商標註冊續期trade Mark Registrations Renewed
Total Page:16
File Type:pdf, Size:1020Kb
Load more
Recommended publications
-
Directors and Parties Involved in the [Redacted]
THIS DOCUMENT IS IN DRAFT FORM, INCOMPLETE AND SUBJECT TO CHANGE AND THAT THE INFORMATION MUST BE READ IN CONJUNCTION WITH THE SECTION HEADED “WARNING” ON THE COVER OF THIS DOCUMENT. DIRECTORS AND PARTIES INVOLVED IN THE [REDACTED] DIRECTORS Name Address Nationality Executive Directors Mr. Fu Chun Keung (傅鎮強) Flat A, 57/F, Block 1 Chinese Ocean Pointe 8 Sham Tsz Street Sham Tseng New Territories Hong Kong Ms. Cheung Lai Yuk (張麗玉) Flat A, 57/F, Block 1 Chinese Ocean Pointe 8 Sham Tsz Street Sham Tseng New Territories Hong Kong Ms. Fu Wan Ling (傅雲玲) Flat 3515, 35/F, Block M Chinese Chung Chak House Tin Chung Court Tin Shui Wai New Territories Hong Kong Independent non-executive Directors Mr. Chan Cheong Tat (陳昌達) Flat A, 7/F Chinese Block 3, City Garden North Point Hong Kong Mr. Wong Wing Keung Meyrick (王泳強) Room 1907, Block M Chinese Kornhill Quarry Bay Hong Kong Mr. Chan Chi Ming Tony (陳子明) Flat A, 19/F Australian Tower 9, The Visionary 1 Ying Hong St Tung Chung Hong Kong For the biographies of the Directors, please refer to the section headed “Directors and senior management” in this document. —47— THIS DOCUMENT IS IN DRAFT FORM, INCOMPLETE AND SUBJECT TO CHANGE AND THAT THE INFORMATION MUST BE READ IN CONJUNCTION WITH THE SECTION HEADED “WARNING” ON THE COVER OF THIS DOCUMENT. DIRECTORS AND PARTIES INVOLVED IN THE [REDACTED] PARTIES INVOLVED Sole Sponsor South China Capital Limited A corporate licensed under the SFO and permitted to carry out Type 6 (advising on corporate finance) of regulated activities as defined under the SFO 28/F, Bank of China Tower No.1 Garden Road Central Hong Kong [REDACTED] Legal advisers to the Company As to Hong Kong law: Li & Partners 22/F, World-Wide House 19 Des Voeux Road Central Central Hong Kong —48— THIS DOCUMENT IS IN DRAFT FORM, INCOMPLETE AND SUBJECT TO CHANGE AND THAT THE INFORMATION MUST BE READ IN CONJUNCTION WITH THE SECTION HEADED “WARNING” ON THE COVER OF THIS DOCUMENT. -
TRAFFIC ADVICE Temporary Traffic and Transport Arrangements On
TRAFFIC ADVICE Temporary Traffic and Transport Arrangements on Des Voeux Road Central, Central Motorists are advised that to facilitate emergency road works, the following temporary traffic and transport arrangements will be implemented from 9.00 am to 6.00 am of the following day on 15 August 2020: A. Road Closure Des Voeux Road Central eastbound between Pedder Street and Murray Road. B. Traffic Diversion Affected vehicles on Des Voeux Road Central eastbound heading for Queensway eastbound will be diverted via Chater Road eastbound and Murray Road southbound. C. Public Transport Arrangements D. Bus Routes Direction Route diversions Suspended bus stops Temporary bus stops NWFB Route To diverted via · Des Voeux Road · Chater Road Central outside No. 25 Braemar Chater Road, opposite Statue Square Statue Hill Murray Road Square NWFB Route To Yiu and resume No. 722 Tung their original Estate routeings XHT Route To Kwun No. 101 Tong XHT Route To Pak No. 104 Tin Estate XHT Route To Ho No. 109 Man Tin Estate Bus Routes Direction Route diversions Suspended bus stops Temporary bus stops XHT Route To Ping No. 111 Shek Estate XHT Route To Choi No. 113 Hung XHT Route To No. 115 Kowloon City Ferry Pier XHT Route To Sha No. 182 Tin XHT Route To Tai Po No. 307 Centre XHT Route To Sheung No. 373 Shui XHT Route To Ping No. 603 Tin XHT Route To Shun No. 619 Lee Estate XHT Route To Kai No. 641 Tak XHT Route To Sheung No. 673 Shui XHT Route To Ma On No. 681P Shan XHT Route To Tseung No. -
Project-Approval-Log-Condos.Pdf
Condo Approval Log as of 3‐16‐19 State Project Name Project Location Phase Warrantable Decision Expiration Date HOA Cert Exp Date Insurance Exp Date Budget Exp Date AL Bella Luna Orange Beach, AL. 36561 Entire Warrantable ‐ O/O or 2nd Home Only Approval Expired 3/5/2017 2/27/2017 4/7/2017 12/31/2016 AL Brown Crest Auburn, AL 36832 Phase 1 Warrantable Approval Expired 9/24/2016 11/2/2016 2/28/2017 12/31/2016 AL Creekside of Auburn AL, Auburn 36830 Entire Warrantable ‐ Freddie Mac Only Approval Expired 3/28/2017 3/13/2017 11/1/2017 12/31/2017 AL Donahue Crossing Auburn, AL. 36830 Entire Warrantable Approval Expired 11/13/2016 10/27/2016 7/4/2017 12/31/2016 AL Residences Auburn, AL 36830 Entire Warrantable Approval Expired 9/15/2016 7/14/2016 8/6/2016 12/31/2016 AL Seachase Orange Beach, AL 36561 Entire Warrantable Approval Expired 12/1/2016 11/14/2016 5/23/2017 12/31/2016 AZ Bella Vista Scottsdale, AZ 85260 Entire Warrantable Approval Expired 9/10/2015 9/3/2015 5/9/2016 12/31/2015 AZ Colonial Grande Casitas Mesa, AZ 85211 Entire Warrantable Approval Expired 3/14/2018 2/28/2018 7/6/2018 12/31/2018 AZ Desert Breeze Villas Phoenix, AZ 85037 Entire Warrantable Approval Expired 11/25/2017 11/21/2017 6/25/2018 12/31/2017 AZ Discovery at the Orchards Peoria, AZ 85381 Entire Warrantable Approval Expired 8/8/2017 7/19/2017 8/24/2017 12/31/2017 AZ Eastwood Park Mesa, AZ 85203 Entire Warrantable Approval Expired 9/12/2017 9/7/2017 1/30/2018 12/31/2017 AZ El Segundo Phoenix, AZ 85008 Entire Non‐Warrantable Approval Expired 9/21/2018 8/28/2018 11/8/2018 12/31/2018 AZ Leisure World Mesa, AZ 85206 Entire Warrantable Approval Expired 3/11/2018 3/4/2018 1/1/2018 12/31/2017 AZ Mountain Park Phoenix AZ 85020 Entire Warrantable Approval Expired 7/13/2015 7/2/2015 11/15/2015 12/31/2015 AZ Palm Gardens Phoenix, AZ 85041 Entire Warrantable Approval Expired 7/11/2016 7/5/2016 11/23/2016 12/31/2016 AZ Pointe Resort @ Tapatio Cliffs Phoenix, AZ. -
Service Boundaries of Tsuen Wan (West)
Tsuen Wan (West) Integrated Family 西荃灣綜合家庭服務中心 Service Centre Social Welfare Department 社會福利署 Tsuen Wan and Kwai Tsing District 荃灣及葵青區 Enquiries: 2439 5429 查詢電話:2439 5429 Fax: 2412 7334 傳真:2412 7334 Email: [email protected] 電郵:[email protected] Geographical Service Boundary 服務地域範圍 Eastern Boundary 東面分界線 - Starts at junction of Castle Peak Road - 始於青山公路(葵涌段)與德士古 (Kwai Chung) and Texaco Road 道交界 - Moving along Kwan Mun Hau Street - 沿關門口街 - Turns north-west at junction of Sha - 轉沙咀道向西北移 Tsui Road - Then turns north-east at junction of - 至大河道向東北移 Tai Ho Road - Then turns to Castle Peak Road - 轉青山公路(荃灣段) (Tsuen Wan) - Ends at Chai Wan Kok and turn to the - 至柴灣角向北移至荃錦坳止 north till Tsuen Kam Au Southern Boundary 南面分界線 - Starts at junction of Castle Peak Road - 始於青山公路(葵涌段)與德士古 (Kwai Chung) and Texaco Road 道交界 - Moving along Texaco Road - 沿德士古道移 - Ends at Riveria Garden - 至海濱花園止 Western Boundary 西面分界線 - Starts from harbour separating Tsing - 始於分隔荃灣及青衣島海岸 Yi Island and Tsuen Wan - Extending to Ma Wan Channel and - 伸延至馬灣海峽及汲水門 Kap Shui Mun - Ends at Ka Loon Tsuen - 至嘉龍村止 1 Northern Boundary 北面分界線 - Starts at junction of Tsuen Kam Au, - 始於荃錦坳向西南移 moving south-west - Ends at Yuen Tun - 至圓墩止 Details of Geographical Service Boundary 服務地域範圍詳情 District Council Constituency 區議會選區# Code Name Part 部分 / Whole 全部 * 代號 名稱 K01 Tak Wah 德華 Part 部分 Whole 全部 ☐ K02 Yeung Uk Road 楊屋道 Part 部分 ☐ Whole 全部 K03 Tsuen Wan South 荃灣南 Part 部分 ☐ Whole 全部 K04 Hoi Bun 海濱 Part 部分 ☐ Whole 全部 K05 Tsuen Wan West 荃灣西 Part 部分 ☐ Whole 全部 K06 Clague Garden 祈德尊 Part 部分 ☐ Whole -
Serial No.:NR723(1)
Residents’ Service Route No. : NR737 Destinations : Yau Oi Estate - Admiralty/Wan Chai Routeing (Yau Oi Estate - Admiralty) : via Oi Yung Street, Yau Oi Road, Tuen Mun Heung Sze Wui Road, Tuen Hing Road, Tuen Mun Road, Tsing Long Highway, Cheung Tsing Highway, Cheung Tsing Tunnel, Tsing Kwai Highway, West Kowloon Highway, Western Harbour Crossing, Sai Ying Pun Interchange, Connaught Road West, Chung King Road, Chung Kong Road, Western Fire Services Street, Connaught Road West, Connaught Road Central, Rumsey Street, Des Voeux Road Central, Chater Road, Murray Road, Queensway and Cotton Tree Drive slip road. Stopping Places : Pick Up : Oi Yung Street outside Oi Yung Set Down : 1. Chung Kong Road House, Yau Oi Estate 2. Chater Road east of Club Street 3. Cotton Tree Drive slip road Lippo Centre Departure time : Mondays to Fridays Saturdays (except general holidays) (except general holidays) 1. 7.50 a.m. 1. 7.55 a.m. 2. 8.10 a.m. 3. 8.25 a.m. Routeing (Wan Chai - Yau Oi Estate) : via Lockhart Road, Arsenal Street, Gloucester Road, Harcourt Road, Connaught Road Central, Ice House Street, Chater Road, Jackson Road, Connaught Road Central, Connaught Road West, Sai Ying Pun Interchange, Western Harbour Crossing, West Kowloon Highway, Tsing Kwai Highway, Cheung Tsing Tunnel, Cheung Tsing Highway, Tsing Long Highway, Tuen Mun Road, Tuen Hi Road, Tuen Lung Street, Tuen Mun Heung Sze Wui Road, Yau Oi Road and Oi Yung Street. Stopping Places : Pick Up : 1. 60 Lockhart Road Set Down : 1. Tuen Mun Heung Sze Wui Road 2. Jackson Road near lamp post outside Tuen Mun Trend Plaza 44305 2. -
Development Name 樓宇名稱lot No. 地段編號parent Co. Or Holding Co
List of Consents to Sell, Consents to Assign and Approvals of Deeds of Mutual Covenant issued since 01/01/1994 (As at 31/08/2021) 自一九九四年一月一日所批出的樓花同意書、轉讓同意書及公契批核書列表 (截至2021年8月31日) Development Name Lot No. Parent Co. or Holding Co./ Type of Consent/Approval Solicitors Consent/ 樓宇名稱 地段編號 Developer 同意書/批核公契種類 律師 Approval Date 發展商母公司或控股公司/ 同意書/ 發展商 批核公契日期 Tsuen Wan 荃灣區 Allway Gardens (Commercial TWTL 236 & Ext Goldhill Investments Limited Approval of Sub-Deed of Woo, Kwan, Lee & 18/12/2007 Development) 荃灣市地段第236號及增批 Mutual Covenant and Lo 荃威花園 (商業樓宇) 部分 Management Agreement 胡關李羅律師行 批核附屬公契及管理協議 Allway Gardens (Non- TWTL 236 & Ext Max Rainbow Enterprise Approval of Sub-Sub-Deed of Wilkinson & Grist 09/05/2013 residential Development) - 荃灣市地段第236號及增批 Limited Mutual Covenant 高露雲律師行 portions of the Commercial 部分 彩麗企業有限公司 批核補充附屬公契 Development comprising G/F & 2/F of Phase 1 and G/F & Cockloft Floor of Phase 2 荃威花園 (非住宅樓宇) - 部分 商業樓宇包括第1期地下及1樓, 第2期地下及閣樓 Anglers' Bay Lot 214 in DD 387 Sino Approval of Deed of Mutual Denton Wilde Sapte 23/05/2003 海雲軒 丈量約份第387約地段第 信和/ Covenant and Management 丹敦浩國際律師事務 214號 Prime Force Limited Agreement 所 弘雄有限公司 批核公契及管理協議 Anglers' Bay Lot 214 in DD 387 Sino Consent to Sell for Denton Wilde Sapte 30/05/2003 海雲軒 丈量約份第387約地段第 信和/ residential development 丹敦浩國際律師事務 214號 Prime Force Limited 住宅預售樓花同意書 所 弘雄有限公司 Bellagio Lot 269 RP in DD 390 Wheelock Approval of Deed of Mutual Slaughter & May 26/06/2002 碧堤半島 丈量約份第390約地段第 會德豐/ Covenant and Management 司力達律師樓 269號之餘段 Salisburgh Company Limited Agreement 批核公契及管理協議 Bellagio (Phase -
HK TRUSTEES' ASSOCIATION LTD STEP HONG KONG LTD C/O
HK TRUSTEES’ ASSOCIATION LTD STEP HONG KONG LTD c/o Deacons c/o Suite 201 St George’s Building 6/F Alexandra House 2 Ice House Street, Central Chater Road, Central, Hong Kong Hong Kong Tel: 2559 7144 Fax: 2559 7249 Email: [email protected] Website: www.step.orghongkong A SEMINAR ON TRUST STRUCTURES TO HOLD AND PRESERVE THE FAMILY-OWNED BUSINESS Speaker: Christian Stewart (Family Legacy Asia (HK) Ltd) Date: Thursday, 5th March 2009 Time: 6.00 p.m. – 7.00 p.m. Venue: HSBC Theatre, Level 13, 1 Queen’s Road Central, Hong Kong Mr Stewart set up Family Legacy Asia in 2008 to provide Asian families with independent advise that is focused solely on helping families plan and then implement best succession and family governance practices. Mr Stewart will discuss the advantages and disadvantages of using a trust to own the family business and some of the critical tasks that a family needs to engage in. Trusts are often marketed in Asia as a succession planning device, and as a tool that can help keep wealth in a family for more than three generations. Clearly there are certain benefits of using a trust structure that tax and trust advisers can articulate for their clients. There is an often quoted statistic that only one third of family owned businesses will make it into the second-generation and something like a 10% chance of survival into the third generation. The theory of family owned businesses helps to explain these statistics by reference to a “three circle model”, which says that a family owned business is made up of three overlapping systems. -
Consultancy Agreement No. NEX/1023 West Island Line Environmental Impact Assessment Final Environmental Impact Assessment Report
Consultancy Agreement No. NEX/1023 West Island Line Environmental Impact Assessment Final Environmental Impact Assessment Report TABLE OF CONTENTS 1 INTRODUCTION......................................................................................................................................... 1 2 PROJECT BACKGROUND........................................................................................................................ 1 3 STUDY SCOPE........................................................................................................................................... 1 4 CULTURAL HERITGE RESOURCES ........................................................................................................ 2 5 CONCLUSIONS........................................................................................................................................ 28 FIGURES Figure 6.1 Identified Cultural Heritage Resources Key Plan Figure 6.2 Locations of Identified Cultural Heritage Resources Figure 6.3 Locations of Identified Cultural Heritage Resources Figure 6.4 Locations of Identified Cultural Heritage Resources Figure 6.5 Locations of Identified Cultural Heritage Resources Figure 6.6 Locations of Identified Cultural Heritage Resources Figure 6.7 Locations of Identified Cultural Heritage Resources Figure 6.8 Locations of Identified Cultural Heritage Resources Figure 6.9 Locations of Identified Cultural Heritage Resources Figure 6.10 Locations of Identified Cultural Heritage Resources Figure 6.11 Locations of Identified Cultural -
Egn200913284208.Ps, Page 1-2 @ Normalize ( MA-28-11557.Indd )
G.N. 4208 Companies Registry MONEY LENDERS ORDINANCE (Chapter 163) NOTICE is hereby given pursuant to regulation 7 of the Money Lenders Regulations that the following applications for a money lender’s licence have been received:— No. Name Address 1. Chiap Hua Credit Limited 19th Floor, World Wide House, 19 Des Voeux Road Central, Hong Kong. 2. Chuang’s Credit Limited Room 2501, 25th Floor, Alexandra House, 18 Chater Road, Central, Hong Kong. 3. Kingston Finance Limited Suite 2801, 28th Floor, One International Finance Centre, 1 Harbour View Street, Central, Hong Kong. 4. Oriental Patron Securities Limited Suites 2701–2703 and 2705–2708, Two Exchange Square, 8 Connaught Place, Central, Hong Kong. 5. Mei Lik Ko Finance Limited Room 802, 8th Floor, Kelly Commercial Centre, 570–572 Nathan Road, Kowloon. 6. The Hong Kong Building And Loan (1) 27th Floor, Entertainment Building, Agency Limited 30 Queen’s Road Central, Hong Kong. (2) Room 2101, 21st Floor, Allied Kajima Building, 138 Gloucester Road, Wan Chai, Hong Kong. 7. First Ascent Properties Finance Unit 1105, 11th Floor, Royal Commercial Limited Centre, 56 Parkes Street, Kowloon. 8. Charter Union Finance Limited Unit 1313, 13th Floor, New East Ocean Centre, 9 Science Museum Road, Tsim Sha Tsui, Kowloon. 9. Trustful Finance Limited 5th Floor, Early Light International Centre, 9 Ka Fu Close, Sheung Shui, New Territories. 10. Erika Financial Services Limited Suites 2301–2308, 23rd Floor, Shell Tower, Times Square, Causeway Bay, Hong Kong. 11. Sun Hung Kai Investment Services (1) 12th Floor, CITIC Tower, 1 Tim Mei Limited Avenue, Central, Hong Kong. (2) 16th Floor, Tower II, Admiralty Centre, 18 Harcourt Road, Hong Kong. -
Tsuen Wan(Revised After
District : Tsuen Wan Provisional District Council Constituency Areas +/- % of Population Estimated Quota Code Proposed Name Boundary Description Major Estates/Areas Population (16,964) K01 Tak Wah 21,075 +24.23 N Tai Ho Road North, Sai Lau Kok Road 1. CHUNG ON BUILDING 2. CITY LANDMARK I NE Sai Lau Kok Road 3. FOU WAH CENTRE E Sai Lau Kok Road, Shing Mun Road 4. HO FAI GARDEN 5. TAK YAN BUILDING (PART) : Kwan Mun Hau Street Stage 2 SE Kwan Mun Hau Street, Sha Tsui Road Stage 4 S Sha Tsui Road, Chuen Lung Street Stage 6 Stage 7 Ho Pui Street, Chung On Street Stage 8 SW Yeung Uk Road 6. THE BLUE YARD 7. TSUEN CHEONG CENTRE W Tai Ho Road 8. TSUEN WAN TOWN SQUARE NW Tai Ho Road, Tai Ho Road North 9. VISION CITY 10. WAH SHING BUILDING K1 District : Tsuen Wan Provisional District Council Constituency Areas +/- % of Population Estimated Quota Code Proposed Name Boundary Description Major Estates/Areas Population (16,964) K02 Yeung Uk Road 19,935 +17.51 N Sha Tsui Road, Kwan Mun Hau Street 1. BO SHEK MANSION 2. CHELSEA COURT Castle Peak Road - Tsuen Wan 3. EAST ASIA GARDENS NE Castle Peak Road - Tsuen Wan 4. HARMONY GARDEN 5. INDI HOME Texaco Road Flyover, Texaco Interchange 6. NEW HAVEN Texaco Road 7. TSUEN WAN GARDEN E Texaco Road, Texaco Road Flyover 8. WEALTHY GARDEN SE Texaco Road S Texaco Road, Tsuen Tsing Interchange Tsuen Wan Road SW Tsuen Wan Road, Texaco Road W Texaco Road, Ma Tau Pa Road Yeung Uk Road, Chung On Street Ho Pui Street NW Chuen Lung Street K2 District : Tsuen Wan Provisional District Council Constituency Areas +/- % of Population Estimated Quota Code Proposed Name Boundary Description Major Estates/Areas Population (16,964) K03 Hoi Bun 19,641 +15.78 N 1. -
PWSC(2014-15)3 on 8 April 2014
For discussion PWSC(2014-15)3 on 8 April 2014 ITEM FOR PUBLIC WORKS SUBCOMMITTEE OF FINANCE COMMITTEE HEAD 704 – DRAINAGE Environmental Protection – Sewerage and sewage treatment 401DS – Feasibility study on relocation of Sham Tseng sewage treatment works to caverns Members are invited to recommend to the Finance Committee the upgrading of 401DS to Category A at an estimated cost of $39.2 million in money-of-the-day prices for carrying out a feasibility study on relocation of Sham Tseng sewage treatment works to caverns. PROBLEM We need to ascertain the feasibility for the relocation of Sham Tseng sewage treatment works (STSTW) to caverns in order to release the existing site for housing or other uses. PROPOSAL 2. The Director of Drainage Services, with the support of the Secretary for Development, proposes to upgrade 401DS to Category A at an estimated cost of $39.2 million in money-of-the-day (MOD) prices for carrying out a feasibility study and the associated site investigation works on relocation of STSTW to caverns. /PROJECT ….. PWSC(2014-15)3 Page 2 PROJECT SCOPE AND NATURE 3. We propose to upgrade 401DS to Category A, comprising – (a) detailed engineering feasibility study including relevant preliminary technical and impact assessments1, preparation of an outline design of engineering works, formulation of implementation strategies and programmes etc. for relocation of STSTW to caverns and the associated works2; (b) planning review with broad technical assessment of the future land use of the existing site of STSTW for the purpose of establishing a business case for the relocation proposal; (c) public engagement (PE) and consultation exercises with relevant stakeholders; and (d) site investigation and other investigations3. -
Feasibility Study on Relocation of Sham Tseng Sewage Treatment Works To
CB(1)1100/13-14(03) For discussion on 25 March 2014 Legislative Council Panel on Development 401DS – Feasibility study on relocation of Sham Tseng sewage treatment works to caverns 402DS – Feasibility study on relocation of Sai Kung sewage treatment works to caverns 195WC – Feasibility study on relocation of Diamond Hill fresh water and salt water service reservoirs to caverns PURPOSE This paper seeks Members’ support on the proposals to upgrade 401DS, 402DS and 195WC to Category A at an estimated cost of $39.2 million, $40.6 million and $46.0 million respectively in money-of-the-day (MOD) prices to carry out feasibility studies on relocation of Sham Tseng sewage treatment works (STSTW), Sai Kung sewage treatment works (SKSTW) and Diamond Hill fresh water and salt water service reservoirs (DHSRs) to caverns. PROJECT SCOPE AND NATURE 2. The scope of 401DS (the STSTW Study) and 402DS (the SKSTW Study), which we propose to upgrade to Category A, comprises – (a) detailed engineering feasibility studies including relevant preliminary technical and impact assessments1, preparation of an outline design of engineering works, formulation of implementation strategies and programmes etc. for relocation of STSTW and SKSTW to caverns and the associated works2; 1 The preliminary technical and impact assessments cover sewage and sludge treatments, sewerage, geotechnical, environmental, drainage, traffic, waterworks, utilities, land requirement and land use aspects. 2 The associated works include – (a) rehabilitation, modification or improvement of the upstream sewerage in relation to relocation of STSTW and SKSTW to caverns; (b) rehabilitation, modification or improvement of the existing submarine outfalls or construction of new outfalls for connecting with the relocated STSTW and SKSTW; (c) demolition of the existing STSTW and SKSTW; and (d) ancillary works.