36. Considered and approved. The Board further resolved that boring of tubewells shall be subject to adherence of rules/ guidelines issued by the competent authorities in this regard.

The Board also resolved that the issue of installation of ornamental lights requested by various Elected Members (under agenda item No.37 to 40) will be taken up as case to case basis in a phased manner. The office may prepare necessary estimates taking into consideration locational aspects, functional requirements and other technical feasibility parameters.

Col Narender Chaudhary (Retd), Member requested installation of security/ garden lights at Sekho Vihar and Police Colony, Village East Mehram Nagar located in his ward. The Board decided to approve request made by the Member in Principle.

37. PROPOSAL FROM MEMBER SMT. KAVITA JAIN

To consider proposal received from Smt. Kavita Jain,Member requesting vide her letter No. Nil dated 21.07.2020 for installation of ornamental lights in main market of Gopi Nath Bazar and parks of ward No. 03.

The Board may consider.

Relevant file is placed on the table.

37. Considered and approved. The Board also resolved that the issue of installation of ornamental lights requested by various Elected Members (under agenda item No.37 to 40) will be taken up as case to case basis in a phased manner. The office may prepare necessary estimates taking into consideration locational aspects, functional requirements and other technical feasibility parameters.

38. PROPOSAL FROM MEMBER SH. JAGAT SINGH LOHIA

To consider letter No. nil dated 25.08.2020 received from Sh. Jagat Singh Lohia, Member requesting for the following works in ward No. 04

➢ To install decorative lights and water hydrants in parks. ➢ To provide street lights in colonies/servant quarters.

The Board may consider.

Relevant file is placed on the table.

38. Considered and approved. The Board also resolved that the issue of installation of ornamental lights requested by various Elected Members (under agenda item No.37 to 40) will be taken up as case to case basis in a phased manner. The office may prepare necessary estimates taking into consideration locational aspects, functional requirements and other technical feasibility parameters. Page 72 of 210

39. PROPOSAL FROM MEMBER SH. NAND KISHOR BENIWAL

To consider the proposal received from Sh. Nand KishoreBeniwal, Member requesting vide his letter No. NKB-540/20, dated 27.07.2020 requesting for the following works.

➢ To upgrade street lighting at Village Jharera&Mehram Nagar. The Board may consider.

Relevant file is placed on the table.

39. Considered and approved. The Board also resolved that the issue of installation of ornamental lights requested by various Elected Members (under agenda item No.37 to 40) will be taken up as case to case basis in a phased manner. The office may prepare necessary estimates taking into consideration locational aspects, functional requirements and other technical feasibility parameters.

40. PROPOSAL FROM MEMBER SH. VIMAL CHOWDHARY

To consider the proposal received from Sh. Vimal Chowdhary, Member, vide his letter No. Nil dated 31.07.2020 requesting for improvement of lighting system in Sadar Bazar and Parks in ward No. 07, Delhi Cantt.

The Board may consider.

Relevant file is placed on the table.

40. Considered and approved. The Board also resolved that the issue of installation of ornamental lights requested by various Elected Members (under agenda item No.37 to 40) will be taken up as case to case basis in a phased manner. The office may prepare necessary estimates taking into consideration locational aspects, functional requirements and other technical feasibility parameters.

41. PROPOSAL FROM MEMBER SMT. PRIYANKA CHAUDHARY

To consider the proposal received from Smt. PriyankaChaudhary,Member, vide her letter No. Nil dated 28.07.2020 requesting for re-boring of two tubewells, near Dhobi Ghat, Sadar Bazar and near Hanuman Mandir Kabul Line Park.

The Board may consider.

Relevant file is placed on the table.

41. Considered and resolved to approve installation of two tubewells as requested by Smt. Priyanka Chaudhary as brought out on the agenda side. The Board further resolved that boring of tubewells shall be subject to adherence of rules/ guidelines issued by the competent authorities in this regard.

Page 73 of 210

42. DEVELOPMENT OF COMMERCIAL COMPLEX ON STATION ROAD IN SY. NO.259, DELHI CANTT

To consider report of the Engineering branch as regards to development of commercial complex on Station road in Sy. No.259, Delhi Cantt. As per the said report a Survey No.259 measuring 28.175 acres in Delhi Cantt is classified as Class C land for the purpose of nallah. The nallah in question starts from Station road Kirby Place and flows in the adjoining MCD area through CVD. The existing width of nallah at site is about 10 mtrs whereas available width of Class C land in Sy. No.259 varies between 68 to 90 mtrs. Further on one side of the bank of drain/ nallah jhuggi dwellers have encroached upon Class C land (nallah berms). A portion of Sy. No.259 classified as Class C land touching Station road has great potential for Commercial ventures and site is best suited for revenue generating project. It is proposed to develop portion of land in Sy. No.259 for development of commercial complex which may inter alia require shifting/ diversion of existing nallah and removal of portion of slum. The Board may consider: a) Issue of development of commercial centre in Sy. No.259. b) Diversion of nallah to facilitate construction of commercial complex. c) Change of purpose of a portion of land in Sy. No.259 (part) for the purpose of development of commercial complex. d) Engaging an agency for conceptualization of the project.

The relevant file and office report are placed on the table.

42. Considered. The Board discussed issue of development of commercial complex on Station road in Sy. No.259, Delhi Cantonment and the Board was of the considered opinion that Station lacks dedicated commercial spaces to fulfill needs and aspirations of Cantonment residents and that the site in question is well suited for commercial projects. The matter was discussed at length and the Board resolved to approve construction of commercial complex on Station road in Sy. No.259 as brought out on the agenda side. The Board discussed the issue of engagement of an agency for conceptualization of the project and the Board decided to engage School of Planning & Architecture (SPA), “An Institute of National Importance” under an Act of Parliament (Ministry of Human Resource Development, Govt. of India) for conceptualization of the project at the earliest and authorized the CEO, Member-Secretary to take action for engagement of SPA for the project, finalization of consultancy fee, execution of agreement with the institute and to incur necessary expenditure thereon. The Board also resolved to approve change of purpose of portion of land in Sy. No.259 for commercial purposes and authorized the CEO, Member-Secretary to submit proposal for change of purpose of portion of land in Sy. No.259 to the competent authority as per the space requirements calculated by the SPA as per conceptual plans drawn for the project.

43. DEVELOPMENT OF CITY CENTRE PHASE – II, DELHI CANTT

To consider report of the Engineering branch as regards to Development of City Centre Phase- II, Delhi Cantt. As per the said report the project of development of City Centre was conceived in the year 1989-90. Later the Board vide its resolution contained in CBR No.40 dated 19.11.1999 had resolved to invite Architectural Competition for Page 74 of 210

conceptualization of the project. The Board vide CBR No.64 dated 24.02.2000 had resolved to appoint a high power committee comprising of the following to scrutinize all the designs received in competition and to adjudicate awards:- i) Rep of DG DE, Addl. DG Cantts - Shri N N Ojha ii) Sr. Director, DE Western Command - Shri S.C. Nagpal iii) President Cantonment Board, Delhi Cantonment - Brig. Rajeshwar Singh iv) Vice President, Delhi Cantt. Board - Shri Ashok Kr. Tanwar v) Cantonment Executive Officer - Ms. Deepa Bajwa

The jury had selected design submitted by M/s Modern (India) Architect as the best design received in the Architectural Competition. The Cantt Board vide CBR No.24 dated 12.07.2000 had unanimously accepted the report submitted by the aforementioned jury and had resolved to approve engagement of M/s Modern (India) Architect for development of City Centre at Delhi Cantt. The agreement between Cantt Board Delhi and approved architect was executed on 26.03.2004.

The project City Centre was approved in principle by the GOC-in-C, Western Command during Project presentation at HQ Western Command on 23.08.2005 under two Phases. The Phase - I comprised of Cantt Board office, workshops, fire station, restaurant block whereas under Phase – II commercial units (11895 Sqmt.) were proposed.

The sanction of the competent authority for execution of City Centre at the cost of Rs.5.25 Cr. was accorded and communicated to the Board vide Dte. DE, Western Command letter No.30/SC/Delhi/CC/DE dated 31.08.2005. Accordingly, the work of City Centre Phase – I was completed on 15.06.2009. Meanwhile Cantt Board had submitted a proposal to the Dte. DE Western Command vide letter No.DCB/8/Arch. Comp./CC/PH – II dated 19.10.2005 requesting sanction under rule 19 (b) of the Cantonment Account Code, 1924 for engaging architect for preparation of detailed designs and estimates for developing City Centre Phase – II. The sanction for engagement of architecture for City Centre Phase – II was not received.

The Cantt Board vide Spl. CBR No.2 dated 16.06.2020 has approved budget estimates for 2020-21 (R) & 2021-22 (O) wherein provisions have been made for construction of Commercial units under City Centre Phase –II. The original scheme/ design of City Centre was approved by the Board in the year 2000 and in last 20 years the design concepts for development of City Centres, District Centres have changed a lot and the approved design of City Centre Phase – II, conceived in the year 2000 as a whole will not suit the present day requirement based on changed on-ground situation and the project need planning de-novo to meet requirement of commercial complexes to suit modern engineering practices and ancillary statutory provisions/ requirements. The clause 4.10 of the agreement executed between Cantt Board Delhi and the architect provide, “The Employers shall have the liberty to postpone or not the execute any work and the architect shall not be entitled to any compensation for non-execution of the work except the fee which are payable to the architect up to the stage of services then in progress”. The Board may consider Development of City Centre Phase –II, Delhi Cantt.

The relevant file and office report are placed on the table. Page 75 of 210

43. Considered. The Board discussed issue of development of City Centre Phase-II at length and resolved to approve the same. The Board was of the opinion that under City Centre Phase-II such commercial units be developed which have lesser public interface so as to avoid congestion close to Cantt Board office complex. The Board noted that the proposed City Centre Phase-II will increase revenue generation to the Board considerably. The Board resolves that the design of City Centre approved by the Board in the year 2000 needs planning de-novo since during intervening period design concepts as a whole have changed considerably and the original plans of City Centre do not suit present day commercial complex needs/ requirements. Further, the requirements/ construction of the space vis-à-vis the changed site conditions, requirements and alignment necessitate fresh design proposals for optimum utilization of space. The Board also discussed clause 4.10 of the agreement dated 26.03.2004 executed between Cantt Board and Modern (India) Architects alongwith terms and conditions of architectural competition invited for development of City Centre in the year 2000 and the Board decided to rescind the architectural consultancy agreement with M/s Modern (India) Architects as per provisions of foreclosure of contract contained therein. The Board also discussed issue of engaging suitable agency for designing of commercial units under Phase – II of City Centre and resolved to approve engagement of School of Planning & Architecture (SPA), “An Institute of National Importance” under an Act of Parliament (Ministry of Human Resource Development, Govt. of India). The Board also resolved to authorize the CEO, Member- Secretary to take action for engagement of SPA for the project, finalization of consultancy fee, execution of agreement with the institute and to incur necessary expenditure thereon.

44. HON’BLE HIGH COURT OF DELHI W.P. (C) NO.4534/2015 TITLED AS “ARPIT BHARGAVA & ANR VS NORTH DMC &ORS”

To consider report of the Engineering branch regarding action plan submitted by the office before Hon’ble High Court of Delhi to ensure seismic stability of the buildings in Delhi Cantonment. As per the said report the Board videSpl. CBR No.8 dated 16.06.2020had approved an action plan to ensure seismic stability of the buildings located in Cantonment area. The action plan approved by the Board was accordingly submitted before Hon’ble High Court of Delhi in WP (C) No.4534/2015 titled as Arpit Bhargava &Anr Vs North DMC &Ors. The action plan provide for structural safety audit of Govt. buildings under Phase-I.The Engineering branch of the Board has identified following Govt. building under charge of Cantt Board Delhi for structural audit:- a. Old building (three storied) of Mother Teresa CB Sr. Sec. School, Uri Enclave. b. Old building block of Dr. APJ CB Sr. Sec. School, Shastri Bazar. c. Old building block (Principle office block) of Mahatma Jyotibha Phule CB Sr. Sec. School, Jharera. d. 32 Staff Qtrs. blocks at Sadar Bazar. e. 16 Staff Qtrs. block at Sadar Bazar. f. Type – II, III & IV Staff Qtrs., Opposite CB Office, Sadar Bazar, Delhi Cantt. g. Kalpatru Commercial Complex h. Chitrakoot Guest House

Page 76 of 210

Further for structural audit of the aforementioned buildings this office has approached IIT Delhi, IIT Roorkee, Delhi Technological University to ascertain their feasibility to undertake work of structural audit and the consultancy charges payable for these services. The response from institutes is awaited. The Board may consider authorizing the CEO, Member-Secretary to engage structural audit agency and to incur necessary expenditure in this regard so as to ensure timely compliance of directions issued by Hon’ble High Court of Delhi.

The relevant file and office report are placed on the table.

44. Considered and resolved to authorize the CEO, Member-Secretary to engage any suitable agency for structural audit of Cantt Board buildings as brought out on the agenda side and to incur necessary expenditure thereon. The Board further resolved to authorize the CEO, Member-Secretary to take action for structural audit of any other buildings/ structures vested with Cantt Board or Defence Estates Organization to timely comply with the directions issued by Hon’ble High Court in the matter and to incur necessary expenditure in this regard.

The Board further authorized the CEO, Member-Secretary to engage IITs/NIITs/DTU/SPA and other equivalent institutes of repute for institutional consultancy, Research works, quality control services, Envitronmental issues/ concerns, Solid Waste Management, Air/Noise/Liquid pollution relates studies and solutions etc and to incur necessary expenditure in this regard.

45. IMPLEMENTATION OF ANIMAL BIRTH CONTROL (DOGS) RULES, 2001 : DEVELOPMENT OF VETERINARY CENTRE AT SHASTRI BAZAR, DELHI CANTT

To consider report of the Engineering branch with respect to implementation of Animal Birth Control (Dogs) Rules, 2001. As per the said report the Animal Welfare Board of India (AWBI) vide Circular No.9-1/2015-16/PCA dated 18.06.2015 addressed to the President/ CEO of all Cantt Boards had directed all Cantt Board to implement provisions of Animal Birth Control (Dogs) Rules, 2001 in letter and spirit for sterilization and immunization of stray dogs to control the population of stray dogs in Cantonment areas. Further, the Hon’ble Supreme Court in its judgement in SLP (C) No.11686 of 2007 in the matter of AWBI Vs A. Nagaraja& Others has directed in Para 77 of the judgement that:

(3) AWBI and Governments are directed to take appropriate steps to see that the persons-in-charge or care of animals, take reasonable measures to ensure the well- being of animals.

(4) AWBI and Governments are directed to take steps to prevent the infliction of unnecessary pain or suffering on the animals, since their rights have been statutorily protected under Sections 3 and 11 of PCA Act.

(10) The Governments would see that if the provisions of the PCA Act and the declarations and the directions issued by this Court are not properly and effectively complied with, disciplinary action be taken against the erring officials so that the purpose and object of PCA Act could be achieved. Page 77 of 210

(12) AWBI is directed to take effective and speedy steps to implement the provisions of PCA Act in consultation with SPCA and make periodical reports to the Governments and if any violation is noticed, the Governments should take steps to remedy the same, including appropriate follow-up action.”

Cantt Board Delhi is maintaining a SulabhSauchalaya at Shastri Bazar and the Board vide its resolution contained in CBR No.7 dated 11.12.2015 has approved demolition of SulabhSauchalaya at Shastri Bazar. The site in question is considered most suited for construction of Veterinary Centre at Shastri Bazar after demolition of SulabhSauchalaya. The estimated cost of Veterinary Centre works out to Rs.49,75,000/-.

Relevant file is placed on the table.

45. Considered. The Board noted the contents of Animal Welfare Board of India circular dated 18.06.2015 and orders issued by Hon’ble Supreme Court of India in the matter SLP No.11686 of 2007. Smt. Kavita Jain, Member requested the Board to consider development of veterinary centre at any other alternate location and she further requested the Board to consider the site in question for development to old age centre at Shastri Bazar. The matter was discussed at length and the Board resolved to approve in principle construction of Veterinary Centre at Delhi Cantonment. The Board further resolved to authorize the CEO, Member-Secretary to decide appropriate site for construction of veterinary centre. However in case any other suitable site is not available then construction of veterinary centre be undertaken at Shastri Bazar after demolition of existing Sulabh Sauchalaya. Elected Members Smt Priyanka Chaudhary, Shri. Jagat Singh requested Hon’ble MLA to consider providing his MLA LAD funds for construction of veterinary centre with operation theatre, post op and best treatment facilities. Sh. Virender Singh Kadian, Hon’ble MLA consented to provide his MLA LAD funds for construction of veterinary centre complete with all facilities.

The Board further resolved to authorize the CEO, Member-Secretary to take action for demolition of dilapidated Sulabh Sauchalayas or other dilapidated/ outdated Cantt fund buildings in the Cantonment area. The Board also authorized the CEO, Member-Secretary to incur necessary expenditure on repair/ improvements to toilet complexes and other Cantt Fund buildings as the case may be.

46. EXTENSION OF CHITRAKOOT GUEST HOUSE

To consider report of the Engineering branch with respect to Extension of Chitrakoot Guest House, Delhi Cantt. As per the said report the Board vide CBR No.5 dated 21.03.2020 had approved conceptual plans for extension of Chitrakoot Guest House alongwith budgetary estimates of Rs.7,46,46,000/-. The project details were discussed with the Principal Director Defence Estates, Western Command during his visit to the Station. Now, it has been proposed to relocate the proposed new building from existing lawn to alternate location close to existing Guest House building in order to save open and green spaces. Accordingly the School of Planning & Architecture (SPA) was asked to modify conceptual plans to suit the site requirements. SPA have submitted modified drawings of the project and budgetary cost estimates amounting to Rs.6.60 Cr.

The relevant file and office report are placed on the table. Page 78 of 210

46. Considered. The Board discussed revised plans for extension of Chitrakoot Guest House alongwith estimated cost of project amounting to Rs.6.60 Cr. and resolved to approve the same. The Board further resolved to authorize the CEO, Member-Secretary to undertake minor modifications in the plans, if needed, further to accommodate suggestions received from higher authorities or to suit site conditions as the case may be. The Board also decided that proposal for the project be submitted to the competent authority for obtaining sanction of the project at the earliest.

47. PROVISIONING OF CNG CREMATORIUM AT VILLAGE OLD NANGAL, DELHI CANTT

To consider report of the Engineering branch regarding provisioning of CNG Crematorium at Village Old Nangal, Delhi Cantt. As per the said report the Board vide resolution contained in FC/CBR No.6/2 dated 25.02.2020/ 21.03.2020 had considered and approved conceptual plans and estimates for provisioning of Electric Crematorium at Village Old Nangal at the cost of Rs.3,10,73,000/-within existing conventional crematorium complex. Accordingly a proposal was forwarded to the Dte. DE, Western Command vide Cantt Board letter No.DCB/8/Engg/Elec. Cre/ON/2020-21 dated 04.07.2020 for obtaining sanction of the competent authority for the project. The Dte. DE, Western Command vide letter No.30/SC/Electric Crematorium/Delhi/DE/WC dated 20.07.2020 has raised a few queries on the proposal. One of the query raised by the Dte. DE, Western Command is that what alternate mode of cremations i.e. Electricity, CNG, PNG etc. are being used by other Local bodies/ Municipal Corporation and the comparative cost analysis of CNG/PNG of crematorium mode with electric mode of cremation. Accordingly, the matter was taken up with the School of Planning & Architecture (SPA) and as per information provided by them there are 18 gas crematoriums (operational/ under construction) in Delhi whereas number of electric cremation facilities in Delhi are four. Further, as per the report of SPA, gas crematoriums are economical and electric load utilization is quite low in gas crematoriums as compared to electric crematoriums. Considering the economic viability of CNG cremation facilities, the SPA was asked to modify the conceptual plans for accommodating two gas furnaces, whereas initially one gas furnace will be commissioned and later additional gas furnace will be installed on need basis after obtaining sanction of the competent authority. The School of Planning & Architecture have submitted revised conceptual plans for provisioning of CNG cremation facilities at Village Old Nangal. The building will have provision to accommodate two gas furnaces. Further, the budgetary cost estimates for commissioning of one furnace under Phase – I works out to Rs.2,82,60,000/-.

The relevant file and office report are placed on the table.

47. Considered. The Board discussed observations received from Dte. DE, Western Command vide letter dated 20.07.2020, revised plans for the project submitted by School of Planning & Architecture (SPA), “An Institute of National Importance” under an Act of Parliament (Ministry of Human Resource Development, Govt. of India) for provisioning of CNG cremation facility under phased programme alongwith estimated cost of the project. The Board resolved to approve construction of CNG crematorium at Village Old Nangal as per revised plans submitted by SPA which provide for construction of cremation building Page 79 of 210

to house two CNG furnaces and provisioning of one furnace under Phase-I at the cost of Rs.2,82,60,000/-. The Board resolved that initially one CNG furnace will be provisioned and later second furnace shall be installed on need basis in second phase after obtaining sanction of the competent authority. The Board also decided to authorize the CEO, Member Secretary to approve further modifications needed in the plan, if any, to suit site requirements to facilitate early execution of the work.

48. DIRECTIONS ON CANTT BOARD BUDGET ESTIMATES 2020-2021 (REVISED) AND 2021-2022 (ORIGINAL)

To consider Dte. DE, Western Command letter No.15044/Bes/Gen/DE/ WC/RMS:30489 dated 21.09.2020 forwarding directions issued by GOC-in-C on BE 2020- 21 (R)& 2021-22 (O) to the Cantt Board during budget presentations made to the GOC-in-C. The following common points (directions) issued by the GOC-in-C are relevant to Cantt Board Delhi too:- a) Timely revision of taxes to be carried out as per the laid down norms. b) Assessment of properties must be carried out after every three yrs as per existing guidelines. c) Feasibility for MP/MLA funds for development in Cantt Board needs to be explored. d) Funds allotted by Fin Commission to be dedicated for development work only. e) The responsibility of Cantt Boards is only to provide primary education. For running middle & higher secondary school, feasibility of funding from State Govt. must be explored. f) A No of Govt. Offices are functioning from Cantt Board land/ buildings and not paying the service charges since long. Efforts should be made to recover all pending dues from various Govt. agencies. The point should be highlighted during CMLC also. g) Since last one year none of Cantt Board had forwarded any project to be implemented from Capital Head. It is once again reiterated that Cantt Board should forward such projects to PDDE Office on priority. h) Cantt Boards should adhere to Govt. guidelines wrt reduction of 20% in budget due to current pandemic situation. j) Cantt Board to pursue with State Govt for enrollment/ subscription under Central Schemes for welfare of the population. k) Cantt Boards should provide bills in a early time frame to avoid bunching or late payment of Taxes. l) In present COVID sit, Dalhousie Cantt had received Rs. Three Lakh out of SDRF fund from Civil administration. Other Cantt Boards should also explore the same. m) Punjab Govt. has released GST compensation to Ferozepur & Jalandhar Cantt Boards. Other Cantt Boards should also take up case with Excise & Taxation Department for the same.

Relevant file is placed on the table.

Page 80 of 210

48. Considered. The Board noted directions issued by the GOC-in-C, Western Command to the Cantonment Boards on Budget Estimates 2020-2021 (Revised) and 2021-2022 (Original) as brought out on the agenda side for compliance.

49. PROVISIONING OF PNG PIPELINE NETWORK BY INDRAPRASTHA GAS LIMITED FOR ALL OFFICERS, JCO’S, OTM ACCOMMODATION IN DELHI CANTT

To consider report of the Engineering branch with respect to PNG pipeline network by Indraprastha Gas Limited for all Officers, JCO’s, OTMaccommodation in Delhi Cantt. As per the said report Station HQ letter No.79/6/Q1 dated 19.05.2020 forwarded copies of Board proceedings for provisioning of pipe natural Gas (PNG) connection by Indraprastha Gas Limited (IGL) for all Officers, JCO’s and OTM Accommodations in Delhi Cantt. Also M/s Indraprastha Gas Limited have requested Cantt Board Delhi vide letter No.IGL/PNG/CS/PH II dated 07.09.2020 to consider and allow their proposal to lay PNG infrastructure for use of 120.081 kms Defence land inside Cantonment with 6278 pits of size 0.06 x 0.06 mtrs. IGL has proposed to lay PNG pipeline infrastructure measuring 120.081 Kms in Delhi Cantt comprising of A-1 (111061 mtrs., A-2 (600 mtrs. ) & B-4 (8420 mtrs.) lands as per details given below:

Sl. Survey No. Type of land with MDPE length (in mtrs.) Grand Total No. A-1 AA-1 A-2 B-4 MDPE length (in mtrs.) 1. Survey No.1 6180 0 0 0 6180 2. Survey No.6 950 0 0 0 950 3. Survey No.22 900 0 0 0 900 4. Survey No.31 2750 0 0 0 2750 5. Survey No.32 2000 0 0 0 2000 6. Survey No.40 3300 0 0 0 3300 7. Survey No.66 9573 0 0 0 9573 8. Survey No.79 1800 0 0 0 1800 9. Survey No.87 2300 0 0 0 2300 10. Survey No.93 4410 0 0 0 4410 11. Survey No.98 1430 0 0 0 1430 12. Survey No.99 3150 0 0 0 3150 13. Survey No.81 900 0 0 0 900 14. Survey No.82 500 0 0 0 500 15. Survey No.54 200 0 0 0 200 16. Survey No.209 300 0 0 0 300 17. Survey No.104 4000 0 0 0 4000 18. Survey No.261 430 0 0 0 430 19. Survey No.100 1470 0 0 0 1470 20. Survey No.221 0 0 0 620 620 21. Survey No.113 200 0 0 0 200 22. Survey No.154 650 0 0 0 650 23. Survey No.199 7041 0 0 0 7041 24. Survey No.46 0 0 0 1000 1000

Page 81 of 210

25. Survey No.26B 300 0 0 0 300 26. Survey No.26 4200 0 0 0 4200 27. Survey No.14 300 0 0 0 300 28. Survey No.249 100 0 0 0 100 29. Survey No.196 150 0 0 0 150 30. Survey No.12 3200 0 0 0 3200 31. Survey No.43 700 0 0 0 700 32. Survey No.25 300 0 0 0 300 33. Survey No.253 7897 0 0 0 7897 34. Survey No.11 900 0 0 0 900 35. Survey No.213 1550 0 0 0 1550 36. Survey No.88 1000 0 0 0 1000 37. Survey No.105 890 0 0 0 890 38. Survey No.130 4000 0 0 0 4000 39. Survey No.129 0 0 0 700 700 40. Survey No.106 1650 0 0 0 1650 41. Survey No.219 10450 0 0 0 10450 42. Survey No.145 1000 0 0 0 1000 43. Survey No.274 2000 0 0 0 2000 44. Survey No.158 0 0 600 0 600 45. Survey No.268 7700 0 0 0 7700 46. Survey No.270/1 8340 0 0 0 8340 47. Survey No.189 0 0 0 1800 1800 48. Survey No.8 0 0 0 4300 4300 MDPE Length inside 111061 0 600 8420 120081 Delhi Cantt (Sum of S. No.1 to 48)

The Govt. of India, Ministry of Defence vide ID No.B/87898/Plg(Lands)/2016/95/ SO(II)/D(Lands) dated 01.03.2017 have issued policy for “Provisioning of PNG infrastructure to OTM and Married Accommodation Projects to create Pipe Natural Gas (PNG) Pipeline Infrastructure with all residential areas/ unit lines of Defence”. The Para 2 (III) of the policy provides that, ‘In areas where both Class A-1 land and other class of Defence land is involved in Cantonment area for laying of PNG infrastructure, the applicant/ PNG company will have to apply to the CEO of the Cantonment Board. However, Cantonment Board will have to obtain NOC from Station HQ for laying of PNG line on A-1 land before the application is processed for sanction’. In the present case Station HQ has itself forwarded the proposal for laying of PNG lines to Cantt Board Delhi.

The provisioning of PNG infrastructure for OTM and Married Accommodation projects to create Piped Natural Gas (PNG) network has been provided in the policy issued by the Ministry of Defence letter No.B/87898/Plg(Lands)/2016/95/SO(II)/D(Lands) dated 01.03.2017. In areas where both class A-1 and other class of Defence land are involved, the license will be issued by the Cantonment Board as per provisions of the Cantonments Act, 2006. The sanctioning authority for provisioning of PNG infrastructure/ pipe line as per policy dated 01.03.2017 is Principal Director, Defence Estates of the Command.

Page 82 of 210

The initial period for license of Defence land for PNG infrastructure/ pipe line will be of 10 years. The license can be renewed on expiry of initial license period for further period of 10 years at the option of lessee. As per policy permission to use Defence land to Government owned PNG companies for laying underground pipe line will accorded at an annual license fee @ Rs.1/- per running meter. However the PNG company shall be required to adhere to the policy guidelines dated 01.03.2017 scrupulously.

The Board may consider the proposal for laying of PNG lines/ infrastructure for OTM and Married Accommodation projects in residential areas and unit lines of Defence through Indraprastha Gas Limited in terms of policy guidelines issued by the competent authority on the subject dated 01.03.2017.

The relevant file and office report are placed on the table.

49. Considered. The Board noted proposal for setting up of PNG infrastructure by M/s Indraprastha Gas Limited for Officer, JCOs and OTM Accommodation in Delhi Cantonment forwarded by the Station HQ vide letter No. 79/6/Q1 dated 19.05.2020 as brought out on the agenda side. The proposal was discussed at length and the Board resolved to recommend the case to the Principal Director Defence Estates, Western Command for according requisite sanction as per policy on the subject issued by Govt. of India, Ministry of Defence vide letter No.B/87898/Plg(Lands)/2016/95/SO(II)/D(Lands) dated 01.03.2017.

Smt. Kavita Jain, Member requested the Board to consider providing PNG facilities for civilian residents of the Cantonment. The Board decided that request of the Member shall be considered in terms of policy guidelines issued by the competent authority in this regard.

50. CONSTRUCTION OF RESIDENTIAL ACCOMMODATION OF JT. CEO, DELHI CANTONMENT BOARD& CMO, CANTONMENT GENERAL HOSPITAL, DELHI CANTT

To consider report of the Engineering branch regarding Construction of residential accommodation of Jt. CEO, Delhi Cantonment Board & CMO, Cantonment General Hospital, Delhi Cantt. As per the said report the Board vide CBR No.33 dated 21.03.2020 decided to construct Jt. CEO, Cantt Board Delhi & CMO, Cantt General Hospital official accommodation at Sadar Bazar. For the purpose of conceptualization & designing of Staff accommodation, it is proposed to engage a suitable agency for conceptualization of the project.

The relevant file and office report are placed on the table.

50. Considered. The matter was discussed at length and the Board resolved to engage School of Planning & Architecture (SPA), “An Institute of National Importance” under an Act of Parliament (Ministry of Human Resource Development, Govt. of India) for institutional consultancy for the project. The Board further resolved to authorize the CEO, Member-Secretary to take further action for engagement of SPA, finalization of consultancy fee, execution of agreement with the institute and to incur necessary expenditure thereon.

Page 83 of 210

51. IMPROVEMENT TO DRAINAGE SYSTEM IN DELHI CANTT

To consider report of the Engineering branch regarding improvement to drainage system in Delhi Cantonment. As per the said report the Board vide CBR No.11 dated 05.03.2019 had considered issue of rejuvenation of drainage system of Delhi Cantonment as per recommendations given in the Drainage Master Plan of Delhi, which needs to be complied by Delhi Cantonment Board and periodic reports are required to be furnished to Hon’ble Court/ Monitoring Committee. The Board vide CBR No.11 dated 05.03.2019 had noted that earlier Board had engaged School of Planning & Architecture (SPA) for reconstruction/ rejuvenation of three major drains in Delhi Cantonment under institutional consultancy from School of Planning & Architecture @ 4% of the cost of work. The Board had resolved to obtain institutional consultancy rates for implementation of recommendations contained in Drainage Master Plan of Delhi to improve drainage system of Delhi Cantonment as per orders of Hon’ble NGT from IIT Delhi. The Board further decided that the final decision in the matter will be arrived after comparison of institutional consultancy rates offered by IIT Delhi with rates offered by SPA. Accordingly, the matter was taken up with the Director IIT Delhi vide Cantt Board letter No.DCB/8/Engg/Drainage/2019-20 dated 11.06.2019 to ascertain feasibility of IIT Delhi to provide institutional consultancy for rejuvenation/ rehabilitation of existing drainage system of Delhi Cantonment by IIT Delhi and the consultancy fee institute will charged in this regard. The IIT Delhi has consented to provide institutional consultancy and the consultancy services shall include broadly the following:- i) Hydro dynamic analysis and preliminary cost estimates ii) A comprehensive urban hydrological and hydraulic modeling study under scenario of present and future land use.

The IIT Delhi has requested institutional consultancy fee of Rs.125 lakh plus applicable GST for the same.

The relevant file and office report are placed on the table.

51. Considered. The Board carefully noted contents of proposal submitted by IIT Delhi for providing institutional consultancy for comprehensive hydrological and hydraulic modeling of drainage system of Delhi Cantonment and resolved to approve the consultancy charges requested by the IIT Delhi amounting to Rs.125 lacs plus applicable taxes. The Board further resolved to authorize the CEO, Member-Secretary to include any further study/ task in the scope of aforementioned consultancy services and to incur additional expenditure, if any, in this regard.

52. PROVISIONING OF STAFF QTRS., DELHI CANTONMENT BOARD

To consider report of the Engineering branch with respect to provisioning of Staff Qtrs., at Delhi Cantt. As per the said report the sanctioned staff strength of the Board is 922 employees, whereas existing staff Qtrs available are 165 nos. Requests are also being received from Medical & Para Medical staff engaged by the Board for Cantt General Hospital on contractual basis for allotment of staff accommodation at applicable terms and conditions for attending medical emergencies. Page 84 of 210

Board has three proposals for construction of Staff Qtrs. which were submitted to the Dte. DE, Western Command for according sanction of the competent authority. The Dte. DE, Western Command have raised queries to proposals of Staff Qtrs. initiated by the Board wherein it has been asked, “How many officials have applied for Govt. accommodation and how many requests are pending for allotment of said type of Govt. accommodation and how many requests are pending for allotment of said type of Govt. accommodation, as on date”. Accordingly, this office has reviewed the requirement of Staff Qtrs. and it is proposed to reduce the number of Staff Qtrs. to be constructed, however necessary provisions to be made in the building designs for future expansions to meet any additional Staff Qtrs. demand at a later date. The details of number of Staff Qtrs. proposed originally and revised number of Staff Qtrs. now proposed to be constructed with budgetary details are given as under:

Sl. Details of Project Original proposal Revised Proposal No. Nos. No. of Amount of Nos. No. of Amount of of Stories work of Stories work Qtrs. Qtrs. 1. Construction of 40 Stilt Rs.11,17,65,000/- 20 Ground Rs.4,84,84,951/- Multi Storied Fire plus 8 plus 3 Staff Qtrs (Type-II) Opp. DAV School, Delhi Cantt 2. Reconstruction of 50 Ground Rs.7,66,60,000/- 30 Ground Rs.4,98,43,120/- Staff Qtrs at Village plus 4 plus 2 Jharera, Delhi Cantt 3. Construction of Staff 32 Stilt Rs.8,07,40,000/- 16 Ground Rs.3,61,04,781/- Qtrs (DAV School), plus 8 plus 3 Sadar Bazar

The Board may consider revised proposal in respect of construction of Staff Qtrs. at aforementioned locations alongwith revised amount of proposals.

The relevant file and office report are placed on the table.

52. Considered. The Board discussed at length queries raised by Dte. DE, Western Command as regards to provisioning of Staff Qtrs. at Delhi Cantt and the Board was of the considered opinion that the number of Staff Qtrs. available (165 nos., excluding 11 Staff Qtrs. existing at Village Jharera declared structurally weak for which demolition action has already been initiated by the Board) are grossly inadequate vis-à-vis sanctioned staff strength of the Cantt Board (922 employees) and there is need for construction of additional Staff Qtrs. The Board also discussed curtailment in number of Staff Qtrs. proposed on the agenda side alongwith revised cost of construction of these Staff Qtrs. and resolved to approve the same. The Board further decided that the construction of proposed Staff Qtrs. should entail provisions for future expansions too.

Smt. Kavita Jain, Member requested the Board to consider reconstruction of Mali Qtrs at Sri Nagesh Garden with optimum utilization of land in multi storied construction. The Board decided that the request made by Member be examined by the CEO, Member- Secretary as per requirement.

Page 85 of 210

53. PROVISIONING OF CLASS ROOMS, LABORATORIES ETC AT SILVER OAK MODEL SCHOOLFOR PROPOSED UPGRADATION FROM SECONDARY LEVEL TO SENIOR SECONDARY LEVEL.

To consider report of the Engineering branch with respect to provisioning of Classrooms, laboratories etc at Silver Oak School. As per the said report Silver Oak Model School is presently upto Secondary level, whereas in the past Board has approved a proposal to upgrade the school from Secondary level to Senior Secondary level, which will inter-alia require provisioning of additional rooms and laboratories. For conceptualization & designing of the project, the Board may consider engagement of suitable architectural firm.

The relevant file and office report are placed on the table.

53. Considered. The Board discussed at length the issue of provisioning of additional rooms and laboratories at Silver Oak Model School for its proposed upgradation from secondary level to Sr. Secondary level and resolved to approve construction of an additional block within school premises. The Board resolved to engage School of Planning & Architecture (SPA), “An Institute of National Importance” under an Act of Parliament (Ministry of Human Resource Development, Govt. of India) for institutional consultancy for the project. The Board further resolved to authorize the CEO, Member-Secretary to take further action for engagement of SPA, finalization of consultancy fee, execution of agreement with the institute and to incur necessary expenditure thereon.

54. SURVEY OF DEFENCE LAND

To consider report of Engineering branch regarding survey of Defence land in Delhi Cantonment. As per the said report Cantt Board has undertaken survey of Defence land under survey Phase-I & Phase-II as per the directions issued from the office of DGDE and PD DE, Western Command in this regard from time to time. During the survey of Defence land in Delhi Cantonment variations in the GLR & GIS areas were noticed in a few survey numbers which inter-alia require land reconciliation, amendments in GLR etc. The amendment in GLR, land reconciliation may also require physical demarcation of a few survey numbers to timely complete land reconciliation task, preparation of shape files of land under encroachments etc which would require both comprehensive and targeted DGPS survey involving expert agencies. The Board may consider authorizing the CEO, Member-Secretary to engage a suitable survey agency for the work of land reconciliation, preparation of shape files of encroachments and other ancillary works.

Relevant file is placed on the table.

54. Considered. The Board discussed issue of reconciliation of variations in GLR and GIS areas inter alia requiring proposals for amendments in GLR, mapping of encroachments and preparation of shape files etc in detail and the Board resolved to authorize the CEO, Member-Secretary to engage suitable survey agencies for the work of lands/ buildings survey, reconciliation with GLR, preparation of shape files etc from time to time and to incur necessary expenditure in this regard. Page 86 of 210

55. CADRE RESTRUCTURING : DELHI CANTONMENT

To consider office report regarding cadre restructuring of Cantt Board Delhi. In the said report, it has been brought out that in the recent times, mandate given by 74th Constitutional (Amendment) Act for strengthening local governance by devolution of funds, function and functionaries to urban local bodies has acquired significance in terms of creation of dedicated municipal cadre for delivering the devolved functions. The existing cadre structure of Cantt Board Delhi is archaic and obsolete, and is not equipped to respond to the present day requirements of civic administration. The present cadre structure of Cantt Board Delhi is of 1960’s vintage and it continues to include some posts like Dog Shooter, Masalchietc which have long lost their relevance and usage. Coupled with this, various aspects of Cantonment administration need specialized expertise especially in the field of IT, Waste Management, Town Planning, Engineering design, Hospital Management and professional handling of ever increasing court cases. Over a period of time schools have been upgraded from primary level to senior secondary level, Cantonment General hospital has been upgraded from primary care level to Secondary level. Now a days lot of emphasis is being given to record management, digitization of land records, reconciliation of land records, surveying of land using innovative techniques &softwares. Also Hon’ble Supreme Court, High Court, National Green Tribunal etc have been issuing numerous directions for timely implementation by local urban bodies on issues concerning Environment, Air/ noise/ liquid pollution, solid waste management, wet bodies management etc and timely implementation of these orders need experts on the subject. After Cadre Structuring of Cantt Board Delhi in 1960’s the functions of Board have escalated many folds but commensurate staff to handle multifarious activities/ functions to fulfill aspirations of public at large is lacking. It is seen that the adjoining municipal bodies are more structured bodies to deal with challenges of the date. Thus there is an urgent need to review the structure of existing cadre alongwith the feeder cadre so as to harmonise the functional needs and at the same time cater to the genuine career progression expectations of the existing staff. There is also a need to review the minimum educational qualifications of some of the existing posts considering the increased usage of technology in municipal work. The Board may consider.

55. Considered. The Board discussed existing cadre structure of the Board and noted that functioning of Board continues to change and evolve over a period of time requiring restructuring of cadre and engagement of experts especially in the field of IT, Waste Management, Town Planning, Engineering design, Hospital Management etc. The Board opined that over a period of time the functions performed by the Board have increased manifold and that there is requirement of streamlining the functioning/ cadre of the Board to suit the modern requirements. The Board also noted with concern that adequate promotional avenues to existing Cantt Board staff are lacking whereas every Govt. servant aspires for career progression. Stagnation not only demoralizes the staff but affects their performance too. The Board also noted that there has been a sea change in the nature of work of Cantt Boards and usage of technology is predominant in all spheres of activities performed by Cantt Boards which necessitate creation of posts to tackle technological advances. The matter was discussed at length and the Board resolved to authorize the CEO, Member-Secretary to engage suitable agency/ consultant to undertake cadre restructuring of the Board and to incur necessary expenditure thereon. The Board further decided that

Page 87 of 210

the report on cadre restructuring be placed before the Board after finalization for its consideration and approval.

56. MAINTENANCE/ OPERATION, ROUND THE CLOCK SAFETY, PERIODICAL CLEANLINESS AND COMPREHENSIVE MAINTENANCE OF TOILET BLOCKS/URINALS IN DELHI CANTONMENT BOARD AREA.

To consider report of the Engg. branch with regard to the subject work & tender process. As per the report tender for maintenance/ operation of modern toilet blocks the Board vide FC/CBR No. 7/2 dated 25.02.2020/21.03.2020 had considered the terms & conditions of the contract and had resolved to approve the same.

Accordingly tenders for work were invited after advertising in the local dailies. The critical dates for publishing and receipt of tenders for the subject work are as shown below: 1. Dated of release of tender through e-procurement : 28.02.2020 at 1700 hrs 2. Last date & time for downloading of tender document : 23.03.2020 upto 1300 hrs 3. Last date and time submission of e-tenders : 23.03.2020 upto 1300 hrs 4. Date and time for opening of e-tenders : 24.03.2020 at 1330 hrs Due to Covid 19 date of receipt of tenders was extended and on 29.05.2020, Six bids were received and found to be responsive and in order. The rates quoted by the agencies are given as under:-

Sr. Name of agency Amount No. 1. M/s U K Security Services 4,50,000/- Per Month 2. M/s Amit Associates 8,02,950/- Per Month 3. M/s S.K Enterprises 7,99,199/- Per Month 4. M/s Agarwal & Company 90,00,000/- Per Month 5. M/s Ganpati Traders 8,85,000/- Per Month 6. M/s Aakanksha Enterprises 7,78,385/- Per Month

M/s U K Security Services, 12, Sri Ram Nagar, 3rd Street, Opp. C.L.R.I. Taramani Post, Chennai are the lowest bidder and have quoted amount for Rs.4,50,000/- per month and the rate quoted by the lowest tenderer are considered reasonable and it is recommended to accept the lowest tender. If approved, the above lowest tender will be accepted and Agreement for the award of contract will be made.

The relevant file and office report are placed on the table.

56. Considered. The Board carefully noted the rates quoted by the agencies as brought out on the agenda side and after deliberations the Board resolved to approve lowest tender of M/s U K Security Services amounting to Rs.4,50,000/- (Rupees Four Lakh Fifty Thousand only) per month. The Board further resolved to authorize the CEO, Member-Secretary to increase/ decrease maintenance of number of toilet blocks under the contract as per actual need from time to time and to incur necessary expenditure in this regard.

Page 88 of 210

57. TERM CONTRACT FOR REPAIR TO CIVIC AMENITIES LIKE DUSTBIN, GROUP LATRINES, URINAL, WATER THROUGH AND OTHER ALLIED STRUCTURE IN WARD NO.1& 5, DELHI CANTT To consider report of the Engg. branch with regard to the subject term contract & tender process. As per the report tenders for the subject work were called for the second time through e-tendering after advertising in the National dailies. In the first call single tender was received and the technical bids were not opened in terms of the decision of the Board contained in CBR No.2(iii) dated 31.08.2017. Tenders were re-invited due to poor competition and the critical dates for publishing and receipt of tenders for the subject work are as shown below:

1. Date of release of tender through e-procurement : 05.08.2020 at 1700 hrs 2. Last date & time for downloading : 27.08.2020upto 1300 hrs 3. Last date & time submission of e-tenders : 27.08.2020upto 1300 hrs 4. Date and time for opening of e-tender : 28.08.2020 at 1330 hrs

On 28.08.2020, four bids were received and three bids have been found to be responsive and in order. The bid of M/s S.K. Enterprises has been found to be non- responsive. The rates quoted by the three agencies are given as under:-

Sr. No. Name of agency Percentage 1. M/s Kansal Construction Co. 15.88% below as per MES SSR 2010 2. M/s Amit Associates 8.53% below as per MES SSR 2010 3. M/s Puja Construction Company 2% above as per MES SSR 2010

M/s Kansal Construction Co. are the lowest bidder and have quoted 15.88% below MES SSR 2010. The rates quoted by the lowest tenderer are considered reasonable and it is recommended to accept the lowest tender. The rates of ongoing contract approved by the Board is 19.20% below MES SSR 2010. If approved, the above lowest tender will be accepted and Agreement for the award of contract will be made.

The relevant file and office report are placed on the table.

57. Considered. The Board carefully noted the rates quoted by the agencies as brought out on the agenda side and after deliberations the Board resolved to approve lowest tender of M/s Kansal Construction Co. @ 15.88% below MES SSR 2010. The existing contract shall continue till new contract is awarded.

58. TERM CONTRACT FOR WHITE WASH/ DISTEMPER, CEMENT PAINT ETC TO CF PROPERTIES OF DELHI CANTONMENT BOARD, DELHI CANTT

To consider report of the Engg. branch with regard to the subject term contract & tender process. As per the report tenders for the subject work were called for the third time through e-tendering after advertising in the National dailies. In the first call no tender was received and in the second call tender was rejected being rates are on higher side.The critical dates for publishing and receipt of tenders for the subject work are as shown below:

Page 89 of 210

1. Date of release of tender through e-procurement : 05.08.2020 at 1700 hrs 2. Last date & time for downloading : 27.08.2020upto 1300 hrs 3. Last date & time submission of e-tenders : 27.08.2020upto 1300 hrs 4. Date and time for opening of e-tender : 28.08.2020 at 1330 hrs

On 28.08.2020, four bids were received and three bids have been found to be responsive and in order. The bid of M/s S.K. Enterprises has been found to be non- responsive. The rates quoted by the three agencies are given as under:-

Sr. No. Name of agency Amount 1. M/s Amit Associates Rs.75,31,000/- 2. M/s Kansal Construction Co. Rs.79,64,950/- 3. M/s Puja Construction Company Rs.1,05,91,000/-

M/s Amit Associates are the lowest bidder and have quoted an amount of Rs.14,11,000/- for item rate schedule and have quoted 32% below MES SSR 2010 for percentage rate schedule, the total amount quoted by the lowest tenderer works out to Rs.75,31,000/-. In the last contract approved rates for provisional sum were 45% below MES SSR 2010 whereas in the present contract rates percentage quoted by the lowest tenderer is 32% below MES SSR 2010. On overall comparison of rates of the lowest tenderer with the last contract for the same work approved by the Board vide FC/CBR No.16/03 dated 10.09.2018/24.09.2018, it is seen that rates of last contract for the corresponding items in the present contract were Rs.61,98,693/- where in the present contract this amount works out to Rs.75,31,000/-. The rates quoted by the lowest tenderer are considered reasonable and it is recommended to accept the lowest tender.If approved, the above lowest tender will be accepted and Agreement for the award of contract will be made.

The relevant file and office report are placed on the table.

58. Considered. The Board carefully noted the rates quoted by the agencies as brought out on the agenda side and after deliberations the Board resolved to approve lowest tender of M/s Amit Associates amounting to Rs.75,31,000/- (Rupees Seventy Five Lakh Thirty One Thousand Only).

59. TERM CONTRACT FOR REPAIRS TO HARD STANDING, BRICK PAVING, ROUNDABOUTS, TRAFFIC ISLANDS, PARK AND LIKE IN WARD NO.1, 2, 3&5 DELHI CANTONMENT

To consider report of the Engg. branch with regard to the subject term contract & tender process. As per the report tenders for the subject work were called for the first time through e-tendering after advertising in the National dailies. The critical dates for publishing and receipt of tenders for the subject work are as shown below: 1. Date of release of tender through e-procurement : 05.08.2020 at 1700 hrs 2. Last date & time for downloading : 27.08.2020upto 1300 hrs 3. Last date & time submission of e-tenders : 27.08.2020upto 1300 hrs 4. Date and time for opening of e-tender : 28.08.2020 at 1330 hrs Page 90 of 210

On 28.08.2020, four bids were received and all the bids have been found to be responsive and in order. The rates quoted by the four agencies are given as under:-

Sr. No. Name of agency Amount 1. M/s Kansal Construction Co. Rs.2,00,97,200/- 2. M/s Puja Construction Company Rs.2,12,81,400/- 3. M/s Choudhary Contractors & Suppliers Rs.2,23,20,000/- 4. M/s Amit Associates Rs.5,16,48,400/-

M/s Kansal Construction Co.are the lowest bidder and have quoted an amount of Rs.69,58,000/- for item rate schedule and have quoted 17.88% below MES SSR 2010 for percentage rate schedule, the total amount quoted by the lowest tenderer works out to Rs.2,00,97,200/-. The rates quoted by the lowest tenderer are considered reasonable and it is recommended to accept the lowest tender. The rates of ongoing contract approved by the Board of the same work were 26.5% below MES SSR 2010 for Ward No.1 &5 whereas for Ward No.2 & 3 the approved rates were 26% below MES SSR 2010.If approved, the above lowest tender will be accepted and Agreement for the award of contract will be made.

The relevant file and office report are placed on the table.

59. Considered. The Board carefully noted the rates quoted by the agencies as brought out on the agenda side and after deliberations the Board resolved to approve lowest tender of M/s Kansal Construction Co. amounting to Rs.2,00,97,200/- (Rupees Two Lakh Ninety Seven Thousand & Two Hundred Only). The existing contract shall continue till new contract is awarded.

60. TERM CONTRACT FOR IMPROVEMENT, REPAIR, CONSTRUCTION OF FOOTPATH/ WALKING PLAZA, JOGGING TRACKS IN DELHI CANTONMENT

To consider report of the Engg. branch with regard to the subject term contract & tender process. As per the report tenders for the subject work were called for the first time through e-tendering after advertising in the National dailies. The critical dates for publishing and receipt of tenders for the subject work are as shown below: 1. Date of release of tender through e-procurement : 05.08.2020 at 1700 hrs 2. Last date & time for downloading : 27.08.2020upto 1300 hrs 3. Last date & time submission of e-tenders : 27.08.2020upto 1300 hrs 4. Date and time for opening of e-tender : 28.08.2020 at 1330 hrs

On 28.08.2020, four bids were received and all the bids have been found to be responsive and in order. The rates quoted by the four agencies are given as under:-

Sr. No. Name of agency Amount 1. M/s Kansal Construction Co. Rs.5,00,44,450/- 2. M/s Amit Associates Rs.5,29,72,100 3. M/s Puja Construction Company Rs.5,44,90,500/- 4. M/s S.N. Malhotra & Sons Rs.5,82,59,400/- Page 91 of 210

M/s Kansal Construction Co. are the lowest bidder and have quoted Rs.5,00,44,450/-. Analysis of rates for major items have been drawn and the rates quoted by the lowest tenderer are considered reasonable and it is recommended to accept the lowest tender. If approved, the above lowest tender will be accepted and Agreement for the award of contract will be made.

The relevant file and office report are placed on the table.

60. Considered. The Board carefully noted the rates quoted by the agencies as brought out on the agenda side and after deliberations the Board resolved to approve lowest tender of M/s Kansal Construction Co. amounting to Rs.5,00,44,450/- (Rupees Five Lakh Forty Four Thousand Four Hundred & Fifty Only). The existing contract shall continue till new contract is awarded.

61. TERM CONTRACT FOR REPAIR/ REPLACEMENT OF GI PIPE AND ALLIED WORK IN DELHI CANTT

To consider the report of E&M section of engineering branch with respect to subject term contract. As per the said report tenders for the subject work were called for the second call through e-tendering after advertising in National dailies. In first call single tender was received and due to poor competition re-tendering is undertaken causing thereby delay in conclusion of tender. Also tender process was delayed due to Covid-19. The critical dates for publishing and receipt of tenders for the subject work are as shown below:

1. Date of release of tender through e-procurement : 22.05.2020 at 1800 hrs 2. Last date & time for downloading : 16.06.2020 upto 1300 hrs 3. Last date & time of submission of e-tenders : 16.06.2020 upto 1300 hrs 4. Last date & time for opening of e-tenders : 17.06.2020 upto 1330 hrs On 17.06.2020, three bids were received and two bids have been found to be responsive and in order. The bid of M/s S.K. Enterprises has been found to be non- responsive on account of non submission of requisite documents. The rates quoted by the two agencies are given as under:-

Sl. No. Name of Agency Percentage 1. M/s Kansal Construction Co. 3.65% below as per MES SSR 2010 2. M/s Amit Associates 28.53% above as per MES SSR 2010

M/s Kansal Construction Co.are the lowest bidder and have quoted 3.65% below MES SSR, 2010. The rates quoted by the lowest tenderer are considered reasonable and recommended to accept the lowest tender. The present contract will continue till the finalization of the new contract. The Board may consider the tender.

Relevant file is placed on the table.

Page 92 of 210

61. Considered. The Board carefully noted the rates quoted by the agencies as brought out on the agenda side and after deliberations the Board resolved to approve lowest tender of M/s Kansal Construction Co. @ 3.65% below MES SSR 2010. The existing contract shall continue till new contract is awarded.

62. TERM CONTRACT FOR REPAIR/ REPLACEMENT OF INTERNAL ELECTRIFICATION AND ALLIED WORKS IN DELHI CANTT

To consider the report of E&M section of engineering branch with respect to subject term contract. As per the said report tenders for the subject work were called for the first time through e-tendering after advertising in National dailies. The critical dates for publishing and receipt of tenders for the subject work are as shown below:

1. Date of release of tender through e-procurement : 23.05.2020 at 1800 hrs 2. Last date & time for downloading : 16.06.2020 upto 1300 hrs 3. Last date & time of submission of e-tenders : 16.06.2020 upto 1300 hrs 4. Last date & time for opening of e-tenders : 17.06.2020 upto 1330 hrs On 17.06.2020, four bids were received and three bids have been found to be responsive and in order. The bid of M/s CIS Electricals (P) Ltd. has been found to be non- responsive on account of non submission of requisite documents. The rates quoted by the three agencies are given as under:-

Sl. No. Name of Agency Percentage 1. M/s Amit Associates 25.53% below as per MES SSR 2010 2. M/s Royal Electrical Company 38.05% below as per MES SSR 2010 3. M/s Gogia Brothers 24.11% below as per MES SSR 2010

M/s Royal Electrical Company are the lowest bidder and have quoted 38.05% below MES SSR, 2010. The rates quoted by the lowest tenderer are considered reasonable and recommended to accept the lowest tender. The Board may consider the tender.

Relevant file is placed on the table.

62. Considered. The Board carefully noted the rates quoted by the agencies as brought out on the agenda side and after deliberations the Board resolved to approve lowest tender of M/s Royal Electrical Company @ 38.05% below MES SSR 2010. The existing contract shall continue till new contract is awarded.

63. TERM CONTRACT FOR REPAIR/ REPLACEMENT OF EXTERNAL ELECTRIFICATION ALLIED WORKS IN DELHI CANTT

To consider the report of E&M section of engineering branch with respect to subject term contract. As per the said report tenders for the subject work were called for the first time through e-tendering after advertising in National dailies. The critical dates for publishing and receipt of tenders for the subject work are as shown below:

Page 93 of 210

1. Date of release of tender through e-procurement : 21.05.2020 at 1800 hrs 2. Last date & time for downloading : 11.06.2020 upto 1300 hrs 3. Last date & time of submission of e-tenders : 11.06.2020 upto 1300 hrs 4. Last date & time for opening of e-tenders : 12.06.2020 upto 1330 hrs On 12.06.2020, two bids were received and both the bids have been found to be responsive and in order. The rates quoted by the two agencies are given as under:-

Sl. No. Name of Agency Percentage 1. M/s Amit Associates 38.53% below as per MES SSR 2010 2. M/s Gogia Brothers 27.55% above as per MES SSR 2010

M/s Amit Associates are the lowest bidder and have quoted 38.53% below MES SSR, 2010. The rates quoted by the lowest tenderer are considered reasonable and recommended to accept the lowest tender. The present contract will continue till the finalization of the new contract. The Board may consider the tender.

Relevant file is placed on the table.

63. Considered. The Board carefully noted the rates quoted by the agencies as brought out on the agenda side and after deliberations the Board resolved to approve lowest tender of M/s Amit Associates@ 38.53% below MES SSR 2010. The existing contract shall continue till new contract is awarded.

64. TERM CONTRACT FOR MAINTENANCE OPERATION OF 4 CETP INSTALLED AT VARIOUS COMMUNITY CENTRE OF DELHI CANTONMENT BOARD, DELHI CANTT

To consider the report of E&M section of engineering branch with respect to subject term contract. As per the said report tenders for the subject work were called for the second time through e-tendering after advertising in National dailies. In first call single tender was received and due to poor competition re-tendering is undertaken causing thereby delay in timely conclusion of tender. The critical dates for publishing and receipt of tenders for the subject work are as shown below:

1. Date of release of tender through e-procurement : 23.05.2020 at 1800 hrs 2. Last date & time for downloading : 16.06.2020 upto 1300 hrs 3. Last date & time of submission of e-tenders : 16.06.2020 upto 1300 hrs 4. Last date & time for opening of e-tenders : 17.06.2020 upto 1330 hrs On 17.06.2020, two bids were received and both the bids have been found to be responsive and in order. The rates quoted by the two agencies are given as under:-

Sl. No. Name of Agency Amount 1. M/s Amit Associates Rs.19,92,250/- 2. M/s LG Builders Rs.22,01,000/-

M/s Amit Associates are the lowest bidder and have quoted Rs.19,92,250. Analysis of rates has been drawn and as compared to analysis the rates quoted by the lowest tenderer are considered reasonable and recommended to accept the lowest tender. The Page 94 of 210

present contract will continue till the finalization of the new contract. The Board may consider the tender.

Relevant file is placed on the table.

64. Considered. The Board carefully noted the rates quoted by the agencies as brought out on the agenda side and after deliberations the Board resolved to approve lowest tender of M/s Amit Associates amounting to Rs.19,92,250/- (Rupees Nineteen Lakh Ninety Two Thousand Two Hundred & Fifty Only). The existing contract shall continue till new contract is awarded.

65. CLEANING AND CHEMICAL TREATMENT OF UNDERGROUND RESERVOIRS AND OVERHEAD TANKS OF DELHI CANTONMENT BOARD, DELHI CANTT (TWICE IN A YEAR)

To consider the report of E&M section of engineering branch with respect to subject term contract. As per the said report tenders for the subject work were called for the first time through e-tendering after advertising in National dailies. The critical dates for publishing and receipt of tenders for the subject work are as shown below:

1. Date of release of tender through e-procurement : 21.05.2020 at 1800 hrs 2. Last date & time for downloading : 11.06.2020 upto 1300 hrs 3. Last date & time of submission of e-tenders : 11.06.2020 upto 1300 hrs 4. Last date & time for opening of e-tenders : 12.06.2020 upto 1330 hrs On 12.06.2020, two bids were received and both the bids have been found to be responsive and in order. The rates quoted by the two agencies are given as under:-

Sl. No. Name of Agency Amount 1. M/s Amit Associates Rs.4,36,991/- 2. M/s Vinayak Security & Allied Services Rs.4,00,441/-

M/s Vinayak Security & Allied Services are the lowest bidder and have quoted Rs.4,00,441/-. The rates quoted by the lowest tenderer are considered reasonable and recommended to accept the lowest tender. The Board may consider the tender.

Relevant file is placed on the table.

65. Considered. The Board carefully noted the rates quoted by the agencies as brought out on the agenda side and after deliberations the Board resolved to approve lowest tender of M/s Vinayak Security & Allied Services amounting to Rs.4,00,441/- (Rupees Four Lakh Four Hundred & Forty One Only).

66. TERM CONTRACT FOR CLEANING OF BOREWELLS AND OTHER ALLIED WORK, DELHI CANTT

To consider the report of E&M section of engineering branch with respect to subject term contract. As per the said report tenders for the subject work were called for the second time through e-tendering after advertising in National dailies. In first call single tender was received and due to poor competition re-tendering is undertaken causing

Page 95 of 210

thereby delay in timely conclusion of tender. The critical dates for publishing and receipt of tenders for the subject work are as shown below:

1. Date of release of tender through e-procurement : 23.05.2020 at 1800 hrs 2. Last date & time for downloading : 16.06.2020 upto 1300 hrs 3. Last date & time of submission of e-tenders : 16.06.2020 upto 1300 hrs 4. Last date & time for opening of e-tenders : 17.06.2020 upto 1330 hrs On 17.06.2020, two bids were received and both the bids have been found to be responsive and in order. The rates quoted by the two agencies are given as under:-

Sl. No. Name of Agency Amount 1. M/s Amit Associates Rs.15,20,610/- 2. M/s LG Builders Rs.14,76,934/-

M/s LG Builders are the lowest bidder and have quoted Rs.14,76,934/-. The rates quoted by the lowest tenderer are considered reasonable and recommended to accept the lowest tender. The present contract will continue till the finalization of the new contract. The Board may consider the tender.

Relevant file is placed on the table.

66. Considered. The Board carefully noted the rates quoted by the agencies as brought out on the agenda side and after deliberations the Board resolved to approve lowest tender of M/s LG Builders amounting to Rs.14,76,934/- (Rupees Fourteen Lakh Seventy Six Thousand Nine Hundred & Thirty Four Only). The existing contract shall continue till new contract is awarded.

67. SUPPLYING & INSTALLATION OF ORNAMENTAL POLE WITH LED LIGHT AT SILVER OAK SCHOOL, SVBP SCHOOL, CB OFFICE & DUSSEHRA GROUND, SADAR BAZAR, DELHI CANTT

To consider the report of E&M section of engineering branch with respect to subject term contract. As per the said report tenders for the subject work were called for the first time through e-tendering after advertising in National dailies as the proposal was approved by the Board vide CBR-14 dated 05.03.2019. The critical dates for publishing and receipt of tenders for the subject work are as shown below:

1. Date of release of tender through e-procurement : 24.07.2020 at 1800 hrs 2. Last date & time for downloading : 20.08.2020 upto 1300 hrs 3. Last date & time of submission of e-tenders : 20.08.2020 upto 1300 hrs 4. Last date & time for opening of e-tenders : 21.08.2020 upto 1330 hrs On 21.08.2020, five bids were received and three bids have been found to be responsive and in order. The bid of M/s Satyabhama & Co. and M/s Kansal Construction Co. have been found to be non-responsive due to non submission of requisite documents. The rates quoted by the agencies are given as under:-

Page 96 of 210

Sl. No. Name of Agency Amount 1. M/s Akay Electricals Rs.75,54,085/- 2. M/s LG Builders Rs. 77,62,975/- 3. M/s M J Electricals & Rs. 99,89,000/- Electronics

M/s Akay Electricals are the lowest bidder and have quoted Rs.75,54,085/-. The rates quoted by the lowest tenderer are considered reasonable and recommended to accept the lowest tender. The Board may consider the tender.

Relevant file is placed on the table.

67. Considered. The Board carefully noted the rates quoted by the agencies as brought out on the agenda side and after deliberations the Board resolved to approve lowest tender of M/s Akay Electricals amounting to Rs.75,54,085/- (Rupees Seventy Five Lakh Fifty Four Thousand & Eighty Five Only). The Board further resolved to authorized the CEO, Member- Secretary to increase/ decrease number of ornamental lights/ poles as per need basis and accordingly incur necessary expenditure in this regard.

68. SUPPLYING AND FIXING OF HVAC SYSTEM AT ALANKAR COMMUNITY HALL, DELHI CANTT To consider the report of E&M section of engineering branch with respect to subject term contract. As per the said report tenders for the subject work were called for the first time through e-tendering after advertising in National dailies. The critical dates for publishing and receipt of tenders for the subject work are as shown below:

1. Date of release of tender through e-procurement : 30.07.2020 at 1800 hrs 2. Last date & time for downloading : 20.08.2020 upto 1300 hrs 3. Last date & time of submission of e-tenders : 20.08.2020 upto 1300 hrs 4. Last date & time for opening of e-tenders : 21.08.2020 upto 1330 hrs On 21.08.2020, four bids were received and three bids have been found to be responsive and in order. The bid of M/s Air View has been found to be non-responsive as the firm has not deposited the Tender Fee & EMD amount. The rates quoted by the agencies are given as under:-

Sl. No. Name of Agency Amount 1. M/s Leo Air & Power Solution Pvt. Ltd. Rs.92,84,480/- 2. M/s Amit Associates Rs.1,06,54,519/- 3. M/s Krishna Refrigeration Rs.97,70,958/-

M/s Leo Air & Power Solution Pvt. Ltd. are the lowest bidder and have quoted Rs.92,84,480/-. As compared to market rates the rates quoted by the lowest tenderer are considered reasonable and recommended to accept the lowest tender. The Board may consider the tender.

Relevant file is placed on the table.

Page 97 of 210

68. Considered. The Board carefully noted the rates quoted by the agencies as brought out on the agenda side and after deliberations the Board resolved to approve lowest tender of M/s Leo Air & Power Solution Pvt. Ltd. amounting to Rs.92,84,480/- (Rupees Ninety Two Lakh Eighty Four Thousand Four Hundred & Eighty Only).

The CEO, Member-Secretary also informed that there is necessity to increase the rates fixed for booking of community hall considering the fact that lot of expenditure has been involved in upgrading facilities available therein and also considering the fact that the cost of its maintenance is bound to increase considerably. The Board accepted the said proposition in principle.

69. TERM CONTRACT FOR M &O OF WATER SUPPLY INSTALLATION INCLUDING OF 7 PUMP HOUSES IN VILLAGE EAST MEHRAM NAGAR AND PEHLADPUR, DELHI CANTT

To consider the report of E&M section of engineering branch with respect to subject term contract. As per the said report tenders for the subject work were called for the first time through e-tendering after advertising in the National dailies. The critical dates for publishing and receipt of tenders for the subject work are as shown below: 1. Date of release of tender through e-procurement : 05.08.2020at 1700 hrs 2. Last date & time for downloading : 20.08.2020upto 1300 Hrs 3. Last date and time submission of e-tenders : 20.08.2020 upto 1300 Hrs 4. Date and time for opening of tenders : 21.08.2020 at 1330 Hrs

In response to the e-tender for the subject work, bids from four firms were received on 21.08.2020. The technical bids of these four firms were thoroughly examined by the committee. The technical evaluation of all four bids has been carried out and all four agencies have been found responsive. Accordingly, the second stage technical evaluation of bids as per (Quality and Cost Base System) QCBS model has been carried out and the technical bids score (TBS) of the concerned firms as obtained by them is placed below for information to the Board. The minimum qualifying marks required in TBS is 70.

Sl.No Name of Firm Total Marks Marks Obtained Status

1. M/s Agarwal& Co. 100 83 Qualified 2. M/s Amit Associates 100 100 Qualified 3. M/s LG Builders 100 98 Qualified 4. M/s Aakanksha Enterprises 100 78 Qualified

Accordingly, the financial bids of all four qualified firms have been opened. The financial bid scoring has been done as detailed below:

• The lowest bid shall be given a financial bid score (FBS) of 100 marks. • The financial bid score (FBS) of other bidders will be determined using the formula: FBS = 100x FP/F, in which FP is the lowest financial bid, and F is the financial bid of the particular vendor.

The summary of rates quoted by the firms is as under:

Page 98 of 210

Sl.No Name of Firm Total Amount Status 1. M/s Agarwal& Co. Rs.62,44,242.64 Responsive 2. M/s Amit Associates Rs.75,26,101.64 Responsive 3. M/s LG Builders Rs.65,26,878.64 Responsive 4. M/s Aakanksha Enterprises Rs.62,44,242.64 Responsive

The financial bid score (FBS) obtained by the firms is as under:

Sl.No Name of Firm Total Marks Marks Obtained 1. M/s Agarwal& Co. 100 100 2. M/s Amit Associates 100 82.96 3. M/s LG Builders 100 95.66 4. M/s Aakanksha Enterprises 100 100

The overall evaluation of responsive bids has been done using QCBS model. The final score (FS) has been calculated based on theformula: Final Score (FS) = [TBS X 50% + FBS X 50%]

Sl.No Name of Firm Total Marks TBS FBS FS 1. M/s Agarwal& Co. 100 41.50 50 91.50 2. M/s Amit Associates 100 50 41.48 91.48 3. M/s LG Builders 100 49 47.83 96.83 4. M/s Aakanksha Enterprises 100 39 50 89

M/s LG Builders have secured the highest final score (FS). All the connected documents submitted by the tenderers are put up hereby to the Board for consideration. The present contract for the work will continued till finalization of new contract.

Relevant file and documents are placed on the table.

69. Considered. The Board carefully noted the rates quoted by the agencies as brought out on the agenda side and after deliberations the Board resolved to approve the tender of M/s LG Builders amounting to Rs.65,26,878.64 (Rupees Sixty Five Lakh Twenty Six Thousand Eight Hundred & Seventy Eight and Sixty Four Paise Only) as per QCBS system. The existing contract shall continue till new contract is awarded.

70. TERM CONTRACT FOR M &O OF WATER SUPPLY INSTALLATION INCLUDING OF 8 PUMP HOUSES AT VILLAGE JHARERA AND 8 PUMP HOUSES AT VILLAGE MEHRAM NAGAR, DELHI CANTT

To consider the report of E&M section of engineering branch with respect to subject term contract. As per the said report tenders for the subject work were called for the first time through e-tendering after advertising in the National dailies. Process of conclusion of tenders has been delayed due to Covid-19. The critical dates for publishing and receipt of tenders for the subject work are as shown below:

Page 99 of 210

1. Date of release of tender through e-procurement : 05.08.2020at 1700 hrs 2. Last date & time for downloading : 20.08.2020upto 1300 Hrs 3. Last date and time submission of e-tenders : 20.08.2020 upto 1300 Hrs 4. Date and time for opening of tenders : 21.08.2020 at 1330 Hrs

In response to the e-tender for the subject work, bids from four firms were received on 21.08.2020. The technical bids of these four firms were thoroughly examined by the committee. The technical evaluation of all four bids has been carried out and three agencies have been found responsive. Accordingly, the second stage technical evaluation of bids as per (Quality and Cost Base System) QCBS model has been carried out and the technical bids score (TBS) of the concerned firms as obtained by them is placed below for information to the Board. The minimum qualifying marks required in TBS is 70.

Sl.No Name of Firm Total Marks Marks Status Obtained 1. M/s Agarwal& Co. 100 83 Qualified 2. M/s Amit Associates 100 100 Qualified 3. M/s LG Builders 100 78 Qualified

Accordingly, the financial bids of three qualified firms have been opened. The financial bid scoring has been done as detailed below:

• The lowest bid shall be given a financial bid score (FBS) of 100 marks. • The financial bid score (FBS) of other bidders will be determined using the formula: FBS = 100x FP/F, in which FP is the lowest financial bid, and F is the financial bid of the particular vendor.

The summary of rates quoted by the firms is as under:

Sl.No Name of Firm Total Amount Status

1. M/s Agarwal& Co. Rs.1,40,09,803.24 Responsive 2. M/s Amit Associates Rs.1,51,66,699.24 Responsive 3. M/s LG Builders Rs.170,40,016.24 Responsive

The financial bid score (FBS) obtained by the firms is as under:

Sl.No Name of Firm Total Marks Marks Obtained 1. M/s Agarwal& Co. 100 100 2. M/s Amit Associates 100 92.37 3. M/s LG Builders 100 82.21

The overall evaluation of responsive bids has been done using QCBS model. The final score (FS)has been calculated based on the formula: Final Score (FS) = [TBS X 50% + FBS X 50%]

Page 100 of 210

Sl.No Name of Firm Total Marks TBS FBS FS 1. M/s Agarwal& Co. 100 41.50 50 91.50 2. M/s Amit Associates 100 50 46.18 96.18 3. M/s LG Builders 100 39 41.10 80.10

M/s Amit Associates have secured the highest final score (FS). All the connected documents submitted by the tenderers are put up hereby to the Board for consideration. The present contract for the work will continued till finalization of new contract.

Relevant file and documents are placed on the table.

70. Considered. The Board carefully noted the rates quoted by the agencies as brought out on the agenda side and after deliberations the Board resolved to approve the tender of M/s Amit Associates amounting to Rs.1,51,66,699.24 (Rupees One Crore Fifty One Lakh Sixty Six Thousand Six Hundred & Ninety Nine and Twenty Four Paise Only) as per QCBS system. The existing contract shall continue till new contract is awarded.

71. ANNUAL CONTRACT FOR HIRING OF TIPPERS, JCBS, TRACTORS ETC FOR DELHI CANTONMENT BOARD

To consider the report of MT Section with respect to subject term contract. As per the said reporttenders for the subject work were called for the third time through e- tendering after advertising in National dailies. In the first call no tender was received and in second call single bid was received. Due to poor competition re-tendering was undertaken causing thereby delay in conclusion of tender. The critical dates for publishing and receipt of tenders for the subject work are as shown below:

1. Date of release of tender through e-procurement : 13.03.2020 at 1500 hrs 2. Last date & time for downloading : 08.04.2020 upto 1300 hrs 3. Last date & time of submission of e-tenders : 08.04.2020 upto 1300 hrs 4. Last date & time for opening of e-tenders : 09.04.2020 upto 1330 hrs

Due to Covid-19 date of receipt of tenders was extended and on 29.05.2020, two bids were received and found to be responsive and in order. The rates quoted by the agencies are given as under:-

Page 101 of 210

Sr. Description of items of work Unit M/s M/s Amit Rates of No. Ravinder Associates Previous Kumar Year 01 02 03 04 05 06 1. Hiring of Tippers with auto tipping facilities, GVB Per trip/ Rs. 6250/- Rs. Rs. 5880/- 6 tonnes provided with a driver and four labour Vehicle 12000/- for collection of Municipal waste and garbage from dust bins/plastic dust bins at different locations in Cantonment area including T&P, fuel, Lubricant and dumping the same at Govt. approved dumping site of MCD at Phase-I, New Delhi about 65-70 Km (to &fro) from Delhi Cantt as directed by Officer–in–Charge. 2. Hiring of Tippers with auto tipping facilities, GVB 6 tonnes provided with a driver (filling of materials by JCB) for collection of garbage from Cantonment area including T&P, fuel, Lubricant as directed by Officer–in–Charge. The quoted rates shall include charges of JCB and no extra shall be payable. 2.01 Dumping within Cantonment limits as per the Per trip/ Rs. 3500/- Rs. 3400/- Rs. 3000/- directions of officer in charge. Vehicle

2.02 Dumping Outside Cantonment limit at govt. Per trip/ Rs. 6000/- Rs. 8500/- Rs. 5500/- approved dumping grounds under contractors Vehicle own arrangement 3 Hiring of Tippers with auto tipping facilities, GVB Per trip/ Rs. 12000/- Rs. 17000/- Rs. 9500/- 15 tonnes provided with a driver (filling of Vehicle materials by JCB) for collection of demolished material/ construction waste from Cantonment Area including T&P, Fuel, Lubricant and dumping the same at Govt. approved dumping site at C&D waste management plant New Delhi about 55-60 km (to & from) from Delhi Cant. as directed by officer-in-charge Note:- The agency is required to submit the Receipt from C&D plant for clearness of Bills. 4. Hiring of Tippers with auto tipping facilities, GVB Per trip/ Rs. 5500/- Rs. 9800/- Rs. 5000/- 6 tonnes provided with a driver and four labour Vehicle for collection of garbage from Cantonment area including T&P, fuel, Lubricant and dumping the same at outside Cantonment limits, under contractors own arrangement, as directed by Officer–in–Charge. 5 Desilting and taking out of debris/silt, rubbish Per hour/ Rs. 7000/- Rs. 7800/- Rs. 5260/- and removal of blockages etc from Trunk sewer vehicle which is heavily surcharged by mechanical device as like Super Sucker Machine/mechanical

Page 102 of 210

device including safe disposal of silt within municipal limit and thereafter CCTV survey of the sewer line with pan and tilt rotated camera and recording as directed by Engineer-in-Charge. Sealing of all joints of the sewer line found leaking with admixture of cement and other suitable chemical, installation of adequate number of over pumping system leak proof stanking arrangement on U/s & D/s side of over working length, temporary rising main etc to smooth flow of sewerage system to avoid flood in the area. Supply of all material, labour, tool and plants, temporary power connection with stand by generator set of capacity of at least 62.5 K.V.A, gas detector, forced air ventilators etc& provision of safety equipments as per guidelines laid in I.S. 11972 (1987)/international standard, traffic control arrangement & proper lighting at night, barricading, display of sign boards, Insurance of workmen & cleaning of site. Removal of all hindrances/obstructions, unfore- seen items complete all as directed by Engineer- in-charge. 6. De-silting of open drain by manual/poclain Per Rs. 2500/- Rs. 2740/- Rs. 2253/- model No. PC 200 and equivalent means for Hour/ removing existing slush /hardened silt /sludge vehicle or debris and object such as boulders, bricks, bacteriological slimes, Roots, encrustations, grease, carbonated deposits etc or any other debris accumulated in the drains, in solid or liquid state, in foul condition, from lined or unlined drains using mechanical means as far as possible or otherwise using manpowers/labours ( where mechanical removal is not feasible) with requisite tools, plants , safety appliance complete with lift upto 3.00 mt depth and disposal within a lead of 50mt from the edges /banks of drains complete as directed by Engineer in-charge. 7. Hiring of Tractor with trolly including one driver Per day Rs. 4200/- Rs. 3780/- Rs. 2900/- and four labour for collecting malba/horticulture (8hrs)/ waste and transportation of the same to the vehicle nearest dumping ground including T&P, fuel lubricant complete as directed by Officer-in- Charge.

Page 103 of 210

8 Hiring of Tractor provided with suitable grass Per Rs. 4800/- Rs. 4400/- Rs. cutter (shrub harvestor) arrangements including day(8hr) 2899/- one driver and one helper for cutting of grass, / wild vegetation and shrubs from different vehicle locations in Cantonment area where ever required, including T&P, fuel, lubricants complete as directed by Officer-in-Charge. 9. Hiring of JCB with one driver and one Per hour/ Rs. 649/- Rs. 670/- Rs. 443/- cleaner/assistant for cleaning of silt from nallah, JCB removal of garbage heaps, excavation over area, demolition of unauthorized construction wherever required at different locations in Delhi Cantt area including T&P, fuel, lubricants etc. as directed by Officer-in-Charge. 10. Hiring of Auto lifting crane fixed on TATA 407 or Per Rs. 4500/- Rs. 4800/- Rs. 3740/- equivalent with driver and helpers for lifting of day(8hr) unauthorized vehicles in Delhi Cantt area and / parking at a designated place in Delhi Cantt Crane including T & P, fuel, lubricants complete as directed by Officer-in-Charge 11. Hiring of TATA ACE or equivalent commercial Per trip/ Rs. 4500/- Rs. Rs. 2830/- vehicle with driver and labour for collection of per 12800/- meat waste from Sadar Bazar shops and vehicle Cantonment Board Slaughter House, Old Nangal including T & P, fuel, lubricant and dumping the same at Gazipur sanitary landfill site as directed by Officer-in-charge.

12. Hiring of crane provided with bucket to facilitate Per day Rs. 5500/- Rs. 5200/- Rs. 5350/- persons to repair street lights or for other works for 8 to be executed upto height of minimum 6 mtrs hours/ above road level, provided with driver, helper Crane including fuel & T & P charges. 13 Hiring of Tata 407 or equivalent, commercial vehicle with driver and four labours for collection of municipal waste other work directed by officer in-charge from Cantonment area including T&P, fuel and Lubricant. 13.01 Dumping within Cantonment limits as per the Per trip/ Rs. 4500/- Rs. 5000/- Rs. 3500/- directions of officer incharge. Vehicle 13.02 Dumping Outside Cantonment limit at govt. Per trip/ Rs. 5000/- Rs. 11000/- Rs. 5000/- approved dumping grounds under contractors Vehicle own arrangement

Page 104 of 210

The contract provides for acceptance of item wise lowest rates. The item wise lowest rates quoted by the agencies as mentioned hereinbefore are considered reasonable and recommended for acceptance. The Board may consider the tender.

Relevant file is placed on the table.

71. Considered and resolved to approve itemwise lowest rates quoted by the agencies as brought out on the agenda side.

The Elected Members requested that the Board may procure heavy machineries like JCB/ Poclain etc of requisite specification so that the works can be done more effectively and to cater for disaster relief measures at odd hours. Members requested that suitable communication be forwarded to Hon’ble MLA in this regard for provisioning of his MLA LAD funds. The Board noted and approved the deliberations.

72. OUTSOURCING OF DRIVERS FOR DIFFERENT LIGHT MOTOR VEHICLES OF DELHICANTONMENT BOARD, DELHI CANTT

To consider the report of MT Section with respect to subject term contract. As per the said report tenders for the subject work were called for the first time through e- tendering after advertising in the National dailies. The critical dates for publishing and receipt of tenders for the subject work are as shown below:

1. Date of release of tender through e-procurement : 05.08.2020 at 1800 hrs 2. Last date & time for downloading : 20.08.2020upto 1300 Hrs 3. Last date and time submission of e-tenders : 20.08.2020 upto 1300 Hrs 4. Date and time for opening of tenders : 21.08.2020 at 1330 Hrs

In response to the e-tender for the subject work, bids from ten firms were received on 21.08.2020. The technical bids of these ten firms were thoroughly examined by the committee. The technical evaluation of all ten bids has been carried out and two agencies have been found responsive. Accordingly, the second stage technical evaluation of bids as per (Quality and Cost Base System) QCBS model has been carried out and the technical bids score (TBS) of the concerned firms as obtained by them is placed below for information to the Board. The minimum qualifying marks required in TBS is 70.

Sl.No Name of Firm Total Marks Marks Status Obtained 1. M/s DikshaDharam Associates 100 90 Qualified 2. M/s Agarwal& Company 100 95 Qualified

Accordingly, the financial bids of two qualified firms have been opened. The financial bid scoring has been done as detailed below:

• The lowest bid shall be given a financial bid score (FBS) of 100 marks. • The financial bid score (FBS) of other bidders will be determined using the formula: FBS = 100x FP/F, in which FP is the lowest financial bid, and F is the financial bid of the particular vendor. Page 105 of 210

The summary of rates quoted by the firms is as under:

Sl.No Name of Firm Total Amount Status

1. M/s DikshaDharam Associates Rs.1,10,83,878/- Responsive 2. M/s Agarwal& Company Rs.1,10,84,508/- Responsive

The financial bid score (FBS) obtained by the firms is as under:

Sl.No Name of Firm Total Marks Marks Obtained 1. M/s DikshaDharam Associates 100 100 2. M/s Agarwal& Company 100 99.99

The overall evaluation of responsive bids has been done using QCBS model. The final score (FS) has been calculated based on the formula: Final Score (FS) = [TBS X 50% + FBS X 50%]

Sl.No Name of Firm Total Marks TBS FBS FS 1. M/s Diksha Dharam Associates 100 45 50 95 2. M/s Agarwal & Company 100 47.50 49.99 97.49

M/s Agarwal& Company have secured the highest final score (FS). All the connected documents submitted by the tenderers are put up hereby to the Board for consideration. The present contract for the work will continued till finalization of new contract.

Relevant file and documents are placed on the table.

72. Considered. The Board carefully noted the rates quoted by the agencies as brought out on the agenda side and after deliberations the Board resolved to approve the tender of M/s Agarwal & Company amounting to Rs.1,10,84,508/- (Rupees One Crore Ten Lakh Eighty Four Thousand Five Hundred & Eight Only) as per QCBS system. The existing contract shall continue till new contract is awarded.

73. OUTSOURCING OF DRIVERS FOR DIFFERENT HEAVY MOTOR VEHICLES OF DELHI CANTONMENT BOARD, DELHI CANTT

To consider the report of MT Section with respect to subject term contract. As per the said report tenders for the subject work were called for the first time through e- tendering after advertising in the National dailies. The critical dates for publishing and receipt of tenders for the subject work are as shown below:

1. Date of release of tender through e-procurement : 05.08.2020 at 1800 hrs 2. Last date & time for downloading : 20.08.2020upto 1300 Hrs 3. Last date and time submission of e-tenders : 20.08.2020 upto 1300 Hrs 4. Date and time for opening of tenders : 21.08.2020 at 1330 Hrs Page 106 of 210

In response to the e-tender for the subject work, bids from nine firms were received on 21.08.2020. The technical bids of these nine firms were thoroughly examined by the committee. The technical evaluation of all nine bids has been carried out and two agencies have been found responsive. Accordingly, the second stage technical evaluation of bids as per (Quality and Cost Base System) QCBS model has been carried out and the technical bids score (TBS) of the concerned firms as obtained by them is placed below for information to the Board. The minimum qualifying marks required in TBS is 70.

Sl.No Name of Firm Total Marks Marks Status Obtained 1. M/s Diksha Dharam Associates 100 90 Qualified 2. M/s Agarwal & Company 100 95 Qualified

Accordingly, the financial bids of two qualified firms have been opened. The financial bid scoring has been done as detailed below:

• The lowest bid shall be given a financial bid score (FBS) of 100 marks. • The financial bid score (FBS) of other bidders will be determined using the formula: FBS = 100x FP/F, in which FP is the lowest financial bid, and F is the financial bid of the particular vendor.

The summary of rates quoted by the firms is as under:

Sl.No Name of Firm Total Amount Status

1. M/s Diksha Dharam Associates Rs.78,81,868.00 Responsive 2. M/s Agarwal & Company Rs.78,82,316.80 Responsive

The financial bid score (FBS) obtained by the firms is as under:

Sl.No Name of Firm Total Marks Marks Obtained 1. M/s Diksha Dharam Associates 100 100 2. M/s Agarwal & Company 100 99.99

The overall evaluation of responsive bids has been done using QCBS model. The final score (FS) has been calculated based on the formula: Final Score (FS) = [TBS X 50% + FBS X 50%]

Sl.No Name of Firm Total Marks TBS FBS FS 1. M/s Diksha Dharam Associates 100 45 50 95 2. M/s Agarwal & Company 100 47.50 49.99 97.49

M/s Agarwal & Company have secured the highest final score (FS). All the connected documents submitted by the tenderers are put up hereby to the Board for consideration. The present contract for the work will continued till finalization of new contract.

Relevant file and documents are placed on the table. Page 107 of 210

73. Considered. The Board carefully noted the rates quoted by the agencies as brought out on the agenda side and after deliberations the Board resolved to approve the tender of M/s Agarwal & Company amounting to Rs.78,82,316.80 (Rupees Seventy Eight Lakh Eighty Two Thousand Three Hundred & Sixteen and Eighty Paise Only) as per QCBS system. The existing contract shall continue till new contract is awarded.

74. OUTSOURCING OF TECHNICAL MANPOWER FOR ARCHIVAL UNIT & RESOURCE CENTRE (AU&RC), DELHI CANTT

To consider the office report with regard to the subject matter. As per the said report, tenders for the subject work were called for the first time through e-tendering after advertising in the National dailies. The critical dates for publishing and receipt of tenders for the subject work are as shown below:

1. Date of release of tender through e-procurement : 06.03.2020 at 1700 hrs 2. Last date & time for downloading : 30.03.2020 upto 1500 Hrs 3. Last date and time submission of e-tenders : 30.03.2020 upto 1500 Hrs 4. Date and time for opening of tenders : 31.03.2020 at 1530 Hrs Due to Covid-19 date of receipt of tenders was extended and on 16.06.2020, twenty nine bids were received. The technical bids of these twenty nine firms were thoroughly examined by the committee. The technical evaluation of all twenty nine bids has been carried out and only ten agencies have been found responsive. Accordingly, the second stage technical evaluation of bids as per (Quality and Cost Base System) QCBS model has been carried out and the technical bids score (TBS) of the concerned firms as obtained by them is placed below for information to the Board. The minimum qualifying marks required in TBS is 70.

S. Name of Firm Total Marks Status No. Marks Obtained 1. M/s Servitor Intelligence Services 100 90 Qualified 2. M/s Aarth Enterprises 100 95 Qualified 3. M/s Rakshak Securitas Pvt. Ltd. 100 95 Qualified 4. M/s Capital Outsourcing and 100 65 Not qualified Management Services Pvt. Ltd. 5. M/s Oriental Integrated Facility 100 95 Qualified Management Pvt. Ltd. 6. M/ Konarak Global Service 100 75 Qualified 7. M/s Mahima Enterprises 100 68 Not Qualified 8. M/s Amit Associates 100 100 Qualified 9 M/s Patheya Detective and Security 100 100 Qualified Services 10 M/s L G Builders 100 93 Qualified

Accordingly, the financial bids of eight qualified firms have been opened. The financial bid scoring has been done as detailed below:

Page 108 of 210

• The lowest bid shall be given a financial bid score (FBS) of 100 marks. • The financial bid score (FBS) of other bidders will be determined using the formula: FBS = 100x FP/F, in which FP is the lowest financial bid, and F is the financial bid of the particular vendor. The summary of rates quoted by the firms is as under:-

S.No Name of Firm Total Amount Status 1. M/s Servitor Intelligence Rs.26,75,860.32 Non-Responsive(firm quoted Services service charges as zero) 2. M/s Aarth Enterprises Rs.27,02,102.04 Responsive 3. M/s Rakshak Securitas Pvt. Rs.27,54,587.88 Responsive Ltd. 4 M/s Oriental Integrated Rs.28,28,068.20 Responsive Facility Management Pvt. Ltd. 5 M/ Konarak Global Service Rs.29,19,423.12 Responsive 6 M/s Amit Associates Rs.26,75,979.12 Responsive 7 M/s Patheya Detective and Rs.27,83,859.12 Responsive Security Services 8 M/s L G Builders Rs.30,35,859.12 Responsive The financial bid score (FBS) obtained by the firms is as under:

S.No Name of Firm Total Marks Marks Obtained

1. M/s Aarth Enterprises 100 99.03 2. M/s Rakshak Securitas Pvt. Ltd. 100 97.14 3. M/s Oriental Integrated Facility 100 94.62 Management Pvt. Ltd. 4 M/ Konarak Global Service 100 91.66 5 M/s Amit Associates 100 100 6 M/s Patheya Detective and 100 96.12 Security Services 7 M/s L G Builders 100 88.14

The overall evaluation of responsive bids has been done using QCBS model. The final score (FS) has been calculated based on the formula:

Final Score (FS) = [TBS X 50% + FBS X 50%]

S.No Name of Firm Total Marks TBS FBS FS

1. M/s Aarth Enterprises 100 47.50 49.51 97.01 2. M/s Rakshak Securitas Pvt. 100 47.50 48.57 96.07 Ltd. 3. M/s Oriental Integrated 100 47.50 47.31 94.81 Facility Management Pvt. Ltd. 4 M/ Konarak Global Service 100 37.50 45.83 83.33 Page 109 of 210

5 M/s Amit Associates 100 50.00 50.00 100 6 M/s Patheya Detective and 100 50.00 48.06 98.06 Security Services 7 M/s L G Builders 100 46.50 44.07 90.57

M/s Amit Associates has secured the highest final score (FS). All the connected documents submitted by the tenderers are put up hereby to the Board for consideration. The present contract for the work will continued till finalization of new contract.

Relevant file is placed on the table.

74. Considered. The Board carefully noted the rates quoted by the agencies as brought out on the agenda side and after deliberations the Board resolved to approve the tender of M/s Amit Associates amounting to Rs.26,75,979.12 (Rupees Twenty Six Lakh Seventy Five Thousand Nine Hundred & Seventy Nine and Twelve Paise Only) as per QCBS system. The existing contract shall continue till new contract is awarded.

75. TERM CONTRACT FOR CLEANING SERVICES OF SCHOOLS & COMMUNITY HALLS, DELHI CANTT

To consider the office report with regard to the subject matter. As per the said report, tenders for the subject work were called for the first time through e-tendering after advertising in the National dailies. The critical dates for publishing and receipt of tenders for the subject work are as shown below: 1. Date of release of tender through e-procurement : 06.03.2020 at 1700 hrs 2. Last date & time for downloading : 30.03.2020 upto 1500 Hrs 3. Last date and time submission of e-tenders : 30.03.2020 upto 1500 Hrs 4. Date and time for opening of tenders : 31.03.2020 at 1530 Hrs

Due to Covid-19 date of receipt of tenders was extended and on 16.06.2020, twenty six bids were received. The technical bids of these twenty six firms were thoroughly examined by the committee. The technical evaluation of all twenty six bids has been carried out and only seven agencies have been found responsive. Accordingly, the second stage technical evaluation of bids as per (Quality and Cost Base System) QCBS model has been carried out and the technical bids score (TBS) of the concerned firms as obtained by them is placed below for information to the Board. The minimum qualifying marks required in TBS is 70.

S.No Name of Firm Total Marks Status Marks Obtained 1. M/s GA Digital Web Word Pvt. Ltd. 100 93 Qualified 2. M/s Agrawal and Co. 100 100 Qualified 3. M/s Good House Keeping 100 83 Qualified 4. M/s Oriental Integrated Facility 100 95 Qualified Management Pvt. Ltd. 5. M/s S.K. Enterprises 100 95 Qualified 6. M/s Amit Associates 100 85 Qualified 7. M/s Aakanksha Enterprises 100 95 Qualified Page 110 of 210

Accordingly, the financial bids of all seven qualified firms have been opened. The financial bid scoring has been done as detailed below:

• The lowest bid shall be given a financial bid score (FBS) of 100 marks. • The financial bid score (FBS) of other bidders will be determined using the formula: FBS = 100x FP/F, in which FP is the lowest financial bid, and F is the financial bid of the particular vendor.

The summary of rates quoted by the firms is as under:

S.No Name of Firm Total Amount Status 1. M/s GA Digital Web Word Rs.2,02,65,222.72 Responsive Pvt. Ltd. 2. M/s Agrawal and Co. Rs.1,96,49,190.72 Responsive 3. M/s Good House Keeping Rs.2,01,79,878.72 Responsive 4 M/s Oriental Integrated Rs.1,96,47,901.74 Non-Responsive (firm Facility Management Pvt. quoted service charges as Ltd. zero or its derivative ) 5 M/s S.K. Enterprises Rs.1,96,47,888.72 Non-Responsive (firm quoted service charges as zero or its derivative ) 6 M/s Amit Associates Rs.1,96,49,190.72 Responsive 7 M/s Aakanksha Enterprises Rs.1,96,49,190.72 Responsive The financial bid score (FBS) obtained by the firms is as under:

S.No Name of Firm Total Marks Marks Obtained

1. M/s GA Digital Web Word Pvt. Ltd. 100 96.96 2. M/s Agrawal and Co. 100 100 3. M/s Good House Keeping 100 97.37 4. M/s Amit Associates 100 100 5. M/s Aakanksha Enterprises 100 100

The overall evaluation of responsive bids has been done using QCBS model. The final score (FS) has been calculated based on the formula: Final Score (FS) = [TBS X 50% + FBS X 50%]

S.No Name of Firm Total Marks TBS FBS FS

1. M/s GA Digital Web Word Pvt. 100 46.50 48.48 94.98 Ltd. 2. M/s Agrawal and Co. 100 50.00 50.00 100.00 3. M/s Good House Keeping 100 41.50 48.68 90.18 4. M/s Amit Associates 100 42.50 50.00 92.50 5. M/s Aakanksha Enterprises 100 47.50 50.00 97.50

Page 111 of 210

M/s Agrawal and Co. has secured the highest final score (FS). All the connected documents submitted by the tenderers are put up hereby to the Board for consideration. The present contract for the work will continued till finalization of new contract.

Relevant file is placed on the table.

75. Considered. The Board carefully noted the rates quoted by the agencies as brought out on the agenda side and after deliberations the Board resolved to approve the tender of M/s Agrawal and Co. amounting to Rs.1,96,49,190.72 (Rupees One Crore Ninety Six Lakh Forty Nine Thousand One Hundred & Ninety and Seventy Two Paise Only) as per QCBS system. The existing contract shall continue till new contract is awarded.

76. TERM CONTRACT FOR HOUSEKEEPING CLEANING & ALLIED SERVICES AT CANTONMENT GENERAL HOSPITAL, DELHI CANT

To consider the office report with regard to the subject matter. As per the said report, tenders for the subject work were called for the first time through e-tendering after advertising in the National dailies. The critical dates for publishing and receipt of tenders for the subject work are as shown below:

1. Date of release of tender through e-procurement :06.03.2020 at 1700 hrs 2. Last date & time for downloading : 30.03.2020 upto 1500 Hrs 3. Last date and time submission of e-tenders : 30.03.2020 upto 1500 Hrs 4. Date and time for opening of tenders : 31.03.2020 at 1530 Hrs

Due to Covid-19 date of receipt of tenders was extended and on 16.06.2020, Forty Nine bids were received. The technical bids of these Forty Nine firms were thoroughly examined by the committee. The technical evaluation of all Forty Nine bids has been carried out and only Fifteen agencies have been found responsive. Accordingly, the second stage technical evaluation of bids as per (Quality and Cost Base System) QCBS model has been carried out and the technical bids score (TBS) of the concerned firms as obtained by them is placed below for information to the Board. The minimum qualifying marks required in TBS is 70.

S.No Name of Firm Total Marks Status Marks Obtained 1. M/s Aarth Enterprises 100 83 Qualified 2. M/s Eximius Management Pvt. Ltd. 100 98 Qualified 3. M/s Shine and Standard 100 68 Non-Qualified 4. M/s Rakshak Securitas Pvt. Ltd. 100 95 Qualified 5. M/s GA Digital Web Word Pvt. Ltd. 100 93 Qualified 6. M/s Agarwal and Co. 100 100 Qualified 7. M/s Singh Builder & Contractors 100 90 Qualified 8. M/s Good House Keeping 100 83 Qualified 9. M/s Prerna Enterprises 100 78 Qualified

Page 112 of 210

10. M/s S.K Enterprises 100 95 Qualified 11. M/s Freaquer Corporation Pvt. Ltd 100 68 Non-Qualified 12. M/s Amit Associates 100 85 Qualified 13. M/s Aakanksha Enterprises 100 95 Qualified 14. M/s Konarak Global Services 100 75 Qualified 15. M/s Krishna Facility Management 100 70 Qualified Services

Accordingly, the financial bids of Thirteen qualified firms have been opened. The financial bid scoring has been done as detailed below:

• The lowest bid shall be given a financial bid score (FBS) of 100 marks. • The financial bid score (FBS) of other bidders will be determined using the formula: FBS = 100x FP/F, in which FP is the lowest financial bid, and F is the financial bid of the particular vendor.

The summary of rates quoted by the firms is as under:

S.No Name of Firm Total Amount Status

1. M/s Aarth Enterprises Rs.1,53,08,206.80 Responsive 2. M/s Eximius Management Pvt. Ltd. Rs.1,63,00,220.80 Responsive 3. M/s Rakshak Securitas Pvt. Ltd. Rs.1,54,08,040.80 Responsive 4. M/s GA Digital Web Word Pvt. Ltd. Rs.1,53,97,376.80 Responsive 5. M/s Agarwal and Co. Rs.1,49,86,688.80 Responsive 6. M/s Singh Builder & Contractors Rs.1,51,58,140.64 Responsive 7. M/s Good House Keeping Rs.1,53,36,560.80 Responsive 8. M/s Prerna Enterprises Rs.1,53,65,494.80 Responsive 9. M/s S.K Enterprises Rs.1,49,85,820.80 Non-Responsive (firm quoted service charges as zero or its derivative ) 10. M/s Amit Associates Rs.1,49,86,688.80 Responsive 11. M/s Aakanksha Enterprises Rs.1,49,86,688.80 Responsive 12. M/s Konarak Global Services Rs.1,57,29,289.68 Responsive 13. M/s Krishna Facility Management Rs.1,52,55,806.80 Responsive Services The financial bid score (FBS) obtained by the firms is as under:

S.No Name of Firm Total Marks Marks Obtained

1. M/s Aarth Enterprises 100 97.89 2. M/s Eximius Management Pvt. Ltd. 100 91.94 3. M/s Rakshak Securitas Pvt. Ltd. 100 97.26 4. M/s GA Digital Web Word Pvt. Ltd. 100 97.33 5. M/s Agarwal and Co. 100 100.00 6. M/s Singh Builder & Contractors 100 98.86 7. M/s Good House Keeping 100 97.71 Page 113 of 210

8. M/s Prerna Enterprises 100 97.53 9. M/s Amit Associates 100 100.00 10. M/s Aakanksha Enterprises 100 100.00 11. M/s Konarak Global Services 100 95.27 12. M/s Krishna Facility Management 100 98.23 Services

The overall evaluation of responsive bids has been done using QCBS model. The final score (FS) has been calculated based on the formula: Final Score (FS) = [TBS X 50% + FBS X 50%]

S.No Name of Firm Total TBS FBS FS Marks 1. M/s Aarth Enterprises 100 41.50 48.94 90.44 2. M/s Eximius Management Pvt. Ltd. 100 49.00 45.97 94.97 3. M/s Rakshak Securitas Pvt. Ltd. 100 47.50 48.63 96.13 4. M/s GA Digital Web Word Pvt. Ltd. 100 46.50 48.66 95.16 5. M/s Agarwal and Co. 100 50.00 50.00 100.00 6. M/s Singh Builder & Contractors 100 45.00 49.43 94.43 7. M/s Good House Keeping 100 41.50 48.85 90.35 8. M/s Prerna Enterprises 100 39.00 48.76 87.76 9. M/s Amit Associates 100 42.50 50.00 92.50 10. M/s Aakanksha Enterprises 100 47.50 50.00 97.50 11. M/s Konarak Global Services 100 37.50 47.63 85.13 12. M/s Krishna Facility Management 100 35.00 49.11 84.11 Services

M/s Agrawal and Co. has secured the highest final score (FS). All the connected documents submitted by the tenderers are put up hereby to the Board for consideration. The present contract for the work will continued till finalization of new contract.

Relevant file is placed on the table.

76. Considered. The Board carefully noted the rates quoted by the agencies as brought out on the agenda side and after deliberations the Board resolved to approve the tender of M/s Agrawal and Co. amounting to Rs.1,49,86,688.80 (Rupees One Crore Forty Nine Lakh Eighty Six Thousand Six Hundred & Eighty Eight and Eighty Paise Only) as per QCBS system. The existing contract shall continue till new contract is awarded.

77. EXTENSION OF CONTRACT

It is submitted that following contracts will be expire on 31.10.2020. NIT for these works was already published in the National Dailies in September, 2020. It is requested that these contracts will be extended till the finalization of new contract.

Page 114 of 210

S. No. Name of Contract Name of Date of Expiry Contractor of Contract 1. Provision of Horticulture/Arboriculture M/s Jagjeet 31.10.2020 services in the Dte. General Defence Estates, Singh RSB, Delhi Cantt 2. Maintenance of Horticulture works at two M/s Jagjeet 31.10.2020 new parks at Kabul Line &one park at Singh SadarBazar, Delhi Cantt 3. Maintenance of Horticulture works at M/s Jagjeet 31.10.2020 various fenced parks in Ward No. 1 to Ward Singh No. 8, Delhi Cantt 4. Maintenance of Horticulture works at Rajpal M/s Amit 31.10.2020 Park & 1 WEC Park, Uri Enclave, Delhi Cantt Associates

The Board may extension of contracts till finalization of new contracts.

Relevant file is placed on the table.

77. Considered and approved. However, the existing contract shall continue till new contract is awarded. Further resolved that the CEO, Member-Secretary may consider grant of extension to the contracts in future in terms of the decision of the Board contained in CBR No.65 dated 24.10.2011.

78. PRUNING OF TREES OF ROADSIDES, PARKS & OPEN AREA ETC IN DELHI CANTONMENT AREA, DELHI CANTT

To consider report of Horticulture branch regarding pruning of trees in Delhi Cantonment area. As per the said report the term of ongoing contract for pruning of trees has expired. However, under the ongoing contract pruning of 492 numbers of trees was undertaken against provision of pruning of 3000 trees. Horticulture branch had invited fresh tenders for pruning of trees after expiry of term of the ongoing contract of pruning of trees in Delhi Cantonment area but in both calls single tender was received and it was decided to invite tender a fresh.This office has been receiving lot of requests for urgent pruning of trees both in residential areas and on public roads for traffic safety. The Board may consider extending term of ongoing contract of pruning of trees on the same terms and conditions approved by the Board vide Spl. CBR No.22 dated 17.07.2018 till new contract is concluded.

Relevant file is placed on the table.

78. Considered and approved.

The Board further resolved that necessary action for finalization of new tender be taken up at the earliest.

Page 115 of 210

79. TERM CONTRACT FOR HIRE CHARGES OF TENTING MATERIAL, SOUND SYSTEM AND BEDDING SET & PROVISION OF REFRESHMENT/ MEALS

To consider report of the storekeeper with regard to the subject term contract. As per the report tenders for the subject work were called for the second timethrough e – tendering after advertising in the National dailies. In the first call two bids were received and the Board vide FC/CBR No.46/2 dated 25.02.2020/21.03.2020 had decided to invite tenders afresh. Accordingly tenders were reinvited and critical dates of publishing and receipt of tenders for the subject work is shown below. In response to the advertisement five tender were received in two bid system. After technical evaluation by the concerned committee one agency were found to be responsive and accordingly price bids were opened on 12.09.2020. The rates quoted by the agencies are tabulated here under.

Date of release of tender through e- procurement : 18.05.2020 Last date & time downloading of tender documents : 09.06.2020 1500 hrs Last date and submission of e- tenders : 09.06.2020 1500 hrs Date and time for opening of e- tenders : 10.06.2020 1530 hrs

Sl. Item Description Units M/s Maa No. Annapurna Tent House (Rate) 1 High Tea for VIP’s Per 350 Person Tea/Coffee (Lemon Tea/ Green Tea) Juice Mixed 1 ltr packing

Samosa, Sandwich, KajuRosted, Almond Rosted, Dhokla, Khandvi, Sandesh, Pastry, Cocktail Idli, Paneer Pakoda, Patties, Mix pakoda, Biscuits, Cookies, Gulab Jamun. (Any six items), size & quality standard available in the market. No compromise in standard size and quality will be acceptable.

Page 116 of 210

2 Bed Tea Per 700 Tea, Biscuits, Rusk person

Break Fast Tea, Coffee, Milk, Milk Bournvita Bread Omlette/Boiled Egg/ Bread Jam/Bread Butter Aloo Puri/Chole Kulche/Poova (any three with Tea/ Coffee)

Evening Tea Tea& Coffee Mix Pakoda/Bread Pakoda/ Samosa/Patties/Mathi/Biscuits (any two items) of standard size and qty will be accepted

Food Items (Meals Vegetarian Lunch/Dinner) Tawa Roti, Tandoori Roti, Rice Raita/ Salad Sabzi:- Sahi Paneer/Dal Makhni/Mix Veg/Any Sabji Palak Paneer/ Palak Corn/ Palak ka Saag/ Sarso ka Saag/Aloo Gobhi/Dum Aloo/Chole (Any four items) Sweet Dish:- Gulab Jamun/Ice cream/Moong Dal Ka Halwa/Jalebi/Rabri(any two items) of standard size and volume available in market. 3 VIP Meals Per 555 (Lunch/Dinner) Person Vegetarians Tawa Roti, Tandoori Roti, Rice Raita/ Salad Sabzi:- Sahi Paneer/Dal Makhni/Mix Veg/Any Sabji Palak Paneer/ Palak Corn/ Palak ka Saag/ Sarso ka Saag/Aloo Gobhi/Dum Aloo/Chole (Any four items) Sweet Dish:- Gulab Jamun/Ice cream/Moong Dal Ka Halwa/Jalebi/Rabri(any two items) - With Bone China Crockery-. Highest standard to be maintained 4 VIP Meals Per 700 (Lunch/Dinner) Person Non-Veg Tawa Roti, Tandoori Roti, Missi Roti, Butter Naan Rice , Raita, Salad Sabzi:- Sahi Paneer/Dal Makhni/Mix Veg/Any Sabji Palak Paneer/ Palak Corn/ Palak ka Saag/ Sarso ka Saag/Aloo Gobhi/Dum Aloo/Chole (Any three items) Mutton, Chicken, Fish, (Any two items) Sweet Dish:- Gulab Jamun/Ice cream/Moong Dal Ka Halwa/Jalebi/Rabri(any two items) - Withe Bone China Crockery- Highest standard to be maintained Page 117 of 210

5 Food Items (Meals Vegetarian Per 555 Lunch/Dinner) Person Tawa Roti, Tandoori Roti, Rice Raita/ Salad Sabzi:- Sahi Paneer/Dal Makhni/Mix Veg/Any Sabji Palak Paneer/ Palak Corn/ Palak ka Saag/ Sarso ka Saag/Aloo Gobhi/Dum Aloo/Chole (Any four items) Sweet Dish:- Gulab Jamun/Ice cream/Moong Dal Ka Halwa/Jalebi/Rabri(any two items) of standard size and volume available in 6 Packed lunch/Dinner or thali per 265 Tawa roti,Rice,Raita/Salad thali Sabzi:- Sahi Paneer, Dal Makhni Sweet Dish:- Gulab Jamun . Size,qty and quality as per standard available in market 7 Coffee/Tea Per 1500 100 person 8 Pepsi 2 ltr Per 2500 100 person 9 Real Juice 1 ltr Per 3500 100 person 10 Bisleri – 200ml Per 6 Unit 11 Bisleri – 500 ml Per 10 Unit 12 Bisleri – 1 litr Per 22 Unit 13 Bisleri – 20 litr with dispenser Per 120 Unit 14 Packed Glass (bisleri) – 200ml Per 6 Unit 15 Stall’s Per Stall 3800 Gol Gappa, Bhalla papdi, Aloo Tikki, Chaomin, Bhelpuri, Dhosa, Idli, (Per Vada, Pav Bhaji, Chilla, Kachori Sabzi–(Per Stall Rates). No 100 compromise in quality and standard person) 16 Table 5”x2 ½” Per 60 Unit 17 Banquet Chair Per 30 Unit 18 Banquet Chair with Covers Per 40 Unit 19 Red Mat 5”x15” Per 90 Unit 20 Red/Green Mat 5”x30” Per 180 Unit 21 Table Fall Per 60 Unit

Page 118 of 210

22 Carpet Woollen 5”x15” Per 175 Unit 23 Sofa 2 Seater Per 500 Unit 24 Sofa 2 Seater (for VIP) Delux Per 1000 Unit 25 Sofa 3 Seater Per 700 Unit 26 Sofa 3 Seater (for VIP) Delux Per 1700 Unit 27 Center Table for VIP Per 500 Unit 28 Curtain’s/ Parda 11”x15” Per 200 Unit 29 Sidewall (white) per Sqft per 3 sqft 30 Side Wall Kapali 5”x15” Per 150 Unit 31 Fan Sound Proof Per 150 Unit 32 Halogen Light 500w Per 100 Unit 33 Halogen Light 1000w Per 200 Unit 34 Bulb 25w Per 9 Unit 35 Sodium Light White Per 300 Unit 36 Stage Light (Different Color-led) Per 450 Unit 37 Gen Set 62 K.V. (Stand By) Per 4000 Unit 38 Gen Set 62 K.V. (Running) Per 9000 Unit 39 Gen Set 125 K.V. (Stand By) Per 7500 Unit 40 Gen Set Ruing 125 K.V (Running) Per 18000 Unit 41 D.J. System Per 7000 Unit 42 D.J. Extra Floor Per 3000 Size-12”x12” Unit 43 P/A System Complete + Speaker set with CD player, mike, Cordless Per Set 8500 mike 44 Stage 4 ft Height (per Sqft) per 25 sqft 45 Stage 1 ½” ft. Height (per Sqft) per 20 sqft 46 Mickey Mouse Per 3500 Unit 47 Air Joker Per 4000 Page 119 of 210

Unit 48 Bouncy Per 4000 Unit 49 Waiter for service Per 650 Waiter 50 Ceiling 15”x15” Per 580 Unit 51 Ceiling 15”x15” Water Proof Per 900 Unit 52 Magic Show Per 8000 Show 53 Patila (Big Size) Per 300 Unit 54 Bed(Bister Set Complete )(Mattress-1, Bed Sheet-1, Pillow-1, Rajai-1), Per Set 110 neat and clean 55 Extra Blanket Per 40 Unit 56 Extra Rajai Per 40 Unit 57 Per 50 Extra Mattresses Unit 58 Extra Pillow Per 25 Unit 59 Per 650 Emergency Light, LED Unit 60 Emergency Light Chargeable, LED Per 650 Unit 61 Iron Jali (Per Sq.ft) Per 10 sqft 62 Tin Shed Per 15 Unit 63 Barricading Per 11 Unit 64 Drum Per 100 Size-200 ltr. Unit 65 Trust Gate Per 9000 Size - 15”x15” Unit 66 Trust Gate Per 12000 Size - 15”x30” Unit 67 Trust Gate Per 18000 Size - 30”x30” Unit 68 Trust Gate Per 24000 Size - 30”x45” Unit 69 Road Gate Per 18000 Size - 30”x30” Unit 70 Road Gate Per 20000 Size - 30”x18” Unit 71 Road Gate Per 30000 Size - 30”x40” Unit 72 Air Balloon Per 10 Size-8 inch Unit Page 120 of 210

73 Gas Balloon Per 20 Size-8 inch Unit 74 A/C Air Cooler Per 2750 Size-40” Unit 75 Desert Cooler Per 600 Size-20” Unit 76 Mist Fan Per 800 Unit 77 Cordless Mic Per 1000 Unit 78 Collar Mic Per 1000 Unit 79 Foot Mic Per 1000 Unit 80 Per 120 Kanat 15”x6” Unit 81 Per 30000 Line Arrey Sound Unit 82 Per 2500 Portable Sound System Unit 83 Per 75 VIP Chair Unit 84 Round Table Per 300 Size-4”x4” Unit 85 Square Table Per 300 Size-4”x4” Unit 86 Umbrella Per 250 Size-5”x5” Unit 87 Knoopi on Table Nos. 150 (Per Table) GST extra as applicable The analysis of rates have been drawn and the item wise lowest rates quoted by the M/s Maa Annapurna Tent House is considered reasonable and recommended for acceptance.

Relevant file is placed on the table.

79. The matter is considered in detail. The CEO, Member-Secretary informed the Board that the rates received in the second call have been compared with the rates received in the first call and that the rates received in the second call for a few items are considered on the higher side. The Board resolved to authorize the CEO, Member-Secretary to examine the rates received for the work in the second call and take further necessary action as deemed fit.

80. ESTIMATES

The Board may consider the following estimates:- i) Improvement to water supply distribution system by providing underground reservoir of 50,000 gallon capacity in Village Naraina, Delhi Cantt amounting to Rs.41,96,631/-. Page 121 of 210

ii) Improvement to existing park by installing fountains at COD near Ramleela ground, Naraina, Delhi Cantt amounting to Rs.14,80,000/-. iii) Addition/ alteration to the SulabhSauchalya, reconstruction of public toilet block with old age centre at First Floor, Village Naraina, Delhi Cantt amounting to Rs.75,00,000/-. iv) Repair to existing boundary wall of Village Naraina, Delhi Cantt amounting to Rs.6,90,000/-. v) Repair to slip road from Delhi Cantt Railway Station to Station road junction, Delhi Cantt (Ward No.2) amounting to Rs.1,76,20,000/-. vi) Erection of fencing from cremation ground Uri Enclave to Karan Vihar, Delhi Cantt amounting to Rs.32,10,000/-. vii) Repair/ improvements to assembly ground of Mother Teresa CB Sr. Secondary School, Uri Enclave, Delhi Cantt amounting to Rs.20,75,000/-. viii) Repair to cement concrete path at Servant Qtrs, Captain Colony, Pratap Chowk, Delhi Cantt amounting to Rs.21,57,000/-. ix) Ready Mix Cement Concrete works in streets and pavements at Subroto Park, Delhi Cantt amounting to Rs.61,42,000/-. x) Ready Mix Cement Concrete works in streets and pavements at Signal Enclave, Delhi Cantt amounting to Rs.23,73,000/-. xi) Repair to road from BalmikiDwarJharera to APS Colony Junction road amounting to Rs.1,52,50,000/-. xii) Improvement to water supply distribution system by providing underground reservoir of 50000 gallon capacity in Village Jharera, Delhi Cantt amounting to Rs.41,96,000/-. xiii) Repair to concrete surfaces on road leading to APS colony to K.V. No.2, Delhi Cantt amounting to Rs.56,84,000/-. xiv) Extensive repairs to pump house near Pond Village Jharera, Delhi Cantt amounting to Rs.24,00,000/-. xv) Construction of old age home and women welfare centre at Village Jharera, Delhi Cantt amounting to Rs.49,60,000/-. xvi) Repair to footpath on road leading to 13 BRD and Panchwati Colony amounting to Rs.60,83,000/-. xvii) Repair to footpath in Sekhawati lines, Delhi Cantt amounting to Rs.55,00,000/-. xviii) Repair to existing park in Sekhawati line, Delhi Cantt amounting to Rs.8,90,000/-. xix) Providing cement concrete path on both side of road berm at Block P-296 to P- 404 to pump house, P-165 to P-298, CVD line, Delhi Cantt amounting to Rs.50,74,000/-. xx) Misc Improvements, face lifting, installation of fountains etc at water body including improvements to adjoining areas at Vill.Jherara amounting to Rs 46,00,000/-. xxi) Repair to road from Rangshala to NH-8 junction amounting to Rs 1,08,00,000/- xxii) Repair to footpath on road leading to PeeruVihar entry gate (CVD side) to entry gate near KV – 1 (MES Service Centre), Delhi Cantt amounting to Rs.37,05,000/-. xxiii) Repair to path/ pavements near DAV School, Sadar Bazar, Delhi Cantt amounting to Rs.31,00,000/-. xxiv) Addition/ alterations and misc improvements to Old LIC building Sadar bazaar amounting to Rs 21,00,000/-

Page 122 of 210

xxv) Addition/ alterations to cremation ground at vill Old Nangal amounting to Rs 40,00,000/- xxvi) Repair to slip road leading to Delhi Cantt Railway Station, Delhi Cantt (Ward No.8) amounting to Rs.71,00,000/-. xxvii) Infrastructural improvement to Cantt General Hospital, Delhi Cantt amounting to Rs.70,00,000/-. xxviii) Improvements to sports facility like volleyball and basket ball/ badminton courts in Parks/ playfield, fountains in Delhi Cantt amounting to Rs.95,00,000/-. xxix) Extensive repairs/ improvements face lifting by murals etcto CB Schools amounting to Rs.1,80,00,000/-. xxx) Repair/ improvement to urinal, sulabh complexes, dustbins in eight wards amounting to Rs.1,20,00,000/-. xxxi) Installation of children playing equipments& gazebos in parks amounting to Rs.1,75,00,000/-. xxxii) Erection of stainless steel waiting sheds in each ward in Delhi Cantt amounting to Rs.7,50,000/- each. xxxiii) Essential repairs/ improvements to Cantt Board assets like Staff Qtrs, library, parks, community halls, cremation grounds, pump houses, slaughter house, guest house, CB Office etc amounting to Rs.1,50,00,000/-. xxxiv) Addition/ alteration and upgradation to Kripa School for day boarding facilities and therapies etc amounting to Rs.2,60,00,000/-. xxxv) Installation of garden benches in eight wards amounting to Rs.39,00,000/-. xxxvi) Improvements to boundary wall, pump house and Misc repairs, addition alterations to pump house at Shastri Bazar amounting to Rs.60,00,000/-. xxxvii) Improvement to path/ pavement by Ready Mix Concrete road from Chitral lines to Sy. No.259, Delhi Cantt amounting to Rs.1,20,00,000/-. xxxviii) Improving drainage system from Chitral lines to Sy. No.259, Kirby Place amounting to Rs.35,00,000/-. xxxix) Fencing of vacant lands in Kirby cluster area amounting to Rs 15,00,000/-. xl) Repair/recarpetting of roads in Delhi cantt with Asphaltic Dense Concrete amounting to Rs 3,00,00,000/-. xli) Installation of road signage’s, road gantries, road safety equipments/ devices and road furniture items etc amounting to Rs.1,65,00,000/-. xlii) Misc improvements to Indo-Korean Friendship park, Delhi Cantt amounting to Rs.80,00,000/-. xliii) Essential improvements to parks, walking tracks in parks, repair/ replacement of grills etc in Delhi Cantonment amounting to Rs.2,25,00,000/-. Relevant file is placed on the table.

80. Considered and approved the estimates. The CEO, Member-Secretary informed theBoard that the execution of the works will be subject to the availability of the funds under relevant Budget heads approved by the Board. The Board further resolved that wherever feasible and possible, the CEO, Member-Secretary may get the works done through MLA/MP Local Area Development Funds or any other grant/Government source of funds made available to the Cantonment Board. Working permissions be obtained from LMA’s wherever applicable.

Page 123 of 210

Smt. Rachna Kadiyan, Vice-President, Smt. Kavita Jain, Member and Lt. Col. Sandeep Singh, Nominated Member requested for some additional works to be undertaken for which estimates have not been prepared yet. The Board resolved that the matter will be considered on case to case basis by the Board at a later date subject to receipt of NOC/ working permission from LMA’s and feasibility of further maintenance in this regard. The CEO, Member-Secretary also cautioned the Board with regard to huge maintenance cost in maintenance of large number of parks being proposed.

81. ESTIMATES

To consider the following estimates: a) Installation of high mast light at 13 BRD, Delhi Cantt amounting to Rs. 4,50,000/-. b) Installation of flood light at 13 BRD, Delhi Cantt amounting to Rs. 4,95,790/-. c) Laying of pipeline for transporting treated waste water for horticulture purpose from common effluent treatment plant to Thimmaya Park reservoir (proposed), Delhi Cantt amounting to Rs. 3,25,08,344/-. d) Installation of Central air conditioning system at Community Centre at Village Mehram Nagar, Delhi Cantt amounting to Rs. 1,90,00,000/-. e) Repair/ replacement of old rusted water pipe line at Village Naraina, Delhi Cantt amounting to Rs. 24,50,000/-. f) Replacement of water pipe line from GI to CI from main pump house No.7 to Chaupal area and near Pakki lane, Village Jharera, Delhi Cantt amounting to Rs. 26,80,000/-. g) Repair/ replacement of water pipe line from pump house No.16 to main gate and pump house No.14 to distribution line at Village Mehram Nagar, Delhi Cantt amounting to Rs. 22,60,000/-. h) Replacement centrifugal pumps delivery suction line headers, base frame etc at Village Jharera and Mehram Nagar, Delhi Cantt amounting to Rs. 29,70,000/-. i) Upgradation of water supply installation including centrifugal pumps, delivery, suction line, headers etc near overhead tank and near 220 kv substation, Naraina, Delhi Cantt amounting to Rs. 26,30,000/-. j) Replacement of sewage pump, panel and allied work at Village Naraina amounting to Rs.11,50,000/-. k) Repair/replacement of water pipe line and to connect type-II, III, IV and hospital staff Qtrs with OHT in front of CB Office, Delhi Cantt to Rs. 7,50,700/- l) Laying of pipe line and water hydrant for horticulture purpose in all eight wards, Delhi Cantt to Rs. 15,89,000/- m) Repair to four nos of shredding machines, cables and electric control panel provided in parks of Delhi Cantonment Board, Delhi Cantt amounting to Rs. 2,75,000/- n) Supplying and fixing of HVAC system at community centreJharera, Delhi Cantt amounting to Rs. 1,10,00,000/-

Relevant file is placed on the table.

Page 124 of 210

81. Considered and approved the estimates. The CEO, Member-Secretary informed theBoard that the execution of the works will be subject to the availability of the funds under relevant Budget heads approved by the Board. The Board further resolved that wherever feasible and possible, the CEO, Member-Secretary may get the works done through MLA/MP Local Area Development Funds or any other grant/Government source of funds made available to the Cantonment Board. Working permissions be obtained from LMA’s wherever applicable.

82. ESTIMATES

To consider the following estimates: a) Provision/ purchase of furnitures, electrical, kitchen appliances for establishment of working Women Hostel, Sadar Bazar, Delhi Cantt amounting to Rs.50,00,000/-. b) Purchase of furnitures, electricals etc for establishment of Library, Sadar Bazar, Delhi Cantt amounting to Rs.10,00,000/-. c) Establishment/ purchase of furnitures, electrical items etc for Old Age Centre, Sadar Bazar, Delhi Cantt amounting to Rs.10,00,000/-. d) Purchase of Anti Smog Gun amounting to Rs.55,00,000/-.

Relevant file is placed on the table.

82. Considered and approved the estimates. The CEO, Member-Secretary informed theBoard that the execution of the works will be subject to the availability of the funds under relevant Budget heads approved by the Board. The Board further resolved that wherever feasible and possible, the CEO, Member-Secretary may get the works done through MLA/MP Local Area Development Funds or any other grant/Government source of funds made available to the Cantonment Board.

Page 125 of 210

83. GRANT OF FINANCIAL UPGRADATION TO THE ELIGIBLE EMPLOYEES OF THE DELHI CANTONMENT BOARD UNDER MODIFIED ASSURED CAREER PROGRESSION SCHEME (MACPS)

The cases of the eligible employees as per the details given below have been scrutinized by the Screening Committee as per sanction accorded by the Command HQrs, vide their letter No.4/927/MACP/DELHI/Cantt/DE dated 09.5.2012 & letter No.15/90/A/Delhi/Cantt/DE dated 22.2.2017, for grant of financial upgradation under MACP Scheme from the due dates: Sr. Name of the Employees Date of Existing Pay Effective 10 Years 20 Years 30 Years (IIIrd) No. appointment Matrix at the time Date of (Ist) (IInd) of grant of upgradatio (As per pay th upgradation under n matrix of 7 CPC) MACP 1. Sh. Ajay Kumar Gupta, J.E, 05.6.1990 Level – 8 05.6.2020 Availed Availed Level – 9 E. No.1384 2. Sh. Pawan Kumar, J.E, E.No.1383 05.6.1990 Level – 8 05.6.2020 Availed Availed Level – 9 3. Sh. Sunil Kumar, Horticulturist, E.No. 1297 22.6.1990 Level – 6 22.6.2020 Availed Availed Level - 7 4. Sh. Raghubir, Mali, E.No.1296 22.6.1990 Level – 3 22.6.2020 Availed Availed Level – 4 5. Sh. Narender, Safaiwala, E.No.460 03.7.1990 Level – 3 03.7.2020 Availed Availed Level – 4 6. Sh. Sohan Lal, Mali. E.No.1405 26.9.1990 Level – 3 26.9.2020 Availed Availed Level – 4 7. Sh. Vinod Kumar, TGT, E.No.1129 22.10.1990 Level – 8 22.10.2020 Availed Availed Level – 9 8. Sh. Ram Swaroop Samariya, TGT, E.No.1131 22.10.1990 Level – 8 22.10.2020 Availed Availed Level – 9 9. Smt. InduBala, TGT, E.No.1112 22.10.1990 Level – 8 22.10.2020 Availed Availed Level – 9 10. Smt. Rashmi Sharma, TGT, E.No.1109 24.10.1990 Level – 8 24.10.2020 Availed Availed Level – 9 11. Sh. Dhandu, Safaiwala, E.No.462 25.3.1991 Level – 3 25.3.2021 Availed Availed Level – 4 12. Sh. Ashok, Safaiwala, E.No.2032 09.12.1998 Level – 2 09.12.2018 Availed Level – 3 - 13. Sh. Sunil, Safaiwala, E.No.2036 17.2.1999 Level – 2 17.2.2019 Availed Level – 3 - 14. Sh. Dalip, Safaiwala, E.No.2033 10.4.1999 Level – 2 10.4.2019 Availed Level – 3 - 15. Smt. Santosh, Safaiwala, E.No.2034 09.8.1999 Level – 2 09.8.2019 Availed Level – 3 - 16. Sh. Om Prakash, Mali, E.No.2035 22.1.2000 Level – 2 22.1.2020 Availed Level – 3 - 17. Sh. Vinod Kumar, Safaiwala, E.No.2037 01.5.2000 Level – 2 01.5.2020 Availed Level – 3 - 18. Sh. Mohit, Safaiwala, E.No.2038 01.5.2000 Level – 2 01.5.2020 Availed Level – 3 - 19. Smt. Anita, Safaiwala, E.No.2039 07.6.2000 Level – 2 07.6.2020 Availed Level – 3 - 20. Sh. Satish Kumar, Mali, E.No.2040 13.6.2000 Level – 2 13.6.2020 Availed Level – 3 - 21. Smt. Seema, Safaiwala, E.No.2043 16.9.2000 Level – 2 16.9.2020 Availed Level – 3 - 22. Smt. Kamlesh, Safaiwala, E.No.2044 18.10.2000 Level – 2 18.10.2020 Availed Level – 3 - 23. Sh. Rohtash Kumar, Safaiwala, E.No.2045 13.3.2001 Level – 2 13.3.2021 Availed Level – 3 - Page 126 of 210

The Screening Committee certified that all the concerned employees under the MACP Scheme fulfil all the conditions as laid down in Annexure I of the Govt. of India, Ministry of Personal, Public Grievances & Pensions New Delhi letter No.35034/3/2008-Estt. (D) dated 19.05.2009 read with Deputy Secretary Finance (Budget), Govt. of NCT of Delhi, Finance (Budget) Department letter No. F.11 (4)/206-Fin (B)/PT.II/dsfb/1192-1297 dated 27.05.2009 & DOP&T letter No.35034/3/2008-Estt(D) dated 09.09.2010 read with Deputy Secretary Finance Govt. of NCT of Delhi, Finance Department letter No.F.No.4(73)/Fin.(Estb-III)/2-10-11/ot-11/DSI/329 dated 22.09.2010 & Govt. of India Ministry of Personnel, Public Grievances and Pensions DOPT letter No.F.No.35034/3/2015-Estt.(d) dt.27.9.2016.

Further, the Committee consisting of the following officers also confirms from the records that no disciplinary proceedings are pending or contemplated against the concerned employees. The case is placed before the Board Committee for its approved recommendations so that the same could be taken up with PDDE, Western Command accordingly for grant of requisite sanction.

Relevant file is placed on the table.

83. Considered. The Board after due deliberation resolved to grant Financial upgradation to the eligible employees of the Delhi Cantonment Board under Modified Assured Career Progression Scheme (MACPS) as brought out on the agenda side. The Board further resolved that the proposal in this regard be submitted to the Principal Director Defence Estates, Western Command, Chandigarh for obtaining requisite sanction.

84. APPEAL UNDER SECTION 340 OF THE CANTONMENTS ACT, 2006 AGAINST THE IMPUGNED ORDER DATED 06.02.2020 UNDER SECTION 239(1) OF THE CANTONMENTS ACTS, 2006 PASSED BY LD. CHIEF EXECUTIVE OFFICER WITH RESPECT TO PROPERTY NO.1/218/15, MASJID QTR., SADAR BAZAR, DELHI CANTT.

Sh. Vijay Kumar S/o Sh. Rati Ram was found to be carrying unauthorized constructionat property No.1/218/15, Masjid Qtr., Sadar Bazar, Delhi Cantt without obtaining prior permission of the competent authority vide JE inspection report dated 31.01.2020. Notices were issued under section 239 (1) and Section 248 of the Cantonments Act, 2006by the office dated 06.02.2020. The unauthorized construction raised by Sh. Vijay Kumar is in-violation of Section 235 of the Cantonments Act, 2006 and also in-violation of lease conditions & provisions of building bye laws.

Sh. Vijay Kumar S/o Sh. Rati Ram has submitted an appeal under section 340 of the Cantonments Act, 2006 against notice under section 239(1) dated 06.02.2020 issued by the office. The Appellate Authority is Cantonment Board, Delhi. The Board may consider appeal under section 340 of the Cantonments Act, 2006.

Relevant file is placed on the table.

84. Considered. The Board noted the details of unauthorized construction carried out by Sh. Vijay Kumar S/o Sh. Rati Ram at property No.1/218/15, Masjid Qtr., Sadar Bazar, Delhi Cantt, JE inspection report and the appeal made under section 340 of the Cantonments Act, 2006 by Sh. Vijay Kumar S/o Sh. Rati Ram against notice under Section 239(1) of the

Page 127 of 210

Cantonments Act 2006 dated 06.02.2020. The Board noted that the appellant has undertaken unauthorized/ illegal construction without obtaining prior sanction of the Competent Authority, material alterations have been carried out new construction has been made at property No.1/218/15, Masjid Qtr., Sadar Bazar, Delhi Cantt in violation of provisions made under Cantonments Act, 2020. The Board was of the considered view that the construction carried out by the appellant is unauthorized construction in violation of provisions of Cantonments Act 2006 which needs to be demolished and the Board resolved to reject the appeal dated 27.07.2020 filed by Sh. Vijay Kumar S/o Sh. Rati Ram as unauthorized construction has been carried out at the premises in violation of the Cantonments Act 2006 and applicable building bye laws notified for Delhi Cantonment by the Competent Authority by dated 08.06.2002.

85. APPEAL UNDER SECTION 340 OF THE CANTONMENTS ACT, 2006 AGAINST THE IMPUGNED ORDER DATED 30.05.2020 UNDER SECTION 239(1) OF THE CANTONMENTS ACTS, 2006 PASSED BY LD. CHIEF EXECUTIVE OFFICER WITH RESPECT TO PROPERTY NO.IV/1/51, GOPINATH BAZAR, DELHI CANTT

Sh. Devender Arora S/o Sh. R.S. Arora was found to be carrying unauthorized construction at property No.IV/1/51, Gopinath Bazar, Delhi Cantt without obtaining prior permission of the competent authority vide JE inspection report dated 30.05.2020. Notices were issued under section 239 (1) and Section 248 of the Cantonments Act, 2006 by the office dated 30.05.2020. The unauthorized construction raised by Sh. Devender Arora is in- violation of Section 235 of the Cantonments Act, 2006 and lease condition & provisions of building bye laws.

Sh. Devender Arora S/o Sh. R.S. Arora has submitted an appeal under section 340 of the Cantonments Act, 2006 for notice under section 239(1) dated 30.05.2020 issued to him. The Appellate Authority is Cantonment Board, Delhi. The Board may consider appeal under section 340 of the Cantonments Act, 2006.

Relevant file is placed on the table.

85. Considered. The Board noted the details of unauthorized construction carried out by Sh. Devender Arora S/o Sh. R.S. Arora at property No.IV/1/51, Gopinath Bazar Bazar, Delhi Cantt, JE inspection report and the appeal under Section 340 of the Cantonments Act, 2006 by him against notice under Section 239(1) of the Cantonments Act 2006 dated 30.05.2020. The Board noted that the appellant has undertaken unauthorized/ illegal construction without obtaining prior sanction of the Competent Authority, Material alterations have been carried out and new construction has been made at property No.IV/1/51, Gopinath Bazar, Delhi Cantt in violation of provisions made under Cantonments Act, 2020. The Board was of the considered view that the construction carried out by the appellant is unauthorized construction in violation of provisions of Cantonments Act 2006 which needs to be demolished and the Board resolved to reject the appeal dated 23.07.2020 filed by Sh. Devender Arora S/o Sh. R.S. Arora as unauthorized construction has been carried out at the premises in violation of the Cantonments Act 2006 and applicable building bye laws notified for Delhi Cantonment by the Competent Authority by dated 08.06.2002.

Page 128 of 210

86. APPEAL UNDER SECTION 340 OF THE CANTONMENTS ACT, 2006 AGAINST THE IMPUGNED ORDER DATED 06.02.2020 UNDER SECTION 239(1) OF THE CANTONMENTS ACTS, 2006 PASSED BY LD. CHIEF EXECUTIVE OFFICER WITH RESPECT TO PROPERTY NO.IV/1/61, GOPINATH BAZAR, DELHI CANTT

Sh. Anil Arora S/o Late Sh. Jagdish Arora was found to be carrying unauthorized construction at property No.IV/1/61, Gopinath Bazar, Delhi Cantt without obtaining prior permission of the competent authority vide JE inspection report dated 06.02.2020. Notices were issued under section 239 (1) and Section 248 of the Cantonments Act, 2006 by the office dated 06.02.2020. The unauthorized construction raised by Sh. Anil Arora is in- violation of Section 235 of the Cantonments Act, 2006& provisions of building bye laws.

Sh. Anil Arora S/o Late Sh. Jagdish Arora has submitted an appeal under section 340 of the Cantonments Act, 2006 dated 23.07.2020 against notice under section 239(1) dated 06.02.2020. The Appellate Authority is Cantonment Board, Delhi. The Board may consider appeal under section 340 of the Cantonments Act, 2006.

Relevant file is placed on the table.

86. Considered. The Board noted the details of unauthorized construction carried out by Sh. Anil Arora S/o Late Sh. Jagdish Arora at property No.IV/1/61, Gopinath Bazar, Delhi Cantt, JE inspection report and the appeal under Section 340 of the Cantonments Act, 2006 filed by him against notice under Section 239(1) of the Cantonments Act 2006 dated 06.02.2020. The Board noted that the appellant has undertaken unauthorized / illegal construction without obtaining prior sanction of the Competent Authority, Material alterations have been carried out and new construction has been made at property No.IV/1/61, Gopinath Bazar, Delhi Cantt in violation of provisions of the Cantonments Act, 2006. The Board was of the considered view that the construction carried out by the appellant is unauthorized construction in violation of provisions of Cantonments Act 2006 which needs to be demolished and the Board resolved to reject the appeal dated 23.07.2020 filed by Sh. Anil Arora S/o Late Sh. Jagdish Arora as unauthorized construction has been carried out at the premises in violation of the Cantonments Act 2006 and applicable building bye laws notified for Delhi Cantonment by the Competent Authority by dated 08.06.2002.

87. APPEAL UNDER SECTION 340 OF THE CANTONMENTS ACT, 2006 AGAINST THE IMPUGNED ORDER DATED 03.03.2020 UNDER SECTION 239(1) OF THE CANTONMENTS ACTS, 2006 PASSED BY LD. CHIEF EXECUTIVE OFFICER WITH RESPECT TO PROPERTY NO.CB-219, VILLAGE NARAINA, DELHI CANTT

Sh. Manish Hans S/o Sh. Prem Nath was found to be carrying unauthorized construction at property No.CB-219, Village Naraina, Delhi Cantt without obtaining prior permission of the competent authority vide JE inspection report dated 05.02.2020. Notices were issued under section 239 (1) and Section 248 of the Cantonments Act, 2006. The construction is unauthorized construction in-violation of Section 235 of the Cantonments Act, 2006 & provisions of building bye laws.

Sh. Manish Hans S/o Sh. Prem Nath has submitted an appeal under section 340 of the Cantonments Act, 2006 for notice under section 239(1) dated 03.03.2020. The Page 129 of 210

Appellate Authority is Cantonment Board, Delhi. The Board may consider appeal under section 340 of the Cantonments Act, 2006.

Relevant file is placed on the table.

87. Considered. The Board noted the details of unauthorized construction carried out by Sh. Manish Hans S/o Sh. Prem Nath at property No.CB-219, Village Naraina, Delhi Cantt, JE inspection report and the appeal under Section 340 of the Cantonments Act, 2006 filed by him against notice under Section 239(1) of the Cantonments Act 2006 dated 03.03.2020. The Board noted that the appellant has undertaken unauthorized / illegal construction without obtaining prior sanction of the Competent Authority, Material alterations have been carried out and new construction has been made at property No.CB-219, Village Naraina, Delhi Cantt in violation of provisions made under Cantonments Act, 2006. The Board was of the considered view that the construction carried out by the appellant is unauthorized construction in violation of provisions of Cantonments Act 2006 which needs to be demolished and the Board resolved to reject the appeal dated 28.07.2020 filed by Sh. Manish Hans S/o Sh. Prem Nath as unauthorized construction has been carried out at the premises in violation of the Cantonments Act 2006 and applicable building bye laws notified for Delhi Cantonment by the Competent Authority by dated 08.06.2002.

88. UNAUTHORISED CONSTRUCTION MADE BY SH. MANISH HANS S/O SH. PREM NATH, CB-219, VILLAGE NARAINA, DELHI CANTT : APPEAL UNDER SECTION 340 OF THE CANTONMENTS ACT, 2006

Sh. Manish Hans S/o Sh. Prem Nath undertook unauthorized construction at premises bearing No.CB-219, Village Naraina, Delhi Cantt. Material alterations were undertaken and the site of unauthorized construction was inspected by the ward JE on 05.02.2020, 12.02.2020 & 25.02.2020 and the ward JE had submitted his reports in this regard. The Cantonment Board vide its resolution contained in CBR No.60, 61 & 62 dated 21.03.2020 had considered the reports of unauthorized construction and had resolved to issue notice u/s 248 of the Cantonments Act, 2006. Accordingly notices u/s 248 of the Act were issued by the office vide letter No.DCB/4/UC/MH/VILL. NARAINA/2019-20 dated 04.05.2020,No.DCB/4/UC/MH/VILL. NARAINA/2019-20/2 dated 04.05.2020 &No.DCB/4/UC/MH/VILL. NARAINA/2019-20/3 dated 04.05.2020. Sh. Manish Hans S/o Sh. Prem Nath did not remove unauthorized construction despite issue of several notices.

Sh. Manish Hans S/o Sh. Prem Nath resident of CB-219, Village Naraina, Delhi Cantt has preferred 03 appeals before the GOC-in-C, Western command against 03 notices under section 248 of the Act issued by the officedated 04.05.2020. Village Narainais located outside limits of notified Civil area of Delhi Cantonment and have been filed within limitation period as provided in the Act. The Board may consider.

Relevant file is placed on the table.

88. Considered. The Board noted details of unauthorized construction carried out at premises bearing No.CB-219, Village Naraina, Delhi Cantt, JE Inspection reports and the decision of the Board contained in CBR No.60, 61 & 62 dated 21.03.2020. The Board also noted details of notices issued to Sh. Manish Hans under section 248(three numbers) of the Page 130 of 210

Cantonments Act, 2006 dated 04.05.2020. The matter was discussed at length and the Board resolved to forward the appeals to the competent authority for consideration and disposal.

89. UNAUTHORISED CONSTRUCTION MADE BY SMT. SAROJ CHABRA, CB-231, VILLAGE NARAINA, DELHI CANTT : APPEAL UNDER SECTION 340 OF THE CANTONMENTS ACT, 2006

Smt. Saroj Chabra W/o Late Sh. Suresh Chabra undertook unauthorized construction at premises bearing No.CB-231, Village Naraina, Delhi Cantt. Material alterations were undertaken and the site of unauthorized construction was inspected by the ward JE on 29.01.2020, 11.02.2020 & 25.02.2020 and the ward JE had submitted his reports in this regard. The Cantonment Board vide its resolution contained in CBR No.57, 58&59 dated 21.03.2020 had considered the reports of unauthorized construction and had resolved to issue notice u/s 248 of the Cantonments Act, 2006. Accordingly notices u/s 248 of the Act were issued by the office vide letter No.DCB/4/UC/SC/NARAINA/2019-20/1 dated 04.05.2020, No.DCB/4/UC/SC/NARAINA/2019-20/2 dated 04.05.2020 &No.DCB/4/UC/SC/NARAINA/2019-20/3 dated 04.05.2020. Smt. Saroj Chabra W/o Late Sh. Suresh Chabra did not remove unauthorized construction despite issue of several notices.

Smt. Saroj Chabra W/o Late Sh. Suresh Chabra resident of CB-231, Village Naraina, Delhi Cantt has preferred 03 appeals before the GOC-in-C, Western command against 03 notices under section 248 of the Act issued by the office dated 04.05.2020. Village Narainais located outside limits of notified Civil area of Delhi Cantonment and have been filed within limitation period as provided in the Act. The Board may consider.

Relevant file is placed on the table.

89. Considered. The Board noted details of unauthorized construction carried out at premises bearing No.CB-231, Village Naraina, Delhi Cantt, JE Inspection reports and the decision of the Board contained in CBR No.57, 58 & 59 dated 21.03.2020. The Board also noted details of notices issued to Smt. Saroj Chabraunder section 248(three numbers) of the Cantonments Act, 2006 dated 04.05.2020. The matter was discussed at length and the Board resolved to forward the appeals to the competent authority for consideration and disposal.

90. APPEAL UNDER SECTION 340 OF THE CANTONMENTS ACT, 2006 AGAINST THE IMPUGNED ORDER DATED 02.03.2020 & 11.03.2020 UNDER SECTION 239(2) OF THE CANTONMENTS ACTS, 2006 PASSED BY LD. CHIEF EXECUTIVE OFFICER WITH RESPECT TO PROPERTY NO.CB-231, VILLAGE NARAINA, DELHI CANTT

Smt. Saroj Chabra W/o Sh. Suresh Chabra was found to be carrying unauthorized construction at property No.CB-231, Village Naraina, Delhi Cantt without obtaining prior permission of the competent authority vide JE inspection report dated 11.02.2020 & 25.02.2020. Notices were issued under section 239 (1), 239 (2) and Section 248 of the Cantonments Act, 2006. The unauthorized construction raised by Smt. Saroj Chabra is in- violation of Section 235 of the Cantonments Act, 2006 and provisions of building bye laws.

Page 131 of 210

Smt. Saroj Chabra W/o Sh. Suresh Chabra has submitted an appeal under section 340 of the Cantonments Act, 2006 for notice under section 239(2) dated 02.03.2020& 11.03.2020. The Appellate Authority is Cantonment Board, Delhi. The Board may consider appeal under section 340 of the Cantonments Act, 2006.

Relevant file is placed on the table.

90. Considered. The Board noted the details of unauthorized construction carried out by Smt. Saroj Chabra W/o Sh. Suresh Chabra at property No.CB-231, Village Naraina, Delhi Cantt, JE inspection reports and the appeal under Section 340 of the Cantonments Act, 2006 by her against notices under Section 239(2) of the Cantonments Act 2006 dated 02.03.2020 & 11.03.2020. The Board noted that the appellant has undertaken unauthorized / illegal construction without obtaining prior sanction of the Competent Authority, Material alterations have been carried out and new construction has been made at property No.CB- 231, Village Naraina, Delhi Cantt in violation of provisions made under Cantonments Act, 2006. The Board was of the considered view that the construction carried out by the appellant is unauthorized construction in violation of provisions of Cantonments Act 2006 which needs to be demolished and the Board resolved to reject the appeals dated 31.07.2020 filed by Smt. Saroj Chabra W/o Sh. Suresh Chabraas unauthorized construction has been carried out at the premises in violation of the Cantonments Act 2006 and applicable building bye laws notified for Delhi Cantonment by the Competent Authority by dated 08.06.2002.

91. UNAUTHORIZED CONSTRUCTION MADE BY RAJBALA D/O SH. RATTAN SINGH CB- 46, VILLAGE NARAINA, DELHI CANTT: ISSUE OF THE NOTICE UNDER SECTION 248 OF CANTONMENTS ACT 2006.

To consider JEs report dated 26.05.2020 regarding unauthorized construction carried out by Rajbala D/o Sh. Rattan Singh CB-46, Village Naraina, Delhi Cantt. The details of unauthorized construction carried out by Rajbala D/o Sh. Rattan Singh as reported in inspection report dated 26.05.2020 is given hereunder:

Unauthorised Construction is carrying out in the area. 7.80 x 16.00mt at ground floor after demolishing the Existing structure R.C.C. Columns are erecting & brick work with cement morter in foundation was in progress at the time of inspection on 26.05.2020.

The unauthorized construction has been carried out in violation of section 234, 235 and 238 of the Cantonments Act 2006. Erection / re-erection has been carried out involving material alterations, new building construction materials have been used for illegal construction. The erection / re-erection being undertaken at aforementioned premises is in violation of building bye laws applicable to Delhi Cantonment notified by the Competent Authority vide Gazette Notification SRO No. DCB/4/Building Bye-Laws dated 08.06.2002. The site of unauthorized construction is located outside notified Civil area with in Delhi Cantonment limits in Sy.No. 1 Village Naraina, Delhi Cantt. It is recommended that notice under Section 248 of the Cantonments Act 2006 be issued to Rajbala D/o Sh. Rattan Singh asking her to remove the said unauthorized constructions within 30days of the date of service of notice.

Relevant file is placed on the table.

Page 132 of 210

91. Considered. The Board noted JEs inspection report as also the details of unauthorised construction brought out on the agenda side. The Board was of the considered opinion that illegal/ unauthorised construction has been carried out by Smt. Rajbala D/o Sh. Rattan Singh without obtaining sanction of the Competent Authority as required u/s 238 of the Cantonments Act, 2006 and in violation of Section 234, 235 & 247 of the Act and provisions made under applicable building bye laws notified by the Competent Authority for Delhi Cantonment area. The matter was discussed at length and the Board resolved that notice under section 248 of Cantonments Act 2006 be issued to Smt. Rajbala D/o Sh. Rattan Singh CB-46, Village Naraina, Delhi Cantt giving her 30 days time to remove the unauthorised construction. The Board further resolved that in the event of non compliance of the notice by Smt. Rajbala D/o Sh. Rattan Singh, the CEO, Member-Secretary will issue notice under section 320 of the Cantonments Act, 2006 to her giving 15 days time to demolish the said unauthorized construction failing which the unauthorized construction shall be demolished by the office at the risk and cost of Smt. Rajbala D/o Sh. Rattan Singh.

92. UNAUTHORIZED CONSTRUCTION MADE BY SH. LALIT GUPTA S/O SH. TEJPAL GUPTA CB- 289, VILLAGE NARAINA, DELHI CANTT: ISSUE OF THE NOTICE UNDER SECTION 248 OF CANTONMENTS ACT 2006.

To consider JEs report dated 25.06.2020 regarding unauthorized construction carried out by Sh. Lalit Gupta S/o Sh. Tejpal Gupta CB-289, Village Naraina, Delhi Cantt. The details of unauthorized construction carried out by Sh. Lalit Gupta S/o Sh. Tejpal Gupta as reported in inspection report dated 25.06.2020. is given hereunder:

Unauthorised Construction was carrying out in the area. 4.55 x 9.10mtr. at fourth floor. R.C.C. Columns casted, brick walls constructed with cement mortar. Roof slab over complete fourth floor provided with RCC at the time of inspection on 25.06.2020.

The unauthorized construction has been carried out in violation of section 234, 235 and 238 of the Cantonments Act 2006. Erection / re-erection has been carried out involving material alterations, new building construction materials have been used for illegal construction. The erection / re-erection being undertaken at aforementioned premises is in violation of building bye laws applicable to Delhi Cantonment notified by the Competent Authority vide Gazette Notification SRO No. DCB/4/Building Bye-Laws dated 08.06.2002. The site of unauthorized construction is located outside notified Civil area with in Delhi Cantonment limits in Sy.No. 1 Village Naraina, Delhi Cantt. It is recommended that notice under Section 248 of the Cantonments Act 2006 be issued to Sh. Lalit Gupta S/o Sh. Tejpal Gupta, asking him to remove the said unauthorized constructions within 30days of the date of service of notice.

Relevant file is placed on the table.

92. Considered. The Board noted JEs inspection report as also the details of unauthorised construction brought out on the agenda side. The Board was of the considered opinion that illegal/ unauthorised construction has been carried out by Sh. Lalit Gupta S/o Sh. Tejpal Gupta without obtaining sanction of the Competent Authority as required u/s 238 of the Cantonments Act, 2006 and in violation of Section 234, 235 & 247 of the Act and provisions made under applicable building bye laws notified by the Competent Authority for Delhi Cantonment area. The matter was discussed at length and the Board resolved that notice under section 248 of Page 133 of 210

Cantonments Act, 2006 be issued to Sh. Lalit Gupta S/o Sh. Tejpal Gupta CB-289, Village Naraina, Delhi Cantt giving him 30 days time to remove the unauthorised construction. The Board further resolved that in the event of non compliance of the notice by Sh. Lalit Gupta S/o Sh. Tejpal Gupta, the CEO, Member-Secretary will issue notice under section 320 of the Cantonments Act, 2006 to him giving 15 days time to demolish the said unauthorized construction failing which the unauthorized construction shall be demolished by the office at the risk and cost of Sh. Lalit Gupta S/o Sh. Tejpal Gupta.

93. UNAUTHORIZED CONSTRUCTION MADE BY SH. ANIL TANWAR S/O SH. KISHAN TANWAR CB-84, VILLAGE NARAINA, DELHI CANTT: ISSUE OF THE NOTICE UNDER SECTION 248 OF CANTONMENTS ACT 2006.

To consider JEs report dated 08.09.2020 regarding unauthorized construction carried out by Sh. Anil Tanwar S/o Sh. KishanTanwar CB-84, Village Naraina, Delhi Cantt. The details of unauthorized construction carried out by Sh. Anil Tanwar S/o Sh. KishanTanwar as reported in inspection report dated 08.09.2020 is given hereunder:

Unauthorised Construction was carrying out in the area. 22 ½ ‘ x 50’ at ground floor. R.C.C. Columns were erecting & Brick work with cement mortar in wall was in progress at the time of inspection on 08.09.2020.

The unauthorized construction has been carried out in violation of section 234, 235 and 238 of the Cantonments Act 2006. Erection / re-erection has been carried out involving material alterations, new building construction materials have been used for illegal construction. The erection / re-erection being undertaken at aforementioned premises is in violation of building bye laws applicable to Delhi Cantonment notified by the Competent Authority vide Gazette Notification SRO No. DCB/4/Building Bye-Laws dated 08.06.2002. The site of unauthorized construction is located outside notified Civil area with in Delhi Cantonment limits in Sy.No. 1 Village Naraina, Delhi Cantt. It is recommended that notice under Section 248 of the Cantonments Act 2006 be issued to Sh. Anil Tanwar S/o Sh. KishanTanwarasking him to remove the said unauthorized constructions within 30days of the date of service of notice.

Relevant file is placed on the table.

93. Considered. The Board noted JEs inspection report as also the details of unauthorisedconstruction brought out on the agenda side. The Board was of the considered opinion that illegal/ unauthorised construction has been carried out by Sh. Anil Tanwar S/o Sh. KishanTanwar without obtaining sanction of the Competent Authority as required u/s 238 of the Cantonments Act, 2006 and in violation of Section 234, 235 & 247 of the Act and provisions made under applicable building bye laws notified by the Competent Authority for Delhi Cantonment area. The matter was discussed at length and the Board resolved that notice under section 248 of Cantonments Act 2006 be issued to Sh. Anil Tanwar S/o Sh. KishanTanwar CB-84, Village Naraina, Delhi Cantt giving him 30 days time to remove the unauthorised construction.The Board further resolved that in the event of non compliance of the notice by Sh. Anil Tanwar S/o Sh. KishanTanwar, the CEO, Member-Secretary will issue notice under section 320 of the Cantonments Act, 2006 to him giving 15 days time to demolish the said unauthorized construction failing which the unauthorized construction shall be demolished by the office at the risk and cost of Sh. Anil Tanwar S/o Sh. KishanTanwar.

Page 134 of 210

94. UNAUTHORIZED CONSTRUCTION MADE BY SH. RAJVEER SINGH S/O LATE SH. RISHPAL SINGH H.NO. 15, NEAR GURDWARA VILLAGE OLD NANGAL,DELHI CANTT: ISSUE OF THE NOTICE UNDER SECTION 248 OF CANTONMENTS ACT 2006.

To consider JEs report dated 27.05.2020 regarding unauthorized construction carried out by Sh. Rajveer Singh S/o Late Sh. Rishpal Singh H.No. 15, Near Gurdwara Village Old Nangal, Delhi Cantt. The details of unauthorized construction carried out by Sh. Rajveer Singh S/o Late Sh. Rishpal Singh as reported in inspection report dated 27.05.2020 is given hereunder:

IIIrd Floor. (i) Room: 3.10m x 3.05m Unauthorised Construction has been carried out in the above Covered area. Height of existing brick walls raised up to roof level. RCC roof slab has been laid on brick walls. Plastering on wall was in progress at the time of inspection on 27.05.2020.

The unauthorized construction has been carried out in violation of section 234, 235 and 238 of the Cantonments Act 2006. Erection /re-erection has been carried out involving material alterations, new building construction materials have been used for illegal construction.The erection / re-erection being undertaken at aforementioned premises is in violation of building bye laws applicable to Delhi Cantonment notified by the Competent Authority vide Gazette Notification SRO No. DCB/4/Building Bye-Laws dated 08.06.2002. The site of unauthorized construction is located outside notified Civil area with in Delhi Cantonment limits in Sy.No. 192, classified as B-4 land under the management of DEO, Delhi Circle, Delhi Cantt. It is recommended that notice under Section 248 of the Cantonments Act 2006 be issued to Sh. Rajveer Singh S/o Late Sh. Rishpal Singh asking him to remove the said unauthorized constructions within 30 days of the date of service of notice.

Relevant file is placed on the table.

94. Considered. The Board noted JEs inspection report as also the details of unauthorised construction brought out on the agenda side. The Board was of the considered opinion that illegal/ unauthorised construction has been carried out by Sh. Rajveer Singh S/o Late Sh. Rishpal Singh without obtaining sanction of the Competent Authority as required u/s 238 of the Cantonments Act, 2006 and in violation of Section 234, 235 & 247 of the Act and provisions made under applicable building bye laws notified by the Competent Authority for Delhi Cantonment area. The matter was discussed at length and the Board resolved that notice under section 248 of Cantonments Act 2006 be issued to Sh. Rajveer Singh S/o Late Sh. Rishpal Singh H.No. 15, Near Gurdwara Village Old Nangal, Delhi Cantt giving him 30 days time to remove the unauthorised construction. The Board further resolved that in the event of non compliance of the notice by Sh. Rajveer Singh S/o Late Sh. Rishpal Singh, the CEO, Member- Secretary will issue notice under section 320 of the Cantonments Act, 2006 to him giving 15 days time to demolish the said unauthorized construction failing which the unauthorized construction shall be demolished by the office at the risk and cost of Sh. Rajveer Singh S/o Late Sh. Rishpal Singh.

95. UNAUTHORIZED CONSTRUCTION MADE BY SH. LAXMAN SINGH S/O LATE SH. KARTAR SINGH H.NO. 8/134, A BLOCK, VILLAGE MEHRAM NAGAR, DELHI CANTT: ISSUE OF THE NOTICE UNDER SECTION 248 OF CANTONMENTS ACT 2006.

To consider JEs report dated 21.03.2020 regarding unauthorized construction carried out by Sh. Laxman Singh S/o Late Sh. Kartar Singh H.No. 8/134, A block, Village Mehram Nagar, Page 135 of 210

Delhi Cantt. The details of unauthorized construction carried out by Sh. Laxman Singh S/o Late Sh. Kartar Singh as reported in inspection report dated 21.03.2020 is given hereunder:

After removing existing tin sheets & raising roof ht. Agra Stone roof laid over ground floor covering area. 4.45mt x 4.80mt. Brick work of parapet done.

The unauthorized construction has been carried out in violation of section 234, 235 and 238 of the Cantonments Act 2006. Erection / re-erection has been carried out involving material alterations, new building construction materials have been used for illegal construction. The erection / re-erection being undertaken at aforementioned premises is in violation of building bye laws applicable to Delhi Cantonment notified by the Competent Authority vide Gazette Notification SRO No. DCB/4/Building Bye-Laws dated 08.06.2002. The site of unauthorized construction is located outside notified Civil area with in Delhi Cantonment limits in Sy.No. 165 classified as ‘C’ land under the management of the Delhi Cantonment Board, Delhi Cantt. It is recommended that notice under Section 248 of the Cantonments Act 2006 be issued to Sh. Laxman Singh S/o Late Sh. Kartar Singh asking him to remove the said unauthorized constructions within 30 days of the date of service of notice.

Relevant file is placed on the table.

95. Considered. The Board noted JEs inspection report as also the details of unauthorised construction brought out on the agenda side. The Board was of the considered opinion that illegal/ unauthorised construction has been carried out by Sh. Laxman Singh S/o Late Sh. Kartar Singh without obtaining sanction of the Competent Authority as required u/s 238 of the Cantonments Act, 2006 and in violation of Section 234, 235 & 247 of the Act and provisions made under applicable building bye laws notified by the Competent Authority for Delhi Cantonment area. The matter was discussed at length and the Board resolved that notice under section 248 of Cantonments Act 2006 be issued to Sh. Laxman Singh S/o Late Sh. Kartar Singh H.No. 8/134, A block, Village Mehram Nagar, Delhi Cantt giving him 30 days time to remove the unauthorised construction. The Board further resolved that in the event of non compliance of the notice by Sh. Laxman Singh S/o Late Sh. Kartar Singh, the CEO, Member- Secretary will issue notice under section 320 of the Cantonments Act, 2006 to him giving 15 days time to demolish the said unauthorized construction failing which the unauthorized construction shall be demolished by the office at the risk and cost of Sh. Laxman Singh S/o Late Sh. Kartar Singh.

96. UNAUTHORIZED CONSTRUCTION MADE BY SMT. SUNITA KUMARI W/O SH. VIRENDER KUMAR H.NO. 8/70A, VILLAGE MEHRAM NAGAR, DELHI CANTT: ISSUE OF THE NOTICE UNDER SECTION 248 OF CANTONMENTS ACT 2006.

To consider JEs report dated 8.06.2020 regarding unauthorized construction carried out by Smt. Sunita Kumari W/o Sh. Virender Kumar H.No. 8/70A, Village Mehram Nagar, Delhi Cantt. The details of unauthorized construction carried out by Smt. Sunita Kumari W/o Sh. Virender Kumar as reported in inspection report dated 08.06.2020 is given hereunder:

The following unauthorised construction of Ist floor was in progress constructing. Room : 4.10mt. x 2.00mt. Room : 4.10mt. x 2.70mt.

Page 136 of 210

Kitchen : 1.75mt x 1.40mt. Brick work upto roof level done.

The unauthorized construction has been carried out in violation of section 234, 235 and 238 of the Cantonments Act 2006. Erection / re-erection has been carried out involving material alterations, new building construction materials have been used for illegal construction. The erection / re-erection being undertaken at aforementioned premises is in violation of building bye laws applicable to Delhi Cantonment notified by the Competent Authority vide Gazette Notification SRO No. DCB/4/Building Bye-Laws dated 08.06.2002. The site of unauthorized construction is located outside notified Civil area with in Delhi Cantonment limits in Sy.No. 165 classified as ‘C’ land under the management of the Delhi Cantonment Board, Delhi Cantt. It is recommended that notice under Section 248 of the Cantonments Act 2006 be issued to Smt. Sunita Kumari W/o Sh. Virender Kumar asking her to remove the said unauthorized constructions within 30 days of the date of service of notice.

Relevant file is placed on the table.

96. Considered. The Board noted JEs inspection report as also the details of unauthorised construction brought out on the agenda side. The Board was of the considered opinion that illegal/ unauthorised construction has been carried out by Smt. Sunita Kumari W/o Sh. Virender Kumar without obtaining sanction of the Competent Authority as required u/s 238 of the Cantonments Act, 2006 and in violation of Section 234, 235 & 247 of the Act and provisions made under applicable building bye laws notified by the Competent Authority for Delhi Cantonment area. The matter was discussed at length and the Board resolved that notice under section 248 of Cantonments Act 2006 be issued to Smt. Sunita Kumari W/o Sh. Virender Kumar H.No. 8/70A, Village Mehram Nagar, Delhi Cantt giving her 30 days time to remove the unauthorised construction. The Board further resolved that in the event of non compliance of the notice by Smt. Sunita Kumari W/o Sh. Virender Kumar, the CEO, Member-Secretary will issue notice under section 320 of the Cantonments Act, 2006 to her giving 15 days time to demolish the said unauthorized construction failing which the unauthorized construction shall be demolished by the office at the risk and cost of Smt. Sunita Kumari W/o Sh. Virender Kumar.

97. UNAUTHORIZED CONSTRUCTION MADE BY SH. RAVINDER KUMAR S/O SH. PRITAM SINGH H.NO. 8/99, VILLAGE MEHRAM NAGAR DELHI CANTT: ISSUE OF THE NOTICE UNDER SECTION 248 OF CANTONMENTS ACT 2006.

To consider JEs report dated 11.08.2020 regarding unauthorized construction carried out by Sh. Ravinder Kumar S/o Sh. Pritam Singh H.No. 8/99, Village Mehram Nagar, Delhi Cantt. The details of unauthorized construction carried out by Sh. Ravinder Kumar S/o Sh. Pritam Singh as reported in inspection report dated 11.08.2020 is given hereunder:

After demolishing existing construction on ground floor following unauthorised construction was in progress covering area. 3.60mtr x 12.80mtr. R.C.C slab casted on Ground floor. Brick work at Ist floor was in progress at the time of inspection on 11. 08.2020.

The unauthorized construction has been carried out in violation of section 234, 235 and 238 of the Cantonments Act 2006. Erection / re-erection has been carried out involving material alterations, new building construction materials have been used for illegal Page 137 of 210

construction. The erection / re-erection being undertaken at aforementioned premises is in violation of building bye laws applicable to Delhi Cantonment notified by the Competent Authority vide Gazette Notification SRO No. DCB/4/Building Bye-Laws dated 08.06.2002. The site of unauthorized construction is located outside notified Civil area with in Delhi Cantonment limits in Sy.No. 165 classified as ‘C’ land under the management of the Delhi Cantonment Board, Delhi Cantt. It is recommended that notice under Section 248 of the Cantonments Act 2006 be issued to Sh. Ravinder Kumar S/o Sh. Pritam Singh asking him to remove the said unauthorized constructions within 30 days of the date of service of notice.

Relevant file is placed on the table.

97. Considered. The Board noted JEs inspection report as also the details of unauthorised construction brought out on the agenda side. The Board was of the considered opinion that illegal/ unauthorised construction has been carried out by Sh. Ravinder Kumar S/o Sh. Pritam Singh without obtaining sanction of the Competent Authority as required u/s 238 of the Cantonments Act, 2006 and in violation of Section 234, 235 & 247 of the Act and provisions made under applicable building bye laws notified by the Competent Authority for Delhi Cantonment area. The matter was discussed at length and the Board resolved that notice under section 248 of Cantonments Act 2006 be issued to Sh. Ravinder Kumar S/o Sh. Pritam Singh H.No. 8/99, Village Mehram Nagar, Delhi Cantt giving him 30 days time to remove the unauthorised construction. The Board further resolved that in the event of non compliance of the notice by Sh. Ravinder Kumar S/o Sh. Pritam Singh, the CEO, Member-Secretary will issue notice under section 320 of the Cantonments Act, 2006 to him giving 15 days time to demolish the said unauthorized construction failing which the unauthorized construction shall be demolished by the office at the risk and cost of Sh. Ravinder Kumar S/o Sh. Pritam Singh.

98. UNAUTHORIZED CONSTRUCTION MADE BY SH. RAVINDER KUMAR S/O SH. PRITAM SINGH H.NO. 8/99, VILLAGE MEHRAM NAGAR DELHI CANTT: ISSUE OF THE NOTICE UNDER SECTION 248 OF CANTONMENTS ACT 2006.

To consider JEs report dated 24.08.2020 regarding unauthorized construction carried out by Sh. Ravinder Kumar S/o Sh. Pritam Singh H.No. 8/99, Village Mehram Nagar, Delhi Cantt. The details of unauthorized construction carried out by Sh. Ravinder Kumar S/o Sh. Pritam Singh as reported in inspection report dated 24.08.2020 is given hereunder:

R.C.C slab casted on Istfloor& second floor covering area (i) 3.60mt x 12.80mt. Projecting R.C.C chajja also. Constructing rooms, Toilet, Kitchen etc. Brick work was in progress at the time of inspection on 24.08.2020.

The unauthorized construction has been carried out in violation of section 234, 235 and 238 of the Cantonments Act 2006. Erection / re-erection has been carried out involving material alterations, new building construction materials have been used for illegal construction. The erection / re-erection being undertaken at aforementioned premises is in violation of building bye laws applicable to Delhi Cantonment notified by the Competent Authority vide Gazette Notification SRO No. DCB/4/Building Bye-Laws dated 08.06.2002. The site of unauthorized construction is located outside notified Civil area with in Delhi Cantonment limits in Sy.No. 165 classified as ‘C’ land under the management of the Delhi Cantonment Board, Delhi Cantt. It is recommended that notice under Section 248 of the Page 138 of 210

Cantonments Act 2006 be issued to Sh. Ravinder Kumar S/o Sh. Pritam Singh asking him to remove the said unauthorized constructions within 30 days of the date of service of notice.

Relevant file is placed on the table.

98. Considered. The Board noted JEs inspection report as also the details of unauthorised construction brought out on the agenda side. The Board was of the considered opinion that illegal/ unauthorised construction has been carried out by Sh. Ravinder Kumar S/o Sh. Pritam Singh without obtaining sanction of the Competent Authority as required u/s 238 of the Cantonments Act, 2006 and in violation of Section 234, 235 & 247 of the Act and provisions made under applicable building bye laws notified by the Competent Authority for Delhi Cantonment area. The matter was discussed at length and the Board resolved that notice under section 248 of Cantonments Act 2006 be issued to Sh. Ravinder Kumar S/o Sh. Pritam Singh H.No. 8/99, Village Mehram Nagar, Delhi Cantt giving him 30 days time to remove the unauthorised construction. The Board further resolved that in the event of non compliance of the notice by Sh. Ravinder Kumar S/o Sh. Pritam Singh, the CEO, Member-Secretary will issue notice under section 320 of the Cantonments Act, 2006 to him giving 15 days time to demolish the said unauthorized construction failing which the unauthorized construction shall be demolished by the office at the risk and cost of Sh. Ravinder Kumar S/o Sh. Pritam Singh.

99. UNAUTHORIZED CONSTRUCTION MADE BY SH. RAVINDER KUMAR S/O SH. PRITAMSINGH H.NO. 8/99, VILLAGE MEHRAM NAGAR DELHI CANTT: ISSUE OF THE NOTICEUNDER SECTION 248 OF CANTONMENTS ACT 2006.

To consider JEs report dated 31.08.2020 regarding unauthorized construction carried out by Sh. Ravinder Kumar S/o Sh. Pritam Singh H.No. 8/99, Village Mehram Nagar, Delhi Cantt. The details of unauthorized construction carried out by Sh. Ravinder Kumar S/o Sh. Pritam Singh as reported in inspection report dated 31.08.2020 is given hereunder:

R.C.C. slab casted on Ist&IInd floor Covering area (1) 3.60mtr x 12.80mtr. Projecting R.C.C. Chajja Also Constructing Rooms, toilet, kitchen etc. Plastering work was in progress at the time of inspection on 31.08.2020.

The unauthorized construction has been carried out in violation of section 234, 235 and 238 of the Cantonments Act 2006. Erection / re-erection has been carried out involving material alterations, new building construction materials have been used for illegal construction. The erection / re-erection being undertaken at aforementioned premises is in violation of building bye laws applicable to Delhi Cantonment notified by the Competent Authority vide Gazette Notification SRO No. DCB/4/Building Bye-Laws dated 08.06.2002. The site of unauthorized construction is located outside notified Civil area with in Delhi Cantonment limits in Sy.No. 165 classified as ‘C’ land under the management of the Delhi Cantonment Board, Delhi Cantt. It is recommended that notice under Section 248 of the Cantonments Act 2006 be issued to Sh. Ravinder Kumar S/o Sh. Pritam Singh asking him to remove the said unauthorized constructions within 30 days of the date of service of notice.

Relevant file is placed on the table.

Page 139 of 210

99. Considered. The Board noted JEs inspection report as also the details of unauthorised construction brought out on the agenda side. The Board was of the considered opinion that illegal/ unauthorised construction has been carried out by Sh. Ravinder Kumar S/o Sh. Pritam Singh without obtaining sanction of the Competent Authority as required u/s 238 of the Cantonments Act, 2006 and in violation of Section 234, 235 & 247 of the Act and provisions made under applicable building bye laws notified by the Competent Authority for Delhi Cantonment area. The matter was discussed at length and the Board resolved that notice under section 248 of Cantonments Act 2006 be issued to Sh. Ravinder Kumar S/o Sh. Pritam Singh H.No. 8/99, Village Mehram Nagar, Delhi Cantt giving him 30 days time to remove the unauthorised construction. The Board further resolved that in the event of non compliance of the notice by Sh. Ravinder Kumar S/o Sh. Pritam Singh, the CEO, Member-Secretary will issue notice under section 320 of the Cantonments Act, 2006 to him giving 15 days time to demolish the said unauthorized construction failing which the unauthorized construction shall be demolished by the office at the risk and cost of Sh. Ravinder Kumar S/o Sh. Pritam Singh.

100. UNAUTHORIZED CONSTRUCTION MADE BY SMT. RANJU DEVI W/O SH. MUKESH THAKUR H.NO. S-313/35, G/B FIRST FLOOR, EAST MEHRAM NAGAR, DELHI CANTT: ISSUE OF THE NOTICE UNDER SECTION 248 OF CANTONMENTS ACT 2006.

To consider JEs report dated 08.06.2020 regarding unauthorized construction carried out by Smt. Ranju Devi W/o Sh. Mukesh Thakur H.No. S-313/35, G/B first floor, East Mehram Nagar, Delhi Cantt. The details of unauthorized construction carried out by Smt. Ranju Devi W/o Sh. Mukesh Thakur as reported in inspection report dated 08.06.2020 is given hereunder:

Constructing a room at first floor covering area. 2.50mt. x 3.70mt. Brick work upto roof level done.

The unauthorized construction has been carried out in violation of section 234, 235 and 238 of the Cantonments Act 2006. Erection / re-erection has been carried out involving material alterations, new building construction materials have been used for illegal construction. The erection / re-erection being undertaken at aforementioned premises is in violation of building bye laws applicable to Delhi Cantonment notified by the Competent Authority vide Gazette Notification SRO No. DCB/4/Building Bye-Laws dated 08.06.2002. The site of unauthorized construction is located outside notified Civil area with in Delhi Cantonment limits in Sy.No. 176 classified as B-1 land. It is recommended that notice under Section 248 of the Cantonments Act 2006 be issued to Smt. Ranju Devi W/o Sh. Mukesh Thakur asking her to remove the said unauthorized constructions within 30 days of the date of service of notice.

Relevant file is placed on the table.

100. Considered. The Board noted JEs inspection report as also the details of unauthorised construction brought out on the agenda side. The Board was of the considered opinion that illegal/ unauthorised construction has been carried out by Smt. Ranju Devi W/o Sh. Mukesh Thakur without obtaining sanction of the Competent Authority as required u/s 238 of the Cantonments Act, 2006 and in violation of Section 234, 235 & 247 of the Act and provisions made under applicable building bye laws notified by the Competent Authority for Delhi Cantonment area. The matter was discussed at length and the Board resolved that notice under section 248 of Cantonments Act 2006 be issued to Smt. Ranju Devi W/o Sh. Mukesh Thakur H.No. S-313/35, G/B first floor, East Mehram Nagar, Delhi Cantt giving her 30 days time to remove the unauthorised construction. The Board further resolved that in the event of non Page 140 of 210

compliance of the notice by Smt. Ranju Devi W/o Sh. Mukesh Thakur, the CEO, Member- Secretary will issue notice under section 320 of the Cantonments Act, 2006 to her giving 15 days time to demolish the said unauthorized construction failing which the unauthorized construction shall be demolished by the office at the risk and cost of Smt. Ranju Devi W/o Sh. Mukesh Thakur.

101. UNAUTHORIZED CONSTRUCTION MADE BY SH. NAVEEN KUMAR S/O SH. NARESH H.NO. T-53/C, VILLAGE EAST MEHRAM NAGAR, DELHI CANTT: ISSUE OF THE NOTICE UNDER SECTION 248 OF CANTONMENTS ACT 2006.

To consider JEs report dated 14.09.2020 regarding unauthorized construction carried out by Sh. Naveen Kumar S/o Sh. Naresh H.No. T-53/C, Village East Mehram Nagar, Delhi Cantt. The details of unauthorized construction carried out by Sh. Naveen Kumar S/o Sh. Naresh as reported in inspection report dated 14.09.2020 is given hereunder:

The following unauthorised construction on Ist floor was in progress covering area. (1) 6.50mtr x 3.10mtr. (2) 6.50mtr x 3.35mtr. Agra Stone roof laid over. Plastering work was in progress at the time of inspection on 14.09.2020.

The unauthorized construction has been carried out in violation of section 234, 235 and 238 of the Cantonments Act 2006. Erection / re-erection has been carried out involving material alterations, new building construction materials have been used for illegal construction. The erection / re-erection being undertaken at aforementioned premises is in violation of building bye laws applicable to Delhi Cantonment notified by the Competent Authority vide Gazette Notification SRO No. DCB/4/Building Bye-Laws dated 08.06.2002. The site of unauthorized construction is located outside notified Civil area with in Delhi Cantonment limits in Sy.No. 176/A classified as B-1 land. It is recommended that notice under Section 248 of the Cantonments Act 2006 be issued to Sh. Naveen Kumar S/o Sh. Naresh asking him to remove the said unauthorized constructions within 30 days of the date of service of notice.

Relevant file is placed on the table.

101. Considered. The Board noted JEs inspection report as also the details of unauthorised construction brought out on the agenda side. The Board was of the considered opinion that illegal/ unauthorised construction has been carried out by Sh. Naveen Kumar S/o Sh. Naresh without obtaining sanction of the Competent Authority as required u/s 238 of the Cantonments Act, 2006 and in violation of Section 234, 235 & 247 of the Act and provisions made under applicable building bye laws notified by the Competent Authority for Delhi Cantonment area. The matter was discussed at length and the Board resolved that notice under section 248 of Cantonments Act 2006 be issued to Sh. Naveen Kumar S/o Sh. Naresh H.No. T-53/C, Village East Mehram Nagar,Delhi Cantt giving him 30 days time to remove the unauthorised construction. The Board further resolved that in the event of non compliance of the notice by Sh. Naveen Kumar S/o Sh. Naresh, the CEO, Member-Secretary will issue notice under section 320 of the Cantonments Act, 2006 to him giving 15 days time to demolish the said unauthorized construction failing which the unauthorized construction shall be demolished by the office at the risk and cost of Sh. Naveen Kumar S/o Sh. Naresh.

Page 141 of 210

102. UNAUTHORIZED CONSTRUCTION MADE BYSMT. JAYPALI W/O LATE SH. DHARAM SINGH H.NO. J/16D, VILLAGE EAST MEHRAM NAGAR, DELHI CANTT: ISSUE OF THE NOTICE UNDER SECTION 248 OF CANTONMENTS ACT 2006.

To consider JEs report dated 30.07.2020 regarding unauthorized construction carried out bySmt. Jaypali W/o Late Sh. Dharam Singh H.No. J/16D, Village East Mehram Nagar, Delhi Cantt. The details of unauthorized construction carried out by Smt. Jaypali W/o Late Sh. Dharam Singh as reported in inspection report dated 30.07.2020 is given hereunder:

After demolishing existing construction in inside portion of his house following unauthorised construction is in progress covering area.5.50mtr x 6.80mtr.Constructing room, toilet, kitchen etc. Agra Stone roof laid over ground floor. Plastering work was in progress at the time of inspection on 30.07.2020.

The unauthorized construction has been carried out in violation of section 234, 235 and 238 of the Cantonments Act 2006. Erection / re-erection has been carried out involving material alterations, new building construction materials have been used for illegal construction. The erection / re-erection being undertaken at aforementioned premises is in violation of building bye laws applicable to Delhi Cantonment notified by the Competent Authority vide Gazette Notification SRO No. DCB/4/Building Bye-Laws dated 08.06.2002. The site of unauthorized construction is located outside notified Civil area with in Delhi Cantonment limits in Sy.No. 176/A classified as B-1 land. It is recommended that notice under Section 248 of the Cantonments Act 2006 be issued to Smt. Jaypali W/o Late Sh. Dharam Singh asking her to remove the said unauthorized constructions within 30 days of the date of service of notice.

Relevant file is placed on the table.

102. Considered. The Board noted JEs inspection report as also the details of unauthorised construction brought out on the agenda side. The Board was of the considered opinion that illegal/ unauthorised construction has been carried out by Smt. Jaypali W/o Late Sh. Dharam Singh without obtaining sanction of the Competent Authority as required u/s 238 of the Cantonments Act, 2006 and in violation of Section 234, 235 & 247 of the Act and provisions made under applicable building bye laws notified by the Competent Authority for Delhi Cantonment area. The matter was discussed at length and the Board resolved that notice under section 248 of Cantonments Act 2006 be issued to Smt. Jaypali W/o Late Sh. Dharam Singh H.No. J/16D, Village East Mehram Nagar,Delhi Cantt giving her 30 days time to remove the unauthorised construction. The Board further resolved that in the event of non compliance of the notice by Smt. Jaypali W/o Late Sh. Dharam Singh, the CEO, Member-Secretary will issue notice under section 320 of the Cantonments Act, 2006 to her giving 15 days time to demolish the said unauthorized construction failing which the unauthorized construction shall be demolished by the office at the risk and cost of Smt. Jaypali W/o Late Sh. Dharam Singh.

103. UNAUTHORIZED CONSTRUCTION MADE BY SH. VIJAY KUMAR S/O RAM SINGH H.NO. T-39/60, EAST MEHRAM NAGAR,DELHI CANTT: ISSUE OF THE NOTICE UNDER SECTION 248 OF CANTONMENTS ACT 2006.

To consider JEs report dated 21.03.2020 regarding unauthorized construction carried out by Sh. Vijay Kumar S/o Ram Singh H.No. T-39/60, EastMehram Nagar, Delhi Cantt. The

Page 142 of 210

details of unauthorized construction carried out by Sh. Vijay Kumar S/o Ram Singh as reported in inspection report dated 21.03.2020 is given hereunder:

After demolishing existing constructing Brick work is done on Ground floor covering area. 3.55mt x 8.00mt.constructing room, toilet etc. Laying of Agra Stone roof was in progress.

The unauthorized construction has been carried out in violation of section 234, 235 and 238 of the Cantonments Act 2006. Erection / re-erection has been carried out involving material alterations, new building construction materials have been used for illegal construction. The erection / re-erection being undertaken at aforementioned premises is in violation of building bye laws applicable to Delhi Cantonment notified by the Competent Authority vide Gazette Notification SRO No. DCB/4/Building Bye-Laws dated 08.06.2002. The site of unauthorized construction is located outside notified Civil area with in Delhi Cantonment limits in Sy.No. 176 classified as B-1 land. It is recommended that notice under Section 248 of the Cantonments Act 2006 be issued to Sh. Vijay Kumar S/o Ram Singh asking him to remove the said unauthorized constructions within 30 days of the date of service of notice.

Relevant file is placed on the table.

103. Considered. The Board noted JEs inspection report as also the details of unauthorised construction brought out on the agenda side. The Board was of the considered opinion that illegal/ unauthorised construction has been carried out by Sh. Vijay Kumar S/o Ram Singhwithout obtaining sanction of the Competent Authority as required u/s 238 of the Cantonments Act, 2006 and in violation of Section 234, 235 & 247 of the Act and provisions made under applicable building bye laws notified by the Competent Authority for Delhi Cantonment area. The matter was discussed at length and the Board resolved that notice under section 248 of Cantonments Act 2006 be issued to Sh. Vijay Kumar S/o Ram Singh H.No. T-39/60, EastMehram Nagar,Delhi Cantt giving him 30 days time to remove the unauthorised construction. The Board further resolved that in the event of non compliance of the notice by Sh. Vijay Kumar S/o Ram Singh, the CEO, Member-Secretary will issue notice under section 320 of the Cantonments Act, 2006 to him giving 15 days time to demolish the said unauthorized construction failing which the unauthorized construction shall be demolished by the office at the risk and cost of Sh. Vijay Kumar S/o Ram Singh.

104. UNAUTHORIZED CONSTRUCTION MADE BY SH. VIJAY KUMAR S/O RAM SINGH H.NO. T-39/60, EAST MEHRAM NAGAR, DELHI CANTT: ISSUE OF THE NOTICE UNDER SECTION 248 OF CANTONMENTS ACT 2006.

To consider JEs report dated 16.07.2020 regarding unauthorized construction carried out by Sh. Vijay Kumar S/o Ram Singh H.No. T-39/60, EastMehram Nagar, Delhi Cantt. The details of unauthorized construction carried out by Sh. Vijay Kumar S/o Ram Singh as reported in inspection report dated 16.07.2020 is given hereunder:

Brick work done on I floor covering area. 3.55mtr x 8.00mtr. Constructing room, Toilet etc. Agra Stone roof laid over. Agra Stone roof laid over I floor was in progress at the time of inspection on 16.07.2020. Page 143 of 210

The unauthorized construction has been carried out in violation of section 234, 235 and 238 of the Cantonments Act 2006. Erection / re-erection has been carried out involving material alterations, new building construction materials have been used for illegal construction. The erection / re-erection being undertaken at aforementioned premises is in violation of building bye laws applicable to Delhi Cantonment notified by the Competent Authority vide Gazette Notification SRO No. DCB/4/Building Bye-Laws dated 08.06.2002. The site of unauthorized construction is located outside notified Civil area with in Delhi Cantonment limits in Sy.No. 176 classified as B-1 land. It is recommended that notice under Section 248 of the Cantonments Act 2006 be issued to Sh. Vijay Kumar S/o Ram Singh asking him to remove the said unauthorized constructions within 30 days of the date of service of notice.

Relevant file is placed on the table.

104. Considered. The Board noted JEs inspection report as also the details of unauthorised construction brought out on the agenda side. The Board was of the considered opinion that illegal/ unauthorised construction has been carried out by Sh. Vijay Kumar S/o Ram Singhwithout obtaining sanction of the Competent Authority as required u/s 238 of the Cantonments Act, 2006 and in violation of Section 234, 235 & 247 of the Act and provisions made under applicable building bye laws notified by the Competent Authority for Delhi Cantonment area. The matter was discussed at length and the Board resolved that notice under section 248 of Cantonments Act 2006 be issued to Sh. Vijay Kumar S/o Ram Singh H.No. T-39/60, EastMehram Nagar,Delhi Cantt giving him 30 days time to remove the unauthorised construction. The Board further resolved that in the event of non compliance of the notice by Sh. Vijay Kumar S/o Ram Singh, the CEO, Member-Secretary will issue notice under section 320 of the Cantonments Act, 2006 to him giving 15 days time to demolish the said unauthorized construction failing which the unauthorized construction shall be demolished by the office at the risk and cost of Sh. Vijay Kumar S/o Ram Singh.

105. UNAUTHORIZED CONSTRUCTION MADE BY SMT. SUNITA W/O SH. DESHRAJ SINGH H.NO. J-69/2, VILLAGE EAST MEHRAM NAGAR, DELHI CANTT: ISSUE OF THE NOTICE UNDER SECTION 248 OF CANTONMENTS ACT 2006.

To consider JEs report dated 21.03.2020 regarding unauthorized construction carried out by Smt. Sunita W/o Sh. Deshraj Singh H.No. J-69/2, Village, East Mehram Nagar, Delhi Cantt. The details of unauthorized construction carried out by Smt. Sunita W/o Sh. Deshraj Singh as reported in inspection report dated 21.03.2020 is given hereunder:

The following unauthorised construction is done on Ist floor covering area. (1) Room 2.50mt x 4.00mt. (2) Toilet & Kitchen 4.10mt x 1.10mt.

The unauthorized construction has been carried out in violation of section 234, 235 and 238 of the Cantonments Act 2006. Erection / re-erection has been carried out involving material alterations, new building construction materials have been used for illegal construction. The erection / re-erection being undertaken at aforementioned premises is in violation of building bye laws applicable to Delhi Cantonment notified by the Competent Authority vide Gazette Notification SRO No. DCB/4/Building Bye-Laws dated 08.06.2002. The site of unauthorized construction is located outside notified Civil area with in Delhi Cantonment limits in Sy.No. 176 classified as B-1 land. It is recommended that notice under Page 144 of 210

Section 248 of the Cantonments Act 2006 be issued to Smt. Sunita W/o Sh. Deshraj Singh asking her to remove the said unauthorized constructions within 30 days of the date of service of notice.

Relevant file is placed on the table.

105. Considered. The Board noted JEs inspection report as also the details of unauthorised construction brought out on the agenda side. The Board was of the considered opinion that illegal/ unauthorised construction has been carried out by Smt. Sunita W/o Sh. Deshraj Singh without obtaining sanction of the Competent Authority as required u/s 238 of the Cantonments Act, 2006 and in violation of Section 234, 235 & 247 of the Act and provisions made under applicable building bye laws notified by the Competent Authority for Delhi Cantonment area. The matter was discussed at length and the Board resolved that notice under section 248 of Cantonments Act 2006 be issued to Smt. Sunita W/o Sh. Deshraj Singh H.No. J-69/2, Village, East Mehram Nagar,Delhi Cantt giving her 30 days time to remove the unauthorised construction. The Board further resolved that in the event of non compliance of the notice by Smt. Sunita W/o Sh. Deshraj Singh, the CEO, Member-Secretary will issue notice under section 320 of the Cantonments Act, 2006 to her giving 15 days time to demolish the said unauthorized construction failing which the unauthorized construction shall be demolished by the office at the risk and cost of Smt. Sunita W/o Sh. Deshraj Singh.

106. UNAUTHORIZED CONSTRUCTION MADE BY SMT. MITHLESH W/O SH. PARAS NATH H.NO. J-39, VILLAGE EAST MEHRAM NAGAR, DELHI CANTT: ISSUE OF THE NOTICE UNDER SECTION 248 OF CANTONMENTS ACT 2006.

To consider JEs report dated 21.03.2020 regarding unauthorized construction carried out by Smt. Mithlesh W/o Sh. Paras Nath H.No. J-39, Village East MehramNagar,Delhi Cantt. The details of unauthorized construction carried out by Smt. Mithlesh W/o Sh. Paras Nath as reported in inspection report dated 21.03.2020 is given hereunder:

After demolishing existing construction on ground floor. Brick work done upto roof level covering area. 3.90mtr x 6.10mtr constructing room, toilet etc. Laying of Agra Stone roof was in progress at the time of inspection on 21.03.2020.

The unauthorized construction has been carried out in violation of section 234, 235 and 238 of the Cantonments Act 2006. Erection / re-erection has been carried out involving material alterations, new building construction materials have been used for illegal construction. The erection / re-erection being undertaken at aforementioned premises is in violation of building bye laws applicable to Delhi Cantonment notified by the Competent Authority vide Gazette Notification SRO No. DCB/4/Building Bye-Laws dated 08.06.2002. The site of unauthorized construction is located outside notified Civil area with in Delhi Cantonment limits in Sy.No. 176/A classified as B-1 land. It is recommended that notice under Section 248 of the Cantonments Act 2006 be issued to Smt. Mithlesh W/o Sh. Paras Nath asking her to remove the said unauthorized constructions within 30 days of the date of service of notice.

Relevant file is placed on the table.

Page 145 of 210

106. Considered. The Board noted JEs inspection report as also the details of unauthorised construction brought out on the agenda side. The Board was of the considered opinion that illegal/ unauthorised construction has been carried out by Smt. Mithlesh W/o Sh. Paras Nath without obtaining sanction of the Competent Authority as required u/s 238 of the Cantonments Act, 2006 and in violation of Section 234, 235 & 247 of the Act and provisions made under applicable building bye laws notified by the Competent Authority for Delhi Cantonment area. The matter was discussed at length and the Board resolved that notice under section 248 of Cantonments Act 2006 be issued to Smt. Mithlesh W/o Sh. Paras Nath H.No. J-39, Village East Mehram Nagar,Delhi Cantt giving her 30 days time to remove the unauthorised construction. The Board further resolved that in the event of non compliance of the notice by Smt. Mithlesh W/o Sh. Paras Nath, the CEO, Member-Secretary will issue notice under section 320 of the Cantonments Act, 2006 to her giving 15 days time to demolish the said unauthorized construction failing which the unauthorized construction shall be demolished by the office at the risk and cost of Smt. Mithlesh W/o Sh. Paras Nath.

107. UNAUTHORIZED CONSTRUCTION MADE BY SMT. MITHLESH W/O SH. PARAS NATH H.NO. J-39, VILLAGE EAST MEHRAM NAGAR, DELHI CANTT: ISSUE OF THE NOTICE UNDER SECTION 248 OF CANTONMENTS ACT 2006.

To consider JEs report dated 16.07.2020 regarding unauthorized construction carried out by Smt. Mithlesh W/o Sh. Paras Nath H.No. J-39, Village East MehramNagar,Delhi Cantt. The details of unauthorized construction carried out by Smt. Mithlesh W/o Sh. Paras Nath as reported in inspection report dated 16.07.2020 is given hereunder:

Brick work on Ist floor upto roof level done covering area. 3.90mt x 6.10mt. Agra Stone roof laid over I floor. Agra Stone roof over I floor at the time of inspection on 16.07.2020.

The unauthorized construction has been carried out in violation of section 234, 235 and 238 of the Cantonments Act 2006. Erection / re-erection has been carried out involving material alterations, new building construction materials have been used for illegal construction. The erection / re-erection being undertaken at aforementioned premises is in violation of building bye laws applicable to Delhi Cantonment notified by the Competent Authority vide Gazette Notification SRO No. DCB/4/Building Bye-Laws dated 08.06.2002. The site of unauthorized construction is located outside notified Civil area with in Delhi Cantonment limits in Sy.No. 176/A classified as B-1 land. It is recommended that notice under Section 248 of the Cantonments Act 2006 be issued to Smt. Mithlesh W/o Sh. Paras Nath asking her to remove the said unauthorized constructions within 30 days of the date of service of notice.

Relevant file is placed on the table.

107. Considered. The Board noted JEs inspection report as also the details of unauthorised construction brought out on the agenda side. The Board was of the considered opinion that illegal/ unauthorised construction has been carried out by Smt. Mithlesh W/o Sh. Paras Nath without obtaining sanction of the Competent Authority as required u/s 238 of the Cantonments Act, 2006 and in violation of Section 234, 235 & 247 of the Act and provisions made under applicable building bye laws notified by the Competent Authority for Delhi Cantonment area. The matter was discussed at length and the Board resolved that notice under section 248 of Cantonments Act 2006 be issued to Smt. Mithlesh W/o Sh. Paras Nath H.No. J-39, Village East Mehram Nagar,Delhi Cantt giving her 30 days time to remove the unauthorised construction. Page 146 of 210

The Board further resolved that in the event of non compliance of the notice by Smt. Mithlesh W/o Sh. Paras Nath, the CEO, Member-Secretary will issue notice under section 320 of the Cantonments Act, 2006 to her giving 15 days time to demolish the said unauthorized construction failing which the unauthorized construction shall be demolished by the office at the risk and cost of Smt. Mithlesh W/o Sh. Paras Nath.

108. UNAUTHORIZED CONSTRUCTION MADE BY SMT. SUMITRA W/O RAM BHAROSE H.NO. 313/124/5 ( NEAR SHIV MANDIR ) VILLAGE EAST MEHRAM NAGAR, DELHI CANTT: ISSUE OF THE NOTICE UNDER SECTION 248 OF CANTONMENTS ACT 2006.

To consider JEs report dated 14.09.2020 regarding unauthorized construction carried out by Smt. Sumitra W/o Ram BharoseH.No. 313/124/5 (Near Shiv Mandir ), Village East Mehram Nagar,Delhi Cantt. The details of unauthorized construction carried out by Smt. Sumitra W/o Ram Bharose as reported in inspection report dated 14.09.2020 is given hereunder:

After demolishing existing construction the following Unauthorised Construction was in progress covering area. (1) 2.80mtr x 6.80mtr. (2) 6.20mtr x 2.90mtr. Brick work upto roof level done. Brick work of area upto roof level done at time of inspection on 14.09.2020.

The unauthorized construction has been carried out in violation of section 234, 235 and 238 of the Cantonments Act 2006. Erection / re-erection has been carried out involving material alterations, new building construction materials have been used for illegal construction. The erection / re-erection being undertaken at aforementioned premises is in violation of building bye laws applicable to Delhi Cantonment notified by the Competent Authority vide Gazette Notification SRO No. DCB/4/Building Bye-Laws dated 08.06.2002. The site of unauthorized construction is located outside notified Civil area with in Delhi Cantonment limits in Sy.No. 176 classified as B-1 land. It is recommended that notice under Section 248 of the Cantonments Act 2006 be issued to Smt. Sumitra W/o Ram Bharose asking her to remove the said unauthorized constructions within 30 days of the date of service of notice.

Relevant file is placed on the table.

108. Considered. The Board noted JEs inspection report as also the details of unauthorised construction brought out on the agenda side. The Board was of the considered opinion that illegal/ unauthorised construction has been carried out by Smt. Sumitra W/o Ram Bharosewithout obtaining sanction of the Competent Authority as required u/s 238 of the Cantonments Act, 2006 and in violation of Section 234, 235 & 247 of the Act and provisions made under applicable building bye laws notified by the Competent Authority for Delhi Cantonment area. The matter was discussed at length and the Board resolved that notice under section 248 of Cantonments Act 2006 be issued to Smt. Sumitra W/o Ram BharoseH.No. 313/124/5 (Near Shiv Mandir ), Village East Mehram Nagar,Delhi Cantt giving her 30 days time to remove the unauthorised construction. The Board further resolved that in the event of non compliance of the notice by Smt. Sumitra W/o Ram Bharose, the CEO, Member-Secretary will issue notice under section 320 of the Cantonments Act, 2006 to her giving 15 days time to

Page 147 of 210

demolish the said unauthorized construction failing which the unauthorized construction shall be demolished by the office at the risk and cost of Smt. Sumitra W/o Ram Bharose.

109. UNAUTHORIZED CONSTRUCTION MADE BY SMT. PREMWATI W/O SH. KANWAL SINGH H.NO. 20/60, 60 STAFF QTRS, VILLAGE EAST MEHRAM NAGAR DELHI CANTT: ISSUE OF THE NOTICE UNDER SECTION 248 OF CANTONMENTS ACT 2006.

To consider JEs report dated 26.06.2020 regarding unauthorized construction carried out by Smt. Premwati W/o Sh. Kanwal Singh H.No. 20/60, 60Staff Qtrs, Village East Mehram Nagar, Delhi Cantt.The details of unauthorized construction carried out by Smt. Premwati W/o Sh. Kanwal Singh as reported in inspection report dated 26.06.2020 is given hereunder:

After demolishing existing construction the following unauthorised construction on ground floor was in progress covering area. 3.70mtr x 10.33mtr. Constructing rooms, toilets, kitchen etc. R.C.C. Columns Casted. Brick work on Ground floor was in progress at the time of inspection on 26.06.2020.

The unauthorized construction has been carried out in violation of section 234, 235 and 238 of the Cantonments Act 2006. Erection / re-erection has been carried out involving material alterations, new building construction materials have been used for illegal construction. The erection / re-erection being undertaken at aforementioned premises is in violation of building bye laws applicable to Delhi Cantonment notified by the Competent Authority vide Gazette Notification SRO No. DCB/4/Building Bye-Laws dated 08.06.2002. The site of unauthorized construction is located outside notified Civil area with in Delhi Cantonment limits in Sy. No. 176/2, classified as ‘C’ land under the management of Delhi Cantonment Board, Delhi Cantt. It is recommended that notice under Section 248 of the Cantonments Act 2006 be issued to Smt. Premwati W/o Sh. Kanwal Singh asking her to remove the said unauthorized constructions within 30 days of the date of service of notice.

Relevant file is placed on the table.

109. Considered. The Board noted JEs inspection report as also the details of unauthorised construction brought out on the agenda side. The Board was of the considered opinion that illegal/ unauthorised construction has been carried out by Smt. Premwati W/o Sh. Kanwal Singhwithout obtaining sanction of the Competent Authority as required u/s 238 of the Cantonments Act, 2006 and in violation of Section 234, 235 & 247 of the Act and provisions made under applicable building bye laws notified by the Competent Authority for Delhi Cantonment area. The matter was discussed at length and the Board resolved that notice under section 248 of Cantonments Act 2006 be issued to Smt. Premwati W/o Sh. Kanwal Singh H.No. 20/60, 60Staff Qtrs, Village East Mehram Nagar, Delhi Cantt giving her 30 days time to remove the unauthorised construction. The Board further resolved that in the event of non compliance of the notice by Smt. Premwati W/o Sh. Kanwal Singh, the CEO, Member-Secretary will issue notice under section 320 of the Cantonments Act, 2006 to her giving 15 days time to demolish the said unauthorized construction failing which the unauthorized construction shall be demolished by the office at the risk and cost of Smt. Premwati W/o Sh. Kanwal Singh.

Page 148 of 210

110. UNAUTHORIZED CONSTRUCTION MADE BY SH. SATPAL S/O SH. SURAJ BHAN H.NO. 47/60, VILLAGE EAST MEHRAM NAGAR DELHI CANTT: ISSUE OF THE NOTICE UNDER SECTION 248 OF CANTONMENTS ACT 2006.

To consider JEs report dated 15.07.2020 regarding unauthorized construction carried out by Sh. Satpal S/o Sh. Suraj BhanH.No. 47/60, Village East Mehram Nagar, Delhi Cantt.The details of unauthorized construction carried out by Sh. Satpal S/o Sh. Suraj Bhan as reported in inspection report dated 15.07.2020 is given hereunder:

R.C. C slab casted on ground floor Covering area.3.25mtr x 6.10mtr. Constructing room, toilet, kitchen etc. After demolishing existing construction. Brick work at I floor was in progress at the time of inspection on 15.07.2020.

The unauthorized construction has been carried out in violation of section 234, 235 and 238 of the Cantonments Act 2006. Erection / re-erection has been carried out involving material alterations, new building construction materials have been used for illegal construction. The erection / re-erection being undertaken at aforementioned premises is in violation of building bye laws applicable to Delhi Cantonment notified by the Competent Authority vide Gazette Notification SRO No. DCB/4/Building Bye-Laws dated 08.06.2002. The site of unauthorized construction is located outside notified Civil area with in Delhi Cantonment limits in Sy. No. 176/2, classified as ‘C’ land under the management of Delhi Cantonment Board, Delhi Cantt. It is recommended that notice under Section 248 of the Cantonments Act 2006 be issued to Sh. Satpal S/o Sh. Suraj BhanSingh asking him to remove the said unauthorized constructions within 30 days of the date of service of notice.

Relevant file is placed on the table.

110. Considered. The Board noted JEs inspection report as also the details of unauthorised construction brought out on the agenda side. The Board was of the considered opinion that illegal/ unauthorised construction has been carried out by Sh. Satpal S/o Sh. Suraj Bhanwithout obtaining sanction of the Competent Authority as required u/s 238 of the Cantonments Act, 2006 and in violation of Section 234, 235 & 247 of the Act and provisions made under applicable building bye laws notified by the Competent Authority for Delhi Cantonment area. The matter was discussed at length and the Board resolved that notice under section 248 of Cantonments Act 2006 be issued to Sh. Satpal S/o Sh. Suraj BhanH.No. 47/60, Village East Mehram Nagar, Delhi Cantt giving him 30 days time to remove the unauthorised construction. The Board further resolved that in the event of non compliance of the notice by Sh. Satpal S/o Sh. Suraj Bhan, the CEO, Member-Secretary will issue notice under section 320 of the Cantonments Act, 2006 to him giving 15 days time to demolish the said unauthorized construction failing which the unauthorized construction shall be demolished by the office at the risk and cost of Sh. Satpal S/o Sh. Suraj Bhan.

Page 149 of 210

111. UNAUTHORIZED CONSTRUCTION MADE BY SMT. PREM LATA W/O SH. HANS RAJ H.NO 44/60, EAST MEHRAM NAGAR, DELHI CANTT: ISSUE OF THE NOTICE UNDERSECTION 248 OF CANTONMENTS ACT 2006.

To consider JEs report dated 26.05.2020 regarding unauthorized construction carried out by Smt. Prem Lata W/o Sh. Hans Raj H.No 44/60, East Mehram Nagar, Delhi Cantt. The details of unauthorized construction carried out by Smt. Prem Lata W/o Sh. Hans Raj as reported in inspection report dated 26.05.2020 is given hereunder:

The following unauthorised construction done on Ist floor covering area. 1. Room : 3.30 x 3.66mt. 2. Room : 3.30 x 5.18mt. 3. Varandha : 3.30 x 2.14mt. Constructing Toilet Kitchen etc. Agra Stone roof laid over the time of inspection on 26.05.2020.

The unauthorized construction has been carried out in violation of section 234, 235 and 238 of the Cantonments Act 2006. Erection / re-erection has been carried out involving material alterations, new building construction materials have been used for illegal construction. The erection / re-erection being undertaken at aforementioned premises is in violation of building bye laws applicable to Delhi Cantonment notified by the Competent Authority vide Gazette Notification SRO No. DCB/4/Building Bye-Laws dated 08.06.2002. The site of unauthorized construction is located outside notified Civil area with in Delhi Cantonment limits in Sy. No. 176, classified as ‘C’ land under the management of Delhi Cantonment Board, Delhi Cantt. It is recommended that notice under Section 248 of the Cantonments Act 2006 be issued to Smt. Prem Lata W/o Sh. Hans Raj asking her to remove the said unauthorized constructions within 30 days of the date of service of notice.

Relevant file is placed on the table.

111. Considered. The Board noted JEs inspection report as also the details of unauthorised construction brought out on the agenda side. The Board was of the considered opinion that illegal/ unauthorised construction has been carried out by Smt. Prem Lata W/o Sh. Hans Raj without obtaining sanction of the Competent Authority as required u/s 238 of the Cantonments Act, 2006 and in violation of Section 234, 235 & 247 of the Act and provisions made under applicable building bye laws notified by the Competent Authority for Delhi Cantonment area. The matter was discussed at length and the Board resolved that notice under section 248 of Cantonments Act 2006 be issued to Smt. Prem Lata W/o Sh. Hans Raj H.No 44/60, East Mehram Nagar, Delhi Cantt giving her 30 days time to remove the unauthorised construction. The Board further resolved that in the event of non compliance of the notice by Smt. Prem Lata W/o Sh. Hans Raj, the CEO, Member-Secretary will issue notice under section 320 of the Cantonments Act, 2006 to her giving 15 days time to demolish the said unauthorized construction failing which the unauthorized construction shall be demolished by the office at the risk and cost of Smt. Prem Lata W/o Sh. Hans Raj.

Page 150 of 210

112. UNAUTHORIZED CONSTRUCTION MADE BY SMT PREM LATA W/O SH. HANS RAJ H.NO 44/60, EAST MEHRAM NAGAR, DELHI CANTT: ISSUE OF THE NOTICE UNDER SECTION 248 OF CANTONMENTS ACT 2006.

To consider JEs report dated 09.06.2020 regarding unauthorized construction carried out by Smt Prem Lata W/o Sh. Hans Raj H.No 44/60, East Mehram Nagar, Delhi Cantt. The details of unauthorized construction carried out by Smt Prem Lata W/o Sh. Hans Raj as reported in inspection report dated 09.06.2020 is given hereunder:

The following unauthorised construction done on IInd floor covering area. 1. Room : 3.30 x 3.66mt. 2. Room : 3.30 x 5.18mt. 3. Varandha : 3.30 x 2.14mt. Constructing Toilet Kitchen etc. Agra Stone laid on II floor. Plastering work was in progress at the time of inspection on 09.06.2020.

The unauthorized construction has been carried out in violation of section 234, 235 and 238 of the Cantonments Act 2006. Erection / re-erection has been carried out involving material alterations, new building construction materials have been used for illegal construction. The erection / re-erection being undertaken at aforementioned premises is in violation of building bye laws applicable to Delhi Cantonment notified by the Competent Authority vide Gazette Notification SRO No. DCB/4/Building Bye-Laws dated 08.06.2002. The site of unauthorized construction is located outside notified Civil area with in Delhi Cantonment limits in Sy. No. 176, classified as ‘C’ land under the management of Delhi Cantonment Board, Delhi Cantt. It is recommended that notice under Section 248 of the Cantonments Act 2006 be issued to Smt Prem Lata W/o Sh. Hans Raj asking her to remove the said unauthorized constructions within 30 days of the date of service of notice.

Relevant file is placed on the table.

112. Considered. The Board noted JEs inspection report as also the details of unauthorised construction brought out on the agenda side. The Board was of the considered opinion that illegal/ unauthorised construction has been carried out by Smt. Prem Lata W/o Sh. Hans Raj without obtaining sanction of the Competent Authority as required u/s 238 of the Cantonments Act, 2006 and in violation of Section 234, 235 & 247 of the Act and provisions made under applicable building bye laws notified by the Competent Authority for Delhi Cantonment area. The matter was discussed at length and the Board resolved that notice under section 248 of Cantonments Act 2006 be issued to Smt. Prem Lata W/o Sh. Hans Raj H.No 44/60, East Mehram Nagar, Delhi Cantt giving her 30 days time to remove the unauthorised construction. The Board further resolved that in the event of non compliance of the notice by Smt. Prem Lata W/o Sh. Hans Raj, the CEO, Member-Secretary will issue notice under section 320 of the Cantonments Act, 2006 to her giving 15 days time to demolish the said unauthorized construction failing which the unauthorized construction shall be demolished by the office at the risk and cost of Smt. Prem Lata W/o Sh. Hans Raj.

Page 151 of 210

113. UNAUTHORIZED CONSTRUCTION MADE BY SMT PREM LATA W/O SH. HANS RAJ H.NO 44/60, EAST MEHRAM NAGAR, DELHI CANTT: ISSUE OF THE NOTICE UNDER SECTION 248 OF CANTONMENTS ACT 2006.

To consider JEs report dated 16.07.2020 regarding unauthorized construction carried out by Smt Prem Lata W/o Sh. Hans Raj H.No 44/60, East Mehram Nagar, Delhi Cantt. The details of unauthorized construction carried out by Smt Prem Lata W/o Sh. Hans Raj as reported in inspection report dated 16.07.2020 is given hereunder:

The Unauthorised Construction done on III floor covering area. 1. Room : 3.30 x 3.66mt. 2. Room : 3.30 x 5.18mt. 3. Varandha : 3.30 x 2.14mt. Constructing Toilet Bathroom etc. Agra Stone laid on III floor. Plastering work was in progress at the time of inspection on 16.07.2020.

The unauthorized construction has been carried out in violation of section 234, 235 and 238 of the Cantonments Act 2006. Erection / re-erection has been carried out involving material alterations, new building construction materials have been used for illegal construction. The erection / re-erection being undertaken at aforementioned premises is in violation of building bye laws applicable to Delhi Cantonment notified by the Competent Authority vide Gazette Notification SRO No. DCB/4/Building Bye-Laws dated 08.06.2002. The site of unauthorized construction is located outside notified Civil area with in Delhi Cantonment limits in Sy. No. 176 classified as ‘C’ land under the management of Delhi Cantonment Board, Delhi Cantt. It is recommended that notice under Section 248 of the Cantonments Act 2006 be issued to Smt Prem Lata W/o Sh. Hans Raj asking her to remove the said unauthorized constructions within 30 days of the date of service of notice.

Relevant file is placed on the table.

113. Considered. The Board noted JEs inspection report as also the details of unauthorised construction brought out on the agenda side. The Board was of the considered opinion that illegal/ unauthorised construction has been carried out by Smt. Prem Lata W/o Sh. Hans Raj without obtaining sanction of the Competent Authority as required u/s 238 of the Cantonments Act, 2006 and in violation of Section 234, 235 & 247 of the Act and provisions made under applicable building bye laws notified by the Competent Authority for Delhi Cantonment area. The matter was discussed at length and the Board resolved that notice under section 248 of Cantonments Act 2006 be issued to Smt. Prem Lata W/o Sh. Hans Raj H.No 44/60, East Mehram Nagar, Delhi Cantt giving her 30 days time to remove the unauthorised construction. The Board further resolved that in the event of non compliance of the notice by Smt. Prem Lata W/o Sh. Hans Raj, the CEO, Member-Secretary will issue notice under section 320 of the Cantonments Act, 2006 to her giving 15 days time to demolish the said unauthorized construction failing which the unauthorized construction shall be demolished by the office at the risk and cost of Smt. Prem Lata W/o Sh. Hans Raj.

114. UNAUTHORIZED CONSTRUCTION MADE BY SMT. SAROJ W/O LATE SH. JOGI RAM H.NO. 27, S-170, NEAR LIBRARY JHUGGI AREA , VILLAGE JHARERA, DELHI CANTT: ISSUE OF THE NOTICE UNDER SECTION 248 OF CANTONMENTS ACT 2006.

To consider JEs report dated 16.06.2020 regarding unauthorized construction carried out by Smt. Saroj W/o Late Sh. Jogi Ram H.No. 27, S-170, Near Library Jhuggi Area , Village Page 152 of 210

Jharera, Delhi Cantt. The details of unauthorized construction carried out by Smt. Saroj W/o Late Sh. Jogi Ram as reported in inspection report dated 16.06.2020 is given hereunder:

After Partially demolishing existing construction & encroached Govt. land on front side following unauthorised construction is done covering area. 2.10mt x 2.60mt on Ground floor.Brick work upto roof level done. Plastering work is in progress.

The unauthorized construction has been carried out in violation of section 234, 235 and 238 of the Cantonments Act 2006. Erection / re-erection has been carried out involving material alterations, new building construction materials have been used for illegal construction. The erection / re-erection being undertaken at aforementioned premises is in violation of building bye laws applicable to Delhi Cantonment notified by the Competent Authority vide Gazette Notification SRO No. DCB/4/Building Bye-Laws dated 08.06.2002. The site of unauthorized construction is located outside notified Civil area with in Delhi Cantonment limits in Sy.No. 218 classified as B-4 land under the management of DEO, Delhi Circle, Delhi Cantt. It is recommended that notice under Section 248 of the Cantonments Act 2006 be issued to Smt. Saroj W/o Late Sh. Jogi Ram asking her to remove the said unauthorized constructions within 30 days of the date of service of notice.

Relevant file is placed on the table.

114. Considered. The Board noted JEs inspection report as also the details of unauthorised construction brought out on the agenda side. The Board was of the considered opinion that illegal/ unauthorised construction has been carried out by Smt. Saroj W/o Late Sh. Jogi Ram without obtaining sanction of the Competent Authority as required u/s 238 of the Cantonments Act, 2006 and in violation of Section 234, 235 & 247 of the Act and provisions made under applicable building bye laws notified by the Competent Authority for Delhi Cantonment area. The matter was discussed at length and the Board resolved that notice under section 248 of Cantonments Act 2006 be issued to Smt. Saroj W/o Late Sh. Jogi Ram H.No. 27, S-170, Near Library Jhuggi Area , Village Jharera, Delhi Cantt giving her 30 days time to remove the unauthorised construction. The Board further resolved that in the event of non compliance of the notice by Smt. Saroj W/o Late Sh. Jogi Ram, the CEO, Member-Secretary will issue notice under section 320 of the Cantonments Act, 2006 to her giving 15 days time to demolish the said unauthorized construction failing which the unauthorized construction shall be demolished by the office at the risk and cost of Smt. Saroj W/o Late Sh. Jogi Ram.

115. UNAUTHORIZED CONSTRUCTION MADE BY SH. SATYA PRAKASH S/O LATE SH. OM PRAKASH H.NO. 146, INFRONT OF C.B. SCHOOL, MAIN GATE, VILLAGE JHARERA,DELHI CANTT: ISSUE OF THE NOTICE UNDER SECTION 248 OF CANTONMENTS ACT 2006.

To consider JEs report dated 01.10.2019 regarding unauthorized construction carried out by Sh. Satya Prakash S/o Late Sh. Om Prakash H.No. 146, infront of C.B. School, Main Gate, Village Jharera, Delhi Cantt. The details of unauthorized construction carried out Satya Prakash S/o Late Sh. Om Prakash as reported in inspection report dated 01.10.2019. is given hereunder:

Unauthorised Construction is carrying out in the area. 5.30 x 4.75mtr. at ground floor by raising the ht. of Shop & carrying out addition/ alteration in the existing Page 153 of 210

unauthorised construction. Brick walls raised with constructions wall in cement mortar.

The unauthorized construction has been carried out in violation of section 234, 235 and 238 of the Cantonments Act 2006. Erection / re-erection has been carried out involving material alterations, new building construction materials have been used for illegal construction. The erection / re-erection being undertaken at aforementioned premises is in violation of building bye laws applicable to Delhi Cantonment notified by the Competent Authority vide Gazette Notification SRO No. DCB/4/Building Bye-Laws dated 08.06.2002. The site of unauthorized construction is located outside notified Civil area with in Delhi Cantonment limits in Sy.No. 218 classified as B-4 land under the management of DEO, Delhi Circle, Delhi Cantt. It is recommended that notice under Section 248 of the Cantonments Act 2006 be issued to Satya Prakash S/o Late Sh. Om Prakash asking him to remove the said unauthorized constructions within 30 days of the date of service of notice.

Relevant file is placed on the table.

115. Considered. The Board noted JEs inspection report as also the details of unauthorised construction brought out on the agenda side. The Board was of the considered opinion that illegal/ unauthorised construction has been carried out by Sh. Satya Prakash S/o Late Sh. Om Prakash without obtaining sanction of the Competent Authority as required u/s 238 of the Cantonments Act, 2006 and in violation of Section 234, 235 & 247 of the Act and provisions made under applicable building bye laws notified by the Competent Authority for Delhi Cantonment area. The matter was discussed at length and the Board resolved that notice under section 248 of Cantonments Act 2006 be issued to Sh. Satya Prakash S/o Late Sh. Om Prakash H.No. 146, infront of C.B. School, Main Gate, Village Jharera, Delhi Cantt giving him 30 days time to remove the unauthorised construction. The Board further resolved that in the event of non compliance of the notice by Sh. Satya Prakash S/o Late Sh. Om Prakash, the CEO, Member-Secretary will issue notice under section 320 of the Cantonments Act, 2006 to him giving 15 days time to demolish the said unauthorized construction failing which the unauthorized construction shall be demolished by the office at the risk and cost of Sh. Satya Prakash S/o Late Sh. Om Prakash.

116. UNAUTHORIZED CONSTRUCTION MADE BYSH. DINESH S/O SH. VIKRAM H.NO. S- 170 J SHOP NO. 201 NEAR LIBRARY VILLAGE JHARERA, DELHI CANTT: ISSUE OF THE NOTICE UNDER SECTION 248 OF CANTONMENTS ACT 2006.

To consider JEs report dated 23.07.2020 regarding unauthorized construction carried out by Sh. Dinesh S/o Sh. VikramH.No. S-170 J Shop No. 201 Near Library Village Jharera, Delhi Cantt. The details of unauthorized construction carried out Sh. Dinesh S/o Sh. Vikram as reported in inspection report dated 23.07.2020.is given hereunder:

Agra Stone slab casted over Ist floor covering area. (1) 7.05mtr x 4.80mtr. (2) 3.20mtr x 5.10mtr. Constructing room, toilet kitchen etc. After doing brick work on I floor. Agra Stone slab casted. Jointing was in progress at the of inspection on 23.07.2020.

Page 154 of 210

The unauthorized construction has been carried out in violation of section 234, 235 and 238 of the Cantonments Act 2006. Erection / re-erection has been carried out involving material alterations, new building construction materials have been used for illegal construction. The erection / re-erection being undertaken at aforementioned premises is in violation of building bye laws applicable to Delhi Cantonment notified by the Competent Authority vide Gazette Notification SRO No. DCB/4/Building Bye-Laws dated 08.06.2002. The site of unauthorized construction is located outside notified Civil area with in Delhi Cantonment limits in Sy.No. 218 classified as B-4 land under the management of DEO, Delhi Circle, Delhi Cantt. It is recommended that notice under Section 248 of the Cantonments Act 2006 be issued to Sh. Dinesh S/o Sh. Vikram asking him to remove the said unauthorized constructions within 30 days of the date of service of notice.

Relevant file is placed on the table.

116. Considered. The Board noted JEs inspection report as also the details of unauthorised construction brought out on the agenda side. The Board was of the considered opinion that illegal/ unauthorised construction has been carried out by Sh. Dinesh S/o Sh. Vikramwithout obtaining sanction of the Competent Authority as required u/s 238 of the Cantonments Act, 2006 and in violation of Section 234, 235 & 247 of the Act and provisions made under applicable building bye laws notified by the Competent Authority for Delhi Cantonment area. The matter was discussed at length and the Board resolved that notice under section 248 of Cantonments Act 2006 be issued to Sh. Dinesh S/o Sh. VikramH.No. S-170 J Shop No. 201 Near Library Village Jharera, Delhi Cantt giving him 30 days time to remove the unauthorised construction. The Board further resolved that in the event of non compliance of the notice by Sh. Dinesh S/o Sh. Vikram, the CEO, Member-Secretary will issue notice under section 320 of the Cantonments Act, 2006 to him giving 15 days time to demolish the said unauthorized construction failing which the unauthorized construction shall be demolished by the office at the risk and cost of Sh. Dinesh S/o Sh. Vikram.

117. UNAUTHORIZED CONSTRUCTION MADE BYSMT. SHEELA W/O SH. SANJAY H.NO. S- 170, 213B, JHUGGI AREA,VILLAGE JHARERA, DELHI CANTT: ISSUE OF THE NOTICE UNDER SECTION 248 OF CANTONMENTS ACT 2006.

To consider JEs report dated 10.08.2020 regarding unauthorized construction carried out by Smt. Sheela W/o Sh. Sanjay H.No. S-170, 213B, Jhuggi Area, Village Jharera, Delhi Cantt. The details of unauthorized construction carried out Smt. Sheela W/o Sh. Sanjay as reported in inspection report dated 10.08.2020 is given hereunder:

Projected a Agra Stone Chajjainfront of his house area measuring 1.20mtr. x 3.50mtr. at the time of inspection on 10.08.2020.

The unauthorized construction has been carried out in violation of section 234, 235 and 238 of the Cantonments Act 2006. Erection / re-erection has been carried out involving material alterations, new building construction materials have been used for illegal construction. The erection / re-erection being undertaken at aforementioned premises is in violation of building bye laws applicable to Delhi Cantonment notified by the Competent Authority vide Gazette Notification SRO No. DCB/4/Building Bye-Laws dated 08.06.2002. The site of unauthorized construction is located outside notified Civil area with in Delhi Cantonment limits in Sy.No. 218 classified as B-4 land under the management of DEO, Delhi Circle, Delhi Cantt. It is recommended that notice under Section 248 of the Cantonments Act Page 155 of 210

2006 be issued to Smt. Sheela W/o Sh. Sanjay her to remove the said unauthorized constructions within 30 days of the date of service of notice.

Relevant file is placed on the table.

117. Considered. The Board noted JEs inspection report as also the details of unauthorised construction brought out on the agenda side. The Board was of the considered opinion that illegal/ unauthorised construction has been carried out by Smt. Sheela W/o Sh. Sanjay without obtaining sanction of the Competent Authority as required u/s 238 of the Cantonments Act, 2006 and in violation of Section 234, 235 & 247 of the Act and provisions made under applicable building bye laws notified by the Competent Authority for Delhi Cantonment area. The matter was discussed at length and the Board resolved that notice under section 248 of Cantonments Act 2006 be issued to Smt. Sheela W/o Sh. Sanjay H.No. S-170, 213B, Jhuggi Area, Village Jharera, Delhi Cantt giving her 30 days time to remove the unauthorised construction. The Board further resolved that in the event of non compliance of the notice by Smt. Sheela W/o Sh. Sanjay, the CEO, Member-Secretary will issue notice under section 320 of the Cantonments Act, 2006 to her giving 15 days time to demolish the said unauthorized construction failing which the unauthorized construction shall be demolished by the office at the risk and cost of Smt. Sheela W/o Sh. Sanjay.

118. UNAUTHORIZED CONSTRUCTION MADE BY SMT. DIVYA JANGRA W/O SH. RAHUL H.NO. T-165, (NEAR SUBZI MANDI) VILLAGE JHARERA, DELHI CANTT: ISSUE OF THE NOTICE UNDER SECTION 248 OF CANTONMENTS ACT 2006.

To consider JEs report dated 23.07.2020 regarding unauthorized construction carried out by Smt. DivyaJangra W/o Sh. Rahul H.No. T-165, (Near Subzi Mandi), Village Jharera, Delhi Cantt. The details of unauthorized construction carried out Smt. DivyaJangra W/o Sh. Rahul as reported in inspection report dated 23.07.2020. is given hereunder:

The following unauthorised construction on II floor was in progress covering area. 5.30mtr. x 6.30mtr. Brick work upto roof level done. Cutting of T-iron for roof was in progress at the time of inspection on 23.07.2020.

The unauthorized construction has been carried out in violation of section 234, 235 and 238 of the Cantonments Act 2006. Erection / re-erection has been carried out involving material alterations, new building construction materials have been used for illegal construction. The erection / re-erection being undertaken at aforementioned premises is in violation of building bye laws applicable to Delhi Cantonment notified by the Competent Authority vide Gazette Notification SRO No. DCB/4/Building Bye-Laws dated 08.06.2002. The site of unauthorized construction is located outside notified Civil area with in Delhi Cantonment limits in Sy.No. 218 classified as B-4 land under the management of DEO, Delhi Circle, Delhi Cantt. It is recommended that notice under Section 248 of the Cantonments Act 2006 be issued to Smt. DivyaJangra W/o Sh. Rahul asking her to remove the said unauthorized constructions within 30 days of the date of service of notice.

Relevant file is placed on the table.

Page 156 of 210

118. Considered. The Board noted JEs inspection report as also the details of unauthorised construction brought out on the agenda side. The Board was of the considered opinion that illegal/ unauthorised construction has been carried out by Smt. DivyaJangra W/o Sh. Rahul without obtaining sanction of the Competent Authority as required u/s 238 of the Cantonments Act, 2006 and in violation of Section 234, 235 & 247 of the Act and provisions made under applicable building bye laws notified by the Competent Authority for Delhi Cantonment area. The matter was discussed at length and the Board resolved that notice under section 248 of Cantonments Act 2006 be issued to Smt. DivyaJangra W/o Sh. Rahul H.No. T-165, (Near Subzi Mandi), Village Jharera, Delhi Cantt giving her 30 days time to remove the unauthorised construction. The Board further resolved that in the event of non compliance of the notice by Smt. DivyaJangra W/o Sh. Rahul, the CEO, Member-Secretary will issue notice under section 320 of the Cantonments Act, 2006 to her giving 15 days time to demolish the said unauthorized construction failing which the unauthorized construction shall be demolished by the office at the risk and cost of Smt. DivyaJangra W/o Sh. Rahul.

119. UNAUTHORIZED CONSTRUCTION MADE BYSMT. SANGEETA W/O SH. RAM CHANDERPAL H.NO. J-21,VILLAGE JHARERA, DELHI CANTT: ISSUE OF THE NOTICE UNDER SECTION 248 OF CANTONMENTS ACT 2006.

To consider JEs report dated 30.06.2020 regarding unauthorized construction carried out by Smt. Sangeeta W/o Sh. Ram ChanderpalH.No. J-21, Village Jharera, Delhi Cantt. The details of unauthorized construction carried out Smt. Sangeeta W/o Sh. Ram Chanderpal as reported in inspection report dated 30.06.2020. is given hereunder:

After demolishing existing construction. The following unauthorisedconstruction on ground floor was in progress covering area. 2.30mtr x 6.00mtr. From work to slab done. Cutting &binding of steel was in progress at the time of inspection on 30.06.2020.

The unauthorized construction has been carried out in violation of section 234, 235 and 238 of the Cantonments Act 2006. Erection / re-erection has been carried out involving material alterations, new building construction materials have been used for illegal construction. The erection / re-erection being undertaken at aforementioned premises is in violation of building bye laws applicable to Delhi Cantonment notified by the Competent Authority vide Gazette Notification SRO No. DCB/4/Building Bye-Laws dated 08.06.2002. The site of unauthorized construction is located outside notified Civil area with in Delhi Cantonment limits in Sy.No. 218 classified as B-4 land under the management of DEO, Delhi Circle, Delhi Cantt. It is recommended that notice under Section 248 of the Cantonments Act 2006 be issued to Smt. Sangeeta W/o Sh. Ram Chanderpal asking her to remove the said unauthorized constructions within 30 days of the date of service of notice.

Relevant file is placed on the table.

119. Considered. The Board noted JEs inspection report as also the details of unauthorised construction brought out on the agenda side. The Board was of the considered opinion that illegal/ unauthorised construction has been carried out by Smt. Sangeeta W/o Sh. Ram Chanderpalwithout obtaining sanction of the Competent Authority as required u/s 238 of the Cantonments Act, 2006 and in violation of Section 234, 235 & 247 of the Act and provisions Page 157 of 210

made under applicable building bye laws notified by the Competent Authority for Delhi Cantonment area. The matter was discussed at length and the Board resolved that notice under section 248 of Cantonments Act 2006 be issued to Smt. Sangeeta W/o Sh. Ram ChanderpalH.No. J-21, Village Jharera, Delhi Cantt giving her 30 days time to remove the unauthorised construction. The Board further resolved that in the event of non compliance of the notice by Smt. Sangeeta W/o Sh. Ram Chanderpal, the CEO, Member-Secretary will issue notice under section 320 of the Cantonments Act, 2006 to her giving 15 days time to demolish the said unauthorized construction failing which the unauthorized construction shall be demolished by the office at the risk and cost of Smt. Sangeeta W/o Sh. Ram Chanderpal.

120. UNAUTHORIZED CONSTRUCTION MADE BY SH. SHANKER DUTT S/O SH. HEERA BALLAGH H.NO. S-170/196, NEAR TINKU TAILOR,VILLAGE JHARERA, DELHI CANTT: ISSUE OF THE NOTICE UNDER SECTION 248 OF CANTONMENTS ACT 2006.

To consider JEs report dated 28.07.2020 regarding unauthorized construction carried out by Sh. Shanker Dutt S/o Sh. HeeraBallaghH.No. S-170/196, Near Tinku Tailor, Village Jharera, Delhi Cantt. The details of unauthorized construction carried out Sh. Shanker Dutt S/o Sh. HeeraBallagh as reported in inspection report dated 28. 07.2020. is given hereunder:

Brick work upto roof level done on Ist floor covering area. 7.10mtr x 3.50mtr. Agra Stone roof laid. Plastering work was in progress at the time of inspection on 28.07.2020.

The unauthorized construction has been carried out in violation of section 234, 235 and 238 of the Cantonments Act 2006. Erection / re-erection has been carried out involving material alterations, new building construction materials have been used for illegal construction. The erection / re-erection being undertaken at aforementioned premises is in violation of building bye laws applicable to Delhi Cantonment notified by the Competent Authority vide Gazette Notification SRO No. DCB/4/Building Bye-Laws dated 08.06.2002. The site of unauthorized construction is located outside notified Civil area with in Delhi Cantonment limits in Sy.No. 218 classified as B-4 land under the management of DEO, Delhi Circle, Delhi Cantt. It is recommended that notice under Section 248 of the Cantonments Act 2006 be issued to Sh. Shanker Dutt S/o Sh. HeeraBallagh asking him to remove the said unauthorized constructions within 30 days of the date of service of notice.

Relevant file is placed on the table.

120. Considered. The Board noted JEs inspection report as also the details of unauthorised construction brought out on the agenda side. The Board was of the considered opinion that illegal/ unauthorised construction has been carried out by Sh. Shanker Dutt S/o Sh. HeeraBallaghwithout obtaining sanction of the Competent Authority as required u/s 238 of the Cantonments Act, 2006 and in violation of Section 234, 235 & 247 of the Act and provisions made under applicable building bye laws notified by the Competent Authority for Delhi Cantonment area. The matter was discussed at length and the Board resolved that notice under section 248 of Cantonments Act 2006 be issued to Sh. Shanker Dutt S/o Sh. HeeraBallaghH.No. S-170/196, Near TinkuTailor, Village Jharera, Delhi Cantt giving him 30 days time to remove the unauthorised construction. The Board further resolved that in the event of non compliance of the notice by Sh. Shanker Dutt S/o Sh. HeeraBallagh, the CEO, Member-Secretary will issue notice under section 320 of the Cantonments Act, 2006 to him giving 15 days time to demolish the said unauthorized construction failing which the Page 158 of 210

unauthorized construction shall be demolished by the office at the risk and cost of Sh. Shanker Dutt S/o Sh. HeeraBallagh.

121. UNAUTHORIZED CONSTRUCTION MADE BYSH. ROHIT KUMAR S/O SH. LALLAN PAL H.NO. S-170/B-480, JHUGGI AREA,VILLAGE JHARERA, DELHI CANTT: ISSUE OF THE NOTICE UNDER SECTION 248 OF CANTONMENTS ACT 2006.

To consider JEs report dated 10.08.2020 regarding unauthorized construction carried out by Sh. Rohit Kumar S/o Sh. Lallan Pal H.No. S-170/B-480, Jhuggi Area, Village Jharera, Delhi Cantt. The details of unauthorized construction carried out Sh. Rohit Kumar S/o Sh. Lallan Pal as reported in inspection report dated 10.08.2020is given hereunder:

The following unauthorised construction done on II floor covering area.4.20mt x 2.30mt.Constructing kitchen, Toilet, etc. Brick work done. Agra Stone roof laid. Plastering work was in progress at the time of inspection on 10.08.2020.

The unauthorized construction has been carried out in violation of section 234, 235 and 238 of the Cantonments Act 2006. Erection / re-erection has been carried out involving material alterations, new building construction materials have been used for illegal construction. The erection / re-erection being undertaken at aforementioned premises is in violation of building bye laws applicable to Delhi Cantonment notified by the Competent Authority vide Gazette Notification SRO No. DCB/4/Building Bye-Laws dated 08.06.2002. The site of unauthorized construction is located outside notified Civil area with in Delhi Cantonment limits in Sy.No. 218 classified as B-4 land under the management of DEO, Delhi Circle, Delhi Cantt. It is recommended that notice under Section 248 of the Cantonments Act 2006 be issued to Sh. Rohit Kumar S/o Sh. Lallan Pal asking him to remove the said unauthorized constructions within 30 days of the date of service of notice.

Relevant file is placed on the table.

121. Considered. The Board noted JEs inspection report as also the details of unauthorised construction brought out on the agenda side. The Board was of the considered opinion that illegal/ unauthorised construction has been carried out by Sh. Rohit Kumar S/o Sh. Lallan Pal without obtaining sanction of the Competent Authority as required u/s 238 of the Cantonments Act, 2006 and in violation of Section 234, 235 & 247 of the Act and provisions made under applicable building bye laws notified by the Competent Authority for Delhi Cantonment area. The matter was discussed at length and the Board resolved that notice under section 248 of Cantonments Act 2006 be issued to Sh. Rohit Kumar S/o Sh. Lallan Pal H.No. S-170/B-480, Jhuggi Area, Village Jharera, Delhi Cantt giving him 30 days time to remove the unauthorised construction. The Board further resolved that in the event of non compliance of the notice by Sh. Rohit Kumar S/o Sh. Lallan Pal, the CEO, Member-Secretary will issue notice under section 320 of the Cantonments Act, 2006 to him giving 15 days time to demolish the said unauthorized construction failing which the unauthorized construction shall be demolished by the office at the risk and cost of Sh. Rohit Kumar S/o Sh. Lallan Pal.

Page 159 of 210

122. UNAUTHORIZED CONSTRUCTION MADE BY SH. RAHUL LOHIA S/O LATE SH. RAMESH LOHIA H.NO. 6/112, DAIRY AREA, VILLAGE JHARERA, DELHI CANTT: ISSUE OF THE NOTICE UNDER SECTION 248 OF CANTONMENTS ACT 2006.

To consider JEs report dated 17.07.2020 regarding unauthorized construction carried out by Sh. Rahul Lohia S/o Late Sh. Ramesh LohiaH.No. 6/112, Dairy Area, Village Jharera, Delhi Cantt. The details of unauthorized construction carried out Sh. Rahul Lohia S/o Late Sh. Ramesh Lohia as reported in inspection report dated 17.07.2020 is given hereunder:

The following unauthorised construction was in progress on I floor covering area. 12.40mt x 10.00mtr. R.C.C. Columns casted brick work done. upto roof level. Form work to roof was done. R.C.C slab also casted on Ground floor projecting chajja. Binding of steel was in progress at the time of the time of inspection on 17.07.2020

The unauthorized construction has been carried out in violation of section 234, 235 and 238 of the Cantonments Act 2006. Erection / re-erection has been carried out involving material alterations, new building construction materials have been used for illegal construction. The erection / re-erection being undertaken at aforementioned premises is in violation of building bye laws applicable to Delhi Cantonment notified by the Competent Authority vide Gazette Notification SRO No. DCB/4/Building Bye-Laws dated 08.06.2002. The site of unauthorized construction is located outside notified Civil area with in Delhi Cantonment limits in Sy.No. 218 classified as B-4 land under the management of DEO, Delhi Circle, Delhi Cantt. It is recommended that notice under Section 248 of the Cantonments Act 2006 be issued to Sh. Rahul Lohia S/o Late Sh. Ramesh Lohia asking him to remove the said unauthorized constructions within 30 days of the date of service of notice.

Relevant file is placed on the table.

122. Considered. The Board noted JEs inspection report as also the details of unauthorised construction brought out on the agenda side. The Board was of the considered opinion that illegal/ unauthorised construction has been carried out by Sh. Rahul Lohia S/o Late Sh. Ramesh Lohiawithout obtaining sanction of the Competent Authority as required u/s 238 of the Cantonments Act, 2006 and in violation of Section 234, 235 & 247 of the Act and provisions made under applicable building bye laws notified by the Competent Authority for Delhi Cantonment area. The matter was discussed at length and the Board resolved that notice under section 248 of Cantonments Act 2006 be issued to Sh. Rahul Lohia S/o Late Sh. Ramesh LohiaH.No. 6/112, Dairy Area, Village Jharera, Delhi Cantt giving him 30 days time to remove the unauthorised construction. The Board further resolved that in the event of non compliance of the notice by Sh. Rahul Lohia S/o Late Sh. Ramesh Lohia, the CEO, Member-Secretary will issue notice under section 320 of the Cantonments Act, 2006 to him giving 15 days time to demolish the said unauthorized construction failing which the unauthorized construction shall be demolished by the office at the risk and cost of Sh. Rahul Lohia S/o Late Sh. Ramesh Lohia.

123. UNAUTHORIZED CONSTRUCTION MADE SH. DEVENDER KUMAR S/O SH. SUKHVEER H.NO. VI-103, DIARY AREA, VILLAGE JHARERA, DELHI CANTT: ISSUE OF THE NOTICE UNDER SECTION 248 OF CANTONMENTS ACT 2006.

To consider JEs report dated 23.09.2020 regarding unauthorized construction carried out by Sh. Devender Kumar S/o Sh. SukhveerH.No. VI-103, Diary Area, Delhi Cantt. The details Page 160 of 210

of unauthorized construction carried out Sh. Devender Kumar S/o Sh. Sukhveeras reported in inspection report dated 23.09.2020. is given hereunder:

The following unauthorised construction on III floor was in progress covering area. (i) 5.10mtr. x 2.50mtr. (ii) 1.15mtr. x 2.10mtr. Form work done. Steel of roof binded. Casting of RCC slab was in progress at the time time of inspection on 23.09.2020.

The unauthorized construction has been carried out in violation of section 234, 235 and 238 of the Cantonments Act 2006. Erection / re-erection has been carried out involving material alterations, new building construction materials have been used for illegal construction. The erection / re-erection being undertaken at aforementioned premises is in violation of building bye laws applicable to Delhi Cantonment notified by the Competent Authority vide Gazette Notification SRO No. DCB/4/Building Bye-Laws dated 08.06.2002. The site of unauthorized construction is located outside notified Civil area with in Delhi Cantonment limits in Sy.No. 218 classified as B-4 land under the management of DEO, Delhi Circle, Delhi Cantt. It is recommended that notice under Section 248 of the Cantonments Act 2006 be issued to Sh. Devender Kumar S/o Sh. Sukhveer asking him to remove the said unauthorized constructions within 30 days of the date of service of notice.

Relevant file is placed on the table.

123. Considered. The Board noted JEs inspection report as also the details of unauthorised construction brought out on the agenda side. The Board was of the considered opinion that illegal/ unauthorised construction has been carried out by Sh. Devender Kumar S/o Sh. Sukhveerwithout obtaining sanction of the Competent Authority as required u/s 238 of the Cantonments Act, 2006 and in violation of Section 234, 235 & 247 of the Act and provisions made under applicable building bye laws notified by the Competent Authority for Delhi Cantonment area. The matter was discussed at length and the Board resolved that notice under section 248 of Cantonments Act 2006 be issued Sh. Devender Kumar S/o Sh. SukhveerH.No. VI-103, Diary Area, Village Jharera, Delhi Canttgiving him 30 days time to remove the unauthorised construction. The Board further resolved that in the event of non compliance of the notice by Smt. Sh. Devender Kumar S/o Sh. Sukhveer, the CEO, Member- Secretary will issue notice under section 320 of the Cantonments Act, 2006 to him giving 15 days time to demolish the said unauthorized construction failing which the unauthorized construction shall be demolished by the office at the risk and cost of Sh. Devender Kumar S/o Sh. Sukhveer.

124. UNAUTHORIZED CONSTRUCTION MADE BY SMT. BALESHWARI DEVI W/O SH. RAJPAL SINGH H.NO. 1/4, VILLAGE PRAHLADPUR, DELHI CANTT: ISSUE OF THE NOTICE UNDER SECTION 248 OF CANTONMENTS ACT 2006.

To consider JEs report dated 11.08.2020 regarding unauthorized construction carried out by Smt. Baleshwari Devi W/o Sh. Rajpal Singh H.No. 1/4, Village Prahladpur, Delhi Cantt. The details of unauthorized construction carried out Smt. Baleshwari Devi W/o Sh. Rajpal Singh as reported in inspection report dated 11.08.2020 is given hereunder:

Page 161 of 210

The following unauthorised Construction was in progress on Ist floor covering area. 5.60mtr x 4.30mtr.Agra Stone roof laid over constructing rooms etc. Plastering work was in progress at the time of inspection on 11.08.2020.

The unauthorized construction has been carried out in violation of section 234, 235 and 238 of the Cantonments Act 2006. Erection / re-erection has been carried out involving material alterations, new building construction materials have been used for illegal construction. The erection / re-erection being undertaken at aforementioned premises is in violation of building bye laws applicable to Delhi Cantonment notified by the Competent Authority vide Gazette Notification SRO No. DCB/4/Building Bye-Laws dated 08.06.2002. The site of unauthorized construction is located outside notified Civil area with in Delhi Cantonment limits in Sy.No. 220 classified as B-4 land under the management of DEO, Delhi Circle, Delhi Cantt. It is recommended that notice under Section 248 of the Cantonments Act 2006 be issued to Smt. BaleshwariDeviW/o Sh. Rajpal Singh asking her to remove the said unauthorized constructions within 30 days of the date of service of notice.

Relevant file is placed on the table.

124. Considered. The Board noted JEs inspection report as also the details of unauthorised construction brought out on the agenda side. The Board was of the considered opinion that illegal/ unauthorised construction has been carried out by Smt. Baleshwari Devi W/o Sh. Rajpal Singh without obtaining sanction of the Competent Authority as required u/s 238 of the Cantonments Act, 2006 and in violation of Section 234, 235 & 247 of the Act and provisions made under applicable building bye laws notified by the Competent Authority for Delhi Cantonment area. The matter was discussed at length and the Board resolved that notice under section 248 of Cantonments Act 2006 be issued Smt. Baleshwari Devi W/o Sh. Rajpal Singh H.No. 1/4,Prahladpur, Delhi Canttgiving her 30 days time to remove the unauthorised construction. The Board further resolved that in the event of non compliance of the notice by Smt. Baleshwari Devi W/o Sh. Rajpal, the CEO, Member-Secretary will issue notice under section 320 of the Cantonments Act, 2006 to her giving 15 days time to demolish the said unauthorized construction failing which the unauthorized construction shall be demolished by the office at the risk and cost of Smt. Baleshwari Devi W/o Sh. Rajpal.

125. UNAUTHORIZED CONSTRUCTION MADE BY SH. MANISH YADAV S/O SH. M.L YADAV H.NO.4, VILLAGE PRAHLADPUR, DELHI CANTT: ISSUE OF THE NOTICE UNDER SECTION 248 OF CANTONMENTS ACT 2006.

To consider JEs report dated 26.06.2020 regarding unauthorized construction carried out by Sh. Manish Yadav S/o Sh. M.L Yadav H.No.4, Village Prahladpur, Delhi Cantt. The details of unauthorized construction carried out by Sh. Manish Yadav S/o Sh. M.L Yadav as reported in inspection report dated 26.06.2020 is given hereunder:

After demolishing existing roof and raising roof ht. followingunauthorised construction done on ground floor. Covering area : 4.80mtr x 2.65mtr. Brick work at Ist floor was in progress covering area. 2.10mtr x 2.65mtr. Brick work above lintel level at Ist floor was in progress at the time of inspection on 26.06.2020.

Page 162 of 210

The unauthorized construction has been carried out in violation of section 234, 235 and 238 of the Cantonments Act 2006. Erection / re-erection has been carried out involving material alterations, new building construction materials have been used for illegal construction. The erection / re-erection being undertaken at aforementioned premises is in violation of building bye laws applicable to Delhi Cantonment notified by the Competent Authority vide Gazette Notification SRO No. DCB/4/Building Bye-Laws dated 08.06.2002. The site of unauthorized construction is located outside notified Civil area with in Delhi Cantonment limits in Sy.No. 165 classified as ‘C’ land under the management of the Delhi Cantonment Board, Delhi Cantt. It is recommended that notice under Section 248 of the Cantonments Act 2006 be issued to Sh. Manish Yadav S/o Sh. M.L Yadav asking him to remove the said unauthorized constructions within 30 days of the date of service of notice.

Relevant file is placed on the table.

125. Considered. The Board noted JEs inspection report as also the details of unauthorised construction brought out on the agenda side. The Board was of the considered opinion that illegal/ unauthorised construction has been carried out by Sh. Manish Yadav S/o Sh. M.L Yadavwithout obtaining sanction of the Competent Authority as required u/s 238 of the Cantonments Act, 2006 and in violation of Section 234, 235 & 247 of the Act and provisions made under applicable building bye laws notified by the Competent Authority for Delhi Cantonment area. The matter was discussed at length and the Board resolved that notice under section 248 of Cantonments Act 2006 be issued Sh. Manish Yadav S/o Sh. M.L Yadav H.No.4, Village Prahladpur,Delhi Cantt giving him 30 days time to remove the unauthorised construction. The Board further resolved that in the event of non compliance of the notice by Sh. Manish Yadav S/o Sh. M.L Yadav, the CEO, Member-Secretary will issue notice under section 320 of the Cantonments Act, 2006 to him giving 15 days time to demolish the said unauthorized construction failing which the unauthorized construction shall be demolished by the office at the risk and cost of Sh. Manish Yadav S/o Sh. M.L Yadav.

126. UNAUTHORIZED CONSTRUCTION MADE BY SH. CHANDER SEN RATHI S/O SH. HARI CHAND HAVELI NO.5, VILLAGE PRAHLADPUR,DELHI CANTT: ISSUE OF THE NOTICE UNDER SECTION 248 OF CANTONMENTS ACT 2006.

To consider JEs report dated 11.08.2020 regarding unauthorized construction carried out by Sh. Chander Sen Rathi S/o Sh. Hari Chand Haveli No.5, Village Prahladpur, Delhi Cantt. The details of unauthorized construction carried out by Sh. Chander Sen Rathi S/o Sh. Hari Chand as reported in inspection report dated 11.08.2020 is given hereunder:

The following unauthorised construction was in progress on Ist floor. Covering Area. (1) Room : 3.00mtr x x 3.35mtr. (2) Room : 5.60mtr x 3.35mtr. (3) Kitchen : 2.10mtr x 1.10mtr. Covering total area 8.60mtr x 5.60mtr.Plastering work was in progress at the time of inspection on 11.08.2020.

The unauthorized construction has been carried out in violation of section 234, 235 and 238 of the Cantonments Act 2006. Erection / re-erection has been carried out involving material alterations, new building construction materials have been used for illegal construction. The erection / re-erection being undertaken at aforementioned premises is in violation of building bye laws applicable to Delhi Cantonment notified by the Competent Page 163 of 210

Authority vide Gazette Notification SRO No. DCB/4/Building Bye-Laws dated 08.06.2002. The site of unauthorized construction is located outside notified Civil area with in Delhi Cantonment limits in Sy.No. 109 classified as ‘C’ land under the management of the Delhi Cantonment Board, Delhi Cantt. It is recommended that notice under Section 248 of the Cantonments Act 2006 be issued to Sh. Chander Sen Rathi S/o Sh. Hari Chand him to remove the said unauthorized constructions within 30 days of the date of service of notice.

Relevant file is placed on the table.

126. Considered. The Board noted JEs inspection report as also the details of unauthorised construction brought out on the agenda side. The Board was of the considered opinion that illegal/ unauthorised construction has been carried out by Sh. Chander Sen Rathi S/o Sh. Hari Chand without obtaining sanction of the Competent Authority as required u/s 238 of the Cantonments Act, 2006 and in violation of Section 234, 235 & 247 of the Act and provisions made under applicable building bye laws notified by the Competent Authority for Delhi Cantonment area. The matter was discussed at length and the Board resolved that notice under section 248 of Cantonments Act 2006 be issued Sh. Chander Sen Rathi S/o Sh. Hari Chand Haveli No.5, Village Prahladpur,Delhi Cantt giving him 30 days time to remove the unauthorised construction. The Board further resolved that in the event of non compliance of the notice by Sh. Chander Sen Rathi S/o Sh. Hari Chand, the CEO, Member-Secretary will issue notice under section 320 of the Cantonments Act, 2006 to him giving 15 days time to demolish the said unauthorized construction failing which the unauthorized construction shall be demolished by the office at the risk and cost of Sh. Chander Sen Rathi S/o Sh. Hari Chand.

127. UNAUTHORIZED CONSTRUCTION MADE BY SH. ASHOK RATHI S/O SH. GAYAN CHAND RATHI H.NO. T-34, KOMAL BAKERY, VILLAGE PRAHLADPUR,DELHI CANTT: ISSUE OF THE NOTICE UNDER SECTION 248 OF CANTONMENTS ACT 2006.

To consider JEs report dated 23.09.2020 regarding unauthorized construction carried out by Sh. Ashok Rathi S/o Sh. Gayan Chand Rathi H.No. T-34, Komal Bakery, Village Prahladpur, Delhi Cantt. The details of unauthorized construction carried out by Sh. Ashok Rathi S/o Sh. Gayan Chand Rathi as reported in inspection report dated 23.09.2020 is given hereunder:

After demolishing existing Agra Stone roof and raising roof ht. same Agra Stone Tukdi laid over ground floor roof of existing shops covering area. 5.00mtr. x 2.90mtr. Curing work was in progress at the time of inspection on 23.09.2020.

The unauthorized construction has been carried out in violation of section 234, 235 and 238 of the Cantonments Act 2006. Erection / re-erection has been carried out involving material alterations, new building construction materials have been used for illegal construction. The erection / re-erection being undertaken at aforementioned premises is in violation of building bye laws applicable to Delhi Cantonment notified by the Competent Authority vide Gazette Notification SRO No. DCB/4/Building Bye-Laws dated 08.06.2002. The site of unauthorized construction is located outside notified Civil area with in Delhi Cantonment limits in Sy.No. 220 classified as ‘B-4’ land under the management of the Delhi Cantonment Board, Delhi Cantt. It is recommended that notice under Section 248 of the

Page 164 of 210

Cantonments Act 2006 be issued to Sh. Ashok Rathi S/o Sh. Gayan Chand Rathi him to remove the said unauthorized constructions within 30 days of the date of service of notice.

Relevant file is placed on the table.

127. Considered. The Board noted JEs inspection report as also the details of unauthorised construction brought out on the agenda side. The Board was of the considered opinion that illegal/ unauthorised construction has been carried out by Sh. Ashok Rathi S/o Sh. Gayan Chand Rathi without obtaining sanction of the Competent Authority as required u/s 238 of the Cantonments Act, 2006 and in violation of Section 234, 235 & 247 of the Act and provisions made under applicable building bye laws notified by the Competent Authority for Delhi Cantonment area. The matter was discussed at length and the Board resolved that notice under section 248 of Cantonments Act 2006 be issued Sh. Ashok Rathi S/o Sh. Gayan Chand Rathi H.No. T-34, Komal Bakery, Village Prahladpur,Delhi Cantt giving him 30 days time to remove the unauthorised construction. The Board further resolved that in the event of non compliance of the notice by Sh. Ashok Rathi S/o Sh. Gayan Chand Rathi, the CEO, Member- Secretary will issue notice under section 320 of the Cantonments Act, 2006 to him giving 15 days time to demolish the said unauthorized construction failing which the unauthorized construction shall be demolished by the office at the risk and cost of Sh. Ashok Rathi S/o Sh. Gayan Chand Rathi.

128. UNAUTHORIZED CONSTRUCTION MADE BY SH. RAJINDER S/O LATE SH. DHARAM SINGH H.NO. VI/113, DAIRY AREA VILLAGE JHARERA, DELHI CANTT: ISSUE OF THE NOTICE UNDER SECTION 248 OF CANTONMENTS ACT 2006.

To consider JEs report dated 18.06.2020 regarding unauthorized construction carried out by Sh. Rajinder S/o Late Sh. Dharam Singh H.No. VI/113, Dairy Area Village Jharera, Delhi Cantt. The details of unauthorized construction carried out Sh. Rajinder S/o Late Sh. Dharam Singh as reported in inspection report dated 18.06.2020. is given hereunder:

R.C.C. slab casted on ground floor covering area. 16.70mtr x 14.70mtr. Brick work upto roof level done on I floor. Form work to slab was in progress. Constructing rooms, Toilet Kitchen etc. Binding of steel was in progress at the time of inspection on 18.06.2020.

The unauthorized construction has been carried out in violation of section 234, 235 and 238 of the Cantonments Act 2006. Erection / re-erection has been carried out involving material alterations, new building construction materials have been used for illegal construction. The erection / re-erection being undertaken at aforementioned premises is in violation of building bye laws applicable to Delhi Cantonment notified by the Competent Authority vide Gazette Notification SRO No. DCB/4/Building Bye-Laws dated 08.06.2002. The site of unauthorized construction is located outside notified Civil area with in Delhi Cantonment limits in Sy.No. 218 classified as B-4 land under the management of DEO, Delhi Circle, Delhi Cantt. It is recommended that notice under Section 248 of the Cantonments Act 2006 be issued to Sh. Rajinder S/o Late Sh. Dharam Singh asking him to remove the said unauthorized constructions within 30 days of the date of service of notice.

Relevant file is placed on the table.

Page 165 of 210

128. Considered. The Board noted JEs inspection report as also the details of unauthorised construction brought out on the agenda side. The Board was of the considered opinion that illegal/ unauthorised construction has been carried out by Sh. Rajinder S/o Late Sh. Dharam Singhwithout obtaining sanction of the Competent Authority as required u/s 238 of the Cantonments Act, 2006 and in violation of Section 234, 235 & 247 of the Act and provisions made under applicable building bye laws notified by the Competent Authority for Delhi Cantonment area. The matter was discussed at length and the Board resolved that notice under section 248 of Cantonments Act 2006 be issued Sh. Rajinder S/o Late Sh. Dharam Singh H.No. VI/113, Dairy Area Village Jharera,Delhi Cantt giving him 30 days time to remove the unauthorised construction. The Board further resolved that in the event of non compliance of the notice by Sh. Rajinder S/o Late Sh. Dharam Singh, the CEO, Member-Secretary will issue notice under section 320 of the Cantonments Act, 2006 to him giving 15 days time to demolish the said unauthorized construction failing which the unauthorized construction shall be demolished by the office at the risk and cost of Sh. Rajinder S/o Late Sh. Dharam Singh.

129. UNAUTHORIZED CONSTRUCTION MADE BY SH. RAJINDER S/O LATE SH. DHARAMSINGH H.NO. VI/113, DAIRY AREA VILLAGE JHARERA, DELHI CANTT: ISSUE OFTHE NOTICE UNDER SECTION 248 OF CANTONMENTS ACT 2006.

To consider JEs report dated 17.07.2020 regarding unauthorized construction carried out by Sh. Rajinder S/o Late Sh. Dharam Singh H.No. VI/113, Dairy Area Village Jharera, Delhi Cantt. The details of unauthorized construction carried out Sh. Rajinder S/o Late Sh. Dharam Singh as reported in inspection report dated 17.07.2020. is given hereunder:

R.C.C. slab casted on ground floor and Ist Floor covering area. 16.70mtr x 14.70mtr. R.C.C. Chajja Projected. Brick work upto roof level done on II floor. Constructing rooms, toilet, kitchen etc. Brick work upto roof level on II floor at the time of inspection on 17.07.2020.

The unauthorized construction has been carried out in violation of section 234, 235 and 238 of the Cantonments Act 2006. Erection / re-erection has been carried out involving material alterations, new building construction materials have been used for illegal construction. The erection / re-erection being undertaken at aforementioned premises is in violation of building bye laws applicable to Delhi Cantonment notified by the Competent Authority vide Gazette Notification SRO No. DCB/4/Building Bye-Laws dated 08.06.2002. The site of unauthorized construction is located outside notified Civil area with in Delhi Cantonment limits in Sy.No. 218 classified as B-4 land under the management of DEO, Delhi Circle, Delhi Cantt. It is recommended that notice under Section 248 of the Cantonments Act 2006 be issued to Sh. Rajinder S/o Late Sh. Dharam Singh asking him to remove the said unauthorized constructions within 30 days of the date of service of notice.

Relevant file is placed on the table.

129. Considered. The Board noted JEs inspection report as also the details of unauthorised construction brought out on the agenda side. The Board was of the considered opinion that illegal/ unauthorised construction has been carried out by Sh. Rajinder S/o Late Sh. Dharam Page 166 of 210

Singh without obtaining sanction of the Competent Authority as required u/s 238 of the Cantonments Act, 2006 and in violation of Section 234, 235 & 247 of the Act and provisions made under applicable building bye laws notified by the Competent Authority for Delhi Cantonment area. The matter was discussed at length and the Board resolved that notice under section 248 of Cantonments Act 2006 be issued Sh. Rajinder S/o Late Sh. Dharam Singh H.No. VI/113, Dairy Area Village Jharera,Delhi Cantt giving him 30 days time to remove the unauthorised construction. The Board further resolved that in the event of non compliance of the notice by Sh. Rajinder S/o Late Sh. Dharam Singh, the CEO, Member-Secretary will issue notice under section 320 of the Cantonments Act, 2006 to him giving 15 days time to demolish the said unauthorized construction failing which the unauthorized construction shall be demolished by the office at the risk and cost of Sh. Rajinder S/o Late Sh. Dharam Singh.

130. UNAUTHORIZED CONSTRUCTION MADE BY SH. RAJINDER S/O LATE SH. DHARAMSINGH H.NO. VI/113, DAIRY AREA VILLAGE JHARERA, DELHI CANTT: ISSUE OFTHE NOTICE UNDER SECTION 248 OF CANTONMENTS ACT 2006.

To consider JEs report dated 10.08.2020 regarding unauthorized construction carried out by Sh. Rajinder S/o Late Sh. Dharam Singh H.No. VI/113, Dairy Area Village Jharera, Delhi Cantt. The details of unauthorized construction carried out Sh. Rajinder S/o Late Sh. Dharam Singh as reported in inspection report dated 18.08.2020. is given hereunder:

R.C.C. slab casted on II floorcovering area. 16.70mtr x 14.70mtr. R.C.C. Chajja Projected. Brick work done. Constructing rooms, toilet, kitchen etc. Plastering work was in progress at the time of inspection on 10.08.2020.

The unauthorized construction has been carried out in violation of section 234, 235 and 238 of the Cantonments Act 2006. Erection / re-erection has been carried out involving material alterations, new building construction materials have been used for illegal construction. The erection / re-erection being undertaken at aforementioned premises is in violation of building bye laws applicable to Delhi Cantonment notified by the Competent Authority vide Gazette Notification SRO No. DCB/4/Building Bye-Laws dated 08.06.2002. The site of unauthorized construction is located outside notified Civil area with in Delhi Cantonment limits in Sy.No. 218 classified as B-4 land under the management of DEO, Delhi Circle, Delhi Cantt. It is recommended that notice under Section 248 of the Cantonments Act 2006 be issued to Sh. Rajinder S/o Late Sh. Dharam Singh asking him to remove the said unauthorized constructions within 30 days of the date of service of notice.

Relevant file is placed on the table.

130. Considered. The Board noted JEs inspection report as also the details of unauthorised construction brought out on the agenda side. The Board was of the considered opinion that illegal/ unauthorised construction has been carried out by Sh. Rajinder S/o Late Sh. Dharam Singh without obtaining sanction of the Competent Authority as required u/s 238 of the Cantonments Act, 2006 and in violation of Section 234, 235 & 247 of the Act and provisions made under applicable building bye laws notified by the Competent Authority for Delhi Cantonment area. The matter was discussed at length and the Board resolved that notice under section 248 of Cantonments Act 2006 be issued Sh. Rajinder S/o Late Sh. Dharam Singh H.No. VI/113, Dairy Area Village Jharera,Delhi Cantt giving him 30 days time to remove the unauthorised construction. The Board further resolved that in the event of non compliance of Page 167 of 210

the notice by Sh. Rajinder S/o Late Sh. Dharam Singh, the CEO, Member-Secretary will issue notice under section 320 of the Cantonments Act, 2006 to him giving 15 days time to demolish the said unauthorized construction failing which the unauthorized construction shall be demolished by the office at the risk and cost of Sh. Rajinder S/o Late Sh. Dharam Singh.

131. UNAUTHORIZED CONSTRUCTION MADE BY SH. RAKESH S/O LATE SH. AZAD SINGH H.NO. S-170/B-161, NEAR LIBRARY VILLAGE JHARERA, DELHI CANTT: ISSUE OF THE NOTICE UNDER SECTION 248 OF CANTONMENTS ACT 2006.

To consider JEs report dated 14.09.2020 regarding unauthorized construction carried out by Sh. Rakesh S/o Late Sh. Azad Singh H.No. S-170/B-161,Near Library, Village Jharera, Delhi Cantt. The details of unauthorized construction carried out Sh. Rakesh S/o Late Sh. Azad Singh as reported in inspection report dated 14.09.2020. is given hereunder:

After demolishing existing construction the following unauthorised construction was in progress on Ground floor covering area. 2.20mt x 4.00mt on existing portion. Brick work upto roof level done. Laying of Agra Stone roof was in progress at the time of inspection on 14.09.2020.

The unauthorized construction has been carried out in violation of section 234, 235 and 238 of the Cantonments Act 2006. Erection / re-erection has been carried out involving material alterations, new building construction materials have been used for illegal construction. The erection / re-erection being undertaken at aforementioned premises is in violation of building bye laws applicable to Delhi Cantonment notified by the Competent Authority vide Gazette Notification SRO No. DCB/4/Building Bye-Laws dated 08.06.2002. The site of unauthorized construction is located outside notified Civil area with in Delhi Cantonment limits in Sy.No. 218 classified as B-4 land under the management of DEO, Delhi Circle, Delhi Cantt. It is recommended that notice under Section 248 of the Cantonments Act 2006 be issued to Sh. Rakesh S/o Late Sh. Azad Singh asking him to remove the said unauthorized constructions within 30 days of the date of service of notice.

Relevant file is placed on the table.

131. Considered. The Board noted JEs inspection report as also the details of unauthorised construction brought out on the agenda side. The Board was of the considered opinion that illegal/ unauthorised construction has been carried out by Sh. Rakesh S/o Late Sh. Azad Singh without obtaining sanction of the Competent Authority as required u/s 238 of the Cantonments Act, 2006 and in violation of Section 234, 235 & 247 of the Act and provisions made under applicable building bye laws notified by the Competent Authority for Delhi Cantonment area. The matter was discussed at length and the Board resolved that notice under section 248 of Cantonments Act 2006 be issued Sh. Rakesh S/o Late Sh. Azad Singh H.No. S-170/B-161,Near Library, Village Jharera,Delhi Cantt giving him 30 days time to remove the unauthorised construction. The Board further resolved that in the event of non compliance of the notice by Sh. Rakesh S/o Late Sh. Azad Singh, the CEO, Member-Secretary will issue notice under section 320 of the Cantonments Act, 2006 to him giving 15 days time to demolish the said unauthorized construction failing which the unauthorized construction shall be demolished by the office at the risk and cost of Sh. Rakesh S/o Late Sh. Azad Singh.

Page 168 of 210

132. UNAUTHORIZED CONSTRUCTION MADE BY SMT. VEER WATI W/O SH. DHARAM SINGH H.NO. S-170/517 JHUGGI AREA VILLAGE JHARERA, DELHI CANTT: ISSUE OF THE NOTICE UNDER SECTION 248 OF CANTONMENTS ACT 2006.

To consider JEs report dated 24.08.2020 regarding unauthorized construction carried out by Smt. Veer Wati W/o Sh. Dharam Singh H.No. S-170/517 Jhuggi Area Village Jharera, Delhi Cantt. The details of unauthorized construction carried out Smt. Veer Wati W/o Sh. Dharam Singh as reported in inspection report dated 24.08.2020. is given hereunder:

After demolishing existing construction R.C.C. Slab casted over after doing brick work & also casted R.C. C. Columns upto roof level covering area. (i) 6.35mt x 9.25mt. (ii) 3.80mt x 4.20mt. R.C.C slab casted over at the time of inspection on 24.08.2020.

The unauthorized construction has been carried out in violation of section 234, 235 and 238 of the Cantonments Act 2006. Erection / re-erection has been carried out involving material alterations, new building construction materials have been used for illegal construction. The erection / re-erection being undertaken at aforementioned premises is in violation of building bye laws applicable to Delhi Cantonment notified by the Competent Authority vide Gazette Notification SRO No. DCB/4/Building Bye-Laws dated 08.06.2002. The site of unauthorized construction is located outside notified Civil area with in Delhi Cantonment limits in Sy.No. 218 classified as B-4 land under the management of DEO, Delhi Circle, Delhi Cantt. It is recommended that notice under Section 248 of the Cantonments Act 2006 be issued to Smt. Veer Wati W/o Sh. Dharam Singh asking her to remove the said unauthorized constructions within 30 days of the date of service of notice.

Relevant file is placed on the table.

132. Considered. The Board noted JEs inspection report as also the details of unauthorised construction brought out on the agenda side. The Board was of the considered opinion that illegal/ unauthorised construction has been carried out by Smt. Veer Wati W/o Sh. Dharam Singhwithout obtaining sanction of the Competent Authority as required u/s 238 of the Cantonments Act, 2006 and in violation of Section 234, 235 & 247 of the Act and provisions made under applicable building bye laws notified by the Competent Authority for Delhi Cantonment area. The matter was discussed at length and the Board resolved that notice under section 248 of Cantonments Act 2006 be issued Smt. Veer Wati W/o Sh. Dharam Singh H.No. S-170/517 Jhuggi Area Village Jharera,Delhi Cantt giving her 30 days time to remove the unauthorised construction. The Board further resolved that in the event of non compliance of the notice by Smt. Veer Wati W/o Sh. Dharam Singh, the CEO, Member-Secretary will issue notice under section 320 of the Cantonments Act, 2006 to her giving 15 days time to demolish the said unauthorized construction failing which the unauthorized construction shall be demolished by the office at the risk and cost of Smt. Veer Wati W/o Sh. Dharam Singh.

133. UNAUTHORIZED CONSTRUCTION MADE BY SMT. VEER WATI W/O SH. DHARAM SINGH H.NO. S-170/517 JHUGGI AREA VILLAGE JHARERA, DELHI CANTT: ISSUE OF THE NOTICE UNDER SECTION 248 OF CANTONMENTS ACT 2006.

To consider JEs report dated 14.09.2020 regarding unauthorized construction carried out by Smt. Veer Wati W/o Sh. Dharam Singh H.No. S-170/517 Jhuggi Area Village Jharera, Page 169 of 210

Delhi Cantt. The details of unauthorized construction carried out Smt. Veer Wati W/o Sh. Dharam Singh as reported in inspection report dated 14.09.2020. is given hereunder:

Brick work and casting of columns on Ist floor covering area. (i) 6.35mt x 9.25mt. (ii) 3.80mt x 4.20mt. Brick work at IIndwas in progress at the time of inspection on 14.09.2020.

The unauthorized construction has been carried out in violation of section 234, 235 and 238 of the Cantonments Act 2006. Erection / re-erection has been carried out involving material alterations, new building construction materials have been used for illegal construction. The erection / re-erection being undertaken at aforementioned premises is in violation of building bye laws applicable to Delhi Cantonment notified by the Competent Authority vide Gazette Notification SRO No. DCB/4/Building Bye-Laws dated 08.06.2002. The site of unauthorized construction is located outside notified Civil area with in Delhi Cantonment limits in Sy.No. 218 classified as B-4 land under the management of DEO, Delhi Circle, Delhi Cantt. It is recommended that notice under Section 248 of the Cantonments Act 2006 be issued to Smt. Veer Wati W/o Sh. Dharam Singh asking her to remove the said unauthorized constructions within 30 days of the date of service of notice.

Relevant file is placed on the table.

133. Considered. The Board noted JEs inspection report as also the details of unauthorised construction brought out on the agenda side. The Board was of the considered opinion that illegal/ unauthorised construction has been carried out by Smt. Veer Wati W/o Sh. Dharam Singh without obtaining sanction of the Competent Authority as required u/s 238 of the Cantonments Act, 2006 and in violation of Section 234, 235 & 247 of the Act and provisions made under applicable building bye laws notified by the Competent Authority for Delhi Cantonment area. The matter was discussed at length and the Board resolved that notice under section 248 of Cantonments Act 2006 be issued Smt. Veer Wati W/o Sh. Dharam Singh H.No. S-170/517 Jhuggi Area Village Jharera,Delhi Cantt giving her 30 days time to remove the unauthorised construction. The Board further resolved that in the event of non compliance of the notice by Smt. Veer Wati W/o Sh. Dharam Singh, the CEO, Member-Secretary will issue notice under section 320 of the Cantonments Act, 2006 to her giving 15 days time to demolish the said unauthorized construction failing which the unauthorized construction shall be demolished by the office at the risk and cost of Smt. Veer Wati W/o Sh. Dharam Singh.

134. UNAUTHORIZED CONSTRUCTIO, N MADE BYSHDEEPAK SINGH BISHT S/O SH. HOSHIYAR SINGH BISHT H.NO. A-337, VILLAGE JHARERA, DELHI CANTT: ISSUE OF THE NOTICE UNDER SECTION 248 OF CANTONMENTS ACT 2006.

To consider JEs report dated 14.09.2020 regarding unauthorized construction carried out by Sh. Deepak Singh Bisht S/o Hoshiyar Singh Bisht H.No. A-337, Village Jharera, Delhi Cantt. The details of unauthorized construction carried out Sh. Deepak Singh Bisht S/o Hoshiyar Singh Bisht as reported in inspection report dated 14.09.2020. is given hereunder:

The following unauthorised construction on IInd floor was in progress covering area. Page 170 of 210

3.20mtr x 9.40mtr. Brick work upto roof level done . Form work to slab was in progress. Cutting of steel also was in progress. Brick work upto roof level done at the time of inspection on 14.09.2020.

The unauthorized construction has been carried out in violation of section 234, 235 and 238 of the Cantonments Act 2006. Erection / re-erection has been carried out involving material alterations, new building construction materials have been used for illegal construction. The erection / re-erection being undertaken at aforementioned premises is in violation of building bye laws applicable to Delhi Cantonment notified by the Competent Authority vide Gazette Notification SRO No. DCB/4/Building Bye-Laws dated 08.06.2002. The site of unauthorized construction is located outside notified Civil area with in Delhi Cantonment limits in Sy.No. 218 classified as B-4 land under the management of DEO, Delhi Circle, Delhi Cantt. It is recommended that notice under Section 248 of the Cantonments Act 2006 be issued to Sh. Deepak Singh Bisht S/o Sh. Hoshiyar Singh Bisht asking him to remove the said unauthorized constructions within 30 days of the date of service of notice.

Relevant file is placed on the table.

134. Considered. The Board noted JEs inspection report as also the details of unauthorised construction brought out on the agenda side. The Board was of the considered opinion that illegal/ unauthorised construction has been carried out by Sh. Deepak Singh Bisht S/o Hoshiyar Singh Bisht without obtaining sanction of the Competent Authority as required u/s 238 of the Cantonments Act, 2006 and in violation of Section 234, 235 & 247 of the Act and provisions made under applicable building bye laws notified by the Competent Authority for Delhi Cantonment area. The matter was discussed at length and the Board resolved that notice under section 248 of Cantonments Act 2006 be issued Sh. Deepak Singh Bisht S/o Hoshiyar Singh Bisht H.No. A-337, Village Jharera,Delhi Cantt giving him 30 days time to remove the unauthorised construction. The Board further resolved that in the event of non compliance of the notice by Sh. Deepak Singh Bisht S/o Hoshiyar Singh Bisht, the CEO, Member-Secretary will issue notice under section 320 of the Cantonments Act, 2006 to him giving 15 days time to demolish the said unauthorized construction failing which the unauthorized construction shall be demolished by the office at the risk and cost of Sh. Deepak Singh Bisht S/o Hoshiyar Singh Bisht.

135. UNAUTHORIZED CONSTRUCTION MADE BY SH. MANIK FOUZDAR S/O SH. BAMKIN FOUZDAR H.NO. 6/121, VILLAGE JHARERA, DELHI CANTT: ISSUE OF THE NOTICE UNDER SECTION 248 OF CANTONMENTS ACT 2006.

To consider JEs report dated 31.08.2020 regarding unauthorized construction carried out by Sh. ManikFouzdar S/o Sh. BamkinFouzdarH.No. 6/121, Village Jharera, Delhi Cantt. The details of unauthorized construction carried out Sh. ManikFouzdar S/o Sh. BamkinFouzdar as reported in inspection report dated 31.08.2020. is given hereunder:

The following unauthorised Construction on II floor was in progress covering area. Room : 3.45mt x 3.35mtr. Brick work upto roof level done. Fixing of T-iron in roof was in progress. Laying of Agra Stone roof was in progress at the time of inspection on 31.08.2020. Page 171 of 210

The unauthorized construction has been carried out in violation of section 234, 235 and 238 of the Cantonments Act 2006. Erection / re-erection has been carried out involving material alterations, new building construction materials have been used for illegal construction. The erection / re-erection being undertaken at aforementioned premises is in violation of building bye laws applicable to Delhi Cantonment notified by the Competent Authority vide Gazette Notification SRO No. DCB/4/Building Bye-Laws dated 08.06.2002. The site of unauthorized construction is located outside notified Civil area with in Delhi Cantonment limits in Sy.No. 218 classified as B-4 land under the management of DEO, Delhi Circle, Delhi Cantt. It is recommended that notice under Section 248 of the Cantonments Act 2006 be issued to Sh. ManikFouzdar S/o Sh. BamkinFouzdar asking him to remove the said unauthorized constructions within 30 days of the date of service of notice.

Relevant file is placed on the table.

135. Considered. The Board noted JEs inspection report as also the details of unauthorised construction brought out on the agenda side. The Board was of the considered opinion that illegal/ unauthorised construction has been carried out by Sh. ManikFouzdar S/o Sh. BamkinFouzdarwithout obtaining sanction of the Competent Authority as required u/s 238 of the Cantonments Act, 2006 and in violation of Section 234, 235 & 247 of the Act and provisions made under applicable building bye laws notified by the Competent Authority for Delhi Cantonment area. The matter was discussed at length and the Board resolved that notice under section 248 of Cantonments Act 2006 be issued Sh. ManikFouzdar S/o Sh. BamkinFouzdarH.No. 6/121, Village Jharera,Delhi Cantt giving him 30 days time to remove the unauthorised construction. The Board further resolved that in the event of non compliance of the notice by Sh. ManikFouzdar S/o Sh. BamkinFouzdar, the CEO, Member-Secretary will issue notice under section 320 of the Cantonments Act, 2006 to him giving 15 days time to demolish the said unauthorized construction failing which the unauthorized construction shall be demolished by the office at the risk and cost of Sh. ManikFouzdar S/o Sh. BamkinFouzdar.

136. UNAUTHORIZED CONSTRUCTION MADE BY SH. RAJ JEET PAL S/O SH. RAM LAKHAN PAL H.NO. S-170/266, VILLAGE JHARERA, DELHI CANTT: ISSUE OF THE NOTICE UNDER SECTION 248 OF CANTONMENTS ACT 2006.

To consider JEs report dated 14.09.2020 regarding unauthorized construction carried out by Sh. Raj Jeet Pal S/o Sh. Ram Lakhan Pal H.No. S-170/266, Village Jharera, Delhi Cantt. The details of unauthorized construction carried out Sh. Raj Jeet Pal S/o Sh. Ram Lakhan Pal as reported in inspection report dated 14.09.2020. is given hereunder:

After demolishing existing construction the following Unauthorised Construction was in progress on ground Floor covering area. (i) 4.60mtr x 5.15mtr. (ii) 3.70mtr x 1.60mtr. Brick work upto roof level done at the time of inspection on 14.09.2020.

The unauthorized construction has been carried out in violation of section 234, 235 and 238 of the Cantonments Act 2006. Erection / re-erection has been carried out involving material alterations, new building construction materials have been used for illegal construction. The erection / re-erection being undertaken at aforementioned premises is in

Page 172 of 210

violation of building bye laws applicable to Delhi Cantonment notified by the Competent Authority vide Gazette Notification SRO No. DCB/4/Building Bye-Laws dated 08.06.2002. The site of unauthorized construction is located outside notified Civil area with in Delhi Cantonment limits in Sy.No. 218 classified as B-4 land under the management of DEO, Delhi Circle, Delhi Cantt. It is recommended that notice under Section 248 of the Cantonments Act 2006 be issued to Sh. Raj Jeet Pal S/o Sh. Ram Lakhan Pal asking him to remove the said unauthorized constructions within 30 days of the date of service of notice.

Relevant file is placed on the table.

136. Considered. The Board noted JEs inspection report as also the details of unauthorised construction brought out on the agenda side. The Board was of the considered opinion that illegal/ unauthorised construction has been carried out by Sh. Raj Jeet Pal S/o Sh. Ram Lakhan Pal without obtaining sanction of the Competent Authority as required u/s 238 of the Cantonments Act, 2006 and in violation of Section 234, 235 & 247 of the Act and provisions made under applicable building bye laws notified by the Competent Authority for Delhi Cantonment area. The matter was discussed at length and the Board resolved that notice under section 248 of Cantonments Act 2006 be issued Sh. Raj Jeet Pal S/o Sh. Ram Lakhan Pal H.No. S-170/266, Village Jharera,Delhi Cantt giving him 30 days time to remove the unauthorised construction. The Board further resolved that in the event of non compliance of the notice by Sh. Raj Jeet Pal S/o Sh. Ram Lakhan Pal, the CEO, Member-Secretary will issue notice under section 320 of the Cantonments Act, 2006 to him giving 15 days time to demolish the said unauthorized construction failing which the unauthorized construction shall be demolished by the office at the risk and cost of Sh. Raj Jeet Pal S/o Sh. Ram Lakhan Pal.

137. UNAUTHORIZED CONSTRUCTION MADE BY SH. MUKHRAM S/O SH. BADLU H.NO. S-170/144 BACK OF PACCI LINE, VILLAGE JHARERA, DELHI CANTT: ISSUE OF THE NOTICE UNDER SECTION 248 OF CANTONMENTS ACT 2006.

To consider JEs report dated 20.08.2020 regarding unauthorized construction carried out by Sh. Mukhram S/o Sh. BadluH.No. S-170/144 Back of Pacci Line, Village Jharera, Delhi Cantt. The details of unauthorized construction carried out by Sh. Mukhram S/o Sh. Badlu as reported in inspection report dated 20.08.2020 is given hereunder:

R.C. C slab casted on Ground floor and first floorcovering area. Ground floor : 4.50mt x 10.50mt. Ist floor : 4.50mt x 7.50mt. Constructing rooms, toilet, kitchen etc. Plastering work was in progress at the time of inspection on 20.08.2020.

The unauthorized construction has been carried out in violation of section 234, 235 and 238 of the Cantonments Act 2006. Erection / re-erection has been carried out involving material alterations, new building construction materials have been used for illegal construction. The erection / re-erection being undertaken at aforementioned premises is in violation of building bye laws applicable to Delhi Cantonment notified by the Competent Authority vide Gazette Notification SRO No. DCB/4/Building Bye-Laws dated 08.06.2002. The site of unauthorized construction is located outside notified Civil area with in Delhi Cantonment limits in Sy.No. 217 classified as ‘C’ land under the management of the Delhi Cantonment Board, Delhi Cantt. It is recommended that notice under Section 248 of the Cantonments Act 2006 be issued to Sh. Mukhram S/o Sh. Badlu asking him to remove the said unauthorized constructions within 30 days of the date of service of notice.

Relevant file is placed on the table. Page 173 of 210

137. Considered. The Board noted JEs inspection report as also the details of unauthorised construction brought out on the agenda side. The Board was of the considered opinion that illegal/ unauthorised construction has been carried out by Sh. Mukhram S/o Sh. Badluwithout obtaining sanction of the Competent Authority as required u/s 238 of the Cantonments Act, 2006 and in violation of Section 234, 235 & 247 of the Act and provisions made under applicable building bye laws notified by the Competent Authority for Delhi Cantonment area. The matter was discussed at length and the Board resolved that notice under section 248 of Cantonments Act 2006 be issued Sh. Mukhram S/o Sh. BadluH.No. S-170/144 Back of Pacci Line, Village Jharera,Delhi Cantt giving him 30 days time to remove the unauthorised construction. The Board further resolved that in the event of non compliance of the notice by Sh. Mukhram S/o Sh. Badlu, the CEO, Member-Secretary will issue notice under section 320 of the Cantonments Act, 2006 to him giving 15 days time to demolish the said unauthorized construction failing which the unauthorized construction shall be demolished by the office at the risk and cost of Sh. Mukhram S/o Sh. Badlu.

138. UNAUTHORIZED CONSTRUCTION MADE BY SMT. MEERA W/O SH. UDAY VEER H.NO. S-170/104, ( BACK SIDE 45 STAFF QTRS) VILLAGE JHARERA, DELHI CANTT: ISSUE OF THE NOTICE UNDER SECTION 248 OF CANTONMENTS ACT 2006.

To consider JEs report dated 24.07.2020 regarding unauthorized construction carried out by Smt. Meera W/o Sh. Uday Veer H.No. S-170/104, ( Back side 45 Staff Qtrs), Village Jharera, Delhi Cantt. The details of unauthorized construction carried out by Smt. Meera W/o Sh. Uday Veer as reported in inspection report dated 24.07.2020 is given hereunder:

The following unauthorised construction was in progress on Ist floor covering area. 3.00mtr x 3.20mtr.( Room). Also make staircase outside his house From ground floor to Ist floor. Brick work upto roof level. Brick work was in progress at the time of inspection on 24.07.2020.

The unauthorized construction has been carried out in violation of section 234, 235 and 238 of the Cantonments Act 2006. Erection / re-erection has been carried out involving material alterations, new building construction materials have been used for illegal construction. The erection / re-erection being undertaken at aforementioned premises is in violation of building bye laws applicable to Delhi Cantonment notified by the Competent Authority vide Gazette Notification SRO No. DCB/4/Building Bye-Laws dated 08.06.2002.The site of unauthorized construction is located outside notified Civil area with in Delhi Cantonment limits in Sy.No. 217 classified as ‘C’ land under the management of the Delhi Cantonment Board, Delhi Cantt. It is recommended that notice under Section 248 of the Cantonments Act 2006 be issued to Smt. Meera W/o Sh. Uday Veer asking her to remove the said unauthorized constructions within 30 days of the date of service of notice.

Relevant file is placed on the table.

138. Considered. The Board noted JEs inspection report as also the details of unauthorised construction brought out on the agenda side. The Board was of the considered opinion that illegal/ unauthorised construction has been carried out by Smt. Meera W/o Sh. Uday Veer without obtaining sanction of the Competent Authority as required u/s 238 of the Cantonments Act, 2006 and in violation of Section 234, 235 & 247 of the Act and provisions made under applicable building bye laws notified by the Competent Authority for Delhi Cantonment area.

Page 174 of 210

The matter was discussed at length and the Board resolved that notice under section 248 of Cantonments Act 2006 be issued Smt. Meera W/o Sh. Uday Veer H.No. S-170/104, ( Back side 45 Staff Qtrs), Village Jharera,Delhi Cantt giving her 30 days time to remove the unauthorised construction. The Board further resolved that in the event of non compliance of the notice by Smt. Meera W/o Sh. Uday Veer, the CEO, Member-Secretary will issue notice under section 320 of the Cantonments Act, 2006 to her giving 15 days time to demolish the said unauthorized construction failing which the unauthorized construction shall be demolished by the office at the risk and cost of Smt. Meera W/o Sh. Uday Veer.

139. UNAUTHORIZED CONSTRUCTION MADE BY SMT SAVITRI W/O SH ROHTAS H.NO. 8/128, VILLAGE MEHRAM NAGAR ,DELHI CANTT: ISSUE OF THE NOTICE UNDER SECTION 248 OF CANTONMENTS ACT 2006.

To consider JEs report dated 17.09.2020 regarding unauthorized construction carried out by SmtSavitriW/o ShRohtasH.No. 8/128, Village Mehram Nagar, Delhi Cantt. The details of unauthorized construction carried out SmtSavitriW/o ShRohtas as reported in inspection report dated 17.09.2020. is given hereunder:

The following unauthorised construction done on Istfloor covering area. 3.90mt X 3.80mt on Govt. land R.C.C slab also Projected on ground.Constructing room, toilet etc. Plastering work was in progress at the time of inspection on 17.09.2020.

The unauthorized construction has been carried out in violation of section 234, 235 and 238 of the Cantonments Act 2006. Erection / re-erection has been carried out involving material alterations, new building construction materials have been used for illegal construction. The erection / re-erection being undertaken at aforementioned premises is in violation of building bye laws applicable to Delhi Cantonment notified by the Competent Authority vide Gazette Notification SRO No. DCB/4/Building Bye-Laws dated 08.06.2002. The site of unauthorized construction is located outside notified Civil area with in Delhi Cantonment limits in Sy.No. 167/1 classified as B-4 land under the management of DEO, Delhi Circle, Delhi Cantt. It is recommended that notice under Section 248 of the Cantonments Act 2006 be issued to SmtSavitriW/o ShRohtas asking her to remove the said unauthorized constructions within 30 days of the date of service of notice.

Relevant file is placed on the table.

139. Considered. The Board noted JEs inspection report as also the details of unauthorised construction brought out on the agenda side. The Board was of the considered opinion that illegal/ unauthorised construction has been carried out by Smt Savitri W/o ShRohtaswithout obtaining sanction of the Competent Authority as required u/s 238 of the Cantonments Act, 2006 and in violation of Section 234, 235 & 247 of the Act and provisions made under applicable building bye laws notified by the Competent Authority for Delhi Cantonment area. The matter was discussed at length and the Board resolved that notice under section 248 of Cantonments Act 2006 be issued Smt Savitri W/o ShRohtasH.No. 8/128, Village MehramNagar,Delhi Cantt giving her 30 days time to remove the unauthorised construction. The Board further resolved that in the event of non compliance of the notice by Smt Savitri W/o ShRohtas, the CEO, Member-Secretary will issue notice under section 320 of the Cantonments Act, 2006 to her giving 15 days time to demolish the said unauthorized construction failing Page 175 of 210

which the unauthorized construction shall be demolished by the office at the risk and cost of Smt Savitri W/o ShRohtas.

140. UNAUTHORISED CONSTRUCTION MADE SMT. MAYA DEVI W/O SH. OM PARKASH H.NO. T-105, VILLAGE OLD NANGAL DELHI CANTT: ISSUE OF NOTICE UNDER SECTION 320 OF THE CANTONMENTS ACT 2006.

Reference CBR No. 34 dated 04.11.2019 where in the Board resolved to issue notice under section 248 of the Cantonment Act 2006 Smt. Maya Devi W/o Sh. Om Parkash H.No. T- 105, Village Old Nangal, Delhi Cantt. Accordingly notice under section 248 of the Act was issued vide notice No. DCB/4/UC/MD/VON/2019-20 dated 12.02.2020 toMohd. AllahuddinH.No. T- 13, Village Old Nangal, Delhi Cantt has neither removed the unauthorised construction nor preferred any appeal U/s 340 of the Cantonment Act 2006. It is therefore proposed to issue notice under section 320 of the Cantonment Act 2006 for the unauthorised construction undertaken Smt. Maya Devi W/o Sh. Om Parkash H.No. T-105, Village Old Nangal, Delhi Cantt. The Board may consider.

Relevant file is placed on the table.

140. Considered. The Board noted its decision contained in CBR No. 34 dated 04.11.2019 and the details of notice u/s 248 dated 12.02.2020 issued to Smt. Maya Devi W/o Sh. Om Parkash H.No. T-105, Village Old Nangal, Delhi Cantt by the office under provisions of the Cantonments Act, 2006. The Board also noted office report that neither the unauthorised construction has been removed/demolished by Smt. Maya Devi W/o Sh. Om Parkash, nor any appeal has been preferred against the said notice. The matter was discussed at length and the Board decided to issue notice under section 320 of the Cantonments Act, 2006 to Smt. Maya Devi W/o Sh. Om Parkash H.No. T-105, Village Old Nangal, Delhi Cantt giving her 15 days time to demolish the said unauthorised construction carried out by her, without obtaining sanction from the Competent Authority, for which notice under section 248 has already been issued on 12.02.2020. In the event of non compliance of notice under section 320 of the Cantonments Act, 2006, the said unauthorized construction shall be demolished by the office at the risk and cost of Smt. Maya Devi W/o Sh. Om Parkash.

141. UNAUTHORISED CONSTRUCTION MADE BY MOH. SHAKEEL S/O MOH SAGEER H.NO. 146, INFRONT OF DISPENSARY, VILLAGE JHARERA,DELHI CANTT: ISSUE OF NOTICE UNDER SECTION 320 OF THE CANTONMENTS ACT 2006.

Reference CBR No. 52 dated 04.11.2019 where in the Board resolved to issue notice under section 248 of the Cantonment Act 2006 Moh. Shakeel S/o MohSageerH.No. 146, Infront of Dispensary, Village Jharera, Delhi Cantt. Accordingly notice under section 248 of the Act was issued vide notice No.DCB/4/UC/MS/Vill. Jharera/2019-20/ dated 14.03.2020 toMoh. Shakeel S/o MohSageerH.No. 146, Infront of Dispensary, Village Jharera, Delhi Cantt has neither removed the unauthorised construction nor preferred any appeal U/s 340 of the Cantonment Act 2006. It is therefore proposed to issue notice under section 320 of the Cantonment Act 2006 for the unauthorised construction undertaken Moh. Shakeel S/o MohSageer H.No.146, Infront of Dispensary Village Jharera, Delhi Cantt. The Board may consider.

Relevant file is placed on the table.

Page 176 of 210

141. Considered. The Board noted its decision contained in CBR No.52 dated 04.11.2019 and the details of notice u/s 248 dated 14. 03.2020 issued to Moh. Shakeel S/o MohSageerH.No. 146, Infront of Dispensary, Village Jharera, Delhi Cantt by the office under provisions of the Cantonments Act, 2006. The Board also noted office report that neither the unauthorised construction has been removed/demolished by Moh. Shakeel S/o MohSageer, nor any appeal has been preferred against the said notice. The matter was discussed at length and the Board decided to issue notice under section 320 of the Cantonments Act, 2006 to Moh. Shakeel S/o MohSageerH.No. 146, Infront of Dispensary, Village Jharera, Delhi Cantt giving him 15 days time to demolish the said unauthorised construction carried out by him, without obtaining sanction from the Competent Authority, for which notice under section 248 has already been issued on 14.03.2020. In the event of non compliance of notice under section 320 of the Cantonments Act, 2006, the said unauthorized construction shall be demolished by the office at the risk and cost of Moh. Shakeel S/o MohSageer.

142. UNAUTHORISED CONSTRUCTION MADE BYMOHD. ALLAHUDDIN H.NO. T-13, VILLAGE OLD NANGAL DELHI CANTT: ISSUE OF NOTICE UNDER SECTION 320 OF THE CANTONMENTS ACT 2006.

Reference CBR No. 38 dated 21.03.2020 where in the Board resolved to issue notice under section 248 of the Cantonment Act 2006 Mohd. AllahuddinH.No. T-13, Village Old Nangal, Delhi Cantt.Accordingly notice under section 248 of the Act was issued vide notice No. DCB/4/UC/MA/VON/2019-20 dated 06.05.2020 toMohd. AllahuddinH.No. T-13, Village Old Nangal, Delhi Cantt has neither removed the unauthorised construction nor preferred any appeal U/s 340 of the Cantonment Act 2006. It is therefore proposed to issue notice under section 320 of the Cantonment Act 2006 for the unauthorised construction undertaken Mohd. AllahuddinH.No. T-13, Village Old Nangal, Delhi Cantt. The Board may consider.

Relevant file is placed on the table.

142. Considered. The Board noted its decision contained in CBR No. 38 dated 21.03.2020 and the details of notice u/s 248 dated 06.05.2020 issued to Mohd. AllahuddinH.No. T-13, Village Old Nangal, Delhi Cantt by the office under provisions of the Cantonments Act, 2006. The Board also noted office report that neither the unauthorised construction has been removed/demolished by Mohd. Allahuddin, nor any appeal has been preferred against the said notice. The matter was discussed at length and the Board decided to issue notice under section 320 of the Cantonments Act, 2006 to Mohd. AllahuddinH.No. T-13, Village Old Nangal, Delhi Cantt giving him 15 days time to demolish the said unauthorised construction carried out by him, without obtaining sanction from the Competent Authority, for which notice under section 248 has already been issued on 06.05.2020. In the event of non compliance of notice under section 320 of the Cantonments Act, 2006, the said unauthorized construction shall be demolished by the office at the risk and cost of Mohd. Allahuddin.

143. UNAUTHORISED CONSTRUCTION MADE SH. SUBHASH S/O LATE SH. GOVIND H.NO. C-115, VILLAGE OLD NANGAL DELHI CANTT: ISSUE OF NOTICE UNDER SECTION 320 OF THE CANTONMENTS ACT 2006.

Reference CBR No. 39 dated 21.03.2020 where in the Board resolved to issue notice under section 248 of the Cantonment Act 2006 Sh. Subhash S/o Late Sh. Govind H.No. C-115, Village Old Nangal, Delhi Cantt. Accordingly notice under section 248 of the Act was issued vide notice No. DCB/4/UC/S/VON/2019-20 dated 12.05.2020 toSh. Subhash S/o Late Sh. Govind Page 177 of 210

H.No. C-115, Village Old Nangal, Delhi Cantt has neither removed the unauthorised construction nor preferred any appeal U/s 340 of the Cantonment Act 2006. It is therefore proposed to issue notice under section 320 of the Cantonment Act 2006 for the unauthorised construction undertaken Sh. Subhash S/o Late Sh. Govind H.No. C-115, Village Old Nangal, Delhi Cantt. The Board may consider.

Relevant file is placed on the table.

143. Considered. The Board noted its decision contained in CBR No. 39 dated 21.03.2020 and the details of notice u/s 248 dated 12.05.2020 issued to Sh. Subhash S/o Late Sh. Govind H.No. C-115, Village Old Nangal, Delhi Cantt by the office under provisions of the Cantonments Act, 2006. The Board also noted office report that neither the unauthorised construction has been removed/demolished bySh. Subhash S/o Late Sh. Govind, nor any appeal has been preferred against the said notice. The matter was discussed at length and the Board decided to issue notice under section 320 of the Cantonments Act, 2006 to Sh. Subhash S/o Late Sh. Govind H.No. C-115, Village Old Nangal, Delhi Cantt giving him 15 days time to demolish the said unauthorised construction carried out by him, without obtaining sanction from the Competent Authority, for which notice under section 248 has already been issued on 12.05.2020. In the event of non compliance of notice under section 320 of the Cantonments Act, 2006, the said unauthorized construction shall be demolished by the office at the risk and cost of Sh. Subhash S/o Late Sh. Govind.

144. UNAUTHORISED CONSTRUCTION MADE SMT. KUSHUM W/O SH. RAJ KUMAR H.NO. T-100T, VILLAGE OLD NANGAL DELHI CANTT: ISSUE OF NOTICE UNDER SECTION 320 OF THE CANTONMENTS ACT 2006.

Reference CBR No. 40 dated 21.03.2020 where in the Board resolved to issue notice under section 248 of the Cantonment Act 2006 Smt. Kushum W/o Sh. Raj Kumar H.No. T-100T, Village Old Nangal, Delhi Cantt. Accordingly notice under section 248 of the Act was issued vide notice No. DCB/4/UC/K/VON/2019-20 dated 12.05.2020 toSmt. Kushum W/o Sh. Raj Kumar H.No. T-100T, Village Old Nangal, Delhi Cantt has neither removed the unauthorised construction nor preferred any appeal U/s 340 of the Cantonment Act 2006. It is therefore proposed to issue notice under section 320 of the Cantonment Act 2006 for the unauthorised construction undertaken Smt. Kushum W/o Sh. Raj Kumar H.No. T-100T, Village Old Nangal, Delhi Cantt. The Board may consider.

Relevant file is placed on the table.

144. Considered. The Board noted its decision contained in CBR No. 40 dated 21.03.2020 and the details of notice u/s 248 dated 12.05.2020 issued to Smt. Kushum W/o Sh. Raj Kumar H.No. T-100T, Village Old Nangal, Delhi Cantt by the office under provisions of the Cantonments Act, 2006. The Board also noted office report that neither the unauthorised construction has been removed/demolished by Smt. Kushum W/o Sh. Raj Kumar, nor any appeal has been preferred against the said notice. The matter was discussed at length and the Board decided to issue notice under section 320 of the Cantonments Act, 2006 to Smt. Kushum W/o Sh. Raj Kumar H.No. T-100T, Village Old Nangal, Delhi Cantt giving her 15 days time to demolish the said unauthorised construction carried out by her, without obtaining sanction from the Competent Authority, for which notice under section 248 has already been issued on 12.05.2020. In the event of non compliance of notice under section 320 of the Cantonments

Page 178 of 210

Act, 2006, the said unauthorized construction shall be demolished by the office at the risk and cost of Smt. Kushum W/o Sh. Raj Kumar.

145. UNAUTHORISED CONSTRUCTION MADE SMT. MAMTA W/O SH. RAVINDER SINGH H.NO. V-10, VILLAGE OLD NANGAL DELHI CANTT: ISSUE OF NOTICE UNDER SECTION 320 OF THE CANTONMENTS ACT 2006.

Reference CBR No. 42 dated 21.03.2020 where in the Board resolved to issue notice under section 248 of the Cantonment Act 2006 Smt. Mamta W/o Sh. Ravinder Singh H.No. V-10, Village Old Nangal, Delhi Cantt. Accordingly notice under section 248 of the Act was issued vide notice No. DCB/4/UC/M/VON/2019-20 dated 04.05.2020 toSmt. Mamta W/o Sh. Ravinder Singh H.No. V-10, Village Old Nangal, Delhi Cantt has neither removed the unauthorised construction nor preferred any appeal U/s 340 of the Cantonment Act 2006. It is therefore proposed to issue notice under section 320 of the Cantonment Act 2006 for the unauthorised construction undertaken Smt. Mamta W/o Sh. Ravinder Singh H.No. V-10, Village Old Nangal, Delhi Cantt. The Board may consider.

Relevant file is placed on the table.

145. Considered. The Board noted its decision contained in CBR No. 42 dated 21.03.2020 and the details of notice u/s 248 dated 04.05.2020 issued to Smt. Mamta W/o Sh. Ravinder Singh H.No. V-10, Village Old Nangal, Delhi Cantt by the office under provisions of the Cantonments Act, 2006. The Board also noted office report that neither the unauthorised construction has been removed/demolished bySmt. Mamta W/o Sh. Ravinder Singh, nor any appeal has been preferred against the said notice. The matter was discussed at length and the Board decided to issue notice under section 320 of the Cantonments Act, 2006 to Smt. Mamta W/o Sh. Ravinder Singh H.No. V-10, Village Old Nangal, Delhi Cantt giving her 15 days time to demolish the said unauthorised construction carried out by her, without obtaining sanction from the Competent Authority, for which notice under section 248 has already been issued on 04.05.2020. In the event of non compliance of notice under section 320 of the Cantonments Act, 2006, the said unauthorized construction shall be demolished by the office at the risk and cost of Smt. Mamta W/o Sh. Ravinder Singh.

146. UNAUTHORISED CONSTRUCTION MADE BY SH. VINOD KUMAR S/O LATE SH. CHARAN SINGH H.NO. V-2, VILLAGE OLD NANGAL, DELHI CANTT: ISSUE OF NOTICE UNDER SECTION 320 OF THE CANTONMENTS ACT 2006.

Reference CBR No. 43 dated 21.03.2020 where in the Board resolved to issue notice under section 248 of the Cantonment Act 2006 Sh. Vinod Kumar S/o Late Sh. Charan Singh H.No. V-2, Village Old Nangal, Delhi Cantt. Accordingly notice under section 248 of the Act was issued vide notice No. DCB/4/UC/VK/VON/2019-20 dated 06.05.2020 toSh. Vinod Kumar S/o Late Sh. Charan Singh H.No. V-2, Village Old Nangal, Delhi Cantt has neither removed the unauthorised construction nor preferred any appeal U/s 340 of the Cantonment Act 2006. It is therefore proposed to issue notice under section 320 of the Cantonment Act 2006 for the unauthorised construction undertaken Sh. Vinod Kumar S/o Late Sh. Charan Singh H.No. V-2, Village Old Nangal, Delhi Cantt. The Board may consider.

Relevant file is placed on the table.

Page 179 of 210

146. Considered. The Board noted its decision contained in CBR No.43 dated 21.03.2020 and the details of notice u/s 248 dated 06.05.2020 issued to Sh. Vinod Kumar S/o Late Sh. Charan Singh H.No. V-2, Village Old Nangal, Delhi Cantt by the office under provisions of the Cantonments Act, 2006. The Board also noted office report that neither the unauthorised construction has been removed/demolished bySh. Vinod Kumar S/o Late Sh. Charan Singh, nor any appeal has been preferred against the said notice. The matter was discussed at length and the Board decided to issue notice under section 320 of the Cantonments Act, 2006 to Sh. Vinod Kumar S/o Late Sh. Charan Singh H.No. V-2, Village Old Nangal, Delhi Cantt giving him 15 days time to demolish the said unauthorised construction carried out by him, without obtaining sanction from the Competent Authority, for which notice under section 248 has already been issued on 06.05.2020. In the event of non compliance of notice under section 320 of the Cantonments Act, 2006, the said unauthorized construction shall be demolished by the office at the risk and cost of Sh. Vinod Kumar S/o Late Sh. Charan Singh.

147. UNAUTHORISED CONSTRUCTION MADE BY SH. HARI KIRPAL S/O SH. SHAM LAL H.NO. T-84, VILLAGE OLD NANGAL, DELHI CANTT: ISSUE OF NOTICE UNDER SECTION 320 OF THE CANTONMENTS ACT 2006.

Reference CBR No. 44 dated 21.03.2020 where in the Board resolved to issue notice under section 248 of the Cantonment Act 2006 Sh. Hari Kirpal S/o Sh. Sham Lal H.No.T-84, Village Old Nangal, Delhi Cantt. Accordingly notice under section 248 of the Act was issued vide notice No. DCB/4/UC/HK/VON/2019-20 dated 06.05.2020 toSh. Hari Kirpal S/o Sh. Sham Lal H.No. T-84, Village Old Nangal, Delhi Cantt has neither removed the unauthorised construction nor preferred any appeal U/s 340 of the Cantonment Act 2006. It is therefore proposed to issue notice under section 320 of the Cantonment Act 2006 for the unauthorised construction undertaken Sh. Hari Kirpal S/o Sh. Sham Lal H.No.T-84, Village Old Nangal, Delhi Cantt. The Board may consider.

Relevant file is placed on the table.

147. Considered. The Board noted its decision contained in CBR No. 44 dated 21.03.2020 and the details of notice u/s 248 dated 06.05.2020 issued to Sh. Hari Kirpal S/o Sh. Sham Lal H.No.T-84, Village Old Nangal, Delhi Cantt by the office under provisions of the Cantonments Act, 2006. The Board also noted office report that neither the unauthorised construction has been removed/demolished bySh. Hari Kirpal S/o Sh. Sham Lal, nor any appeal has been preferred against the said notice. The matter was discussed at length and the Board decided to issue notice under section 320 of the Cantonments Act, 2006 to Sh. Hari Kirpal S/o Sh. Sham LalH.No. T-84, Village Old Nangal, Delhi Cantt giving him 15 days time to demolish the said unauthorised construction carried out by him, without obtaining sanction from the Competent Authority, for which notice under section 248 has already been issued on 06.05.2020. In the event of non compliance of notice under section 320 of the Cantonments Act, 2006, the said unauthorized construction shall be demolished by the office at the risk and cost of Sh. Hari Kirpal S/o Sh. Sham Lal.

148. UNAUTHORISED CONSTRUCTION MADE BY SH. DHEERAJ SINGH S/O SH. SUNIL KUMAR SINGH H.NO. V-15 VILLAGE OLD NANGAL, DELHI CANTT: ISSUE OF NOTICE UNDER SECTION 320 OF THE CANTONMENTS ACT 2006.

Reference CBR No. 45 dated 21.03.2020 where in the Board resolved to issue notice under section 248 of the Cantonment Act 2006 Sh. Dheeraj Singh S/o Sh. Sunil Kumar Singh Page 180 of 210

H.No. V-15 Village Old Nangal, Delhi Cantt. Accordingly notice under section 248 of the Act was issued vide notice No. DCB/4/UC/DS/VON/2019-20 dated 12.05.2020 to Sh. Dheeraj Singh S/o Sh. Sunil Kumar Singh H.No. V-15 Village Old Nangal, Delhi Cantt has neither removed the unauthorised construction nor preferred any appeal U/s 340 of the Cantonment Act 2006. It is therefore proposed to issue notice under section 320 of the Cantonment Act 2006 for the unauthorised construction undertaken Sh. Dheeraj Singh S/o Sh. Sunil Kumar Singh H.No. V-15 Village Old Nangal, Delhi Cantt. The Board may consider.

Relevant file is placed on the table.

148. Considered. The Board noted its decision contained in CBR No. 45 dated 21.03.2020and the details of notice u/s 248 dated 12.05.2020 issued to Sh. Dheeraj Singh S/o Sh. Sunil Kumar SinghH.No. V-15 Village Old Nangal, Delhi Cantt by the office under provisions of the Cantonments Act, 2006. The Board also noted office report that neither the unauthorised construction has been removed/demolished by Sh. Dheeraj Singh S/o Sh. Sunil Kumar Singh, nor any appeal has been preferred against the said notice. The matter was discussed at length and the Board decided to issue notice under section 320 of the Cantonments Act, 2006 to Sh. Dheeraj Singh S/o Sh. Sunil Kumar Singh H.No. V-15 Village Old Nangal, Delhi Cantt giving him 15 days time to demolish the said unauthorised construction carried out by him, without obtaining sanction from the Competent Authority, for which notice under section 248 has already been issued on 06.05.2020. In the event of non compliance of notice under section 320 of the Cantonments Act, 2006, the said unauthorized construction shall be demolished by the office at the risk and cost of Dheeraj Singh S/o Sh. Sunil Kumar Singh.

149. UNAUTHORISED CONSTRUCTION MADE BY SH. MOHAN TIWARI S/O LATE SH. HOSHALA TIWARI CB-176, VILLAGE NARAINA, DELHI CANTT: ISSUE OF NOTICE UNDER SECTION 320 OF THE CANTONMENTS ACT 2006.

Reference CBR No. 52dated 21.03.2020 where in the Board resolved to issue notice under section 248 of the Cantonment Act 2006 Sh. Mohan Tiwari S/o Late Sh. Hoshala Tiwari CB-176, Village Naraina, Delhi Cantt. Accordingly notice under section 248 of the Act was issued vide notice No. DCB/4/UC/MT/Naraina/2019-20/1dated 04.05.2020toSh. Mohan Tiwari S/o Late Sh. Hoshala Tiwari CB-176, Village Naraina, Delhi Cantt has neither removed the unauthorised construction nor preferred any appeal U/s 340 of the Cantonment Act 2006. It is therefore proposed to issue notice under section 320 of the Cantonment Act 2006 for the unauthorised construction undertaken Sh. Mohan Tiwari S/o Late Sh. Hoshala Tiwari CB-176, Village Naraina, Delhi Cantt. The Board may consider.

Relevant file is placed on the table.

149. Considered. The Board noted its decision contained in CBR No. 52 dated 21.03.2020and the details of notice u/s 248 dated 04.05.2020 issued to Sh. Mohan Tiwari S/o Late Sh. Hoshala Tiwari CB-176, Village Naraina, Delhi Cantt by the office under provisions of the Cantonments Act, 2006. The Board also noted office report that neither the unauthorised construction has been removed/demolished by Sh. Mohan Tiwari S/o Late Sh. Hoshala Tiwari, nor any appeal has been preferred against the said notice. The matter was discussed at length and the Board decided to issue notice under section 320 of the Cantonments Act, 2006 to Sh. Mohan Tiwari S/o Late Sh. Hoshala Tiwari CB-176, Village Naraina, Delhi Cantt giving him 15 days time to demolish the said unauthorised construction carried out by him, without obtaining sanction from the Competent Authority, for which notice under section 248 has already been issued on Page 181 of 210

04.05.2020. In the event of non compliance of notice under section 320 of the Cantonments Act, 2006, the said unauthorized construction shall be demolished by the office at the risk and cost of Sh. Mohan Tiwari S/o Late Sh. Hoshala Tiwari.

150. UNAUTHORISED CONSTRUCTION MADE BY SH. MOHAN TIWARI S/O LATE SH. HOSHALA TIWARI CB-176, VILLAGE NARAINA, DELHI CANTT: ISSUE OF NOTICE UNDER SECTION 320 OF THE CANTONMENTS ACT 2006.

Reference CBR No. 53dated 21.03.2020 where in the Board resolved to issue notice under section 248 of the Cantonment Act 2006 Sh. Mohan Tiwari S/o Late Sh. Hoshala Tiwari CB-176, Village Naraina, Delhi Cantt. Accordingly notice under section 248 of the Act was issued vide notice No. DCB/4/UC/MT/Naraina/2019-20/2dated 04.05.2020toSh. Mohan Tiwari S/o Late Sh. Hoshala Tiwari CB-176, Village Naraina, Delhi Cantt has neither removed the unauthorised construction nor preferred any appeal U/s 340 of the Cantonment Act 2006. It is therefore proposed to issue notice under section 320 of the Cantonment Act 2006 for the unauthorised construction undertaken Sh. Mohan Tiwari S/o Late Sh. Hoshala Tiwari CB-176, Village Naraina, Delhi Cantt. The Board may consider.

Relevant file is placed on the table.

150. Considered. The Board noted its decision contained in CBR No. 53 dated 21.03.2020 and the details of notice u/s 248 dated 04.05.2020 issued to Sh. Mohan Tiwari S/o Late Sh. Hoshala Tiwari CB-176, Village Naraina, Delhi Cantt by the office under provisions of the Cantonments Act, 2006. The Board also noted office report that neither the unauthorised construction has been removed/demolished by Sh. Mohan Tiwari S/o Late Sh. Hoshala Tiwari, nor any appeal has been preferred against the said notice. The matter was discussed at length and the Board decided to issue notice under section 320 of the Cantonments Act, 2006 to Sh. Mohan Tiwari S/o Late Sh. Hoshala Tiwari CB-176, Village Naraina, Delhi Cantt giving him 15 days time to demolish the said unauthorised construction carried out by him, without obtaining sanction from the Competent Authority, for which notice under section 248 has already been issued on 04.05.2020. In the event of non compliance of notice under section 320 of the Cantonments Act, 2006, the said unauthorized construction shall be demolished by the office at the risk and cost of Sh. Mohan Tiwari S/o Late Sh. Hoshala Tiwari.

151. UNAUTHORISED CONSTRUCTION MADE BY SH. MOHAN TIWARI S/O LATE SH. HOSHALA TIWARI CB-176, VILLAGE NARAINA, DELHI CANTT: ISSUE OF NOTICE UNDER SECTION 320 OF THE CANTONMENTS ACT 2006.

Reference CBR No. 54dated 21.03.2020 where in the Board resolved to issue notice under section 248 of the Cantonment Act 2006 Sh. Mohan Tiwari S/o Late Sh. Hoshala Tiwari CB-176, Village Naraina, Delhi Cantt. Accordingly notice under section 248 of the Act was issued vide notice No. DCB/4/UC/MT/Naraina/2019-20/3dated 04.05.2020toSh. Mohan Tiwari S/o Late Sh. Hoshala Tiwari CB-176, Village Naraina, Delhi Cantt has neither removed the unauthorised construction nor preferred any appeal U/s 340 of the Cantonment Act 2006. It is therefore proposed to issue notice under section 320 of the Cantonment Act 2006 for the unauthorised construction undertaken Sh. Mohan Tiwari S/o Late Sh. Hoshala Tiwari CB-176, Village Naraina, Delhi Cantt. The Board may consider.

Relevant file is placed on the table. Page 182 of 210

151. Considered. The Board noted its decision contained in CBR No. 54 dated 21.03.2020 and the details of notice u/s 248 dated 04.05.2020 issued to Sh. Mohan Tiwari S/o Late Sh. Hoshala Tiwari CB-176, Village Naraina, Delhi Cantt by the office under provisions of the Cantonments Act, 2006. The Board also noted office report that neither the unauthorised construction has been removed/demolished by Sh. Mohan Tiwari S/o Late Sh. Hoshala Tiwari, nor any appeal has been preferred against the said notice. The matter was discussed at length and the Board decided to issue notice under section 320 of the Cantonments Act, 2006 to Sh. Mohan Tiwari S/o Late Sh. Hoshala Tiwari CB-176, Village Naraina, Delhi Cantt giving him 15 days time to demolish the said unauthorised construction carried out by him, without obtaining sanction from the Competent Authority, for which notice under section 248 has already been issued on 04.05.2020. In the event of non compliance of notice under section 320 of the Cantonments Act, 2006, the said unauthorized construction shall be demolished by the office at the risk and cost of Sh. Mohan Tiwari S/o Late Sh. Hoshala Tiwari.

152. UNAUTHORISED CONSTRUCTION MADE BY SH. MOHAN TIWARI S/O LATE SH. HOSHALA TIWARI CB-176, VILLAGE NARAINA, DELHI CANTT: ISSUE OF NOTICE UNDER SECTION 320 OF THE CANTONMENTS ACT 2006.

Reference CBR No. 55dated 21.03.2020 where in the Board resolved to issue notice under section 248 of the Cantonment Act 2006 Sh. Mohan Tiwari S/o Late Sh. Hoshala Tiwari CB-176, Village Naraina, Delhi Cantt. Accordingly notice under section 248 of the Act was issued vide notice No. DCB/4/UC/MT/Naraina/2019-20/4dated 04.05.2020toSh. Mohan Tiwari S/o Late Sh. Hoshala Tiwari CB-176, Village Naraina, Delhi Cantt has neither removed the unauthorised construction nor preferred any appeal U/s 340 of the Cantonment Act 2006. It is therefore proposed to issue notice under section 320 of the Cantonment Act 2006 for the unauthorised construction undertaken Sh. Mohan Tiwari S/o Late Sh. Hoshala Tiwari CB-176, Village Naraina, Delhi Cantt. The Board may consider.

Relevant file is placed on the table.

152. Considered. The Board noted its decision contained in CBR No. 55 dated 21.03.2020 and the details of notice u/s 248 dated 04.05.2020 issued to Sh. Mohan Tiwari S/o Late Sh. Hoshala Tiwari CB-176, Village Naraina, Delhi Cantt by the office under provisions of the Cantonments Act, 2006. The Board also noted office report that neither the unauthorised construction has been removed/demolished by Sh. Mohan Tiwari S/o Late Sh. Hoshala Tiwari, nor any appeal has been preferred against the said notice. The matter was discussed at length and the Board decided to issue notice under section 320 of the Cantonments Act, 2006 to Sh. Mohan Tiwari S/o Late Sh. Hoshala Tiwari CB-176, Village Naraina, Delhi Cantt giving him 15 days time to demolish the said unauthorised construction carried out by him, without obtaining sanction from the Competent Authority, for which notice under section 248 has already been issued on 04.05.2020. In the event of non compliance of notice under section 320 of the Cantonments Act, 2006, the said unauthorized construction shall be demolished by the office at the risk and cost of Sh. Mohan Tiwari S/o Late Sh. Hoshala Tiwari.

153. UNAUTHORISED CONSTRUCTION MADE BY SH. MOHAN TIWARI S/O LATE SH. HOSHALA TIWARI CB-176, VILLAGE NARAINA, DELHI CANTT: ISSUE OF NOTICE UNDER SECTION 320 OF THE CANTONMENTS ACT 2006.

Reference CBR No. 56dated 21.03.2020 where in the Board resolved to issue notice under section 248 of the Cantonment Act 2006 Sh. Mohan Tiwari S/o Late Sh. Hoshala Tiwari Page 183 of 210

CB-176, Village Naraina, Delhi Cantt. Accordingly notice under section 248 of the Act was issued vide notice No. DCB/4/UC/MT/Naraina/2019-20/5dated 04.05.2020toSh. Mohan Tiwari S/o Late Sh. Hoshala Tiwari CB-176, Village Naraina, Delhi Cantt has neither removed the unauthorised construction nor preferred any appeal U/s 340 of the Cantonment Act 2006. It is therefore proposed to issue notice under section 320 of the Cantonment Act 2006 for the unauthorised construction undertaken Sh. Mohan Tiwari S/o Late Sh. Hoshala Tiwari CB-176, Village Naraina, Delhi Cantt. The Board may consider.

Relevant file is placed on the table.

153. Considered. The Board noted its decision contained in CBR No. 56 dated 21.03.2020 and the details of notice u/s 248 dated 04.05.2020 issued to Sh. Mohan Tiwari S/o Late Sh. Hoshala Tiwari CB-176, Village Naraina, Delhi Cantt by the office under provisions of the Cantonments Act, 2006. The Board also noted office report that neither the unauthorised construction has been removed/demolished by Sh. Mohan Tiwari S/o Late Sh. Hoshala Tiwari, nor any appeal has been preferred against the said notice. The matter was discussed at length and the Board decided to issue notice under section 320 of the Cantonments Act, 2006 to Sh. Mohan Tiwari S/o Late Sh. Hoshala Tiwari CB-176, Village Naraina, Delhi Cantt giving him 15 days time to demolish the said unauthorised construction carried out by him, without obtaining sanction from the Competent Authority, for which notice under section 248 has already been issued on 04.05.2020. In the event of non compliance of notice under section 320 of the Cantonments Act, 2006, the said unauthorized construction shall be demolished by the office at the risk and cost of Sh. Mohan Tiwari S/o Late Sh. Hoshala Tiwari.

154. UNAUTHORISED CONSTRUCTION MADE BY SH. SUKHVIR SINGH S/O LATE SH. JAGDISH LAL CB-302, VILLAGE NARAINA, DELHI CANTT: ISSUE OF NOTICE UNDER SECTION 320 OF THE CANTONMENTS ACT 2006.

Reference CBR No. 64dated 21.03.2020 where in the Board resolved to issue notice under section 248 of the Cantonment Act 2006 Sh. Sukhvir Singh S/o Late Sh. Jagdish Lal CB- 302, Village Naraina, Delhi Cantt. Accordingly notice under section 248 of the Act was issued vide notice No.DCB/4/UC/SS/Vill. Naraina/2019-20/1dated 04.05.2020toSh. Sukhvir Singh S/o Late Sh. Jagdish Lal CB-302, Village Naraina, Delhi Cantt has neither removed the unauthorised construction nor preferred any appeal U/s 340 of the Cantonment Act 2006. It is therefore proposed to issue notice under section 320 of the Cantonment Act 2006 for the unauthorised construction undertaken Sh. Sukhvir Singh S/o Late Sh. Jagdish Lal CB-302, Village Naraina, Delhi Cantt. The Board may consider.

Relevant file is placed on the table.

154. Considered. The Board noted its decision contained in CBR No. 64 dated 21.03.2020 and the details of notice u/s 248 dated 04.05.2020 issued to Sh. Sukhvir Singh S/o Late Sh. Jagdish Lal CB-302, Village Naraina, Delhi Cantt by the office under provisions of the Cantonments Act, 2006. The Board also noted office report that neither the unauthorised construction has been removed/demolished by Sh. Sukhvir Singh S/o Late Sh. Jagdish Lal, nor any appeal has been preferred against the said notice. The matter was discussed at length and the Board decided to issue notice under section 320 of the Cantonments Act, 2006 to Sh. Sukhvir Singh S/o Late Sh. Jagdish Lal CB-302, Village Naraina, Delhi Cantt giving him 15 days time to demolish the said unauthorised construction carried out by him, without obtaining sanction from the Competent Authority, for which notice under section 248 has already been Page 184 of 210

issued on 04.05.2020. In the event of non compliance of notice under section 320 of the Cantonments Act, 2006, the said unauthorized construction shall be demolished by the office at the risk and cost of Sh. Sukhvir Singh S/o Late Sh. Jagdish Lal.

155. UNAUTHORISED CONSTRUCTION MADE BY SH. SUKHVIR SINGH S/O LATE SH. JAGDISH LAL CB-302, VILLAGE NARAINA, DELHI CANTT: ISSUE OF NOTICE UNDER SECTION 320 OF THE CANTONMENTS ACT 2006.

Reference CBR No. 65dated 21.03.2020 where in the Board resolved to issue notice under section 248 of the Cantonment Act 2006 Sh. Sukhvir Singh S/o Late Sh. Jagdish Lal CB- 302, Village Naraina, Delhi Cantt. Accordingly notice under section 248 of the Act was issued vide notice No.DCB/4/UC/SS/Vill. Naraina/2019-20/2dated 04.05.2020toSh. Sukhvir Singh S/o Late Sh. Jagdish Lal CB-302, Village Naraina, Delhi Cantt has neither removed the unauthorised construction nor preferred any appeal U/s 340 of the Cantonment Act 2006. It is therefore proposed to issue notice under section 320 of the Cantonment Act 2006 for the unauthorised construction undertaken Sh. Sukhvir Singh S/o Late Sh. Jagdish Lal CB-302, Village Naraina, Delhi Cantt. The Board may consider.

Relevant file is placed on the table.

155. Considered. The Board noted its decision contained in CBR No. 65 dated 21.03.2020 and the details of notice u/s 248 dated 04.05.2020 issued to Sh. Sukhvir Singh S/o Late Sh. Jagdish Lal CB-302, Village Naraina, Delhi Cantt by the office under provisions of the Cantonments Act, 2006. The Board also noted office report that neither the unauthorised construction has been removed/demolished by Sh. Sukhvir Singh S/o Late Sh. Jagdish Lal, nor any appeal has been preferred against the said notice. The matter was discussed at length and the Board decided to issue notice under section 320 of the Cantonments Act, 2006 to Sh. Sukhvir Singh S/o Late Sh. Jagdish Lal CB-302, Village Naraina, Delhi Cantt giving him 15 days time to demolish the said unauthorised construction carried out by him, without obtaining sanction from the Competent Authority, for which notice under section 248 has already been issued on 04.05.2020. In the event of non compliance of notice under section 320 of the Cantonments Act, 2006, the said unauthorized construction shall be demolished by the office at the risk and cost of Sh. Sukhvir Singh S/o Late Sh. Jagdish Lal.

156. UNAUTHORISED CONSTRUCTION MADE BY SH. SUKHVIR SINGH S/O LATE SH. JAGDISH LAL CB-302, VILLAGE NARAINA, DELHI CANTT: ISSUE OF NOTICE UNDER SECTION 320 OF THE CANTONMENTS ACT 2006.

Reference CBR No. 66dated 21.03.2020 where in the Board resolved to issue notice under section 248 of the Cantonment Act 2006 Sh. Sukhvir Singh S/o Late Sh. Jagdish Lal CB- 302, Village Naraina, Delhi Cantt. Accordingly notice under section 248 of the Act was issued vide notice No.DCB/4/UC/SS/Vill. Naraina/2019-20/3dated 04.05.2020toSh. Sukhvir Singh S/o Late Sh. Jagdish Lal CB-302, Village Naraina, Delhi Cantt has neither removed the unauthorised construction nor preferred any appeal U/s 340 of the Cantonment Act 2006. It is therefore proposed to issue notice under section 320 of the Cantonment Act 2006 for the unauthorised construction undertaken Sh. Sukhvir Singh S/o Late Sh. Jagdish Lal CB-302, Village Naraina, Delhi Cantt. The Board may consider.

Relevant file is placed on the table.

Page 185 of 210

156. Considered. The Board noted its decision contained in CBR No. 66 dated 21.03.2020 and the details of notice u/s 248 dated 04.05.2020 issued to Sh. Sukhvir Singh S/o Late Sh. Jagdish Lal CB-302, Village Naraina, Delhi Cantt by the office under provisions of the Cantonments Act, 2006. The Board also noted office report that neither the unauthorised construction has been removed/demolished by Sh. Sukhvir Singh S/o Late Sh. Jagdish Lal, nor any appeal has been preferred against the said notice. The matter was discussed at length and the Board decided to issue notice under section 320 of the Cantonments Act, 2006 to Sh. Sukhvir Singh S/o Late Sh. Jagdish Lal CB-302, Village Naraina, Delhi Cantt giving him 15 days time to demolish the said unauthorised construction carried out by him, without obtaining sanction from the Competent Authority, for which notice under section 248 has already been issued on 04.05.2020. In the event of non compliance of notice under section 320 of the Cantonments Act, 2006, the said unauthorized construction shall be demolished by the office at the risk and cost of Sh. Sukhvir Singh S/o Late Sh. Jagdish Lal.

157. UNAUTHORISED CONSTRUCTION MADE BY SH. DINESH S/O LATE SH. BHAGAT SINGH CB-105, VILLAGE NARAINA, DELHI CANTT: ISSUE OF NOTICE UNDER SECTION 320 OF THE CANTONMENTS ACT 2006.

Reference CBR No. 67dated 21.03.2020 where in the Board resolved to issue notice under section 248 of the Cantonment Act 2006 Sh. Dinesh S/o Late Sh. Bhagat Singh CB-105, Village Naraina, Delhi Cantt. Accordingly notice under section 248 of the Act was issued vide notice No.DCB/4/UC/D/Vill. Naraina/2019-20/dated 04.05.2020toSh. Dinesh S/o Late Sh. Bhagat Singh CB-105, Village Naraina, Delhi Cantt has neither removed the unauthorised construction nor preferred any appeal U/s 340 of the Cantonment Act 2006. It is therefore proposed to issue notice under section 320 of the Cantonment Act 2006 for the unauthorised construction undertaken Sh. Dinesh S/o Late Sh. Bhagat Singh CB-105, Village Naraina, Delhi Cantt. The Board may consider.

Relevant file is placed on the table.

157. Considered. The Board noted its decision contained in CBR No. 67 dated 21.03.2020 and the details of notice u/s 248 dated 04.05.2020 issued to Sh. Dinesh S/o Late Sh. Bhagat Singh CB-105, Village Naraina, Delhi Cantt by the office under provisions of the Cantonments Act, 2006. The Board also noted office report that neither the unauthorised construction has been removed/demolished by Sh. Dinesh S/o Late Sh. Bhagat Singh, nor any appeal has been preferred against the said notice. The matter was discussed at length and the Board decided to issue notice under section 320 of the Cantonments Act, 2006 to Sh. Dinesh S/o Late Sh. Bhagat Singh CB-105, Village Naraina, Delhi Cantt giving him 15 days time to demolish the said unauthorised construction carried out by him, without obtaining sanction from the Competent Authority, for which notice under section 248 has already been issued on 04.05.2020. In the event of non compliance of notice under section 320 of the Cantonments Act, 2006, the said unauthorized construction shall be demolished by the office at the risk and cost of Sh. Dinesh S/o Late Sh. Bhagat Singh.

158. UNAUTHORISED CONSTRUCTION MADE BY SH. MANOJ S/O SH. RAMESH KUMAR CB-164, VILLAGE NARAINA, DELHI CANTT: ISSUE OF NOTICE UNDER SECTION 320 OF THE CANTONMENTS ACT 2006.

Reference CBR No. 68dated 21.03.2020 where in the Board resolved to issue notice under section 248 of the Cantonment Act 2006 Sh. Manoj S/o Sh. Ramesh Kumar CB-164, Page 186 of 210

Village Naraina, Delhi Cantt. Accordingly notice under section 248 of the Act was issued vide notice No.DCB/4/UC/M/Vill. Naraina/2019-20/1dated 04.05.2020toSh. Manoj S/o Sh. Ramesh Kumar CB-164, Village Naraina, Delhi Cantt has neither removed the unauthorised construction nor preferred any appeal U/s 340 of the Cantonment Act 2006. It is therefore proposed to issue notice under section 320 of the Cantonment Act 2006 for the unauthorised construction undertaken Sh. Manoj S/o Sh. Ramesh Kumar CB-164, Village Naraina, Delhi Cantt. The Board may consider.

Relevant file is placed on the table.

158. Considered. The Board noted its decision contained in CBR No. 68 dated 21.03.2020 and the details of notice u/s 248 dated 04.05.2020 issued to Sh. Manoj S/o Sh. Ramesh Kumar CB-164, Village Naraina, Delhi Cantt by the office under provisions of the Cantonments Act, 2006. The Board also noted office report that neither the unauthorised construction has been removed/demolished by Sh. Manoj S/o Sh. Ramesh Kumar, nor any appeal has been preferred against the said notice. The matter was discussed at length and the Board decided to issue notice under section 320 of the Cantonments Act, 2006 to Sh. Manoj S/o Sh. Ramesh Kumar CB- 164, Village Naraina, Delhi Cantt giving him 15 days time to demolish the said unauthorised construction carried out by him, without obtaining sanction from the Competent Authority, for which notice under section 248 has already been issued on 04.05.2020. In the event of non compliance of notice under section 320 of the Cantonments Act, 2006, the said unauthorized construction shall be demolished by the office at the risk and cost of Sh. Manoj S/o Sh. Ramesh Kumar.

159. UNAUTHORISED CONSTRUCTION MADE BY SH. MANOJ S/O SH. RAMESH KUMAR CB-164, VILLAGE NARAINA, DELHI CANTT: ISSUE OF NOTICE UNDER SECTION 320 OF THE CANTONMENTS ACT 2006.

Reference CBR No. 69dated 21.03.2020 where in the Board resolved to issue notice under section 248 of the Cantonment Act 2006 Sh. Manoj S/o Sh. Ramesh Kumar CB-164, Village Naraina, Delhi Cantt. Accordingly notice under section 248 of the Act was issued vide notice No.DCB/4/UC/M/Vill. Naraina/2019-20/2dated 04.05.2020toSh. Manoj S/o Sh. Ramesh Kumar CB-164, Village Naraina, Delhi Cantt has neither removed the unauthorised construction nor preferred any appeal U/s 340 of the Cantonment Act 2006. It is therefore proposed to issue notice under section 320 of the Cantonment Act 2006 for the unauthorised construction undertaken Sh. Manoj S/o Sh. Ramesh Kumar CB-164, Village Naraina, Delhi Cantt. The Board may consider.

Relevant file is placed on the table.

159. Considered. The Board noted its decision contained in CBR No. 69 dated 21.03.2020 and the details of notice u/s 248 dated 04.05.2020 issued to Sh. Manoj S/o Sh. Ramesh Kumar CB-164, Village Naraina, Delhi Cantt by the office under provisions of the Cantonments Act, 2006. The Board also noted office report that neither the unauthorised construction has been removed/demolished by Sh. Manoj S/o Sh. Ramesh Kumar, nor any appeal has been preferred against the said notice. The matter was discussed at length and the Board decided to issue notice under section 320 of the Cantonments Act, 2006 to Sh. Manoj S/o Sh. Ramesh Kumar CB- 164, Village Naraina, Delhi Cantt giving him 15 days time to demolish the said unauthorised construction carried out by him, without obtaining sanction from the Competent Authority, for which notice under section 248 has already been issued on 04.05.2020. In the event of non Page 187 of 210

compliance of notice under section 320 of the Cantonments Act, 2006, the said unauthorized construction shall be demolished by the office at the risk and cost of Sh. Manoj S/o Sh. Ramesh Kumar.

160. UNAUTHORISED CONSTRUCTION MADE BY SH. MANOJ S/O SH. RAMESH KUMAR CB-164, VILLAGE NARAINA, DELHI CANTT: ISSUE OF NOTICE UNDER SECTION 320 OF THE CANTONMENTS ACT 2006.

Reference CBR No. 70dated 21.03.2020 where in the Board resolved to issue notice under section 248 of the Cantonment Act 2006 Sh. Manoj S/o Sh. Ramesh Kumar CB-164, Village Naraina, Delhi Cantt. Accordingly notice under section 248 of the Act was issued vide notice No.DCB/4/UC/M/Vill. Naraina/2019-20/3dated 04.05.2020toSh. Manoj S/o Sh. Ramesh Kumar CB-164, Village Naraina, Delhi Cantt has neither removed the unauthorised construction nor preferred any appeal U/s 340 of the Cantonment Act 2006. It is therefore proposed to issue notice under section 320 of the Cantonment Act 2006 for the unauthorised construction undertaken Sh. Manoj S/o Sh. Ramesh Kumar CB-164, Village Naraina, Delhi Cantt. The Board may consider.

Relevant file is placed on the table.

160. Considered. The Board noted its decision contained in CBR No. 70 dated 21.03.2020 and the details of notice u/s 248 dated 04.05.2020 issued to Sh. Manoj S/o Sh. Ramesh Kumar CB-164, Village Naraina, Delhi Cantt by the office under provisions of the Cantonments Act, 2006. The Board also noted office report that neither the unauthorised construction has been removed/demolished by Sh. Manoj S/o Sh. Ramesh Kumar, nor any appeal has been preferred against the said notice. The matter was discussed at length and the Board decided to issue notice under section 320 of the Cantonments Act, 2006 to Sh. Manoj S/o Sh. Ramesh Kumar CB- 164, Village Naraina, Delhi Cantt giving him 15 days time to demolish the said unauthorised construction carried out by him, without obtaining sanction from the Competent Authority, for which notice under section 248 has already been issued on 04.05.2020. In the event of non compliance of notice under section 320 of the Cantonments Act, 2006, the said unauthorized construction shall be demolished by the office at the risk and cost of Sh. Manoj S/o Sh. Ramesh Kumar.

161. UNAUTHORISED CONSTRUCTION MADE BY SH. VINOD KUMAR S/O SH. SAMEY SINGH H.NO. S-133/110 EAST MEHRAM NAGAR,, DELHI CANTT: ISSUE OF NOTICE UNDER SECTION 320 OF THE CANTONMENTS ACT 2006.

Reference CBR No. 71dated 21.03.2020 where in the Board resolved to issue notice under section 248 of the Cantonment Act 2006 Sh. Vinod Kumar S/o Sh. Samey Singh H.No. S- 133/110 East Mehram Nagar, Delhi Cantt. Accordingly notice under section 248 of the Act was issued vide notice No. DCB/4/UC/VK/EMN /2019-20/1dated 04.05.2020toSh. Vinod Kumar S/o Sh. Samey Singh H.No. S-133/110 East Mehram Nagar, Delhi Cantt has neither removed the unauthorised construction nor preferred any appeal U/s 340 of the Cantonment Act 2006. It is therefore proposed to issue notice under section 320 of the Cantonment Act 2006 for the unauthorised construction undertaken Sh. Vinod Kumar S/o Sh. Samey Singh H.No. S-133/110 East Mehram Nagar, Delhi Cantt. The Board may consider.

Relevant file is placed on the table.

Page 188 of 210

161. Considered. The Board noted its decision contained in CBR No. 71 dated 21.03.2020 and the details of notice u/s 248 dated 04.05.2020 issued to Sh. Vinod Kumar S/o Sh. Samey Singh H.No. S-133/110 East Mehram Nagar, Delhi Cantt by the office under provisions of the Cantonments Act, 2006. The Board also noted office report that neither the unauthorised construction has been removed/demolished by Sh. Vinod Kumar S/o Sh. Samey Singh, nor any appeal has been preferred against the said notice. The matter was discussed at length and the Board decided to issue notice under section 320 of the Cantonments Act, 2006 to Sh. Vinod Kumar S/o Sh. Samey Singh H.No. S-133/110 East Mehram Nagar, Delhi Cantt giving him 15 days time to demolish the said unauthorised construction carried out by him, without obtaining sanction from the Competent Authority, for which notice under section 248 has already been issued on 04.05.2020. In the event of non compliance of notice under section 320 of the Cantonments Act, 2006, the said unauthorized construction shall be demolished by the office at the risk and cost of Sh. Vinod Kumar S/o Sh. Samey Singh.

162. UNAUTHORISED CONSTRUCTION MADE BY SH. VINOD KUMAR S/O SH. SAMEY SINGH H.NO. S-133/110 EAST MEHRAM NAGAR, DELHI CANTT: ISSUE OF NOTICE UNDER SECTION 320 OF THE CANTONMENTS ACT 2006.

Reference CBR No. 72dated 21.03.2020 where in the Board resolved to issue notice under section 248 of the Cantonment Act 2006 Sh. Vinod Kumar S/o Sh. Samey Singh H.No. S- 133/110 East Mehram Nagar, Delhi Cantt. Accordingly notice under section 248 of the Act was issued vide notice No. DCB/4/UC/VK/EMN /2019-20/2dated 12.05.2020toSh. Vinod Kumar S/o Sh. Samey Singh H.No. S-133/110 East Mehram Nagar, Delhi Cantt has neither removed the unauthorised construction nor preferred any appeal U/s 340 of the Cantonment Act 2006. It is therefore proposed to issue notice under section 320 of the Cantonment Act 2006 for the unauthorised construction undertaken Sh. Vinod Kumar S/o Sh. Samey Singh H.No. S-133/110 East Mehram Nagar, Delhi Cantt. The Board may consider.

Relevant file is placed on the table.

162. Considered. The Board noted its decision contained in CBR No. 72 dated 21.03.2020 and the details of notice u/s 248 dated 12.05.2020 issued to Sh. Vinod Kumar S/o Sh. Samey Singh H.No. S-133/110 East Mehram Nagar, Delhi Cantt by the office under provisions of the Cantonments Act, 2006. The Board also noted office report that neither the unauthorised construction has been removed/demolished by Sh. Vinod Kumar S/o Sh. Samey Singh, nor any appeal has been preferred against the said notice. The matter was discussed at length and the Board decided to issue notice under section 320 of the Cantonments Act, 2006 to Sh. Vinod Kumar S/o Sh. Samey Singh H.No. S-133/110 East Mehram Nagar, Delhi Cantt giving him 15 days time to demolish the said unauthorised construction carried out by him, without obtaining sanction from the Competent Authority, for which notice under section 248 has already been issued on 12.05.2020. In the event of non compliance of notice under section 320 of the Cantonments Act, 2006, the said unauthorized construction shall be demolished by the office at the risk and cost of Sh. Vinod Kumar S/o Sh. Samey Singh.

163. UNAUTHORISED CONSTRUCTION MADE BYSH. RAHUL S/O SH. SURESH H.NO. 313/3B, NEAR POND VILLAGE EAST MEHRAM NAGAR, , DELHI CANTT: ISSUE OF NOTICE UNDER SECTION 320 OF THE CANTONMENTS ACT 2006.

Reference CBR No. 76dated 21.03.2020 where in the Board resolved to issue notice under section 248 of the Cantonment Act 2006 Sh. Rahul S/o Sh. Suresh H.No. 313/3B, Near Page 189 of 210

Pond Village East Mehram Nagar, Delhi Cantt. Accordingly notice under section 248 of the Act was issued vide notice No. DCB/4/UC/R/EMN/2019-20 dated 12.05.2020toSh. Rahul S/o Sh. Suresh H.No. 313/3B, Near Pond Village East Mehram Nagar, Delhi Cantt has neither removed the unauthorised construction nor preferred any appeal U/s 340 of the Cantonment Act 2006. It is therefore proposed to issue notice under section 320 of the Cantonment Act 2006 for the unauthorised construction undertaken Sh. Rahul S/o Sh. Suresh H.No. 313/3B, Near Pond Village East Mehram Nagar, Delhi Cantt. The Board may consider.

Relevant file is placed on the table.

163. Considered. The Board noted its decision contained in CBR No. 76 dated 21.03.2020 and the details of notice u/s 248 dated 12.05.2020 issued to Sh. Rahul S/o Sh. Suresh H.No. 313/3B, Near Pond Village East Mehram Nagar, Delhi Cantt by the office under provisions of the Cantonments Act, 2006. The Board also noted office report that neither the unauthorised construction has been removed/demolished by Sh. Rahul S/o Sh. Suresh, nor any appeal has been preferred against the said notice. The matter was discussed at length and the Board decided to issue notice under section 320 of the Cantonments Act, 2006 to Sh. Rahul S/o Sh. Suresh H.No. 313/3B, Near Pond Village East Mehram Nagar, Delhi Cantt giving him 15 days time to demolish the said unauthorised construction carried out by him, without obtaining sanction from the Competent Authority, for which notice under section 248 has already been issued on 12.05.2020. In the event of non compliance of notice under section 320 of the Cantonments Act, 2006, the said unauthorized construction shall be demolished by the office at the risk and cost of Sh. Rahul S/o Sh. Suresh.

164. UNAUTHORISED CONSTRUCTION MADE BYSH. RAMESH CHAND S/O SH. AASHA RAM H.NO. T-43, VILLAGE EAST MEHRAM NAGAR, DELHI CANTT: ISSUE OF NOTICE UNDER SECTION 320 OF THE CANTONMENTS ACT 2006.

Reference CBR No. 74dated 21.03.2020 where in the Board resolved to issue notice under section 248 of the Cantonment Act 2006 Sh. Ramesh Chand S/o Sh. Aasha Ram H.No. T- 43, Village East Mehram Nagar, Delhi Cantt. Accordingly notice under section 248 of the Act was issued vide notice No. DCB/4/UC/RC/EMN/2019-20 dated 05.05.2020toSh. Ramesh Chand S/o Sh. Aasha Ram H.No. T-43, Village East Mehram Nagar, Delhi Cantt has neither removed the unauthorised construction nor preferred any appeal U/s 340 of the Cantonment Act 2006. It is therefore proposed to issue notice under section 320 of the Cantonment Act 2006 for the unauthorised construction undertaken Sh. Ramesh Chand S/o Sh. Aasha Ram H.No. T-43, Village East Mehram Nagar, Delhi Cantt. The Board may consider.

Relevant file is placed on the table.

164. Considered. The Board noted its decision contained in CBR No. 74 dated 21.03.2020 and the details of notice u/s 248 dated 05.05.2020 issued to Sh. Ramesh Chand S/o Sh. Aasha Ram H.No. T-43, Village East Mehram Nagar, Delhi Cantt by the office under provisions of the Cantonments Act, 2006. The Board also noted office report that neither the unauthorisedconstruction has been removed/demolished by Sh. Ramesh Chand S/o Sh. Aasha Ram, nor any appeal has been preferred against the said notice. The matter was discussed at length and the Board decided to issue notice under section 320 of the Cantonments Act, 2006 to Sh. Ramesh Chand S/o Sh. Aasha Ram H.No. T-43, Village East Mehram Nagar, Delhi Cantt giving him 15 days time to demolish the said unauthorised construction carried out by him, without obtaining sanction from the Competent Authority, for which notice under section 248 Page 190 of 210

has already been issued on 05.05.2020. In the event of non compliance of notice under section 320 of the Cantonments Act, 2006, the said unauthorized construction shall be demolished by the office at the risk and cost of Sh. Ramesh Chand S/o Sh. Aasha Ram.

165. UNAUTHORISED CONSTRUCTION MADE BY SH SANJAY S/O SH. KISHAN H.NO. T- 52/60 C, EAST MEHRAM NAGAR, DELHI CANTT: ISSUE OF NOTICE UNDER SECTION 320 OF THE CANTONMENTS ACT 2006.

Reference CBR No. 75dated 21.03.2020 where in the Board resolved to issue notice under section 248 of the Cantonment Act 2006 Sh Sanjay S/o Sh. KishanH.No. T-52/60 C, East MehramNagar,DelhiCantt.Accordingly notice under section 248 of the Act was issued vide notice No. DCB/4/UC/S/EMN/2019-20 dated 11.05.2020toSh Sanjay S/o Sh. KishanH.No. T- 52/60 C, East Mehram Nagar, Delhi Cantt has neither removed the unauthorised construction nor preferred any appeal U/s 340 of the Cantonment Act 2006. It is therefore proposed to issue notice under section 320 of the Cantonment Act 2006 for the unauthorised construction undertaken Sh Sanjay S/o Sh. KishanH.No. T-52/60 C, East Mehram Nagar, Delhi Cantt. The Board may consider.

Relevant file is placed on the table.

165. Considered. The Board noted its decision contained in CBR No. 75 dated 21.03.2020 and the details of notice u/s 248 dated 11.05.2020 issued to Sh Sanjay S/o Sh. KishanH.No. T- 52/60 C, East Mehram Nagar, Delhi Cantt by the office under provisions of the Cantonments Act, 2006. The Board also noted office report that neither the unauthorised construction has been removed/demolished by Sh Sanjay S/o Sh. Kishan, nor any appeal has been preferred against the said notice. The matter was discussed at length and the Board decided to issue notice under section 320 of the Cantonments Act, 2006 to Sh Sanjay S/o Sh. KishanH.No. T- 52/60 C, East Mehram Nagar, Delhi Cantt giving him 15 days time to demolish the said unauthorised construction carried out by him, without obtaining sanction from the Competent Authority, for which notice under section 248 has already been issued on 11.05.2020. In the event of non compliance of notice under section 320 of the Cantonments Act, 2006, the said unauthorized construction shall be demolished by the office at the risk and cost of Sh Sanjay S/o Sh. Kishan.

166. UNAUTHORISED CONSTRUCTION MADE BY SMT. LALITA W/O SH. NANAK CHAND H.NO. T-31, NEAR SUBZI MANDI, VILLAGE, EAST MEHRAM NAGAR, DELHI CANTT: ISSUE OF NOTICE UNDER SECTION 320 OF THE CANTONMENTS ACT 2006.

Reference CBR No. 78dated 21.03.2020 where in the Board resolved to issue notice under section 248 of the Cantonment Act 2006 Smt. Lalita W/o Sh. Nanak Chand H.No. T-31, Near Subzi Mandi, Village East MehramNagar,DelhiCantt.Accordingly notice under section 248 of the Act was issued vide notice No. DCB/4/UC/L/EMN/2019-20 dated 06.05.2020toSmt. Lalita W/o Sh. Nanak Chand H.No. T-31, Near Subzi Mandi, VillageEastMehramNagar,Delhi Cantt has neither removed the unauthorised construction nor preferred any appeal U/s 340 of the Cantonment Act 2006. It is therefore proposed to issue notice under section 320 of the Cantonment Act 2006 for the unauthorised construction undertaken Smt. Lalita W/o Sh. Nanak Chand H.No. T-31, Near Subzi Mandi, Village, East Mehram Nagar, Delhi Cantt. The Board may consider.

Relevant file is placed on the table. Page 191 of 210

166. Considered. The Board noted its decision contained in CBR No. 78 dated 21.03.2020 and the details of notice u/s 248 dated 06.05.2020 issued to Smt. Lalita W/o Sh. Nanak Chand H.No. T-31, Near Subzi Mandi, Village East Mehram Nagar, Delhi Cantt by the office under provisions of the Cantonments Act, 2006. The Board also noted office report that neither the unauthorised construction has been removed/demolished by Smt. Lalita W/o Sh. Nanak Chand, nor any appeal has been preferred against the said notice. The matter was discussed at length and the Board decided to issue notice under section 320 of the Cantonments Act, 2006 to Smt. Lalita W/o Sh. Nanak Chand H.No. T-31, Near Subzi Mandi, Village East Mehram Nagar, Delhi Cantt giving him 15 days time to demolish the said unauthorised construction carried out by her, without obtaining sanction from the Competent Authority, for which notice under section 248 has already been issued on 06.05.2020. In the event of non compliance of notice under section 320 of the Cantonments Act, 2006, the said unauthorized construction shall be demolished by the office at the risk and cost of Smt. Lalita W/o Sh. Nanak Chand.

167. UNAUTHORISED CONSTRUCTION MADE BY SH. SHAILENDER KUMAR S/O SH. BIRBAL H.NO. 59/60, VILLAGE, EAST MEHRAM NAGAR, DELHI CANTT: ISSUE OF NOTICE UNDER SECTION 320 OF THE CANTONMENTS ACT 2006.

Reference CBR No. 80dated 21.03.2020 where in the Board resolved to issue notice under section 248 of the Cantonment Act 2006 Sh. Shailender Kumar S/o Sh. Birbal H.No. 59/60Village,EastMehram Nagar, Delhi Cantt. Accordingly notice under section 248 of the Act was issued vide notice No. DCB/4/UC/SK/EMN/2019-20/1dated 04.05.2020toSh. Shailender Kumar S/o Sh. Birbal H.No. 59/60 Village, East Mehram Nagar, Delhi Cantt has neither removed the unauthorised construction nor preferred any appeal U/s 340 of the Cantonment Act 2006. It is therefore proposed to issue notice under section 320 of the Cantonment Act 2006 for the unauthorised construction undertaken Sh. Shailender Kumar S/o Sh. Birbal H.No. 59/60 Village, East Mehram Nagar, Delhi Cantt. The Board may consider.

Relevant file is placed on the table.

167. Considered. The Board noted its decision contained in CBR No. 80 dated 21.03.2020 and the details of notice u/s 248 dated 04.05.2020 issued to Sh. Shailender Kumar S/o Sh. Birbal H.No. 59/60 Village, East Mehram Nagar, Delhi Cantt by the office under provisions of the Cantonments Act, 2006. The Board also noted office report that neither the unauthorised construction has been removed/demolished by Sh. Shailender Kumar S/o Sh. Birbal, nor any appeal has been preferred against the said notice. The matter was discussed at length and the Board decided to issue notice under section 320 of the Cantonments Act, 2006 to Sh. Shailender Kumar S/o Sh. Birbal H.No. 59/60 Village, East Mehram Nagar, Delhi Cantt giving him 15 days time to demolish the said unauthorised construction carried out by him, without obtaining sanction from the Competent Authority, for which notice under section 248 has already been issued on 04.05.2020. In the event of non compliance of notice under section 320 of the Cantonments Act, 2006, the said unauthorized construction shall be demolished by the office at the risk and cost of Sh. Shailender Kumar S/o Sh. Birbal.

Page 192 of 210

168. UNAUTHORISED CONSTRUCTION MADE BY SH. SHAILENDER KUMAR S/O SH. BIRBAL H.NO. 59/60, VILLAGE, EAST MEHRAM NAGAR, DELHI CANTT: ISSUE OF NOTICE UNDER SECTION 320 OF THE CANTONMENTS ACT 2006.

Reference CBR No. 81dated 21.03.2020 where in the Board resolved to issue notice under section 248 of the Cantonment Act 2006 Sh. Shailender Kumar S/o Sh. Birbal H.No. 59/60 Village, East Mehram Nagar, Delhi Cantt. Accordingly notice under section 248 of the Act was issued vide notice No. DCB/4/UC/SK/EMN/2019-20/2dated 04.05.2020toSh. Shailender Kumar S/o Sh. Birbal H.No. 59/60 Village, East Mehram Nagar, Delhi Cantt has neither removed the unauthorised construction nor preferred any appeal U/s 340 of the Cantonment Act 2006. It is therefore proposed to issue notice under section 320 of the Cantonment Act 2006 for the unauthorised construction undertaken Sh. Shailender Kumar S/o Sh. Birbal H.No. 59/60 Village, East Mehram Nagar, Delhi Cantt. The Board may consider.

Relevant file is placed on the table.

168. Considered. The Board noted its decision contained in CBR No. 81 dated 21.03.2020 and the details of notice u/s 248 dated 04.05.2020 issued to Sh. Shailender Kumar S/o Sh. Birbal H.No. 59/60 Village, East Mehram Nagar, Delhi Cantt by the office under provisions of the Cantonments Act, 2006. The Board also noted office report that neither the unauthorised construction has been removed/demolished by Sh. Shailender Kumar S/o Sh. Birbal, nor any appeal has been preferred against the said notice. The matter was discussed at length and the Board decided to issue notice under section 320 of the Cantonments Act, 2006 to Sh. Shailender Kumar S/o Sh. Birbal H.No. 59/60 Village, East Mehram Nagar, Delhi Cantt giving him 15 days time to demolish the said unauthorised construction carried out by him, without obtaining sanction from the Competent Authority, for which notice under section 248 has already been issued on 04.05.2020. In the event of non compliance of notice under section 320 of the Cantonments Act, 2006, the said unauthorized construction shall be demolished by the office at the risk and cost of Sh. Shailender Kumar S/o Sh. Birbal.

169. UNAUTHORISED CONSTRUCTION MADE BYSH. NARENDER SINGH S/O LATE SH. BHAJAN SINGH H.NO. 34/60, EAST MEHRAM NAGAR, DELHI CANTT: ISSUE OF NOTICE UNDER SECTION 320 OF THE CANTONMENTS ACT 2006.

Reference CBR No. 82dated 21.03.2020where in the Board resolved to issue notice under section 248 of the Cantonment Act 2006 Sh. Narender Singh S/o Late Sh. Bhajan Singh H.No. 34/60 East Mehram Nagar, Delhi Cantt. Accordingly notice under section 248 of the Act was issuedvide notice No. DCB/4/UC/NS/EMN/2019-20 dated 03.05.2020toSh. Narender Singh S/o Late Sh. Bhajan Singh H.No. 34/60, East Mehram Nagar, Delhi Cantt has neither removed the unauthorised construction nor preferred any appeal U/s 340 of the Cantonment Act 2006. It is therefore proposed to issue notice under section 320 of the Cantonment Act 2006 for the unauthorised construction Sh. Narender Singh S/o Late Sh. Bhajan Singh H.No. 34/60, East MehramNagar,Delhi Cantt. The Board may consider.

Relevant file is placed on the table.

169. Considered. The Board noted its decision contained in CBR No. 82 dated 21.03.2020 and the details of notice u/s 248 dated 03.05.2020 issued to Sh. Narender Singh S/o Late Sh. Bhajan Singh H.No. 34/60 East Mehram Nagar, Delhi Cantt by the office under provisions of the Cantonments Act, 2006. The Board also noted office report that neither the Page 193 of 210

unauthorisedconstruction has been removed/demolished by Sh. Narender Singh S/o Late Sh. Bhajan Singh, nor any appeal has been preferred against the said notice. The matter was discussed at length and the Board decided to issue notice under section 320 of the Cantonments Act, 2006 to Sh. Narender Singh S/o Late Sh. Bhajan Singh H.No. 34/60 East Mehram Nagar, Delhi Cantt giving him 15 days time to demolish the said unauthorised construction carried out by him, without obtaining sanction from the Competent Authority, for which notice under section 248 has already been issued on 03.05.2020. In the event of non compliance of notice under section 320 of the Cantonments Act, 2006, the said unauthorized construction shall be demolished by the office at the risk and cost of Sh. Narender Singh S/o Late Sh. Bhajan Singh.

170. UNAUTHORISED CONSTRUCTION MADE BY SMT REKHA W/O SH. VINOD KUMAR H.NO. 3/60, VILLAGE EAST MEHRAM NAGAR, DELHI CANTT: ISSUE OF NOTICE UNDER SECTION 320 OF THE CANTONMENTS ACT 2006.

Reference CBR No. 83dated 21.03.2020where in the Board resolved to issue notice under section 248 of the Cantonment Act 2006 Smt Rekha W/o Sh. Vinod Kumar H.No. 3/60, Village East Mehram Nagar, Delhi Cantt. Accordingly notice under section 248 of the Act was issuedvide notice No. DCB/4/UC/R/EMN/2019-20 dated 05.05.2020 toSmt Rekha W/o Sh. Vinod Kumar H.No. 3/60, Village East Mehram Nagar, Delhi Cantt has neither removed the unauthorised construction nor preferred any appeal U/s 340 of the Cantonment Act 2006. It is therefore proposed to issue notice under section 320 of the Cantonment Act 2006 for the unauthorised construction Smt Rekha W/o Sh. Vinod Kumar H.No. 3/60, Village East Mehram Nagar,Delhi Cantt. The Board may consider.

Relevant file is placed on the table.

170. Considered. The Board noted its decision contained in CBR No. 83 dated 21.03.2020 and the details of notice u/s 248 dated 03.05.2020 issued to Smt Rekha W/o Sh. Vinod Kumar H.No. 3/60, Village East Mehram Nagar, Delhi Cantt by the office under provisions of the Cantonments Act, 2006. The Board also noted office report that neither the unauthorised construction has been removed/demolished by Smt Rekha W/o Sh. Vinod Kumar, nor any appeal has been preferred against the said notice. The matter was discussed at length and the Board decided to issue notice under section 320 of the Cantonments Act, 2006 to Smt Rekha W/o Sh. Vinod Kumar H.No. 3/60, Village East Mehram Nagar, Delhi Cantt giving her 15 days time to demolish the said unauthorised construction carried out by her, without obtaining sanction from the Competent Authority, for which notice under section 248 has already been issued on 03.05.2020. In the event of non compliance of notice under section 320 of the Cantonments Act, 2006, the said unauthorized construction shall be demolished by the office at the risk and cost of Smt Rekha W/o Sh. Vinod Kumar.

171. UNAUTHORISED CONSTRUCTION MADE BY SMT. LEENA W/O SH. RANDHIR H.NO. T-3/60A, NEAR 60 QTRS, VILLAGE EAST MEHRAM NAGAR, DELHI CANTT: ISSUE OF NOTICE UNDER SECTION 320 OF THE CANTONMENTS ACT 2006.

Reference CBR No. 84dated 21.03.2020where in the Board resolved to issue notice under section 248 of the Cantonment Act 2006 Smt. Leena W/o Sh. RandhirH.No. T-3/60A, Near 60 Qtrs, Village East Mehram Nagar, Delhi Cantt. Accordingly notice under section 248 of the Act was issuedvide notice No. DCB/4/UC/L/EMN/2019-20 dated 05.05.2020 toSmt. Leena W/o Sh. RandhirH.No. T-3/60A, Near 60 Qtrs, Village East Mehram Nagar, Delhi Cantt has Page 194 of 210

neither removed the unauthorised construction nor preferred any appeal U/s 340 of the Cantonment Act 2006. It is therefore proposed to issue notice under section 320 of the Cantonment Act 2006 for the unauthorised construction Smt. Leena W/o Sh. RandhirH.No. T- 3/60A, Near 60 Qtrs, Village East MehramNagar,Delhi Cantt. The Board may consider.

Relevant file is placed on the table.

171. Considered. The Board noted its decision contained in CBR No. 84 dated 21.03.2020 and the details of notice u/s 248 dated 05.05.2020 issued to Smt. Leena W/o Sh. RandhirH.No. T-3/60A, Near 60 Qtrs, Village East Mehram Nagar, Delhi Cantt by the office under provisions of the Cantonments Act, 2006. The Board also noted office report that neither the unauthorised construction has been removed/demolished by Smt. Leena W/o Sh. Randhir, nor any appeal has been preferred against the said notice. The matter was discussed at length and the Board decided to issue notice under section 320 of the Cantonments Act, 2006 to Smt. Leena W/o Sh. RandhirH.No. T-3/60A, Near 60 Qtrs, Village East Mehram Nagar, Delhi Cantt giving her 15 days time to demolish the said unauthorised construction carried out by her, without obtaining sanction from the Competent Authority, for which notice under section 248 has already been issued on 05.05.2020. In the event of non compliance of notice under section 320 of the Cantonments Act, 2006, the said unauthorized construction shall be demolished by the office at the risk and cost of Smt. Leena W/o Sh. Randhir.

172. UNAUTHORISED CONSTRUCTION MADE BYSMT. ANITA W/O SH. RAJESH H.NO. S- 313/32, EAST MEHRAM NAGAR, DELHI CANTT: ISSUE OF NOTICE UNDER SECTION 320 OF THE CANTONMENTS ACT 2006.

Reference CBR No. 87dated 21.03.2020 where in the Board resolved to issue notice under section 248 of the Cantonment Act 2006 Smt. Anita W/o Sh. Rajesh H.No. S-313/32, East Mehram Nagar, Delhi Cantt. Accordingly notice under section 248 of the Act was issued vide notice No. DCB/4/UC/A/EMN/2019-20 dated 11.05.2020toSmt. Anita W/o Sh. Rajesh H.No. S- 313/32, East Mehram Nagar, Delhi Cantt has neither removed the unauthorised construction nor preferred any appeal U/s 340 of the Cantonment Act 2006. It is therefore proposed to issue notice under section 320 of the Cantonment Act 2006 for the unauthorised construction Smt. Anita W/o Sh. Rajesh H.No. S-313/32, East Mehram Nagar, Delhi Cantt. The Board may consider.

Relevant file is placed on the table.

172. Considered. The Board noted its decision contained in CBR No. 87 dated 21.03.2020 and the details of notice u/s 248 dated 11.05.2020 issued to Smt. Anita W/o Sh. Rajesh H.No. S- 313/32, East Mehram Nagar, Delhi Cantt by the office under provisions of the Cantonments Act, 2006. The Board also noted office report that neither the unauthorised construction has been removed/demolished by Smt. Anita W/o Sh. Rajesh, nor any appeal has been preferred against the said notice. The matter was discussed at length and the Board decided to issue notice under section 320 of the Cantonments Act, 2006 to Smt. Anita W/o Sh. Rajesh H.No. S-313/32, East Mehram Nagar, Delhi Cantt giving her 15 days time to demolish the said unauthorised construction carried out by her, without obtaining sanction from the Competent Authority, for which notice under section 248 has already been issued on 11.05.2020. In the event of non compliance of notice under section 320 of the Cantonments Act, 2006, the said unauthorized construction shall be demolished by the office at the risk and cost of Smt. Anita W/o Sh. Rajesh.

Page 195 of 210

173. UNAUTHORISED CONSTRUCTION MADE BY SH. BIJENDER KUMAR S/O LATE SH. TARA CHAND H.NO. T-66, ROAD LEADING FRONT CB SCHOOL TO POND SIDE , VILLAGE JHARERA, DELHI CANTT: ISSUE OF NOTICE UNDER SECTION 320 OF THE CANTONMENTS ACT 2006.

Reference CBR No. 88 dated 04.11.2019 where in the Board resolved to issue notice under section 248 of the Cantonment Act 2006 Sh. Bijender Kumar S/o Late Sh. Tara Chand H.No. T-66, Road leading front CB School to Pond side, VillgeJharera, Delhi Cantt. Accordingly notice under section 248 of the Act was issued vide notice No.DCB/4/UC/BK/Vill. Jharera/2019-20/1dated 27.02.2020 to Sh. Bijender Kumar S/o Late Sh. Tara Chand H.No. T- 66, Road leading front CB School to Pond side, Village Jharera,Delhi Cantt has neither removed the unauthorised construction nor preferred any appeal U/s 340 of the Cantonment Act 2006. It is therefore proposed to issue notice under section 320 of the Cantonment Act 2006 for the unauthorised construction Sh. Bijender Kumar S/o Late Sh. Tara Chand H.No. T-66, Road leading front CB School to Pond side, Village Jharera, Delhi Cantt. The Board may consider.

Relevant file is placed on the table.

173. Considered. The Board noted its decision contained in CBR No. 88 dated 04.11.2019 and the details of notice u/s 248 dated 27.02.2020 issued to Sh. Bijender Kumar S/o Late Sh. Tara Chand H.No. T-66, Road Leading front of CB School to Pond side, Village Jharera, Delhi Cantt by the office under provisions of the Cantonments Act, 2006. The Board also noted office report that neither the unauthorised construction has been removed/demolished by Sh. Bijender Kumar S/o Late Sh. Tara Chand, nor any appeal has been preferred against the said notice. The matter was discussed at length and the Board decided to issue notice under section 320 of the Cantonments Act, 2006 to Sh. Bijender Kumar S/o Late Sh. Tara Chand H.No. T-66, Road Leading front of CB School to Pond side, Village Jharera, Delhi Cantt giving her 15 days time to demolish the said unauthorised construction carried out by her, without obtaining sanction from the Competent Authority, for which notice under section 248 has already been issued on 27.02.2020. In the event of non compliance of notice under section 320 of the Cantonments Act, 2006, the said unauthorized construction shall be demolished by the office at the risk and cost of Sh. Bijender Kumar S/o Late Sh. Tara Chand.

174. UNAUTHORISED CONSTRUCTION MADE BY SH. BIJENDER KUMAR S/O LATE SH. TARA CHAND H.NO. T-66, ROAD LEADING FRONT CB SCHOOL TO POND SIDE , Village Jharera, DELHI CANTT: ISSUE OF NOTICE UNDER SECTION 320 OF THE CANTONMENTS ACT 2006.

Reference CBR No. 89 dated 04.11.2019 where in the Board resolved to issue notice under section 248 of the Cantonment Act 2006 Sh. Bijender Kumar S/o Late Sh. Tara Chand H.No. T-66, Road leading front CB School to Pond side, Village Jharera,Delhi Cantt. Accordingly notice under section 248 of the Act was issued vide notice No.DCB/4/UC/BK/Vill. Jharera/2019-20/2 dated 27.02.2020 to Sh. Bijender Kumar S/o Late Sh. Tara Chand H.No. T- 66, Road leading front CB School to Pond side, Village Jharera, Delhi Cantt has neither removed the unauthorised construction nor preferred any appeal U/s 340 of the Cantonment Act 2006. It is therefore proposed to issue notice under section 320 of the Cantonment Act 2006 for the unauthorised construction Sh. Bijender Kumar S/o Late Sh. Tara Chand H.No. T-66, Road leading front CB School to Pond side, Village Jharera, Delhi Cantt. The Board may consider.

Relevant file is placed on the table.

Page 196 of 210

174. Considered. The Board noted its decision contained in CBR No. 89 dated 04.11.2019 and the details of notice u/s 248 dated 27.02.2020 issued to Sh. Bijender Kumar S/o Late Sh. Tara Chand H.No. T-66, Road Leading front of CB School to Pond side, Village Jharera, Delhi Cantt by the office under provisions of the Cantonments Act, 2006. The Board also noted office report that neither the unauthorised construction has been removed/demolished by Sh. Bijender Kumar S/o Late Sh. Tara Chand, nor any appeal has been preferred against the said notice. The matter was discussed at length and the Board decided to issue notice under section 320 of the Cantonments Act, 2006 to Sh. Bijender Kumar S/o Late Sh. Tara Chand H.No. T-66, Road Leading front of CB School to Pond side, Village Jharera, Delhi Cantt giving him 15 days time to demolish the said unauthorised construction carried out by him, without obtaining sanction from the Competent Authority, for which notice under section 248 has already been issued on 27.02.2020. In the event of non compliance of notice under section 320 of the Cantonments Act, 2006, the said unauthorized construction shall be demolished by the office at the risk and cost of Sh. Bijender Kumar S/o Late Sh. Tara Chand.

175. UNAUTHORISED CONSTRUCTION MADE BY SH. BIJENDER KUMAR S/O LATE SH. TARA CHAND H.NO. T-66, ROAD LEADING FRONT CB SCHOOL TO POND SIDE , VILLAGE JHARERA, DELHI CANTT: ISSUE OF NOTICE UNDER SECTION 320 OF THE CANTONMENTS ACT 2006.

Reference CBR No. 90 dated 04.11.2019 where in the Board resolved to issue notice under section 248 of the Cantonment Act 2006 Sh. Bijender Kumar S/o Late Sh. Tara Chand H.No. T-66, Road leading front CB School to Pond side, Village Jharera, Delhi Cantt. Accordingly notice under section 248 of the Act was issued vide notice No.DCB/4/UC/BK/Vill. Jharera/2019-20/3 dated 27.02.2020 to Sh. Bijender Kumar S/o Late Sh. Tara Chand H.No. T- 66, Road leading front CB School to Pond side, Village Jharera, Delhi Cantt has neither removed the unauthorised construction nor preferred any appeal U/s 340 of the Cantonment Act 2006. It is therefore proposed to issue notice under section 320 of the Cantonment Act 2006 for the unauthorised construction Sh. Bijender Kumar S/o Late Sh. Tara Chand H.No. T-66, Road leading front CB School to Pond side, Village Jharera, Delhi Cantt. The Board may consider.

Relevant file is placed on the table.

175. Considered. The Board noted its decision contained in CBR No. 90 dated 04.11.2019 and the details of notice u/s 248 dated 27.02.2020 issued to Sh. Bijender Kumar S/o Late Sh. Tara Chand H.No. T-66, Road Leading front of CB School to Pond side, Village Jharera, Delhi Cantt by the office under provisions of the Cantonments Act, 2006. The Board also noted office report that neither the unauthorised construction has been removed/demolished Sh. Bijender Kumar S/o Late Sh. Tara Chand, nor any appeal has been preferred against the said notice. The matter was discussed at length and the Board decided to issue notice under section 320 of the Cantonments Act, 2006 to Sh. Bijender Kumar S/o Late Sh. Tara Chand H.No. T-66, Road Leading front of CB School to Pond side, Village Jharera, Delhi Cantt giving him 15 days time to demolish the said unauthorised construction carried out by him, without obtaining sanction from the Competent Authority, for which notice under section 248 has already been issued on 27.02.2020. In the event of non compliance of notice under section 320 of the Cantonments Act, 2006, the said unauthorized construction shall be demolished by the office at the risk and cost of Sh. Bijender Kumar S/o Late Sh. Tara Chand.

Page 197 of 210

176. UNAUTHORISED CONSTRUCTION MADE BY SH. ASHOK KUMAR S/O SH. HOSHIYAR SINGH H.NO. 8/128, VILLAGE MEHRAM NAGAR, DELHI CANTT: ISSUE OF NOTICE UNDER SECTION 320 OF THE CANTONMENTS ACT 2006.

Reference CBR No. 96 dated 21.03.2020 where in the Board resolved to issue notice under section 248 of the Cantonment Act 2006 Sh. Ashok Kumar S/o Sh. Hoshiyar Singh H.No. 8/128, Village Mehram Nagar, Delhi Cantt. Accordingly notice under section 248 of the Act was issued vide notice No. DCB/4/UC/AK/VMN/2019-20 dated 11.05.2020 to Sh. Ashok Kumar S/o Sh. Hoshiyar Singh H.No. 8/128, Village Mehram Nagar, Delhi Cantt has neither removed the unauthorised construction nor preferred any appeal U/s 340 of the Cantonment Act 2006. It is therefore proposed to issue notice under section 320 of the Cantonment Act 2006 for the unauthorised construction undertaken Sh. Ashok Kumar S/o Sh. Hoshiyar Singh H.No. 8/128, Village Mehram Nagar, Delhi Cantt. The Board may consider.

Relevant file is placed on the table.

176. Considered. The Board noted its decision contained in CBR No. 96 dated 21.03.2020 and the details of notice u/s 248 dated 11.05.2020 issued to Sh. Ashok Kumar S/o Sh. Hoshiyar Singh H.No. 8/128, Village Mehram Nagar, Delhi Cantt by the office under provisions of the Cantonments Act, 2006. The Board also noted office report that neither the unauthorised construction has been removed/demolished by Sh. Ashok Kumar S/o Sh. Hoshiyar Singh, nor any appeal has been preferred against the said notice. The matter was discussed at length and the Board decided to issue notice under section 320 of the Cantonments Act, 2006 to Sh. Ashok Kumar S/o Sh. Hoshiyar Singh H.No. 8/128, Village Mehram Nagar, Delhi Cantt giving him 15 days time to demolish the said unauthorised construction carried out by him, without obtaining sanction from the Competent Authority, for which notice under section 248 has already been issued on 11.05.2020. In the event of non compliance of notice under section 320 of the Cantonments Act, 2006, the said unauthorized construction shall be demolished by the office at the risk and cost of Sh. Ashok Kumar S/o Sh. Hoshiyar Singh.

177. UNAUTHORISED CONSTRUCTION MADE BY SH. KARAMVEER LOHIA ( URF NEELU) S/O LATE SH. DHARAM SINGH, LOHIA BUILDING MATERIAL, NEAR POND ON WAY TO NH-8, VILLAGE JHARERA,DELHI CANTT: ISSUE OF NOTICE UNDER SECTION 320 OF THE CANTONMENTS ACT 2006.

Reference CBR No. 101 dated 21.03.2020 where in the Board resolved to issue notice under section 248 of the Cantonment Act 2006 Sh. KaramveerLohia ( UrfNeelu) S/o Late Sh. Dharam Singh, Lohia Building Material, Near Pond on way to NH-8, Village Jharera, Delhi Cantt. Accordingly notice under section 248 of the Act was issued vide notice No.DCB/4/UC/KL/Vill. Jharera/2019-20 dated 19.05.2020 to Sh. KaramveerLohia ( UrfNeelu) S/o Late Sh. Dharam Singh, Lohia Building Material, Near Pond on way to NH-8, Village Jharera, Delhi Cantt has neither removed the unauthorised construction nor preferred any appeal U/s 340 of the Cantonment Act 2006. It is therefore proposed to issue notice under section 320 of the Cantonment Act 2006 for the unauthorised construction undertaken Sh. KaramveerLohia ( UrfNeelu) S/o Late Sh. Dharam Singh, Lohia Building Material, Near Pond on way to NH-8, Village Jharera, Delhi Cantt. The Board may consider.

Relevant file is placed on the table.

Page 198 of 210

177. Considered. The Board noted its decision contained in CBR No. 101 dated 21.03.2020 and the details of notice u/s 248 dated 19.05.2020 issued to Sh. KaramveerLohia (UrfNeelu) S/o Late Sh. Dharam Singh, Lohia Building Material, Near Pond on way to NH-8, Village Jharera,, Delhi Cantt by the office under provisions of the Cantonments Act, 2006. The Board also noted office report that neither the unauthorised construction has been removed/demolished by Sh. KaramveerLohia (UrfNeelu) S/o Late Sh. Dharam Singh, nor any appeal has been preferred against the said notice. The matter was discussed at length and the Board decided to issue notice under section 320 of the Cantonments Act, 2006 to Sh. KaramveerLohia (UrfNeelu) S/o Late Sh. Dharam Singh, Lohia Building Material, Near Pond on way to NH-8, Village Jharera,, Delhi Cantt giving him 15 days time to demolish the said unauthorised construction carried out by him, without obtaining sanction from the Competent Authority, for which notice under section 248 has already been issued on 19.05.2020. In the event of non compliance of notice under section 320 of the Cantonments Act, 2006, the said unauthorized construction shall be demolished by the office at the risk and cost of Sh. KaramveerLohia (UrfNeelu) S/o Late Sh. Dharam Singh.

178. UNAUTHORISED CONSTRUCTION MADE BY SH. KARAMVEER LOHIA ( URF NEELU) S/O LATE SH. DHARAM SINGH, LOHIA BUILDING MATERIAL, NEAR POND ON WAY TO NH-8, VILLAGE JHARERA,DELHI CANTT: ISSUE OF NOTICE UNDER SECTION 320 OF THE CANTONMENTS ACT 2006.

Reference CBR No. 102 dated 21.03.2020 where in the Board resolved to issue notice under section 248 of the Cantonment Act 2006 Sh. KaramveerLohia ( UrfNeelu) S/o Late Sh. Dharam Singh, Lohia Building Material, Near Pond on way to NH-8, Village Jharera, Delhi Cantt. Accordingly notice under section 248 of the Act was issued vide notice No.DCB/4/UC/KL/Vill. Jharera/2019-20 dated 19.05.2020 to Sh. KaramveerLohia ( UrfNeelu) S/o Late Sh. Dharam Singh, Lohia Building Material, Near Pond on way to NH-8, Village Jharera, Delhi Cantt has neither removed the unauthorised construction nor preferred any appeal U/s 340 of the Cantonment Act 2006. It is therefore proposed to issue notice under section 320 of the Cantonment Act 2006 for the unauthorised construction undertaken Sh. KaramveerLohia ( UrfNeelu) S/o Late Sh. Dharam Singh, Lohia Building Material, Near Pond on way to NH-8, Village Jharera, Delhi Cantt. The Board may consider.

Relevant file is placed on the table.

178. Considered. The Board noted its decision contained in CBR No. 102 dated 21.03.2020and the details of notice u/s 248 dated 19.05.2020 issued to Sh. KaramveerLohia (UrfNeelu) S/o Late Sh. Dharam Singh, Lohia Building Material, Near Pond on way to NH-8, Village Jharera, Delhi Cantt by the office under provisions of the Cantonments Act, 2006. The Board also noted office report that neither the unauthorised construction has been removed/demolished by Sh. KaramveerLohia (UrfNeelu) S/o Late Sh. Dharam Singh, nor any appeal has been preferred against the said notice. The matter was discussed at length and the Board decided to issue notice under section 320 of the Cantonments Act, 2006 to Sh. KaramveerLohia (UrfNeelu) S/o Late Sh. Dharam Singh, Lohia Building Material, Near Pond on way to NH-8, Village Jharera,, Delhi Cantt giving him 15 days time to demolish the said unauthorised construction carried out by him, without obtaining sanction from the Competent Authority, for which notice under section 248 has already been issued on 19.05.2020. In the event of non compliance of notice under section 320 of the Cantonments Act, 2006, the said unauthorized construction shall be demolished by the office at the risk and cost of Sh. KaramveerLohia (UrfNeelu) S/o Late Sh. Dharam Singh. Page 199 of 210

179. UNAUTHORISED CONSTRUCTION MADE BY SMT. RAJBERI W/O SH. KISHAN CHAND H.NO. 6/112, NEAR SHIV MANDIR, VILLAGE JHARERA,DELHI CANTT: ISSUE OF NOTICE UNDER SECTION 320 OF THE CANTONMENTS ACT 2006.

Reference CBR No. 118 dated 21.03.2020 where in the Board resolved to issue notice under section 248 of the Cantonment Act 2006 Smt. Rajberi W/o Sh. Kishan Chand H.No. 6/112, Near Shiv Mandir, Village Jharera, Delhi Cantt. Accordingly notice under section 248 of the Act was issued vide notice No.DCB/4/UC/R/Vill. Jharera/2019-20/1 dated 04.05.2020 to Smt. Rajberi W/o Sh. Kishan Chand H.No. 6/112, Near Shiv Mandir, Village Jharera, Delhi Cantt has neither removed the unauthorised construction nor preferred any appeal U/s 340 of the Cantonment Act 2006. It is therefore proposed to issue notice under section 320 of the Cantonment Act 2006 for the unauthorised construction undertaken Smt. Rajberi W/o Sh. Kishan Chand H.No. 6/112, Near Shiv Mandir, Village Jharera, Delhi Cantt. The Board may consider.

Relevant file is placed on the table.

179. Considered. The Board noted its decision contained in CBR No. 118 dated 21.03.2020 and the details of notice u/s 248 dated 04.05.2020 issued to Smt. Rajberi W/o Sh. Kishan Chand H.No. 6/112, Near Shiv Mandir, Village Jharera, Delhi Cantt by the office under provisions of the Cantonments Act, 2006. The Board also noted office report that neither the unauthorised construction has been removed/demolished by Smt. Rajberi W/o Sh. Kishan Chand, nor any appeal has been preferred against the said notice. The matter was discussed at length and the Board decided to issue notice under section 320 of the Cantonments Act, 2006 to Smt. Rajberi W/o Sh. Kishan Chand H.No. 6/112, Near Shiv Mandir, Village Jharera, Delhi Cantt giving her 15 days time to demolish the said unauthorised construction carried out by her, without obtaining sanction from the Competent Authority, for which notice under section 248 has already been issued on 04.05.2020.In the event of non compliance of notice under section 320 of the Cantonments Act, 2006, the said unauthorized construction shall be demolished by the office at the risk and cost of Smt. Rajberi W/o Sh. Kishan Chand.

180. UNAUTHORISED CONSTRUCTION MADE BY SMT. RAJBERI W/O SH. KISHAN CHAND H.NO. 6/112, NEAR SHIV MANDIR, VILLAGE JHARERA,DELHI CANTT: ISSUE OF NOTICE UNDER SECTION 320 OF THE CANTONMENTS ACT 2006.

Reference CBR No. 119 dated 21.03.2020 where in the Board resolved to issue notice under section 248 of the Cantonment Act 2006 Smt. Rajberi W/o Sh. Kishan Chand H.No. 6/112, Near Shiv Mandir, Village Jharera, Delhi Cantt. Accordingly notice under section 248 of the Act was issued vide notice No.DCB/4/UC/M/Vill. Jharera/2019-20/2 dated 14.05.2020 to Smt. Rajberi W/o Sh. Kishan Chand H.No. 6/112, Near Shiv Mandir, Village Jharera, Delhi Cantt has neither removed the unauthorised construction nor preferred any appeal U/s 340 of the Cantonment Act 2006. It is therefore proposed to issue notice under section 320 of the Cantonment Act 2006 for the unauthorised construction undertaken Smt. Rajberi W/o Sh. Kishan Chand H.No. 6/112, Near Shiv Mandir, Village Jharera, Delhi Cantt. The Board may consider.

Relevant file is placed on the table.

Page 200 of 210

180. Considered. The Board noted its decision contained in CBR No. 119 dated 21.03.2020 and the details of notice u/s 248 dated 14.05.2020 issued to Smt. Rajberi W/o Sh. Kishan Chand H.No. 6/112, Near Shiv Mandir, Village Jharera, Delhi Cantt by the office under provisions of the Cantonments Act, 2006. The Board also noted office report that neither the unauthorised construction has been removed/demolished by Smt. Rajberi W/o Sh. Kishan Chand, nor any appeal has been preferred against the said notice. The matter was discussed at length and the Board decided to issue notice under section 320 of the Cantonments Act, 2006 to Smt. Rajberi W/o Sh. Kishan Chand H.No. 6/112, Near Shiv Mandir, Village Jharera, Delhi Cantt giving her 15 days time to demolish the said unauthorised construction carried out by her, without obtaining sanction from the Competent Authority, for which notice under section 248 has already been issued on 14.05.2020. In the event of non compliance of notice under section 320 of the Cantonments Act, 2006, the said unauthorized construction shall be demolished by the office at the risk and cost of Smt. Rajberi W/o Sh. Kishan Chand.

181. UNAUTHORISED CONSTRUCTION MADE BY SMT. RAJBERI W/O SH. KISHAN CHANDH.NO. 6/112, NEAR SHIV MANDIR, VILLAGE JHARERA,DELHI CANTT: ISSUE OF NOTICE UNDER SECTION 320 OF THE CANTONMENTS ACT 2006.

Reference CBR No. 120 dated 21.03.2020 where in the Board resolved to issue notice under section 248 of the Cantonment Act 2006 Smt. Rajberi W/o Sh. Kishan Chand H.No. 6/112, Near Shiv Mandir, Village Jharera, Delhi Cantt. Accordingly notice under section 248 of the Act was issued vide notice No.DCB/4/UC/R/Vill. Jharera/2019-20/3 dated 04.05.2020 to Smt. Rajberi W/o Sh. Kishan Chand H.No. 6/112, Near Shiv Mandir, Village Jharera, Delhi Cantt has neither removed the unauthorised construction nor preferred any appeal U/s 340 of the Cantonment Act 2006. It is therefore proposed to issue notice under section 320 of the Cantonment Act 2006 for the unauthorised construction undertaken Smt. Rajberi W/o Sh. Kishan Chand H.No. 6/112, Near Shiv Mandir, Village Jharera, Delhi Cantt. The Board may consider.

Relevant file is placed on the table.

181. Considered. The Board noted its decision contained in CBR No. 120 dated 21.03.2020 and the details of notice u/s 248 dated 04.05.2020 issued to Smt. Rajberi W/o Sh. Kishan Chand H.No. 6/112, Near Shiv Mandir, Village Jharera, Delhi Cantt by the office under provisions of the Cantonments Act, 2006. The Board also noted office report that neither the unauthorised construction has been removed/demolished by Smt. Rajberi W/o Sh. Kishan Chand, nor any appeal has been preferred against the said notice. The matter was discussed at length and the Board decided to issue notice under section 320 of the Cantonments Act, 2006 to Smt. Rajberi W/o Sh. Kishan Chand H.No. 6/112, Near Shiv Mandir, Village Jharera, Delhi Cantt giving her 15 days time to demolish the said unauthorised construction carried out by her, without obtaining sanction from the Competent Authority, for which notice under section 248 has already been issued on 04.05.2020. In the event of non compliance of notice under section 320 of the Cantonments Act, 2006, the said unauthorized construction shall be demolished by the office at the risk and cost of Smt. Rajberi W/o Sh. Kishan Chand.

182. UNAUTHORISED CONSTRUCTION MADE BY SMT. RAJBERI W/O SH. KISHAN CHAND H.NO. 6/112, NEAR SHIV MANDIR, VILLAGE JHARERA,DELHI CANTT: ISSUE OF NOTICE UNDER SECTION 320 OF THE CANTONMENTS ACT 2006.

Reference CBR No. 121 dated 21.03.2020 where in the Board resolved to issue notice under section 248 of the Cantonment Act 2006 Smt. Rajberi W/o Sh. Kishan Chand H.No. Page 201 of 210

6/112, Near Shiv Mandir, Village Jharera, Delhi Cantt. Accordingly notice under section 248 of the Act was issued vide notice No.DCB/4/UC/M/Vill. Jharera/2019-20/4 dated 14.05.2020 toSmt. Rajberi W/o Sh. Kishan Chand H.No. 6/112, Near Shiv Mandir, Village Jharera, Delhi Cantt has neither removed the unauthorised construction nor preferred any appeal U/s 340 of the Cantonment Act 2006. It is therefore proposed to issue notice under section 320 of the Cantonment Act 2006 for the unauthorised construction undertaken Smt. Rajberi W/o Sh. Kishan Chand H.No. 6/112, Near Shiv Mandir, Village Jharera, Delhi Cantt. The Board may consider.

Relevant file is placed on the table.

182. Considered. The Board noted its decision contained in CBR No. 121 dated 21.03.2020 and the details of notice u/s 248 dated 14.05.2020 issued to Smt. Rajberi W/o Sh. Kishan Chand H.No. 6/112, Near Shiv Mandir, Village Jharera, Delhi Cantt by the office under provisions of the Cantonments Act, 2006. The Board also noted office report that neither the unauthorised construction has been removed/demolished by Smt. Rajberi W/o Sh. Kishan Chand, nor any appeal has been preferred against the said notice. The matter was discussed at length and the Board decided to issue notice under section 320 of the Cantonments Act, 2006 to Smt. Rajberi W/o Sh. Kishan Chand H.No. 6/112, Near Shiv Mandir, Village Jharera, Delhi Cantt giving her 15 days time to demolish the said unauthorised construction carried out by her, without obtaining sanction from the Competent Authority, for which notice under section 248 has already been issued on 14.05.2020. In the event of non compliance of notice under section 320 of the Cantonments Act, 2006, the said unauthorized construction shall be demolished by the office at the risk and cost of Smt. Rajberi W/o Sh. Kishan Chand.

183. UNAUTHORISED CONSTRUCTION MADE BY SMT. MANJU W/O SH. RAMESH H.NO. S-170/174, SHIV SHAKTI BUILDING MATERIAL, INFRONT OF WATER BODY & NEAR PUMP HOUSE, VILLAGE JHARERA,DELHI CANTT: ISSUE OF NOTICE UNDER SECTION 320 OF THE CANTONMENTS ACT 2006.

Reference CBR No. 129 dated 21.03.2020 where in the Board resolved to issue notice under section 248 of the Cantonment Act 2006 Smt. Manju W/o Sh. Ramesh H.No. S-170/174, Shiv Shakti Building Material, Infront of Water Body & Near Pump House, Village Jharera, Delhi Cantt. Accordingly notice under section 248 of the Act was issued vide notice No.DCB/4/UC/M/Vill. Jharera/2019-20/1 dated 14.05.2020 to Smt. Manju W/o Sh. Ramesh H.No. S-170/174, Shiv Shakti Building Material, Infront of Water Body & Near Pump House, Village Jharera, Delhi Cantt has neither removed the unauthorised construction nor preferred any appeal U/s 340 of the Cantonment Act 2006. It is therefore proposed to issue notice under section 320 of the Cantonment Act 2006 for the unauthorised construction undertaken Smt. Manju W/o Sh. Ramesh H.No. S-170/174, Shiv Shakti Building Material, Infront of Water Body & Near Pump House, Village Jharera,, Delhi Cantt. The Board may consider.

Relevant file is placed on the table.

183. Considered. The Board noted its decision contained in CBR No. 129 dated 21.03.2020 and the details of notice u/s 248 dated 14.05.2020 issued to Smt. Manju W/o Sh. Ramesh H.No. S-170/174, Shiv Shakti Building Material, Infront of Water Body &Near Pump House, Village Jharera, Delhi Cantt by the office under provisions of the Cantonments Act, 2006. The Board also noted office report that neither the unauthorised construction has been removed/demolished by Smt. Manju W/o Sh. Ramesh, nor any appeal has been preferred Page 202 of 210

against the said notice. The matter was discussed at length and the Board decided to issue notice under section 320 of the Cantonments Act, 2006 to Smt. Manju W/o Sh. Ramesh H.No. S- 170/174, Shiv Shakti Building Material, Infront of Water Body & Near Pump House, Village Jharera, Delhi Cantt giving her 15 days time to demolish the said unauthorised construction carried out by her, without obtaining sanction from the Competent Authority, for which notice under section 248 has already been issued on 14.05.2020. In the event of non compliance of notice under section 320 of the Cantonments Act, 2006, the said unauthorized construction shall be demolished by the office at the risk and cost of Smt. Manju W/o Sh. Ramesh.

184. UNAUTHORISED CONSTRUCTION MADE BY SMT. MANJU W/O SH. RAMESH H.NO. S-170/174, SHIV SHAKTI BUILDING MATERIAL, INFRONT OF WATER BODY & NEAR PUMP HOUSE, VILLAGE JHARERA,DELHI CANTT: ISSUE OF NOTICE UNDER SECTION 320 OF THE CANTONMENTS ACT 2006.

Reference CBR No. 130 dated 21.03.2020 where in the Board resolved to issue notice under section 248 of the Cantonment Act 2006 Smt. Manju W/o Sh. Ramesh H.No. S-170/174, Shiv Shakti Building Material, Infront of Water Body & Near Pump House, Village Jharera, Delhi Cantt. Accordingly notice under section 248 of the Act was issued vide notice No.DCB/4/UC/M/Vill. Jharera/2019-20/2 dated 14.05.2020 to Smt. Manju W/o Sh. Ramesh H.No. S-170/174, Shiv Shakti Building Material, Infront of Water Body & Near Pump House, Village Jharera, Delhi Cantt has neither removed the unauthorised construction nor preferred any appeal U/s 340 of the Cantonment Act 2006. It is therefore proposed to issue notice under section 320 of the Cantonment Act 2006 for the unauthorised construction undertaken Smt. Manju W/o Sh. Ramesh H.No. S-170/174, Shiv Shakti Building Material, Infront of Water Body & Near Pump House, Village Jharera,, Delhi Cantt. The Board may consider.

Relevant file is placed on the table.

184. Considered. The Board noted its decision contained in CBR No. 130 dated 21.03.2020 and the details of notice u/s 248 dated 14.05.2020 issued to Smt. Manju W/o Sh. Ramesh H.No. S-170/174, Shiv Shakti Building Material, Infront of Water Body &Near Pump House, Village Jharera, Delhi Cantt by the office under provisions of the Cantonments Act, 2006. The Board also noted office report that neither the unauthorised construction has been removed/demolished by Smt. Manju W/o Sh. Ramesh, nor any appeal has been preferred against the said notice. The matter was discussed at length and the Board decided to issue notice under section 320 of the Cantonments Act, 2006 to Smt. Manju W/o Sh. Ramesh H.No. S- 170/174, Shiv Shakti Building Material, Infront of Water Body & Near Pump House, Village Jharera, Delhi Cantt giving her 15 days time to demolish the said unauthorised construction carried out by her, without obtaining sanction from the Competent Authority, for which notice under section 248 has already been issued on 14.05.2020. In the event of non compliance of notice under section 320 of the Cantonments Act, 2006, the said unauthorized construction shall be demolished by the office at the risk and cost of Smt. Manju W/o Sh. Ramesh.

185. UNAUTHORISED CONSTRUCTION MADE BY SMT. MANJU W/O SH. RAMESH H.NO. S-170/174, SHIV SHAKTI BUILDING MATERIAL, INFRONT OF WATER BODY & NEAR PUMP HOUSE, VILLAGE JHARERA,DELHI CANTT: ISSUE OF NOTICE UNDER SECTION 320 OF THE CANTONMENTS ACT 2006.

Reference CBR No. 131 dated 21.03.2020 where in the Board resolved to issue notice under section 248 of the Cantonment Act 2006 Smt. Manju W/o Sh. Ramesh H.No. S-170/174, Page 203 of 210

Shiv Shakti Building Material, Infront of Water Body & Near Pump House, Village Jharera, Delhi Cantt. Accordingly notice under section 248 of the Act was issued vide notice No.DCB/4/UC/M/Vill. Jharera/2019-20/3 dated 14.05.2020 to Smt. Manju W/o Sh. Ramesh H.No. S-170/174, Shiv Shakti Building Material, Infront of Water Body & Near Pump House, Village Jharera, Delhi Cantt has neither removed the unauthorised construction nor preferred any appeal U/s 340 of the Cantonment Act 2006. It is therefore proposed to issue notice under section 320 of the Cantonment Act 2006 for the unauthorised construction undertaken Smt. Manju W/o Sh. Ramesh H.No. S-170/174, Shiv Shakti Building Material, Infront of Water Body & Near Pump House, Village Jharera,, Delhi Cantt. The Board may consider.

Relevant file is placed on the table.

185. Considered. The Board noted its decision contained in CBR No. 131 dated 21.03.2020 and the details of notice u/s 248 dated 14.05.2020 issued to Smt. Manju W/o Sh. Ramesh H.No. S-170/174, Shiv Shakti Building Material, Infront of Water Body &Near Pump House, Village Jharera, Delhi Cantt by the office under provisions of the Cantonments Act, 2006. The Board also noted office report that neither the unauthorised construction has been removed/demolished by Smt. Manju W/o Sh. Ramesh, nor any appeal has been preferred against the said notice. The matter was discussed at length and the Board decided to issue notice under section 320 of the Cantonments Act, 2006 to Smt. Manju W/o Sh. Ramesh H.No. S- 170/174, Shiv Shakti Building Material, Infront of Water Body & Near Pump House, Village Jharera, Delhi Cantt giving her 15 days time to demolish the said unauthorised construction carried out by her, without obtaining sanction from the Competent Authority, for which notice under section 248 has already been issued on 14.05.2020. In the event of non compliance of notice under section 320 of the Cantonments Act, 2006, the said unauthorized construction shall be demolished by the office at the risk and cost of Smt. Manju W/o Sh. Ramesh.

186. UNAUTHORISED CONSTRUCTION MADE BY SH. SHUSHANT KUMAR SAHOO S/O LATE SH. CHAITANY SAHOO H.NO. 6/10, NEAR C.B. SCHOOL, VILLAGE JHARERA , DELHI CANTT: ISSUE OF NOTICE UNDER SECTION 320 OF THE CANTONMENTS ACT 2006.

Reference CBR No. 136 dated 21.03.2020 where in the Board resolved to issue notice under section 248 of the Cantonment Act 2006 Sh. Shushant Kumar Sahoo S/o Late Sh. Chaitany Sahoo H.No. 6/10, Near C.B. School, Village Jharera, Delhi Cantt. Accordingly notice under section 248 of the Act was issued vide notice No.DCB/4/UC/SS/Vill. Jharera/2019-20/1 dated 14.05.2020 to Sh. Shushant Kumar Sahoo S/o Late Sh. Chaitany Sahoo H.No. 6/10, Near C.B. School, Village Jharera, Delhi Cantt has neither removed the unauthorised construction nor preferred any appeal U/s 340 of the Cantonment Act 2006. It is therefore proposed to issue notice under section 320 of the Cantonment Act 2006 for the unauthorised construction undertaken Sh. Shushant Kumar Sahoo S/o Late Sh. Chaitany Sahoo H.No. 6/10, Near C.B. School, Village Jharera, Delhi Cantt. The Board may consider.

Relevant file is placed on the table.

186. Considered. The Board noted its decision contained in CBR No. 136 dated 21.03.2020 and the details of notice u/s 248 dated 14.05.2020 issued to Sh. Shushant Kumar Sahoo S/o Late Sh. Chaitany Sahoo H.No. 6/10, Near C.B. School, Village Jharera, Delhi Cantt by the office under provisions of the Cantonments Act, 2006. The Board also noted office report that neither the unauthorised construction has been removed/demolished by Sh. Shushant Kumar Sahoo Page 204 of 210

S/o Late Sh. Chaitany Sahoo, nor any appeal has been preferred against the said notice. The matter was discussed at length and the Board decided to issue notice under section 320 of the Cantonments Act, 2006 to Sh. Shushant Kumar Sahoo S/o Late Sh. Chaitany Sahoo H.No. 6/10, Near C.B. School, Village Jharera, Delhi Cantt giving him 15 days time to demolish the said unauthorised construction carried out by him, without obtaining sanction from the Competent Authority, for which notice under section 248 has already been issued on 14.05.2020. In the event of non compliance of notice under section 320 of the Cantonments Act, 2006, the said unauthorized construction shall be demolished by the office at the risk and cost of Sh. Shushant Kumar Sahoo S/o Late Sh. Chaitany Sahoo.

187. UNAUTHORISED CONSTRUCTION MADE BY SH. SHUSHANT KUMAR SAHOO S/O LATE SH. CHAITANY SAHOO H.NO. 6/10, NEAR C.B. SCHOOL, VILLAGE JHARERA , DELHI CANTT: ISSUE OF NOTICE UNDER SECTION 320 OF THE CANTONMENTS ACT 2006.

Reference CBR No. 137 dated 21.03.2020 where in the Board resolved to issue notice under section 248 of the Cantonment Act 2006 Sh. Shushant Kumar Sahoo S/o Late Sh. Chaitany Sahoo H.No. 6/10, Near C.B. School, Village Jharera, Delhi Cantt. Accordingly notice under section 248 of the Act was issued vide notice No.DCB/4/UC/SS/Vill. Jharera/2019- 20/2dated 14.05.2020 to Sh. Shushant Kumar Sahoo S/o Late Sh. Chaitany Sahoo H.No. 6/10, Near C.B. School, Village Jharera, Delhi Cantt has neither removed the unauthorised construction nor preferred any appeal U/s 340 of the Cantonment Act 2006. It is therefore proposed to issue notice under section 320 of the Cantonment Act 2006 for the unauthorised construction undertaken Sh. Shushant Kumar Sahoo S/o Late Sh. Chaitany Sahoo H.No. 6/10, Near C.B. School, Village Jharera, Delhi Cantt. The Board may consider.

Relevant file is placed on the table.

187. Considered. The Board noted its decision contained in CBR No. 137 dated 21.03.2020 and the details of notice u/s 248 dated 14.05.2020 issued to Sh. Shushant Kumar Sahoo S/o Late Sh. Chaitany Sahoo H.No. 6/10, Near C.B. School, Village Jharera, Delhi Cantt by the office under provisions of the Cantonments Act, 2006. The Board also noted office report that neither the unauthorised construction has been removed/demolished by Sh. Shushant Kumar Sahoo S/o Late Sh. Chaitany Sahoo, nor any appeal has been preferred against the said notice. The matter was discussed at length and the Board decided to issue notice under section 320 of the Cantonments Act, 2006 to Sh. Shushant Kumar Sahoo S/o Late Sh. Chaitany Sahoo H.No. 6/10, Near C.B. School, Village Jharera, Delhi Cantt giving him 15 days time to demolish the said unauthorised construction carried out by him, without obtaining sanction from the Competent Authority, for which notice under section 248 has already been issued on 14.05.2020. In the event of non compliance of notice under section 320 of the Cantonments Act, 2006, the said unauthorized construction shall be demolished by the office at the risk and cost of Sh. Shushant Kumar Sahoo S/o Late Sh. Chaitany Sahoo.

188. UNAUTHORISED CONSTRUCTION MADE BY SH. SHUSHANT KUMAR SAHOO S/O LATE SH. CHAITANY SAHOO H.NO. 6/10, NEAR C.B. SCHOOL, VILLAGE JHARERA , DELHI CANTT: ISSUE OF NOTICE UNDER SECTION 320 OF THE CANTONMENTS ACT 2006.

Reference CBR No. 138 dated 21.03.2020 where in the Board resolved to issue notice under section 248 of the Cantonment Act 2006 Sh. Shushant Kumar Sahoo S/o Late Sh. Page 205 of 210

Chaitany Sahoo H.No. 6/10, Near C.B. School, Village Jharera, Delhi Cantt. Accordingly notice under section 248 of the Act was issued vide notice No.DCB/4/UC/SS/Vill. Jharera/2019- 20/3dated 14.05.2020 to Sh. Shushant Kumar Sahoo S/o Late Sh. Chaitany Sahoo H.No. 6/10, Near C.B. School, Village Jharera, Delhi Cantt has neither removed the unauthorised construction nor preferred any appeal U/s 340 of the Cantonment Act 2006. It is therefore proposed to issue notice under section 320 of the Cantonment Act 2006 for the unauthorised construction undertaken Sh. Shushant Kumar Sahoo S/o Late Sh. Chaitany Sahoo H.No. 6/10, Near C.B. School, Village Jharera, Delhi Cantt. The Board may consider.

Relevant file is placed on the table.

188. Considered. The Board noted its decision contained in CBR No. 138 dated 21.03.2020 and the details of notice u/s 248 dated 14.05.2020 issued to Sh. Shushant Kumar Sahoo S/o Late Sh. Chaitany Sahoo H.No. 6/10, Near C.B. School, Village Jharera, Delhi Cantt by the office under provisions of the Cantonments Act, 2006. The Board also noted office report that neither the unauthorised construction has been removed/demolished by Sh. Shushant Kumar Sahoo S/o Late Sh. Chaitany Sahoo, nor any appeal has been preferred against the said notice. The matter was discussed at length and the Board decided to issue notice under section 320 of the Cantonments Act, 2006 to Sh. Shushant Kumar Sahoo S/o Late Sh. Chaitany Sahoo H.No. 6/10, Near C.B. School, Village Jharera, Delhi Cantt giving him 15 days time to demolish the said unauthorised construction carried out by him, without obtaining sanction from the Competent Authority, for which notice under section 248 has already been issued on 14.05.2020. In the event of non compliance of notice under section 320 of the Cantonments Act, 2006, the said unauthorized construction shall be demolished by the office at the risk and cost of Sh. Shushant Kumar Sahoo S/o Late Sh. Chaitany Sahoo.

189. UNAUTHORISED CONSTRUCTION MADE BY SH. SHUSHANT KUMAR SAHOO S/O LATE SH. CHAITANY SAHOO H.NO. 6/10, NEAR C.B. SCHOOL, VILLAGE JHARERA , DELHI CANTT: ISSUE OF NOTICE UNDER SECTION 320 OF THE CANTONMENTS ACT 2006.

Reference CBR No. 139 dated 21.03.2020 where in the Board resolved to issue notice under section 248 of the Cantonment Act 2006 Sh. Shushant Kumar Sahoo S/o Late Sh. Chaitany Sahoo H.No. 6/10, Near C.B. School, Village Jharera, Delhi Cantt. Accordingly notice under section 248 of the Act was issued vide notice No.DCB/4/UC/SS/Vill. Jharera/2019- 20/4dated 14.05.2020 to Sh. Shushant Kumar Sahoo S/o Late Sh. Chaitany Sahoo H.No. 6/10, Near C.B. School, Village Jharera, Delhi Cantt has neither removed the unauthorised construction nor preferred any appeal U/s 340 of the Cantonment Act 2006. It is therefore proposed to issue notice under section 320 of the Cantonment Act 2006 for the unauthorised construction undertaken Sh. Shushant Kumar Sahoo S/o Late Sh. Chaitany Sahoo H.No. 6/10, Near C.B. School, Village Jharera, Delhi Cantt. The Board may consider.

Relevant file is placed on the table.

189. Considered. The Board noted its decision contained in CBR No. 139 dated 21.03.2020 and the details of notice u/s 248 dated 14.05.2020 issued to Sh. Shushant Kumar Sahoo S/o Late Sh. Chaitany Sahoo H.No. 6/10, Near C.B. School, Village Jharera, Delhi Cantt by the office under provisions of the Cantonments Act, 2006. The Board also noted office report that neither the unauthorised construction has been removed/demolished by Sh. Shushant Kumar Sahoo S/o Late Sh. Chaitany Sahoo, nor any appeal has been preferred against the said notice. The Page 206 of 210

matter was discussed at length and the Board decided to issue notice under section 320 of the Cantonments Act, 2006 to Sh. Shushant Kumar Sahoo S/o Late Sh. Chaitany Sahoo H.No. 6/10, Near C.B. School, Village Jharera, Delhi Cantt giving him 15 days time to demolish the said unauthorised construction carried out by him, without obtaining sanction from the Competent Authority, for which notice under section 248 has already been issued on 14.05.2020. In the event of non compliance of notice under section 320 of the Cantonments Act, 2006, the said unauthorized construction shall be demolished by the office at the risk and cost of Sh. Shushant Kumar Sahoo S/o Late Sh. Chaitany Sahoo.

190. UNAUTHORISED CONSTRUCTION MADE BY MOH. SHAKEEL S/O MOH SAGEER H.NO.146, INFRONT OF DISPENSARY , VILLAGE JHARERA,DELHI CANTT: ISSUE OF NOTICE UNDER SECTION 320 OF THE CANTONMENTS ACT 2006.

Reference CBR No. 143 dated 21.03.2020 where in the Board resolved to issue notice under section 248 of the Cantonment Act 2006 Moh. Shakeel S/o MohSageerH.No. 146, Infront of Dispensary, Village Jharera, Delhi Cantt. Accordingly notice under section 248 of the Act was issued vide notice No.DCB/4/UC/MS/Vill. Jharera/2019-20/1 dated 14.05.2020 toMoh. Shakeel S/o MohSageerH.No. 146, Infront of Dispensary, Village Jharera, Delhi Cantt has neither removed the unauthorised construction nor preferred any appeal U/s 340 of the Cantonment Act 2006. It is therefore proposed to issue notice under section 320 of the Cantonment Act 2006 for the unauthorised construction undertaken Moh. Shakeel S/o MohSageer H.No.146, Infront of Dispensary Village Jharera, Delhi Cantt. The Board may consider.

Relevant file is placed on the table.

190. Considered. The Board noted its decision contained in CBR No. 143 dated 21.03.2020 and the details of notice u/s 248 dated 14.05.2020 issued to Moh. Shakeel S/o MohSageerH.No. 146, Infront of Dispensary, Village Jharera, Delhi Cantt by the office under provisions of the Cantonments Act, 2006. The Board also noted office report that neither the unauthorised construction has been removed/demolished by Moh. Shakeel S/o MohSageer, nor any appeal has been preferred against the said notice. The matter was discussed at length and the Board decided to issue notice under section 320 of the Cantonments Act, 2006 to Moh. Shakeel S/o MohSageerH.No. 146, Infront of Dispensary, Village Jharera, Delhi Cantt giving him 15 days time to demolish the said unauthorised construction carried out by him, without obtaining sanction from the Competent Authority, for which notice under section 248 has already been issued on 14.05.2020. In the event of non compliance of notice under section 320 of the Cantonments Act, 2006, the said unauthorized construction shall be demolished by the office at the risk and cost of Moh. Shakeel S/o MohSageer.

191. UNAUTHORISED CONSTRUCTION MADE BY MOH. SHAKEEL S/O MOH SAGEER H.NO.146, INFRONT OF DISPENSARY, VILLAGE JHARERA,DELHI CANTT: ISSUE OF NOTICE UNDER SECTION 320 OF THE CANTONMENTS ACT 2006.

Reference CBR No. 144 dated 21.03.2020 where in the Board resolved to issue notice under section 248 of the Cantonment Act 2006 Moh. Shakeel S/o MohSageerH.No. 146, Infront of Dispensary, Village Jharera, Delhi Cantt. Accordingly notice under section 248 of the Act was issued vide notice No.DCB/4/UC/MS/Vill. Jharera/2019-20/2 dated 14.05.2020 toMoh. Shakeel S/o MohSageerH.No. 146, Infront of Dispensary, Village Jharera, Delhi Cantt has neither removed the unauthorised construction nor preferred any appeal U/s 340 of the Cantonment Act 2006. It is therefore proposed to issue notice under section 320 of the Cantonment Act Page 207 of 210

2006 for the unauthorised construction undertaken Moh. Shakeel S/o MohSageer H.No.146, Infront of Dispensary Village Jharera, Delhi Cantt. The Board may consider.

Relevant file is placed on the table.

191. Considered. The Board noted its decision contained in CBR No. 144 dated 21.03.2020 and the details of notice u/s 248 dated 14.05.2020 issued to Moh. Shakeel S/o MohSageerH.No. 146, Infront of Dispensary, Village Jharera, Delhi Cantt by the office under provisions of the Cantonments Act, 2006. The Board also noted office report that neither the unauthorised construction has been removed/demolished by Moh. Shakeel S/o MohSageer, nor any appeal has been preferred against the said notice. The matter was discussed at length and the Board decided to issue notice under section 320 of the Cantonments Act, 2006 to Moh. Shakeel S/o MohSageerH.No. 146, Infront of Dispensary, Village Jharera, Delhi Cantt giving him 15 days time to demolish the said unauthorised construction carried out by him, without obtaining sanction from the Competent Authority, for which notice under section 248 has already been issued on 14.05.2020. In the event of non compliance of notice under section 320 of the Cantonments Act, 2006, the said unauthorized construction shall be demolished by the office at the risk and cost of Moh. Shakeel S/o MohSageer.

192. UNAUTHORISED CONSTRUCTION MADE BY SH. BIJENDER KUMAR S/O LATE SH. TARA CHAND H.NO. T-66, ROAD LEADING FRONT CB SCHOOL TO POND SIDE, VILLAGE JHARERA,DELHI CANTT: ISSUE OF NOTICE UNDER SECTION 320 OF THE CANTONMENTS ACT 2006.

Reference CBR No. 156 dated 21.03.2020 where in the Board resolved to issue notice under section 248 of the Cantonment Act 2006 Sh. Bijender Kumar S/o Late Sh. Tara Chand H.No. T-66, Road leading front CB School to Pond side, Village Jharera, Delhi Cantt. Accordingly notice under section 248 of the Act was issued vide notice No.DCB/4/UC/BK/Vill. Jharera/2019-20 dated 04.05.2020 to Sh. Bijender Kumar S/o Late Sh. Tara Chand H.No. T-66, Road leading front CB School to Pond side, Village Jharera, Delhi Cantt has neither removed the unauthorised construction nor preferred any appeal U/s 340 of the Cantonment Act 2006. It is therefore proposed to issue notice under section 320 of the Cantonment Act 2006 for the unauthorised construction undertaken Sh. Bijender Kumar S/o Late Sh. Tara Chand H.No. T-66, Road leading front CB School to Pond side, Village Jharera, Delhi Cantt. The Board may consider.

Relevant file is placed on the table.

192. Considered. The Board noted its decision contained in CBR No. 156 dated 21.03.2020 and the details of notice u/s 248 dated 04.05.2020 issued to Sh. Bijender Kumar S/o Late Sh. Tara Chand H.No. T-66,Road leading front of CB School to Pond side, Village Jharera, Delhi Cantt by the office under provisions of the Cantonments Act, 2006. The Board also noted office report that neither the unauthorised construction has been removed/demolished by Sh. Bijender Kumar S/o Late Sh. Tara Chand, nor any appeal has been preferred against the said notice. The matter was discussed at length and the Board decided to issue notice under section 320 of the Cantonments Act, 2006 to Sh. Bijender Kumar S/o Late Sh. Tara Chand H.No. T-66,Road leading front of CB School to Pond side, Village Jharera, Delhi Cantt giving him 15 days time to demolish the said unauthorised construction carried out by him, without obtaining sanction from the Competent Authority, for which notice under section 248 has already been issued on 04.05.2020. In the event of non compliance of notice under section 320 of the Cantonments Page 208 of 210

Act, 2006, the said unauthorized construction shall be demolished by the office at the risk and cost of Sh. Bijender Kumar S/o Late Sh. Tara Chand.

193. FINANCE COMMITTEE ELECTION

The last Finance Committee of the Board was constituted vide CBR No.03 dated 29.07.2019. The term of the Committee came to end on 28.07.2020. Now the Board is to consider the constitution of Finance Committee u/s 48(1)(E) of the Cantonments Act, 2006 and Business Regulations No.28(1)(A)(II).

193. Considered. The CEO, Member-Secretary informed the Board that the term of last Finance Committee constituted vide CBR No.3 dated 29.07.2019 has expired on 28.07.2020. He further briefed the Board about provisions concerning appointment of the Finance Committee as laid down in Business Regulations of Delhi Cantonment Board and that the constitution of Finance Committee shall have three Elected Members and two Nominated Members to be appointed by the President Cantonment Board. The President Cantonment Board requested Elected Members to forward their nominations for election to the post of Member Finance Committee, Delhi Cantonment Board. Following nominations were received:

Name of Candidate Proposer Seconder Smt. Rachna Kadiyan Sh. Jagat Singh Col. Narender Chaudhary (Retd)

Smt. Kavita Jain Col. Narender Chaudhary (Retd) Ms. Priyanka Chaudhary

Sh. Vimal Chowdhary Sh. Vimal Chowdhary Sh. Nand Kishore Beniwal

Only three nominations from Elected Members were received against three posts and the President Cantonment Board declared aforementioned three Members to be the Members of the Finance Committee. Further as per clause 29(i) of the Business Regulations applicable to Cantt Board Delhi, Smt. Rachna Kadiyan by virtue of being Vice-President of the Board shall be the Chairman of the Finance Committee. The President Cantonment Board further nominated the CEO, Member-Secretary and GE (C) to be the Nominated Members of the Finance Committee.

194. WITH THE PERMISSION OF CHAIR FOLLOWING ITEMS WERE DISCUSSED:- i) The President Cantt Board urged the Board to take steps in order to further improve the infrastructure and quality of the education available with Cantt Board Schools. He further expressed that the meritorious students should be felicitated in a suitable manner to motivate them to perform better. Ms. Priyanka Chaudhary, Member requested that the girl students should be given training for self defencetechniques, Martial art etc to handle any unforeseen situation. The President Cantt Board further stated that the Board should take necessary action with regard to training of Cantt Board school children to perform wellso that they can enter to armed forces like NDA etc to serve the Country. The President Cantt Board informed that he will use his good office to provide necessary training both

Page 209 of 210

physical and aptitude to Cantt Board students through serving/ retired officers of the forces.

The Board considered the matter at length and resolved to authorize the CEO, Member-Secretary to take further necessary action and to incur necessary expenditure towards improving the infrastructure, quality of education and allied activities for the betterment of schools and students with special emphasis on girl child and special children. ii) Smt. Priyanka Chaudhary, Member requested the Board to consider allowing maternity leave of six months to the contractual staff engaged by the Board for Cantt General Hospital. The President Cantonment Board requested the CEO, Member-Secretary to examine terms and conditions of existing contractual engagements. iii) All Elected Members submitted proposals for naming of parks etc in Delhi Cantonment area. The President Cantonment Board requested the CEO, Member-Secretary to examine the proposals received from Elected Members. iv) Ms. Priyanka Chaudhary, Member requested that improvement to compound grills, gate and other misc works to improve aesthetic at Thimmaya Park be considered by the Board. The President Cantt Board stated that suggestions given by Member will be considered in the overall scheme being prepared by office for improvements to Indo- Korean friendship park.

Meeting ended with the vote of thanks to the Chair.

Sd/- Sd/- Member-Secretary Brig. Cantonment Board President Cantonment Board Delhi Cantonment Delhi Cantonment 13th October, 2020 13th October, 2020

Page 210 of 210