Article 5A. Mechanical Code

Total Page:16

File Type:pdf, Size:1020Kb

Article 5A. Mechanical Code ARTICLE 5A. MECHANICAL CODE 4-5a01. UNIFORM MECHANICAL CODE INCORPORATED. The Uniform Mechanical Code, 1997 edition, including Appendix A, prepared and published by the International Conference of Building Officials, 5360 Workman Mill Road, Whittier, California 90601-2298 is hereby adopted and incorporated by reference as authorized by K.S.A. 12-3009 to 12-3012 inclusive, for the purpose of establishing rules and regulations for mechanical systems installed or modified in the city and jurisdiction thereof, except as otherwise provided in this article. Not less than three copies of the Uniform Mechanical Code, 1997, shall be marked or stamped “Official Copy as Incorporated by the Code of the City of Ulysses,” and shall be filed with the city clerk to be open for inspection and available to the public at all reasonable hours. Persons charged with the enforcement of this code shall be supplied copies at the cost of the city. (Ord. 1025, Sec. 1) 4-5a02. PERMIT FEES. Table 1A of the Uniform Mechanical Code is amended by deleting the original language and substituting the following: (a) For the issuance of each permit - $5; (b) For the installation or relocation of each forced-air or gravity- type furnace or burner, including ducts and vents attached to such appliance, up to and including 10,000 BTU's - $6; (c) For the installation or relocation of each floor furnace, including vent; or each suspended heater, recessed wall heater or floor mounted unit heater - $6; (d) For the installation, relocation or replacement of each appliance vent installed and not included in an appliance permit - $5; (e) For the repair of, alteration of, or additional to each heating appliance, refrigeration unit, cooling unit, absorption unit, or each heating, cooling, absorption or evaporative cooling system, including installation of controls regulated by this code - $6; (f) For the installation or relocation of each boiler or compressor to and including three horsepower, or each absorption system to and including 100,000 BTU's - $6; (g) For the installation or relocation of each boiler or compressor over three horsepower to and including 15 horsepower, or each absorption system over 100,000 BTU's to and including 500,000 BTU's - $10; (h) For the installation or relocation of each boiler or compressor over 15 horsepower to and including 30 horsepower or each absorption system over 500,000 BTU's to and including 1,000,000 BTU's - $13; (i) For the installation or relocation of each boiler or compressor over 30 horsepower to and including 50 horsepower or each absorption system over 1,000,000 BTU's to and including 1,750,000 BTU's - $19; (j) For the installation or relocation of each boiler or refrigeration compressor over 50 horsepower, or each absorption system over 1,750,000 -$30; (k) For each air handling unit to and including 10,000 cubic feet per minute, including ducts attached thereto - $5; NOTE: This fee shall not apply to an air handling unit which is a portion of a factory assembled appliance, cooling unit, evaporative cooler or absorption unit for which a permit is required elsewhere in this code. (l) For each air handling unit over 10,000 cubic feet per minute - $7; (m) For each evaporative cooler, ventilation, system which is not a portion of any heating or air conditioning system, for the installation of each hood which is served by mechanical exhaust, including the ducts for such hood, full house exhaust fan or bath exhaust fan - $5; (n) For the installation or relocation of each commercial or industrial type incinerator - $23; (o) For each appliance or piece of equipment regulated by this code but not classed in other appliance categories, or for which no other fee is listed in this code - $5. (Ord. 1025, Sec. 1) 4-5a03. AMENDMENT. Flue Pipe Sizing. Section 809-3 para 3 of the 1997 Uniform Mechanical Code is hereby deleted and replaced by the table No. C-8-D as shown in Appendix of the Code. (Ord. 1025, Sec. 1) 4-5a04. PENALTY. Any person whether acting directly or through employees or agents, violating any part or any provision of this article shall upon conviction, be fined not to exceed $100 or imprisoned in jail not to exceed 30 days or both so fined and imprisoned in jail for each offense or violation. Each day that a violation is permitted to exist shall constitute a separate offense. (Ord. 850, Sec. 4) .
Recommended publications
  • Table No. 1-A Uniform Mechanical Code
    1997 EDITION TABLE NO. 1-A UNIFORM MECHANICAL CODE * This is a “fixed fee” based permit schedule. * Permit Issuance and Heaters 1. For the issuance of each mechanical permit………………………………….. $23.50 2. For issuing each supplemental permit for which the original permit has not expired, been canceled or finaled……………………………………………….. 7.25 Unit Fee Schedule (Note: The following do not include permit-issuing fee.) 1. Furnaces For the installation or relocation of each forced-air or gravity-type furnace or burner, including ducts and vents attached to such appliance, up to and including 100,000Btu/h(29.3W)…………………………………………………………… 14.80 For the installation or relocation of each forced-air or gravity-type furnace or burner, including ducts and vents attached to such appliance over 100,000 Btu/h(29.3kW).………………………………………………………………….. 18.20 For the installation or relocation of each floor furnace, including vent……………………………………………………….....................………… 14.80 For the installation or relocation of each suspended heater, recessed wall heater or floor-mounted unit heater………………………………………….…………. 14.80 2. Appliance Vents For the installation, relocation or replacement of each appliance vent installed and not included in an appliance permit..…..……...…...................................…… 7.25 3. Repairs or Additions For the repair of, alteration of, or addition to each heating appliance, refrigeration unit, cooling unit, absorption unit, or each heating, cooling, absorption or evaporative cooling system, including installation of controls regulated by the Mechanical Code……………………………………………….. 13.70 4. Boilers, Compressors and Absorption Systems For the installation or relocation of each boiler or compressor to and including 3 horsepower (10.6kW), or each absorption system to and including 100,000 B~ (29.3kW)……..……………….....................…………………………………….
    [Show full text]
  • 2018 Uniform Mechanical Code Preface
    SOUTHERN NEVADA AMENDMENTS TO THE 2018 UNIFORM MECHANICAL CODE PREFACE This document was developed by the Southern Nevada Building Officials' Uniform Mechanical Code (UMC) Committee and presents recommended amendments to the 2018 Uniform Mechanical Code as published by the International Association of Plumbing and Mechanical Officials (IAPM0). Participation in the 2018 UMC Committee was open to all interested parties. However, voting on amendment proposals was limited to one vote each for six of Southern Nevada municipalities (Clark County, Henderson, Las Vegas, North Las Vegas, Boulder City, and Mesquite), the Clark County School District, and three industry representatives. All committee proceedings were conducted in accordance with Robert's Rules of Order. The recommended amendments contained herein are not code unless adopted and codified by governmental jurisdictions. These amendments are not intended to prevent the use of any material or method of construction not specifically prescribed herein, provided any alternates have been approved and their use authorized by the Building Official. This document may be copied and used in whole or in part without permission or approval from the organizations listed on the cover page. Page 2 of 8 Dated: July 3, 2018 Table of Contents Chapter1: Administration 4 Section 203 Definitions Section 304.3.1.2 Permanent Ladders Section 304.4 Appliances in Attics and Under-Floor Spaces Section 504.4 Clothes Dryers 5 Section 504.4.2.1 — Length Limitation Section 510.1.6.1 Bracing and Supports Section 511.2.2.1.1 Performance Test Section 603.4.1 Length Limitation 6 Section 603.13 Air Dispersion Systems Section 608.1 Automatic Shutoffs Section 802.6.1 Termination Requirements Section Chapter 10, Boilers and Pressure Vessels 7 Section 1301.2 Dry Gas Section 1310.1.6 Piping Underground Beneath Buildings Section 1701.1 Standards 8 Page 3 of 8 Dated: July 3, 2018 Section Chapter 1: Administration Delete Chapter 1 in its entirety, except for sections 101.1, 101.2 and 101.3.
    [Show full text]
  • Code Change No: M2-07/08
    DOCUMENTATION Code Change No: M2-07/08 Original Proposal Section: 202 Proponent: Bob Eugene, Underwriters Laboratories, Inc. Revise definition as follows: COMBINATION FIRE/SMOKE DAMPER (Supp). A listed device installed in ducts and air transfer openings designed to close automatically upon the detection of heat and resist the passage of flame and smoke. The device is installed to operate automatically, and be controlled by a smoke detection system, and where required, is capable of being positioned from a fire command center. Reason: To provide a consistent definition throughout all the I-codes. The phrase that is added is consistent with the IBC and IMC and is appropriate for the IMC as well considering that the bulk of the smoke control system is installed to the requirements of the IMC. Cost Impact: The code change proposal will not increase the cost of construction. Public Hearing Results Committee Action: Approved as Submitted Committee Reason: The additional phrase makes the definition consistent with the IBC definition. Assembly Action: None Final Hearing Results M2-07/08 AS Code Change No: M3-07/08 Original Proposal Sections: 202 (IFC [M] 602.1) Proponent: Richard Swierczyna, Architectural Energy Corporation, representing the Commercial Kitchen Ventilation Technical Interest Group Revise definition as follows: HOOD (IFC [M] HOOD). An air intake device used to capture by entrapment, impingement, adhesion or similar means, grease, moisture, hot air and similar contaminants before they enter a duct system. Type I. A kitchen hood for collecting and removing grease vapors and smoke. Such hoods are equipped with a fire suppression system. Type II.
    [Show full text]
  • Code Check Plumbing & Mechanical®
    INTRODUCTION u ABBREVIATIONS ® Code 3Check Plumbing & Mechanical Fifth Edition By DOUGLAS HANSEN, SKIP WALKER, & REDWOOD KARDON Illustrations & layout by Paddy Morrissey © 2019 by The Taunton Press, Inc. ISBN 978-1-631186-947-1 Code Check® is a trademark of The Taunton Press, Inc., registered in the U.S. Patent & Trademark Office Code Check Plumbing & Mechanical 5th Edition is a guide to important code KEY TO USING CODE CHECK requirements and common code violations in the plumbing and Mechanical systems of 1- & 2-family dwellings & townhouses. The main codes referenced in this book Code Check Plumbing & Mechanical condenses large amounts of code informa- are the plumbing and mechanical provisions of the 2015 International Residential tion by using “shorthand” conventions that are explained here. Each text line begins ® Code for One- and Two-Family Dwellings (IRC), the 2015 Uniform Plumbing with a checkbox and ends with the code citations. The first code citation is typically Code (UPC), and the 2015 Uniform Mechanical Code (UMC). These codes are the from the IRC, and the second from the UPC or UMC. The following example is most widely used throughout the United States. Other referenced codes used in the taken from p.14 under the topic of plumbing vents: book are listed below in Table 1 (T1). NFPA 54, the National Fuel Gas Code, is the basis for the fuel gas provisions of the IRC, UPC, and UMC. n All fixture traps req venting _______________________ 3101.2.1 901.2 Model codes are published on a three year cycle. Codes are adopted at different This line is stating that all fixture traps require venting, and the rule is found in times in different places around the country.
    [Show full text]
  • Building Air Intake and Exhaust Design
    CHAPTER 46 BUILDING AIR INTAKE AND EXHAUST DESIGN Exhaust Stack and Air Intake Design Strategies........................................................................... 46.1 Geometric Method for Estimating Stack Height ........................................................................... 46.5 Exhaust-To-Intake Dilution or Concentration Calculations......................................................... 46.7 Other Considerations.................................................................................................................. 46.10 UTDOOR air enters a building through its air intake to provide O ventilation air to building occupants. Likewise, building ex- haust systems remove air from a building and expel the contaminants to the atmosphere. If the intake or exhaust system is not well de- signed, contaminants from nearby outdoor sources (e.g., vehicle ex- haust, emergency generators, exhaust stacks on nearby buildings) or from the building itself (e.g., laboratory fume hood exhaust, plumb- ing vents) can enter the building before dilution. Poorly diluted con- taminants may cause odors, health impacts, and reduced indoor air quality. This chapter discusses proper design of exhaust stacks and placement of air intakes to avoid adverse air quality impacts. Chapter 24 of the 2017 ASHRAE Handbook—Fundamentals de- scribes wind and airflow patterns around buildings in greater detail. Related information can also be found in Chapters 9, 18, 33, 34, and 35 of this volume, Chapters 11 and 12 of the 2017 ASHRAE Hand- Fig. 1 Flow Recirculation Regions and Exhaust Parameters book—Fundamentals, and Chapters 29, 30, and 35 of the 2016 (Wilson 1982) ASHRAE Handbook—HVAC Systems and Equipment. of ganged stacks. In general, for a tight cluster to be considered as a 1. EXHAUST STACK AND AIR INTAKE single stack (i.e., to add stack momentums together) in dilution cal- DESIGN STRATEGIES culations, the stacks must be uncapped and nearly be touching the middle stack of the group.
    [Show full text]
  • IRC — Mechanical
    IRC — Mechanical 2015 GROUP A PROPOSED CHANGES TO THE I-CODES MEMPHIS COMMITTEE ACTION HEARINGS April 19–28, 2015 Memphis Cook Convention Center Memphis, Tennessee First Printing Publication Date: March 2015 Copyright © 2015 By International Code Council, Inc. ALL RIGHTS RESERVED. This 2015-2017 Code Development Cycle, Group A (2015) Proposed Changes to the 2015 International Codes is a copyrighted work owned by the International Code Council, Inc. Without advanced written permission from the copyright owner, no part of this book may be reproduced, distributed, or transmitted in any form or by any means, including, without limitations, electronic, optical or mechanical means (by way of example and not limitation, photocopying, or recording by or in an information storage retrieval system). For information on permission to copy material exceeding fair use, please contact: Publications, 4051 West Flossmoor Road, Country Club Hills, IL 60478 (Phone 1-888-422-7233). Trademarks: “International Code Council,” the “International Code Council” logo are trademarks of the International Code Council, Inc. PRINTED IN THE U.S.A. 2015 GROUP A – PROPOSED CHANGES TO THE INTERNATIONAL RESIDENTIAL CODE – PLUMBING/MECHANICAL PLUMBING/MECHANICAL CODE COMMITTEE Travis Lindsey, MCP, Chair Thomas Polino Senior Plans Examiner Plumbing Subcode Official City of Scottsdale West Windsor Township Scottsdale, AZ West Windsor, NJ Clarence Lee Milligan, MCP, Vice Chair Stanley Richardson Assistant Township Manager Rep: National Association of Home Builders Upper Providence Township Richardson Construction Oaks, PA Dalton, GA Charles “Chuck” Atkinson, CBO Paul W. Roebuck, Sr. Building Codes Director Rep: Texas Professional Real Estate Inspectors Beaufort County, South Carolina (IAS Accredited) Assoc. Beaufort, SC President and Inspector TexaSpec Inspections and Building Consultants Marguerite Carroll Montgomery, TX Regional Regulatory Services Manager Underwriters Laboratories Loren Swanson San Jose, CA Rep: National Association of Home Builders Southern Michigan Co.
    [Show full text]
  • Gas Hydronics Service Certification
    GAS HYDRONICS SERVICE CERTIFICATION Certification Information Scope - Tests a candidate's knowledge of the installation, service, maintenance, and repair of hot water heating systems. System sizes are limited to 400,000 BTU or less heating capacity. Qualifications Y This is a test and certification for TECHNICIANS in the HVAC industry. The test is designed for top level service technicians. This test for certification is not intended for the HVAC system designer, sales force, or the engineering community. To become NATE-certified, you must pass this specialty and a CORE SERVICE exam. Y This test will measure what 80% of the Gas Hydronics candidates have an 80% likelihood of encountering at least once during the year on a NATIONAL basis. Y Suggested requirement is two years of field experience working on Gas Hydronics systems as a service technician and technical training for theoretical knowledge. Test Specifications Closed Book 2.5 Hour Time Limit 100 Questions Passing Score: PASS/FAIL Listed are the percentages of questions that will be in each section of the Gas Hydronics exam. SECTION AREA DESCRIPTION SECTION PERCENTAGE Installation 15% Service 45% Components 30% Applied Knowledge 10% Gas Hydronics Industry References The reference materials listed below will be helpful in preparing for this exam. These materials may NOT contain all of the information necessary to be competent in this specialty or to pass the exam. • American National Standards Institute (ANSI) / Air Conditioning Contractors of America (ACCA) Manuals - Latest Edition
    [Show full text]
  • Division 4. Adoption of Mechanical Code with Amendments
    ORDINANCE NUMBER 10-10555 AN ORDINANCE AMENDING CHAPTER 8, ARTICLE I, DIVISION 4 OF THE SALINA CODE ADOPTING THE 2006 UNIFORM MECHANICAL CODE AND LOCAL AMENDMENTS. BE IT ORDAINED by the Governing Body of the City of Salina, Kansas: Section 1. That Division 4 of Chapter 8, Article I of the Salina Code is hereby amended and reads as follows: “DIVISION 4. ADOPTION OF MECHANICAL CODE WITH AMENDMENTS Sec. 8-121. Uniform Mechanical Code adopted. There is hereby adopted, by reference, by the city for the purpose of providing minimum standards to safeguard life or limb, health, property, and public welfare by regulating and controlling the design, construction, quality of materials, location, operation, alteration repair and maintenance of heating, ventilating, cooling, refrigeration systems, incinerators and other miscellaneous heat-producing appliances, that certain building code known as the Uniform Mechanical Code, recommended and published by the International Association of Plumbing and Mechanical Officials, being particularly the 2006 edition not including appendices thereto, except as amended in this article of the Salina Code, of which not fewer than three (3) copies have been, and are now filed in the office of the city clerk and the same are hereby incorporated as fully as if set out at length herein and the provisions thereof shall be controlling in the construction and maintenance of all buildings and structures therein contained within the corporate limits of the city. Sec. 8-122. Amendment to Section 108.1 of the Uniform Mechanical Code. [Section 108. is hereby amended to read as follows:] 108.1 General. The Administrative Authority as used in this code shall mean the City of Salina and the building official.
    [Show full text]
  • IAPMO Uniform Codes Highlights
    IAPMO Uniform Codes Highlights The International Association of Plumbing and Mechanical Officials (IAPMO) continues to protect the industry through its ANSI-approved process. In early 2018, IAPMO published the 2018 Uniform Pluming Code® (UPC) and the 2018 Uniform Mechanical Code® (UMC). The 2018 editions of the Uniform Solar, Hydronics and Geothermal Code™ (USHGC) and the Uniform Swimming Pool, Spa and Hot Tub Code® (USPSHTC) are set to be published in September. The Uniform Codes maintain the necessary balance between prescriptive requirements and allowable performance standards; they detail exactly how a system needs to go together to protect the public’s health and safety. Some of the key provisions of the 2018 UPC, and changes from the 2015 edition include: • New sound transmission provisions for plumbing piping systems. 309.5 Sound Transmission. Plumbing piping systems shall be designed and installed in conformance with sound limitations as required in the building code. Section 309.5 was added to address building codes’ specific requirements to reduce sound transmission in residential structures. With the changing societal living preferences toward luxury apartments and condominiums reflected in the current construction industry, the change was added to assist design professionals and authorities having jurisdiction. Furthermore, the change correlates the UPC with accepted engineering practices and building codes. • New product standards for such plumbing products as wall-hung fixtures, waste fittings, lavatories, showers, bathtubs and whirlpool bathtubs, flushometer valves, sinks and eyewash stations; and signage for single use toilet facilities. Chapter 4 has been updated to include the appropriate reference standards to assist the end user and the authority having jurisdiction for enforcement purposes.
    [Show full text]
  • Gas Hydronics Installation Certification
    GAS HYDRONICS INSTALLATION CERTIFICATION Certification Information Scope - Tests a candidate's knowledge of the installation, service, maintenance, and repair of hot water heating systems. System sizes are limited to 400,000 BTU or less heating capacity. Qualifications ¾ This is a test and certification for TECHNICIANS in the HVAC industry. The test is designed for top level installation technicians. This test for certification is not intended for the HVAC system designer, sales force, or the engineering community. To become NATE-certified, you must pass this specialty and a CORE INSTALL exam. Once certification is obtained it lasts for five years. ¾ This test will measure what 80% of the Gas Hydronics candidates have an 80% likelihood of encountering at least once during the year on a NATIONAL basis. ¾ Suggested requirement is one year of field experience working on Gas Hydronics systems as an installation technician and technical training for theoretical knowledge. Test Specifications Closed Book 2.5 Hour Time Limit 100 Questions Passing Score: PASS/FAIL Listed are the percentages of questions that will be in each section of the Gas Hydronics exam. SECTION AREA DESCRIPTION SECTION PERCENTAGE Installation 40% Service 10% Components 30% Applied Knowledge 20% Gas Hydronics Industry References The reference materials listed below will be helpful in preparing for this exam. These materials may NOT contain all of the information necessary to be competent in this specialty or to pass the exam. • American National Standards Institute (ANSI)
    [Show full text]
  • Adoption of the Uniform Building Codes Volumes I, II and V (Building, Mechanical and Sign), Fire Code and Plumbing Code - May 1, 1972
    ROUTT COUNTY'S BUILDING CODE ADOPTION RESOLUTIONS AND ORDINANCES SINCE 1972 1. Resolution No. 72-013 - Adoption of the Uniform Building Codes Volumes I, II and V (Building, Mechanical and Sign), Fire Code and Plumbing Code - May 1, 1972 2. Resolution No. 72-17 - A Resolution Adopting by Reference the Uniform Building Code, (Volumes I and V) 1970 Edition; the Uniform Plumbing Code, 1970 Edition; the Uniform Fire Code, 1971 Edition; the Uniform Mechanical Code, 1970 Edition; and Providing Penalties for the Violation Thereof, All Within a Designated Part of the Unincorporated Area of Routt County, Colorado, and Repealing all Resolutions in Conflict Therewith - June 29, 1972 3. Minutes of Board of County Commissioner meeting of September 12, 1973 adopting the National Electrical Code 4. Minutes of Board of County Commissioner meeting of October 7 & 8, 1974 adopting 1973 codes for Building, Fire, Mechanical, Abatement of Dangerous Buildings, Signs and Plumbing 5. Resolution No. 75-07 - A Resolution Adopting the National Electrical Code, 1975 Edition (Recorded in Book 402, Page 391) - January 8, 1975 6. Resolution No. 77-34 - Resolution Adopting Uniform Codes - June 7, 1977 7. Resolution No. 79-036 - Resolution Re: Building Permit System - April 24, 1979 8. Resolution No. 80-003 Re: Adoption of the Uniform Building Code and Uniform Building Code Standards (1979 edition) - January 14, 1980 9. Resolution No. 80-004 Re: Amendment and Adoption of Uniform Code (1979 edition) - January 14, 1980 10. Resolution No. 81-069 - Re: Adoption of the 1981 National Electrical Code and the 1981 Life Safety Code - September 1, 1981 11.
    [Show full text]
  • 2021-04-01 IAPMO UPC UMC Monographs.Pdf
    FOR IMMEDIATE RELEASE Contact: Hugo Aguilar (909) 472-4111 [email protected] IAPMO Code Change Monographs Now Available Ontario, Calif. (April 1, 2021) – The International Association of Plumbing and Mechanical Officials (IAPMO) has made the 2021 Uniform Plumbing CoDe (UPC®) and Uniform Mechanical CoDe (UMC®) Technical Committee (TC) meeting monographs available for download. These monographs will be used at the upcoming TC meetings in May. Attendees will be requireD to register in orDer to participate. Guests wishing to aDDress the TC shall notify the staff liaison in writing at least seven days before the webinar meetings. If you wish to aDDress the TC, please notify the staff liaison at coDes- [email protected] with your name, representation, anD proposal item number. The Uniform Plumbing CoDe (UPC) Technical Committee virtual meeting is scheDuleD for May 3-7, starting at 8 a.m. PDT and enDing at noon each Day, MonDay-FriDay. Register in aDvance for this webinar: https://iapmo-org.zoom.us/webinar/register/WN_YGcDdqpeTcGeriB6JUmGvQ The Uniform Mechanical CoDe (UMC) Technical Committee virtual meeting is scheduled for May 17-21, starting at 8 a.m. PDT and ending at noon each day, Monday-FriDay. Register in aDvance for this webinar: https://iapmo-org.zoom.us/webinar/register/WN_tiXpmRBTSp2DKyxkmA4hlQ The chairperson reserves the right to extenD the times as neeDeD to complete the requireD minimum number of proposals. All indiviDuals anticipating an active role in the ANSI-accredited consensus development of the Uniform Codes will want to download these documents in Adobe PDF format from the following URLs: UPC: https://codes.iapmo.org/docs/2024/UPC/2021%20UPC%20TC%20Meeting%20Monograph.pdf UMC: https://codes.iapmo.org/docs/2024/UMC/2021%20UMC%20TC%20Meeting%20Monograph.pDf HarDcopy versions will not be available.
    [Show full text]