Cogjm.Font Oper 1970-01-20.Pdf (988.5Kb)

Total Page:16

File Type:pdf, Size:1020Kb

Cogjm.Font Oper 1970-01-20.Pdf (988.5Kb) WATER UNITED STArrES DEPARTMENT of the INTERIOR * * * * *BUREAU * * OF * REX:LAMATION * * * * * * * * * * * * * newsJanuary release 20, 1970 Region 4, Salt Lake City, Utah For Immediate Releas OPERATING RULES FOR ANNOO~ ED BY BUREAU Operating procedures for Fontenelle Dam and Reservoir were announced today by David L. Crandall, Regional Director of the Bureau of Reclamation. Mr. Crandall said that these procedures are part of the Bureau's program for optimizing the benefit from regulation of the water of the Green River in Wyoming . Before the procedures were established, all Federal, State, and local agencies and municipal and industrial users were consulted to ascertain the demands on the reservoir and river system, both from an ecologic and economic viewpoint . Fontenelle Reservoir, part of the Seedskadee Project, is one of the initial group of participating projects authorized with the Colorado River Storage Project. The operating rules establish firm minimum flows in the river below Fontenelle Dam as guidelines for the Bureau's operations and for release of information to the news media. In brief, they cover the following: 1 . Compliance with the State of Wyoming water laws, the terms of the Upper Colorado River Basin Compact, the Colorado River Compact, and water sales contracts. 2. Operation of Fontenelle Reservoir for incidental flood control. 3. Releases from Fontenelle Reservoir to supply municipal and industrial water, to generate power, to benefit water sport and recreation, to minimize ice jarmning, and to lend to the aesthetic environment of the river. 4. Release patterns which will benefit fish and wildlife below the dam. 5. The routine release of information of interest to the public. These rules are subject to change as experience and changes in con- ditions and needs warrant . Mr . Crandall said that the Bureau will prepare and give wide distri- bution to an annual plan of operation based on a preseason snowmelt run- off forecast, existing circQIDstances and needs, and ecologic factors . This plan will enable the Bureau, the water users, and the recreation- ists to proceed intelligently with their responsibilities or activities. Whenever significant changes occ~ but in no case less than cP-ce a week, the Bureau will provide information on the immediate past and future short- term operation of Fontenelle Reservoir which will be distributed to the press and other news media serving the area, to interested Federal and State representatives, and to the water users so that anyone having an interest will be aware of Reclamation plans for operating the reservoir. The Bureau has been cooperating with the Wyoming Fish and Game De­ partment and Seedskadee Wildlife Refuge (Bureau of Sport Fisheries and Wildlife) by increasing releases from Fontenelle Reservoir during the nesting season to compel the geese to nest above the river's low stage shoreline. Similar procedure will be taken during the duck nesting season. Minimum flows have also been maintained to enhance the fish life habitat below the dam and to improve the rrrunicipal and industrial water quality. 2 .
Recommended publications
  • Green River Basin Water Planning Process
    FINAL REPORT Green River Basin Water Planning Process February, 2001 Prepared for: Wyoming Water Development Commission Basin Planning Program States West Water Resources Corporation Acknowledgements The States West team would like to acknowledge the assistance of the many individuals, groups, and agencies that contributed to the compilation of this document. At the risk of possible omission, these include: The Green River Basin Advisory Group (facilitated by Mr. Joe Lord) The Wyoming Water Development Office River Basin Planning Staff The Wyoming Water Resources Data System The Wyoming State Engineer’s Office The Wyoming Department of Environmental Quality The Wyoming State Geological Survey The University of Wyoming Spatial Data and Visualization Center The Wyoming Game and Fish Department Dr. Larry Pochop, University of Wyoming The U.S. Fish and Wildlife Service, Seedskadee National Wildlife Refuge The U.S. Department of Agriculture, Natural Resources Conservation Service The U.S. Department of Agriculture, Forest Service (Bridger-Teton, Wasatch-Cache, Ashley, and Medicine Bow National Forests) The U.S. Department of the Interior, Bureau of Land Management The U.S. Department of the Interior, Geological Survey Wyoming Department of State Parks and Cultural Resources Cover: Millich Ditch, East Fork Smiths Fork Prepared in association with: Boyle Engineering Corporation Purcell Consulting, P.C. Water Right Services, L.L.C. Watts and Associates, Inc. CHAPTER CONTENTS (Individual Chapters have page number listings) ACRONYM LIST I. INTRODUCTION A. Introduction B. Description C. Water-Related History of the Basin D. Wyoming Water Law E. Interstate Compacts II. BASIN WATER USE AND WATER QUALITY PROFILE A. Overview B. Agricultural Water Use C.
    [Show full text]
  • Changes to the Seedskadee Ecosystem
    CHANGES TO THE SEEDSKADEE ECOSYSTEM This study obtained information on contem- warmer than in earlier times and large prey (horse, porary: 1) physical features, 2) land use and man- camel, mammoth, bison) became extinct or smaller agement, 3) hydrology, 4) vegetation communities, and native people shifted to hunt smaller animals and 5) fish and wildlife populations of Seedskadee (Thompson and Pastor 1995). They also probably NWR. These data chronicle the history of land and made greater use of vegetable foods that apparently ecosystem changes at and near the refuge from the occurred during this period; summers may have Presettlement period and provide perspective on been spent in mountains and winters were spent when, how, and why alterations have occurred to eco- in foothills and valleys. Early Archaic subsistence logical processes in the NWR and surrounding lands. centered around pronghorn, rabbits, and other small Data on chronological changes in physical features animals including fish and birds obtained in the and land use/management of the region are most Green River Valley. available and complete (e.g., from NWR annual nar- By about 2,000 BP, human populations in ratives, USDA data and records, sequential aerial southwest Wyoming increased and apparently many photographs, hydrology data from the Green River, small villages were established; evidence of early agri- etc.) while data documenting changes in fish and culture is found along some waterways. The Shoshone wildlife populations generally are limited. people spread into the Seedskadee region around 700 BP. They were a nomadic tribe that traveled widely and created multiple trails between the Green SETTLEMENT AND EARLY LAND USE River floodplain and nearby mountains (USFWS CHANGES 2002).
    [Show full text]
  • Cogjm.Crsp Prog Rpt April 1960.Pdf (1.729Mb)
    ""C C'"':) ""C C;") :::io :::io c::, ::ic:-, --1 c::, :::io :::ic, r-- ""C ~ c::, c::, c:.c- ""C ~ c::, ::ic:-, :::ic, CD :::io c:::: c::, :::io :::io c::, -~ ::- ~ ::ic:-, r-- :::ic, ~ C'"':) ~ :::io c::, --1 C;") --1 ~ C;") c::, Construction of the Colorado River Storage Under the a~thor~zing le~islation four great TH f CQ L Q R A O Q RI Vf R Project is well under way. Men and their giant earth water storage umts will be built, as well as many moving machines are working under full steam to "participating pr?jects" in Colorado, New Mexico, SJ Q RA G f pR Q J f CJ tame the mighty Colorado River and its tributary Utah, and Wyommg. streams and to reshape the destiny of a vast basin Water and power from the project will provide in the arid west. opportunity for industrial expansion, agricultural Great strides have been made in building the development, growth of cities, and will create new four-state project since President Eisenhower in jobs for thousands of Americans. The project will 1956 pressed the golden telegraph key in Washing­ create new markets, stimulate trade, broaden the ton, D. C., that triggered the start of this huge tax base, and bolster national economy. reclamation development. The Colorado River Storage Project is a multi­ Appropriations by the Congress have enabled purpose development. Storage units will regulate construction to proceed - and at costs less than stream flows, create hydroelectric power, and make engineers' estimates. much-needed water available for agricultural, in­ Construction of Glen Canyon, Flaming Gorge and dustrial and municipal use.
    [Show full text]
  • Status of Construction
    UNITED STATES DEPAR'.IMENT OF THE IN'IERIOR BUREAU OF RECLAMATION Regional Office, Region 4 Salt Lake City J.O, Utah RE.MARKS BY REGIONAL DIRECTOR E. O. LARSON BEFORE THE UPFER COLORADO RIVER COMMISSION AT CHEYENNE, WYOMING, MONDAY, SEPl'EMBER 2l, 1959 The F.t. 1960 appropriations by the Congress for the Upper Colorado River Basin are adequate to continue the construction activities now underway and include about $2-k million for 3 new participating project starts--the Hammond Project in New Mexico, Seedskadee Project in Wyoming, and Smith Fork Project in Colorado. The total. obligation program for construction on storage units and participating projects is $78,o80,032. In addition, $961,013 is available for advance planning and $915,654 for general. investigations. By comparison, the F.Y. 1959 obligation program was about 68 million dollars for construction. The authorized obl.igation program for continuing construction is as follows: $46.8 million for Glen Canyon, $12.9 million for Flaming Gorge, $10.l million for Navajo, $3.l million for Paonia Project, and $2.0 million for the Vernal Unit of the Central. Utah Project. Amounts included for the new participating projects are $487,000 for the Hammond Project, $1.3 million for the Seedskadee Project, and $487,000 for the Smith Fork Project. About $.764,ooo is available tor pre- construction work on the Transmission Division. STATUS OF CONSTRUCTION Generally speaking, construction of the storage units and participating projects has proceeded on schedule in F.Y. 1959. Contracts were awarded to begin construction on the Paonia Project and Vernal Unit, Central Utah Project, which were new starts in F.Y.
    [Show full text]
  • DATA: 26 March 1979, Major Repair (MR) World Register of Dams U.S
    ,, .. EAST FORK DAH FONTEN ELI.E OAH East Fork of Tuckasegee River Green River Tuckasegee, Horth Carolina LaBarge, Wyoming 1955, Rocl<fill }g65,. Jarthfi 11 DATA: DATA: ~ 26 March 1979, Major repair (MR) Deter i ora lion of rockcut spil lway .• 1965, Accident , Type 2 (A 2) Seepage causing erosion of embankment World Register of Dams 1973 , page 407, l ine 3 U.S. Register of Dams 1963 , page 104, l ine 17 1982, Accident, Type 1 (All Anoma lous seepage and instrumentation Height 135ft (41.1 m) readings, and extremely soft zones Reservoir 11,400 acre-ft (14,100 x 103 m3) Wor ld Register of Dams 1984, page 31, li ne 23 Purpose Hydroel ectric power U.S. Register of Dams 1963, page 137 , line 20 Geology Gra nite lieigh t 139 ft (42.4 m) Reservoir \ 345,000 acre-ft (425,550 x 103m3) DESCRIPTION OF DAM: Purpose M&l and power generation Geology The dam l s located in a re latively 4 flat val ley nearly a mi le wide. The East Fork Dam is rock filled with an earth face. The dam is a 135 ft ~ (41.1 m) high wi t h a crest length of 385 ft ( 117m). The pr imary pu r- rock fo und at ion and abutments for the pose is hydroelectric power . l dam consi st of flat lying Interbedded \ massive to thinly bedded sedimentary OESCRIPTI OH OF INC IDENT: ' depos i ts of sandstone, si ltstone, \ sha le, and minor beds of llmnstone. The.spil lway was co n s~ r~c ted by blasting through a natural granite for­ The rock underlying the dam is mati on.
    [Show full text]
  • Technical Memorandum
    Technical Memorandum Subject: Use of Wyoming’s Contract Storage Water in Fontenelle Reservoir This memorandum addresses how Wyoming’s use of its contract water in Fontenelle Reservoir could affect the state’s remaining compact entitlements under the Colorado River Compacts. The Fontenelle Reservoir storage water right (permit no. 6629R), held by the Bureau of Reclamation (Reclamation), has a priority date of January 22, 1962 to store 345,397 acre-feet of water. As prescribed by the original storage right, the Reservoir was originally divided into three separate pools: a 190,250 acre-feet active pool, a 154,584 acre-feet inactive pool, and a 563 acre- feet dead pool. Authorized uses of Fontenelle Reservoir under the water right include: irrigation, domestic, industrial, municipal, stock watering, fish and wildlife and recreation as primary purposes, with power generation specified as the only secondary purpose. The 154,584 acre-feet inactive pool was originally defined by the elevation of the proposed east and west canal outlet structures. The inactive pool has historically been used only for power production, recreation and fish and wildlife purposes. The elevation of the active pool, outlet structures and canals was established to convey water to irrigate the Seedskadee Project. Since the canals and other irrigation components were never constructed, Reclamation filed an application with the State Engineer in 1973 for an enlarged active capacity of 344,844 acre-feet, which includes the original active capacity of 190,250 acre-feet and previously inactive capacity of 154,584 acre-feet. The State Engineer granted Reclamation’s request, documented by permit no.
    [Show full text]
  • Environmental Assessment Seedskadee Revocation Project Wyoming
    Environmental Assessment Seedskadee Revocation Project Wyoming PRO-EA-012-003 Seedskadee Project, Wyoming Upper Colorado Region U.S. Department of the Interior Bureau of Reclamation Provo Area Office Provo, UT May 2013 Mission Statements The mission of the Department of the Interior is to protect and provide access to our Nation’s natural and cultural heritage and honor our trust responsibilities to Indian Tribes and our commitments to island communities. The mission of the Bureau of Reclamation is to manage, develop, and protect water and related resources in an environmentally and economically sound manner in the interest of the American public. Environmental Assessment Seedskadee Revocation Project Wyoming PRO-EA-012-003 Seedskadee Project, Wyoming Upper Colorado Region Lead Agency: Bureau of Reclamation Upper Colorado Region Provo Area Office Cooperating Agencies: Bureau of Land Management U.S. Fish and Wildlife Service State of Wyoming Sublette County Commission Lincoln County Commission Sweetwater County Commission Sweetwater County Conservation District Seedskadee Revocation Project Contents Page Chapter 1: Purpose and Need for the Proposed Action ................................... 1 1.1 Introduction ................................................................................................. 1 1.2 Purpose and Need for Action ...................................................................... 2 1.2.1 Project Description............................................................................. 2 1.2.2 Related Actions
    [Show full text]
  • Environmental Assessment Fontenelle Community Renovation, Seedskadee Project, Lincoln County, Wyoming
    Utah State University DigitalCommons@USU Environmental Assessments (WY) Wyoming 7-15-2010 Environmental Assessment Fontenelle Community Renovation, Seedskadee Project, Lincoln County, Wyoming United States Department of the Interior, Bureau of Reclamation Follow this and additional works at: https://digitalcommons.usu.edu/wyoming_enviroassess Part of the Environmental Sciences Commons Recommended Citation United States Department of the Interior, Bureau of Reclamation, "Environmental Assessment Fontenelle Community Renovation, Seedskadee Project, Lincoln County, Wyoming" (2010). Environmental Assessments (WY). Paper 26. https://digitalcommons.usu.edu/wyoming_enviroassess/26 This Report is brought to you for free and open access by the Wyoming at DigitalCommons@USU. It has been accepted for inclusion in Environmental Assessments (WY) by an authorized administrator of DigitalCommons@USU. For more information, please contact [email protected]. Environmental Assessment Fontenelle Community Renovation, Seedskadee Project Lincoln County, Wyoming U.S. Department of the Interior Bureau of Reclamation Upper Colorado Region and Power Office July 15, 2010 Mission Statements The U.S. Department of the Interior protects and manages the nation’s natural resources and cultural heritage; provides scientific and other information about those resources; and honors its trust responsibilities or special commitments to American Indians, Alaska natives, and affiliated island communities. The mission of the Bureau of Reclamation is to manage, develop, and protect water and related resources in an environmentally and economically sound manner in the interest of the American Public. Environmental Assessment for Fontenelle Community Renovation Proposed agency action: Fontenelle Community Renovation, Seedskadee Project, Lincoln County, Wyoming Type of statement: Environmental assessment Lead agency: Bureau of Reclamation, Upper Colorado Regional Power Office Cooperating agencies: None For further information: Ms.
    [Show full text]
  • Wayne Aspinall Unit Colorado River Storage Project
    Wayne Aspinall Unit Colorado River Storage Project Zachary Redmond Bureau of Reclamation History Program 2000 Table Of Contents Table Of Contents .............................................................1 The Wayne Aspinall Unit .......................................................2 Project Location.........................................................2 Historic Setting .........................................................4 Prehistoric Setting .................................................4 Historic Setting ...................................................6 Project Authorization....................................................15 Construction History ....................................................20 Blue Mesa Dam..................................................20 Morrow Point Dam ...............................................33 Crystal Dam.....................................................43 Post-Construction History................................................53 Settlement of the Project .................................................61 Uses of Project Water ...................................................62 Conclusion............................................................64 About the Author .............................................................64 Bibliography ................................................................66 Archival Collections ....................................................66 Government Documents .................................................66 Articles...............................................................67
    [Show full text]
  • Navajo Unit Colorado River Storage Project
    The Navajo Unit Colorado River Storage Project Toni Rae Linenberger Bureau of Reclamation History Program Denver, Colorado Research on Historic Reclamation Projects 1998 United States Department of the Interior BUREAU OF RECLAMATION Commissioner’s Office PO Box 25007 Denver Federal Center Denver, Colorado 80225-0007 PREFATORY NOTE Established in 1902, the Bureau of Reclamation is one of the major Federal water development agencies. Historically Reclamation developed water projects to "reclaim" arid Western lands for irrigated farming. The concept of "homemaking" was integral to Reclamation's early projects, i.e., homes would be made for settlers on new, irrigated farms. Over the years Reclamation's responsibilities expanded to multiple uses including water development for municipal and industrial uses, generation of hydroelectric power, flood control, and recreation. Reclamation built about 180 projects and is currently completing the last authorized major construction on those projects. The bureau is now concentrating on management of its existing water development projects. In the summer of 1993 Reclamation's history program began a multi-year research project. The intention is to develop a basic narrative history of each Reclamation project. Each narrative will outline the historic/prehistoric setting, the reasons for authorization, basic construction history, the aftermath of project development, and a rudimentary bibliography. These brief narrative overviews are not intended to be definitive or deeply interpretive. Each narrative is expected to be further edited for inclusion in a publication, about 2002, on the history of Reclamation projects. In the meantime, we plan to distribute these narrative essays both to make the basic information available, and to encourage independent research in Reclamation's history.
    [Show full text]
  • The Planning, Operation, and Analysis of the Green River Fish Control Project
    THE PLANNING, OPERATION, AND ANALYSIS OF THE GREEN RIVER FISH CONTROL PROJECT A JOINT REPORT OF THE UTAH STATE DEPARTMENT WYOMING GAME AND FISH OF FISH AND GAME DEPARTMENT Harold S. Crane, Director S. J. Jiacoletti, Commissioner THE PLANNING, OPERA.TION, AND ANALYSIS OF THE GREEN RIVER FISH CONTROL PROJECT by Alan ~inns - Wyoming Game and Fish Department Fred Eiserman - Wyoming Game and Fish Department F.W. Jackson - Wyoming Game and Fish Department Albert F. Regenthal - Utah State Department of Fish and Game Roderick Stone - Utah State Department of Fish and Game A JOINT REPORT OF THE UTAH STATE DEPARTMENT WfOMING GAME AND FISH OF FISH AND GAME DEPARTMENT Harold S. Crane, Director S.J. Jiacoletti, Commissioner ii TABLE OF CONTENTS page LIST OF TABLES. ..... • • . • . • . • . • . • • . • . • . • • • . i v LIST OF FIGURES. v INTRODUCTION. • • • . • . • . • • . • • • • . • • • • • • • • . • • . • . • • . • . • • • . 1 TREATMENT TECHNIQUES..... 5 Project Economics.... 5 Preliminary River Mapping and Flow Estimation.. ........... 5 Initial Testing of Rotenone Introduction Methods... ... .... 6 The Refined Rotenone Introduction System.................. 8 General Treatment Plan.. 9 Public Relations.......................................... 10 Mapping and Final Locations of Station Sites.............. 11 Personnel Organization and Servicing Arrangements... ...... 11 The Final Detail s.................. 13 Review of Operation....................................... 13 EVALUATION OF TREATMENT EFFICIENCy. ............................ 16 Post-Treatment
    [Show full text]
  • Download This Document As A
    This is a digital document from the collections of the Wyoming Water Resources Data System (WRDS) Library. For additional information about this document and the document conversion process, please contact WRDS at [email protected] and include the phrase “Digital Documents” in your subject heading. To view other documents please visit the WRDS Library online at: http://library.wrds.uwyo.edu Mailing Address: Water Resources Data System University of Wyoming, Dept 3943 1000 E University Avenue Laramie, WY 82071 Physical Address: Wyoming Hall, Room 249 University of Wyoming Laramie, WY 82071 Phone: (307) 766-6651 Fax: (307) 766-3785 Funding for WRDS and the creation of this electronic document was provided by the Wyoming Water Development Commission (http://wwdc.state.wy.us) This PDF is intended to represent the document delivered to the Wyoming Water Development Office in hard copy; however variations may exist from the printed version. Fontenelle Dam and Outworks Infrastructure CompleƟon Level II Study Prepared by: In associaƟon with: 1600 Specht Point Rd. #209 Fort Collins, CO 80525 Denver, CO Fort Collins, CO Raton, NM Fontenelle Dam and Outworks Infrastructure Completion Level II Study Prepared for: Wyoming Water Development Commission 6920 Y ellowtail Road Cheyenne, WY 82002 Prepared by: ~gineering Analytics, Inc. 1600 Specht Point Road, Suite 209 Fort Collins, Colorado 80525 (970) 488-3111 Fax (970) 488-3112 Project No. 110661 December 2018 Fontenelle Dam and Outworks Level II Study Wyoming Water Development Office TABLE OF CONTENTS INTRODUCTION
    [Show full text]