ECOLOGICAL HABITAT ASSESSMENT FOR THE PROPOSED 26km 132kV KINGBIRD LINE FROM THE GUMENI SUBSTATION TO THE BOSLOOP SUBSTATION, ESKOM DISTRIBUTION DIVISION, NORTHERN REGION; MPUMALANGA PROVINCE Compiled for: SSI ENGINEERS & ENVIRONMENTAL CONSULTANTS BY: Mr C.L.COOK (MSc. Zool. U.P) Pr.Sci.Nat. 400084/08 Zoological Consultant: Specialist Herpetological Consultant Cell No. 082 688 9585
[email protected] SUBMITTED: 24th OCTOBER 2011 Ecological Survey for Gumeni to Bosloop132kV Kingbird Line 1 1. BACKGROUND INFORMATION Eskom Transmission is responsible for providing a high quality supply of electricity to meet the ever increasing needs of its end users. As a result, its infrastructure of power lines and substations are continuingly being established and expanded upon to support annual load growth. Eskom is planning to build a new 132kV Kingbird distribution line from the recently constructed Gumeni Substation to the south of Machadadorp to the existing Bosloop Substation. The study area is located in the Northern Mpumalanga Lowveld region. The powerline being considered for the project falls within rural areas, largely characterised by intensive commercial agricultural and pastoral land uses. The area is situated close to the small mining town of Machadadorp approximately 17km to the north, with Nelspruit situated approximately 75km to the northwest. There are two main roads that allow general access to the study area and these are R541 and the R36. The need for ESKOM’s proposed development has been identified by the low voltage service experienced in the 132kV ring supplied from Witkloof substation due to the loss of either the Witkloof-Holnek 132kV line or Witkloof-Wintershoek 132kV line voltages during the transmission and distribution.