i

Due Diligence Report on Environment and Social Safeguards

Final Report August 2013

UZB: Housing for Integrated Rural Development Investment Program

Prepared by: Odil Akbarov, National Safeguards Specialist (Staff Consultant)

ii

ABBREVIATIONS

ADB Asian Development Bank DDR Due Diligence Review EIA Environmental Impact Assessment Housing for Integrated Rural Development HIRD Investment Program State committee for land resources, geodesy, SCLRGCSC cartography and state cadas tre SCAC State committee of architecture and construction NPC Nature Protection Committee MAWR Ministry of Agriculture and Water Resources QQB Qishloq Qurilish Bank QQI Qishloq Qurilish Invest

This Due Diligence Report on Environmental and Social Safeguards is a document of the borrower. The views expressed herein do not necessarily represent those of ADB's Board of Directors, Management, or staff, and may be preliminary in nature.

In preparing any country program or strategy, financing any project, or by making any designation of or reference to a particular territory or geographic area in this document, the Asian Development Bank does not intend to make any judgments as to the legal or other status of any territory or area.

iii

TABLE OF CONTENTS

A. INTRODUCTION ...... 4 B. SUMMARY FINDINGS ...... 4 C. SAFEGUARD STANDARDS ...... 4 D. DUE DILIGENCE PROCESS...... 5 E. FINDINGS AND FOLLOW UP ACTIONS ...... 9 F. RECOMMENDATIONS ...... 10

4

A. INTRODUCTION

1. To mitigate risks associated with inappropriate land selection an independent review of the HIRD safeguard due diligence process was commissioned for HIRD 2013 new housing sites (massifs).1 While the review was initially planned to be undertaken on a sample basis, it was determined that a 100% due diligence review would improve implementation of HIRD safeguard requirements nationwide, strengthen capacity of participating technical agencies, and better ensure compliance.

B. SUMMARY FINDINGS

2. Of the 410 massifs proposed and considered for HIRD 2013, 346 massifs were approved for new construction of HIRD 2013 rural houses. For each of the approved massifs, a safeguard due diligence review was undertaken and compliance with national and ADB environmental and social safeguard requirements confirmed. The safeguard review process was undertaken in close coordination with the PIU and relevant technical agencies to ensure timely briefing and immediate corrective action on all GOU and ADB safeguard issues.

3. The safeguard due diligence review encompassed: a. A review of ADB and GOU safeguards requirements. b. An initial screening of massifs based on information provided by GOU. c. Field assessment of environmental and social risks and land acquisition or resettlement issues.

4. A desk review was undertaken of land selection documents and assessments and certifications required from technical agencies for each of the 346 massifs. The documentation review was undertaken over an eight month period from November 2013 to mid August 2013.

5. Site inspections were scheduled by region, and coordinated with the rollout of the HIRD 2013 tender and procurement process. Regional site inspections included a briefing on safeguard issues and ADB and GOU safeguards requirements for participating staff of regional and district local governments and technical agencies. Site inspections were undertaken starting mid February 2013 to end May 2013.

6. Findings of the safeguard due diligence review, were presented at a week long training of the trainers session in mid October 2012, attended by HIRD PIU, safeguard staff from QQB, QQI, and participating staff from regional and district local governments and technical agencies. C. SAFEGUARD STANDARDS

7. ADB Safeguard Policy Statement. The safeguard review was conducted on the basis of policy guidance provided by the ADB Safeguard Policy Statement (SPS) (2009) under three key areas: environment, involuntary resettlement, and indigenous peoples.

8. For safeguard purposes, HIRD is classified as FI category C. HIRD land selection criteria as specified by Tranche 2 loan and project agreements were used as a basis for the safeguard review. Criteria applied are: a. The site of the house plot must be on land approved by the District Hokimiyat for residential use. b. The site of the house plot must be on land that was classified as reserved land by the local government or administered by state agencies not later than 31 December 2010 for Tranche 2.

1 For HIRD 2013 this review was commissioned by ADB URM.

5

c. The activities financed under the mortgage will not cause involuntary resettlement or have an adverse effect on Indigenous People, including any adverse effect on any third party land user of site where the house plot is located. d. The site of the house plot must not be situated in or near an area that has been classified as an environmentally sensitive area by the Regional Nature Protection Committee or the State Committee for Geodesy and Mineral Resources. e. The site must have an environmental clearance from the Regional Nature Protection Committee. f. ADB's prohibited investment activity list applies as appended to the Loan Agreement.

9. GOU Safeguards. The safeguard review was conducted based on government safeguards regulations implemented by mandated technical agencies and state committees.2 The safeguard review confirmed that the following assessments and certifications were completed: a. Soil, geology, hydrology, groundwater, and sanitation assessments as undertaken by regional and district branches of responsible technical agencies. b. Certification of infrastructure requirements, i.e., access to water supply, gas and electricity networks, and fire safety arrangements issued by district branches of relevant agencies. c. Environmental assessments as approved by NPC, which includes: (i) confirmation by NPC that the proposed housing site is not located in an environmetally sensitive area, (ii) an environmental impact proposal prepared by QQI, and (iii) an environmental impact assessment (EIA) carried out by the NPC regional department of the NPC.

D. DUE DILIGENCE PROCESS

10. Scope of Work. The first list of proposed massifs was prepared in September- October 2012, and subject to numerous revision prior to being finalized in August 2013. Table 1 reflects the extensive changes made.

Table 1: Summary of Amendments Made to the List of Housing Sites January 2013 April 2013 Reduced* Increased** New*** Reduced Increased New National 31 69 65 20 13 6 Karakalpakstan 3 4 8 2 2 - Andijan 3 8 5 1 1 - 1 5 3 1 - 1 Djizak - 8 6 - - 1 Kashkadarya - 7 1 - - 1 Navoiy 2 3 4 - - - Namangan 5 3 10 - - - Samarkand 5 12 5 3 3 - Surkhandarya - 9 5 1 1 - Sirdarya - 4 - - - 1 Tashkent 8 2 8 - - - Ferghana 1 2 8 2 3 - Khorezm 3 2 2 10 3 2 * Sites with reduced number of houses ** Sites with increased number of houses *** Newly selected sites

2 Attachment 1: List of agencies and mandates involved in the GOU Safeguard process.

6

11. Desk Review. A two phased desk review was undertaken. Phase 1 comprised a review of (i) ADB Safeguard Policy Statement (SPS) (2009), and (ii) all relevant government legislation and regulations on national social and environmental safeguard requirements.

12. Regulation of Land Acquisition and Resettlement. In all land acquisition and/or resettlement is subject to the following laws and regulations:

i. Law on “State Cadastre”, N171-II, December 2000. ii. Law on “State Land Cadastre”, N666-I, August 1998, amended 2002-2004. iii. Cabinet of Ministers Resolution on “Approval of the Regulation on the order of adjudication of land disputes in the Republic of Uzbekistan”, №246, May 1992. iv. Cabinet of Minister Resolution on “Order of realization into private property of objects of trade and public services together with land plots, where they are located, and land plots into life inherit tenure”, №126, April 1995, amended CoM Resolution № 202, April 1999. v. Cabinet of Ministers Resolution on “Land Acquisition and Compensation for State and public needs” № 97, May 2006 vi. Cabinet of Ministers Resolution on “Procedure for granting land for urban development and other non-agricultural activities”, № 146, May 2011.

13. Regulation of Environmental Issues. In accordance with national environmental legislation3, an environmental assessment must be conducted for all types of construction activities. The scope of the environmental assessment is defined in the Appendix to the Resolution of CoM No.491, dated 31.12.2001. Based on this Resolution, HIRD rural house construction activity is categorized as Class 4, having a low environmental impact.4 As a Class 4 activity,5 an environmental impact statement (EIS) must be prepared, and environmental clearance for each massif obtained from the regional NPC, prior to commencing construction works. During construction, the district NPC is required to monitor compliance with national legislation. Applicable environmental laws include:

i. Law on Nature Protection, 09.12.1992 ii. Law on Water and Water Use, 06.05.1993. iii. Law on Atmosphere Air Protection, 27.12.1996 iv. Law on Flora Protection and Management, 26.12.1997. v. Law on Wildlife Protection and Management. 26.12.1997. vi. Law on Forest, 15.04.1999. vii. Law on Mineral Resources, 23.09.1994. viii. Law on Waste, 2002. ix. Law on Protection of Archeological Monuments, 13.10.2009. x. Law on Environmental Control (Supervision), 12.12.2013

14. Phase 2 comprised a desk review of land selection documentation and social and environmental safeguard documentation specific to each proposed HIRD 2013 new housing site. Phase 2 of the desk review was initiated in November 2012 and conducted in parallel to the rollout of the field inspection and site validation process. Finalization of Phase 2 of the desk review of documentation for all 346 HIRD 2013 massifs, was completed mid August 2013. For each of 346 massifs the documentation review encompassed a review of: (i) the Order of the Hokim on land selection; (ii) assessments and clearances from district and regional departments of the SCAC, the State Committee for Land Resources, Geodesy,

3 Law on Nature Protection (1992) and Environmental Expertise (2000) 4 In accordance with Resolution of Cabinet Ministries #491 dated from 31.12.2001 all activities are classified into 4 categories depending on level of activity impact on environment. Category I is the highest impact and category IV is the lowest. . 5 Class 4 requires a project description and confirmation that the project will have only local impacts.

7

Cartography, and State Cadastre, the State Committee for Geology and Mineral Resources; and (iii) EIA reports from the NPC. For each massif documents reviewed totaled 40 to 77 pages whereby information was compiled in a table format on each massif that included: the massif location, the proposed number of houses in each massif, and the issues noted during the desk review. A list of documents reviewed for each massif is presented in Table 2.

Table 2: Land Selection and Safeguard Documents Reviewed 6

No. of № Issuing Agency Document Pages 1. Regional or district Hokimiyat Hokimiyat Decree on Site Selection 1-3 2. Hokimiyat Decree on Land Plot Regional or district Hokimiyat 1-3 Allocation 3. Hokimiyat Decree on Land Regional or district Hokimiyat 1-3 Reservat ion (if relevant) 4. Regional committee composed of regional/district “Dalolatnoma” Committee Document representatives of Hokimiyat and relevant technical on Site Selection 1-6 agencies 5. Regional or district department of State Committee Site Selection Conclusion of Land Resources, Geodesy, Cartography and 1-4 Cadastre Agency 6. Regional or district department of State Committee Site Map of Land Resources, Geodesy, Cartography and 1 Cadastre Agency 7. Regional or district department of State Committee Land Book Extract (detailing type and of Land Resources, Geodesy, Cartography and quantity of land) 3 Cadastre Agency 8. Regional or district department of State Committee Land Inventory Extract (if relevant) of Land Resources, Geodesy, Cartography and 10 Cadastre Agency 9. SCAC ADA parts 1 and 2 10 -30 10. NPC Environmental Conclusion (EIA) 3-6 11. District Sanitary Epidemiology agency of Ministry of Sanitary Epidemiology Conclusion (if 2 Health requested) 12. QQL and District Office of State Committee of Masterplan 1 Architecture and Construction 13. District Hokimiyat or QQI Photos 5

15. Field Inspection and Site Validation. Regional visits of the safeguard review team were organized with logistical and technical support provided by SCAC and QQI. In addition to site visits to each of 346 HIRD 2013 massifs, each regional visit involved consultation and briefings held with regional and district Hokimiyat staff and regional and district representatives of the SCAC and State Committee of Land Resources, Geodesy, Cartography and Cadastre Agencies, and regional and district staff of QQL and QQI. Table 3 provides a list of agencies and staff met in each of 13 regions visited.

Table 3: List of HIRD Regional/District Safeguard Stakeholders

Agency Title Regional Local Government Deputy Hokim of Province for Construction SCAC Regional Chief Architect /Head of Department State Committee for Land Resources, Geodesy, Regional Head of Department Cartography and State Cadastre Qishloq Qurilish Invest Regional Head District Local Government District Deputy Hokim for Construction

6 Appendix 2 provides a description of all key documents reviewed.

8

SCAC District Chief Architect/ Head of Department State Committee for Land Resources, Geodesy, District Head of Department Cartography and State Cadastre Qishloq Qurilish Invest Technical Inspectors (2-5 per region)

16. Regional visits of the safeguard review team were scheduled prior to the roll out of HIRD 2013 tender and procurement process in each region. Table 4 outlines the schedule of regional visits made by each safeguard reviewer.

Table 4: Field Inspection and Site Validation Schedule

Regions Visited by Regions Visited by Regions Visited by Field Visit Safeguard Reviewer 1 Safeguard Reviewer 2 Safeguard Reviewer 3 22.11.2012 Syrdarya Syrdarya Syrdarya 23.11.2012 - Bukhara - 24.11.2012 Samarqand Bukhara Andijan 25.11.2012 Samarqand Bukhara Andijan 26.11.2012 Samarqand Bukhara Andijan 27.11.2012 Samarqand Bukhara Andijan 28.11.2012 Samarqand/Kashkadrya Bukhara/Navoi Andijan/Ferghana 29.11.2012 Kashkadarya Navoi Ferghana 30.11.2012 Kashkadarya Navoi Ferghana 01.12.2012 Kashkadarya Navoi/Djizzakh Ferghana 02.12.2012 Surkhandarya Djizzakh - 03.12.2012 Surkhandarya Djizzakh - 04.12.2012 Surkhandarya Djizzakh Karakalpakstan 05.12.2012 - Namangan Karakalpakstan 06.12.2012 - Namangan Karakalpakstan 07.12.2012 - Namangan Karakalpakstan 08.12.2012 - Namangan Karakalpakstan /Khorezm 09.12.2012 - Namangan Khorezm 10.12.2012 - Namangan Khorezm 11.12.2012 - Namangan Khorezm 12.12.2012 - - Khorezm 13.12.2012 - Tashkent - 14.12.2012 - Tashkent - 15.12.2012 - Tashkent - 17.12.2012 - Tashkent - 18.12.2012 - Tashkent - 19.12.2012 - Tashkent -

17. A field inspection and site validation visit was made to each of 346 HIRD massifs to confirm the following:

a. The site must be on land approved by the District Hokimiyat for residential use. b. The site has been classified as state-owned/state-reserve land for residential use by the District Hokimiyat since 31 December 2010 (for HIRD 2013), and will not cause any involuntary resettlement or have any adverse effect on any third-party land users.

9

c. The site must not be situated in or near an area that has been classified as an environmentally sensitive area by the Regional NPC or the State Committee for Land Resources, Geodesy, Cartography and State Cadastre. d. An EIA has been undertaken of the site and the site has been cleared for new residential construction and has an environmental clearance by the Regional Nature Protection Committee.

18. The table prepared for the desk review stage was updated to reflect findings in the field, and also to track follow up actions by the safeguard team to discuss and resolve social and environmental safeguard issues identified during the desk review and during site visits.7 Field findings were regularly communicated to the MOE PIU and to ADB to support timely coordination of HIRD 2013 tender and procurement process. The table with information by massif is attached as Appendix 3.

19. On-site Advisory Support. Follow up discussions and debriefing sessions were held with regional and district officials to resolve issues identified during the desk review and the field inspection and site validation visits to each massif. These discussions supported timely resolution of social and environmental safeguard issues identified during the safeguard review process.

E. FINDINGS

20. Compliance with ADB and GOU safeguard requirements was confirmed for 346 massifs located in 155 rural districts across 13 regions, based on a safeguard review of review of key site documents and a site inspection visit to each massif. Of the 410 sites proposed, GOU safeguard issues were identified in 41 sites, ADB safeguard issues were identified in 34 sites, and a range of other issues were identified in 80 sites. In total 36 sites were subsequently dropped. Table 5 provides a regional breakdown of sites in which GOU or ADB issues were identified or were subsequently dropped.

Table 5: Safeguard Review Findings by Region

Sites with Sites with Sites Sites with Sites GOU ADB Sites Sites Approved Region Other Proposed Safeguard Safeguard Dropped Approved as % of Issues Issues Issues Sites Proposed National 410 41 34 80 36 346 84% Karakalpakstan 24 - - 1 6 18 75% Andijan 48 - 3 10 2 46 96% Bukhara 38 2 2 19 - 32 84% Djizak 23 4 1 2 1 22 96% Kashkadarya 29 10 4 1 4 24 83% Navoiy 21 2 1 - 1 19 90% Namangan 41 5 1 18 6 34 83% Samarkand 31 10 6 1 1 30 97% Surkhandarya 24 1 5 - 1 23 96% Sirdarya 9 1 1 1 1 8 89% Tashkent 56 3 4 12 11 31 55% Ferghana 37 2 3 12 2 30 81% Khorezm 29 1 3 3 - 29 100%

7 This table served as a starting point for the development of an HIRD site inspection form. The HIRD site inspection form supports data collection and serves as a checklist for each massif to document site conditions, to confirm site assessments and certifications, and to confirm infrastructure access.

10

21. GOU Safeguard Issues. The following GOU safeguard issues were noted and acted upon: (i) the massif was located on agricultural land; (ii) changes in massif; (iii) buffer zone required to meet environmental and sanitary-epidemiology norms.

22. Environmental Assessment. All investigated sites had acquired positive EIA reports from the District Environmental Department. Nevertheless of issued positive EIA report the District Environmental Department should routinely monitor the construction process. Monitoring is aimed on checking of fulfillment of EIA requirements before, during and after construction process i.e. conservation of available trees, cutting and moving fertile topsoil, avoid area pollution and so on.

23. ADB Safeguard Issues. Issues with involuntary resettlement and the land not being State Reserve for more than 2 years were noted in the safeguards review and appropriate action taken.

24. Land Acquisition and Resettlement. A significant number of massifs checked were not sufficiently documented regarding land acquisition and resettlement. It was necessary in many cases, to further explain the requirements and to request resubmission of documentation. A full list of examined sites with remarks is provided in Appendix 3.

25. Indigenous peoples. No adverse impact was noted as the national population does not include people defined by ADB SPS 2009 as Indigenous Peoples.

26. Other Safeguard Issues. Massifs with missing required supporting documents were dropped by Hokimiyats or rejected during DD process.

Table 6: Safeguard Review Issues by Type

No. of Issues Action Taken to Resolve Sites GOU Safeguard Issue Documents provided to confirm site is classified as non- agricultural land 22 Possible agricultural land Change of land category to non-agricultural Site design changed to eliminate impact on agricultural land Ineligible land category (high quality 1 Dropped / rejected agricultural Land) 18 Buffer zone required Site design changed to create buffer zone ADB Safeguard Issue 25 Possible land acquisition Site plan altered to eliminate land acquisition issue 6 Involuntary Resettlement Dropped / rejected 3 Not State Reserve for ≥ 2 years Dropped / rejected Other Issue 12 Incomplete documents Dropped / rejected 68 Construction site not ready Site preparation

F. CONCLUSIONS AND RECOMMENDATIONS

27. Selection of Massifs. The first list of proposed massifs was prepared in September – October 2012 and subject to numerous revision prior to being finalized in August 2013.

Recommendation: The list of massifs should be finalized and safeguard due diligence reviews completed at least one year prior to planned construction starts to enable sufficient time to advertise and confirm HIRD homebuyers and complete the HIRD tender and procurement processes.

11

28. Scope of Review. Initially, the safeguard review targeted a 10% sample of massifs across 13 regions for site inspection. With extensive amendments to the list of massifs, and the type of issues that arose at the start of the review process, the target for site visits was increased to 30%. In consultation with the PIU and ADB, it was decided that a 100% due diligence review would better ensure compliance, in addition to strengthening the capacity of participating technical agencies, and improving the implementation of HIRD safeguard requirements nationwide.

Recommendation: With nationwide coverage, capacity gaps and high turnover among technical agencies responsible for land selection and safeguard due diligence processes, 100% site visits should be continued for the next phase of HIRD to mitigate safeguard risks and ensure appropriate compliance with GOU and ADB safeguard requirements.

29. EIA Requirements. The EIA of selected massifs should be performed as soon as possible after site selection in case of non-compliance. This will enable sufficient time to consider changes to the exisiting massif plan that will meet EIA requirements or identify an alternative massif.

Recommendation: Increased monitoring of site selection and closer coordination with NPC is required to ensure compliance with NPC environmental requirements.

30. Capacity Building. Extensive on-site advisory support was provided by the safeguard review team on ADB land selection requirements, and ADB/GOU land acquisition and environmental issues to regional and district HIRD stakeholders such as Hokimiyats, the State Committee for Land Resources, Cartography and State Cadastre, and the SCAC. Review findings were presented at a training of trainers workshop delivered by the safeguard review team in mid October 2012 to over 300 participants. The session was held in Tashkent with participation of PIU trainers and staff responsible for HIRD safeguards from QQB, QQI and participating technical agencies.

Recommendation: Training, regional advisory support, and debriefings on issues and follow up action required should be rolled out nationwide to strengthen the capacity of participating technical agencies, and improve the implementation of HIRD safeguard requirements nationwide. Safeguard capacity building of local government and key technical agencies should be offered prior to the start of the site selection process, with onsite advisory support and debriefings held in each region.

12

APPENDIXES

13

Appendix 1: Safeguard Technical Agencies

Agency Safeguard Mandate The State Committee • Ensure implementation of unified state policy on land management on Land Resources, • Regulate land issues Geodesy, Cartography • Manage and monitor land use and land protection and State Cadastre • Oversee preservation, improvement and restoration of soil fertility, and develop and implement government programs to improve soil fertility • Manage geodetic and cartographic activities, and supervise coordination of public cadastre activities • Maintain state land cadastre and unified system of state cadastres, state cartography, and state inventory of buildings Hydrogeology Institute • study and use of water resources (HYDROENGEO) • study and use of minerals in water resources • groundwater monitoring • study of the processes of pollution and depletion of water • study of hydrogeological and geotechnical conditions of mineral deposits • development of groundwater exploration technologies and their rational usage • development of technology of artificial recharge of fresh groundwater and preventing pollution Ministry of Health • Ensure sanitary and epidemiological welfare of the population. State Committee for • State control over environmental protection, use and reproduction of natural Nature Protection resources (NPC) • implementation of cross-sectoral integrated environmental management • development and implementation of a unified environment and resource policy • ensure a favorable ecological environment • environmental improvement Regional Design • undertake survey work on design Institute (SCAC Institute - GASHK -LITI) “Uzkommunxizmat” • introduction of advanced modern technology, machinery, equipment for control of Agency of Uzbekistan consumption of water and heat energy Suvoqava • coordination of activities of the inter-regional pipelines, ensuring their effective (Communal Water usage, reliable and stable operation Utility) Uztransgaz • Manage rational use, transportation and sale of natural gas to consumers within (National Gas the Republic of Uzbekistan Company) Uzbekenergo Joint • Manage nationwide electric power supply Stock Company (National Electricity Company) Ministry of Emergency • Develop and implement state policy in the field of disaster prevention, the Situations protection of life and health • Establish and manage state emergency warning system Ministry of Internal • Manage and supervise fire safety standards Affairs, Fire Safety Department State Committee for • monitoring the quality of design and construction works, Architecture and • compliance with legislation, regulations and standards in the planning and Construction (SCAC) development of rural settlements • coordinating and monitoring the progress of economic reforms in capital construction • improving the pricing system in construction • facilitate the future development of a competitive environment in the markets and project works, construction materials, the development of construction market infrastructure • monitoring the performance of contractual obligations entered into by the results of competitive bidding, overseeing quality and terms of construction Qishloq Qurilish • undertake survey work on design Loyiha (QQL) • ensure national design standards are met

14

Appendix 2: Land Selection and Safeguard Documents

Official Document Agency Purpose of Document Name The State Committee on Primary conclusion, Map location of proposed site and relevant Land Resources, topography and infrastructure and social facilities, Geodesy, Cartography information on land and State Cadastre allocated for construction of houses of standard design SCAC’s Institute- GASHK- Primary conclusion on Soil assessment of proposed site LITI land allocated for (to be included in specifications for detailed construction of houses of design, such as necessary foundation depth, standard design soil subsidence, depth of soil freeze, loam depth) Hydrogeology Institute Primary conclusion on Groundwater assessment of proposed site, land allocated for construction of houses of standard design Ministry of Health Primary conclusion on Sanitation assessment of proposed site land allocated for construction of houses of standard design State Committee for Primary conclusion on Environmental impact assessment of Nature Protection (NPC) environmental effects proposed site “Uzkommunxizmat” Technical assessment Confirmation and specification of source of Agency of Uzbekistan drinking water for proposed site Suvoqava (Communal Water Utility) Uztransgaz Technical assessment Confirmation and specification of access to (National Gas Company) gas network for proposed site Uzbekenergo Joint Stock Technical assessment Confirmation and specification of access to Company (National electricity network for proposed site Electricity Company) Ministry of Emergency Technical assessment Confirmation of safety and evacuation Situations arrangements for proposed site Ministry of Internal Technical assessment Confirmation of fire safety arrangements for Affairs, Fire Safety proposed site Qishloq Qurilish Loyiha Master plan Site master plan with housing lots specified, (QQL) Location of houses in massifs , road master plan, gas pipeline, electric power supply, and infrastructure State Committee for Architectural Design Certification of all required technical Architecture and Assignment (ADA) assessments completed for proposed site, Construction (SCAC) information on proposed site, conditions of proposed site

15

Appendix 3: Regional Summaries of Safeguard Review Findings, Followup Action, and Final Outcome of Review Process

Massif No. of № District (Village Assembly of Citizens, Village) Issues Identified Followup Action Outcome of Review Houses KFY MFI Bukhara 730 1 Romiton Shurcha Emgir kishlogi 18 Construction site not ready Site preparation ADB & GOU Safeguards Confirmed 2 Romiton Romiton Musicha 10 Construction site not ready Site preparation ADB & GOU Safeguards Confirmed 3 Romiton Kurgon Samosiy 12 Close to cropping field Change of site design ADB & GOU Safeguards Confirmed Kokishtovun akholi 4 Romiton Shurcha 10 Construction site not ready Site preparation ADB & GOU Safeguards Confirmed punkti Makhalla akholi 5 Peshku Kalaymirishkor 12 No issues identified ADB & GOU Safeguards Confirmed punkti 6 Peshku Ibn-Sino Makadit akholi punkti 16 Construction site not ready Site preparation ADB & GOU Safeguards Confirmed 7 Korakul Khujalar Khujalar 35 No issues identified ADB & GOU Safeguards Confirmed 8 Olot Talkonsayet Arabkhona 10 No issues identified ADB & GOU Safeguards Confirmed Change of site design, land 9 Olot Chandir Chagas kishlogi 10 Possible land acquisition ADB & GOU Safeguards Confirmed acqu isition eliminated. 10 Olot Guliston Khasabuyi kishlogi 10 No issues identified ADB & GOU Safeguards Confirmed 11 Gijduvon Sarmijon Labirut kishlogi 10 Construction site not ready Site preparation ADB & GOU Safeguards Confirmed Change of site design, land 12 Gijduvon F.Yunusov Khavzak kishlogi 12 Possible land acquisition ADB & GOU Safeguards Confirmed acquisition eliminated. 13 Gijduvon Zarangari Abadi kishlogi 25 Construction site not ready Site preparation ADB & GOU Safeguards Confirmed 14 Gijduvon Pozagar Tukol kishlogi 19 Construction site not ready Site preparation ADB & GOU Safeguards Confirmed 15 Gijduvon Sarmijon Naymanobod kishlogi 19 Construction site not ready Site preparation ADB & GOU Safeguards Confirmed 16 Gijduvon Armechan Setalon 20 Construction site not ready Site preparation ADB & GOU Safeguards Confirmed 17 Robatokhon Binokor kuchasi 15 Buffer zone required Change of site design ADB & GOU Safeguards Confirmed 18 Vobkent Kungirot Kosari kishlogi 10 No issues identified ADB & GOU Safeguards Confirmed 19 Vobkent Rabotakhon mfy Binokor kuchasi 30 No issues identified ADB & GOU Safeguards Confirmed Imomkozikhon 20 Vobkent Imomkozikhon 12 No issues identified ADB & GOU Safeguards Confirmed kishlogi 21 Bukhara Bogi kalon Yuzon kishlogi 30 No issues identified ADB & GOU Safeguards Confirmed 22 Bukhara Yurinbolo Yurinpoen kishlogi 10 Construction site not ready Site preparation ADB & GOU Safeguards Confirmed

16

23 Bukhara Sakhovat Talimuron kishlogi 10 No issues identified ADB & GOU Safeguards Confirmed 24 Bukhara Shekhoncha Shekhoncha kishlogi 72 No issues identified ADB & GOU Safeguards Confirmed 25 Bukhara Istikbol Rabotak kishlogi 56 No issues identified ADB & GOU Safeguards Confirmed 26 Bukhara Shergiron Chorbakir kishlogi 11 Construction site not ready Site preparation ADB & GOU Safeguards Confirmed 27 Puloti Kucha kishlogi 47 Construction site not ready Site preparation ADB & GOU Safeguards Confirmed 28 Kogon Beklar Shurobod kishlogi 1 64 Construction site not ready Site preparation ADB & GOU Safeguards Confirmed 29 Kogon Beklar Shurobod kishlogi 2 30 No issues identified ADB & GOU Safeguards Confirmed 30 Kogon Geofiziklar Dechafgon 20 No issues identified ADB & GOU Safeguards Confirmed 31 Korovulbozor Buzachi Sardoba kishlogi 25 No issues identified ADB & GOU Safeguards Confirmed 32 Shofirkon Savrak Zarchabek kishlogi 40 No issues identified ADB & GOU Safeguards Confirmed

17

Massif No. of № District (Village Assembly of Citizens, Village) Issues Identified Followup Action Outcome of Review Houses KFY MFI Navoi 600 1 Karmana Khazara Khazara 10 No issues identified ADB & GOU Safeguards Confirmed 2 Karmana Malikrabot Malik 75 No issues identified ADB & GOU Safeguards Confirmed 3 Karmana Yangiarik Vark 60 No issues identified ADB & GOU Safeguards Confirmed 4 Karmana Narpay Dustlik 175 No issues identified ADB & GOU Safeguards Confirmed 5 Kiziltepa Buston Uzbekiston 50 No issues identified ADB & GOU Safeguards Confirmed 6 Kiziltepa Buston Ruzibien 10 No issues identified ADB & GOU Safeguards Confirmed 7 Kiziltepa Buston Goibien 10 No issues identified ADB & GOU Safeguards Confirmed 8 Kiziltepa Zarmetan Azizobod 10 Possible agricultural land Non agricultural land confirmed ADB & GOU Safeguards Confirmed 9 Navbakhor Beshrabot Boykho 15 No issues identified ADB & GOU Safeguards Confirmed 10 Navbakhor Yangiyul Shurtepa 15 No issues identified ADB & GOU Safeguards Confirmed 11 Khatirchi Yangiyul Tamabakhrin 20 Possible agricultural land Non agricultural land confirmed ADB & GOU Safeguards Confirmed 12 Khatirchi Uzbekiston Galabek 10 No issues identified ADB & GOU Safeguards Confirmed 13 Khatirchi Olchinobod Kavish 20 No issues identified ADB & GOU Safeguards Confirmed 14 Khatirchi Uzbekiston Yangikishlok 10 No issues identified ADB & GOU Safeguards Confirmed 15 Nurota Gozgon Gozgon 15 No issues identified ADB & GOU Safeguards Confirmed 16 Nurota Nurota S.Eshon 10 No issues identified ADB & GOU Safeguards Confirmed 17 Konimekh Chordara Telemen 10 No issues identified ADB & GOU Safeguards Confirmed 18 Tomdi Tomdibulok Shark 50 No issues identified ADB & GOU Safeguards Confirmed 19 Uchkuduk L.Murashimov Bazar Jirau 25 No issues identified ADB & GOU Safeguards Confirmed

18

Massif No. of № District (Village Assembly of Citizens, Village) Issues Identified Followup Action Outcome of Review Houses KFY MFI Jizzakh 550 1 Zafarobod Birlik 20 No issues identified ADB & GOU Safeguards Confirmed 2 Arnasoy G.Gulom G.Gulom 20 No issues identified ADB & GOU Safeguards Confirmed 3 Bakhmal Oktosh Bunedkor kishlogi 50 No issues identified ADB & GOU Safeguards Confirmed Change of site design, land Possible land acquisition and 4 Gallaorol Mirzabulok Mulkush 20 acquisition and demolition ADB & GOU Safeguards Confirmed demolition eliminated Change of land category from 5 Gallaorol Moltob Moltob 35 Agricultural land category ADB & GOU Safeguards Confirmed agricultural to non-agricultural 6 Dustlik Mevazor Sanoat kuchasi 35 No issues identified ADB & GOU Safeguards Confirmed Mevazor 7 Dustlik Kholkhujaev kuchasi 20 No issues identified ADB & GOU Safeguards Confirmed (Navbakhor) 8 Jizzakh Uchtepa 55 Construction site not ready Site preparation ADB & GOU Safeguards Confirmed 9 Jizzakh Gandumtosh 30 Construction site not ready Site preparation ADB & GOU Safeguards Confirmed 10 Jizzakh Kushbarmok 15 No issues identified ADB & GOU Safeguards Confirmed 11 Jizzakh Pakhtaobod 9 No issues identified ADB & GOU Safeguards Confirmed 12 Jizzakh Kulama 21 No issues identified ADB & G OU Safeguards Confirmed 13 Jizzakh Okoltin 14 No issues identified ADB & GOU Safeguards Confirmed 14 Jizzakh Tokchilik 11 No issues identified ADB & GOU Safeguards Confirmed 15 Zarbdor Shodlik 35 No issues identified ADB & GOU Safeguards Confirmed 16 Zomin Shirin 15 No issues identified ADB & GOU Safeguards Confirmed 17 Zomin Gallakor Laylak uya kishlogi 40 No issues identified ADB & GOU Safeguards Confirmed 18 Mirzachul Galaba 30 No issues identified ADB & GOU Safeguards Confirmed 19 Pakhtakor Chamanzor 20 No issues identified ADB & GOU Safeguards Confirmed 20 Pakhtakor Pakhtakor 20 No issues identified ADB & GOU Safeguards Confirmed 21 Yangiobod Khovos Pastki chakir 10 No issues identified ADB & GOU Safeguards Confirmed 22 Forish Osmonsoy Tutak kishlogi 25 No issues identified ADB & GOU Safeguards Confirmed

19

Massif No. of № District (Village Assembly of Citizens, Village) Issues Identified Followup Action Outcome of Review Houses KFY MFI Namangan 700 1 Uychi Erkurgon Tepasaroy mfy 22 Construction site not ready Site preparation ADB & GOU Safeguards Confirmed Kurgoncha mfy 2 Uychi Uychi 10 Possible agricultural land Non agricultural land confirmed ADB & GOU Safeguards Confirmed (Umid) 3 Uychi Uychi Kurgoncha mfy 10 Construction site not ready Site preparation ADB & GOU Safeguards Confirmed 4 Uychi Uychi Soku 10 Construction site not ready Site preparation ADB & GOU Safeguards Confirmed 5 Uychi Jiydakapa Dustlik 25 Construction site not ready Site preparation ADB & GOU Safeguards Confirmed 6 Turakurgon Burmatut Buramatut mfy 10 Construction site not ready Site preparation ADB & GOU Safeguards Confirmed 7 Turakurgon Shakhand Uzbekiston mfy 8 Construction site not ready Site preparation ADB & GOU Safeguards Confirmed 8 Turakurgon Sayram Chustkuprik 20 No issues identified ADB & GOU Safeguards Confirmed 9 Turakurgon Sayram Isvakhon 35 No issues identified ADB & GOU Safeguards Confirmed 10 Yangikurgon Zarkent Madaniyat mfy 10 No issues identified ADB & GOU Safeguards Confirmed 11 Yangikurgon Zarbdor Guliston 12 No issues identified ADB & GOU Safeguards Confirmed 12 Yangikurgon Zarbdor Tinchlik 10 No issues identified ADB & GOU Safeguards Confirmed 13 Yangikurgon Navkent Khurriyat 10 No issues identified ADB & GOU Safeguards Confirmed 14 Yangikurgon Nanay Kiziljozi 30 No issues identified ADB & GOU Safeguards Confirmed 15 Kosonsoy Korasuv Korasuv 50 Possible agricultural land Non agricultural land confirmed ADB & GOU Safeguards Confirmed 16 Kosonsoy Chindovul Dadakhonov 10 No issues identified ADB & GOU Safeguards Confirmed 17 Kosonsoy Obod 25 No issues identified ADB & GO U Safeguards Confirmed 18 Uchkurgon Khamza Kattamugol 10 Construction site not ready Site preparation ADB & GOU Safeguards Confirmed 19 Uchkurgon Kugay ulmas Shakhrikhonchek 10 Construction site not ready Site preparation ADB & GOU Safeguards Confirmed 20 Uchkurgon Khamza Khamza 10 Buffer zone required Change of site design ADB & GOU Safeguards Confirmed 21 Uchkurgon Yangier Yangier 28 No issues identified ADB & GOU Safeguards Confirmed Sabzazor-3 akholi 22 Chust Sabzazor MMTP 75 Possible agricultural land Non agricultural land confirmed ADB & GOU Safeguards Confirmed punkti 23 Chortok Peshkurgon Tupkayrogoch 10 Construction site not ready Site preparation ADB & GOU Safeguards Confirmed 24 Chortok Koroskon Bog 11 Construction site not ready Site preparation ADB & GOU Safeguards Confirmed 25 Chortok Koroskon Tinchlik 27 Construction site not ready Site preparation ADB & GOU Safeguards Confirmed

20

26 Chortok Koroskon Sarkor 22 Construction site not ready Site preparation ADB & GOU Safeguards Confirmed Change of site design, land Land acquisition and demolition 27 Pop Pop Uchbular kishlogi 70 acquisition and demolition ADB & GOU Safeguards Confirmed of structures eliminated. A.Shamsiddinov 28 Norin Tuda 15 Possible agricultural land Non agricultural land confirmed ADB & GOU Safeguards Confirmed kishlogi 29 Norin Kurgontepa Galaba massivi 15 Construction site not ready Site preparation ADB & GOU Safeguards Confirmed 30 Mingbulok Oltinkul Mulkobod 10 Construction site not ready Site preparation ADB & GOU Safeguards Confirmed 31 Mingbulok Jomashuy Kurikobod 20 Construction site not ready Site preparation ADB & GOU Safeguards Confirmed 32 Namangan Bogishamol Kurama kishlogi 18 Construction site not ready Site preparation ADB & GOU Safeguards Confirmed 33 Namangan Irvadon Irvadon kishlogi 22 Construction site not ready Site preparation ADB & GOU Safeguards Confirmed Yukori Rovuston 34 Namangan mirishkor 20 Construction site not ready Site preparation ADB & GOU Safeguards Confirmed kishlogi

21

Massif No. of № District (Village Assembly of Citizens, Village) Issues Identified Followup Action Outcome of Review Houses KFY MFI Ferghana 850 1 Kushtepa Korakushchi Beshkapa 50 Construction site not ready Site preparation ADB & GOU Safeguards Confirmed 2 Yozyovon Khonobod Sovjoni 10 No issues identified ADB & GOU Safeguards Confirmed 3 Yozyovon Yozyovon Beruniy mfy 10 No issues identified ADB & GOU Safeguards Confirmed 4 Uchkuprik Uchkuprik Uchkuprik kishlogi 50 Construction site not ready Site preparation ADB & GOU Safeguards Confirmed 5 Furkat Tomosha Surpa kishlogi 30 No issues identified ADB & GOU Safeguards Confirmed 6 Besharik Yakkatut Buston-2 kishlogi 16 No issues identified ADB & GOU Safeguards Confirmed 7 Buvayda Ibrat ShFY Maslakhat kilshogi 35 Construction site not ready Site preparation ADB & GOU Safeguards Confirmed 8 Dangara Okjar Bino kishlogi 15 No issues identified ADB & GOU Safeguards Confirmed 9 Dangara Taypok Kum kishlogi 15 Construction site not ready Site preparation ADB & GOU Safeguards Confirmed 10 Toshlok Birlik Yakkatut 20 Construction site not ready Site preparation ADB & GOU Safeguards Confirmed 11 Toshlok Arabmozor Tegirmonboshi 30 No issues identified ADB & GOU Safeguards Confirmed 12 Rishton Buston Vokhim 15 No issues identified ADB & GOU Safeguards Confirmed 13 Rishton Ok er Ok er 20 No issues identified ADB & GOU Safeguards Confirmed 14 Rishton Rishton Abdullobaen kishlogi 10 Possible agricultural land Non agricultural land confirmed ADB & GOU Safeguards Confirmed 15 Uzbekiston Konizar Khaydarobod kishlogi 10 No issues identified ADB & GOU Safeguards Confirmed 16 Uzbekiston Mintut Khasanobod 30 No issues identified ADB & GOU Safeguards Confirmed 17 Uzbekiston Mintut Yangikhaet 55 No issues identified ADB & GOU Safeguards Confirmed 18 Kuva Namuna Pakhtaobod kishlogi 17 Construction site not ready Site preparation ADB & GOU Safeguards Confirmed Gulobod mfy,Ziekor 19 Kuva 18 No issues identified ADB & GOU Safeguards Confirmed kuchasi 20 Oltiarik Fayziobod Ustoz kishlogi 12 Construction site not ready Site preparation ADB & GOU Safeguards Confirmed Change of site design, land Land acquisition and demolition 21 Oltiarik Yangikurgon Beshkovok kishlogi 11 acquisition and demolition ADB & GOU Safeguards Confirmed of structures eliminated. 22 Oltiarik Gayrat Jarkurgon 37 No issues identified ADB & GOU Safeguards Confirmed 23 Oltiarik Povulgon Povulgon 10 No issues identified ADB & GOU Safeguards Confirmed Land acquisition and demolition Change of site design, land 24 Oltiarik Yangikurgon Yuksalish kishlogi 10 ADB & GOU Safeguards Confirmed of structures acquisition and demolition

22

eliminated. 25 Oltiarik Zilkha Kurgoncha kishlogi 10 No issues identified ADB & GOU Safeguards Confirmed 26 Bagdod Samarkand Samarkand kishlogi 40 No issues identified ADB & GOU Safeguards Confirmed 27 Besharik Yakkatut Buston kishlogi 37 Construction site not ready Site preparation ADB & GOU Safeguards Confirmed 28 Fargona Chekshura 137 Construction site not ready Site preparation ADB & GOU Safeguards Confirmed Logon-Makhkam- 29 Fargona Logon 40 Buffer zone required Change of site design ADB & GOU Safeguards Confirmed Khakimobod masivi 30 Fargona Logon Mashal 50 Construction site not ready Site preparation ADB & GOU Safeguards Confirmed

23

Massif No. of № District (Village Assembly of Citizens, Village) Issues Identified Followup Action Outcome of Review Houses KFY MFI Andijan 900 1 Kurgontepa Savay S.Rakhimov 18 Construction site not ready Site preparation ADB & GOU Safeguards Confirmed Change of site design, land Land acquisition and demolition 2 Kurgontepa Kurgontepa Uchkun 10 acquisition and demolition ADB & GOU Safeguards Confirmed of structures eliminated. 3 Kurgontepa Kurgontepa Eshonkishlok 10 Construction site not ready Site preparation ADB & GOU Safeguards Confirmed 4 Kurgontepa Kurgontepa Toshkurgon 10 No issues identified ADB & GOU Safeguards Confirmed 5 Shakhrikhon Pakhaobod Segaza 10 No issues identified ADB & GOU Safeguards Confirmed 6 Shakhrikhon Pakhaobod Segaza (Anteks) 26 No issues identified ADB & GOU Safeguards Confirmed 7 Shakhrikhon Nazarmakhram Kurgoncha 15 No issues identified ADB & GOU Safeguards Confirmed 8 Shakhrikhon Uzbekiston Kurgoncha 10 No issues identified ADB & GOU Safeguards Confirmed 9 Khujaobod Birlashgan Khidirsha 30 No issues identified ADB & GOU Safeguards Confirmed 10 Khujaobod Manak Manak 20 No issues identified ADB & GOU Safeguards Confirmed 11 Ulugnor Ok oltin Bobur kishlogi 25 No issues identified ADB & GOU Safeguards Confirmed 12 Pakhtaobod Buston Dustlik 10 No issues identified ADB & GOU Safeguards Confirmed 13 Pakhtaobod Buston Navbakhor 15 No issues identified ADB & GOU Safeguards Confirmed 14 Pakhtaobod Ittifok Nodirabegim 18 No issues identified ADB & GOU Safeguards Confirmed 15 Markhamat Kutarma Ukchi 10 No issues identified ADB & GOU Safeguards Confirmed 16 Markhamat Markhamat G.Gulom 11 No issues identified ADB & GOU Safeguards Confirmed 17 Markhamat Korakurgon Gar Gar 11 No issues identified ADB & GOU Safeguards Confirmed 18 Markhamat Kutarma Dorboz 10 No issues identified ADB & GOU Safeguards Confirmed 19 Oltinkul Kushtepasaroy Urta 10 No issues identified ADB & GOU Safeguards Confirmed 20 Oltinkul Oltinkul Buston 10 No issues identified ADB & GOU Safeguards Confirmed 21 Oltinkul Oltinkul Ittifok 20 No issues identified ADB & GOU Safeguards Confirmed 22 Oltinkul Kumakay Kumakay 37 No issues identified ADB & GOU Safeguards Confirmed 23 Izboskan Erkin Kugay 10 No issues identified ADB & GOU Safeguards Confirmed 24 Izboskan Urtoklar Kushkuprik 35 Construction site not ready Site preparation ADB & GOU Safeguards Confirmed 25 Jalakuduk Oyim Uzbekiston 10 Land acquisition and demolition Change of site design, land ADB & GOU Safeguards Confirmed

24

of structures acquisition and demolition eliminated. 26 Jalakuduk Guliston Kessak 15 Construction site not ready Site preparation ADB & GOU Safeguards Confirmed 27 Jalakuduk Erkishlok Toshkhovuz 15 No issues identified ADB & GOU Safeguards Confirmed 28 Jalakuduk Abdullabiy Ibrat 10 No issues identified ADB & GOU Safeguards Confirmed 29 Bulokboshi Shirmonbulok Tinchlik, 10 No issues identified ADB & GOU Safeguards Confirmed 30 Bulokboshi Bulokboshi T.Rakhimov 10 No issues identified ADB & GOU Safeguards Confirmed 31 Bulokboshi Shirmonbulok Shirmonbulok 10 No issues identified ADB & GOU Safeguards Confirmed Change of site design, land Land acquisition and demolition 32 Buz Dustlik 14 acquisition and demolition ADB & GOU Safeguards Confirmed of structures eliminated. 33 Buz Buston 15 No issues identified ADB & GOU Safeguards Confirmed 34 Balikchi Khujaobod Guzar 10 Construction site not ready Site preparation ADB & GOU Safeguards Confirmed 35 Balikchi Balikchi Yakkatol 12 No issues identified ADB & GOU Safeguards Confirmed 36 Balikchi Okhunboboev Kiyali 13 Construction site not ready Site preparation ADB & GOU Safeguards Confirmed Uzbekiston 37 Asaka Ilgor 47 No issues identified ADB & GOU Safeguards Confirmed mustakilligi, Akhtachi 38 Asaka Bobur Tolzor 55 Construction site not ready Site preparation ADB & GOU Safeguards Confirmed 39 Asaka Kujgan Yukori Buz 10 No issues identified ADB & GOU Safeguards Confirmed 40 Asaka Kujgan Obod makhallasi 18 Construction site not ready Site preparation ADB & GOU Safeguards Confirmed 41 Andijon Khortum Urikzor 163 Construction site not ready Site preparation ADB & GOU Safeguards Confirmed 42 Andijon Ok - er M.Soliev 12 No issues identified ADB & GOU Safeguards Confirmed 43 Andijon Yorboshi Damarik 30 No issues identified ADB & GOU Safeguards Confirmed 44 Andijon Yorboshi Beshbuynak 10 No issues identified ADB & GOU Safeguards Confirmed 45 Andijon Kunji Beshkaram 10 Construction site not ready Site preparation ADB & GOU Safeguards Confirmed 46 Andijon Nayman Gulobod 10 No issues identified ADB & GOU Safeguards Confirmed

25

Massif No. of № District (Village Assembly of Citizens, Village) Issues Identified Followup Action Outcome of Review Houses KFY MFI Karakalpakstan 550 1 Amudaryo Chaykul OFY Basuv 18 No issues identified ADB & GOU Safeguards Confirmed 2 Amudaryo Urta kal"a OFY Vakum қishloғi 10 No issues identified ADB & GOU Safeguards Confirmed 3 Amudaryo Urta kal'a Vakum 10 No issues identified ADB & GOU Safeguards Confirmed 4 Beruniy Shimam KFY Kukkuz massivi 42 No issues identified ADB & GOU Safeguards Confirmed 5 Kanlikul Navruz OFY Kanlikul 70 No issues identified ADB & GOU Safeguards Confirmed 6 Karauzak Berdakh Kobeyshungil 10 No issues identified ADB & GOU Safeguards Confirmed 7 Kegeyli Juzum-bag Juzum-bag 10 No issues identified ADB & GOU Safeguards Confirmed 8 Kegeyli Aktuba Aktuba 15 No issues identified ADB & GOU Safeguards Confirmed 9 Kungrad Kungirad Gulistan 10 No issues identified ADB & GOU Safeguards Confirmed 10 Kungrad Elabad Elabad 20 No issues identified ADB & GOU Safeguards Confirmed 11 Nukus Samanbay Uzunkul 30 No issues identified ADB & GOU Safeguards Confirmed 12 Takhtakupir Atakol Khojametovul 90 No issues identified ADB & GOU Safeguards Confirmed 13 Turtkul Ullubog Ullubog 10 No issues identified ADB & GOU Safeguards Confirmed 14 Khodjeyli Samankul Oybek 70 No issues identified ADB & GOU Safeguards Confirmed 15 Chimbay Tazgara Togaykhujaligi 45 No issues identified ADB & GOU Safeguards Confirmed 16 Shumanay Ak-jap Dauletbay 25 No issues identified ADB & GOU Safeguards Confirmed 17 Ellikkala Amirobod Amirobod 60 Construction site not ready Site preparation ADB & GOU Safeguards Confirmed 18 Ellikkala Ellikkala Ellikkala 5 No issues identified ADB & GOU Safeguards Confirmed

26

Massif No. of № District (Village Assembly of Citizens, Village) Issues Identified Followup Action Outcome of Review Houses KFY MFI Khorezm 730 1 Bogot Beshariq qishloғi Boyqozoq MFY 40 No issues identified ADB & GOU Safeguards Confirmed 2 Khonka Kirk yopkishlogi Obod makhallasi 15 No issues identified ADB & GOU Safeguards Confirmed 3 Khonka Kirk yopkishlogi Pakhtakor makhallasi 15 No issues identified ADB & GOU Safeguards Confirmed 4 Khonka Madir Dustlik-2 30 No issues identified ADB & GOU Safeguards Confirmed 5 Khonka Olaja kishlogi Shirin makhallasi 20 No issues identified ADB & GOU Safeguards Confirmed Shomokhulum 6 Khiva Shomokhulum makha 20 No issues identified ADB & GOU Safeguards Confirmed kish 7 Khiva Sayot kishlogi Gullanbog makhallasi 20 Construction site not ready Site preparation ADB & GOU Safeguards Confirmed 8 Khiva Doshek kishlogi Gulshan 80 No issues identified ADB & GOU Safeguards Confirmed Eski Kiyot Avaz dunak 9 Khiva 30 Construction site not ready Site preparation ADB & GOU Safeguards Confirmed kishlogi makhallasi Pichokchi "12 Narvon" 10 Khazorasp 10 No issues identified ADB & GOU Safeguards Confirmed kishlogi makhallasi 11 Khazorasp Buston kishlogi Buston makhallasi 20 No issues identified ADB & GOU Safeguards Confirmed 12 Khazorasp Pitnak kishlogi Obod makhallasi 40 No issues identified ADB & GOU Safeguards Confirmed 13 Yangiarik Gulobod kishlogi "Boromik" makhallasi 10 No issues identified ADB & GOU Safeguards Confirmed 14 Yangiarik Tagan kishlogi Sevgan makhallasi 10 No issues identified ADB & GOU Safeguards Confirmed 15 Yangiarik Ostona Chakir 24 No issues identified ADB & GOU Safeguards Confirmed 16 Yangiarik Karmish kishlogi Shikhbogi makhallasi 12 No issues identified ADB & GOU Safeguards Confirmed 17 Urganch Cholish kishlogi Sokhibkor massivi 42 No issues identified ADB & GOU Safeguards Confirmed Change of site design, land Land acquisition and demolition 18 Urganch Begovot kishlogi Kungirot makhallasi 30 acquisition and demolition ADB & GOU Safeguards Confirmed of structures eliminated. Change of site design, land Land acquisition and demolition 19 Shovot Kiyot kishlogi Kiyot makhallasi 25 acquisition and demolition ADB & GOU Safeguards Confirmed of structures eliminated. 20 Shovot Buyrachi kishlogi Ostona makhallasi 10 No issues identified ADB & GOU Safeguards Confirmed Change of site design, land Kozok kal"a Land acquisition and demolition 21 Shovot Khitoy kishlogi 20 acquisition and demolition ADB & GOU Safeguards Confirmed makhallasi of structures elimin ated.

27

22 Shovot Kat kal"a kishlogi Oltin kal"a makhallasi 10 No issues identified ADB & GOU Safeguards Confirmed Ocha kal"a 23 Yangibozor Shirinkungirot 40 No issues identified ADB & GOU Safeguards Confirmed makhallasi Kalandar "Mangitlar" 24 Yangibozor 10 Construction site not ready Site preparation ADB & GOU Safeguards Confirmed durman makhallasi Oyokdurman "Khalkobod" 25 Yangibozor 10 No issues identified ADB & GOU Safeguards Confirmed kishlogi makhallasi "Kenagas" 26 Kushkupir Kenagas kishlogi 18 No issues identified ADB & GOU Safeguards Confirmed makhallasi 27 Kushkupir Yangilik Yangilik 15 No issues identified ADB & GOU Safeguards Confirmed 28 Kushkupir Khadra kishlogi Takirdauk makhallasi 34 No issues identified ADB & GOU Safeguards Confirmed 29 Gurlan Olga kishlogi Sovunchi makhallasi 70 No issues identified ADB & GOU Safeguards Confirmed

28

Massif No. of № District (Village Assembly of Citizens, Village) Issues Identified Followup Action Outcome of Review Houses KFY MFI Samarkand 1050 1 Pastdargom Dimishkabolo Lolazor 2 120 Buffer zone required Change of site design ADB & GOU Safeguards Confirmed 2 Paxtachi Sultonobod Sardoba 3 No issues identified ADB & GOU Safeguards Confirmed 3 Paxtachi Misit Suluv 10 No issues identified ADB & GOU Safeguards Confirmed 4 Paxtachi Misit Ziyovuddin 10 Buffer zone required Change of site design ADB & GOU Safeguards Confirmed Change of site design, land Land acquisition and demolition 5 Jomboy Eski Jomboy Jomboy 10 acquisition and demolition ADB & GOU Safeguards Confirmed of structures eliminated. 6 Jomboy Xolvoy Uzunovul 37 Buffer zone required Change of site design ADB & GOU Safeguards Confirmed 7 Jomboy Xolvoy Hashdala 23 No issues identified ADB & GOU Safeguards Confirmed 8 Ishtixon Chordara Tupor 12 Buffer zone required Change of site design ADB & GOU Safeguards Confirmed 9 Ishtixon Qoraqo'yli Qoraqo'yli 59 No issues identified ADB & GOU Safeguards Confirmed 10 Oqdaryo Qorateri Mevazor 20 No issues identified ADB & GOU Safeguards Confirmed 11 Oqdaryo Qorateri Kirkdarxon 140 Buffer zone required Change of site design ADB & GOU Safeguards Confirmed Change of site design, land 12 Bulungur Sohibkor Mingchinor 13 Possible land acquisition ADB & GOU Safeguards Confirmed acquisition eliminated. 13 Bulungur Urtabuloq Migntepa 10 No issues identified ADB & GOU Safeguards Confirmed 14 Bulungur Beshkuton Katta 37 Buffer zone required Change of site design ADB & GOU Safeguards Confirmed 15 Kattakurgon Saroykurgon Muhtor 54 Buffer zone required Change of site design ADB & GOU Safeguards Confirmed 16 Kushrabod Pichot Bulokboshi 10 No issues identified ADB & GOU Safeguards Confirmed 17 Kushrabod Oktepa Kugon 10 No issues identified ADB & GOU Safeguards Confirmed 18 Nurobod Norbulok Yangikishlok 5 No issues identified ADB & GOU Safeguards Confirmed Confirmed: Land acquisition 19 Nurobod Nurbulok Nurbulok 30 Possible land acquisition ADB & GOU Safeguards Confirmed period meet req uirements Change of site design, land Land acquisition and demolition 20 Payarik Korasuluv Moylitepa 28 acquisition and demolition ADB & GOU Safeguards Confirmed of structures eliminated. 21 Payarik Oytamgali Kichkinaturk 32 No issues identified ADB & GOU Safeguards Confirmed 22 Samarkand Ulugbek Yangiarik 102 Construction site not ready Site preparation ADB & GOU Safeguards Confirmed

29

23 Samarkand Dashtakibolo Okmachit 18 No issues identified ADB & GOU Safeguards Confirmed Change of land category from 24 Urgut Beshbulok Kingir 36 Agricultural land category ADB & GOU Safeguards Confirmed agricultural to non-agricultural Change of land category from 25 Urgut Mirzakishlok Kamongaron v. 64 Agricultural land category ADB & GOU Safeguards Confirmed agricultural to non -agricultural 26 Urgut Mirzakishlok Mergancha 15 No issues identified ADB & GOU Safeguards Confirmed Change of site design, land 27 Toylok Madaniyat Madaniyat 90 Possible land acquisition ADB & GOU Safeguards Confirmed acq uisition eliminated. 28 Narpay Nograxona Nograxona 28 Buffer zone required Change of site design ADB & GOU Safeguards Confirmed Change of site design, land 29 Narpay Sarbozor Sarbozor -1 10 Possible land acquisition ADB & GOU Safeguards Confirmed acq uisition eliminated. 30 Narpay Sarbozor Sarbozor -2 14 No issues identified ADB & GOU Safeguards Confirmed

30

Massif No. of № District (Village Assembly of Citizens, Village) Issues Identified Followup Action Outcome of Review Houses KFY MFI Kashkadarya 1050 1 Muborak Muborak Yangi Korakum 130 No issues identified ADB & GOU Safeguards Confirmed Beshbulok 2 Dekhkonobod Beshbuolok 60 No issues identified ADB & GOU Safeguards Confirmed massive Change of land category from 3 Kamashi Kamay Okguzar 50 Agricultural land category ADB & GOU Safeguards Confirmed agricultural to non -agricultural Change of site design, land Land acquisition and demolition 4 Shakhrisabz Uzbekistan Yangibog 85 acquisition and demolition ADB & GOU Safeguards Confirmed of structures eliminated. Change of land category from 5 Mirishkor Jeynov Jeynov 20 Agricultural land category ADB & GOU Safeguards Confirmed agricultural to non -agricultural Change of land category from 6 Mirishkor Mirishkor Yangi Mirishkor 20 Agricultural land category ADB & GOU Safeguards Confirmed agricultural to non-agricultural Change of site design, land 7 Guzor Korakul Mashal 240 Possible land acquisition ADB & GOU Safeguards Confirmed acquisition eliminated. 8 Kasbi Galaba Toshkurgon 22 No issues identified ADB & GOU Safeguards Confirmed 9 Kasbi Dureza 14 Buffer zone required Change of site design ADB & GOU Safeguards Confirmed 10 Kasbi Yangi-Khayot Nazartepa 20 No issues identified ADB & GOU Safeguards Confirmed 11 Kasbi Korakungirot Unikki 14 Buffer zone required Change of site design ADB & GOU Safeguards Confirmed Change of site design, land Land acquisition and demolition 12 Kasbi Muglon Muglon 22 acquisition and demolition ADB & GOU Safeguards Confirmed of structures eliminated. 13 Yakkabog Choydori Kutantepa 10 No issues identified ADB & GOU Safeguards Confirmed 14 Yakkabog Kishlik Sinnon 10 Construction site not ready Site preparation ADB & GOU Safeguards Confirmed Change of site design, land Land acquisition and demolition 15 Yakkabog Sandal Chumich 20 acquisition and demolition ADB & GOU Safeguards Confirmed of structures eliminated. 16 Yakkabog Sandal Turtogayni 14 No issues identified ADB & GOU Safeguards Confirmed 17 Koson Koson Navruz 10 No issues identified ADB & GOU Safeguards Confirmed 18 Koson Koson Arabxona 25 No issues identified ADB & GOU Safeguards Confirmed 19 Koson Dustlik Boygundi 30 Buffer zone required Change of site design ADB & GOU Safeguards Confirmed 20 Karshi Bogobod Bogobod 59 Agricultural land category Change of land category from ADB & GOU Safeguards Confirmed

31

agricultural to non-agricultural Change of land category from 21 Karshi Kat Yangi Xonobod 30 Agricultural land category ADB & GOU Safeguards Confirmed agricultural to non-agricultural 22 Chirokchi Khumo Khuja Abdujabbor 50 No issues identified ADB & GOU Safeguards Confirmed Change of land category from 23 Kitob Bogbon Yangicharmgar 55 Agricultural land category ADB & GOU Safeguards Confirmed agricultural to non -agricultural Change of land category from 24 Nishon U.Yusupov Yangi-Khayot 40 Agricultural land category ADB & GOU Safeguards Confirmed agricultural to non -agricultural

32

Massif No. of № District (Village Assembly of Citizens, Village) Issues Identified Followup Action Outcome of Review Houses KFY MFI Surkhandarya 810 1 Kumkurgan Pakhtaobod 44 No issues identified ADB & GOU Safeguards Confirmed 2 Kumkurgan Okjar Jiydali 6 No issues identified ADB & GOU Safeguards Confirmed 3 Yangi Bozor Joyilma 55 No issues identified ADB & GOU Safeguards Confirmed 4 Kizirik Yangi Hayot Karmaki 35 No issues identified ADB & GOU Safeguards Confirmed 5 Kizirik Bandixon 10 No issues identified ADB & GOU Safeguards Confirmed Change of site design, land 6 Sherobod Tallashkon Paxtaobod 20 Possible land acquisition ADB & GOU Safeguards Confirmed acquisition eliminated. Change of site design, land 7 Sherobod Rabatak Yangiarik 35 Possible land acquisition ADB & GOU Safeguards Confirmed acquisition eliminated. 8 Uzun Telpakchinor Obuzarang 45 No issues identified ADB & GOU Safeguards Confirmed Change of site design, land Parrandachilik, Land acquisition and demolition 9 Termiz 100 acquisition and demolition ADB & GOU Safeguards Confirmed Limonzor of structures eliminated. 10 Termiz Uchqizil Yagihaet 40 No issues identified ADB & GOU Safeguards Confirmed 11 Tokchiyon Fozilkuchdi 55 No issues identified ADB & GOU Safeguards Confirmed 12 Oltinsoy Chep Chep 6 No issues identified ADB & GO U Safeguards Confirmed 13 Oltinsoy Dugoba Shakarkamish 34 No issues identified ADB & GOU Safeguards Confirmed 14 Oltinsoy Korlik Markaz 5 No issues identified ADB & GOU Safeguards Confirmed 15 Muzrabod Xalkobod Ch.Chuvondikov 10 No issues identified ADB & GOU Safeguards Confirmed Change of site design, land Land acquisition and demolition 16 Muzrabod Xalkobod Ch.Chuvondikov-2 35 acquisition and demolition ADB & GOU Safeguards Confirmed of structures eliminated. 17 Rabot Bibishirin 45 Buffer zone required Change of site design ADB & GOU Safeguards Confirmed Change of site design, land Land acquisition and demolition 18 Jarkurgon Okkurgon Korayontok 65 acquisition and demolition ADB & GOU Safeguards Confirmed of structures eliminated. 19 Angor Tallimaron Guliston 45 No issues identified ADB & GOU Safeguards Confirmed 20 Denov Yurchi Kattakarshi 40 No issues identified ADB & GOU Safeguards Confirmed 21 Denov Yurchi Gulobod 20 No issues identified ADB & GOU Safeguards Confirmed

33

22 Denov Anbarsoy Obodon 20 No issues identified ADB & GOU Safeguards Confirmed 23 Denov Hazarobog Jamatak 40 No issues identified ADB & GOU Safeguards Confirmed

34

Massif No. of № District (Village Assembly of Citizens, Village) Issues Identified Followup Action Outcome of Review Houses KFY MFI Syrdarya 430 1 Sayxunobod Uzbekistan Yoshlik 20 Construction site not ready Site preparation ADB & GOU Safeguards Confirmed 2 Xovos Xovos Chamanzor 40 No issues identified ADB & GOU Safeguards Confirmed 3 Okoltin K.Ukubayev G.Gulom 20 No issues identified ADB & GOU Safeguards Confirmed 4 Sardoba Chulkuvar T.Malik 20 No issues identified ADB & GOU Safeguards Confirmed 5 Mirzaobod Tashkent Khaydar 100 No issues identified ADB & GOU Safeguards Confirmed Confirmed: Land acquisition 6 Guliston Zarbdor 120 Possible land acquisition ADB & GOU Safeguards Confirmed period meet requirements 7 Boyovut Dehkonobod Guliston 90 No issues identified ADB & GOU Safeguards Confirmed 8 Sirdaryo S.Rahimov Pahtazor 20 No issues identified ADB & GOU Safeguards Confirmed

35

Massif No. of № District (Village Assembly of Citizens, Village) Issues Identified Followup Action Outcome of Review Houses KFY MFI Tashkent 37 sites 1050 Subtotal 31 sites 810 (cleared) Subtotal 6 sites 240 (withheld) 1 Bekobod Jumabozor A.Mirzaev 20 Construction site not ready Site preparation ADB & GOU Safeguards Confirmed 2 Bekobod Mekhnatobod Takachi 50 Construction site not ready Site preparation ADB & GOU Safeguards Confirmed Change of land category from 3 Buka Kushtapa B.Umarov 13 Agricultural land category ADB & GOU Safeguards Confirmed agricultural to non -agricultural 4 Buka Korakuyli Achamayli kishlogi 8 Construction site not ready Site preparation ADB & GOU Safeguards Confirmed 5 Yukorichirchik Bardonkul Mirobod makhallasi 80 Construction site not ready Site preparation ADB & GOU Safeguards Confirmed 6 Yukorichirchik Tinchlik Iykota 22 No issues identified ADB & GOU Safeguards Confirmed Pending details confirming 7 Yukorichirchik Istiklol Khitoytepa 20 Land acquisition Withheld eligibility dates Land acquisition Pending details confirming 8 Yukorichirchik Saksonota Toshtiguzak 20 Withheld eligibility dates Land acquisition Pending details confirming 9 Yukorichirchik Saksonota Sergeli 63 Withheld eligibility dates Land acquisition Pending details confirming 10 Yukorichirchik Saksonota Javgashti 32 Withheld eligibility dates 11 Okhangaron Birlik Birlik kishlogi 20 Buffer zone required Change of site design ADB & GOU Safeguards Confirmed 12 Parkent Changi Obikalon 20 Construction site not ready Site preparation ADB & GOU Safeguards Confirmed 13 Parkent Zarkent T.Rizaev 14 No issues identified ADB & GOU Safeguards Confirmed 14 Parkent Parkent Gulbog 12 No issues identified ADB & GOU Safeguards Confirmed 15 Chinoz Chinoz Gulzorobod khuja 11 No issues identified ADB & GOU Safeguards Confirmed 16 Chinoz Chinoz Gulzorobod 12 No issues identified ADB & GOU Safeguards Confirmed 17 Chinoz Tillakon Tillakon 38 No issues identified ADB & GOU Safeguards Confirmed 18 Yangiyul Shuralisoy Navruz makhallasi 26 No issues identified ADB & GOU Safeguards Confirmed 19 Yangiyul Gulbakhor Gulbakhor 18 No issues identified ADB & GOU Safeguards Confirmed 20 Yangiyul Eskikovunchi Kovunchi makhallasi 10 Construction site not ready Site preparation ADB & GOU Safeguards Confirmed

36

21 Yangiyul Niezboshi Madaniyat makhallasi 10 Buffer zone required Change of site design ADB & GOU Safeguards Confirmed 22 Zangiota Khasanboy Khasanboy kishlogi 19 Construction site not ready Site preparation ADB & GOU Safeguards Confirmed 23 Zangiota Khasanboy Kensoy kishlogi 15 No issues identified ADB & GOU Safeguards Confirmed 24 Zangiota Urtaovul Fayz makhallasi 16 No issues identified ADB & GOU Safeguards Confirmed 25 Zangiota Erkin Kueshli makhallasi 48 No issues identified ADB & GOU Safeguards Confirmed Korakalpok 116- 26 Urtachirchik Kumovul 30 No issues identified ADB & GOU Safeguards Confirmed kontur 27 Urtachirchik Kumovul yangikhaet 32 No issues identified ADB & GOU Safeguards Confirmed 28 Urtachirchik Kumovul Namuna 17 No issues identified ADB & GOU Safeguards Confirmed 29 Kibray Baytkurgon Baytkurgon 20 No issues identified ADB & GOU Safeguards Confirmed 30 Kibray Tuzel Bobur 36 No issues identified ADB & GOU Safeguards Confirmed 31 Kibray Yangiobod Alisherobod 58 No issues identified ADB & GOU Safeguards Confirmed 32 Piskent Kelovchi Evalak 55 No issues identified ADB & GOU Safeguards Confirmed 33 Okkurgon Zafar Zafar kishlogi 15 Construction site not ready Site preparation ADB & GOU Safeguards Confirmed 34 Bustonlik Chimboylik Chimboylik kishlogi 45 No issues identified ADB & GOU Safeguards Confirmed 35 Bustonlik Khujakent Khujakent-1 32 Agricultural land Pending resolution from GOU Withheld 36 Bustonlik Khujakent Khujakent-2 73 Agricultural land Pending resolution from GOU Withheld Uzbekiston 5 37 Kuyichirchik Dustlik makhallasi 20 No issues identified ADB & GOU Safeguards Confirmed yilligi