Environmental Monitoring Report IND:Second Jharkhand State Road
Total Page:16
File Type:pdf, Size:1020Kb
Environmental Monitoring Report Project Number: 49125-001 October 2017 Period: March 2016 – December 2016 IND: Second Jharkhand State Road Project Submitted by Project Management Unit, State Highways Authority of Jharkhand, Ranchi This report has been submitted to ADB by the Project Management Unit, State Highways Authority of Jharkhand, Ranchi and is made publicly available in accordance with ADB’s Public Communications Policy (2011). It does not necessarily reflect the views of ADB. This environmental monitoring report is a document of the borrower. The views expressed herein do not necessarily represent those of ADB's Board of Directors, Management, or staff, and may be preliminary in nature. In preparing any country program or strategy, financing any project, or by making any designation of or reference to a particular territory or geographic area in this document, the Asian Development Bank does not intend to make any judgments as to the legal or other status of any territory or area STATE HIGHWAYS AUTHORITY OF JHARKHAND (SHAJ) PHASE-II PROJECTS Improvement / Upgrading / Widening of RD:01- Dumka- Hansdiha, 44.221 Km, RD:02- Pachamba-Jamua-Sarwan, 45.175 km, RD:03- Govindpur-Tundi-Giridih, 43.550 km, RD:04- Khunti-Tamar, 43.697km Annual Environmental Monitoring Report March 2016 (Commencement) to December 2016 STATE HIGHWAYS AUTHORITY OF JHARKHAND (SHAJ) ADB LOAN NO: 3276-IND EUROESTUDIOS S.L. Joint Venture with RODIC CONSULTANTS PVT LTD In Association with EUROESTUDIOS INDIA Pvt. Ltd. Contractors of Second Jharkhand State Road Project (SJSRP): Package – I Ashoka Buildcon Limited Package – II GKC Projects Limited Package – III Ashoka Buildcon Limited Package – IV YFC Projects Limited EUROESTUDIOS S.L. in Joint Venture with RODIC CONSULTANTS PVT LTD In Association with EUROESTUDIOS INDIA Pvt. Ltd. Page 1 of 163 STATE HIGHWAYS AUTHORITY OF JHARKHAND (SHAJ) PHASE-II PROJECTS TABLE OF CONTENTS Sl. Description Page No. 1 Introduction & Project Progress 3 - 7 Compliance status with National /State /Local statutory 2 7 - 9 environmental requirements Compliance status with the environmental covenants as 3 10 - 12 stipulated in the Loan Agreement Compliance status with environmental management and monitoring plans and environmental assessment and review 4 13 - 153 framework/procedures as stipulated in the environmental documentation as agreed with ADB Monitoring of environmental receptors/ attributes (e.g. ambient 5 air, surface water, ground water, land, ecological aspects, 154 - 157 noise, hazardous/toxic wastes, etc.) Any other environmental aspects, impacts observed during 6 158 - 158 implementation which were not covered earlier Details of Grievance Redress Committee and complaints 7 158 - 158 received from public and actions taken thereof to resolve 8 Public consultation during project implementation 158 - 158 9 Institutional set-up for EMP implementation 159 - 159 10 Follow-up actions and conclusions 160 - 160 List of Table: Table-01 Project Road Details 03 Table-02 Silent Feature and Progress as on December 2016 05 Table-03(a) Section wise forest detail in Package-II 06 Table-03(b) Section wise forest detail in Package-III 06-07 Table-04 Status of Statutory Compliances 07-09 Table-05 Compliance Status of Environmental Loan Covenants 10-12 Table-06 EMP Compliance of Package-I 13-45 Table-07 EMP Compliance of Package-II 45-82 Table-08 EMP Compliance of Package-III 82-121 Table-09 EMP Compliance of Package-IV 121-153 Table-10 ADB approved Environmental Monitoring Plan 154-157 Table-11 Public Consultation carried out for Package-4 till Dec’16 159 Table-12 SJSRP Environmental Management Cell 160 List of Figure: Figure-1 Location Map of Project Road 04 Figure-2 Organization Chart for SJSRP 159 List of Appendix: Appendix-1 Attendance Sheet and Photograph of Public Consultation 162-163 at Package-IV EUROESTUDIOS S.L. in Joint Venture with RODIC CONSULTANTS PVT LTD In Association with EUROESTUDIOS INDIA Pvt. Ltd. Page 2 of 163 STATE HIGHWAYS AUTHORITY OF JHARKHAND (SHAJ) PHASE-II PROJECTS 1.0 INTRODUCTION 1. The Government of Jharkhand has planned a consistent upgrading of its road network through State Highways Authority of Jharkhand (SHAJ). The Second Jharkhand State Road Project (SJSRP) has been conceptualized to improve state highways connectivity in the State of Jharkhand which came into existence at the initiative by the Government of Jharkhand after the implementation of the JSRP projects. 2. The Detailed Project Reports (DPR) was prepared in 20014-15 by the DPR consultants based on that, a loan component US$200 Million has been provided to SHAJ. Further for implementing development of 4 selected priority State Highways under the external funding concept of Government of India the Government of Jharkhand has granted Loan under ID No. 3276 (INDIA). 3. The SHAJ projects have conceded into 4 separate contract packages as Package-1 to Package-4 under BOQ modality of financial loan assistance from the Asian Development Bank. The all Four contract packages has been awarded to separate Contractors for development of respective section of State Highways and Construction Supervision Consultant’s Services entrusted to M/s EUROESTUDIOS S.L. in Joint Venture with RODIC CONSULTANTS PVT LTD In Association with EUROESTUDIOS INDIA Pvt. Ltd. for all four contract packages. 4. The Second Jharkhand State Road Project (SJSRP) project includes widening and improvement of three exiting State Highways and one Major District Roads totalling 176.643 km located in Dumka, Godda, Giridih, Dhanbad, Khunti and Ranchi districts of Jharkhand State. The Project Details are given in Table-1 and the Location Map in Fig-1. Table-1: Project Road Details Pkg Road ID SH/MDR Description Length (KM) District Contractor Name I RD 01 SH-17 Dumka to Hansdiha 44.221 Dumka, Gonda, Ashoka Buildcon Ltd. II RD 02 MDR-86 & 83 Pachamba-Jamua- Sarwan 45.175 Giridih GKC Projects Ltd. III RD 03 SH-13 Govindpur-Tundi- Giridih 43.550 Dhanbad, Giridih Ashoka Buildcon Ltd. IV RD 04 SH-3 Khunti to Tamar 43.697 Khunti, Ranchi YFC Projects Ltd. Total 176.643 EUROESTUDIOS S.L. in Joint Venture with RODIC CONSULTANTS PVT LTD In Association with EUROESTUDIOS INDIA Pvt. Ltd. Page 3 of 163 STATE HIGHWAYS AUTHORITY OF JHARKHAND (SHAJ) PHASE-II PROJECTS Fig-1: Location Map of Project Roads 5. The Annual Environmental Monitoring Report (EMR) has been prepared to ensure the supervision and monitoring of the Contractors obligations is being carried out in accordance with the Contractors Contract Agreement and to apprise Employer and Asian Development Bank about the Contractors EMP implementation at each Contract Project sites. 6. The EMR covers the implementation of various parameters of Environmental Management Plan (EMP), and Construction safety during the Project Implementation for the Period March 2016 (Commencement) to December 2016. 7. As per ADB’s Safeguard Policy Statement (2009) and the Environmental assessment guidelines 2003 all the four packages have been categorised as Category-“B”. 8. The salient feature and progress as on December 2016 is given in Table-2. EUROESTUDIOS S.L. in Joint Venture with RODIC CONSULTANTS PVT LTD In Association with EUROESTUDIOS INDIA Pvt. Ltd. Page 4 of 163 STATE HIGHWAYS AUTHORITY OF JHARKHAND (SHAJ) PHASE-II PROJECTS Table-2: Salient Feature and Progress as on December 2016 Package 2 Package 3 S/ Status of Package 1 Dumka- Package 4 Pachamba- Gobindpur- N Road Projects Hansdiha Khunti-Tamar Jamua-Sarwan Tundi-Giridih Total Length 1 44.221 45.175 43.55 43.697 (km) Ashoka Buildcon 2 Contractor Ashoka Buildcon Ltd. GKC Projects Ltd YFC Projects Ltd Ltd. Contract Sign 3 11.03.2016 11.04.2016 11.03.2016 03.05.2016 Date Contract 4 2,114,905,455.00 1,701,015,184.00 1,901,047,663.00 1,514,296,367.00 Amount (Rs.) Village- Tikha Village- Tarbandha at Village- Lodharia Village- Simbukel Magha at Km Km 17+000, at Km 17+000, at Km 03+420, 37+300, Installation of Installation of Installation of 5 Camp Details Installation of Base Camp and Base Camp and Base Camp and Base Camp and Labour Camp is in Labour Camp is in Labour Camp is in Labour Camp is in Progress. Progress. Progress. Progress. Major Bridge: 01 Major Bridge: 02 Major Bridge: 03 Major Bridge: Nil Minor Bridge: 04 Minor Bridge: 03 Minor Bridge: 05 Minor Bridge: 09 H P Culvert: 82 H P Culvert: Nil H P Culvert: 03 H P Culvert: Nil Major Project Box Culvert: 81 Box Culvert: 18 Box Culvert: 33 Box Culvert: 51 6 Features Slab Culvert: Nil Slab Culvert: Nil Slab Culvert: Nil Slab Culvert: Nil Bypass: Nil Bypass: Jamua Bypass: Nil Bypass:Nil (2.03 Kms) New scope1 Survey work and Survey work is in Survey work and Survey work is in Physical Cross drainage Progress Cross drainage Progress 7 Progress works is in Progress works is in Progress Crusher Plant at Crusher Plant, Hot Crusher Plant at Crusher Plant at Maouza- Chorbatiya Mix Plant, WMM Gorga, Km Saedba at Km Km 45+000 (RHS) - Plant & Batch Mix 17+000 (RHS) 11+000 (LHS) about 3.00 Km Plant at Km about 22 Km. about 2 Kms. 8 Plant Details Hot Mix Plant, WMM 17+000 (Base Hot Mix Plant, Hot Mix Plant, Plant & Batch Mix Camp) WMM Plant & WMM Plant & Plant at Km 17+000 Batch Mix Plant at Batch Mix Plant at (Base Camp) Km 37+300 (Base Km 03+420 (Base Camp) Camp) Section wise Section wise 9 Forest Details Nil Forest details is Forest details is Nil given in Table-3(a) given in Table-3(b) Tree Cutting Dumka: 2316 Dhanbad:359 10 Giridih: 720 Khunti: 1459 Details Godda: 140 Giridih:133 Elephant 11 Corridor Study of Elephant corridor by the Wild Life Expert, CSC is under progress.