Environmental Monitoring Report

Project Number: 49125-001 December 2018

Period: January 2017 – December 2017

IND: Second State Road Project

Submitted by Project Management Unit, State Highways Authority of Jharkhand, Ranchi

This report has been submitted to ADB by the Project Management Unit, State Highways Authority of Jharkhand, Ranchi and is made publicly available in accordance with ADB’s Public Communications Policy (2011). It does not necessarily reflect the views of ADB. This environmental monitoring report is a document of the borrower. The views expressed herein do not necessarily represent those of ADB's Board of Directors, Management, or staff, and may be preliminary in nature. In preparing any country program or strategy, financing any project, or by making any designation of or reference to a particular territory or geographic area in this document, the Asian Development Bank does not intend to make any judgments as to the legal or other status of any territory or area.

lW Ranchi/Dat "d 5.t8 f V f STATE HIGHWAYS AUTHORITY OF JHARKHAND (SHAJ)

PHASE-II PROJECTS

Second Jharkhand State Road Project (SJSRP) ADB LOAN NO.: 3276-IND

Annual Environmental Monitoring Report January 2017 to December 2017

STATE HIGHWAYS AUTHORITY OF JHARKHAND (SHAJ)

TPF GETINSA EUROESTUDIOS S.L. Joint Venture with RODIC CONSULTANTS PVT LTD In Association with EUROESTUDIOS Pvt. Ltd.

Improvement / Upgrading / Widening of:

Package – 1 RD:01- Dumka-Hansdiha, 44.221Km, Ashoka Buildcon Limited. Package – 2 RD:02- Pachamba--Sarwan, 45.175Km, GKC Projects Limited. Package – 3 RD:03- Govindpur--, 43.550Km, Ashoka Buildcon Limited. Package – 4 RD:04- Khunti-Tamar, 43.697km, YFC Projects Limited.

TPF GETINSA EUROESTUDIOS S.L. in Joint Venture with RODIC CONSULTANTS PVT LTD In Association with EUROESTUDIOS INDIA Pvt. Ltd.

Page 1 of 178

STATE HIGHWAYS AUTHORITY OF JHARKHAND (SHAJ) PHASE-II PROJECTS

TABLE OF CONTENTS

Sl. Description Page No. 1 Introduction & Project Progress 4 Compliance status with National /State /Local statutory 2 8 environmental requirements Compliance status with the environmental covenants as 3 12 stipulated in the Loan Agreement Compliance status with environmental management and monitoring plans and environmental assessment and review 4 16 framework/procedures as stipulated in the environmental documentation as agreed with ADB Monitoring of environmental receptors/ attributes (e.g. ambient 5 air, surface water, ground water, land, ecological aspects, noise, 144 hazardous/toxic wastes, etc.) Any other environmental aspects, impacts observed during 6 155 implementation which were not covered earlier Details of Grievance Redress Committee and complaints 7 155 received from public and actions taken thereof to resolve 8 Public consultation during project implementation 155 9 Institutional set-up for EMP implementation 156 10 Follow-up actions and conclusions 159 List of Table: Table-01 Project Road Details 4 Table-02 Silent Feature and Progress as on December 2017 6 Table-03(a) Section wise forest detail in Package-II 7 Table-03(b) Section wise forest detail in Package-III 7 Table-04 Status of Statutory Compliances 9 Table-05 Compliance Status of Environmental Loan Covenants 12 Table-06 EMP Compliance of Package-I 16 Table-07 EMP Compliance of Package-II 47 Table-08 EMP Compliance of Package-III 77 Table-09 EMP Compliance of Package-IV 114 Table-10 ADB approved Environmental Monitoring Plan 144 Table- 11 Environmental Monitoring data 149 Table-12 Public Consultation carried out f till December 2017 156 Table-13 SJSRP Environmental Management Cell 159

List of Figure: Figure-1 Location Map of Project Road 5 Figure-2 Organization Chart for SJSRP 159

TPF GETINSA EUROESTUDIOS S.L. in Joint Venture with RODIC CONSULTANTS PVT LTD In Association with EUROESTUDIOS INDIA Pvt. Ltd.

Page 2 of 178

STATE HIGHWAYS AUTHORITY OF JHARKHAND (SHAJ) PHASE-II PROJECTS

List of Appendix: Appendix-1 Sample Public Consultation Record 160 Appendix-2 Sample HIV AIDS & Free Health Camp 165 Appendix-3 Photographs of EHS Orientation & Trainings 166 Appendix-4 Constitution of GRC at PIU Level 167 Appendix-5 Constitution of GRC at State / SHAJ Level 169 Appendix-6 Tree Cutting Permission 171 Appendix 7 Sample Environmental Monitoring Test Reports 176

TPF GETINSA EUROESTUDIOS S.L. in Joint Venture with RODIC CONSULTANTS PVT LTD In Association with EUROESTUDIOS INDIA Pvt. Ltd.

Page 3 of 178

STATE HIGHWAYS AUTHORITY OF JHARKHAND (SHAJ) PHASE-II PROJECTS

1.0 INTRODUCTION

1. The Government of Jharkhand has planned a consistent upgrading of its road network through State Highways Authority of Jharkhand (SHAJ). The Second Jharkhand State Road Project (SJSRP) has been conceptualized to improve state highways connectivity in the State of Jharkhand which came into existence at the initiative by the Government of Jharkhand after the implementation of the JSRP projects. 2. The Detailed Project Reports (DPR) was prepared in 20014-15 by the DPR consultants based on that, a loan component US$200 Million has been provided to SHAJ. Further for implementing development of 4 selected priority State Highways under the external funding concept of Government of India the Government of Jharkhand has granted Loan under ID No. 3276 (INDIA). 3. The SHAJ projects have conceded into 4 separate contract packages as Package-1 to Package-4 under BOQ modality of financial loan assistance from the Asian Development Bank. All the four contract packages have been awarded to separate Contractors for development of respective sections of State Highways and Construction Supervision Consultant’s Services entrusted to M/s TPF GETINSA EUROESTUDIOS S.L. in Joint Venture with RODIC CONSULTANTS PVT LTD In Association with EUROESTUDIOS INDIA Pvt. Ltd. for all four contract packages. 4. The Second Jharkhand State Road Project (SJSRP) project includes widening and improvement of three exiting State Highways and one Major District Roads totalling 176.643 km located in Dumka, Godda, Giridih, Dhanbad, Khunti and Ranchi districts of Jharkhand State. The Project Details are given in Table-1 and the Location Map in Fig-1. Table-1: Project Road Details

Pkg Road ID SH/MDR Description Length (KM) District Contractor Name

I RD 01 SH-17 Dumka to Hansdiha 44.221 Dumka, Godda, Ashoka Buildcon Ltd. MDR-86 & II RD 02 Pachamba-Jamua- Sarwan 45.175 Giridih GKC Projects Ltd. 83 III RD 03 SH-13 Govindpur-Tundi- Giridih 43.550 Dhanbad, Giridih Ashoka Buildcon Ltd. IV RD 04 SH-3 Khunti to Tamar 43.697 Khunti, Ranchi YFC Projects Ltd. Total 176.643

TPF GETINSA EUROESTUDIOS S.L. in Joint Venture with RODIC CONSULTANTS PVT LTD In Association with EUROESTUDIOS INDIA Pvt. Ltd.

Page 4 of 178

STATE HIGHWAYS AUTHORITY OF JHARKHAND (SHAJ) PHASE-II PROJECTS

Fig-1: Location Map of Project Roads

5. The Annual Environmental Monitoring Report (EMR) has been prepared to ensure the supervision and monitoring of the Contractors obligations is being carried out in accordance with the Contractors Contract Agreement and to apprise Employer and Asian Development Bank about the Contractors EMP implementation at each Contract Project sites. 6. The EMR covers the implementation of various parameters of Environmental Management Plan (EMP), and Construction safety during the Project Implementation for the Period January 2017 to December 2017. 7. As per ADB’s Safeguard Policy Statement (2009) and the Environmental assessment guidelines 2003 all the four packages have been categorised as Category-“B”. 8. The salient feature and progress as on December 2017 is given in Table-2.

TPF GETINSA EUROESTUDIOS S.L. in Joint Venture with RODIC CONSULTANTS PVT LTD In Association with EUROESTUDIOS INDIA Pvt. Ltd.

Page 5 of 178

STATE HIGHWAYS AUTHORITY OF JHARKHAND (SHAJ) PHASE-II PROJECTS

Table-2: Salient Feature and Progress as on December 2017 Package 2 Package 3 S/ Status of Package 1 Dumka- Package 4 Pachamba- Gobindpur-Tundi- N Road Projects Hansdiha Khunti-Tamar Jamua-Sarwan Giridih Total Length 1 44.221 45.175 43.55 43.697 (km) Ashoka Buildcon 2 Contractor Ashoka Buildcon Ltd. GKC Projects Ltd YFC Projects Ltd Ltd. Contract Sign 3 11.03.2016 11.04.2016 11.03.2016 03.05.2016 Date Commenceme 4 01.08.2016 15.09.2016 01.08.2016 12.09.2016 nt date Scheduled 5 date of 01.08.2019 14.09.2019 01.08.2019 11.09.2019 completion Contract 6 2,114,905,455.00 1,701,015,184.00 1,901,047,663.00 1,514,296,367.00 Amount (Rs.) Village- Tikha Village- Tarbandha Village- Lodharia Village- Simbukel Magha at Km at Km 17+000, at Km 17+000, at Km 03+420, 37+300, Installation Installation of Installation of Installation of 7 Camp Details of Base Camp and Base Camp and Base Camp and Base Camp and Labour Camp is in Labour Camp is in Labour Camp is in Labour Camp is in Progress. Progress. Progress. Progress. Major Bridge: 01 Major Bridge: 02 Major Bridge: 03 Major Bridge: Nil Minor Bridge: 05 Minor Bridge: 04 Minor Bridge: 06 Minor Bridge: 09 Pipe Culvert: 82 Pipe Culvert: 15 Pipe Culvert: 29 Pipe Culvert: 15 Major Project Box Culvert: 81 Box Culvert: 32 Box Culvert: 33 Box Culvert: 57 8 Features Slab Culvert: Nil Slab Culvert: Nil Bypass: Nil Slab Culvert: 02 Bypass: Nil Bypass: Jamua Bypass: Nil (2.03 Kms) New scope1 Physical Progress Physical Progress Physical Progress Physical Progress Physical (Highway and (Highway and (Highway and (Highway and 9 Progress Structure) is 39.09% Structure) is Structure) is Structure) is 18.32% 40.37% 30.59% Crusher Plant at Crusher Plant, Crusher Plant at Crusher Plant at Maouza- Hot Mix Plant, Gorga, Km 17+000 Saedba at Km Chorbatiya Km WMM Plant & (RHS) about 22 Km. 11+000 (LHS) 45+000 (RHS) - Batch Mix Plant at Hot Mix Plant, about 2 Kms. 10 Plant Details about 3.00 Km Km 17+000 (Base WMM Plant & Batch Hot Mix Plant, Hot Mix Plant, WMM Camp) Mix Plant at Km WMM Plant & Plant & Batch Mix 37+300 (Base Batch Mix Plant at Plant at Km 17+000 Camp) Km 03+420 (Base (Base Camp) Camp) Section wise Section wise Forest Forest details is 11 Forest Details Nil details is given in Nil given in Table- Table-3(b) 3(a)

1 Addendum to the ADB approved IEE report is being prepared.

TPF GETINSA EUROESTUDIOS S.L. in Joint Venture with RODIC CONSULTANTS PVT LTD In Association with EUROESTUDIOS INDIA Pvt. Ltd.

Page 6 of 178

STATE HIGHWAYS AUTHORITY OF JHARKHAND (SHAJ) PHASE-II PROJECTS

Package 2 Package 3 S/ Status of Package 1 Dumka- Package 4 Pachamba- Gobindpur-Tundi- N Road Projects Hansdiha Khunti-Tamar Jamua-Sarwan Giridih Dumka: 2280 out of 720 in non-forest Dhanbad:359 Tree Cutting 2316 trees felled. area Giridih:133 12 Khunti: 1459 Details Godda: 138 out of 140 161 in Forest felled area.

Study of Elephant corridor by the Wild Life Expert, CSC has been carried out. Elephant Elephant movement path along the following three road subprojects has been found: 13 Corridor 1. Dumka to Hansdia Pkg 1, Details 2. Govindpur-Tundi-Giridih (Pkg-III) and 3. Khunti- Tamar (Pkg-IV):

Table-3(a): Section wise Forest details in Package-2 (Pachamba-Jamua-Sarwan) Chainage S. No. Village Forest Land (ha.) from To 1 3+210 4+570 Nawadih 0.192 2 4+570 5+900 Pariana 0.496 3 11+000 12+900 Karodih 0.572 4 12+900 14+375 Dharchachi 0.392 5 14+350 15+820 Bati 0.24 6 19+120 20+530 Kandajor 0.004 7 21+290 22+160 Chitardih 0.456 8 52+000 54+500 Chatro 0.104 9 54+500 55+920 Kantidighi 0.048 10 55+920 56+200 Gamhardih 0.584 11 57+000 58+250 Patharatand 0.432 Total 3.52

Table-3(b): Section wise Forest details in Package-3 (Gobindpur-Tundi-Giridih) Chainage Forest S. No. Village From To land (ha.) Dhanbad division 1 6.440 6.590 6.880 6.910 Sundar Pahari 0.271 6.520 6.630 2 13.130 13.600 3.336 Pandugri 13.600 14.190 3 14.210 15.090 15.420 15.600 Durgadih 2.223 15.220 15.420 4 15.920 16.200 Lodhariya 0.696 15.600 15.870 5 17.420 17.530 Mahtodih 0.073

TPF GETINSA EUROESTUDIOS S.L. in Joint Venture with RODIC CONSULTANTS PVT LTD In Association with EUROESTUDIOS INDIA Pvt. Ltd.

Page 7 of 178

STATE HIGHWAYS AUTHORITY OF JHARKHAND (SHAJ) PHASE-II PROJECTS

Chainage Forest S. No. Village From To land (ha.) 6 17.390 18.340 Gaditundi 0.992 17.530 18.060 7 18.230 18.930 18.640 18.900 Sagbehri 0.951 18.340 18.370 8 18.930 19.120 Kammalpur 1.235 19.310 19.690 9 19.650 20.190 Lachnasar 0.235 10 19.690 20.190 Rajnagar 0.409 11 20.190 20.250 20.350 20.520 Bhagnahir 0.356 20.580 20.690 12 23.280 23.420 Kolhar 1.178 24.910 25.240 13 25.240 25.450 Karitand 0.567 14 25.450 25.660 25.660 25.850 Jiyajori 1.506 25.850 26.050 15 25.660 25.850 Lakrakhundi 0.182 16 27.030 27.100 Dhadhkitand 0.061 17 37.135 37.380 Pratappur 0.652 Total 14.923 Giridih division 1 28.110 28.210 Taratanr 0.2427 28.370 28.450 2 39.350 39.410 39.400 39.490 39.540 39.860 Barkitanr 1.5627 39.890 39.950 40.030 40.360 40.380 40.510 3 40.520 40.650 Gangapur 0.0809 Total 1.880

2.0 Compliance status with National /State /Local statutory environmental requirements:

9. SHAJ has initiated the forest clearances, tree cutting permission for non-forest area and forest area. Study on identification of Elephant Corridor within the sub project has been carried out and Elephant movement path along the following three road subprojects has been found: 1. Dumka to Hansdiha Pkg 1, 2. Pachamba-Jamua- Sarwan Pkg 2 2. Govindpur-Tundi-Giridih Pkg-3 and 3. Khunti- Tamar (Pkg-4)

10. Compliance Report for Elephant Movement path along the three roads’ in Jharkhand state and suggestion for the precautionary measures has also been prepared and issued to Contractors for implementation.

TPF GETINSA EUROESTUDIOS S.L. in Joint Venture with RODIC CONSULTANTS PVT LTD In Association with EUROESTUDIOS INDIA Pvt. Ltd.

Page 8 of 178

STATE HIGHWAYS AUTHORITY OF JHARKHAND (SHAJ) PHASE-II PROJECTS

11. The requisite statutory permission by the civil contractor has been initiated and details of the same are given in Table-4. Table-4: Status of Statutory Compliance initiated by the contractor during Project implementation Applicable # Pkg-1 Pkg-2 Pkg-3 Pkg-4 Permits Permission for  Vendor  DMO Giridih  Vendor  DMO Dhanbad Agreement letter No. 1355 Agreement Stone Quarry letter No. 1663 Dated 10.01.17 Dated 09.06.17 Dated 10.01.17 from: Dated 03.10.17 up to 31.03.18  up to 31.03.18 a) Department Vendor EC No No 1924 Dated   of Mines Mining Lease 843 dt 30.04.15 22.11.17 DMO Khunti DMO letter no and letter No. 27 and  DMO Dhanbad 1586 dated Agreements Dated 02.05.17 Geology, No 717 dt. 26.11.2016  & letter No 214 b) SEIAA Mining Lease 24.04.2017 valid up to Dt 11.07.2015 Dated 02.05.16 /DEIAA  DMO Giridih 25.11.2021 up to Letter No 379 c) State No 459 Dt  EC Quarry 31.03.2020 dated 26.07.16 Revenue 13.02.2017 DEIAA-letter vide No 125 dt (LOI) 1 Department  Mining lease No 19 Dt 07.11.2017 of  DEIAA/EC- d) District 2161/1898 17.09.2016 Dept of 13/2016-17 dated Administrati Upto industries dated 28.03.2016 up on. 16.09.2020 mines and 28.10.2016 up to 27.03.2026. e) If mining  DMO Dumka geology to 27.10.2020  EC/SEIAA/201 area comes letter No. 2264 (Mining Court)  Mining Lease 5- under forest dated 13.12.17  DEIAA(EC) letter no-IN- 16/1743/2015/2 land, No 1781 dated letter no 91 JH0401576891 581dt permission 19.09.17, 1869 dated 90890 dated 31.12.2016 up from State dt 11.10.17 No 11.05.2017 up 10.12.2016upto to 20.12.2020 Forest 701 dt 22.04.17 to 10.05.2021 09.12.2020

Department R-2/stonequarry/p- DGMS vide letter 19-2016-2220 No-S- 29020/114/2017- DGMS 2 Yet to be submitted Not applicable obtained dt. 23-09- RR-893 Dated- Permission 16. 22/05/2017 valid up to 21/05/2020 (three years)  Material being  Material being procured from  Hiralal procured from market. Agencies Pvt. market.  Vendor Ltd. License  Vendor Agreement No. Agreement Dated 10.01.17  Material being E/HQ/JH/22/25 Dated 10.01.17 up to 31.03.18 License for use procured from 3, Valid up to up to 31.03.18  Vendor’s of explosive market 19/12/2020.  Vendor’s Blasting license 3 from the office  Vendor License and blasting Blasting license No 28 dt. of Explosives No. agreement is No 28 dt. 07.02.2017 controller; E/EC/JH/22/921 07.02.2017  Blasting valid up to (E81140) Blasting Certificate Certificate No 31.03.2018 No E/EH/JH/30/58( E/EH/JH/30/58(E78 E78606) 606) dt.12.11.13 dt.12.11.13

valid till 12.11.2018 valid till 12.11.2018

TPF GETINSA EUROESTUDIOS S.L. in Joint Venture with RODIC CONSULTANTS PVT LTD In Association with EUROESTUDIOS INDIA Pvt. Ltd.

Page 9 of 178

STATE HIGHWAYS AUTHORITY OF JHARKHAND (SHAJ) PHASE-II PROJECTS

Applicable # Pkg-1 Pkg-2 Pkg-3 Pkg-4 Permits Permission for drawing water from bore well / pond / river 4 from village Yet to be submitted Yet to be submitted Yet to be submitted Yet to be submitted Panchayat / Irrigation Department as applicable; Consent to Establishment (CTE)2 from JSPCB: Obtained vide Lt. Obtained vide Lt. Obtained vide Lt. Obtained vide Lt. No.-131  Crusher No.-476 dt. No.-446 dt. No.-471 dt. dt.06.04.2017 and Plant 21/12/2016 16.08.2017 19.12.2016 Lt. No.-55 dt. 23.02.2017 Obtained vide Lt. Obtained vide Lt. Obtained vide Lt. Obtained vide Lt. 5  HMP No.-472 dt. No.-446 dt. No.-72 dt. No.-345 dt. 19/12/2016 16.08.2017 01.03.2017 18.07.2017 Obtained vide Lt. Obtained vide Lt. Obtained vide Lt. Obtained vide Lt.  WMM Plant No.-474 dt. No.-446 dt. No.-72 dt. No.-345 dt. 19/12/2016 16.08.2017 01.03.2017 18.07.2017  Concrete Obtained vide Lt. Obtained vide Lt. Obtained vide Lt. Obtained vide Lt. Batching No.-473 dt. No.-446 dt. No.-72 dt. No.-343 dt. Plant 19/12/2016 16.08.2017 01.03.2017 18.07.2017 Consent to Operate (CTO) from JSPCB: Obtained vide Lt. No.-128 dt. Obtained vide Lt. 08/02/2017 Obtained vide Lt. Obtained vide Lt. No.-819 Dt.  Crusher Renewed vide Lt. No.-1801 Dt. No.-181 Dt. 29.06.2017 Valid Plant No.-1876 Dt. 23.11.2017 VALID 01.03.2017 Valid 31.03.2018 UPTO 30.06.2020 31.12.2017 07.12.2017 Valid 31.12.2017 Obtained vide Lt. Obtained vide Lt. No.-127 dt. Obtained vide Lt. No.-1535 Dt. 02/08/2017 Obtained vide Lt. 6 No.-1801 Dt.  HMP Renewed vide Lt. No.-234 Dt. 02.11.2017 Valid 23.11.2017 VALID No.-1876 Dt. 02.02.2018 31.03.2018 UPTO 30.06.2020 07.12.2017 Valid 31/12/2020 Obtained vide Lt. No.-129 dt. Obtained vide Lt. Obtained vide Lt. Obtained vide Lt. 02/08/2017 No.-345 Dt. No.-1801 Dt. No.-234 Dt. Renewed vide Lt.  WMM Plant 23.11.2017 02.02.2018 18.07.2017. Valid No.-1878 Dt. Valid upto Valid upto upto 31.03.2018 12.07.2017 30.06.2020 31.12.2020 Valid upto 31.12.2020

2 DG Sets consent has been obtained along with Plants.

TPF GETINSA EUROESTUDIOS S.L. in Joint Venture with RODIC CONSULTANTS PVT LTD In Association with EUROESTUDIOS INDIA Pvt. Ltd.

Page 10 of 178

STATE HIGHWAYS AUTHORITY OF JHARKHAND (SHAJ) PHASE-II PROJECTS

Applicable # Pkg-1 Pkg-2 Pkg-3 Pkg-4 Permits Obtained vide Lt. No.-159 dt. Obtained vide Lt. Obtained vide Lt. Obtained vide Lt.  Concrete 22/02/2017 No.-1801 Dt. No.-234 Dt. No.-170 Dt. Batching Renewed vide Lt. 23.11.2017 02.02.2018 11.08.2017 Valid Plant No.-1877 Dt. Valid upto Valid upto 31.03.2019 07.12.2017 30.06.2020 31.12.2020 Valid 31.12.2020 Obtained on Obtained on Obtained on Obtained on 7 Labour License 14/06/2016 & valid 11/03/2017 & valid 25/08/2017 & valid 12/09/2017 & valid up to 13/06/2018 up to 10/03/2018 up to 24/08/2018 up to 11/09/2018 Labor insurance No- Insurance 960000361601000 Labor insurance Labor Insurance Policy including Labor Insurance 00084 FROM 26- No- No- labours No- 08-2016 TO 25-08- 170427272711000 101006/48/18/0002 170427271100008 8 insurance 9 dated 30.04.2017 2017 & 090 Dated- 43 dated (skilled and valid up to 960000361701000 30.04.2017 valid up 13.10.2017 Valid semi-skilled 29.04.2018. 00144 FROM 26- to 29.04.2017 up to 12.10.2018. workers) 08-2017 Valid up to 25-08-2018

CAR No. Contractors All CAR No CAR No Risks (CAR) CAR No 112002441 0204824416P1018 0204824416P1018 Insurance 74049 Dt.05-04- 960000441603000 6p113140872 71865 dated Policy including 2016 0012 Dt. dated 27-09-2016 04.05.2016 valid up 9 labours Valid up to 06.08.2016 valid up valid up to 26-09- to 03.05.2019 insurance 05.03.2019 to 05.08.2019 2019 (skilled and

semi-skilled workers)

Identification of Identification of Identification of Identification of Borrow Area has Borrow Area has Borrow Area has Borrow Area has been done. been done. been done. been done. Borrow Earth Contractor has Contractor has Contractor has Contractor is applied for applied for applied for applying for 10 permission from permission from permission from permission from DEIAA/SEIAA DEIAA/SEIAA DEIAA/SEIAA DEIAA/SEIAA Permission from DIEAA / Yet to be submitted Yet to be submitted Yet to be submitted Yet to be submitted SEIAA Forest 11 Not Required Under process Under process Not Required Clearances  Permission Permission obtained obtained vide Letter Godda forest no-2034 Dt. Tree Cutting division letter 23/12/2016. 12 Under process Under process Permission no 3003 No. of trees to be Dt.2/12/2016 cut 1455 and No. for 192,140 no of trees to be of plant. replanted 194

TPF GETINSA EUROESTUDIOS S.L. in Joint Venture with RODIC CONSULTANTS PVT LTD In Association with EUROESTUDIOS INDIA Pvt. Ltd.

Page 11 of 178

STATE HIGHWAYS AUTHORITY OF JHARKHAND (SHAJ) PHASE-II PROJECTS

Applicable # Pkg-1 Pkg-2 Pkg-3 Pkg-4 Permits  Permission obtained Vide no-3554 Dt, 13/12/2016 for 2316 no of trees Uniform Tree Cutting permission explaining procedure granted for all packages vide No 3625 Dated 16.05.2018 for all packages. Elephant Elephant Elephant movement movement movement assessment & plan assessment & plan assessment & plan prepared in prepared in prepared in consultation with consultation with consultation with Study of DFOs. DFOs. DFOs. Elephant Proposed Plan Study rules out any Proposed Plan Proposed Plan Corridor and approved on elephant movement approved on approved on 13 Permission 26.05.2017 vide along the 26.05.2017 vide 26.05.2017 vide from Wildlife letter no.907 subproject road. letter no.907 letter no.907 Department Approved plan Approved plan Approved plan issued to issued to issued to Contractor for Contractor for Contractor for implementation on implementation on implementation on 21.08.2017 vide no 21.08.2017 vide no 21.08.2017 vide no 952 952 952 P/EL/JH/14/1746(P P/EC/JH/14/1732 P/EC/JH/14/1771 P/EC/JH/14/1734 390151) Dated 03- (P379777) (P389796) (P380164) Permission for 01-2017 14 Dated- 29/08/2016 Dated- 27/04/2017 Dated 02-09-2016 HSD Pump Valid up to 31-12- Valid up to- Valid up to Valid up to 2018 31/12/2018 31.12.2020 31.12.2018

3.0 Compliance status with the environmental covenants as stipulated in the Loan Agreement 11. The compliance status of Environmental Loan covenants as stipulated in the Loan Agreement is given in Table-5. Table-5: Compliance status of Environmental Loan covenants as stipulated in the Loan Agreement Sl. Loan Agreement Compliance Environmental Compliance Requirements No Reference Status Conditions of Award of Contract Commencement of Work: Para-5,  The Borrower shall ensure or cause the EA to ensure that 1 Schedule-4 of no Works contract is awarded which involves environmental Being Complied Loan Agreement: impacts until the EA has incorporated the relevant provisions from the EMP into the Works contract.

TPF GETINSA EUROESTUDIOS S.L. in Joint Venture with RODIC CONSULTANTS PVT LTD In Association with EUROESTUDIOS INDIA Pvt. Ltd.

Page 12 of 178

STATE HIGHWAYS AUTHORITY OF JHARKHAND (SHAJ) PHASE-II PROJECTS

Sl. Loan Agreement Compliance Environmental Compliance Requirements No Reference Status  The Borrower shall ensure or cause the EA to ensure that no commencement of Works is allowed under any Works contract which involves environmental impacts and requires environmental clearances, until EA has obtained the final approval of (i) the IEE from ADB, and (ii) environmental clearance including approval of the environmental assessment report, from the State Environmental Impact Assessment Authority. Environment: The Borrower shall ensure or cause the EA to ensure that the preparation, design, construction, implementation, operation and decommissioning of the Project and all Project facilities Para-4, comply with Schedule-5 of (i) all applicable laws and regulations of the Borrower and Being Complied Loan the State relating to environment, health, and safety; Agreement: (ii) the Environmental Safeguards; and (iii) all measures and requirements set forth in the IEE and EMP, and any corrective or preventative actions set forth in a Safeguards Monitoring Report Human and Financial Resources to Implement Para-8, Safeguards Requirements: Schedule-5 of The Borrower shall make available or cause the EA to make Being Complied Loan available necessary budgetary and human resources to fully Agreement: implement the EMP and the RP. Safeguards — Related Provisions in Bidding Documents and Works Contracts: (a) The Borrower shall ensure or cause the EA to ensure that all bidding documents and contracts for Works contain provisions that require contractors to: (b) comply with the measures relevant to the contractor set forth in the IEE, the EMP, and the RP (to the extent they concern impacts on affected people during construction), and Para-9, any corrective or preventative actions set forth in a Safeguards Schedule-5 of Monitoring Report; Being Complied Loan (c) make available a budget for all such environmental and Agreement: social measures; (d) provide the EA with a written notice of any unanticipated environmental, resettlement or indigenous peoples risks or impacts that arise during construction, implementation or operation of the Project that were not considered in the IEE, the EMP, and the RP; (e) adequately record the condition of roads, agricultural land and other infrastructure prior to starting to transport materials and construction; and

TPF GETINSA EUROESTUDIOS S.L. in Joint Venture with RODIC CONSULTANTS PVT LTD In Association with EUROESTUDIOS INDIA Pvt. Ltd.

Page 13 of 178

STATE HIGHWAYS AUTHORITY OF JHARKHAND (SHAJ) PHASE-II PROJECTS

Sl. Loan Agreement Compliance Environmental Compliance Requirements No Reference Status (f) Reinstate pathways, other local infrastructure, and agricultural land to at least their pre-project condition upon the completion of construction. Safeguards Monitoring and Reporting: The Borrower shall ensure or cause the EA to ensure the following: a) submit Safeguards Monitoring Reports semiannually for Involuntary Resettlement Safeguards and Indigenous Peoples Safeguards and annually for Environmental Safeguards to ADB and disclose relevant information from such reports to affected persons promptly upon submission; b) if any unanticipated environmental and/or social risks and impacts arise during construction, implementation or operation of the Project that were not considered in the Para-10, IEE, the EMP, and the RP, promptly inform ADB of the Schedule-5 of occurrence of such risks or impacts, with detailed Being Complied. Loan description of the event and proposed corrective action Agreement: plan; c) no later than 3 months from award of the first Works contract, engage or cause to be engaged qualified and experienced external experts or qualified nongovernmental organizations under a selection process and terms of reference acceptable to ADB, to verify information produced through the Project monitoring process, and facilitate the carrying out of any verification activities by such external experts; and d) Report any actual or potential breach of compliance with the measures and requirements set forth in the EMP or the RP promptly after becoming aware of the breach. Prohibited List of Investments: Para-11, The Borrower shall ensure or cause the EA to ensure that no Schedule-5 of proceeds of the Loan under the Project are used to finance Being Complied Loan any activity included in the list of prohibited investment Agreement: activities provided in Appendix 5 of the SPS. Labor Standards: The Borrower and EA shall ensure that Works contracts under the Project follow all applicable labor laws of the Borrower and Para-12, the State and that these further include provisions to the effect Schedule-5 of that contractors; Being Complied Loan (i) carry out HIV/AIDS awareness programs for labor and Agreement: disseminate information at worksites on risks of sexually transmitted diseases and HIV/AIDS as part of health and safety measures for those employed during construction; and

TPF GETINSA EUROESTUDIOS S.L. in Joint Venture with RODIC CONSULTANTS PVT LTD In Association with EUROESTUDIOS INDIA Pvt. Ltd.

Page 14 of 178

STATE HIGHWAYS AUTHORITY OF JHARKHAND (SHAJ) PHASE-II PROJECTS

Sl. Loan Agreement Compliance Environmental Compliance Requirements No Reference Status (ii) Follow and implement all statutory provisions on labor (including not employing or using children as labor, equal pay for equal work), health, safety, welfare, sanitation, and working conditions. Such contracts shall also include clauses for termination in case of any breach of the stated provisions by the contractors.

11. Change of Scope: The new “Jamua Bypass” has been identified in Package-II which was not covered in ADB approved Initial Environmental Examination (IEE). An addendum to approved IEE report is being prepared and approval from ADB will be obtained before commencement of civil works on Jamua Bypass.

TPF GETINSA EUROESTUDIOS S.L. in Joint Venture with RODIC CONSULTANTS PVT LTD In Association with EUROESTUDIOS INDIA Pvt. Ltd.

Page 15 of 178 STATE HIGHWAYS AUTHORITY OF JHARKHAND (SHAJ)

PHASE-II PROJECTS

4.0 Compliance status with environmental management and monitoring plans and environmental assessment and review framework/procedures as stipulated in the environmental documentation as agreed with ADB: The compliance status of EMP implementation during project execution is given in Table-6, Table-7, Table-8 & Table-9 for the Package-01, 02, 03 and 04 respectively. Table-6: Environmental Management Plan Compliance Status of Package-1 Environmental Remedial Measure Reference to Location Monitoring Monitoring Institutional Observation Observation Corrective Issue/ Component laws/ guideline indicators (MI)/ Methods Responsibility during the during the action and Performance reporting reporting follow up if Target (PT) period period required Implementation Supervision Environmental Management Plan Compliance Status of Package-1 A. Design and Pre-construction Stage 1. Alignment 1.1 Pavement  Soaked CBR value of Design Entire stretch MI: Design and Review of Design SHAJ Complied - damage and sub grade is requirement Embankment number of cross and detail design Consultant inadequate drainage recommended to be 12 raised at 12 side drains, slab/box documents & locations for a culverts, and Hume drawings and provisions in habitat %.  Overloading to be length of 4.33 km pipes comparison areas checked (Refer Appendix with site  Raised embankment 4 of ADB PT: Design and conditions and provision of approved IEE numbers are in roadside drainage to report) Roadside accordance with site prevent damage to drains (both sides needs pavement due to water together) logging on the road and Covered=28.106 also inconvenience km Lined=46.246 caused to km  Provision of adequate Unlined=12.734 no. of cross drainage km structures.  Increase (vent and For list of bridges height) in waterway of with increased existing structures. waterway Pls refer  Roadside drains have Appendix 3 of been proposed with ADB approved suitable outfalls. IEE report.  Additional 19 culverts proposed

TPF GETINSA EUROESTUDIOS S.L. in Joint Venture with RODIC CONSULTANTS PVT LTD In Association with EUROESTUDIOS INDIA Pvt. Ltd.

Page 16 of 178

STATE HIGHWAYS AUTHORITY OF JHARKHAND (SHAJ) PHASE-II PROJECTS

Environmental Remedial Measure Reference to Location Monitoring Monitoring Institutional Observation Observation Corrective Issue/ Component laws/ guideline indicators (MI)/ Methods Responsibility during the during the action and Performance reporting reporting follow up if Target (PT) period period required Implementation Supervision Environmental Management Plan Compliance Status of Package-1 1.2 Safety along the  Provision of crash Design At embankment, MI: number and Review of Design SHAJ Complied - proposed alignment barriers at accident requirement height >3.0 m total location of crash design Consultant prone areas and high length = 5.29 km barriers, rumble documents embankments. strips, warning sign and drawings  Rumble strips in habitat IRC:SP:84-2014 Rumble strip = 40 boards, sidewalks and areas, schools, junction IRC:8, IRC:25, locations ( 27 built comparison and curves to regulate IRC:26, IRC:35, up areas, 1 PT: numbers and with site speed. IRC:67, IRC:103 school, 12 location are in conditions  Provision of retro and Section 800 junctions) accordance with site reflective warning of MoRTH needs signboards near Specifications Total 854 road school, hospital delineators/chevro ,religious places and Horizontal n/ object markers forests geometry will be  Provision of based on IRC: Pedestrian Guard sidewalks in the 38-1988 and Rails=7.1 km builtup sections, on vertical geometry both sides. will be based on Service Road for  Signs and marking IRC: SP 23-1993 7.1 km length at viz., cat’s eyes, “. 13.800 to 14.800, delineators, object 26.150 to 27.700 markers, hazard IRC: SP: 67- 41.500 to 45.500 markers, safety 2012 Total no. of street barriers at hazardous lights=534 locations, pedestrian guardrails, etc  Pedestrian cross-walks Complied - at all Junctions and where conflict exists between vehicular and pedestrian movements (bus bays, schools and habitation.  Safety kerb at all bridges  Service roads in densely habitated areas

TPF GETINSA EUROESTUDIOS S.L. in Joint Venture with RODIC CONSULTANTS PVT LTD In Association with EUROESTUDIOS INDIA Pvt. Ltd.

Page 17 of 178

STATE HIGHWAYS AUTHORITY OF JHARKHAND (SHAJ) PHASE-II PROJECTS

Environmental Remedial Measure Reference to Location Monitoring Monitoring Institutional Observation Observation Corrective Issue/ Component laws/ guideline indicators (MI)/ Methods Responsibility during the during the action and Performance reporting reporting follow up if Target (PT) period period required Implementation Supervision Environmental Management Plan Compliance Status of Package-1  Horizontal and vertical geometry as per IRC Specification  Zebra crossing with informatory warning sign on approach to school, warning sign with footways and speed limit sign  Street Lighting in built- up sections  Ambulance and medical aid posts 2. Natural Hazards 2.2  Provision of adequate IRC:34 Entire stretch. MI: Design and Review of SHAJ Complied - Flooding/Waterloggi number of CD Recommendatio numbers of cross & design ng structures. Additional n IRC:34 IRC:34 Embankment side drains, slab/box documents culverts have been Recommendatio raised at 12 culverts Hume and drawings proposed. ns for road locations for a pipes, road and

 All CD structures construction in length of 4.33 km embankment height, comparison designed for 50year waterlogged area (Refer Appendix design and number with site HFL return period and and IRC: 75 and 4 of ADB of bridges conditions bridges designed for MORT&H approved IEE 100 year HFL return guidelines for report) PT: Design and period Design of High numbers are in  Water ways of bridges Embankments Roadside drains accordance with site and culverts have been (both sides needs increased. together)  Roadside drains also Covered=28.106 provided km Lined=46.246  Embankment height km raised along low lying/ Unlined=12.734 potential water logged km For list of areas bridges with  Improvement in existing increased culverts/ Bridges to waterway Refer Appendix 3 of

TPF GETINSA EUROESTUDIOS S.L. in Joint Venture with RODIC CONSULTANTS PVT LTD In Association with EUROESTUDIOS INDIA Pvt. Ltd.

Page 18 of 178

STATE HIGHWAYS AUTHORITY OF JHARKHAND (SHAJ) PHASE-II PROJECTS

Environmental Remedial Measure Reference to Location Monitoring Monitoring Institutional Observation Observation Corrective Issue/ Component laws/ guideline indicators (MI)/ Methods Responsibility during the during the action and Performance reporting reporting follow up if Target (PT) period period required Implementation Supervision Environmental Management Plan Compliance Status of Package-1 increase their carrying ADB approved capacity. IEE report) 3. Loss of Land and Assets 3.1 livelihood loss to  affected persons The Right to Fair Throughout the MI: Payment of Check LA SHAJ and SHAJ Under Details affected persons  Road improvement Compensation corridor compensation and records; implementing Process provided in work to be and assistance to DPs as design NGO SMR July- accommodated within Transparency in per RP drawings vs Dec 2017 available ROW to the Land Acquisition, land plans; extent possible. Rehabilitation Number of  Social Impact And complaints/griev Interview with Assessment and Resettlement ances related to affected Resettlement Plan to Act, 2013 and compensation and persons be undertaken as per ADB’s resettlement PT: national policy and involuntary Minimal number of Check status ADB’ guidelines. resettlement complaints/grievance of  Complete all necessary policy. s. All cases of employment land and property resettlement and given to local acquisition procedures Contract Clause rehabilitation if any people during prior to the for preference to are resolved at GRC construction commencement of civil local people level. No case work. during referred to  Adhere to the Land employment arbitrator/court. Acquisition procedures in accordance to RP’s Entitlement Framework.  Compensation and assistance as per project Resettlement Plan  Income restoration as per RP  Preference in employment and petty  contracts during construction to APs  Constitute GRC as per RP

TPF GETINSA EUROESTUDIOS S.L. in Joint Venture with RODIC CONSULTANTS PVT LTD In Association with EUROESTUDIOS INDIA Pvt. Ltd.

Page 19 of 178

STATE HIGHWAYS AUTHORITY OF JHARKHAND (SHAJ) PHASE-II PROJECTS

Environmental Remedial Measure Reference to Location Monitoring Monitoring Institutional Observation Observation Corrective Issue/ Component laws/ guideline indicators (MI)/ Methods Responsibility during the during the action and Performance reporting reporting follow up if Target (PT) period period required Implementation Supervision Environmental Management Plan Compliance Status of Package-1 4. Diversion of Forest Land and Cutting of Trees 4.1 Need for cutting  Geometric adjustments Forest Throughout the MI: Number and Review final SHAJ, Design department Tree cutting - of trees. made to minimize tree Conservation corridor Total location of geometric design. consultants SHAH/Forest permission cutting. Act, 1980 number of adjustments made to Check forest department obtained  Obtain tree cutting affected avoid forestland and budget permission from forest trees=2457 tree cutting, budget provision for INR1.64Cr department Additional amount allocated for compensator deposited with  Provision for mandatory Plantation near compensatory y DFO Forest compensatory sensitive afforestation and afforestation Department afforestation (1:2) for receptors, river additional plantation and for deposit of payment to banks, borrow additional compensatory Forestry Department areas PT: Unnecessary plantation. plantation.  Provision for additional tree felling on forest compensatory land avoided. Budget plantation on 1: 2 basis allocation is to be implemented by adequate contractor through village Joint Forest Management (JFM) Committee 5. Elephant Movement 5.1 Road design  Provision for rumble Project Sirsanath gate MI: budget allocation Review of bid SHAJ, Design SHAJ/CSC in Elephant Implementatio causing strip, cautionary Requirement near for rumble strips, documents Consultant coordination movement ns of disruption in sign boards for speed Barapalasi, cautionary and and project with Forest assessment & recommended elephant limits up to 30 Kmph on bridge informatory sign budget plan Department plan prepared additional movement/ both sides with gentle near Amarpur- boards, solar street in consultation measures Vehicle- side slope and turfing Segatola, Loha lamps, solar dragon with need to be Elephant collision for easy movement of bridge near lamps, habitat concerned monitoring and and Elephant. Bhandaro and enhancement and DFO. follow-up. Human-Elephant Provision for solar LakraDwani; conservation Proposed Conflict Street Lights in No of Solar activities PT: Budget Plan approved communities near lights=40 amount is enough to on 26.05.2017 elephant crossing Rumble Strips =8 fulfill the installation vide letter areas to keep the Informatory sign and construction of no.907 elephants away boards=8 recommended Approved plan Provision for supply of Cautionary Sign facilities and recommendati solar dragon boards=8 structures ons issued to Contractor for

TPF GETINSA EUROESTUDIOS S.L. in Joint Venture with RODIC CONSULTANTS PVT LTD In Association with EUROESTUDIOS INDIA Pvt. Ltd.

Page 20 of 178

STATE HIGHWAYS AUTHORITY OF JHARKHAND (SHAJ) PHASE-II PROJECTS

Environmental Remedial Measure Reference to Location Monitoring Monitoring Institutional Observation Observation Corrective Issue/ Component laws/ guideline indicators (MI)/ Methods Responsibility during the during the action and Performance reporting reporting follow up if Target (PT) period period required Implementation Supervision Environmental Management Plan Compliance Status of Package-1 light to local Joint implementatio Forest Management n on Committees in villages 21.08.2017 near elephant vide no 952 crossing areas for use to chase away elephants  Provision for habitat enhancement viz. plantation of fodder plants in forest areas, through Joint Forest Management (JFM).  Provision for additional conservation measures to be taken after elephant study that will be conducted by the  CSC Wildlife Specialist. 6. Shifting of Utilities 6.1 Disruption of  All telephone and Project Throughout the MI: Number of Interaction Contractor/ SHAJ/CSC Complied - utility services to electrical poles/wires requirement corridor complaints from local with SHAJ/utility local community and underground people, number, concerned company utility cables should be timing and type of shifted before start of authorities notifications issued construction and local  Necessary permission to local people, time public and payments should taken to shift utilities be made to relevant PT: No. of utility service agencies complaints should be to allow quick shifting 0. Effective and and restoration of utility timely notification. services Minimal time for  Local people must be informed through utility shifting appropriate means about the time of

TPF GETINSA EUROESTUDIOS S.L. in Joint Venture with RODIC CONSULTANTS PVT LTD In Association with EUROESTUDIOS INDIA Pvt. Ltd.

Page 21 of 178

STATE HIGHWAYS AUTHORITY OF JHARKHAND (SHAJ) PHASE-II PROJECTS

Environmental Remedial Measure Reference to Location Monitoring Monitoring Institutional Observation Observation Corrective Issue/ Component laws/ guideline indicators (MI)/ Methods Responsibility during the during the action and Performance reporting reporting follow up if Target (PT) period period required Implementation Supervision Environmental Management Plan Compliance Status of Package-1 shifting of utility structures and potential disruption of services if any B. Construction Stage 1. Air Quality 1.1 Dust Generation  Contractor to submit MORT&H Throughout MI: PM10 level Standards Contractor SHAJ /CSC Complied - due to construction location and layout plan Specifications for project corridor measurements CPCB activities and for storage areas of Road and Bridge Complaints from methods transport, storage locals due to dust Observations construction materials works Air (P and and handling of approved by CSC Public CP) Act 1974 construction  Transport, loading and PT: PM10 level < consultation materials unloading of loose and Central 100 ug/m3Number and fine materials Motor and of complaints should Review of through covered Vehicle Act 1988 be 0. monitoring vehicles. General data  Paved approach roads. Conditions of Bid maintained by contractor  Storage areas to be Document located downwind of the habitation area.

 Water spraying on earthworks, unpaved haulage roads and other dust prone areas.  Provision of PPEs to workers. 1.2 Emission of air  Regular maintenance The Air Asphalt mixing MI: Levels of HC, Standards Contractor SHAJ /CSC The pollutants of machinery and (Prevention and plants, crushers, SO2, NO2, and CO. CPCB Environmental (HC,SO2,NOX,CO equipment. Control of DG sets locations Status of PUC methods monitoring Pollution) Act, certificates agency etc) from vehicles  Batching, asphalt mixing plants and 1981 (Amended Review of finalized and due to traffic crushers at downwind 1987) and Rules PT: SO2 and NO2 monitoring monitoring congestion and use (1km) direction from the 1982 levels are both less data being carried of equipment and nearest settlement. than 80ug/m3. PUC maintained out. machinery  Only crushers licensed certificate of by contractor by the PCB shall be equipment and used machinery is upto date

TPF GETINSA EUROESTUDIOS S.L. in Joint Venture with RODIC CONSULTANTS PVT LTD In Association with EUROESTUDIOS INDIA Pvt. Ltd.

Page 22 of 178

STATE HIGHWAYS AUTHORITY OF JHARKHAND (SHAJ) PHASE-II PROJECTS

Environmental Remedial Measure Reference to Location Monitoring Monitoring Institutional Observation Observation Corrective Issue/ Component laws/ guideline indicators (MI)/ Methods Responsibility during the during the action and Performance reporting reporting follow up if Target (PT) period period required Implementation Supervision Environmental Management Plan Compliance Status of Package-1  DG sets with stacks of adequate height and use of low sulphur diesel as fuel.  LPG should be used as fuel source in construction camps instead of wood  Ambient air quality monitoring  Contractor to prepare traffic management and dust suppression plan duly approved by SHAJ 2. Noise 2.1 Disturbance to  All equipment to be Legal Throughout MI: day and night As per Noise Contractor SHAJ /CSC The local residents and timely serviced and requirement project section Noise levels. rule, 2000 Environmental sensitive receptors properly maintained. Noise Pollution especially at Number of monitoring due to excessive  Construction (Regulation construction sites, complaints from local Consultation agency noise from equipment and and Control) residential and people with local finalized and construction machinery to be fitted Rules, 2000 identified sensitive people monitoring activities and with silencers and and locations. PT: Zero complaints being carried operation of maintained properly. amendments or no repeated Review of out. equipment and  Only IS approved thereof + Clause Refer Table 21 of complaints by local noise level machinery equipment shall be No 501.8.6. IEE for information people. Average day monitoring used for construction MORT&H on sensitive and night time noise data activities. Specifications for receptors levels are within maintained  Timing of noisy Road and Bridge permissible limits for by contractor construction activities works work zone areas shall be done during Observation night time and weekend of near schools, construction  Implement noisy site operations intermittently to reduce the total noise generated

TPF GETINSA EUROESTUDIOS S.L. in Joint Venture with RODIC CONSULTANTS PVT LTD In Association with EUROESTUDIOS INDIA Pvt. Ltd.

Page 23 of 178

STATE HIGHWAYS AUTHORITY OF JHARKHAND (SHAJ) PHASE-II PROJECTS

Environmental Remedial Measure Reference to Location Monitoring Monitoring Institutional Observation Observation Corrective Issue/ Component laws/ guideline indicators (MI)/ Methods Responsibility during the during the action and Performance reporting reporting follow up if Target (PT) period period required Implementation Supervision Environmental Management Plan Compliance Status of Package-1  Manage existing traffic to avoid traffic jams and accumulation of noise beyond standards.  Restrict construction near residential, built up and forest areas construction today light hours.  Initiation of multi- layered plantation, to serve as mitigation option for operation phase  Honking restrictions near sensitive areas  PPEs to workers  Noise monitoring as per EMoP. 3. Land and Soil 3.1 Landuse  Non-agricultural areas Project Throughout the MI: Borrow pit Review Contractor SHAJ /CSC Under - Change and Loss of to be used as borrow requirement project section locations/Top soil borrow area Process productive / topsoil areas to the extent and borrow areas storage area plan, site possible. visits  Land identified for PT: Zero complaints If using agricultural land, top soil to be camp, storage or disputes preserved and laid over areas etc registered against either on the contractor by land embankment slope for owner growing vegetation to protect soil erosion.  Land for temporary facilities like construction camp, storage areas etc. shall be brought back to its original land use

TPF GETINSA EUROESTUDIOS S.L. in Joint Venture with RODIC CONSULTANTS PVT LTD In Association with EUROESTUDIOS INDIA Pvt. Ltd.

Page 24 of 178

STATE HIGHWAYS AUTHORITY OF JHARKHAND (SHAJ) PHASE-II PROJECTS

Environmental Remedial Measure Reference to Location Monitoring Monitoring Institutional Observation Observation Corrective Issue/ Component laws/ guideline indicators (MI)/ Methods Responsibility during the during the action and Performance reporting reporting follow up if Target (PT) period period required Implementation Supervision Environmental Management Plan Compliance Status of Package-1 3.2 Slope failure and  Bio-turfing of IRC: 56 -1974 Throughout the MI: Occurrence of Review of Design consultant SHAJ /CSC Being - Soil erosion due to embankments to recommended entire project road slope failure or design and Contractor, Complied Construction protect slopes. practice for erosion issues documents activities, earthwork,  Slope protection by treatment of and site and cut and fill, providing frames, dry embankment PT: No slope observation stockpiles etc. stone pitching, masonry slopes for failures. Minimal retaining walls, planting erosion control erosion issues of grass and trees. Clause No. 306  Side slopes of all cut and 305.2.2 and fill areas will be MORT&H graded and covered Specifications for with stone pitching, Road and Bridge grass and shrub as per works Guidelines design specifications. IX for Soil Care should be taken erosion that the slope gradient shall not be greater than2:1.  The earth stockpiles to be provided with gentle slopes to soil erosion. 3.3 Borrow area  Obtain EC from SEIAA IRC Guidelines Borrow sites MI: Existence of Review of Contractor SHAJ /CSC Identification Contractor is management before opening any on borrow areas location borrow areas in design of Borrow being new borrow area. and for quarries inappropriate documents Area is instructed to  Comply to EC (Environmental unauthorized and site completed expedite the conditions of SEIAA protection Act locations. Poor observations and process process getting  Non-productive, and Rules, 1986; borrow area for obtaining the Borrow barren lands, upland Water Act, Air management Compare site the requisite area shall be used for Act)+Clause practices. Number of conditions permission permission for borrowing earth with 305.2.2 MORTH accidents. with EC from all identified the necessary Specifications for Complaints from conditions by competent Borrow Area permissions/ consents. Road and local people. SEIAA Authority  Depths of borrow pits to Bridgeworks initiated. be regulated and sides Guidelines for PT: No case of non- not steeper than 25%. Borrow Areas compliance to  Topsoil to be stockpiled management conditions stipulated and protected for use at by SEIAA in the rehabilitation stage. clearance letter. Zero

TPF GETINSA EUROESTUDIOS S.L. in Joint Venture with RODIC CONSULTANTS PVT LTD In Association with EUROESTUDIOS INDIA Pvt. Ltd.

Page 25 of 178

STATE HIGHWAYS AUTHORITY OF JHARKHAND (SHAJ) PHASE-II PROJECTS

Environmental Remedial Measure Reference to Location Monitoring Monitoring Institutional Observation Observation Corrective Issue/ Component laws/ guideline indicators (MI)/ Methods Responsibility during the during the action and Performance reporting reporting follow up if Target (PT) period period required Implementation Supervision Environmental Management Plan Compliance Status of Package-1  Transportation of earth accidents. Zero materials through complaints. covered vehicles.  Follow IRC recommended practice for borrow pits (IRC 10: 1961) for identification of location, its operation and rehabilitation  Borrow areas not to be dug continuously.  To the extent borrow areas shall be sited away from habitated areas.  Borrow areas shall be leveled with salvaged material or other filling materials which do not pose contamination of soil. Else, it shall be converted into fish pond. 3.4 Quarry  Aggregates will be Clause No.111.3 Quarry area MI: Existence of Review of Contractor SHAJ /CSC Identification Operations sourced from existing MORT&H locations licenses quarry design of Stone licensed quarries. Specifications for areas from which documents, Quarries  Copies of consent/ Road and Bridge materials to be contractor completed approval / rehabilitation works Guidelines sourced and documents and the plan for a new quarry or VI for Quarry Existence of a quarry and site requisite use of existing source Areas redevelopment plan observation permission will be submitted to Management Compliance from SHAJ. Environmental PT: Quarry license is to EC competent  The contractor will Protection Rules valid.: No case of conditions in Authority have develop a Quarry noncompliance to case of been Redevelopment plan, consent conditions opening new obtained. as per the Mining Rules and air quality meets quarries of the state and submit the prescribed limit

TPF GETINSA EUROESTUDIOS S.L. in Joint Venture with RODIC CONSULTANTS PVT LTD In Association with EUROESTUDIOS INDIA Pvt. Ltd.

Page 26 of 178

STATE HIGHWAYS AUTHORITY OF JHARKHAND (SHAJ) PHASE-II PROJECTS

Environmental Remedial Measure Reference to Location Monitoring Monitoring Institutional Observation Observation Corrective Issue/ Component laws/ guideline indicators (MI)/ Methods Responsibility during the during the action and Performance reporting reporting follow up if Target (PT) period period required Implementation Supervision Environmental Management Plan Compliance Status of Package-1 a copy of the approval to EA.  Obtain environmental clearance from SEIAA in case of opening new quarry 3.5 Compaction of  Construction vehicles, Design Parking areas, MI: Location of Site Contractor SHAJ /CSC Being - soil and impact on machinery, and requirement Haulage roads approach and observation Complied quarry haul roads equipment to be and construction haulage roads due to movement of stationed in the yards Presence of vehicles and designated ROW to destroyed/comp equipment avoid compaction. acted agricultural  Approach land or land which roads/haulage roads has not be restored shall be designed along to its original the barren and hard soil condition PT: Zero area to reduce the occurrence of compaction. destroyed/comp  Transportation of acted land and quarry material to the undestroyed land dumping site through heavy vehicles shall be done through existing major roads to the extent possible to restrict wear and tear to the village/minor roads.  Land taken for construction camp and other temporary facility shall be restored to its original conditions 3.6 Contamination of  Construction vehicles Design Fuelling station, MI: Quality of soil Site Contractor SHAJ /CSC Being - soil due to leakage/ and equipment will be requirement construction m near storage area observation Complied spillage of oil, maintained and sites, and Presence of spilled bituminous and non refueled in such a construction oil or bitumen in bituminous debris fashion that oil/diesel camps and project area generated from disposal location

TPF GETINSA EUROESTUDIOS S.L. in Joint Venture with RODIC CONSULTANTS PVT LTD In Association with EUROESTUDIOS INDIA Pvt. Ltd.

Page 27 of 178

STATE HIGHWAYS AUTHORITY OF JHARKHAND (SHAJ) PHASE-II PROJECTS

Environmental Remedial Measure Reference to Location Monitoring Monitoring Institutional Observation Observation Corrective Issue/ Component laws/ guideline indicators (MI)/ Methods Responsibility during the during the action and Performance reporting reporting follow up if Target (PT) period period required Implementation Supervision Environmental Management Plan Compliance Status of Package-1 demolition and road spillage does not construction contaminate the soil. PT: Soil test  Fuel storage and conforming to no – refueling sites to be contamination. No kept away from sighting of spilled oil drainage channels. or bitumen in  Unusable debris shall construction site or be dumped in ditches camp site and low lying areas.  To avoid soil contamination oil Interceptors shall be provided at wash down and refueling areas.  Waste oil and oil soaked cotton/ cloth shall be stored in containers labeled ‘Waste Oil’ and ‘Hazardous’ sold off to MoEF/SPCB authorized vendors  Non-bituminous wastes to be dumped in borrow pits with the concurrence of landowner and covered with a layer of topsoil conserved from opening the pit.  Bituminous wastes will be disposed off in an identified dumping site approved by the State Pollution Control Board 4. Water Resources

TPF GETINSA EUROESTUDIOS S.L. in Joint Venture with RODIC CONSULTANTS PVT LTD In Association with EUROESTUDIOS INDIA Pvt. Ltd.

Page 28 of 178

STATE HIGHWAYS AUTHORITY OF JHARKHAND (SHAJ) PHASE-II PROJECTS

Environmental Remedial Measure Reference to Location Monitoring Monitoring Institutional Observation Observation Corrective Issue/ Component laws/ guideline indicators (MI)/ Methods Responsibility during the during the action and Performance reporting reporting follow up if Target (PT) period period required Implementation Supervision Environmental Management Plan Compliance Status of Package-1 4.1 Sourcing of  Requisite permission CGWA Throughout the MI: Approval from Checking of Contractor SHAJ /CSC The ground Contractor is water during shall be obtained for Guidelines Project section competent authority documentatio water source being Construction abstraction of Complaints from n has been instructed to groundwater from local people on identified and expedite Central Groundwater Check Dam at water availability application for required Authority. suitable locations Talk to local requisite Ground water  Arrangements shall be PT: Valid approval people permission permission made by contractor that from competent has been from the water availability authority. Zero submitted by competent and supply to nearby complaints from local the contractor. Authority. communities remain people.

intensive activities not to be undertaken during

Provision of water harvesting structure to augment groundwater condition in the area 4.2 Disposal of  Provisions shall be Clause No.1010 Throughout the MI: Condition of Standards Contractor SHAJ /CSC Being - water during made to connect road EP Act 1986 Project section drainage system in methods Complied construction side drains with existing MORT&H construction site. Site nearby natural drains. Specifications for Presence/ab sense observation Road and of water logging in and review of Bridgeworks project area. documents

PT: Existence of proper drainage system. No water logging in project area 4.3 Alteration in  Existing drainage Design Near all drainage MI: Proper flow of Review of Contractor SHAJ /CSC Being - surface water system to be requirement, channels, river/ water in existing design Complied hydrology maintained Clause No nallah crossings streams and rivers documents  And further enhanced. 501.8.6. etc.  Provision shall be made MORT&H PT: No complain of Site for adequate size and Specifications water shortage by observation number of cross downstream

TPF GETINSA EUROESTUDIOS S.L. in Joint Venture with RODIC CONSULTANTS PVT LTD In Association with EUROESTUDIOS INDIA Pvt. Ltd.

Page 29 of 178

STATE HIGHWAYS AUTHORITY OF JHARKHAND (SHAJ) PHASE-II PROJECTS

Environmental Remedial Measure Reference to Location Monitoring Monitoring Institutional Observation Observation Corrective Issue/ Component laws/ guideline indicators (MI)/ Methods Responsibility during the during the action and Performance reporting reporting follow up if Target (PT) period period required Implementation Supervision Environmental Management Plan Compliance Status of Package-1 drainage structures communities. No esp. in the areas where record of land is sloping towards overtopping/ water road alignment. logging  Road level shall be raised above HFL level wherever road level is lesser than HFL  Culverts reconstruction shall be done during lean flow period. In some cases these minor channels may be diverted for a very short period (15-30 days) and will be bring back to its original course immediately after construction. 4.4 Siltation in water  Embankment slopes to Design Near all water MI: Presence Field Contractor SHAJ /CSC Being - bodies due to be modified suitably to requirement, bodies /waterway /absence of siltation observation Complied construction restrict the soil debris ClauseNo501.8. Refer Table 15. in rivers, streams, activities /earthwork entering water bodies. 6.MORT&H ponds and other  Provision of Silt fencing Specifications for water bodies in shall be made at water Road and Bridge project area. bodies. works Turbidity test levels  Silt/sediment should be Retaining collected and stockpiled Worldwide best wall=250m PT: No records of for possible reuse as practices siltation due to surfacing of slopes project activities. where they have to be Surface water quality re-vegetated. tests confirm to  Earthworks and stone turbidity and TSS works to be limit prevented from impeding natural flow of rivers, streams and

TPF GETINSA EUROESTUDIOS S.L. in Joint Venture with RODIC CONSULTANTS PVT LTD In Association with EUROESTUDIOS INDIA Pvt. Ltd.

Page 30 of 178

STATE HIGHWAYS AUTHORITY OF JHARKHAND (SHAJ) PHASE-II PROJECTS

Environmental Remedial Measure Reference to Location Monitoring Monitoring Institutional Observation Observation Corrective Issue/ Component laws/ guideline indicators (MI)/ Methods Responsibility during the during the action and Performance reporting reporting follow up if Target (PT) period period required Implementation Supervision Environmental Management Plan Compliance Status of Package-1 water canals or existing drainage system.  Retaining walls at water bodies /ponds to avoid siltation near ponds 4.5 Deterioration in  No vehicles or The Water Water bodies, MI: Water quality of Conduction Contractor SHAJ /CSC The - Surface water equipment should be (Prevention and refueling stations, ponds, streams, of water Environmental quality due to parked or refueled near Control of construction rivers and other quality tests monitoring leakage from water-bodies, so as to Pollution) Act, camps. water bodies in as per the agency has vehicles and avoid contamination 1974 and project monitoring been finalized equipments and from fuel and amendments plan and waste from lubricants. thereof. Presence of oil monitoring is construction camps  Oil and grease traps floating in water Field being carried and fuelling platforms to bodies in project observation out. be provided at re- area fuelling locations.  All chemicals and oil PT: Surface water shall be stored away quality meets from water and freshwater quality concreted platform with standards prescribed catchment pit for spills by CPCB collection.  All equipment operators, drivers, and warehouse personnel will be trained in immediate response for spill containment and eventual clean-up. Readily available, simple to understand and preferably written in the local language emergency response procedure, including reporting, will be provided by the contractors.

TPF GETINSA EUROESTUDIOS S.L. in Joint Venture with RODIC CONSULTANTS PVT LTD In Association with EUROESTUDIOS INDIA Pvt. Ltd.

Page 31 of 178

STATE HIGHWAYS AUTHORITY OF JHARKHAND (SHAJ) PHASE-II PROJECTS

Environmental Remedial Measure Reference to Location Monitoring Monitoring Institutional Observation Observation Corrective Issue/ Component laws/ guideline indicators (MI)/ Methods Responsibility during the during the action and Performance reporting reporting follow up if Target (PT) period period required Implementation Supervision Environmental Management Plan Compliance Status of Package-1  Construction camp to be sited away from water bodies.  Wastes must be collected, stored and taken to approve disposal site only.  Water quality shall be monitored 5. Flora and Fauna 5.1 Vegetation loss  Restrict tree cutting Forest Throughout MI: ROW width Review of Mandatory SHAJ /CSC Being - due to site upto toe line Conservation project corridor Number of trees for relevant Compensatory Complied preparation and considering safety to Act1980 + felling Compensatory documents – plantation by construction road users. IRC:SP:21 and Estimated No. of plantation plan tree cutting forest INR 1.64Cr activities  Roadside trees to be IRC:SP:66 affected Number of trees permit, Department and transferred to removed with prior tree=2457 replanted. compensator Additional Forest approval of competent y plantation plantation by Department authority. Additional PT: Additional plan. Meeting contractor in for carrying  Mandatory Plantation near compensatory with JFM partnership with out compensatory Sensitive afforestation done on Committee respective local compensatory plantation at 1:2 basis receptors, river a 1:2 basis by members JFM Committee plantation. by Forestry Department banks, borrow contractor through  Additional areas JFM. Number of Field compensatory trees planted is observations plantation 1:2 as per double the number the IRC by contractor in of trees removed. partnership with Tree survival rate is respective village JFM at least 70%. Committee. Local villagers to be employed for afforestation activities. Employment preference to women  Regular maintenance trees planted.  Provision of LPG in construction camp as

TPF GETINSA EUROESTUDIOS S.L. in Joint Venture with RODIC CONSULTANTS PVT LTD In Association with EUROESTUDIOS INDIA Pvt. Ltd.

Page 32 of 178

STATE HIGHWAYS AUTHORITY OF JHARKHAND (SHAJ) PHASE-II PROJECTS

Environmental Remedial Measure Reference to Location Monitoring Monitoring Institutional Observation Observation Corrective Issue/ Component laws/ guideline indicators (MI)/ Methods Responsibility during the during the action and Performance reporting reporting follow up if Target (PT) period period required Implementation Supervision Environmental Management Plan Compliance Status of Package-1 fuel source to avoid tree cutting.  Plantation of trees on both sides of the road where technically feasible. Trees should be offset 1m back from the ultimate edge of the roadway to prevent safety hazard and provide adequate sight distance.  Integrate vegetation management (IVM) with the carriage way completely clear of vegetation.  Additional plantation near sensitive receptors, river banks to minimize noise & air pollution, and to check erosion.  Controlled use of pesticides/ fertilizers 6. Construction Camps 6.1 Impact  All camps should be Design All construction MI: Location of On site Contractor and SHAJ /CSC Being - associated with established with prior Requirement The camps campsites and observation EO Complied location permission from PCB. Water distance from habitation, forest Interaction Camps to maintain (Prevention and minimum distance areas, water bodies, with workers Control of from following: # 500 m through traffic route and local from habitation # 500 m Pollution) and construction community from forest areas where Act,1974and its camps PT: Distance possible # 500 m from amendments of campsite is less water bodies where thereof than 500m from possible # 500 m from listed locations through traffic route #

TPF GETINSA EUROESTUDIOS S.L. in Joint Venture with RODIC CONSULTANTS PVT LTD In Association with EUROESTUDIOS INDIA Pvt. Ltd.

Page 33 of 178

STATE HIGHWAYS AUTHORITY OF JHARKHAND (SHAJ) PHASE-II PROJECTS

Environmental Remedial Measure Reference to Location Monitoring Monitoring Institutional Observation Observation Corrective Issue/ Component laws/ guideline indicators (MI)/ Methods Responsibility during the during the action and Performance reporting reporting follow up if Target (PT) period period required Implementation Supervision Environmental Management Plan Compliance Status of Package-1 500 m from identified elephant movement locations 6.2 Worker’s Health  The location, layout and The Building and All construction MI: Camp health Camp Contractor SHAJ /CSC Being - in construction camp basic facility provision Other camps records records Complied of each labor camp will Construction Existence of proper Site be submitted to CSC workers and approved b EA. first aid kit in camp observation (Regulation of The contractor will site maintain necessary Employment and Consultation living accommodation Conditions of Complaints from with and ancillary facilities in service) Act 1996 workers. contractor hygienic manner. and The Water workers and  Adequate water and (Prevention and PT: No record of local people illness due to living nearby sanitary latrines with Control of septic tanks with soak unhygienic Pollution) pits shall be provided. conditions or vectors.  Preventive medical Act,1974 and Zero cases of STD. facilities in camp amendments Clean and tidy camp  Waste disposal facilities thereof site conditions. such as dust bins must be provided in the camps and regular disposal of waste The Contractor will take all precautions to protect the workers from insect and pest to reduce the risk to health. This includes the use of insecticides which should comply with local regulations.  No liquor or prohibited drugs will be imported to, sell, give and barter to the workers of host community.

TPF GETINSA EUROESTUDIOS S.L. in Joint Venture with RODIC CONSULTANTS PVT LTD In Association with EUROESTUDIOS INDIA Pvt. Ltd.

Page 34 of 178

STATE HIGHWAYS AUTHORITY OF JHARKHAND (SHAJ) PHASE-II PROJECTS

Environmental Remedial Measure Reference to Location Monitoring Monitoring Institutional Observation Observation Corrective Issue/ Component laws/ guideline indicators (MI)/ Methods Responsibility during the during the action and Performance reporting reporting follow up if Target (PT) period period required Implementation Supervision Environmental Management Plan Compliance Status of Package-1  Awareness raising to immigrant workers/local community on communicable and sexually transmitted diseases. 7. Management of Construction Waste/Debris 7.1 Selection of  Contractor to submit a Design At all MI: Location of Field survey Contractor SHAJ /CSC Being - Dumping Sites waste/spoil disposal Requirement, Dumping/Disposal dumping sites and complied plan and get it MORT&H Sites Number of public interaction approved by CSC and guidelines and complaints. with local EA. General people.  Create controlled Conditions of PT: No public Review of dumping sites with a Contract complaints. Consent consent letter non-permeable lining Document letters for all incorporated in the pit dumping sites design to avoid available with leachate seepage into contractor the soil, which may later affect ground water quality  Unproductive/wastelan ds shall be selected for dumping sites away from residential areas and water bodies  Dumping sites must be having adequate capacity equal to the amount of debris generated.  Public perception and consent from the village Panchayats has to be obtained before finalizing the location

TPF GETINSA EUROESTUDIOS S.L. in Joint Venture with RODIC CONSULTANTS PVT LTD In Association with EUROESTUDIOS INDIA Pvt. Ltd.

Page 35 of 178

STATE HIGHWAYS AUTHORITY OF JHARKHAND (SHAJ) PHASE-II PROJECTS

Environmental Remedial Measure Reference to Location Monitoring Monitoring Institutional Observation Observation Corrective Issue/ Component laws/ guideline indicators (MI)/ Methods Responsibility during the during the action and Performance reporting reporting follow up if Target (PT) period period required Implementation Supervision Environmental Management Plan Compliance Status of Package-1 7.2 Reuse and  The existing bitumen Design Throughout the MI: Percentage of Contractor Contractor SHAJ /CSC Being - disposal of surface shall be utilized Requirement, project corridor reuse of existing records Complied construction and for paving of cross MORT&H surface material guidelines and Field dismantled waste roads, access roads, and paving works in General Method and location observation construction sites Conditions of of disposal site of and camps, Contract construction debris Interaction temporary traffic Document with local diversions, and haulage people routes.  All excavated materials PT: No public from roadway, complaint and shoulders, verges, consent letters for all drains, cross drainage dumping sites will be used for available with backfilling contractor or CSC embankments, filling pits, and landscaping.  Unusable and non- bituminous debris materials should be suitably disposed off at pre-designated disposal locations, with approval of the concerned authority.  The bituminous wastes shall be disposed in secure landfill sites only in environmentally accepted manner. For removal of debris, wastes and its disposal, MORTH guidelines should be followed.  Unusable and surplus materials, as determined by the

TPF GETINSA EUROESTUDIOS S.L. in Joint Venture with RODIC CONSULTANTS PVT LTD In Association with EUROESTUDIOS INDIA Pvt. Ltd.

Page 36 of 178

STATE HIGHWAYS AUTHORITY OF JHARKHAND (SHAJ) PHASE-II PROJECTS

Environmental Remedial Measure Reference to Location Monitoring Monitoring Institutional Observation Observation Corrective Issue/ Component laws/ guideline indicators (MI)/ Methods Responsibility during the during the action and Performance reporting reporting follow up if Target (PT) period period required Implementation Supervision Environmental Management Plan Compliance Status of Package-1 Project Engineer, will be removed and disposed off-site. 8. Traffic Management and Safety 8.1 Management of  Traffic Management Design Throughout the MI: Traffic Review traffic Contractor SHAJ /CSC Being existing traffic and Plan shall be submitted requirement and project corridor management plan. management complied safety by the contractor and IRC: SP: 27 - especially at Presence/ absence plan Field approved by the CSC. 1984, Report intersections of safety signs, traffic observation  The traffic control plans Containing demarcations, flag of traffic shall contain details of Recommendatio men etc. on site. management diversions; traffic safety n of IRC Complaints from and safety arrangements during Regional road users. No of system construction; safety Workshops accidents PT: No measures for night time on Highway complaints. No Interaction traffic and precautions Safety IRC:SP: accidents due to with people for transportation of 32 -1988 Road poor traffic in vehicles hazardous materials. Safety for management. Traffic using the Timing and scheduling Children (5-12 signs, demarcation road to be done so that Years Old) in lines etc. present in transportation of Construction appropriate locations dangerous goods is Zones on site done during least IRC:SP:55-2014 number of people and The Building and other vehicles on the other road. Construction  The Contractor will workers Act 1996 ensure that the and Cess Act of diversion/detour is 1996 Factories always maintained in Act running condition, 1948+Section 6 particularly during the of Employer’s monsoon to avoid Requirement of disruption to traffic flow. Bid Document On stretches where it is not possible to pass the traffic on the part width of existing carriageway, temporary paved

TPF GETINSA EUROESTUDIOS S.L. in Joint Venture with RODIC CONSULTANTS PVT LTD In Association with EUROESTUDIOS INDIA Pvt. Ltd.

Page 37 of 178

STATE HIGHWAYS AUTHORITY OF JHARKHAND (SHAJ) PHASE-II PROJECTS

Environmental Remedial Measure Reference to Location Monitoring Monitoring Institutional Observation Observation Corrective Issue/ Component laws/ guideline indicators (MI)/ Methods Responsibility during the during the action and Performance reporting reporting follow up if Target (PT) period period required Implementation Supervision Environmental Management Plan Compliance Status of Package-1 diversions will be constructed.  Restriction of construction activity to only one side of the existing road  The contractor shall inform local community of changes to traffic routes, and pedestrian access arrangements with assistance from “Engineer”.  Use of adequate signage’s to ensure traffic management and safety. Conduct of regular safety audit on safety measures. 8.2 Pedestrians,  Temporary access and Same as above Near habitation on MI: Presence/ Field Contractor SHAJ /CSC Under - animal movement diversion, with proper both sides of absence of access Observation Process drainage facilities. schools, temples, routes for Interaction  Access to the schools, hospitals, pedestrians. Road with local temples and other graveyards, signage Number of people public places must be construction sites, complaints from local maintained when haulage roads, people construction takes diversion sites. place near them. PT: Easy access to  Fencing wherever cattle schools, temples and movement is expected. public places. Zero  Large number of box complaints culverts has been proposed. .All structures having vertical clearance above 3m and not catering to perennial flow of water may serve

TPF GETINSA EUROESTUDIOS S.L. in Joint Venture with RODIC CONSULTANTS PVT LTD In Association with EUROESTUDIOS INDIA Pvt. Ltd.

Page 38 of 178

STATE HIGHWAYS AUTHORITY OF JHARKHAND (SHAJ) PHASE-II PROJECTS

Environmental Remedial Measure Reference to Location Monitoring Monitoring Institutional Observation Observation Corrective Issue/ Component laws/ guideline indicators (MI)/ Methods Responsibility during the during the action and Performance reporting reporting follow up if Target (PT) period period required Implementation Supervision Environmental Management Plan Compliance Status of Package-1 as underpass for animals 8.3 Safety of  Contractors to adopt Same as above Construction sites MI: Availability of Site Obligation of SHAJ/CSC Being - Workers and and maintain safe Safety gears to observation Contractor Complied accident risk from working practices. workers construction  Usage of fluorescent Review activities and retro refectory Safety signage records on signage, in local Training records on safety language at the safety training and construction sites accidents  Training to workers on Number of safety safety procedures and related accidents Interact with precautions. construction  Mandatory PT: Zero fatal workers appointment of safety accidents. Zero or officer. minor nonfatal  All regulations accidents. regarding safe scaffolding, ladders, working platforms, gangway, stair wells, excavations, trenches and safe means of entry and egress shall be complied with.  Provision of PPEs to workers.  Provision of a readily available first aid unit including an adequate supply of dressing materials.  The contractor will not employ any person below the age of 18years  Use of hazardous material should be

TPF GETINSA EUROESTUDIOS S.L. in Joint Venture with RODIC CONSULTANTS PVT LTD In Association with EUROESTUDIOS INDIA Pvt. Ltd.

Page 39 of 178

STATE HIGHWAYS AUTHORITY OF JHARKHAND (SHAJ) PHASE-II PROJECTS

Environmental Remedial Measure Reference to Location Monitoring Monitoring Institutional Observation Observation Corrective Issue/ Component laws/ guideline indicators (MI)/ Methods Responsibility during the during the action and Performance reporting reporting follow up if Target (PT) period period required Implementation Supervision Environmental Management Plan Compliance Status of Package-1 minimized and/or restricted.  Emergency plan (to be approved by engineer) shall be prepared to respond to any accidents or emergencies.  Accident Prevention Officer must be appointed by the contractor. 8.4 Accident risk to  Restrict access to Same as above Construction sites MI: Safety signs and Site Contractor SHAJ /CSC Being - local community construction sites only their location inspection Complied to authorized personnel. Incidents of Consultation  Physical separation accidents with local must be provided for people movement of vehicular Complaints from and human traffic. local people PT:  Adequate signage Zero incident of must be provided for accidents. Zero safe traffic movement complaints.  Provision of temporary diversions and awareness to locals before opening new construction fronts 9. Site restoration and rehabilitation 9.1 Clean-up  Contractor will prepare Project Throughout the MI: Condition of Site Contractor SHAJ /CSC Shall be - Operations, site restoration plans, requirement project corridor, camp, borrow areas observation initiated Restoration and which will be approved construction camp and construction before closer Rehabilitation by the ‘Engineer’. sites and borrow sites, Presence/ Interaction of Camp and  The clean-up and areas absence of with locals Plant sites. restoration operations construction are to be implemented material/debris after Issue by the contractor prior completion of completion to demobilization. construction works certificate

TPF GETINSA EUROESTUDIOS S.L. in Joint Venture with RODIC CONSULTANTS PVT LTD In Association with EUROESTUDIOS INDIA Pvt. Ltd.

Page 40 of 178

STATE HIGHWAYS AUTHORITY OF JHARKHAND (SHAJ) PHASE-II PROJECTS

Environmental Remedial Measure Reference to Location Monitoring Monitoring Institutional Observation Observation Corrective Issue/ Component laws/ guideline indicators (MI)/ Methods Responsibility during the during the action and Performance reporting reporting follow up if Target (PT) period period required Implementation Supervision Environmental Management Plan Compliance Status of Package-1  All construction zones on site. PT: Clean after including riverbeds, and tidy sites. No restoration of culverts, road-side trash or debris left on all sites are areas, camps, hot mix site. Site restored found plant sites, crushers, and leveled. satisfactory batching plant sites and any other area used/affected by the project will be left clean and tidy, to the satisfaction of the Environmental officer.  All the opened borrow areas will be rehabilitated and ‘Engineer’ will certify Operation and Maintenance stage 1. Elephant Movement 1.1 Anticipated risk  Effectiveness of Project At identified MI: No. of vehicle - Site SHAJ field SHAJ field Not Applicable - of vehicle-elephant mitigative measures Requirement elephant crossing elephant collision. Observation offices/Forest offices/Forest collision and human- (rumble strips, locations Time (day or night, Department Department animal conflict informatory /cautionary season/month and Discussion signage, solar street location of collision. with local lighting, solar dragon Cause of collision. People lights etc.) No of incidence of recommended in human – elephant Collection of design stage shall be conflict. PT: Zero information monitored. vehicle - elephant from Forestry  Effectiveness of habitat collisions. Reduced Department enhancement number of human measures shall be elephant conflicts. evaluated Improvement in  SHAJ to keep record of elephant habitat all accidents. coverage and quality  If it is observed after the study that elephants establish a defined movement path and

TPF GETINSA EUROESTUDIOS S.L. in Joint Venture with RODIC CONSULTANTS PVT LTD In Association with EUROESTUDIOS INDIA Pvt. Ltd.

Page 41 of 178

STATE HIGHWAYS AUTHORITY OF JHARKHAND (SHAJ) PHASE-II PROJECTS

Environmental Remedial Measure Reference to Location Monitoring Monitoring Institutional Observation Observation Corrective Issue/ Component laws/ guideline indicators (MI)/ Methods Responsibility during the during the action and Performance reporting reporting follow up if Target (PT) period period required Implementation Supervision Environmental Management Plan Compliance Status of Package-1 cross the road at specific locations, provision of civil structure shall be made in consultation with forest department.  Fresh assessment in case of future widening 2. Air Quality 2.1 Air pollution due  Roadside tree Environmental Throughout the MI: Ambient air As per CPCB SHAJ SHAJ Not Applicable - to due to vehicular plantations shall be Protection Act, Corridor quality (PM10, requirements movement maintained at least with 1986; The Air CO,SO2 NO2)

70% survival rate. (Prevention and  Regular maintenance PT: Levels are equal Site Control of of the road will be done to or below baseline inspection to ensure good surface Pollution) Act, levels given in the condition 1981 IEE report  Ambient air quality monitoring. If monitored parameters exceeds prescribed limit, suitable control measures must be taken.  Signages shall be provided reminding them to properly maintain their vehicles to economize on fuel consumption.  Enforcement of vehicle emission rules in coordination with transport department or installing emission checking equipments 3. Noise

TPF GETINSA EUROESTUDIOS S.L. in Joint Venture with RODIC CONSULTANTS PVT LTD In Association with EUROESTUDIOS INDIA Pvt. Ltd.

Page 42 of 178

STATE HIGHWAYS AUTHORITY OF JHARKHAND (SHAJ) PHASE-II PROJECTS

Environmental Remedial Measure Reference to Location Monitoring Monitoring Institutional Observation Observation Corrective Issue/ Component laws/ guideline indicators (MI)/ Methods Responsibility during the during the action and Performance reporting reporting follow up if Target (PT) period period required Implementation Supervision Environmental Management Plan Compliance Status of Package-1 3.1 Noise due to  Effective traffic Noise Pollution Sensitive MI: Noise levels Noise SHAJ SHAJ Identification The contractor movement of traffic management and good (Regulation and receptors as monitoring as of Noise and CSC have riding conditions shall Control) identified in IEE per noise Barrier been PT: Levels are equal rules ,2000 location at suggested to be maintained Rules,2000 and  Speed limitation to 20 to or below baseline sensitive follow the ADB amendments km/hour and honking levels given in the receptors approved EMP restrictions near thereof IEE report Discussion such as while finalizing sensitive receptors and with people School, the noise elephant movement at sensitive College, barrier areas receptor sites Hospital & locations along  Construction of noise Court is under the project barriers near sensitive Process road. receptors with consent of local community  The effectiveness of the multilayered plantation should be monitored and if need be, solid noise barrier shall be placed.  Create awareness amongst the residents about likely noise levels from road operation at different distances, the safe ambient noise limits and easy to implement noise reduction measures while constructing a building near road 4. Land and Soil 4.1 Soil erosion at  Periodic checking to be Project At bridge locations MI: Existence of soil On site SHAJ SHAJ Not Applicable - embankment during carried to assess the requirement and embankment erosion sites observation heavy rainfall. effectiveness of the slopes and other Number of soil stabilization measures probable soil erosion sites viz. turfing, stone erosion areas.

TPF GETINSA EUROESTUDIOS S.L. in Joint Venture with RODIC CONSULTANTS PVT LTD In Association with EUROESTUDIOS INDIA Pvt. Ltd.

Page 43 of 178

STATE HIGHWAYS AUTHORITY OF JHARKHAND (SHAJ) PHASE-II PROJECTS

Environmental Remedial Measure Reference to Location Monitoring Monitoring Institutional Observation Observation Corrective Issue/ Component laws/ guideline indicators (MI)/ Methods Responsibility during the during the action and Performance reporting reporting follow up if Target (PT) period period required Implementation Supervision Environmental Management Plan Compliance Status of Package-1 pitching, river training PT: Zero or minimal structures etc… occurrences of soil  Necessary measures to erosion be followed wherever there are failures 5. Water resources/Flooding and Inundation 5.1 Siltation  Regular checks shall be Project Near surface MI: Water quality Site Not Applicable - made for soil erosion requirement Water bodies observation and turfing conditions of PT: No turbidity of river training structures surface water bodies for its effective due to the road maintenance. 5.2 Water logging  Regular visual checks Project Near surface MI: Presence/ Site SHAJ SHAJ Not Applicable - due to blockage of and cleaning (at least requirement Water absence of water observation drains, culverts or once before monsoon) IRC: SP:21-2009 bodies/cross logging along the streams of drains to ensure that drains/side drains road flow of water is maintained through PT: No record of cross drains and other overtopping/ Water channels/streams. logging  Monitoring of water borne diseases due to stagnant water bodies 6. Flora 6.1 Vegetation  Planted trees, shrubs, Forest Project tree MI: Tree/plants Records and SHAJ/JFM/Forest SHAJ/JFM/Fore Not Applicable - and grasses to be Conservation Act plantation sites survival rate field Department st Department properly maintained. 1980 observations.  The tree survival audit PT: Minimum rate of Information to be conducted at least 70% tree survival from Forestry once in a year to Department assess the effectiveness 7. Maintenance of Right of Way and Safety 7.1 Accident Risk  Maintain shoulder Project Throughout the MI: Presence and Visual SHAJ SHAJ Not Applicable - due to uncontrolled completely clear of requirement IRC: Project route extent of vegetation inspection growth of vegetation vegetation. SP:21-2009 growth on either side of road. Number of

TPF GETINSA EUROESTUDIOS S.L. in Joint Venture with RODIC CONSULTANTS PVT LTD In Association with EUROESTUDIOS INDIA Pvt. Ltd.

Page 44 of 178

STATE HIGHWAYS AUTHORITY OF JHARKHAND (SHAJ) PHASE-II PROJECTS

Environmental Remedial Measure Reference to Location Monitoring Monitoring Institutional Observation Observation Corrective Issue/ Component laws/ guideline indicators (MI)/ Methods Responsibility during the during the action and Performance reporting reporting follow up if Target (PT) period period required Implementation Supervision Environmental Management Plan Compliance Status of Package-1  Minimum offset as accidents. PT: No Check prescribed in accidents due to accident IRC:SP:21-2009 to be vegetation growth records maintained  Regular maintenance/ trimming of plantation along the road side  No invasive plantation near the road 7.2 Accident risks  Traffic control IRC:SP:55-2014 Throughout the MI: Number of Review SHAJ SHAJ Not Applicable - associated with measures, including Project route accidents Conditions accident traffic movement speed limits, will be and existence of records enforced strictly. safety signs, rumble  Further encroachment strips etc. on the Site of squatters within the road observations ROW will be prevented. Presence/absence  No school or hospital of sensitive receptor will be allowed to be structures inside the established beyond the stipulated planning stipulated planning line line as per relevant as per relevant local local law law  Monitor/ensure that all PT: Fatal and non safety provisions fatal accident rate is included in design and reduced after construction phase are improvement properly maintained  Highway patrol unit(s) for round the clock patrolling. Phone booth for accidental reporting and ambulance services with minimum response time for rescue of any accident victims, if possible.

TPF GETINSA EUROESTUDIOS S.L. in Joint Venture with RODIC CONSULTANTS PVT LTD In Association with EUROESTUDIOS INDIA Pvt. Ltd.

Page 45 of 178

STATE HIGHWAYS AUTHORITY OF JHARKHAND (SHAJ) PHASE-II PROJECTS

Environmental Remedial Measure Reference to Location Monitoring Monitoring Institutional Observation Observation Corrective Issue/ Component laws/ guideline indicators (MI)/ Methods Responsibility during the during the action and Performance reporting reporting follow up if Target (PT) period period required Implementation Supervision Environmental Management Plan Compliance Status of Package-1  Tow-way facility for the breakdown vehicles if possible. 7.3.Transport of  Existence of spill - Throughout the MI: Status of Review of SHAJ SHAJ Not Applicable - Dangerous Goods prevention and control project stretch emergency system – spill and emergency whether operational prevention responsive system or not and  Emergency plan for emergency vehicles carrying PT: Fully functional response hazardous material emergency system plan Spill accident records

TPF GETINSA EUROESTUDIOS S.L. in Joint Venture with RODIC CONSULTANTS PVT LTD In Association with EUROESTUDIOS INDIA Pvt. Ltd.

Page 46 of 178

STATE HIGHWAYS AUTHORITY OF JHARKHAND (SHAJ) PHASE-II PROJECTS

Table-7: Environmental Management Plan Compliance Status of Package-2 Monitoring Institutional Responsibility Observation Corrective Reference to Environmental indicators (MI)/ Monitoring Implementation Supervision during the action and Remedial Measure laws/ Location Issue/Component Performance Methods reporting follow up if guideline Target (PT) period required Environmental Management Plan Compliance Status of Package-2 A. Design and Pre-construction Stage 1. Alignment 1.1 Pavement  Soaked CBR value of Design Entire stretch MI: Design and Review of detail Design Consultant SHAJ Complied - damage and sub grade is requirement Embankment number of cross design documents & inadequate recommended to be raised at 18 and side drains, drawings and locations for a slab/box comparison with site drainage provisions 12 %.  Overloading to be length of 5.785 culverts, conditions in habitat areas checked km and Hume pipes  Raised embankment (Appendix 4 of PT: Design and and provision of ADB approved numbers are in roadside drainage to IEE report) accordance with prevent damage to Roadside drains site needs pavement due to (both sides water logging on the together) road and also Covered=24.766 inconvenience km caused to unlined=65.534  Provision of adequate km no. of cross drainage For list of structures. bridges  Increase (vent and with increased height) in waterway of waterway existing structures. Please refer  Roadside drains have Appendix 3 of been proposed with ADB approved suitable outfalls. IEE report  Additional 19 culverts proposed 1.2 Safety along  Provision of crash Design At embankment MI: number and Review of design Design Consultant SHAJ Complied - the proposed barriers at accident requirement height >3.0 m location of crash documents and alignment prone areas and high total barriers, rumble drawings and embankments. length = 1.76 km strips, warning comparison with site  Rumble strips in IRC:SP:84-2014 Rumble strip = sign boards, conditions habitat areas, IRC:8, IRC:25, 14 sidewalks schools, junction and IRC:26, IRC:35, locations ( 13 curves to regulate IRC:67, IRC:103 built-up PT: numbers and speed. and Section 800 location are in

TPF GETINSA EUROESTUDIOS S.L. in Joint Venture with RODIC CONSULTANTS PVT LTD In Association with EUROESTUDIOS INDIA Pvt. Ltd.

Page 47 of 178

STATE HIGHWAYS AUTHORITY OF JHARKHAND (SHAJ) PHASE-II PROJECTS

Monitoring Institutional Responsibility Observation Corrective Reference to Environmental indicators (MI)/ Monitoring Implementation Supervision during the action and Remedial Measure laws/ Location Issue/Component Performance Methods reporting follow up if guideline Target (PT) period required Environmental Management Plan Compliance Status of Package-2  Provision of retro of MoRTH areas, 1 accordance with reflective warning Specifications junction) site needs signboards near Signs and school, hospital Horizontal marking ,religious places and geometry will be viz., cat’s eyes, forests based on IRC: delineators,  Provision of 38-1988 and object sidewalks in the built- vertical markers, hazard up sections, on both geometry will be markers, safety sides. based on IRC: barriers at  Signs and marking SP 23-1993 “. hazardous viz., cat’s eyes, locations, delineators, object pedestrian markers, hazard guardrails, etc markers, safety barriers at hazardous locations, pedestrian guardrails, etc…  Pedestrian cross- IRC: SP: 67- Total no. of Complied - walks at all Junctions 2012 street lights=704 and where conflict exists between vehicular and pedestrian movements (bus bays, schools and habitation.  Safety kerb at all bridges  Service roads in densely habituated areas  Horizontal and vertical geometry as per IRC Specification  Zebra crossing with informatory warning sign on approach to school, warning sign

TPF GETINSA EUROESTUDIOS S.L. in Joint Venture with RODIC CONSULTANTS PVT LTD In Association with EUROESTUDIOS INDIA Pvt. Ltd.

Page 48 of 178

STATE HIGHWAYS AUTHORITY OF JHARKHAND (SHAJ) PHASE-II PROJECTS

Monitoring Institutional Responsibility Observation Corrective Reference to Environmental indicators (MI)/ Monitoring Implementation Supervision during the action and Remedial Measure laws/ Location Issue/Component Performance Methods reporting follow up if guideline Target (PT) period required Environmental Management Plan Compliance Status of Package-2 with footways and speed limit sign  Street Lighting in built-up sections  Ambulance and medical aid posts 2. Natural Hazards 2.2  Provision of adequate IRC:34 Embankment MI: Design and Review of design SHAJ Complied - Flooding/Waterlogg number of CD Recommendatio raised at 18 numbers of cross documents and ing structures. Additional ns IRC:34 locations for a & side drains, drawings and culverts have been IRC:34 length of 5.785 slab/box culverts comparison with site proposed. Recommendatio km (Refer Hume pipes, road conditions

 All CD structures ns for road Appendix 4 of embankment designed for 50year construction in ADB approved height, design HFL return period waterlogged IEE report) and and number of and bridges designed area and IRC: for list of bridges for 100 year HFL 75 and bridges with return period MORT&H increased PT: Design and  Water ways of guidelines for waterway Pls numbers are in bridges and culverts Design of High refer Appendix accordance with have been increased. Embankments 3 of ADB site needs  Roadside drains also approved IEE provided report.  Embankment height raised along low lying/ potential water logged areas  Improvement in existing culverts/ Bridges to increase their carrying capacity. 3. Loss of Land and Assets 3.1 livelihood loss  affected persons The Right to Fair Throughout the MI: Payment of Check LA records; SHAJ and SHAJ Under Process Details provided to affected persons  Road improvement Compensation corridor compensation design drawings vs implementing in SMR July- work to be and and assistance to land plans; NGO Dec 2017 accommodated within Transparency in DPs as per RP available ROW to the Land Interview with extent possible. Acquisition, affected persons

TPF GETINSA EUROESTUDIOS S.L. in Joint Venture with RODIC CONSULTANTS PVT LTD In Association with EUROESTUDIOS INDIA Pvt. Ltd.

Page 49 of 178

STATE HIGHWAYS AUTHORITY OF JHARKHAND (SHAJ) PHASE-II PROJECTS

Monitoring Institutional Responsibility Observation Corrective Reference to Environmental indicators (MI)/ Monitoring Implementation Supervision during the action and Remedial Measure laws/ Location Issue/Component Performance Methods reporting follow up if guideline Target (PT) period required Environmental Management Plan Compliance Status of Package-2  Social Impact Rehabilitation Number of Assessment and And complaints/griev Check status of Resettlement Plan to Resettlement ances related to employment given to be undertaken as per Act, 2013 and compensation local people during national policy and ADB’s and resettlement construction ADB’ guidelines. involuntary PT: Minimal  Complete all resettlement number of necessary land and policy. complaints/griev property acquisition ances. All cases procedures prior to Contract Clause of resettlement the commencement for preference to and rehabilitation of civil work. local people if any are  Adhere to the Land during resolved at GRC Acquisition employment level. No case procedures in referred to accordance to RP’s arbitrator/court. Entitlement Framework.  Compensation and assistance as per project Resettlement Plan  Income restoration as per RP  Preference in employment and petty  contracts during construction to APs  Constitute GRC as per RP 4. Diversion of Forest Land and Cutting of Trees 4.1 Need for cutting  Geometric Forest Throughout the MI: Number and Review final design. SHAJ, Design department Tree cutting - of trees. adjustments made to Conservation corridor location of Check budget consultants forest SHAH/Forest permission minimize tree cutting. Act, 1980 Total number of geometric provision for department under process  Obtain tree cutting affected adjustments compensatory permission from trees=1344 made to avoid afforestation and forest department Diversion of forestland and additional plantation. Forest tree cutting,

TPF GETINSA EUROESTUDIOS S.L. in Joint Venture with RODIC CONSULTANTS PVT LTD In Association with EUROESTUDIOS INDIA Pvt. Ltd.

Page 50 of 178

STATE HIGHWAYS AUTHORITY OF JHARKHAND (SHAJ) PHASE-II PROJECTS

Monitoring Institutional Responsibility Observation Corrective Reference to Environmental indicators (MI)/ Monitoring Implementation Supervision during the action and Remedial Measure laws/ Location Issue/Component Performance Methods reporting follow up if guideline Target (PT) period required Environmental Management Plan Compliance Status of Package-2  Provision for Land=1.354 Ha budget amount mandatory Forest allocated for compensatory land=1.354 Ha compensatory afforestation (1:2) for afforestation and deposit of payment to additional Forestry Department plantation  Provision for additional PT: Unnecessary compensatory tree felling on plantation on 1: 2 forest land basis to be avoided. Budget implemented by allocation is contractor through adequate village Joint Forest Management (JFM) Committee

5. Shifting of Utilities 5.1 Disruption of  All telephone and Project Throughout the MI: Number of Interaction with Contractor/ SHAJ/CSC Complied - utility services to electrical requirement corridor complaints from concerned utility SHAJ/utility local community poles/wires and local people, authorities and local company public underground cables number, timing should be shifted and type of before start of construction notifications  Necessary issued to local permission and people, time payments taken to shift should be made to utilities PT: No. of relevant utility complaints should service agencies to be 0. Effective allow quick shifting and and timely restoration of utility notification. services Minimal time for  Local people must be utility shifting informed

TPF GETINSA EUROESTUDIOS S.L. in Joint Venture with RODIC CONSULTANTS PVT LTD In Association with EUROESTUDIOS INDIA Pvt. Ltd.

Page 51 of 178

STATE HIGHWAYS AUTHORITY OF JHARKHAND (SHAJ) PHASE-II PROJECTS

Monitoring Institutional Responsibility Observation Corrective Reference to Environmental indicators (MI)/ Monitoring Implementation Supervision during the action and Remedial Measure laws/ Location Issue/Component Performance Methods reporting follow up if guideline Target (PT) period required Environmental Management Plan Compliance Status of Package-2 Through appropriate means about the time of shifting of utility structures and potential disruption of services if any B. Construction Stage 1. Air Quality 1.1 Dust  Contractor to submit MORT&H Throughout MI: PM10 level Standards CPCB Contractor SHAJ /CSC Complied Not Required Generation due to location and layout Specifications project corridor measurements methods construction plan for storage areas for Road and Complaints from Observations Public activities and locals due to dust consultation of construction Bridge works Air transport, storage materials approved (P and CP) Act and handling of by CSC PT: PM10 level < Review of monitoring construction  Transport, loading 1974 and 100 data maintained by materials and unloading of Central Motor ug/m3Number of contractor loose and fine and Vehicle Act complaints materials through 1988 General should be 0. covered vehicles. Conditions of  Paved approach Bid Document roads.  Storage areas to be

located downwind of the habitation area.  Water spraying on earthworks, unpaved haulage roads and other dust prone areas.  Provision of PPEs to workers. 1.2 Emission of air  Regular maintenance The Air Asphalt mixing MI: Levels of HC, Standards CPCB Contractor SHAJ /CSC The - pollutants of machinery and (Prevention and plants, crushers, SO2, NO2, and methods Environmental (HC,SO2,NOX,CO equipment. Control of DG sets locations CO. Status of monitoring Pollution) Act, PUC certificates Review of monitoring agency finalized etc) from vehicles  Batching, asphalt mixing plants and 1981 (Amended data maintained by and monitoring due to traffic crushers at downwind 1987) and PT: SO2 and contractor is being carried congestion and use (1km) direction from Rules 1982 NO2 levels are out both less than

TPF GETINSA EUROESTUDIOS S.L. in Joint Venture with RODIC CONSULTANTS PVT LTD In Association with EUROESTUDIOS INDIA Pvt. Ltd.

Page 52 of 178

STATE HIGHWAYS AUTHORITY OF JHARKHAND (SHAJ) PHASE-II PROJECTS

Monitoring Institutional Responsibility Observation Corrective Reference to Environmental indicators (MI)/ Monitoring Implementation Supervision during the action and Remedial Measure laws/ Location Issue/Component Performance Methods reporting follow up if guideline Target (PT) period required Environmental Management Plan Compliance Status of Package-2 of equipment and the nearest 80ug/m3. PUC machinery settlement. certificate of  Only crushers equipment and licensed by the PCB machinery is upto shall be used date  DG sets with stacks of adequate height and use of low sulphur diesel as fuel.  LPG should be used as fuel source in construction camps instead of wood  Ambient air quality monitoring  Contractor to prepare traffic management and dust suppression plan duly approved by SHAJ 2. Noise 2.1 Disturbance to  All equipment to be Legal Throughout MI: day and night As per Noise rule, Contractor SHAJ /CSC The - local residents and timely serviced and requirement project section Noise levels. 2000 Environmental sensitive receptors properly maintained. Noise Pollution especially at Number of monitoring due to excessive  Construction (Regulation construction complaints from Consultation with agency finalized noise from equipment and and Control) sites, residential local people local people and monitoring construction machinery to be Rules, 2000 and identified is being carried activities and fitted with silencers and sensitive PT: Zero Review of noise out. operation of and maintained amendments locations. complaints or no level monitoring data equipment and properly. thereof + Clause repeated maintained by machinery  Only IS approved No 501.8.6. Refer Table 22 of complaints by contractor equipment shall be MORT&H IEE for local people. used for construction Specifications information on Average day and Observation of activities. for Road and sensitive night time noise construction site  Timing of noisy Bridge works receptors levels are within construction activities permissible limits shall be done during for work zone night time and areas

TPF GETINSA EUROESTUDIOS S.L. in Joint Venture with RODIC CONSULTANTS PVT LTD In Association with EUROESTUDIOS INDIA Pvt. Ltd.

Page 53 of 178

STATE HIGHWAYS AUTHORITY OF JHARKHAND (SHAJ) PHASE-II PROJECTS

Monitoring Institutional Responsibility Observation Corrective Reference to Environmental indicators (MI)/ Monitoring Implementation Supervision during the action and Remedial Measure laws/ Location Issue/Component Performance Methods reporting follow up if guideline Target (PT) period required Environmental Management Plan Compliance Status of Package-2 weekend near schools,  Implement noisy operations intermittently to reduce the total noise generated  Manage existing traffic to avoid traffic jams and accumulation of noise beyond standards.  Restrict construction near residential, built up and forest areas construction today light hours.  Initiation of multi- layered plantation, to serve as mitigation option for operation phase  Honking restrictions near sensitive areas  PPEs to workers  Noise monitoring as per EMoP. 3. Land and Soil 3.1 Land use  Non-agricultural Project Throughout the MI: Borrow pit Review borrow area Contractor SHAJ /CSC Under Process - Change and Loss areas to be used as requirement project section locations/Top soil plan, site visits of productive / borrow areas to the and borrow storage area areas Land topsoil extent possible.  If using agricultural identified for PT: Zero land, top soil to be Camp, storage complaints or preserved and laid areas etc. disputes over either on the registered against embankment slope contractor by land for growing owner

TPF GETINSA EUROESTUDIOS S.L. in Joint Venture with RODIC CONSULTANTS PVT LTD In Association with EUROESTUDIOS INDIA Pvt. Ltd.

Page 54 of 178

STATE HIGHWAYS AUTHORITY OF JHARKHAND (SHAJ) PHASE-II PROJECTS

Monitoring Institutional Responsibility Observation Corrective Reference to Environmental indicators (MI)/ Monitoring Implementation Supervision during the action and Remedial Measure laws/ Location Issue/Component Performance Methods reporting follow up if guideline Target (PT) period required Environmental Management Plan Compliance Status of Package-2 vegetation to protect soil erosion.  Land for temporary facilities like construction camp, storage areas etc. shall be brought back to its original land use 3.2 Slope failure  Bio-turfing of IRC: 56 -1974 Throughout the MI: Occurrence of Review of design Design consultant SHAJ /CSC Being Complied - and Soil erosion embankments to recommended entire project slope failure or documents and site and Contractor, due to Construction protect slopes. practice for road especially erosion issues observation activities,  Slope protection by treatment of along hilly areas earthwork, and cut providing frames, dry embankment PT: No slope and fill, stockpiles stone pitching, slopes for failures. Minimal etc. masonry retaining erosion control erosion issues walls, planting of Clause No. 306 grass and trees. and 305.2.2  Side slopes of all cut MORT&H and fill areas will be Specifications graded and covered for Road and with stone pitching, Bridge works grass and shrub as Guidelines IX for per design Soil erosion specifications. Care should be taken that the slope gradient shall not be greater than2:1.  The earth stockpiles to be provided with gentle slopes to soil erosion. 3.3 Borrow area  Obtain EC from IRC Guidelines Borrow sites MI: Existence of Review of design Contractor SHAJ /CSC Identification of Contractor is management SEIAA before on borrow areas location borrow areas in documents and site Borrow Area is being instructed opening any new and for quarries inappropriate observations completed and to expedite borrow area. (Environmental unauthorized process for process the  Comply to EC protection Act locations. Poor Compare site obtaining the Borrow area conditions of SEIAA and Rules, borrow area conditions with EC requisite permission for 1986; Water Act, management conditions by SEIAA permission from

TPF GETINSA EUROESTUDIOS S.L. in Joint Venture with RODIC CONSULTANTS PVT LTD In Association with EUROESTUDIOS INDIA Pvt. Ltd.

Page 55 of 178

STATE HIGHWAYS AUTHORITY OF JHARKHAND (SHAJ) PHASE-II PROJECTS

Monitoring Institutional Responsibility Observation Corrective Reference to Environmental indicators (MI)/ Monitoring Implementation Supervision during the action and Remedial Measure laws/ Location Issue/Component Performance Methods reporting follow up if guideline Target (PT) period required Environmental Management Plan Compliance Status of Package-2  Non-productive, Air Act)+Clause practices. competent all identified barren lands, 305.2.2 MORTH Number of Authority Borrow Area upland shall be used Specifications accidents. initiated. for borrowing earth for Road and Complaints from with the necessary Bridgeworks local people. permissions/ Guidelines for consents. Borrow Areas PT: No case of  Depths of borrow pits management non-compliance to be regulated and to conditions sides not steeper stipulated by than 25%. SEIAA in  Topsoil to be clearance letter. stockpiled and Zero accidents. protected for use at Zero complaints. the rehabilitation stage.  Transportation of earth materials through covered vehicles.  Follow IRC recommended practice for borrow pits (IRC 10: 1961) for identification of location, its operation and rehabilitation  Borrow areas not to be dug continuously.  To the extent borrow areas shall be sited away from habitated areas.  Borrow areas shall be leveled with salvaged material or other filling materials which do not pose contamination of soil.

TPF GETINSA EUROESTUDIOS S.L. in Joint Venture with RODIC CONSULTANTS PVT LTD In Association with EUROESTUDIOS INDIA Pvt. Ltd.

Page 56 of 178

STATE HIGHWAYS AUTHORITY OF JHARKHAND (SHAJ) PHASE-II PROJECTS

Monitoring Institutional Responsibility Observation Corrective Reference to Environmental indicators (MI)/ Monitoring Implementation Supervision during the action and Remedial Measure laws/ Location Issue/Component Performance Methods reporting follow up if guideline Target (PT) period required Environmental Management Plan Compliance Status of Package-2 Else, it shall be converted into fish pond. 3.4 Quarry  Aggregates will be Clause No.111.3 Quarry area MI: Existence of Review of design Contractor SHAJ /CSC Identification of - Operations sourced from existing MORT&H locations licenses quarry documents, Stone Quarries licensed quarries. Specifications areas from which contractor completed and  Copies of consent/ for Road and materials to be documents and site the requisite approval / Bridge works sourced and observation permission from rehabilitation plan for Guidelines VI for Existence of a Compliance to EC competent a new quarry or use Quarry Areas quarry conditions in case of Authority have of existing source will Management redevelopment opening new been obtained. be submitted to Environmental plan quarries SHAJ. Protection Rules  The contractor will PT: Quarry develop a Quarry license is valid.: Redevelopment plan, No case of as per the Mining noncompliance to Rules of the state and consent submit a copy of conditions and air the approval to EA. quality meets the  Obtain environmental prescribed limit clearance from SEIAA in case of opening new quarry 3.5 Compaction of  Construction vehicles, Design Parking areas, MI: Location of Site observation Contractor SHAJ /CSC Being Complied - soil and impact on machinery, and requirement Haulage roads approach and quarry haul roads equipment to be and construction haulage roads due to movement of stationed in the yards Presence of vehicles and designated ROW to destroyed/comp equipment avoid compaction. acted agricultural  Approach land or land which roads/haulage roads has not be shall be designed restored to its along the barren and original condition hard soil area to PT: Zero reduce the occurrence of compaction. destroyed/comp  Transportation of acted land and quarry material to the undestroyed land

TPF GETINSA EUROESTUDIOS S.L. in Joint Venture with RODIC CONSULTANTS PVT LTD In Association with EUROESTUDIOS INDIA Pvt. Ltd.

Page 57 of 178

STATE HIGHWAYS AUTHORITY OF JHARKHAND (SHAJ) PHASE-II PROJECTS

Monitoring Institutional Responsibility Observation Corrective Reference to Environmental indicators (MI)/ Monitoring Implementation Supervision during the action and Remedial Measure laws/ Location Issue/Component Performance Methods reporting follow up if guideline Target (PT) period required Environmental Management Plan Compliance Status of Package-2 dumping site through heavy vehicles shall be done through existing major roads to the extent possible to restrict wear and tear to the village/minor roads.  Land taken for construction camp and other temporary facility shall be restored to its original conditions 3.6 Contamination  Construction vehicles Design Fuelling station, MI: Quality of soil Site observation Contractor SHAJ /CSC Being complied Finalization of of soil due to and equipment will be requirement construction near storage area dumping leakage/ spillage of maintained and sites, and Presence of location by the oil, bituminous and refueled in such a construction spilled oil or contractor with non-bituminous fashion that oil/diesel camps and bitumen in project consultation debris generated spillage does not disposal location area with CSC / from demolition and contaminate the soil. SHAJ. road construction  Fuel storage and refueling sites to be PT: Soil test kept away from conforming to no drainage channels. –contamination.  Unusable debris shall No sighting of be dumped in ditches spilled oil or and low lying areas. bitumen in  To avoid soil construction site contamination oil or camp site Interceptors shall be provided at wash down and refueling areas.  Waste oil and oil soaked cotton/ cloth shall be stored in containers labeled ‘Waste Oil’ and

TPF GETINSA EUROESTUDIOS S.L. in Joint Venture with RODIC CONSULTANTS PVT LTD In Association with EUROESTUDIOS INDIA Pvt. Ltd.

Page 58 of 178

STATE HIGHWAYS AUTHORITY OF JHARKHAND (SHAJ) PHASE-II PROJECTS

Monitoring Institutional Responsibility Observation Corrective Reference to Environmental indicators (MI)/ Monitoring Implementation Supervision during the action and Remedial Measure laws/ Location Issue/Component Performance Methods reporting follow up if guideline Target (PT) period required Environmental Management Plan Compliance Status of Package-2 ‘Hazardous’ sold off to MoEF/SPCB authorized vendors  Non-bituminous wastes to be dumped in borrow pits with the concurrence of landowner and covered with a layer of topsoil conserved from opening the pit.  Bituminous wastes will be disposed off in an identified dumping site approved by the State Pollution Control Board 4. Water Resources 4.1 Sourcing of  Requisite permission CGWA Throughout the MI: Approval from Checking of Contractor SHAJ /CSC The ground Obtaining of water during shall be obtained for Guidelines Project section competent documentation water source Ground water Construction abstraction of authority has been permission from groundwater from Complaints from identified and competent Central Groundwater Check Dam at local people on Talk to local people requisite Authority by the Authority. suitable locations water availability permission has contractor to be  Arrangements shall been initiated by expedited. be made by PT: Valid the contractor. contractor that the approval from water availability and competent supply to nearby authority. Zero communities remain complaints from unaffected. local people.  Water intensive activities not to be undertaken during summer season.  Provision of water harvesting structure to augment

TPF GETINSA EUROESTUDIOS S.L. in Joint Venture with RODIC CONSULTANTS PVT LTD In Association with EUROESTUDIOS INDIA Pvt. Ltd.

Page 59 of 178

STATE HIGHWAYS AUTHORITY OF JHARKHAND (SHAJ) PHASE-II PROJECTS

Monitoring Institutional Responsibility Observation Corrective Reference to Environmental indicators (MI)/ Monitoring Implementation Supervision during the action and Remedial Measure laws/ Location Issue/Component Performance Methods reporting follow up if guideline Target (PT) period required Environmental Management Plan Compliance Status of Package-2 groundwater condition in the area 4.2 Disposal of  Provisions shall be Clause No.1010 Throughout the MI: Condition of Standards methods Contractor SHAJ /CSC Being Complied - water during made to connect road EP Act 1986 Project section drainage system Site observation and construction side drains with MORT&H in construction review of documents existing nearby Specifications site. Presence/ natural drains. for Road and absence of water Bridgeworks logging in project area.

PT: Existence of proper drainage system. No water logging in project area 4.3 Alteration in  Existing drainage Design Near all drainage MI: Proper flow of Review of design Contractor SHAJ /CSC Being Complied - surface water system to be requirement, channels, river/ water in existing documents hydrology maintained Clause No nallah crossings streams and  And further 501.8.6. etc. rivers Site observation enhanced. MORT&H  Provision shall be Specifications PT: No complain made for adequate of water shortage size and number of by downstream cross drainage communities. No structures esp. in the record of areas where land is overtopping/ sloping towards road water logging alignment.  Road level shall be raised above HFL level wherever road level is lesser than HFL  Culverts reconstruction shall be done during lean flow period. In some cases these minor channels may be

TPF GETINSA EUROESTUDIOS S.L. in Joint Venture with RODIC CONSULTANTS PVT LTD In Association with EUROESTUDIOS INDIA Pvt. Ltd.

Page 60 of 178

STATE HIGHWAYS AUTHORITY OF JHARKHAND (SHAJ) PHASE-II PROJECTS

Monitoring Institutional Responsibility Observation Corrective Reference to Environmental indicators (MI)/ Monitoring Implementation Supervision during the action and Remedial Measure laws/ Location Issue/Component Performance Methods reporting follow up if guideline Target (PT) period required Environmental Management Plan Compliance Status of Package-2 diverted for a very short period (15-30 days) and will be bring back to its original course immediately after construction. 4.4 Siltation in  Embankment slopes Design Near all water MI: Presence Field observation Contractor SHAJ /CSC Being Complied - water bodies due to to be modified requirement, bodies /waterway /absence of construction suitably to restrict the ClauseNo501.8. Refer Table 15. siltation in rivers, activities /earthwork soil debris entering 6.MORT&H streams, ponds water bodies. Specifications and other water  Provision of Silt for Road and Br bodies in project fencing shall be made edge works area. Turbidity at water bodies. Retaining test levels  Silt/sediment should Worldwide wall=140m be collected and bester actives PT: No records of stockpiled for siltation due to possible reuse as project activities. surfacing of slopes Surface water where they have to quality tests be re-vegetated. confirm to turbidity  Earthworks and stone and TSS limit works to be prevented from impeding natural flow of rivers, streams and water canals or existing drainage system.  Retaining walls at water bodies /ponds to avoid siltation near ponds 4.5 Deterioration in  No vehicles or The Water Water bodies, MI: Water quality Conduction of water Contractor SHAJ /CSC The - Surface water equipment should be (Prevention and refueling stations, of ponds, quality tests as per Environmental quality due to parked or refueled Control of construction streams, rivers the monitoring plan monitoring leakage from near water-bodies, so Pollution) Act, camps. and other water agency has vehicles and as to avoid 1974 and bodies in project Field observation been finalized

TPF GETINSA EUROESTUDIOS S.L. in Joint Venture with RODIC CONSULTANTS PVT LTD In Association with EUROESTUDIOS INDIA Pvt. Ltd.

Page 61 of 178

STATE HIGHWAYS AUTHORITY OF JHARKHAND (SHAJ) PHASE-II PROJECTS

Monitoring Institutional Responsibility Observation Corrective Reference to Environmental indicators (MI)/ Monitoring Implementation Supervision during the action and Remedial Measure laws/ Location Issue/Component Performance Methods reporting follow up if guideline Target (PT) period required Environmental Management Plan Compliance Status of Package-2 equipment’s and contamination from amendments and monitoring waste from fuel and lubricants. thereof. Presence of oil shall be carried construction camps  Oil and grease traps floating in water out and fueling platforms bodies in project to be provided at re- area fueling locations.  All chemicals and oil PT: Surface water shall be stored away quality meets from water and freshwater quality concreted platform standards with catchment pit for prescribed by spills collection. CPCB  All equipment operators, drivers, and warehouse personnel will be trained in immediate response for spill containment and eventual clean-up. Readily available, simple to understand and preferably written in the local language emergency response procedure, including reporting, will be provided by the contractors.  Construction camp to be sited away from water bodies.  Wastes must be collected, stored and taken to approve disposal site only.  Water quality shall be monitored 5. Flora and Fauna

TPF GETINSA EUROESTUDIOS S.L. in Joint Venture with RODIC CONSULTANTS PVT LTD In Association with EUROESTUDIOS INDIA Pvt. Ltd.

Page 62 of 178

STATE HIGHWAYS AUTHORITY OF JHARKHAND (SHAJ) PHASE-II PROJECTS

Monitoring Institutional Responsibility Observation Corrective Reference to Environmental indicators (MI)/ Monitoring Implementation Supervision during the action and Remedial Measure laws/ Location Issue/Component Performance Methods reporting follow up if guideline Target (PT) period required Environmental Management Plan Compliance Status of Package-2 5.1 Vegetation loss  Restrict tree cutting Forest Throughout MI: ROW width Review of relevant Mandatory SHAJ /CSC Tree cutting - due to site upto toe line Conservation project corridor Number of trees documents – tree Compensatory permission preparation and considering safety to Act1980 + Estimated No. of for felling cutting permit, plantation by forest under process. construction road users. IRC:SP:21 and affected Compensatory compensatory Department and activities  Roadside trees to be IRC:SP:66 tree=1344 plantation plan plantation plan. Additional removed with prior Additional Number of trees Meeting with JFM plantation by approval of Plantation near replanted. Committee contractor in competent authority. Sensitive members partnership with  Mandatory receptors, river PT: Additional respective local compensatory banks, borrow compensatory Field observations JFM Committee plantation at 1:2 basis areas afforestation done by Forestry on a 1:2 basis by Department contractor through  Additional JFM. Number of compensatory trees planted is plantation 1:2 as per double the the IRC by contractor number of trees in partnership with removed. Tree respective village survival rate is at JFM Committee. least 70%. Local villagers to be employed for afforestation activities. Employment preference to women  Regular maintenance trees planted.  Provision of LPG in construction camp as fuel source to avoid tree cutting.  Plantation of trees on both sides of the road where technically feasible. Trees should be offset 1m back from the ultimate edge of the roadway

TPF GETINSA EUROESTUDIOS S.L. in Joint Venture with RODIC CONSULTANTS PVT LTD In Association with EUROESTUDIOS INDIA Pvt. Ltd.

Page 63 of 178

STATE HIGHWAYS AUTHORITY OF JHARKHAND (SHAJ) PHASE-II PROJECTS

Monitoring Institutional Responsibility Observation Corrective Reference to Environmental indicators (MI)/ Monitoring Implementation Supervision during the action and Remedial Measure laws/ Location Issue/Component Performance Methods reporting follow up if guideline Target (PT) period required Environmental Management Plan Compliance Status of Package-2 to prevent safety hazard and provide adequate sight distance.  Integrate vegetation management (IVM) with the carriage way completely clear of vegetation.  Additional plantation near sensitive receptors, river banks to minimize noise & air pollution, and to check erosion.  Controlled use of pesticides/ fertilizers 6. Construction Camps 6.1 Impact  All camps should be Design All construction MI: Location of On site observation Contractor and EO SHAJ /CSC Being Complied - associated with established with prior Requirement camps campsites and location permission from PCB. The Water distance from Interaction with habitation, forest workers and local Camps to maintain (Prevention and minimum distance areas, water community Control of from following: # 500 bodies, through m from habitation # Pollution) traffic route and 500 m from forest Act,1974and its construction areas where possible amendments camps PT: # 500 m from water thereof Distance of bodies where campsite is less possible # 500 m than 500m from from through traffic listed locations route # 500 m from identified elephant movement locations 6.2 Worker’s Health  The location, layout The Building All construction MI: Camp health Camp records Contractor SHAJ /CSC Being Complied - in construction and basic facility and Other camps records camp provision of each Construction Site observation labor camp will be

TPF GETINSA EUROESTUDIOS S.L. in Joint Venture with RODIC CONSULTANTS PVT LTD In Association with EUROESTUDIOS INDIA Pvt. Ltd.

Page 64 of 178

STATE HIGHWAYS AUTHORITY OF JHARKHAND (SHAJ) PHASE-II PROJECTS

Monitoring Institutional Responsibility Observation Corrective Reference to Environmental indicators (MI)/ Monitoring Implementation Supervision during the action and Remedial Measure laws/ Location Issue/Component Performance Methods reporting follow up if guideline Target (PT) period required Environmental Management Plan Compliance Status of Package-2 submitted to CSC workers Existence of Consultation with and approved b EA. (Regulation of proper first aid kit contractor workers The contractor will Employment in camp site and local people maintain necessary living nearby. and Conditions living accommodation Complaints from and ancillary facilities of service) Act workers. in hygienic manner. 1996 and The  Adequate water and Water PT: No record of sanitary latrines with (Prevention and illness due to septic tanks with soak Control of unhygienic pits shall be provided. Pollution) conditions or  vectors. Zero Preventive medical Act,1974 and facilities in camp cases of STD. amendments  Waste disposal Clean and tidy facilities such as dust thereof camp site bins must be conditions. provided in the camps and regular disposal of waste The Contractor will take all precautions to protect the workers from insect and pest to reduce the risk to health. This includes the use of insecticides which should comply with local regulations.  No liquor or prohibited drugs will be imported to, sell, give and barter to the workers of host community.  Awareness raising to immigrant workers/local community on

TPF GETINSA EUROESTUDIOS S.L. in Joint Venture with RODIC CONSULTANTS PVT LTD In Association with EUROESTUDIOS INDIA Pvt. Ltd.

Page 65 of 178

STATE HIGHWAYS AUTHORITY OF JHARKHAND (SHAJ) PHASE-II PROJECTS

Monitoring Institutional Responsibility Observation Corrective Reference to Environmental indicators (MI)/ Monitoring Implementation Supervision during the action and Remedial Measure laws/ Location Issue/Component Performance Methods reporting follow up if guideline Target (PT) period required Environmental Management Plan Compliance Status of Package-2 communicable and sexually transmitted diseases. 7. Management of Construction Waste/Debris 7.1 Selection of  Contractor to submit Design At all MI: Location of Field survey and Contractor SHAJ /CSC Being complied - Dumping Sites a waste/spoil disposal Requirement, Dumping/Dispos dumping sites interaction with local plan and get it MORT&H al Sites Number of public people. Review of approved by CSC guidelines and complaints. consent letter and EA. General  Create controlled Conditions of PT: No public dumping sites with a Contract complaints. non-permeable lining Document Consent letters incorporated in the pit for all dumping design to avoid sites available leachate seepage with contractor into the soil, which may later affect ground water quality  Unproductive/wastela nds shall be selected for dumping sites away from residential areas and water bodies  Dumping sites must be having adequate capacity equal to the amount of debris generated.  Public perception and consent from the village Panchayats has to be obtained before finalizing the location 7.2 Reuse and  The existing bitumen Design Throughout the MI: Percentage of Contractor records Contractor SHAJ /CSC Being complied - disposal of surface shall be Requirement, project corridor reuse of existing utilized for paving of MORT&H surface material Field observation cross roads, access guidelines and

TPF GETINSA EUROESTUDIOS S.L. in Joint Venture with RODIC CONSULTANTS PVT LTD In Association with EUROESTUDIOS INDIA Pvt. Ltd.

Page 66 of 178

STATE HIGHWAYS AUTHORITY OF JHARKHAND (SHAJ) PHASE-II PROJECTS

Monitoring Institutional Responsibility Observation Corrective Reference to Environmental indicators (MI)/ Monitoring Implementation Supervision during the action and Remedial Measure laws/ Location Issue/Component Performance Methods reporting follow up if guideline Target (PT) period required Environmental Management Plan Compliance Status of Package-2 construction and roads, and paving General Method and Interaction with local dismantled waste works in construction Conditions of location of people sites and camps, Contract disposal site of temporary traffic Document construction diversions, and debris haulage routes.  All excavated materials from roadway, shoulders, PT: No public verges, drains, cross complaint and drainage will be used consent letters for for backfilling all dumping sites embankments, filling available with pits, and landscaping. contractor or CSC  Unusable and non- bituminous debris materials should be suitably disposed off at pre-designated disposal locations, with approval of the concerned authority.  The bituminous wastes shall be disposed in secure landfill sites only in environmentally accepted manner. For removal of debris, wastes and its disposal, MORTH guidelines should be followed.  Unusable and surplus materials, as determined by the Project Engineer, will be removed and disposed off-site.

TPF GETINSA EUROESTUDIOS S.L. in Joint Venture with RODIC CONSULTANTS PVT LTD In Association with EUROESTUDIOS INDIA Pvt. Ltd.

Page 67 of 178

STATE HIGHWAYS AUTHORITY OF JHARKHAND (SHAJ) PHASE-II PROJECTS

Monitoring Institutional Responsibility Observation Corrective Reference to Environmental indicators (MI)/ Monitoring Implementation Supervision during the action and Remedial Measure laws/ Location Issue/Component Performance Methods reporting follow up if guideline Target (PT) period required Environmental Management Plan Compliance Status of Package-2 8. Traffic Management and Safety 8.1 Management of  Traffic Management Design Throughout the MI: Traffic Review traffic Contractor SHAJ /CSC Being complied The contractor existing traffic and Plan shall be requirement and project corridor management management plan has been safety submitted by the IRC: SP: 27 - especially at plan. Presence/ Field observation of suggested to contractor and 1984, Report intersections absence of safety traffic management submit the approved by the Containing signs, traffic and safety system Traffic CSC. Recommendatio demarcations, Management  The traffic control n of IRC flag men etc. on Interaction with Plan and get it plans shall contain Regional site. Complaints people in vehicles approved from details of diversions; Workshops from road users. using the road CSC. traffic safety on Highway No of accidents arrangements during Safety IRC:SP: PT: No construction; safety 32 -1988 Road complaints. No measures for night Safety for accidents due to time traffic and Children (5-12 poor traffic precautions for Years Old) in management. transportation of Construction Traffic signs, hazardous materials. Zones demarcation lines Timing and IRC:SP:55-2014 etc. present in scheduling to be The Building appropriate done so that and other locations on site transportation of Construction dangerous goods is workers Act done during least 1996 and Cess number of people and Act of 1996 other vehicles on the Factories Act road. 1948+Section 6  The Contractor will of Employer’s ensure that the Requirement of diversion/detour is Bid Document always maintained in running condition, particularly during the monsoon to avoid disruption to traffic flow. On stretches where it is not possible to pass the traffic on the part

TPF GETINSA EUROESTUDIOS S.L. in Joint Venture with RODIC CONSULTANTS PVT LTD In Association with EUROESTUDIOS INDIA Pvt. Ltd.

Page 68 of 178

STATE HIGHWAYS AUTHORITY OF JHARKHAND (SHAJ) PHASE-II PROJECTS

Monitoring Institutional Responsibility Observation Corrective Reference to Environmental indicators (MI)/ Monitoring Implementation Supervision during the action and Remedial Measure laws/ Location Issue/Component Performance Methods reporting follow up if guideline Target (PT) period required Environmental Management Plan Compliance Status of Package-2 width of existing carriageway, temporary paved diversions will be constructed.  Restriction of construction activity to only one side of the existing road  The contractor shall inform local community of changes to traffic routes, and pedestrian access arrangements with assistance from “Engineer”.  Use of adequate signage’s to ensure traffic management and safety. Conduct of regular safety audit on safety measures. 8.2 Pedestrians,  Temporary access Same as above Near habitation MI: Presence/ Field Observation Contractor SHAJ /CSC Under Process - animal movement and diversion, with on both sides of absence of Interaction with local proper drainage schools, temples, access routes for people facilities. hospitals, pedestrians.  Access to the graveyards, Road signage schools, temples and construction Number of other public places sites, haulage complaints from must be maintained roads, diversion local people when construction sites. takes place near PT: Easy access them. to schools,  Fencing wherever temples and cattle movement is public places. expected. Zero complaints

TPF GETINSA EUROESTUDIOS S.L. in Joint Venture with RODIC CONSULTANTS PVT LTD In Association with EUROESTUDIOS INDIA Pvt. Ltd.

Page 69 of 178

STATE HIGHWAYS AUTHORITY OF JHARKHAND (SHAJ) PHASE-II PROJECTS

Monitoring Institutional Responsibility Observation Corrective Reference to Environmental indicators (MI)/ Monitoring Implementation Supervision during the action and Remedial Measure laws/ Location Issue/Component Performance Methods reporting follow up if guideline Target (PT) period required Environmental Management Plan Compliance Status of Package-2  Large number of box culverts has been proposed. .All structures having vertical clearance above 3m and not catering to perennial flow of water may serve as underpass for animals 8.3 Safety of  Contractors to adopt Same as above Construction MI: Availability of Site observation Obligation of SHAJ/CSC Being Complied - Workers and and maintain safe sites Safety gears to Contractor accident risk from working practices. workers Review records on construction  Usage of fluorescent safety training and activities and retro refectory Safety signage accidents signage, in local Training records language at the on safety Interact with construction sites construction workers  Training to workers Number of safety on safety procedures related accidents and precautions.  Mandatory PT: Zero fatal appointment of safety accidents. Zero or officer. minor nonfatal  All regulations accidents. regarding safe scaffolding, ladders, working platforms, gangway, stair wells, excavations, trenches and safe means of entry and egress shall be complied with.  Provision of PPEs to workers.  Provision of a readily available first aid unit including an

TPF GETINSA EUROESTUDIOS S.L. in Joint Venture with RODIC CONSULTANTS PVT LTD In Association with EUROESTUDIOS INDIA Pvt. Ltd.

Page 70 of 178

STATE HIGHWAYS AUTHORITY OF JHARKHAND (SHAJ) PHASE-II PROJECTS

Monitoring Institutional Responsibility Observation Corrective Reference to Environmental indicators (MI)/ Monitoring Implementation Supervision during the action and Remedial Measure laws/ Location Issue/Component Performance Methods reporting follow up if guideline Target (PT) period required Environmental Management Plan Compliance Status of Package-2 adequate supply of dressing materials.  The contractor will not employ any person below the age of 18years  Use of hazardous material should be minimized and/or restricted.  Emergency plan (to be approved by engineer) shall be prepared to respond to any accidents or emergencies.  Accident Prevention Officer must be appointed by the contractor. 8.4 Accident risk to  Restrict access to Same as above Construction MI: Safety signs Site inspection Contractor SHAJ /CSC Being Complied - local community construction sites sites and their location only to authorized Consultation with personnel. Incidents of local people  Physical separation accidents must be provided for movement of Complaints from vehicular and human local people PT: traffic. Zero incident of  Adequate signage accidents. Zero must be provided for complaints. safe traffic movement  Provision of temporary diversions and awareness to locals before opening new construction fronts 9. Site restoration and rehabilitation

TPF GETINSA EUROESTUDIOS S.L. in Joint Venture with RODIC CONSULTANTS PVT LTD In Association with EUROESTUDIOS INDIA Pvt. Ltd.

Page 71 of 178

STATE HIGHWAYS AUTHORITY OF JHARKHAND (SHAJ) PHASE-II PROJECTS

Monitoring Institutional Responsibility Observation Corrective Reference to Environmental indicators (MI)/ Monitoring Implementation Supervision during the action and Remedial Measure laws/ Location Issue/Component Performance Methods reporting follow up if guideline Target (PT) period required Environmental Management Plan Compliance Status of Package-2 9.1 Clean-up  Contractor will Project Throughout the MI: Condition of Site observation Contractor SHAJ /CSC Shall be - Operations, prepare site requirement project corridor, camp, borrow initiated before Restoration and restoration plans, construction areas and Interaction with closer of Camp Rehabilitation which will be camp sites and construction sites, locals and Plant sites. approved by the borrow areas Presence/ ‘Engineer’. absence of Issue completion  The clean-up and construction certificate after restoration operations material/debris restoration of all are to be after completion sites are found implemented by the of construction satisfactory contractor prior to works on site. PT: demobilization. Clean and tidy  All construction zones sites. No trash or including riverbeds, debris left on site. culverts, road-side Site restored and areas, camps, hot leveled. mix plant sites, crushers, batching plant sites and any other area used/affected by the project will be left clean and tidy, to the satisfaction of the Environmental officer.  All the opened borrow areas will be rehabilitated and ‘Engineer’ will certify Operation and Maintenance stage 1. Air Quality 1.1 Air pollution due  Roadside tree Environmental Throughout the MI: Ambient air As per CPCB SHAJ SHAJ Not Applicable - to due to vehicular plantations shall be Protection Act, Corridor quality (PM10, requirements movement maintained at least 1986; The Air CO,SO2 NO2)

with 70% survival (Prevention and rate. PT: Levels are Site inspection Control of  Regular maintenance equal to or below of the road will be baseline levels

TPF GETINSA EUROESTUDIOS S.L. in Joint Venture with RODIC CONSULTANTS PVT LTD In Association with EUROESTUDIOS INDIA Pvt. Ltd.

Page 72 of 178

STATE HIGHWAYS AUTHORITY OF JHARKHAND (SHAJ) PHASE-II PROJECTS

Monitoring Institutional Responsibility Observation Corrective Reference to Environmental indicators (MI)/ Monitoring Implementation Supervision during the action and Remedial Measure laws/ Location Issue/Component Performance Methods reporting follow up if guideline Target (PT) period required Environmental Management Plan Compliance Status of Package-2 done to ensure good Pollution) Act, given in the IEE surface condition 1981 report  Ambient air quality monitoring. If monitored parameters exceeds prescribed limit, suitable control measures must be taken.  Signages shall be provided reminding them to properly maintain their vehicles to economize on fuel consumption.  Enforcement of vehicle emission rules in coordination with transport department or installing emission checking equipment’s 2. Noise 2.1 Noise due to  Effective traffic Noise Pollution Sensitive MI: Noise levels Noise monitoring as SHAJ SHAJ Identification of The contractor movement of traffic management and (Regulation and receptors as per noise rules ,2000 Noise Barrier and CSC has good riding conditions Control) identified in IEE location at been suggested PT: Levels are sensitive to follow the shall be maintained Rules,2000 and  Speed limitation to 20 equal to or below Discussion with receptors such ADB approved amendments km/hour and honking baseline levels people at sensitive as School, EMP while restrictions near thereof given in the IEE receptor sites College, finalizing the sensitive receptors report Hospital & Court noise barrier and elephant is under locations along movement areas Process the project road.  Construction of noise barriers near sensitive receptors with consent of local community

TPF GETINSA EUROESTUDIOS S.L. in Joint Venture with RODIC CONSULTANTS PVT LTD In Association with EUROESTUDIOS INDIA Pvt. Ltd.

Page 73 of 178

STATE HIGHWAYS AUTHORITY OF JHARKHAND (SHAJ) PHASE-II PROJECTS

Monitoring Institutional Responsibility Observation Corrective Reference to Environmental indicators (MI)/ Monitoring Implementation Supervision during the action and Remedial Measure laws/ Location Issue/Component Performance Methods reporting follow up if guideline Target (PT) period required Environmental Management Plan Compliance Status of Package-2  The effectiveness of the multilayered plantation should be monitored and if need be, solid noise barrier shall be placed.  Create awareness amongst the residents about likely noise levels from road operation at different distances, the safe ambient noise limits and easy to implement noise reduction measures while constructing a building near road 3. Land and Soil 3.1 Soil erosion at  Periodic checking to Project At bridge MI: Existence of On site observation SHAJ SHAJ Not Applicable - embankment be carried to assess requirement locations and soil erosion sites during heavy the effectiveness of embankment Number of soil rainfall. the stabilization slopes and other erosion sites measures viz. turfing, probable soil stone pitching, river erosion areas. PT: Zero or training structures etc minimal  Necessary measures occurrences of to be followed soil erosion wherever there are failures 4. Water resources/Flooding and Inundation 4.1 Siltation  Regular checks shall Project Near surface MI: Water quality Site observation Not Applicable - be made for soil requirement Water bodies erosion and turfing PT: No turbidity of conditions of river surface water training structures for bodies due to the its effective road maintenance.

TPF GETINSA EUROESTUDIOS S.L. in Joint Venture with RODIC CONSULTANTS PVT LTD In Association with EUROESTUDIOS INDIA Pvt. Ltd.

Page 74 of 178

STATE HIGHWAYS AUTHORITY OF JHARKHAND (SHAJ) PHASE-II PROJECTS

Monitoring Institutional Responsibility Observation Corrective Reference to Environmental indicators (MI)/ Monitoring Implementation Supervision during the action and Remedial Measure laws/ Location Issue/Component Performance Methods reporting follow up if guideline Target (PT) period required Environmental Management Plan Compliance Status of Package-2 4.2 Water logging  Regular visual checks Project Near surface MI: Presence/ Site observation SHAJ SHAJ Not Applicable - due to blockage of and cleaning (at least requirement Water absence of water drains, culverts or once before IRC: SP:21- bodies/cross logging along the streams monsoon) of drains to 2009 drains/side drains road ensure that flow of water is maintained PT: No record of through cross drains overtopping/ and other channels/ Water logging stream.  Monitoring of water borne diseases due to stagnant water bodies 5. Flora 5.1 Vegetation  Planted trees, shrubs, Forest Project tree MI: Tree/plants Records and field SHAJ/JFM/Forest SHAJ/JFM/Fo Not Applicable - and grasses to be Conservation plantation sites survival rate observations. Department rest properly maintained. Act 1980 Information from Department  The tree survival PT: Minimum rate Forestry Department audit to be conducted of 70% tree at least once in a year survival to assess the effectiveness 6. Maintenance of Right of Way and Safety 6.1 Accident Risk  Maintain shoulder Project Throughout the MI: Presence and Visual inspection SHAJ SHAJ Not Applicable - due to uncontrolled completely clear of requirement Project route extent of growth of vegetation. IRC: SP:21- vegetation growth Check accident vegetation  Minimum offset as 2009 on either side of records prescribed in road. Number of IRC:SP:21-2009 to accidents. PT: No be maintained accidents due to  Regular vegetation growth maintenance/trimmin g of plantation along the road side  No invasive plantation near the road 6.2 Accident risks  Traffic control IRC:SP:55-2014 Throughout the MI: Number of Review accident SHAJ SHAJ Not Applicable - associated with measures, including Project route accidents records traffic movement Conditions and

TPF GETINSA EUROESTUDIOS S.L. in Joint Venture with RODIC CONSULTANTS PVT LTD In Association with EUROESTUDIOS INDIA Pvt. Ltd.

Page 75 of 178

STATE HIGHWAYS AUTHORITY OF JHARKHAND (SHAJ) PHASE-II PROJECTS

Monitoring Institutional Responsibility Observation Corrective Reference to Environmental indicators (MI)/ Monitoring Implementation Supervision during the action and Remedial Measure laws/ Location Issue/Component Performance Methods reporting follow up if guideline Target (PT) period required Environmental Management Plan Compliance Status of Package-2 speed limits, will be existence of Site observations enforced strictly. safety signs,  Further rumble strips etc. encroachment of on the road squatters within the Presence/absenc ROW will be e of sensitive prevented. receptor  No school or hospital structures inside will be allowed to be the stipulated established beyond planning line as the stipulated per relevant local planning line as per law relevant local law  Monitor/ensure that PT: Fatal and non all safety provisions fatal accident rate included in design is reduced after and construction improvement phase are properly maintained  Highway patrol unit(s) for round the clock patrolling. Phone booth for accidental reporting and ambulance services with minimum response time for rescue of any accident victims, if possible.  Tow-way facility for the breakdown vehicles if possible 6.3.Transport of  Existence of spill - Throughout the MI: Status of Review of spill SHAJ SHAJ Not Applicable - Dangerous Goods prevention and project stretch emergency prevention and control and system – whether emergency emergency operational or not response plan Spill responsive system accident records

TPF GETINSA EUROESTUDIOS S.L. in Joint Venture with RODIC CONSULTANTS PVT LTD In Association with EUROESTUDIOS INDIA Pvt. Ltd.

Page 76 of 178

STATE HIGHWAYS AUTHORITY OF JHARKHAND (SHAJ) PHASE-II PROJECTS

Monitoring Institutional Responsibility Observation Corrective Reference to Environmental indicators (MI)/ Monitoring Implementation Supervision during the action and Remedial Measure laws/ Location Issue/Component Performance Methods reporting follow up if guideline Target (PT) period required Environmental Management Plan Compliance Status of Package-2  Emergency plan for PT: Fully vehicles carrying functional hazardous material emergency system

Table-8: Environmental Management Plan Compliance Status of Package-3 Monitoring Institutional Responsibility Observation Corrective Environmental Reference to indicators (MI)/ Monitoring Implementation Supervision during the action and Remedial Measure Location Issue/Component laws/guideline Performance Methods reporting follow up if Target (PT) period required Environmental Management Plan Compliance Status of Package-3 A. Design and Pre-construction Stage 1. Alignment 1.1 Pavement  Soaked CBR value Design Embankment MI: Design and Review of detail Design Consultant SHAJ Complied Not Required damage and of sub grade is requirement raised at 18 number of cross design documents & inadequate recommended to locations for a and side drains, drawings and length of 3.700 slab/box comparison with site drainage provisions be 12 %.  Overloading to be km culverts, conditions in habitat areas checked (Refer and Hume pipes  Raised Appendix PT: Design and embankment and 4 of ADB numbers are in provision of approved IEE accordance with roadside drainage report) site needs to prevent damage Roadside drains to pavement due to (both sides water logging on together) the road and also Covered=4.6 km inconvenience Unlined=82.5 caused to km  Provision of For list of adequate no. of bridges cross drainage with increased structures. waterway Pls  Increase (vent and refer height) in

TPF GETINSA EUROESTUDIOS S.L. in Joint Venture with RODIC CONSULTANTS PVT LTD In Association with EUROESTUDIOS INDIA Pvt. Ltd.

Page 77 of 178

STATE HIGHWAYS AUTHORITY OF JHARKHAND (SHAJ) PHASE-II PROJECTS

Monitoring Institutional Responsibility Observation Corrective Environmental Reference to indicators (MI)/ Monitoring Implementation Supervision during the action and Remedial Measure Location Issue/Component laws/guideline Performance Methods reporting follow up if Target (PT) period required Environmental Management Plan Compliance Status of Package-3 waterway of Appendix 3 of existing structures. ADB approved  Roadside drains IEE report have been proposed with suitable outfalls.  Additional 19 culverts proposed 1.2 Safety along  Provision of crash Design At embankment MI: number and Review of design Design Consultant SHAJ Complied Not Required the proposed barriers at accident requirement height >3.0 m location of crash documents and alignment prone areas and total barriers, rumble drawings and high length = 3.0 km strips, warning comparison with site embankments. IRC:SP:84-2014 Rumble strip = sign boards, conditions  Rumble strips in IRC:8, IRC:25, 31 sidewalks habitat areas, IRC:26, IRC:35, locations ( 19 schools, junction IRC:67, IRC:103 builtup PT: numbers and and curves to and Section 800 areas, 8 school, location are in regulate speed. of MoRTH 4 junctions) accordance with  Provision of retro Specifications Total 1863 road site needs reflective warning delineators/chev signboards near Horizontal ron school, hospital geometry will be n/object markers ,religious places based on IRC: Length of Guard and forests 38-1988 and rails=3.155 Km  Provision of vertical Service Road sidewalks in the geometry will be for, 1.4 km built-up sections, based on IRC: length at Total on both sides. SP 23-1993 “. no. of street  Signs and marking lights=776 viz., cat’s eyes, delineators, object markers, hazard markers, safety barriers at hazardous locations, pedestrian guardrails, etc

TPF GETINSA EUROESTUDIOS S.L. in Joint Venture with RODIC CONSULTANTS PVT LTD In Association with EUROESTUDIOS INDIA Pvt. Ltd.

Page 78 of 178

STATE HIGHWAYS AUTHORITY OF JHARKHAND (SHAJ) PHASE-II PROJECTS

Monitoring Institutional Responsibility Observation Corrective Environmental Reference to indicators (MI)/ Monitoring Implementation Supervision during the action and Remedial Measure Location Issue/Component laws/guideline Performance Methods reporting follow up if Target (PT) period required Environmental Management Plan Compliance Status of Package-3  Pedestrian cross- IRC: SP: 67- Total no. of Complied Not Required walks at all 2012 street Junctions and lights=704 where conflict exists between vehicular and pedestrian movements (bus bays, schools and habitation.  Safety kerb at all bridges  Service roads in densely habitated areas  Horizontal and vertical geometry as per IRC Specification  Zebra crossing with informatory warning sign on approach to school, warning sign with footways and speed limit sign  Street Lighting in built-up sections  Ambulance and medical aid posts 2. Natural Hazards 2.2  Provision of IRC:34 Entire stretch. MI: Design and Review of design SHAJ Complied Not Required Flooding/Waterlogg adequate number Recommendatio Embankment numbers of cross documents and ing of CD structures. ns IRC:34 raised at 18 & side drains, drawings and Additional culverts IRC:34 locations for a slab/box culverts comparison with site have been Recommendatio length of 3.700 Hume pipes, road conditions

proposed. ns for road km embankment construction in height, design

TPF GETINSA EUROESTUDIOS S.L. in Joint Venture with RODIC CONSULTANTS PVT LTD In Association with EUROESTUDIOS INDIA Pvt. Ltd.

Page 79 of 178

STATE HIGHWAYS AUTHORITY OF JHARKHAND (SHAJ) PHASE-II PROJECTS

Monitoring Institutional Responsibility Observation Corrective Environmental Reference to indicators (MI)/ Monitoring Implementation Supervision during the action and Remedial Measure Location Issue/Component laws/guideline Performance Methods reporting follow up if Target (PT) period required Environmental Management Plan Compliance Status of Package-3  All CD structures waterlogged (Refer and number of designed for area and IRC: Appendix 4 of bridges 50year HFL return 75 and ADB approved period and bridges MORT&H IEE report PT: Design and designed for 100 guidelines for Roadside drains numbers are in year HFL return Design of High (both sides accordance with period Embankments together) site needs  Water ways of Covered=4.6 km bridges and Unlined=82.5 culverts have been km increased. For list of  Roadside drains bridges also provided with increased  Embankment waterway Pls height raised along Refer Appendix low lying/ potential 3 of ADB water logged areas approved IEE  Improvement in report existing culverts/ Bridges to increase their carrying capacity. 3. Loss of Land and Assets 3.1 livelihood loss  affected persons The Right to Fair Throughout the MI: Payment of Check LA records; SHAJ and SHAJ Under Process Details provided to affected persons  Road improvement Compensation corridor compensation design drawings vs implementing in SMR July- work to be and and assistance to land plans; NGO Dec 2017 accommodated Transparency in DPs as per RP within available Land Interview with ROW to the extent Acquisition, Number of affected persons possible. Rehabilitation complaints/griev  Social Impact And ances related to Check status of Assessment and Resettlement compensation employment given to Resettlement Plan Act, 2013 and and resettlement local people during to be undertaken ADB’s PT: Minimal construction as per national involuntary number of policy and ADB’ resettlement complaints/griev guidelines. policy. ances. All cases  Complete all of resettlement necessary land and rehabilitation

TPF GETINSA EUROESTUDIOS S.L. in Joint Venture with RODIC CONSULTANTS PVT LTD In Association with EUROESTUDIOS INDIA Pvt. Ltd.

Page 80 of 178

STATE HIGHWAYS AUTHORITY OF JHARKHAND (SHAJ) PHASE-II PROJECTS

Monitoring Institutional Responsibility Observation Corrective Environmental Reference to indicators (MI)/ Monitoring Implementation Supervision during the action and Remedial Measure Location Issue/Component laws/guideline Performance Methods reporting follow up if Target (PT) period required Environmental Management Plan Compliance Status of Package-3 and property Contract Clause if any are acquisition for preference to resolved at GRC procedures prior to local people level. No case the during referred to commencement of employment arbitrator/court. civil work.  Adhere to the Land Acquisition procedures in accordance to RP’s Entitlement Framework.  Compensation and assistance as per project Resettlement Plan  Income restoration as per RP  Preference in employment and petty  contracts during construction to APs  Constitute GRC as per RP 4. Diversion of Forest Land and Cutting of Trees 4.1 Need for cutting  Geometric Forest Throughout the MI: Number and Review final design. SHAJ, Design department Under Process - of trees. adjustments made Conservation corridor location of Check budget consultants forest SHAH/Forest to minimize tree Act, 1980 Total number of geometric provision for department cutting. affected adjustments compensatory  Obtain tree cutting trees=1957 made to avoid afforestation and permission from Additional forestland and additional plantation. forest department Plantation near tree cutting,  Provision for sensitive budget amount mandatory receptors, river allocated for compensatory banks, borrow compensatory afforestation (1:2) areas afforestation and for deposit of Forest Land 0.5

TPF GETINSA EUROESTUDIOS S.L. in Joint Venture with RODIC CONSULTANTS PVT LTD In Association with EUROESTUDIOS INDIA Pvt. Ltd.

Page 81 of 178

STATE HIGHWAYS AUTHORITY OF JHARKHAND (SHAJ) PHASE-II PROJECTS

Monitoring Institutional Responsibility Observation Corrective Environmental Reference to indicators (MI)/ Monitoring Implementation Supervision during the action and Remedial Measure Location Issue/Component laws/guideline Performance Methods reporting follow up if Target (PT) period required Environmental Management Plan Compliance Status of Package-3 payment to Ha additional Forestry plantation Department  Provision for PT: Unnecessary additional tree felling on compensatory forest land plantation on 1: 2 avoided. Budget basis to be allocation is implemented by adequate contractor through village Joint Forest Management (JFM) Committee

5. Elephant Movement 5.1 Road design  Provision for Project Sangramdih MI: budget Review of bid SHAJ, Design SHAJ/CSC in Elephant Implementation causing rumble strip, Requirement village, allocation for documents and Consultant coordination movement of disruption in cautionary Domunda rumble strips, project budget plan with Forest assessment & recommended elephant sign boards for village, Kolhar cautionary and Department plan prepared in additional movement/ speed limits up to village, pond on informatory sign consultation measures need Vehicle- 30 RHS near boards, solar with concerned to be monitoring Elephant collision  Kmph on both Kamalpur/Gadi- street lamps, DFO. and follow-up. and sides with gentle Tundi and Tundi solar dragon Proposed Plan Human-Elephant side petrol pump, lamps, habitat approved on Conflict slope and turfing , enhancement and 26.05.2017 vide for easy movement Pandri village conservation letter no.907 of Elephant. and activities PT: Approved plan  Provision for solar Usri River Budget amount is recommendatio Street Lights in No of Solar enough to fulfill ns issued to communities near street the installation Contractor for elephant crossing lights=59 and construction implementation areas to keep the Rumble Strips of recommended on 21.08.2017 elephants away =12 facilities and vide no 952  Provision for Informatory sign structures supply of solar boards=12 dragon Cautionary Sign light to local Joint boards=12 Forest Management

TPF GETINSA EUROESTUDIOS S.L. in Joint Venture with RODIC CONSULTANTS PVT LTD In Association with EUROESTUDIOS INDIA Pvt. Ltd.

Page 82 of 178

STATE HIGHWAYS AUTHORITY OF JHARKHAND (SHAJ) PHASE-II PROJECTS

Monitoring Institutional Responsibility Observation Corrective Environmental Reference to indicators (MI)/ Monitoring Implementation Supervision during the action and Remedial Measure Location Issue/Component laws/guideline Performance Methods reporting follow up if Target (PT) period required Environmental Management Plan Compliance Status of Package-3 Committees in villages near elephant crossing areas for use to chase away elephants  Provision for habitat enhancement viz. plantation of fodder plants in forest areas, through Joint Forest Management (JFM).  Provision for additional conservation measures to be taken after elephant study that will be conducted by the CSC Wildlife Specialist. 6. Shifting of Utilities 6.1 Disruption of  All telephone and Project Throughout the MI: Number of Interaction with Contractor/ SHAJ/CSC Complied - utility services to electrical requirement corridor complaints from concerned utility SHAJ/utility local community poles/wires and local people, authorities and local company public underground number, timing cables and type of should be shifted before start of notifications construction issued to local  Necessary people, time permission and taken to shift payments utilities PT: No. of should be made to complaints should relevant utility

TPF GETINSA EUROESTUDIOS S.L. in Joint Venture with RODIC CONSULTANTS PVT LTD In Association with EUROESTUDIOS INDIA Pvt. Ltd.

Page 83 of 178

STATE HIGHWAYS AUTHORITY OF JHARKHAND (SHAJ) PHASE-II PROJECTS

Monitoring Institutional Responsibility Observation Corrective Environmental Reference to indicators (MI)/ Monitoring Implementation Supervision during the action and Remedial Measure Location Issue/Component laws/guideline Performance Methods reporting follow up if Target (PT) period required Environmental Management Plan Compliance Status of Package-3 service agencies to be 0. Effective allow quick and timely shifting and notification. restoration of utility Minimal time for services utility shifting  Local people must be informed through appropriate means about the time of shifting of utility structures and potential disruption of services if any B. Construction Stage 1. Air Quality 1.1 Dust  Contractor to MORT&H Throughout MI: PM10 level Standards CPCB Contractor SHAJ /CSC Complied Not Required Generation due to submit location Specifications project corridor measurements methods construction and layout plan for for Road and Complaints from Observations Public activities and locals due to dust consultation storage areas of Bridge works Air transport, storage construction (P and CP) Act and handling of materials approved PT: PM10 level < Review of monitoring construction by CSC 1974 and 100 data maintained by materials  Transport, loading Central Motor ug/m3Number of contractor and unloading of and Vehicle Act complaints should loose and fine 1988 General be 0. materials through Conditions of covered vehicles. Bid Document  Paved approach roads.

 Storage areas to be located downwind of the habitation area.  Water spraying on earthworks, unpaved haulage roads

TPF GETINSA EUROESTUDIOS S.L. in Joint Venture with RODIC CONSULTANTS PVT LTD In Association with EUROESTUDIOS INDIA Pvt. Ltd.

Page 84 of 178

STATE HIGHWAYS AUTHORITY OF JHARKHAND (SHAJ) PHASE-II PROJECTS

Monitoring Institutional Responsibility Observation Corrective Environmental Reference to indicators (MI)/ Monitoring Implementation Supervision during the action and Remedial Measure Location Issue/Component laws/guideline Performance Methods reporting follow up if Target (PT) period required Environmental Management Plan Compliance Status of Package-3 and other dust prone areas.  Provision of PPEs to workers. 1.2 Emission of air  Regular The Air Asphalt mixing MI: Levels of HC, Standards CPCB Contractor SHAJ /CSC The - pollutants maintenance of (Prevention and plants, crushers, SO2, NO2, and methods Environmental (HC,SO2,NOX,CO machinery and Control of DG sets locations CO. Status of monitoring Pollution) Act, PUC certificates Review of monitoring agency has etc) from vehicles equipment.  Batching, asphalt 1981 (Amended data maintained by been finalized due to traffic mixing plants and 1987) and PT: SO2 and contractor and monitoring congestion and use crushers at Rules 1982 NO2 levels are is being carried of equipment and downwind (1km) both less than out. machinery direction from the 80ug/m3. PUC nearest settlement. certificate of  Only crushers equipment and licensed by the machinery is up to PCB shall be used date  DG sets with stacks of adequate height and use of low Sulphur diesel as fuel.  LPG should be used as fuel source in construction camps instead of wood  Ambient air quality monitoring  Contractor to prepare traffic management and dust suppression plan duly approved by SHAJ 2. Noise 2.1 Disturbance to  All equipment to be Legal Throughout MI: day and night As per Noise rule, Contractor SHAJ /CSC The Finalization of local residents and timely serviced and requirement project section Noise levels. 2000 Environmental monitoring

TPF GETINSA EUROESTUDIOS S.L. in Joint Venture with RODIC CONSULTANTS PVT LTD In Association with EUROESTUDIOS INDIA Pvt. Ltd.

Page 85 of 178

STATE HIGHWAYS AUTHORITY OF JHARKHAND (SHAJ) PHASE-II PROJECTS

Monitoring Institutional Responsibility Observation Corrective Environmental Reference to indicators (MI)/ Monitoring Implementation Supervision during the action and Remedial Measure Location Issue/Component laws/guideline Performance Methods reporting follow up if Target (PT) period required Environmental Management Plan Compliance Status of Package-3 sensitive receptors properly Noise Pollution especially at Number of monitoring agency and due to excessive maintained. (Regulation construction complaints from Consultation with agency has initiation of noise from  Construction and Control) sites, residential local people local people been finalized Environmental construction equipment and Rules, 2000 and identified and monitoring monitoring activities and machinery to be and sensitive PT: Zero Review of noise is being carried operation of fitted with silencers amendments locations. complaints or no level monitoring data out. equipment and and maintained thereof + Clause repeated maintained by machinery properly. No 501.8.6. Refer Table 23 of complaints by contractor  Only IS approved MORT&H IEE for local people. equipment shall be Specifications information on Average day and Observation of used for for Road and sensitive night time noise construction site construction Bridge works receptors levels are within activities. permissible limits  Timing of noisy for work zone construction areas activities shall be done during night time and weekend near schools,  Implement noisy operations intermittently to reduce the totalnoise generated  Manage existing traffic to avoid traffic jams and accumulation of noise beyond standards.  Restrict construction near residential, built up and forest areas construction today light hours.  Initiation of multi- layered plantation,

TPF GETINSA EUROESTUDIOS S.L. in Joint Venture with RODIC CONSULTANTS PVT LTD In Association with EUROESTUDIOS INDIA Pvt. Ltd.

Page 86 of 178

STATE HIGHWAYS AUTHORITY OF JHARKHAND (SHAJ) PHASE-II PROJECTS

Monitoring Institutional Responsibility Observation Corrective Environmental Reference to indicators (MI)/ Monitoring Implementation Supervision during the action and Remedial Measure Location Issue/Component laws/guideline Performance Methods reporting follow up if Target (PT) period required Environmental Management Plan Compliance Status of Package-3 to serve as mitigation option for operation phase  Honking restrictions near sensitive areas  PPEs to workers  Noise monitoring as per EMoP. 3. Land and Soil 3.1 Land use  Non-agricultural Project Throughout the MI: Borrow pit Review borrow area Contractor SHAJ /CSC Under Process - Change and Loss areas to be used requirement project section locations/Top soil plan, site visits of productive / as borrow areas to and borrow storage area areas Land topsoil the extent possible. identified for PT: Zero  If using agricultural camp, storage complaints or land, top soil to be areas etc. disputes preserved and laid registered against over either on the contractor by land embankment slope owner for growing vegetation to protect soil erosion.  Land for temporary facilities like construction camp, storage areas etc. shall be brought back to its original landuse 3.2 Slope failure  Bio-turfing of IRC: 56 -1974 Throughout the MI: Occurrence of Review of design Design consultant SHAJ /CSC Being Complied - and Soil erosion embankments to recommended entire project slope failure or documents and site and Contractor, due to Construction protect slopes. practice for road especially erosion issues observation activities,  Slope protection by treatment of along hilly areas earthwork, and cut providing frames, embankment PT: No slope and fill, stockpiles dry stone pitching, slopes for failures. Minimal etc. masonry retaining erosion control erosion issues

TPF GETINSA EUROESTUDIOS S.L. in Joint Venture with RODIC CONSULTANTS PVT LTD In Association with EUROESTUDIOS INDIA Pvt. Ltd.

Page 87 of 178

STATE HIGHWAYS AUTHORITY OF JHARKHAND (SHAJ) PHASE-II PROJECTS

Monitoring Institutional Responsibility Observation Corrective Environmental Reference to indicators (MI)/ Monitoring Implementation Supervision during the action and Remedial Measure Location Issue/Component laws/guideline Performance Methods reporting follow up if Target (PT) period required Environmental Management Plan Compliance Status of Package-3 walls, planting of Clause No. 306 grass and trees. and 305.2.2  Side slopes of all MORT&H cut and fill areas Specifications will be graded and for Road and covered with stone Bridge works pitching, grass and Guidelines IX for shrub as per Soil erosion design specifications. Care should be taken that the slope gradient shall not be greater than2:1.  The earth stockpiles to be provided with gentle slopes to soil erosion.

3.3 Borrow area  Obtain EC from IRC Guidelines Borrow sites MI: Existence of Review of design Contractor SHAJ /CSC Identification of Contractor has management SEIAA before on borrow areas location borrow areas in documents and site Borrow Area been suggested opening any new and for quarries inappropriate observations has been to expedite borrow area. (Environmental unauthorized completed and process the  Comply to EC protection Act locations. Poor Compare site process for Borrow area conditions of and Rules, borrow area conditions with EC obtaining permission for SEIAA 1986; Water Act, management conditions by SEIAA requisite all identified  Non-productive, Air Act)+Clause practices. permission from Borrow Area barren lands, 305.2.2 MORTH Number of competent upland shall be Specifications accidents. Authority used for borrowing for Road and Complaints from initiated. earth with the Bridgeworks local people. EC for two necessary Guidelines for borrow areas permissions/conse Borrow Areas PT: No case of has been nts. management non-compliance obtained by the  Depths of borrow to conditions Contractor and pits to be regulated stipulated by remaining EC’s SEIAA in

TPF GETINSA EUROESTUDIOS S.L. in Joint Venture with RODIC CONSULTANTS PVT LTD In Association with EUROESTUDIOS INDIA Pvt. Ltd.

Page 88 of 178

STATE HIGHWAYS AUTHORITY OF JHARKHAND (SHAJ) PHASE-II PROJECTS

Monitoring Institutional Responsibility Observation Corrective Environmental Reference to indicators (MI)/ Monitoring Implementation Supervision during the action and Remedial Measure Location Issue/Component laws/guideline Performance Methods reporting follow up if Target (PT) period required Environmental Management Plan Compliance Status of Package-3 and sides not clearance letter. are under steeper than 25%. Zero accidents. process.  Topsoil to be Zero complaints. stockpiled and protected for use at the rehabilitation stage.  Transportation of earth materials through covered vehicles.  Follow IRC recommended practice for borrow pits (IRC 10: 1961) for identification of location, its operation and rehabilitation  Borrow areas not to be dug continuously.  To the extent borrow areas shall be sited away from habitated areas.  Borrow areas shall be leveled with salvaged material or other filling materials which do not pose contamination of soil. Else, it shall be converted into fish pond. 3.4 Quarry  Aggregates will be Clause No.111.3 Quarry area MI: Existence of Review of design Contractor SHAJ /CSC Identification of - Operations sourced from MORT&H locations licenses quarry documents, Stone Quarries Specifications areas from which contractor has been

TPF GETINSA EUROESTUDIOS S.L. in Joint Venture with RODIC CONSULTANTS PVT LTD In Association with EUROESTUDIOS INDIA Pvt. Ltd.

Page 89 of 178

STATE HIGHWAYS AUTHORITY OF JHARKHAND (SHAJ) PHASE-II PROJECTS

Monitoring Institutional Responsibility Observation Corrective Environmental Reference to indicators (MI)/ Monitoring Implementation Supervision during the action and Remedial Measure Location Issue/Component laws/guideline Performance Methods reporting follow up if Target (PT) period required Environmental Management Plan Compliance Status of Package-3 existing licensed for Road and materials to be documents and site completed and quarries. Bridge works sourced and observation are being  Copies of consent/ Guidelines VI for Existence of a Compliance to EC operated after approval / Quarry Areas quarry conditions in case of obtaining the rehabilitation plan Management redevelopment opening new requisite for a new quarry or Environmental plan quarries permission from use of existing Protection Rules competent source will be PT: Quarry Authority. submitted to SHAJ. license is valid.:  The contractor will No case of develop a Quarry noncompliance to Redevelopment consent plan, as per the conditions and air Mining Rules of the quality meets the state and submit prescribed limit a copy of the approval to EA.  Obtain environmental clearance from SEIAA in case of opening new quarry 3.5 Compaction of  Construction Design Parking areas, MI: Location of Site observation Contractor SHAJ /CSC Being Complied - soil and impact on vehicles, requirement Haulage roads approach and quarry haul roads machinery, and and construction haulage roads due to movement of equipment to be yards Presence of vehicles and stationed in the destroyed/comp equipment designated ROW acted agricultural to avoid land or land which compaction. has not be  Approach restored to its roads/haulage original condition roads shall be PT: Zero designed along the occurrence of barren and hard destroyed/comp soil area to reduce acted land and the compaction. undestroyed land

TPF GETINSA EUROESTUDIOS S.L. in Joint Venture with RODIC CONSULTANTS PVT LTD In Association with EUROESTUDIOS INDIA Pvt. Ltd.

Page 90 of 178

STATE HIGHWAYS AUTHORITY OF JHARKHAND (SHAJ) PHASE-II PROJECTS

Monitoring Institutional Responsibility Observation Corrective Environmental Reference to indicators (MI)/ Monitoring Implementation Supervision during the action and Remedial Measure Location Issue/Component laws/guideline Performance Methods reporting follow up if Target (PT) period required Environmental Management Plan Compliance Status of Package-3  Transportation of quarry material to the dumping site through heavy vehicles shall be done through existing major roads to the extent possible to restrict wear and tear to the village/minor roads.  Land taken for construction camp and other temporary facility shall be restored to its original conditions 3.6 Contamination  Construction Design Fuelling station, MI: Quality of soil Site observation Contractor SHAJ /CSC Being complied of soil due to vehicles and requirement construction near storage area leakage/ spillage of equipment will be sites, and Presence of oil, bituminous and maintained and construction spilled oil or non-bituminous refueled in such a camps and bitumen in project debris generated fashion that disposal location area from demolition and oil/diesel spillage road construction does not contaminate the PT: Soil test soil. conforming to no  Fuel storage and –contamination. refueling sites to No sighting of be kept away from spilled oil or drainage channels. bitumen in  Unusable debris construction site shall be dumped in or camp site ditches and low lying areas.  To avoid soil contamination Oil

TPF GETINSA EUROESTUDIOS S.L. in Joint Venture with RODIC CONSULTANTS PVT LTD In Association with EUROESTUDIOS INDIA Pvt. Ltd.

Page 91 of 178

STATE HIGHWAYS AUTHORITY OF JHARKHAND (SHAJ) PHASE-II PROJECTS

Monitoring Institutional Responsibility Observation Corrective Environmental Reference to indicators (MI)/ Monitoring Implementation Supervision during the action and Remedial Measure Location Issue/Component laws/guideline Performance Methods reporting follow up if Target (PT) period required Environmental Management Plan Compliance Status of Package-3 Interceptors shall be provided at wash down and refueling areas.  Waste oil and oil soaked cotton/ cloth shall be stored in containers labeled ‘Waste Oil’ and ‘Hazardous’ sold off to MoEF/SPCB authorized vendors  Non-bituminous wastes to be dumped in borrow pits with the concurrence of landowner and covered with a layer of topsoil conserved from opening the pit.  Bituminous wastes will be disposed off in an identified dumping site approved by the State Pollution Control Board 4. Water Resources 4.1 Sourcing of  Requisite CGWA Throughout the MI: Approval from Checking of Contractor SHAJ /CSC The ground Ground water water during permission shall be Guidelines Project section competent documentation water source permission from Construction obtained for authority has been competent abstraction of Complaints from identified and Authority by the groundwater from Check Dam at local people on Talk to local people requisite contractor. Central suitable locations water availability permission has Groundwater been initiated by Authority. the contractor.

TPF GETINSA EUROESTUDIOS S.L. in Joint Venture with RODIC CONSULTANTS PVT LTD In Association with EUROESTUDIOS INDIA Pvt. Ltd.

Page 92 of 178

STATE HIGHWAYS AUTHORITY OF JHARKHAND (SHAJ) PHASE-II PROJECTS

Monitoring Institutional Responsibility Observation Corrective Environmental Reference to indicators (MI)/ Monitoring Implementation Supervision during the action and Remedial Measure Location Issue/Component laws/guideline Performance Methods reporting follow up if Target (PT) period required Environmental Management Plan Compliance Status of Package-3  Arrangements PT: Valid shall be made by approval from contractor that the competent water availability authority. Zero and supply to complaints from nearby local people. communities remain unaffected.  Water intensive activities not to be undertaken during summer season.  Provision of water harvesting structure to augment groundwater condition in the area 4.2 Disposal of  Provisions shall be Clause No.1010 Throughout the MI: Condition of Standards methods Contractor SHAJ /CSC Being Complied - water during made to connect EP Act 1986 Project section drainage system Site observation and construction road side drains MORT&H in construction review of documents with existing Specifications site.Presence/ab nearby natural for Road and sence of water drains. Bridgeworks logging in project area.

PT: Existence of proper drainage system. No water logging in project area 4.3 Alteration in  Existing drainage Design Near all drainage MI: Proper flow of Review of design Contractor SHAJ /CSC Being Complied - surface water system to be requirement, channels, river/ water in existing documents hydrology maintained Clause No nallah crossings streams and  And further 501.8.6. etc. rivers Site observation enhanced. MORT&H  Provision shall be Specifications PT: No complain made for adequate of water shortage

TPF GETINSA EUROESTUDIOS S.L. in Joint Venture with RODIC CONSULTANTS PVT LTD In Association with EUROESTUDIOS INDIA Pvt. Ltd.

Page 93 of 178

STATE HIGHWAYS AUTHORITY OF JHARKHAND (SHAJ) PHASE-II PROJECTS

Monitoring Institutional Responsibility Observation Corrective Environmental Reference to indicators (MI)/ Monitoring Implementation Supervision during the action and Remedial Measure Location Issue/Component laws/guideline Performance Methods reporting follow up if Target (PT) period required Environmental Management Plan Compliance Status of Package-3 size and number of by downstream cross drainage communities. No structures esp. in record of the areas where overtopping/ land is sloping water logging towards road alignment.  Road level shall be raised above HFL level wherever road level is lesser than HFL  Culverts reconstruction shall be done during lean flow period. In some cases these minor channels may be diverted for a very short period (15-30 days) and will be bring back to its original course immediately after construction. 4.4 Siltation in  Embankment Design Near all water MI: Presence Field observation Contractor SHAJ /CSC Being Complied - water bodies due to slopes to be requirement, bodies/ /absence of construction modified suitably to ClauseNo501.8. waterway siltation in rivers, activities /earthwork restrict the soil 6.MORT&H Refer Table 15. streams, ponds debris entering Specifications Retaining and other water water bodies. for Road and wall=820m bodies in project  Provision of Silt Bridge works area. Turbidity fencing shall be test levels made at water Worldwide best bodies. practices PT: No records of  Silt/sediment siltation due to should be collected project activities. and stockpiled for Surface water

TPF GETINSA EUROESTUDIOS S.L. in Joint Venture with RODIC CONSULTANTS PVT LTD In Association with EUROESTUDIOS INDIA Pvt. Ltd.

Page 94 of 178

STATE HIGHWAYS AUTHORITY OF JHARKHAND (SHAJ) PHASE-II PROJECTS

Monitoring Institutional Responsibility Observation Corrective Environmental Reference to indicators (MI)/ Monitoring Implementation Supervision during the action and Remedial Measure Location Issue/Component laws/guideline Performance Methods reporting follow up if Target (PT) period required Environmental Management Plan Compliance Status of Package-3 possible reuse as quality tests surfacing of slopes confirm to turbidity where they have to and TSS limit be re-vegetated.  Earthworks and stone works to be prevented from impeding natural flow of rivers, streams and water canals or existing drainage system.  Retaining walls at water bodies /ponds to avoid siltation near ponds 4.5 Deterioration in  No vehicles or The Water Water bodies, MI: Water quality Conduction of water Contractor SHAJ /CSC The - Surface water equipment should (Prevention and refueling stations, of ponds, quality tests as per Environmental quality due to be parked or Control of construction streams, rivers the monitoring plan monitoring leakage from refueled near Pollution) Act, camps. and other water agency has vehicles and water-bodies, so 1974 and bodies in project Field observation been finalized equipment’s and as to avoid amendments and monitoring waste from contamination thereof. Presence of oil is being carried construction camps from fuel and floating in water out. lubricants. bodies in project  Oil and grease area traps and fueling platforms to be PT: Surface water provided at re- quality meets fueling locations. freshwater quality  All chemicals and standards oil shall be stored prescribed by away from water CPCB and concreted platform with catchment pit for spills collection.

TPF GETINSA EUROESTUDIOS S.L. in Joint Venture with RODIC CONSULTANTS PVT LTD In Association with EUROESTUDIOS INDIA Pvt. Ltd.

Page 95 of 178

STATE HIGHWAYS AUTHORITY OF JHARKHAND (SHAJ) PHASE-II PROJECTS

Monitoring Institutional Responsibility Observation Corrective Environmental Reference to indicators (MI)/ Monitoring Implementation Supervision during the action and Remedial Measure Location Issue/Component laws/guideline Performance Methods reporting follow up if Target (PT) period required Environmental Management Plan Compliance Status of Package-3  All equipment operators, drivers, and warehouse personnel will be trained in immediate response for spill containment and eventual clean-up. Readily available, simple to understand and preferably written in the local language emergency response procedure, including reporting, will be provided by the contractors.  Construction camp to be sited away from water bodies.  Wastes must be collected, stored and taken to approve disposal site only.  Water quality shall be monitored 5. Flora and Fauna 5.1 Vegetation loss  Restrict tree cutting Forest Throughout MI: ROW width Review of relevant Mandatory SHAJ /CSC Tree cutting - due to site up to toe line Conservation project corridor Number of trees documents – tree Compensatory permission preparation and considering safety Act1980 + Estimated No. of for felling cutting permit, plantation by forest under process construction to road users. IRC:SP:21 and affected Compensatory compensatory Department and activities  Roadside trees to IRC:SP:66 tree=1957 plantation plan plantation plan. Additional be removed with Additional Meeting with JFM plantation by

TPF GETINSA EUROESTUDIOS S.L. in Joint Venture with RODIC CONSULTANTS PVT LTD In Association with EUROESTUDIOS INDIA Pvt. Ltd.

Page 96 of 178

STATE HIGHWAYS AUTHORITY OF JHARKHAND (SHAJ) PHASE-II PROJECTS

Monitoring Institutional Responsibility Observation Corrective Environmental Reference to indicators (MI)/ Monitoring Implementation Supervision during the action and Remedial Measure Location Issue/Component laws/guideline Performance Methods reporting follow up if Target (PT) period required Environmental Management Plan Compliance Status of Package-3 prior approval of Plantation near Number of trees Committee contractor in competent Sensitive replanted. members partnership with authority. receptors, river respective local  Mandatory banks, borrow PT: Additional Field observations JFM Committee compensatory areas compensatory plantation at 1:2 afforestation done basis by Forestry on a 1:2 basis by Department contractor through  Additional JFM. Number of compensatory trees planted is plantation 1:2 as double the per the IRC by number of trees contractor in removed. Tree partnership with survival rate is at respective village least 70%. JFM Committee. Local villagers to be employed for afforestation activities. Employment preference to women  Regular maintenance trees planted.  Provision of LPG in construction camp as fuel source to avoid tree cutting.  Plantation of trees on both sides of the road where technically feasible. Trees should be offset 1m back from the ultimate edge of the roadway to

TPF GETINSA EUROESTUDIOS S.L. in Joint Venture with RODIC CONSULTANTS PVT LTD In Association with EUROESTUDIOS INDIA Pvt. Ltd.

Page 97 of 178

STATE HIGHWAYS AUTHORITY OF JHARKHAND (SHAJ) PHASE-II PROJECTS

Monitoring Institutional Responsibility Observation Corrective Environmental Reference to indicators (MI)/ Monitoring Implementation Supervision during the action and Remedial Measure Location Issue/Component laws/guideline Performance Methods reporting follow up if Target (PT) period required Environmental Management Plan Compliance Status of Package-3 prevent safety hazard and provide adequate sight distance.  Integrate vegetation management (IVM) with the carriage way completely clear of vegetation.  Additional plantation near sensitive receptors, river banks to minimize noise & air pollution, and to check erosion.  Controlled use of pesticides/ fertilizers 6. Construction Camps 6.1 Impact  All camps should Design All construction MI: Location of On site observation Contractor and EO SHAJ /CSC Being Complied - associated with be established with Requirement camps campsites and location prior permission The Water distance from Interaction with habitation, forest workers and local from PCB. Camps (Prevention and to maintain areas, water community Control of minimum distance bodies, through from following: # Pollution) traffic route and 500 m from Act,1974and its construction habitation # 500 m amendments camps PT: from forest areas thereof Distance of where possible # campsite is less than 500m from 500 m from water bodies where listed locations possible # 500 m from through traffic route # 500 m

TPF GETINSA EUROESTUDIOS S.L. in Joint Venture with RODIC CONSULTANTS PVT LTD In Association with EUROESTUDIOS INDIA Pvt. Ltd.

Page 98 of 178

STATE HIGHWAYS AUTHORITY OF JHARKHAND (SHAJ) PHASE-II PROJECTS

Monitoring Institutional Responsibility Observation Corrective Environmental Reference to indicators (MI)/ Monitoring Implementation Supervision during the action and Remedial Measure Location Issue/Component laws/guideline Performance Methods reporting follow up if Target (PT) period required Environmental Management Plan Compliance Status of Package-3 from identified elephant movement locations 6.2 Worker’s Health  The location, The Building All construction MI: Camp health Camp records Contractor SHAJ /CSC Being Complied - in construction layout and basic and Other camps records camp facility provision of Construction Site observation Existence of each labor camp workers will be submitted to proper first aid kit Consultation with (Regulation of CSC and approved in camp site contractor workers b EA. The Employment and local people contractor will and Conditions Complaints from living nearby maintain of service) Act workers. necessary living 1996 and The accommodation Water PT: No record of and ancillary illness due to (Prevention and facilities in hygienic unhygienic manner. Control of conditions or  Adequate water Pollution) vectors. Zero and sanitary Act,1974 and cases of STD. latrines with septic amendments Clean and tidy tanks with soak thereof camp site pits shall be conditions. provided.  Preventive medical facilities in camp  Waste disposal facilities such as dust bins must be provided in the camps and regular disposal of waste The Contractor will take all precautions to protect the workers from insect and pest to reduce the risk to health. This

TPF GETINSA EUROESTUDIOS S.L. in Joint Venture with RODIC CONSULTANTS PVT LTD In Association with EUROESTUDIOS INDIA Pvt. Ltd.

Page 99 of 178

STATE HIGHWAYS AUTHORITY OF JHARKHAND (SHAJ) PHASE-II PROJECTS

Monitoring Institutional Responsibility Observation Corrective Environmental Reference to indicators (MI)/ Monitoring Implementation Supervision during the action and Remedial Measure Location Issue/Component laws/guideline Performance Methods reporting follow up if Target (PT) period required Environmental Management Plan Compliance Status of Package-3 includes the use of insecticides which should comply with local regulations.  No liquor or prohibited drugs will be imported to, sell, give and barter to the workers of host community.  Awareness raising to immigrant workers/local community on communicable and sexually transmitted diseases. 7. Management of Construction Waste/Debris 7.1 Selection of  Contractor to Design At all MI: Location of Field survey and Contractor SHAJ /CSC Being complied - Dumping Sites submit a Requirement, Dumping/Dispos dumping sites interaction with local waste/spoil MORT&H al Sites Number of public people. Review of disposal plan and guidelines and complaints. consent letter get it approved by General CSC and EA. Conditions of PT: No public  Create controlled Contract complaints. dumping sites with Document Consent letters a non-permeable for all dumping lining incorporated sites available in the pit design to with contractor avoid leachate seepage into the soil, which may later affect ground water quality  Unproductive/wast elands shall be selected for

TPF GETINSA EUROESTUDIOS S.L. in Joint Venture with RODIC CONSULTANTS PVT LTD In Association with EUROESTUDIOS INDIA Pvt. Ltd.

Page 100 of 178

STATE HIGHWAYS AUTHORITY OF JHARKHAND (SHAJ) PHASE-II PROJECTS

Monitoring Institutional Responsibility Observation Corrective Environmental Reference to indicators (MI)/ Monitoring Implementation Supervision during the action and Remedial Measure Location Issue/Component laws/guideline Performance Methods reporting follow up if Target (PT) period required Environmental Management Plan Compliance Status of Package-3 dumping sites away from residential areas and water bodies  Dumping sites must be having adequate capacity equal to the amount of debris generated.  Public perception and consent from the village Panchayats has to be obtained before finalizing the location 7.2 Reuse and  The existing Design Throughout the MI: Percentage of Contractor records Contractor SHAJ /CSC Being Complied - disposal of bitumen surface Requirement, project corridor reuse of existing construction and shall be utilized for MORT&H surface material Field observation guidelines and dismantled waste paving of cross roads, access General Method and Interaction with local roads, and paving Conditions of location of people works in Contract disposal site of construction sites Document construction and camps, debris temporary traffic diversions, and haulage routes.  All excavated PT: No public materials from complaint and roadway, consent letters for shoulders, verges, all dumping sites drains, cross available with drainage will be contractor or CSC used for backfilling embankments, filling pits, and landscaping.

TPF GETINSA EUROESTUDIOS S.L. in Joint Venture with RODIC CONSULTANTS PVT LTD In Association with EUROESTUDIOS INDIA Pvt. Ltd.

Page 101 of 178

STATE HIGHWAYS AUTHORITY OF JHARKHAND (SHAJ) PHASE-II PROJECTS

Monitoring Institutional Responsibility Observation Corrective Environmental Reference to indicators (MI)/ Monitoring Implementation Supervision during the action and Remedial Measure Location Issue/Component laws/guideline Performance Methods reporting follow up if Target (PT) period required Environmental Management Plan Compliance Status of Package-3  Unusable and non- bituminous debris materials should be suitably disposed off at pre- designated disposal locations, with approval of the concerned authority.  The bituminous wastes shall be disposed in secure landfill sites only in environmentally accepted manner. For removal of debris, wastes and its disposal, MORTH guidelines should be followed.  Unusable and surplus materials, as determined by the Project Engineer, will be removed and disposed off-site. 8. Traffic Management and Safety 8.1 Management of  Traffic Design Throughout the MI: Traffic Review traffic Contractor SHAJ /CSC Being complied - existing traffic and Management Plan requirement and project corridor management management plan safety shall be submitted IRC: SP: 27 - especially at plan. Presence/ Field observation of by the contractor 1984, Report intersections absence of safety traffic management and approved by Containing signs, traffic and safety system the CSC. Recommendatio demarcations,  The traffic control n of IRC flag men etc. on Interaction with plans shall contain Regional site. Complaints people in vehicles details of Workshops from road users. using the road diversions; traffic on Highway No of accidents

TPF GETINSA EUROESTUDIOS S.L. in Joint Venture with RODIC CONSULTANTS PVT LTD In Association with EUROESTUDIOS INDIA Pvt. Ltd.

Page 102 of 178

STATE HIGHWAYS AUTHORITY OF JHARKHAND (SHAJ) PHASE-II PROJECTS

Monitoring Institutional Responsibility Observation Corrective Environmental Reference to indicators (MI)/ Monitoring Implementation Supervision during the action and Remedial Measure Location Issue/Component laws/guideline Performance Methods reporting follow up if Target (PT) period required Environmental Management Plan Compliance Status of Package-3 safety Safety IRC:SP: PT: No arrangements 32 -1988 Road complaints. No during Safety for accidents due to construction; Children (5-12 poor traffic safety measures Years Old) in management. for night time traffic Construction Traffic signs, and precautions for Zones demarcation lines transportation of IRC:SP:55-2014 etc. present in hazardous The Building appropriate materials. Timing and other locations on site and scheduling to Construction be done so that workers Act transportation of 1996 and Cess dangerous goods Act of 1996 is done during Factories Act least number of 1948+Section 6 people and other of Employer’s vehicles on the Requirement of road. Bid Document  The Contractor will ensure that the diversion/detour is always maintained in running condition, particularly during the monsoon to avoid disruption to traffic flow. On stretches where it is not possible to pass the traffic on the part width of existing carriageway, temporary paved diversions will be constructed.

TPF GETINSA EUROESTUDIOS S.L. in Joint Venture with RODIC CONSULTANTS PVT LTD In Association with EUROESTUDIOS INDIA Pvt. Ltd.

Page 103 of 178

STATE HIGHWAYS AUTHORITY OF JHARKHAND (SHAJ) PHASE-II PROJECTS

Monitoring Institutional Responsibility Observation Corrective Environmental Reference to indicators (MI)/ Monitoring Implementation Supervision during the action and Remedial Measure Location Issue/Component laws/guideline Performance Methods reporting follow up if Target (PT) period required Environmental Management Plan Compliance Status of Package-3  Restriction of construction activity to only one side of the existing road  The contractor shall inform local community of changes to traffic routes, and pedestrian access arrangements with assistance from “Engineer”.  Use of adequate signage’s to ensure traffic management and safety. Conduct of regular safety audit on safety measures. 8.2 Pedestrians,  Temporary access Same as above Near habitation MI: Presence/ Field Observation Contractor SHAJ /CSC Under Process - animal movement and diversion, with on both sides of absence of Interaction with local proper drainage schools, temples, access routes for people facilities. hospitals, pedestrians.  Access to the graveyards, Road signage schools, temples construction Number of and other public sites, haulage complaints from places must be roads, diversion local people maintained when sites. construction takes PT: Easy access place near them. to schools,  Fencing wherever temples and cattle movement is public places. expected. Zero complaints  Large number of box culverts has been proposed.

TPF GETINSA EUROESTUDIOS S.L. in Joint Venture with RODIC CONSULTANTS PVT LTD In Association with EUROESTUDIOS INDIA Pvt. Ltd.

Page 104 of 178

STATE HIGHWAYS AUTHORITY OF JHARKHAND (SHAJ) PHASE-II PROJECTS

Monitoring Institutional Responsibility Observation Corrective Environmental Reference to indicators (MI)/ Monitoring Implementation Supervision during the action and Remedial Measure Location Issue/Component laws/guideline Performance Methods reporting follow up if Target (PT) period required Environmental Management Plan Compliance Status of Package-3 .All structures having vertical clearance above 3m and not catering to perennial flow of water may serve as underpass for animals 8.3 Safety of  Contractors to Same as above Construction MI: Availability of Site observation Obligation of SHAJ/CSC Being Complied - Workers and adopt and maintain sites Safety gears to Contractor accident risk from safe working workers Review records on construction practices. safety training and activities  Usage of Safety signage accidents fluorescent and Training records retro refectory on safety Interact with signage, in local construction workers language at the Number of safety construction sites related accidents  Training to workers on safety PT: Zero fatal procedures and accidents. Zero or precautions. minor nonfatal  Mandatory accidents. appointment of safety officer.  All regulations regarding safe scaffolding, ladders, working platforms, gangway, stair wells, excavations, trenches and safe means of entry and egress shall be complied with.  Provision of PPEs to workers.

TPF GETINSA EUROESTUDIOS S.L. in Joint Venture with RODIC CONSULTANTS PVT LTD In Association with EUROESTUDIOS INDIA Pvt. Ltd.

Page 105 of 178

STATE HIGHWAYS AUTHORITY OF JHARKHAND (SHAJ) PHASE-II PROJECTS

Monitoring Institutional Responsibility Observation Corrective Environmental Reference to indicators (MI)/ Monitoring Implementation Supervision during the action and Remedial Measure Location Issue/Component laws/guideline Performance Methods reporting follow up if Target (PT) period required Environmental Management Plan Compliance Status of Package-3  Provision of a readily available first aid unit including an adequate supply of dressing materials.  The contractor will not employ any person below the age of 18years  Use of hazardous material should be minimized and/or restricted.  Emergency plan (to be approved by engineer) shall be prepared to respond to any accidents or emergencies.  Accident Prevention Officer must be appointed by the contractor. 8.4 Accident risk to  Restrict access to Same as above Construction MI: Safety signs Site inspection Contractor SHAJ /CSC Being Complied - local community construction sites sites and their location only to authorized Consultation with personnel. Incidents of local people  Physical accidents separation must be provided for Complaints from movement of local people PT: vehicular and Zero incident of human traffic. accidents. Zero  Adequate signage complaints. must be provided for safe traffic movement

TPF GETINSA EUROESTUDIOS S.L. in Joint Venture with RODIC CONSULTANTS PVT LTD In Association with EUROESTUDIOS INDIA Pvt. Ltd.

Page 106 of 178

STATE HIGHWAYS AUTHORITY OF JHARKHAND (SHAJ) PHASE-II PROJECTS

Monitoring Institutional Responsibility Observation Corrective Environmental Reference to indicators (MI)/ Monitoring Implementation Supervision during the action and Remedial Measure Location Issue/Component laws/guideline Performance Methods reporting follow up if Target (PT) period required Environmental Management Plan Compliance Status of Package-3  Provision of temporary diversions and awareness to locals before opening new construction fronts 9. Site restoration and rehabilitation 9.1 Clean-up  Contractor will Project Throughout the MI: Condition of Site observation Contractor SHAJ /CSC Shall be - Operations, prepare site requirement project corridor, camp, borrow initiated before Restoration and restoration plans, construction areas and Interaction with closer of Camp Rehabilitation which will be camp sites and construction sites, locals and Plant sites. approved by the borrow areas Presence/ ‘Engineer’. absence of Issue completion  The clean-up and construction certificate after restoration material/debris restoration of all operations are to after completion sites are found be implemented by of construction satisfactory the contractor prior works on site. PT: to demobilization. Clean and tidy  All construction sites. No trash or zones including debris left on site. riverbeds, culverts, Site restored and road-side areas, leveled. camps, hot mix plant sites, crushers, batching plant sites and any other area used/affected by the project will be left clean and tidy, to the satisfaction of the Environmental officer.  All the opened borrow areas will be rehabilitated

TPF GETINSA EUROESTUDIOS S.L. in Joint Venture with RODIC CONSULTANTS PVT LTD In Association with EUROESTUDIOS INDIA Pvt. Ltd.

Page 107 of 178

STATE HIGHWAYS AUTHORITY OF JHARKHAND (SHAJ) PHASE-II PROJECTS

Monitoring Institutional Responsibility Observation Corrective Environmental Reference to indicators (MI)/ Monitoring Implementation Supervision during the action and Remedial Measure Location Issue/Component laws/guideline Performance Methods reporting follow up if Target (PT) period required Environmental Management Plan Compliance Status of Package-3 and ‘Engineer’ will certify Operation and Maintenance stage 1. Elephant Movement 1.1 Anticipated risk  Effectiveness of Project At identified MI: No. of vehicle Site Observation SHAJ field SHAJ field Not Applicable - of vehicle-elephant mitigate measures Requirement elephant crossing - elephant offices/Forest offices/Forest collision and (rumble strips, locations collision. Time Discussion with local Department Department human-animal informatory (day or night, People conflict /cautionary season/month signage, solar and location of Collection of street lighting, collision. Cause of information from solar dragon lights collision. No of Forestry Department etc.) incidence of recommended in human – elephant design stage shall conflict. PT: Zero be monitored. vehicle - elephant  Effectiveness of collisions. habitat Reduced number enhancement of human measures shall be elephant conflicts. evaluated Improvement in  SHAJ to keep elephant habitat record of all coverage and accidents. quality  If it is observed after the study that elephants establish a defined movement path and cross the road at specific locations, provision of civil structure shall be made in consultation with forest department.  Fresh assessment in case of future widening

TPF GETINSA EUROESTUDIOS S.L. in Joint Venture with RODIC CONSULTANTS PVT LTD In Association with EUROESTUDIOS INDIA Pvt. Ltd.

Page 108 of 178

STATE HIGHWAYS AUTHORITY OF JHARKHAND (SHAJ) PHASE-II PROJECTS

Monitoring Institutional Responsibility Observation Corrective Environmental Reference to indicators (MI)/ Monitoring Implementation Supervision during the action and Remedial Measure Location Issue/Component laws/guideline Performance Methods reporting follow up if Target (PT) period required Environmental Management Plan Compliance Status of Package-3 2. Air Quality 2.1 Air pollution due  Roadside tree Environmental Throughout the MI: Ambient air As per CPCB SHAJ SHAJ Not Applicable - to due to vehicular plantations shall be Protection Act, Corridor quality (PM10, requirements movement maintained at least 1986; The Air CO,SO2 NO2)

with 70% survival (Prevention and rate. PT: Levels are Site inspection Control of  Regular equal to or below maintenance of the Pollution) Act, baseline levels road will be done 1981 given in the IEE to ensure good report surface condition  Ambient air quality monitoring. If monitored parameters exceeds prescribed limit, suitable control measures must be taken.  Signage’s shall be provided reminding them to properly maintain their vehicles to economize on fuel consumption.  Enforcement of vehicle emission rules in coordination with transport department or installing emission checking equipment’s 3. Noise

TPF GETINSA EUROESTUDIOS S.L. in Joint Venture with RODIC CONSULTANTS PVT LTD In Association with EUROESTUDIOS INDIA Pvt. Ltd.

Page 109 of 178

STATE HIGHWAYS AUTHORITY OF JHARKHAND (SHAJ) PHASE-II PROJECTS

Monitoring Institutional Responsibility Observation Corrective Environmental Reference to indicators (MI)/ Monitoring Implementation Supervision during the action and Remedial Measure Location Issue/Component laws/guideline Performance Methods reporting follow up if Target (PT) period required Environmental Management Plan Compliance Status of Package-3 3.1 Noise due to  Effective traffic Noise Pollution Sensitive MI: Noise levels Noise monitoring as SHAJ SHAJ Identification of The contractor movement of traffic management and (Regulation and receptors as per noise rules ,2000 Noise Barrier and CSC has good riding Control) identified in IEE location at been suggested PT: Levels are sensitive to follow the conditions shall be Rules,2000 and maintained equal to or below Discussion with receptors such ADB approved amendments  Speed limitation to baseline levels people at sensitive as School, EMP while 20 km/hour and thereof given in the IEE receptor sites College, finalizing the honking report Hospital & Court noise barrier restrictions near is under locations along sensitive receptors Process the project road. and elephant movement areas  Construction of noise barriers near sensitive receptors with consent of local community  The effectiveness of the multilayered plantation should be monitored and if need be, solid noise barrier shall be placed.  Create awareness amongst the residents about likely noise levels from road operation at different distances, the safe ambient noise limits and easy to implement noise reduction measures while constructing a building near road 4. Land and Soil

TPF GETINSA EUROESTUDIOS S.L. in Joint Venture with RODIC CONSULTANTS PVT LTD In Association with EUROESTUDIOS INDIA Pvt. Ltd.

Page 110 of 178

STATE HIGHWAYS AUTHORITY OF JHARKHAND (SHAJ) PHASE-II PROJECTS

Monitoring Institutional Responsibility Observation Corrective Environmental Reference to indicators (MI)/ Monitoring Implementation Supervision during the action and Remedial Measure Location Issue/Component laws/guideline Performance Methods reporting follow up if Target (PT) period required Environmental Management Plan Compliance Status of Package-3 4.1 Soil erosion at  Periodic checking Project At bridge MI: Existence of On site observation SHAJ SHAJ Not Applicable - embankment to be carried to requirement locations and soil erosion sites during heavy assess the embankment Number of soil rainfall. effectiveness of slopes and other erosion sites the stabilization probable soil measures viz. erosion areas. PT: Zero or turfing, stone minimal pitching, river occurrences of training structures soil erosion etc…  Necessary measures to be followed wherever there are failures 5. Water resources/Flooding and Inundation 5.1 Siltation  Project Near surface MI: Water quality Site observation Not Applicable - shall be made for requirement Water bodies soil erosion and PT: No turbidity of turfing conditions surface water of river training bodies due to the structures for its road effective maintenance. 5.2 Water logging  Regular visual Project Near surface MI: Presence/ Site observation SHAJ SHAJ Not Applicable - due to blockage of checks and requirement Water absence of water drains, culverts or cleaning (at least IRC: SP:21- bodies/cross logging along the streams once before 2009 drains/side drains road monsoon) of drains to ensure that flow PT: No record of of water is overtopping/ maintained through Water logging cross drains and other channels/streams.

water borne diseases due to stagnant water bodies

TPF GETINSA EUROESTUDIOS S.L. in Joint Venture with RODIC CONSULTANTS PVT LTD In Association with EUROESTUDIOS INDIA Pvt. Ltd.

Page 111 of 178

STATE HIGHWAYS AUTHORITY OF JHARKHAND (SHAJ) PHASE-II PROJECTS

Monitoring Institutional Responsibility Observation Corrective Environmental Reference to indicators (MI)/ Monitoring Implementation Supervision during the action and Remedial Measure Location Issue/Component laws/guideline Performance Methods reporting follow up if Target (PT) period required Environmental Management Plan Compliance Status of Package-3 6. Flora 6.1 Vegetation  Planted trees, Forest Project tree MI: Tree/plants Records and field SHAJ/JFM/Forest SHAJ/JFM/Fo Not Applicable - shrubs, and Conservation plantation sites survival rate observations. Department rest grasses to be Act 1980 Information from Department properly PT: Minimum rate Forestry Department of 70% tree tree survival audit survival to be conducted at least once in a year to assess the effectiveness 7. Maintenance of Right of Way and Safety 7.1 Accident Risk  Maintain shoulder Project Throughout the MI: Presence and Visual inspection SHAJ SHAJ Not Applicable - due to uncontrolled completely clear of requirement Project route extent of growth of vegetation. IRC: SP:21- vegetation growth Check accident vegetation  Minimum offset as 2009 on either side of records prescribed in road. Number of IRC:SP:21-2009 to accidents. PT: No accidents due to Regular vegetation growth maintenance/trimm ing of plantation along the road side  No invasive plantation near the road 7.2 Accident risks  Traffic control IRC:SP:55-2014 Throughout the MI: Number of Review accident SHAJ SHAJ Not Applicable - associated with measures, Project route accidents records traffic movement including speed Conditions and limits, will be existence of Site observations enforced strictly. safety signs,  Further rumble strips etc. encroachment of on the road squatters within Presence/absenc the ROW will be e of sensitive prevented. receptor  No school or structures inside hospital will be the stipulated allowed to be planning line as

TPF GETINSA EUROESTUDIOS S.L. in Joint Venture with RODIC CONSULTANTS PVT LTD In Association with EUROESTUDIOS INDIA Pvt. Ltd.

Page 112 of 178

STATE HIGHWAYS AUTHORITY OF JHARKHAND (SHAJ) PHASE-II PROJECTS

Monitoring Institutional Responsibility Observation Corrective Environmental Reference to indicators (MI)/ Monitoring Implementation Supervision during the action and Remedial Measure Location Issue/Component laws/guideline Performance Methods reporting follow up if Target (PT) period required Environmental Management Plan Compliance Status of Package-3 established per relevant local beyond the law stipulated planning line as per relevant PT: Fatal and local law non-fatal accident  Monitor/ensure rate is reduced that all safety after improvement provisions included in design and construction phase are properly maintained  Highway patrol unit(s) for round the clock patrolling. Phone booth for accidental reporting and ambulance services with minimum response time for rescue of any accident victims, if possible.  Tow-way facility for the breakdown vehicles if possible. 7.3.Transport of  Existence of spill - Throughout the MI: Status of Review of spill SHAJ SHAJ Not Applicable - Dangerous Goods prevention and project stretch emergency prevention and control and system – whether emergency emergency operational or not response plan Spill responsive system accident records  Emergency plan PT: Fully for vehicles functional carrying hazardous emergency material system

TPF GETINSA EUROESTUDIOS S.L. in Joint Venture with RODIC CONSULTANTS PVT LTD In Association with EUROESTUDIOS INDIA Pvt. Ltd.

Page 113 of 178

STATE HIGHWAYS AUTHORITY OF JHARKHAND (SHAJ) PHASE-II PROJECTS

Table-9: Environmental Management Plan Compliance Status of Package-4 Environmental Remedial Measure Reference to Location Monitoring Monitoring Institutional Observation Observation Corrective Issue/Component laws/guideline indicators (MI)/ Methods Responsibility during the during action and Performance reporting reporting follow up if Target (PT) period period required Implementation Supervision Environmental Management Plan Compliance Status of Package-4 A. Design and Pre-construction Stage 1. Alignment 1.1 Pavement damage  Soaked CBR value of Design Entire stretch MI: Design and Review of Design SHAJ Complied Not Required and inadequate sub grade is requirement Embankment raised number of cross detail design Consultant drainage provisions in recommended to be 12 at 12 locations for a and side drains, documents & habitat areas %. length of 4.33 km slab/box culverts, drawings and  Overloading to be (Refer Appendix 4 and Hume pipes comparison checked of ADB approved with site  Raised embankment and IEE report) PT: Design and conditions provision of roadside Roadside drains numbers are in drainage to prevent (both sides together) accordance with damage to pavement Covered=28.106 km site needs due to water logging on Lined=46.246 km the road and also Unlined=12.734 km inconvenience caused to  Provision of adequate For list of bridges no. of cross drainage with increased structures. waterway Pls refer  Increase (vent and Appendix 3 of height) in waterway of ADB approved IEE existing structures. report.  Roadside drains have been proposed with suitable outfalls.  Additional 19 culverts proposed 1.2 Safety along the  Provision of crash Design At embankment MI: number and Review of Design SHAJ Complied Not Required proposed alignment barriers at accident requirement height >3.0 m total location of crash design Consultant prone areas and high length = 1.4 km barriers, rumble documents embankments. IRC:SP:84-2014 Rumble strip = 20 strips, warning and drawings  Rumble strips in habitat IRC:8, IRC:25, locations ( 17 built- sign boards, and areas, schools, junction IRC:26, IRC:35, up sidewalks comparison and curves to regulate IRC:67, IRC:103 areas, 1 school, with site speed. and Section 800 of 2 junctions) conditions

TPF GETINSA EUROESTUDIOS S.L. in Joint Venture with RODIC CONSULTANTS PVT LTD In Association with EUROESTUDIOS INDIA Pvt. Ltd.

Page 114 of 178

STATE HIGHWAYS AUTHORITY OF JHARKHAND (SHAJ) PHASE-II PROJECTS

Environmental Remedial Measure Reference to Location Monitoring Monitoring Institutional Observation Observation Corrective Issue/Component laws/guideline indicators (MI)/ Methods Responsibility during the during action and Performance reporting reporting follow up if Target (PT) period period required Implementation Supervision Environmental Management Plan Compliance Status of Package-4  Provision of retro MoRTH Total 573 road PT: numbers and reflective warning Specifications delineators/chevron/ location are in signboards near school, object markers accordance with hospital ,religious places Horizontal Pedestrian Guard site needs and forests geometry will be Rails=6.120 km  Provision of sidewalks in based on IRC: 38- Service Road the built-up sections, on 1988 and vertical Length= 4.4 km. both sides. geometry will be (km  Signs and marking viz., based on IRC: SP 0+000 to Km 2+200 cat’s eyes, delineators, 23-1993 “. on Both sides object markers, hazard Total no. of street markers, safety barriers IRC: SP: 67-2012 lights=629 at hazardous locations, pedestrian guardrails, etc…  Pedestrian cross-walks Complied Not Required at all Junctions and where conflict exists between vehicular and pedestrian movements (bus bays, schools and habitation.  Safety kerb at all bridges  Service roads in densely habitated areas  Horizontal and vertical geometry as per IRC Specification  Zebra crossing with informatory warning sign on approach to school, warning sign with footways and speed limit sign  Street Lighting in built-up sections  Ambulance and medical aid posts

TPF GETINSA EUROESTUDIOS S.L. in Joint Venture with RODIC CONSULTANTS PVT LTD In Association with EUROESTUDIOS INDIA Pvt. Ltd.

Page 115 of 178

STATE HIGHWAYS AUTHORITY OF JHARKHAND (SHAJ) PHASE-II PROJECTS

Environmental Remedial Measure Reference to Location Monitoring Monitoring Institutional Observation Observation Corrective Issue/Component laws/guideline indicators (MI)/ Methods Responsibility during the during action and Performance reporting reporting follow up if Target (PT) period period required Implementation Supervision Environmental Management Plan Compliance Status of Package-4 2. Natural Hazards 2.2  Provision of adequate IRC:34 Entire stretch MI: Design and Review of SHAJ Complied Not Required Flooding/WaterLogging number of CD structures. Recommendations Embankment raised numbers of cross design Additional culverts have IRC:34 IRC:34 at 17 locations for a & side drains, documents been proposed. Recommendations length of 4.1 km slab/box culverts and drawings  All CD structures for road (Refer Appendix 4 Hume pipes, road and designed for 50year construction in of ADB approved embankment comparison HFL return period and waterlogged area IEE report) height, design and with site bridges designed for 100 and IRC: 75 and Roadside drains number of bridges conditions year HFL return period MORT&H (both sides  Water ways of bridges guidelines for together) PT: Design and and culverts have been Design of High Covered=8.4 km numbers are in increased. Embankments Unlined=79.0 km accordance with  Roadside drains also For list of bridges site needs provided with increased  Embankment height waterway Pls raised along low lying/ refer Appendix 3 of potential water logged ADB approved IEE areas report  Improvement in existing culverts/ Bridges to increase their carrying capacity. 3. Loss of Land and Assets 3.1 livelihood loss to  Road improvement work The Right to Fair Throughout the MI: Payment of Check LA SHAJ and SHAJ Under Process Details affected persons to be Compensation corridor compensation and records; implementing provided in accommodated within and Transparency assistance to DPs design NGO SMR July- available in Land as per RP drawings vs Dec 2017 ROW to the extent Acquisition, land plans; possible. Rehabilitation And Number of Social Impact Resettlement Act, complaints/ Interview with Assessment and 2013 and ADB’s grievances related affected Resettlement Plan to be involuntary to compensation persons undertaken resettlement and resettlement as per national policy policy. PT: Minimal Check status and ADB guidelines. number of of employment  Complete all necessary Contract Clause complaints/ given to local land and for preference to grievances. All

TPF GETINSA EUROESTUDIOS S.L. in Joint Venture with RODIC CONSULTANTS PVT LTD In Association with EUROESTUDIOS INDIA Pvt. Ltd.

Page 116 of 178

STATE HIGHWAYS AUTHORITY OF JHARKHAND (SHAJ) PHASE-II PROJECTS

Environmental Remedial Measure Reference to Location Monitoring Monitoring Institutional Observation Observation Corrective Issue/Component laws/guideline indicators (MI)/ Methods Responsibility during the during action and Performance reporting reporting follow up if Target (PT) period period required Implementation Supervision Environmental Management Plan Compliance Status of Package-4 property acquisition local people during cases of people during procedures prior employment resettlement and construction to the commencement of rehabilitation if any civil work. are resolved at  Adhere to the Land GRC level. No Acquisition case referred to procedures in arbitrator/court. accordance to RP’s Entitlement Framework.  Compensation and assistance as  per project Resettlement Plan  Income restoration as per RP  Preference in employment and petty  contracts during construction to APs  Constitute GRC as per RP 4. Diversion of Forest Land and Cutting of Trees 4.1 Need for cutting of  Geometric adjustments Forest Throughout the MI: Number and Review final SHAJ, Design department Tree cutting - trees. made to minimize tree Conservation Act, corridor location of design. Check consultants SHAH/Forest permission cutting. 1980 Total number of geometric budget forest department obtained  Obtain tree cutting affected adjustments made provision for permission from forest trees=3050 to avoid forestland compensatory Requisition for department Additional and tree cutting, afforestation Compensatory  Provision for mandatory Plantation near budget amount and additional plantation compensatory sensitive allocated for plantation. awaited from afforestation (1:2) for receptors, river compensatory concerned DFO. deposit of payment to banks, borrow afforestation and Forestry Department areas additional  Provision for additional plantation compensatory plantation on 1: 2 basis to be PT: Unnecessary implemented by tree felling on forest land

TPF GETINSA EUROESTUDIOS S.L. in Joint Venture with RODIC CONSULTANTS PVT LTD In Association with EUROESTUDIOS INDIA Pvt. Ltd.

Page 117 of 178

STATE HIGHWAYS AUTHORITY OF JHARKHAND (SHAJ) PHASE-II PROJECTS

Environmental Remedial Measure Reference to Location Monitoring Monitoring Institutional Observation Observation Corrective Issue/Component laws/guideline indicators (MI)/ Methods Responsibility during the during action and Performance reporting reporting follow up if Target (PT) period period required Implementation Supervision Environmental Management Plan Compliance Status of Package-4 contractor through village avoided. Budget Joint Forest allocation is Management (JFM) adequate Committee 5. Elephant Movement 5.1 Road design  Provision for rumble Project Serenghatu, MI: budget Review of bid SHAJ, Design SHAJ/ Forest Elephant Implementation causing strip, cautionary Requirement Jaranga, Sindri allocation for documents Consultant Department movement of disruption in elephant sign boards for speed village and Dodya rumble strips, and project assessment & recommended movement/ Vehicle- limits up to 30 Kmph on More cautionary and budget plan plan prepared in additional Elephant collision and both sides with gentle No of Solar informatory sign consultation with measures Human-Elephant side slope and turfing for lights=35 boards, solar concerned DFO. need to be Conflict easy movement Rumble Strips =8 street lamps, solar Proposed Plan monitoring and of Elephant. Informatory sign dragon lamps, approved on follow-up.  Provision for solar Street boards=8 habitat 26.05.2017 vide Lights in Cautionary enhancement and letter no.907 communities near Sign boards=8 conservation Approved plan elephant crossing activities PT: recommendations areas to keep the Budget amount is issued to elephants away enough to fulfill the Contractor for  Provision for supply of installation and implementation solar dragon construction of on 21.08.2017 light to local Joint Forest recommended vide no 952 Management facilities and Committees in villages structures near elephant crossing areas for use to chase away elephants  Provision for habitat enhancement viz. plantation of fodder plants in forest areas, through Joint Forest Management (JFM).  Provision for additional conservation

TPF GETINSA EUROESTUDIOS S.L. in Joint Venture with RODIC CONSULTANTS PVT LTD In Association with EUROESTUDIOS INDIA Pvt. Ltd.

Page 118 of 178

STATE HIGHWAYS AUTHORITY OF JHARKHAND (SHAJ) PHASE-II PROJECTS

Environmental Remedial Measure Reference to Location Monitoring Monitoring Institutional Observation Observation Corrective Issue/Component laws/guideline indicators (MI)/ Methods Responsibility during the during action and Performance reporting reporting follow up if Target (PT) period period required Implementation Supervision Environmental Management Plan Compliance Status of Package-4 measures to be taken after elephant study that will be conducted by the CSC Wildlife Specialist. 6. Shifting of Utilities 6.1 Disruption of utility  All telephone and Project Throughout the MI: Number of Interaction Contractor/ SHAJ/CSC Complied - services to local electrical requirement corridor complaints from with SHAJ/utility community poles/wires and local people, concerned company underground cables number, timing utility should be shifted before and type of authorities and start of notifications local public construction issued to local  Necessary permission people, time taken and payments to shift utilities PT: should be made to No. of complaints relevant utility should be 0. service agencies to allow Effective and quick timely notification. shifting and restoration of Minimal time for utility utility shifting services  Local people must be informed through appropriate means about the time of shifting of utility structures and potential disruption of services if any B. Construction Stage 1. Air Quality 1.1 Dust Generation  Contractor to submit MORT&H Throughout project MI: PM10 level Standards Contractor SHAJ /CSC Complied Not Required due to construction location and layout plan Specifications for corridor measurements CPCB activities and transport, for storage areas of Road and Bridge Complaints from methods storage and handling construction materials works Air (P and locals due to dust Observations of construction approved by CSC CP) Act 1974 and Public materials Central Motor and consultation

TPF GETINSA EUROESTUDIOS S.L. in Joint Venture with RODIC CONSULTANTS PVT LTD In Association with EUROESTUDIOS INDIA Pvt. Ltd.

Page 119 of 178

STATE HIGHWAYS AUTHORITY OF JHARKHAND (SHAJ) PHASE-II PROJECTS

Environmental Remedial Measure Reference to Location Monitoring Monitoring Institutional Observation Observation Corrective Issue/Component laws/guideline indicators (MI)/ Methods Responsibility during the during action and Performance reporting reporting follow up if Target (PT) period period required Implementation Supervision Environmental Management Plan Compliance Status of Package-4  Transport, loading and Vehicle Act 1988 PT: PM10 level < unloading of loose and General 100 Review of fine materials through Conditions of Bid ug/m3Number of monitoring covered vehicles. Document complaints should data  Paved approach roads. be 0. maintained by  Storage areas to be contractor located downwind of the habitation area.  Water spraying on earthworks, unpaved haulage roads and other dust prone areas.  Provision of PPEs to workers.

TPF GETINSA EUROESTUDIOS S.L. in Joint Venture with RODIC CONSULTANTS PVT LTD In Association with EUROESTUDIOS INDIA Pvt. Ltd.

Page 120 of 178

STATE HIGHWAYS AUTHORITY OF JHARKHAND (SHAJ) PHASE-II PROJECTS

Environmental Remedial Measure Reference to Location Monitoring Monitoring Institutional Observation Observation Corrective Issue/Component laws/guideline indicators (MI)/ Methods Responsibility during the during action and Performance reporting reporting follow up if Target (PT) period period required Implementation Supervision Environmental Management Plan Compliance Status of Package-4 1.2 Emission of air  Regular maintenance of The Air Asphalt mixing MI: Levels of HC, Standards Contractor SHAJ /CSC The - pollutants machinery and (Prevention and plants, crushers, DG SO2, NO2, and CPCB Environmental (HC,SO2,NOX,CO etc) equipment. Control of sets locations CO. Status of methods monitoring from vehicles due to  Batching, asphalt mixing Pollution) Act, PUC certificates agency has been traffic congestion and plants and crushers at 1981 (Amended Review of finalized and use of equipment and downwind (1km) 1987) and Rules PT: SO2 and monitoring monitoring is machinery direction from the 1982 NO2 levels are data being carried out. nearest settlement. both less than maintained by  Only crushers licensed 80ug/m3. PUC contractor by the PCB shall be certificate of used equipment and  DG sets with stacks of machinery is up to adequate height and use date of low sulphur diesel as fuel.  LPG should be used as fuel source in construction camps instead of wood  Ambient air quality monitoring  Contractor to prepare traffic management and dust suppression plan duly approved by SHAJ 2. Noise 2.1 Disturbance to  All equipment to be Legal requirement Throughout project MI: day and night As per Noise Contractor SHAJ /CSC The - local residents and timely serviced and Noise Pollution section especially at Noise levels. rule, 2000 Environmental sensitive receptors due properly maintained. (Regulation construction sites, Number of monitoring to excessive noise  Construction equipment and Control) residential and complaints from Consultation agency has been from construction and machinery to be Rules, 2000 identified sensitive local people with local finalized and activities and operation fitted with silencers and and amendments locations. people monitoring is of equipment and maintained properly. thereof + Clause PT: Zero being carried out. machinery  Only IS approved No 501.8.6. Refer Table 21 of complaints or no Review of equipment shall be used MORT&H IEE for information repeated noise level for construction activities. Specifications for on sensitive complaints by monitoring Road and Bridge receptors local people. data works Average day and

TPF GETINSA EUROESTUDIOS S.L. in Joint Venture with RODIC CONSULTANTS PVT LTD In Association with EUROESTUDIOS INDIA Pvt. Ltd.

Page 121 of 178

STATE HIGHWAYS AUTHORITY OF JHARKHAND (SHAJ) PHASE-II PROJECTS

Environmental Remedial Measure Reference to Location Monitoring Monitoring Institutional Observation Observation Corrective Issue/Component laws/guideline indicators (MI)/ Methods Responsibility during the during action and Performance reporting reporting follow up if Target (PT) period period required Implementation Supervision Environmental Management Plan Compliance Status of Package-4  Timing of noisy night time noise maintained by construction activities levels are within contractor shall be done during permissible limits night time and weekend for work zone Observation of near schools, areas construction  Implement noisy site operations intermittently to reduce the total noise generated  Manage existing traffic to avoid traffic jams and accumulation of noise beyond standards.  Restrict construction near residential, built up and forest areas construction today light hours.  Initiation of multi-layered plantation, to serve as mitigation option for operation phase  Honking restrictions near sensitive areas  PPEs to workers  Noise monitoring as per EMoP. 3. Land and Soil 3.1 Landuse Change  Non-agricultural areas to Project Throughout the MI: Borrow pit Review Contractor SHAJ /CSC Being complied - and Loss of productive be used as borrow areas requirement project section and locations/Top soil borrow area / topsoil to the extent possible. borrow areas storage area plan, site visits  If using agricultural land, top soil to be preserved Land identified for PT: Zero and laid over either on camp, storage areas complaints or the embankment slope etc disputes for growing vegetation to registered against protect soil erosion. contractor by land owner

TPF GETINSA EUROESTUDIOS S.L. in Joint Venture with RODIC CONSULTANTS PVT LTD In Association with EUROESTUDIOS INDIA Pvt. Ltd.

Page 122 of 178

STATE HIGHWAYS AUTHORITY OF JHARKHAND (SHAJ) PHASE-II PROJECTS

Environmental Remedial Measure Reference to Location Monitoring Monitoring Institutional Observation Observation Corrective Issue/Component laws/guideline indicators (MI)/ Methods Responsibility during the during action and Performance reporting reporting follow up if Target (PT) period period required Implementation Supervision Environmental Management Plan Compliance Status of Package-4  Land for temporary facilities like construction camp, storage areas etc. shall be brought back to its original land use 3.2 Slope failure and  Bio-turfing of IRC: 56 -1974 Throughout the MI: Occurrence of Review of Contractor, SHAJ /CSC Being Complied - Soil erosion due to embankments to protect recommended entire project road slope failure or design Construction activities, slopes. practice for erosion issues documents earthwork, and cut and  Slope protection by treatment of and site fill, stockpiles etc. providing frames, dry embankment PT: No slope observation stone pitching, masonry slopes for erosion failures. Minimal retaining walls, planting control Clause No. erosion issues of grass and trees. 306 and 305.2.2  Side slopes of all cut and MORT&H fill areas will be graded Specifications for and covered with stone Road and Bridge pitching, grass and shrub works Guidelines as per design IX for Soil erosion specifications. Care should be taken that the slope gradient shall not be greater than2:1.  The earth stockpiles to be provided with gentle slopes to soil erosion. 3.3 Borrow area  Obtain EC from SEIAA IRC Guidelines on Borrow sites location MI: Existence of Review of Contractor SHAJ /CSC Identification of Contractor has management before opening any new borrow areas and borrow areas in design Borrow Area is been borrow area. for quarries inappropriate documents completed and suggested to  Comply to EC conditions (Environmental unauthorized and site process for expedite the of SEIAA protection Act and locations. Poor observations obtaining the process getting  Non-productive, Rules, 1986; borrow area requisite the Borrow barren lands, upland Water Act, Air management Compare site permission from area shall be used for Act)+Clause practices. Number conditions with competent permission for borrowing earth with the 305.2.2 MORTH of accidents. EC conditions Authority being all identified necessary Specifications for Complaints from by SEIAA initiated. Borrow Area permissions/consents. Road and local people. Bridgeworks Guidelines for

TPF GETINSA EUROESTUDIOS S.L. in Joint Venture with RODIC CONSULTANTS PVT LTD In Association with EUROESTUDIOS INDIA Pvt. Ltd.

Page 123 of 178

STATE HIGHWAYS AUTHORITY OF JHARKHAND (SHAJ) PHASE-II PROJECTS

Environmental Remedial Measure Reference to Location Monitoring Monitoring Institutional Observation Observation Corrective Issue/Component laws/guideline indicators (MI)/ Methods Responsibility during the during action and Performance reporting reporting follow up if Target (PT) period period required Implementation Supervision Environmental Management Plan Compliance Status of Package-4  Depths of borrow pits to Borrow Areas PT: No case of be regulated and sides management non-compliance to not steeper than 25%. conditions  Topsoil to be stockpiled stipulated by and protected for use at SEIAA in the rehabilitation stage. clearance letter.  Transportation of earth Zero accidents. materials through Zero complaints. covered vehicles.  Follow IRC recommended practice for borrow pits (IRC 10: 1961) for identification of location, its operation and rehabilitation  Borrow areas not to be dug continuously.  To the extent borrow areas shall be sited away from habitated areas.  Borrow areas shall be leveled with salvaged material or other filling materials which do not pose contamination of soil. Else, it shall be converted into fish pond. 3.4 Quarry Operations  Aggregates will be Clause No.111.3 Quarry area MI: Existence of Review of Contractor SHAJ /CSC Identification of - sourced from existing MORT&H locations licenses quarry design Stone Quarries licensed quarries. Specifications for areas from which documents, finalized and the  Copies of consent/ Road and Bridge materials to be contractor same are being approval / rehabilitation works Guidelines sourced and documents operated after plan for a new quarry or VI for Quarry Existence of a and site obtaining the use of existing source Areas quarry observation requisite will be submitted to Management redevelopment Compliance to permission from SHAJ. Environmental plan EC conditions competent Protection Rules in case of Authority.

TPF GETINSA EUROESTUDIOS S.L. in Joint Venture with RODIC CONSULTANTS PVT LTD In Association with EUROESTUDIOS INDIA Pvt. Ltd.

Page 124 of 178

STATE HIGHWAYS AUTHORITY OF JHARKHAND (SHAJ) PHASE-II PROJECTS

Environmental Remedial Measure Reference to Location Monitoring Monitoring Institutional Observation Observation Corrective Issue/Component laws/guideline indicators (MI)/ Methods Responsibility during the during action and Performance reporting reporting follow up if Target (PT) period period required Implementation Supervision Environmental Management Plan Compliance Status of Package-4  The contractor will PT: Quarry license opening new develop a Quarry is valid.: No case quarries Redevelopment plan, as of noncompliance per the Mining Rules of to consent the state and submit a conditions and air copy of the approval quality meets the to EA. prescribed limit  Obtain environmental clearance from SEIAA in case of opening new quarry 3.5 Compaction of soil  Construction vehicles, Design Parking areas, MI: Location of Site Contractor SHAJ /CSC Being Complied - and impact on quarry machinery, and requirement Haulage roads and approach and observation haul roads due to equipment to be construction yards haulage roads movement of vehicles stationed in the Presence of and equipment designated ROW to destroyed/comp avoid compaction. acted agricultural  Approach roads/haulage land or land which roads shall be designed has not be along the barren and restored to its hard soil area to reduce original condition the compaction. PT: Zero  Transportation of quarry occurrence of material to the dumping destroyed/comp site through heavy acted land and vehicles shall be done undestroyed land through existing major roads to the extent possible to restrict wear and tear to the village/minor roads.  Land taken for construction camp and other temporary facility shall be restored to its original conditions 3.6 Contamination of  Construction vehicles Design Fuelling station, MI: Quality of soil Site Contractor SHAJ /CSC Being complied - soil due to leakage/ and equipment will be requirement construction sites, near storage area observation

TPF GETINSA EUROESTUDIOS S.L. in Joint Venture with RODIC CONSULTANTS PVT LTD In Association with EUROESTUDIOS INDIA Pvt. Ltd.

Page 125 of 178

STATE HIGHWAYS AUTHORITY OF JHARKHAND (SHAJ) PHASE-II PROJECTS

Environmental Remedial Measure Reference to Location Monitoring Monitoring Institutional Observation Observation Corrective Issue/Component laws/guideline indicators (MI)/ Methods Responsibility during the during action and Performance reporting reporting follow up if Target (PT) period period required Implementation Supervision Environmental Management Plan Compliance Status of Package-4 spillage of oil, maintained and refueled and construction Presence of bituminous and non- in such a fashion that camp sand disposal spilled oil or bituminous debris oil/diesel spillage does location bitumen in project generated from not contaminate the soil. area demolition and road  Fuel storage and construction refueling sites to be kept away from drainage PT: Soil test channels. conforming to no –  Unusable debris shall be contamination. No dumped in ditches and sighting of spilled low lying areas. oil or bitumen in  To avoid soil construction site contamination Oil or camp site Interceptors shall be provided at wash down and refueling areas.  Waste oil and oil soaked cotton/ cloth shall be stored in containers labeled ‘Waste Oil’ and ‘Hazardous’ sold off to MoEF/SPCB authorized vendors  Non-bituminous wastes to be dumped in borrow pits with the concurrence of landowner and covered with a layer of topsoil conserved from opening the pit.  Bituminous wastes will be disposed off in an identified dumping site approved by the State Pollution Control Board 4. Water Resources 4.1 Sourcing of water  Requisite permission CGWA Guidelines Throughout the MI: Approval from Checking of Contractor SHAJ /CSC The ground water Ground water during Construction shall be obtained for Project section competent documentation source has been permission

TPF GETINSA EUROESTUDIOS S.L. in Joint Venture with RODIC CONSULTANTS PVT LTD In Association with EUROESTUDIOS INDIA Pvt. Ltd.

Page 126 of 178

STATE HIGHWAYS AUTHORITY OF JHARKHAND (SHAJ) PHASE-II PROJECTS

Environmental Remedial Measure Reference to Location Monitoring Monitoring Institutional Observation Observation Corrective Issue/Component laws/guideline indicators (MI)/ Methods Responsibility during the during action and Performance reporting reporting follow up if Target (PT) period period required Implementation Supervision Environmental Management Plan Compliance Status of Package-4 abstraction of authority identified and from groundwater from Complaints from requisite competent Central Groundwater Check Dam at local people on Talk to local permission has Authority by Authority. suitable locations water availability people been initiated by the contractor  Arrangements shall be the contractor. to be expedited made by contractor that PT: Valid approval the water availability and from competent supply to nearby authority. Zero communities remain complaints from unaffected. local people.  Water intensive activities not to be undertaken during summer season.  Provision of water harvesting structure to augment groundwater condition in the area 4.2 Disposal of water  Provisions shall be made Clause No.1010 Throughout the MI: Condition of Standards Contractor SHAJ /CSC Being Complied - during construction to connect road side EP Act 1986 Project section drainage system methods Site drains with existing MORT&H in construction observation nearby natural drains. Specifications for site. Presence/ab and review of Road and sense of water documents Bridgeworks logging in project area.

PT: Existence of proper drainage system. No water logging in project area 4.3 Alteration in  Existing drainage system Design Near all drainage MI: Proper flow of Review of Contractor SHAJ /CSC Being Complied - surface water to be maintained requirement, channels, river/ water in existing design hydrology  And further enhanced. Clause No nallah crossings etc. streams and rivers documents  Provision shall be made 501.8.6. MORT&H for adequate size and Specifications PT: No complain Site number of cross of water shortage observation drainage structures esp. by downstream in the areas where land communities. No

TPF GETINSA EUROESTUDIOS S.L. in Joint Venture with RODIC CONSULTANTS PVT LTD In Association with EUROESTUDIOS INDIA Pvt. Ltd.

Page 127 of 178

STATE HIGHWAYS AUTHORITY OF JHARKHAND (SHAJ) PHASE-II PROJECTS

Environmental Remedial Measure Reference to Location Monitoring Monitoring Institutional Observation Observation Corrective Issue/Component laws/guideline indicators (MI)/ Methods Responsibility during the during action and Performance reporting reporting follow up if Target (PT) period period required Implementation Supervision Environmental Management Plan Compliance Status of Package-4 is sloping towards road record of alignment. overtopping/ water  Road level shall be logging raised above HFL level wherever road level is lesser than HFL  Culverts reconstruction shall be done during lean flow period. In some cases these minor channels may be diverted for a very short period (15-30 days) and will be bring back to its original course immediately after construction. 4.4 Siltation in water  Embankment slopes to Design Near all water bodies MI: Presence Field Contractor SHAJ /CSC Being Complied - bodies due to be modified suitably to requirement, /waterway Refer /absence of observation construction activities restrict the soil debris ClauseNo501.8. Table 15. siltation in rivers, /earthwork entering water bodies. 6.MORT&H streams, ponds  Provision of Silt fencing Specifications for and other water shall be made at water Road and Bridge bodies in project bodies. works area. Turbidity test  Silt/sediment should be levels collected and stockpiled Worldwide best for possible reuse as practices PT: No records of surfacing of slopes siltation due to where they have to be project activities. re-vegetated. Surface water  Earthworks and stone quality tests works to be prevented confirm to turbidity from impeding natural and TSS limit flow of rivers, streams and water canals or existing drainage system.

TPF GETINSA EUROESTUDIOS S.L. in Joint Venture with RODIC CONSULTANTS PVT LTD In Association with EUROESTUDIOS INDIA Pvt. Ltd.

Page 128 of 178

STATE HIGHWAYS AUTHORITY OF JHARKHAND (SHAJ) PHASE-II PROJECTS

Environmental Remedial Measure Reference to Location Monitoring Monitoring Institutional Observation Observation Corrective Issue/Component laws/guideline indicators (MI)/ Methods Responsibility during the during action and Performance reporting reporting follow up if Target (PT) period period required Implementation Supervision Environmental Management Plan Compliance Status of Package-4  Retaining walls at water bodies /ponds to avoid siltation near ponds 4.5 Deterioration in  No vehicles or The Water Water bodies, MI: Water quality Conduction of Contractor SHAJ /CSC The Finalization of Surface water quality equipment should be (Prevention and refueling stations, of ponds, streams, water quality Environmental monitoring due to leakage from parked or refueled near Control of construction camps. rivers and other tests as per monitoring agency and vehicles and water-bodies, so as to Pollution) Act, water bodies in the monitoring agency has been initiation of equipment’s and waste avoid contamination 1974 and project plan finalized and Environmental from construction from fuel and amendments monitoring carried monitoring camps lubricants. thereof. Presence of oil Field out.  Oil and grease traps and floating in water observation fueling platforms to be bodies in project provided at re-fueling area locations.  All chemicals and oil PT: Surface water shall be stored away quality meets from water and freshwater quality concreted platform with standards catchment pit for spills prescribed by collection. CPCB  All equipment operators, drivers, and warehouse personnel will be trained in immediate response for spill containment and eventual clean-up. Readily available, simple to understand and preferably written in the local language emergency response procedure, including reporting, will be provided by the contractors.  Construction camp to be sited away from water bodies.

TPF GETINSA EUROESTUDIOS S.L. in Joint Venture with RODIC CONSULTANTS PVT LTD In Association with EUROESTUDIOS INDIA Pvt. Ltd.

Page 129 of 178

STATE HIGHWAYS AUTHORITY OF JHARKHAND (SHAJ) PHASE-II PROJECTS

Environmental Remedial Measure Reference to Location Monitoring Monitoring Institutional Observation Observation Corrective Issue/Component laws/guideline indicators (MI)/ Methods Responsibility during the during action and Performance reporting reporting follow up if Target (PT) period period required Implementation Supervision Environmental Management Plan Compliance Status of Package-4  Wastes must be collected, stored and taken to approve disposal site only.  Water quality shall be monitored 5. Flora and Fauna 5.1 Vegetation loss  Restrict tree cutting up to Forest Throughout project MI: ROW width Review of Mandatory SHAJ /CSC Tree cutting - due to site preparation toe line considering Conservation corridor Number of trees relevant Compensatory permission and construction safety to road users. Act1980 + for felling documents – plantation by obtained activities  Roadside trees to be IRC:SP:21 and Estimated No. of Compensatory tree cutting forest removed with prior IRC:SP:66 affected tree=2457 plantation plan permit, Department and Requisition for approval of competent Number of trees compensatory Additional Compensatory authority. Additional Plantation replanted. plantation plantation by plantation  Mandatory near Sensitive plan. Meeting contractor in awaited from compensatory plantation receptors, river PT: Additional with JFM partnership with concerned DFO at 1:2 basis by Forestry banks, borrow areas compensatory Committee respective local Requisition from Department afforestation done members JFM Committee DFO for  Additional compensatory on a 1:2 basis by compensatory plantation 1:2 as per the contractor through Field plantation IRC by contractor in JFM. Number of observations awaited partnership with trees planted is respective village JFM double the Committee. Local number of trees villagers to be employed removed. Tree for afforestation survival rate is at activities. Employment least 70%. preference to women  Regular maintenance trees planted.  Provision of LPG in construction camp as fuel source to avoid tree cutting.  Plantation of trees on both sides of the road where technically feasible. Trees should be

TPF GETINSA EUROESTUDIOS S.L. in Joint Venture with RODIC CONSULTANTS PVT LTD In Association with EUROESTUDIOS INDIA Pvt. Ltd.

Page 130 of 178

STATE HIGHWAYS AUTHORITY OF JHARKHAND (SHAJ) PHASE-II PROJECTS

Environmental Remedial Measure Reference to Location Monitoring Monitoring Institutional Observation Observation Corrective Issue/Component laws/guideline indicators (MI)/ Methods Responsibility during the during action and Performance reporting reporting follow up if Target (PT) period period required Implementation Supervision Environmental Management Plan Compliance Status of Package-4 offset 1m back from the ultimate edge of the roadway to prevent safety hazard and provide adequate sight distance.  Integrate vegetation management (IVM) with the carriage way completely clear of vegetation.  Additional plantation near sensitive receptors, river banks to minimize noise & air pollution, and to check erosion.  Controlled use of pesticides/ fertilizers 6. Construction Camps 6.1 Impact associated  All camps should be Design All construction MI: Location of On site Contractor and SHAJ /CSC Being Complied - with location established with prior Requirement The camps campsites and observation EO permission from PCB. Water (Prevention distance from Camps to maintain and Control of habitation, forest Interaction minimum distance from Pollution) areas, water with workers following: # 500 m from Act,1974and its bodies, through and local habitation # 500 m from amendments traffic route and community forest areas where thereof construction possible # 500 m from camps PT: water bodies where Distance of possible # 500 m from campsite is less through traffic route # than 500m from 500 m from identified listed locations elephant movement locations 6.2 Worker’s Health in  The location, layout and The Building and All construction MI: Camp health Camp records Contractor SHAJ /CSC Being Complied - construction camp basic facility provision of Other Construction camps records each labor camp will be workers Site submitted to CSC and (Regulation of observation

TPF GETINSA EUROESTUDIOS S.L. in Joint Venture with RODIC CONSULTANTS PVT LTD In Association with EUROESTUDIOS INDIA Pvt. Ltd.

Page 131 of 178

STATE HIGHWAYS AUTHORITY OF JHARKHAND (SHAJ) PHASE-II PROJECTS

Environmental Remedial Measure Reference to Location Monitoring Monitoring Institutional Observation Observation Corrective Issue/Component laws/guideline indicators (MI)/ Methods Responsibility during the during action and Performance reporting reporting follow up if Target (PT) period period required Implementation Supervision Environmental Management Plan Compliance Status of Package-4 approved b EA. The Employment and Existence of contractor will maintain Conditions of proper first aid kit Consultation necessary living service) Act 1996 in camp site with contractor accommodation and and The Water workers and ancillary facilities in (Prevention and Complaints from local people hygienic manner. Control of workers. living nearby  Adequate water and Pollution) Act,1974 sanitary latrines with and amendments PT: No record of septic tanks with soak thereof illness due to pits shall be provided. unhygienic  Preventive medical conditions or facilities in camp vectors. Zero  Waste disposal facilities cases of STD. such as dust bins must Clean and tidy be provided in the camps camp site and regular disposal of conditions. waste The Contractor will take all precautions to protect the workers from insect and pest to reduce the risk to health. This includes the use of insecticides which should comply with local regulations.  No liquor or prohibited drugs will be imported to, sell, give and barter to the workers of host community.  Awareness raising to immigrant workers/local community on communicable and sexually transmitted diseases. 7. Management of Construction Waste/Debris

TPF GETINSA EUROESTUDIOS S.L. in Joint Venture with RODIC CONSULTANTS PVT LTD In Association with EUROESTUDIOS INDIA Pvt. Ltd.

Page 132 of 178

STATE HIGHWAYS AUTHORITY OF JHARKHAND (SHAJ) PHASE-II PROJECTS

Environmental Remedial Measure Reference to Location Monitoring Monitoring Institutional Observation Observation Corrective Issue/Component laws/guideline indicators (MI)/ Methods Responsibility during the during action and Performance reporting reporting follow up if Target (PT) period period required Implementation Supervision Environmental Management Plan Compliance Status of Package-4 7.1 Selection of  Contractor to submit a Design At all Dumping Sites MI: Location of Field survey Contractor SHAJ /CSC Being Complied - Dumping Sites waste/spoil disposal plan Requirement, dumping sites and interaction and get it approved by MORT&H Number of public with local CSC and EA. guidelines and complaints. people.  Create controlled General Review of dumping sites with a Conditions of PT: No public consent letter non-permeable lining Contract complaints. incorporated in the pit Document Consent letters for design to avoid leachate all dumping sites seepage into the soil, available with which may later affect contractor/ CSC ground water quality  Unproductive/wastelands shall be selected for dumping sites away from residential areas and water bodies  Dumping sites must be having adequate capacity equal to the amount of debris generated.  Public perception and consent from the village Panchayats has to be obtained before finalizing the location 7.2 Reuse and  The existing bitumen Design Throughout the MI: Percentage of Contractor Contractor SHAJ /CSC Being Complied - disposal of surface shall be utilized Requirement, project corridor reuse of existing records construction and for paving of cross roads, MORT&H surface material dismantled waste access roads, and guidelines and Field paving works in General Method and observation construction sites and Conditions of location of camps, temporary Contract disposal site of Interaction traffic diversions, and Document construction with local haulage routes. debris people  All excavated materials Contractor from roadway, records

TPF GETINSA EUROESTUDIOS S.L. in Joint Venture with RODIC CONSULTANTS PVT LTD In Association with EUROESTUDIOS INDIA Pvt. Ltd.

Page 133 of 178

STATE HIGHWAYS AUTHORITY OF JHARKHAND (SHAJ) PHASE-II PROJECTS

Environmental Remedial Measure Reference to Location Monitoring Monitoring Institutional Observation Observation Corrective Issue/Component laws/guideline indicators (MI)/ Methods Responsibility during the during action and Performance reporting reporting follow up if Target (PT) period period required Implementation Supervision Environmental Management Plan Compliance Status of Package-4 shoulders, verges, drains, cross drainage PT: No public will be used for complaint and backfilling consent letters for embankments, filling pits, all dumping sites and landscaping. available with  Unusable and non- contractor or CSC bituminous debris materials should be suitably disposed off at pre-designated disposal locations, with approval of the concerned authority.  The bituminous wastes shall be disposed in secure landfill sites only in environmentally accepted manner. For removal of debris, wastes and its disposal, MORTH guidelines should be followed.  Unusable and surplus materials, as determined by the Project Engineer, will be removed and disposed off-site. 8. Traffic Management and Safety 8.1 Management of  Traffic Management Plan Design Throughout the MI: Traffic Review traffic Contractor SHAJ /CSC Being Complied - existing traffic and shall be submitted by the requirement and project corridor management plan. management safety contractor and approved IRC: SP: 27 -1984, especially at Presence/ plan Field by the CSC. Report Containing intersections absence of safety observation of  The traffic control plans Recommendation signs, traffic traffic shall contain details of of IRC Regional demarcations, flag management diversions; traffic safety Workshops on men etc. on site. and safety arrangements during Highway Safety Complaints from system construction; safety IRC:SP: 32 -1988 road users. No of

TPF GETINSA EUROESTUDIOS S.L. in Joint Venture with RODIC CONSULTANTS PVT LTD In Association with EUROESTUDIOS INDIA Pvt. Ltd.

Page 134 of 178

STATE HIGHWAYS AUTHORITY OF JHARKHAND (SHAJ) PHASE-II PROJECTS

Environmental Remedial Measure Reference to Location Monitoring Monitoring Institutional Observation Observation Corrective Issue/Component laws/guideline indicators (MI)/ Methods Responsibility during the during action and Performance reporting reporting follow up if Target (PT) period period required Implementation Supervision Environmental Management Plan Compliance Status of Package-4 measures for night time Road Safety for accidents PT: No Interaction traffic and precautions Children (5-12 complaints. No with people in for transportation of Years Old) in accidents due to vehicles using hazardous materials. Construction poor traffic the road Timing and scheduling to Zones IRC:SP:55- management. be done so that 2014 Traffic signs, transportation of The Building and demarcation lines dangerous goods is other Construction etc. present in done during least workers Act 1996 appropriate number of people and and Cess Act of locations on site other vehicles on the 1996 Factories Act road. 1948+Section 6 of  The Contractor will Employer’s ensure that the Requirement of diversion/detour is Bid Document always maintained in running condition, particularly during the monsoon to avoid disruption to traffic flow. On stretches where it is not possible to pass the traffic on the part width of existing carriageway, temporary paved diversions will be constructed.  Restriction of construction activity to only one side of the existing road  The contractor shall inform local community of changes to traffic routes, and pedestrian access arrangements with assistance from “Engineer”.

TPF GETINSA EUROESTUDIOS S.L. in Joint Venture with RODIC CONSULTANTS PVT LTD In Association with EUROESTUDIOS INDIA Pvt. Ltd.

Page 135 of 178

STATE HIGHWAYS AUTHORITY OF JHARKHAND (SHAJ) PHASE-II PROJECTS

Environmental Remedial Measure Reference to Location Monitoring Monitoring Institutional Observation Observation Corrective Issue/Component laws/guideline indicators (MI)/ Methods Responsibility during the during action and Performance reporting reporting follow up if Target (PT) period period required Implementation Supervision Environmental Management Plan Compliance Status of Package-4  Use of adequate signage’s to ensure traffic management and safety. Conduct of regular safety audit on safety measures. 8.2 Pedestrians,  Temporary access and Same as above Near habitation on MI: Presence/ Field Contractor SHAJ /CSC Under Process - animal movement diversion, with proper both sides of absence of access Observation drainage facilities. schools, temples, routes for Interaction  Access to the schools, hospitals, pedestrians. Road with local temples and other public graveyards, signage Number people places must be construction sites, of complaints from maintained when haulage roads, local people construction takes Place diversion sites. near them. PT: Easy access  Fencing wherever cattle to schools, movement is expected. temples and  To avoid the need for public places. cattle underpasses, Zero complaints some of the reposed culverts near habitations may be widened to facilitate cattle movement. 8.3 Safety of Workers  Contractors to adopt and Same as above Construction sites MI: Availability of Site Obligation of SHAJ/CSC Being Complied - and accident risk from maintain safe working Safety gears to observation Contractor construction activities practices. workers  Usage of fluorescent and Review retro refectory signage, Safety signage records on in local language at the Training records safety training construction sites on safety and accidents  Training to workers on safety procedures and Number of safety Interact with precautions. related accidents construction  Mandatory appointment workers of safety officer. PT: Zero fatal  All regulations regarding accidents. Zero or safe scaffolding, ladders,

TPF GETINSA EUROESTUDIOS S.L. in Joint Venture with RODIC CONSULTANTS PVT LTD In Association with EUROESTUDIOS INDIA Pvt. Ltd.

Page 136 of 178

STATE HIGHWAYS AUTHORITY OF JHARKHAND (SHAJ) PHASE-II PROJECTS

Environmental Remedial Measure Reference to Location Monitoring Monitoring Institutional Observation Observation Corrective Issue/Component laws/guideline indicators (MI)/ Methods Responsibility during the during action and Performance reporting reporting follow up if Target (PT) period period required Implementation Supervision Environmental Management Plan Compliance Status of Package-4 working platforms, minor nonfatal gangway, stair wells, accidents. excavations, trenches and safe means of entry and egress shall be complied with.  Provision of PPEs to workers.  Provision of a readily available first aid unit including an adequate supply of dressing materials.  The contractor will not employ any person below the age of 18years  Use of hazardous material should be minimized and/or restricted.  Emergency plan (to be approved by engineer) shall be prepared to respond to any accidents or emergencies.  Accident Prevention Officer must be appointed by the contractor. 8.4 Accident risk to  Restrict access to Same as above Construction sites MI: Safety signs Site inspection Contractor SHAJ /CSC Being Complied - local community construction sites only to and their location authorized personnel. Consultation  Physical separation must Incidents of with local be provided for accidents people movement of vehicular and human traffic. Complaints from local people PT: Zero incident of

TPF GETINSA EUROESTUDIOS S.L. in Joint Venture with RODIC CONSULTANTS PVT LTD In Association with EUROESTUDIOS INDIA Pvt. Ltd.

Page 137 of 178

STATE HIGHWAYS AUTHORITY OF JHARKHAND (SHAJ) PHASE-II PROJECTS

Environmental Remedial Measure Reference to Location Monitoring Monitoring Institutional Observation Observation Corrective Issue/Component laws/guideline indicators (MI)/ Methods Responsibility during the during action and Performance reporting reporting follow up if Target (PT) period period required Implementation Supervision Environmental Management Plan Compliance Status of Package-4  Adequate signage must accidents. Zero be provided for safe complaints. traffic movement  Provision of temporary diversions and awareness to locals before opening new construction fronts 9. Site restoration and rehabilitation 9.1 Clean-up  Contractor will prepare Project Throughout the MI: Condition of Site Contractor SHAJ /CSC Shall be initiated - Operations, site restoration plans, requirement project corridor, camp, borrow observation before closer of Restoration and which will be approved construction camp areas and Camp and Plant Rehabilitation by the ‘Engineer’. sites and borrow construction sites, Interaction sites.  The clean-up and areas Presence/ with locals restoration operations absence of are to be implemented construction Issue by the contractor prior to material/debris completion demobilization. after completion of certificate after  All construction zones construction works restoration of including riverbeds, on site. PT: Clean all sites are culverts, road-side areas, and tidy sites. No found camps, hot mix plant trash or debris left satisfactory sites, crushers, batching on site. Site plant sites and any restored and other area used/affected leveled. by the project will be left clean and tidy, to the satisfaction of the Environmental officer.  All the opened borrow areas will be rehabilitated and ‘Engineer’ will certify Operation and Maintenance stage 1. Elephant Movement 1.1 Anticipated risk of  Effectiveness of mitigate Project At identified elephant MI: No. of vehicle - Site SHAJ field SHAJ field Not Applicable - vehicle-elephant measures (rumble strips, Requirement crossing locations elephant collision. Observation offices/Forest offices/Forest informatory /cautionary Time (day or night, Department Department

TPF GETINSA EUROESTUDIOS S.L. in Joint Venture with RODIC CONSULTANTS PVT LTD In Association with EUROESTUDIOS INDIA Pvt. Ltd.

Page 138 of 178

STATE HIGHWAYS AUTHORITY OF JHARKHAND (SHAJ) PHASE-II PROJECTS

Environmental Remedial Measure Reference to Location Monitoring Monitoring Institutional Observation Observation Corrective Issue/Component laws/guideline indicators (MI)/ Methods Responsibility during the during action and Performance reporting reporting follow up if Target (PT) period period required Implementation Supervision Environmental Management Plan Compliance Status of Package-4 collision and human- signage, solar street season/month and Discussion animal conflict lighting, solar dragon location of with local lights etc.) collision. Cause of People recommended in design collision. No of stage shall be monitored. incidence of Collection of  Effectiveness of habitat human – elephant information enhancement measures conflict. PT: Zero from Forestry shall be evaluated vehicle - elephant Department  SHAJ to keep record of collisions. all accidents. Reduced number  If it is observed after the of human elephant study that elephants conflicts. establish a defined Improvement in movement path and elephant habitat cross the road at specific coverage and locations, provision of quality civil structure shall be made in consultation with forest department.  Fresh assessment in case of future widening 2. Air Quality 2.1 Air pollution due to  Roadside tree Environmental Throughout the MI: Ambient air As per CPCB SHAJ SHAJ Not Applicable - due to vehicular plantations shall be Protection Act, Corridor quality (PM10, requirements movement maintained at least with 1986; The Air CO,SO2 NO2) 70% survival rate. (Prevention and  Regular maintenance of Control of PT: Levels are Site inspection the road will be done to Pollution) Act, equal to or below ensure good surface 1981 baseline levels condition given in the IEE  Ambient air quality report monitoring. If monitored parameters exceeds prescribed limit, suitable control measures must be taken.  Signages shall be provided reminding them

TPF GETINSA EUROESTUDIOS S.L. in Joint Venture with RODIC CONSULTANTS PVT LTD In Association with EUROESTUDIOS INDIA Pvt. Ltd.

Page 139 of 178

STATE HIGHWAYS AUTHORITY OF JHARKHAND (SHAJ) PHASE-II PROJECTS

Environmental Remedial Measure Reference to Location Monitoring Monitoring Institutional Observation Observation Corrective Issue/Component laws/guideline indicators (MI)/ Methods Responsibility during the during action and Performance reporting reporting follow up if Target (PT) period period required Implementation Supervision Environmental Management Plan Compliance Status of Package-4 to properly maintain their vehicles to economize on fuel consumption.  Enforcement of vehicle emission rules in coordination with transport department or installing emission checking equipment’s 3. Noise 3.1 Noise due to  Effective traffic Noise Pollution Sensitive receptors MI: Noise levels Noise SHAJ SHAJ Identification of The contractor movement of traffic management and good (Regulation and as identified in IEE monitoring as Noise Barrier and CSC has riding conditions shall be Control) per noise rules location at been maintained Rules,2000 and PT: Levels are ,2000 sensitive suggested to  Speed limitation to 20 amendments equal to or below receptors such as follow the ADB km/hour and honking thereof baseline levels School, College, approved EMP restrictions near given in the IEE Discussion Hospital & Court while finalizing sensitive receptors and report with people at is under Process the noise elephant movement sensitive barrier areas receptor sites locations along  Construction of noise the project barriers near sensitive road. receptors with consent of local community  The effectiveness of the multilayered plantation should be monitored and if need be, solid noise barrier shall be placed.  Create awareness amongst the residents about likely noise levels from road operation at different distances, the safe ambient noise limits and easy to implement noise reduction measures while

TPF GETINSA EUROESTUDIOS S.L. in Joint Venture with RODIC CONSULTANTS PVT LTD In Association with EUROESTUDIOS INDIA Pvt. Ltd.

Page 140 of 178

STATE HIGHWAYS AUTHORITY OF JHARKHAND (SHAJ) PHASE-II PROJECTS

Environmental Remedial Measure Reference to Location Monitoring Monitoring Institutional Observation Observation Corrective Issue/Component laws/guideline indicators (MI)/ Methods Responsibility during the during action and Performance reporting reporting follow up if Target (PT) period period required Implementation Supervision Environmental Management Plan Compliance Status of Package-4 constructing a building near road 4. Land and Soil 4.1 Soil erosion at  Periodic checking to be Project At bridge locations MI: Existence of On site SHAJ SHAJ Not Applicable - embankment during carried to assess the requirement and embankment soil erosion sites observation heavy rainfall. effectiveness of the slopes and other Number of soil stabilization measures probable soil erosion erosion sites viz. turfing, stone areas. pitching, river training PT: Zero or structures etc minimal  Necessary measures to occurrences of soil be followed wherever erosion there are failures 5. Water resources/Flooding and Inundation 5.1 Siltation  Regular checks shall be Project Near surface Water MI: Water quality Site SHAJ SHAJ Not Applicable - made for soil erosion requirement bodies observation and turfing conditions of PT: No turbidity of river training structures surface water for its effective bodies due to the maintenance. road 5.2 Water logging due  Regular visual checks Project Near surface MI: Presence/ Site SHAJ SHAJ Not Applicable - to blockage of drains, and cleaning (at least requirement Water bodies, absence of water observation. culverts or streams once before monsoon) of Flood prone/low logging along the Interaction drains shall be done lying sections road with along the alignment to local ensure that flow of water PT: No record of community is maintained through overtopping/ cross drains and other Water logging channels/streams.  Monitoring of water borne diseases due to stagnant water bodies  SHAJ will ensure that all drains (side drains and all cross drainages) are periodically cleared especially before monsoon season to

TPF GETINSA EUROESTUDIOS S.L. in Joint Venture with RODIC CONSULTANTS PVT LTD In Association with EUROESTUDIOS INDIA Pvt. Ltd.

Page 141 of 178

STATE HIGHWAYS AUTHORITY OF JHARKHAND (SHAJ) PHASE-II PROJECTS

Environmental Remedial Measure Reference to Location Monitoring Monitoring Institutional Observation Observation Corrective Issue/Component laws/guideline indicators (MI)/ Methods Responsibility during the during action and Performance reporting reporting follow up if Target (PT) period period required Implementation Supervision Environmental Management Plan Compliance Status of Package-4 facilitate the quick passage of rainwater and avoid flooding. 6. Flora 6.1 Vegetation  Planted trees, shrubs, Forest Project tree MI: Tree/plants Records and SHAJ/JFM/Forest SHAJ/JFM/Forest Not Applicable - and grasses to be Conservation Act plantation sites survival rate field Department Department properly maintained 1980 observations.  The tree survival audit to PT: Minimum rate Information be conducted at least of 70% tree from Forestry once in a year to assess survival Department the effectiveness 7. Maintenance of Right of Way and Safety 7.1 Accident Risk due  Efforts shall be made to Project Throughout the MI: Presence and Visual SHAJ SHAJ Not Applicable - to uncontrolled growth make shoulder requirement IRC: Project route extent of inspection of vegetation completely clear of SP:21-2009 vegetation growth vegetation. on either side of Check  Minimum offset as road. Number of accident prescribed in IRC:SP:21- accidents. PT: No records 2009 to be maintained accidents due to  Regular maintenance of vegetation growth plantation along the roadside  No invasive plantation near the road. 7.2 Accident risks  Traffic control measures, IRC:SP:55-2014 Throughout the MI: Number of Review SHAJ SHAJ Not Applicable - associated with traffic including speed limits, Project route accidents accident movement will be enforced strictly. Conditions and records  Further encroachment of existence of safety squatters within the signs, rumble Site ROW will be prevented. strips etc. on the observations  No school or hospital will road be allowed to be Presence/absence established beyond the of sensitive stipulated planning line receptor structures as per relevant local law inside the  Monitor/ensure that all stipulated planning safety provisions line as per relevant local law

TPF GETINSA EUROESTUDIOS S.L. in Joint Venture with RODIC CONSULTANTS PVT LTD In Association with EUROESTUDIOS INDIA Pvt. Ltd.

Page 142 of 178

STATE HIGHWAYS AUTHORITY OF JHARKHAND (SHAJ) PHASE-II PROJECTS

Environmental Remedial Measure Reference to Location Monitoring Monitoring Institutional Observation Observation Corrective Issue/Component laws/guideline indicators (MI)/ Methods Responsibility during the during action and Performance reporting reporting follow up if Target (PT) period period required Implementation Supervision Environmental Management Plan Compliance Status of Package-4 included in design and construction phase are PT: Fatal and non properly maintained fatal accident rate  Highway patrol unit(s) for is reduced after round the clock improvement patrolling. Phone booth for accidental reporting and ambulance services with minimum response time for rescue of any accident victims, if possible.  Tow-way facility for the breakdown vehicles if possible. 7.3.Transport of  Existence of spill - Throughout the MI: Status of Review of spill SHAJ SHAJ Not Applicable - Dangerous Goods prevention and control project stretch emergency prevention and emergency system – whether and responsive system operational or not emergency  Emergency plan for response plan vehicles carrying PT: Fully Spill accident hazardous material functional records emergency system

TPF GETINSA EUROESTUDIOS S.L. in Joint Venture with RODIC CONSULTANTS PVT LTD In Association with EUROESTUDIOS INDIA Pvt. Ltd.

Page 143 of 178 STATE HIGHWAYS AUTHORITY OF JHARKHAND (SHAJ)

PHASE-II PROJECTS

5.0 Monitoring of environmental receptors/ attributes (e.g. ambient air, surface water, ground water, land, ecological aspects, noise, hazardous/toxic wastes, etc.) 12. The ADB approved Environmental Monitoring plan is given in Table-10. The monitoring has been carried out during the reporting period. Table-10: Environmental Monitoring plan

Frequency Corrective action Env. Project Method/ Observation during Parameters Location and Standards Implementation Supervision and follow up if Indicators Stage Guidelines the reporting period Duration required Active construction site and representative Contractor . High volume 24 hr sample each for Air quality through Environmental Construction sampler to be continuous, residential, standard by approved SHAJ /CSC monitoring has been NA stage located 50 m 3/year for 3 commercial CPCB monitoring carried out during this from the years and industrial area agency reporting period selected PM 10 PM2.5 (Total 4 Locations)- Air Quality locations in the SO2, NOX, CO Each Road Downwind Representative direction. Use sample method 24 hr SHAJ through each for residential, Water quality Operation specified continuous, approved commercial and standard by SHAJ NA stage by CPCB 3/year for 1 monitoring industrial area CPCB year agency (4 Locations)- Each Road Grab sample collected from Groundwater at Ground water: source and Construction Contractor (IS:10500:1991) Environmental analyses as per Camps and Surface Water quality through Construction And Surface 3/year for 3 monitoring has been Standard water of Perennial standard by approved SHAJ /CSC NA stage water criteria for years carried out during this Methods Rivers/Ponds (3 CPCB monitoring Freshwater reporting period for Examination Samples) – Each agency classification Water of Water and Road Quality Wastewater Groundwater at 1 locations and SHAJ through surface water at 2 Air quality Operation 3/year for 1 approved locations and standard by SHAJ NA stage year monitoring pond developed CPCB agency due to Borrows areas – Each Road

TPF GETINSA EUROESTUDIOS S.L. in Joint Venture with RODIC CONSULTANTS PVT LTD In Association with EUROESTUDIOS INDIA Pvt. Ltd.

Page 144 of 178

STATE HIGHWAYS AUTHORITY OF JHARKHAND (SHAJ) PHASE-II PROJECTS

Frequency Corrective action Env. Project Method/ Observation during Parameters Location and Standards Implementation Supervision and follow up if Indicators Stage Guidelines the reporting period Duration required Construction site, National and 1each at Ambient IS:4954-1968 residential, Contractor 24 hr Noise Environmental as adopted by commercial and through Construction continuous, Standard monitoring has been CPCB for Sensitive locations approved SHAJ /CSC NA stage Equivalent 3*/year for 3 specified in carried out during this Identified along the monitoring Noise levels on years Environment reporting period Noise levels Study Area alignment. agency dB (A) scale for Protection CPCB/IS:4954- (4Locations) Each day and night Act, 1986 1968Using Road Noise Near Sensitive SHAJ through Operation level meter locations and 3 / year for 1 approved SHAJ NA stage residential areas yea monitoring (4 Locations) agency Camp, Dumping Once during As specified by and HMP sites whole Contractor the site Environmental NPK (ICAR Each Road At oil construction through Construction engineer ICAR monitoring has been standard ) and spillage locations stage Once approved SHAJ /CSC NA stage SHAJ / standard carried out during this heavy metals and other probable for the first monitoring Supervision reporting period soil contamination year of agency Consultants location operation Soil Quality Throughout the Project SHAJ through Corridor especially Operation 3 / year for 1 CPCB approved Oil and grease at River banks, SHAJ NA stage yea standard monitoring bridge locations agency and river training structures The contractor and CSC have been Visual suggested to follow the Visual check for Construction After first Checks ADB approved EMP Soil erosion and Contractor SHAJ/CSC Being Complied stage rain and IRC guidelines to Soil Erosion Visual check for siltation control soil erosion Soil erosion and wherever noticed along siltation the project road.

Once during Operation operation of Visual Engineering Team of SHAJ NA stage 1st Checks year Drainage Construction Visual check for Throughout the Once in a None The contractor and IRC guidelines Contractor' SHAJ/CSC Being Complied Congestion stage Soil erosion and Project year Specific CSC have been

TPF GETINSA EUROESTUDIOS S.L. in Joint Venture with RODIC CONSULTANTS PVT LTD In Association with EUROESTUDIOS INDIA Pvt. Ltd.

Page 145 of 178

STATE HIGHWAYS AUTHORITY OF JHARKHAND (SHAJ) PHASE-II PROJECTS

Frequency Corrective action Env. Project Method/ Observation during Parameters Location and Standards Implementation Supervision and follow up if Indicators Stage Guidelines the reporting period Duration required siltation Corridor especially before rainy suggested to follow the Probable drainage season ADB approved EMP congestion areas and IRC guidelines to ensure congestion free drainage system all along the project road. Once in a Operation year None SHAJ NA stage before rainy Specific season The contractor and CSC has been suggested to strictly IRC follow the ADB guidelines + Contractor with Construction Borrow areas to be Once in a approved EMP and IRC Visual check IRC guidelines Compliance approval from SHAJ/CSC Being Complied stage operated month guidelines to ensure Borrow conditions of SHAJ, SHAJ necessary permits and Areas SEIAA EMP OPM for borrow area operations in across the packages. Rehabilitation Quarterly for Operation Closed Borrow Visual check As per IRC 1 SHAJ NA stage Areas guidelines year The contractor and Construction Hygiene, Rapid audit as Quarterly Construction Sites Contractor with CSC has been Sites and Construction drainage per during IRC and approval from SHAJ/CSC Being Complied suggested to follow the Labour stage Medical reporting construction guidelines Camp SHAJ, SHAJ ADB approved EMP Camp Facilities Etc. format period and IRC guidelines During site Compensatory: SHAJ/Local Throughout the Tree Construction Surveillance monitoring of trees clearance in Forest Departments Project NA NA Plantation stage felling construction Additional Plantation: Contractor Section phase through JFM As The Engineer will be responsible suggested for monitoring up to the Defect by Forest Throughout the Once in a Liability Period in any particular Operation Audit for survival rate of trees Dept. Project year for stretch. After this period SHAJ NA NA stage plantation Section years through maintenance contractor will be responsible for monitoring involving JFM

TPF GETINSA EUROESTUDIOS S.L. in Joint Venture with RODIC CONSULTANTS PVT LTD In Association with EUROESTUDIOS INDIA Pvt. Ltd.

Page 146 of 178

STATE HIGHWAYS AUTHORITY OF JHARKHAND (SHAJ) PHASE-II PROJECTS

Frequency Corrective action Env. Project Method/ Observation during Parameters Location and Standards Implementation Supervision and follow up if Indicators Stage Guidelines the reporting period Duration required Throughout the The contractor and stretch including occurrence As CSC has been Record of Construction Type, nature and cause of construction sites, of suggested Contractor SHAJ/CSC Being Complied suggested to follow the Accident stage accidents. crusher, diversions, accidents by PMC/SC ADB approved EMP Methodology as suggested by HMP, earthwork, and IRC guidelines CSC demolition site etc. and approved by SHAJ occurrence Operation Throughout the Road Safety unit of SHAJ with of NA NA stage stretch support from local police accidents The contractor and Elephant- Nature and cause of collision, Elephant Crossing occurrence CSC has been Construction Vehicle season, Month and time of Locations as of Being Complied suggested to follow the stage Collisions* collision. identified in IEE collision ADB approved EMP and MoEF guidelines 1. Success of road furniture’s viz. As rumble strip, cautionary signage’s SHAJ in coordination with forest Continuous suggested etc. designed for safe movement department or through an during Oct- by forest 2. Nature and cause of collision, specialized wildlife expert team Elephant Crossing Nov and Jul- department Operation season, Month and time of Locations as Aug and NA NA stage collision identified in IEE random 3. Monitoring of movement path visits during based on information’s available re with Forest department and local people. 13. Besides regular on-site monitoring for the implementation of Environmental Management Plan, air quality, water quality, noise levels and soil quality were required to be monitored to check any adverse impact due to construction activities and to ensure that plants and machineries working on project do not pollute the surrounding environment. The Contractors have hired the services of environmental monitoring laboratories; accredited by NABL/MOEF&CC to monitor the environmental parameters like air, noise and water quality parameters as per the agreed Environmental Monitoring Plan. 14. In air quality the parameters monitored include PM10, PM2.5, SO2, NOx, and CO. The water quality parameters include temperature, pH, EC, TDS, BOD, COD, Hardness, Calcium, Magnesium, Chloride, Sulphate, total coliform, etc. The parameters monitored are also compared with the Bureau of Indian Standard. The details of parameters being monitored by Environmental Monitoring Agency are given below in Table 11.

TPF GETINSA EUROESTUDIOS S.L. in Joint Venture with RODIC CONSULTANTS PVT LTD In Association with EUROESTUDIOS INDIA Pvt. Ltd.

Page 147 of 178

STATE HIGHWAYS AUTHORITY OF JHARKHAND (SHAJ) PHASE-II PROJECTS

15. Air Quality: Monitored 24 hourly parameters of ambient air quality are within the prescribed limits of National Ambient Air Quality Standard (NAAQS) and Central Pollution Control Board (CPCB). However, particulate matter (PM10) was observed slightly higher at Plant Yard (Stone Crusher & WMM Plant). Increased level can be attributed to proximity to industrial activity, poor road conditions and high traffic density. 16. Water Quality: Monitored parameters largely conforms to the drinking water standards (IS:10500-1991) prescribed by Bureau of Indian Standard. Some of the parameters like total dissolved solids (TDS), total hardness and alkalinity were found to be slightly high but are well within maximum permissible limit for water quality 17. Noise Level: Noise level monitoring indicates that the noise level mostly meets the prescribed noise standards for all land use categories viz. commercial, industrial as well as residential zones. Slight increase noise level may be attributed to construction activity, high traffic density, low maintenance of vehicles, frequent honking due to congestion, and use of low grade fuel.

TPF GETINSA EUROESTUDIOS S.L. in Joint Venture with RODIC CONSULTANTS PVT LTD In Association with EUROESTUDIOS INDIA Pvt. Ltd.

Page 148 of 178

STATE HIGHWAYS AUTHORITY OF JHARKHAND (SHAJ) PHASE-II PROJECTS

ENVIRONMENTAL MONITORING DATA Table-11: Environmental Monitoring Data AMBIENT AIR QUALITY MONITORING AT WORKING SITES

Parameters Pkg Monitoring location Monitoring stage Date of Monitoring SO2 NO2 PM2.5 PM10 Co3 μg/m3 μg/m3 μg/m3 μg/m3 μg/m3 HMP & Batching Plant, Jamua Construction 23.12.2017 31.30 37.60 32.00 72.00 Stone Crusher, WMM, Jamua Construction 23.12.2017 35.00 36.40 45.00 82.00 Near Office, Jamua Construction 23.12.2017 24.90 32.80 29.00 65.00 Near Weigh Bridge Construction 22.03.2017 - 23.03.2017 31.09 37.60 85.87 294.84 Pkg 2 Near WMM Plant Construction 22.03.2017 - 23.03.2017 29.03 36.44 85.77 308.66 Near Administation Building & Laboratory Construction 22.03.2017 - 23.03.2017 24.91 32.52 80.01 283.41 Near Entrance Construction 02.09.2017 20.44 27.31 59.17 25m North-East 120 degree from work zone Construction 02.09.2017 19.79 27.74 63.18 25m South-West Boundary Wall at 120 degree from work zone Construction 02.09.2017 20.79 27.23 61.84 Barakar Bridge Construction 08.02.2017-09.02.2017 12.31 20.37 18.21 78.36 Pkg 3 Camp Area Construction 07.02.2017-08.02.2017 10.34 15.32 28.41 73.29 Usri Bridge Construction 08.02.2017-09.02.2017 13.51 21.56 19.83 74.83

TPF GETINSA EUROESTUDIOS S.L. in Joint Venture with RODIC CONSULTANTS PVT LTD In Association with EUROESTUDIOS INDIA Pvt. Ltd.

Page 149 of 178

STATE HIGHWAYS AUTHORITY OF JHARKHAND (SHAJ) PHASE-II PROJECTS

North side of the Stone mine Construction 01.03.2017-02.03.2017 29.98 27.33 73.90 294.36 South-west corner of the Crusher Construction 01.03.2017-02.03.2017 34.93 31.47 79.15 306.51 Near Office Construction 01.03.2017-02.03.2017 28.11 26.36 64.64 271.68 Near Office Construction 24.07.2017-25.07.2017 32.31 36.16 71.97 34.64 0.31 Near Staff Room Construction 24.07.2017-25.07.2017 33.83 41.19 80.85 39.93 0.29 Pkg 4 Near Batching Plant Construction 24.07.2017-25.07.2017 37.50 46.53 88.02 46.03 0.39 Near HMP & WMM, Saedba, Murhu Construction 24.07.2017-25.07.2017 37.81 45.25 87.02 49.43 0.44 Near Office Construction 29.12.2017-30.12.2017 29.38 33.88 31.68 71.38 0.42 Near Staff Room Construction 29.12.2017-30.12.2017 26.36 38.75 36.24 78.45 0.21 Near Batching Plant Construction 29.12.2017-30.12.2017 25.21 38.52 43.55 80.87 0.26

Near HMP & WMM, Saedba, Murhu Construction 29.12.2017-30.12.2017 32.50 33.64 46.75 83.87 0.35

TPF GETINSA EUROESTUDIOS S.L. in Joint Venture with RODIC CONSULTANTS PVT LTD In Association with EUROESTUDIOS INDIA Pvt. Ltd.

Page 150 of 178

STATE HIGHWAYS AUTHORITY OF JHARKHAND (SHAJ) PHASE-II PROJECTS

WATER QUALITY DATA

WATER QUALITY MONITORING (Package-01) Total Total Monitoring Nitrate Oil & Sulphate Calcium Iron Test Monitoring location Monitoring date pH Temp TSS TDS BOD COD Chloride Hardness as 2+ Mag Alkalinity stage NO3 Grease Ca CaCO3 (as SO4) Fe (CaCO3) Surface Water NALLA OUTLET Construction 28.12.2017 – 30.12.2017 7.6 121.9 1.6 16 80 6 0.2 112 Ground Water 17 CAMP SITE Construction 28.12.2017 – 30.12.2017 7.9 202 1.2 140 10 0.1 80 Pond Water 18 CAMP (BORO AREA) Construction 28.12.2017 – 30.12.2017 7.7 136 1.8 72 12 1 100

WATER QUALITY MONITORING (Package-02) Total Total Monitoring Nitrate Oil & Sulphate Calcium Iron Test Monitoring location Monitoring date pH Temp TSS TDS BOD COD Chloride Hardness as 2+ Mag Alkalinity stage NO3 Grease Ca CaCO3 (as SO4) Fe (CaCO3) Surface Water BASE CAMP Construction 23.12.2017 6.2 42 14 55 3.2 BASE CAMP Construction 23.12.2017 6.9 158 10.4 102.08 5.15 28.35 0.1 Ground Water NEAR CANTEEN Construction 21.03.2017 6.75 237.1 10.2 106.08 200 75 0.07 10.4 103.4

WATER QUALITY MONITORING (Package-03) Total Total Monitoring Nitrate Oil & Sulphate Calcium Iron Test Monitoring location Monitoring date pH Temp TSS TDS BOD COD Chloride Hardness as 2+ Mag Alkalinity stage NO3 Grease Ca CaCO3 (as SO4) Fe (CaCO3) ND CANTEEN - CAMP AREA Construction 11.02.2017-20.02.2017 7.4 24 272 0.9 4.9 139.4 7.8 34 13.2 186 Drinking Water (DL0.01) BOREWELL Construction 11.02.2017-20.02.2017 8.6 24 94 647 2.6 35.6 0.6 15.6 <4 67 376

TPF GETINSA EUROESTUDIOS S.L. in Joint Venture with RODIC CONSULTANTS PVT LTD In Association with EUROESTUDIOS INDIA Pvt. Ltd.

Page 151 of 178

STATE HIGHWAYS AUTHORITY OF JHARKHAND (SHAJ) PHASE-II PROJECTS

WATER QUALITY MONITORING (Package-04) Total Total Monitoring Nitrate Oil & Sulphate Calcium Iron Test Monitoring location Monitoring date pH Temp TSS TDS BOD COD Chloride Hardness as 2+ Mag Alkalinity stage NO3 Grease Ca CaCO3 (as SO4) Fe (CaCO3) Surface Water Anidih Nala Ch. 11+500 Construction 24.07.2017-27.07.2017 6.64 24.6 72.6 308.4 16 60.24 20.06 104.04 <4.0 16.07 31.07 0.07 6.44 75.21 Surface Water Anidih Nala Ch. 10+500 Construction 24.07.2017-27.07.2017 6.70 24.7 80.3 322.1 19 70.28 18.1 106.08 <4.0 15.51 32.7 0.06 5.95 77.39 Surface Water Tajna River Ch. 6+000 Construction 24.07.2017-27.07.2017 6.89 24.7 85.1 286.4 14 50.2 17.61 97.92 <4.0 14.8 30.25 0.07 5.45 70.85 Ground Water Near HMP Construction 24.07.2017 6.79 262.7 26.91 124.44 17.06 39.25 0.08 6.44 76.30 Ground Water Near Staff Room Construction 24.07.2017 6.85 255.2 22.01 114.24 16.21 35.98 0.06 5.95 83.93 Ground Water Near Office Construction 24.07.2017 6.76 243.5 22.09 108.12 15.79 34.34 0.08 5.45 74.12 Ground Water Near HMP Construction 29.12.2017 6.85 274.7 24.14 134.64 18.3 42.52 0.07 6.94 79.18 Ground Water Near Staff Room Construction 29.12.2017 6.8 264.3 19.71 122.4 14.76 38.43 0.06 6.44 81.32 Ground Water Near HMP Construction 23.03.2017 6.77 251.4 21.04 120.36 15.92 37.61 0.08 6.44 74.20 Ground Water Near Office Construction 29.12.2017 6.83 249.4 24.64 116.28 16.27 35.98 0.09 6.44 78.11

TPF GETINSA EUROESTUDIOS S.L. in Joint Venture with RODIC CONSULTANTS PVT LTD In Association with EUROESTUDIOS INDIA Pvt. Ltd.

Page 152 of 178

STATE HIGHWAYS AUTHORITY OF JHARKHAND (SHAJ) PHASE-II PROJECTS

NOISE QUALITY DATA TABLE NOISE QUALITY MONITORING AT WORKING SITES

Day Night Package Sampling location Implementation stage Date of Monitoring Time/Max Time/Min Leq dB(A) Leq dB(A) Near Rani Sonawati School, Nonihat Construction 26.12.2017 – 27.12.2017 58.50 45.25 Near Jawahar Navodaya Vidyalaya (Hansdiha) Construction 26.12.2017 – 27.12.2017 63.00 44.00 Package 1 Near Camp 17 Construction 26.12.2017 – 27.12.2017 65.10 45.30 Near Barhet Swasth Ukendra Construction 26.12.2017 – 27.12.2017 57.60 43.25 Batching & HMP, Jamua Construction 23.12.2017 60.35 Near Office, Jamua Construction 23.12.2017 51.85 WMM & Crusher Plant, Jamua Construction 23.12.2017 61.15 Package 2 Near Entrance Construction 31.08.2017-01.09.2017 64.00 48.00 25m North-East 120 degree from work zone Construction 31.08.2017-01.09.2017 60.00 45.00 25m South-West Boundary Wall at 120 degree from work zone Construction 31.08.2017-01.09.2017 62.00 49.00 Barakar Bridge Construction 08.02.2017-09.02.2017 75.00 70.00 Camp Area Construction 07.02.2017-08.02.2017 75.00 70.00 Package 3 Usri Bridge Construction 08.02.2017-09.02.2017 75.00 70.00 Crusher Unit Construction 07.02.2017-08.02.2017 75.00 70.00 North side of the Stone mine Construction 27.02.2017 78.00 60.40 South-west corner of the Crusher Construction 27.02.2017 87.70 66.70 Near Office Construction 27.02.2017 72.30 57.90 Near Office Construction 21.07.2017-22.07.2017 78.90 54.20 Near Staff Room Construction 21.07.2017-22.07.2017 80.10 52.00 Package 4 Near Batching Plant Construction 21.07.2017-22.07.2017 79.10 56.30 Near HMP & WMM, Saedba, Murhu Construction 21.07.2017-22.07.2017 79.30 61.00 Near Office Construction 27.12.2017-28.12.2017 76.60 52.30 Near Staff Room Construction 27.12.2017-28.12.2017 76.70 50.50 Near Batching Plant Construction 27.12.2017-28.12.2017 78.20 53.70 Near HMP, Saedba, Murhu Construction 27.12.2017-28.12.2017 74.80 54.90

TPF GETINSA EUROESTUDIOS S.L. in Joint Venture with RODIC CONSULTANTS PVT LTD In Association with EUROESTUDIOS INDIA Pvt. Ltd.

Page 153 of 178

STATE HIGHWAYS AUTHORITY OF JHARKHAND (SHAJ) PHASE-II PROJECTS

SOIL QUALITY DATA

Package Package-2 Monitoring Location Near Garage Monitoring Stage Construction Date of Monitoring 24.03.2017-25.03.2017 pH 5.38 Moisture Content (%) 2.10 Organic matter (%) 4.42 Organic Carbon (%) - Chloride (%) 3.45 Iron (%) 0.22 Mag (meq/100gm) - Calcium (meq/100gm) - Texture - Gravel/Sand/Silt/Clay (%) Porosity (%) -

Parameters Bulk Density (g/cm3) - Water Holding Capacity (%) - Conductivity (μg/cm) - Alkalinity (%) - Sodium (ppm) - Potassium (kg/acre) - SAR (meq/l) - Nitrogen (Kg/Acre) - Salinity (μg/cm) -

TPF GETINSA EUROESTUDIOS S.L. in Joint Venture with RODIC CONSULTANTS PVT LTD In Association with EUROESTUDIOS INDIA Pvt. Ltd.

Page 154 of 178 STATE HIGHWAYS AUTHORITY OF JHARKHAND (SHAJ)

PHASE-II PROJECTS

6.0 Any other environmental aspects, impacts observed during implementation which were not covered earlier 18. During the project implementation stage, Jamua bypass of length 1.867 km has been proposed under “Pachamba-Jamua-Sarwan road” (RD-02) and due to change of scope, the addendum to ADB-approved IEE report is being prepared. 7.0 Details of Grievance Redress Committee and complaints received from public and actions taken thereof to resolve 19. For addressing safeguard related (Environment and Social) grievances and issues under Second Jharkhand state Road project, Grievance Redress committees have been formed at PIU level and State level in September 2016 and May 2017, respectively. Objective of the committee is to facilitate displaced / affected persons in registering their grievances at the PIU level. A complaint register will be maintained at PIU level to facilitate ease of access of the DPs / APs to the grievance redress mechanism. The details related to the date of complaint, complaint, date of personal hearing, action taken and date of communication sent to complainant will be recorded. This complaint register has been initiated at the PIU level. For addressing complaints of major concern a grievance redressal committee at State / SHAJ level has also been constituted in May 2017. 20. Constitution / members of Grievance Redress committee at PIU level:

1. DGM (PIU) SHAJ -Chairman 2. A representative from local NGOs or a local person of repute and standing in the society, elected representative from Zila Parisad –Member 3. One representatives from the affected village -Member 4. A representative for women from a relevant agency which could be from the government, or NGO or local community -Member 5. A representative from IP community or NGO for IP related issue-Member Representative of sl. no.2 to 5 will be selected by District level Task force committee.

21. Constitution / members of Grievance Redress committee at SHAJ level:

3. Member Administration SHAJ –Chairman 4. Member Technical SHAJ –Member 5. General Manager / Project Director SHAJ – Member 6. District Land Acquisition Officer – Member 7. A representative from IP community or NGO for IP related issue - Member 8. A representative from relevant NGO – Member 22. Copy of GRC Constitution at PIU level and GRC constitution at State level is given in Appendix- 1 8.0 Disclosure of Documents 23. The summary of initial environmental examination (IEE) report is being translated by SHAJ in local language through Rajbhasha Vibagh (State Language Department). Once it gets translated the soft/hard copy of this report shall be made available at (i) each Gram Panchayat office along the sub-project corridors; and (ii) site offices of PIU /CSCs /civil works contractors (iii) official website of SHAJ.

TPF GETINSA EUROESTUDIOS S.L. in Joint Venture with RODIC CONSULTANTS PVT LTD In Association with EUROESTUDIOS INDIA Pvt. Ltd.

Page 155 of 178

STATE HIGHWAYS AUTHORITY OF JHARKHAND (SHAJ) PHASE-II PROJECTS

9.0 Public consultation during project implementation

24. In accordance with ADB’s Safeguard Policy Statement (SPS) 2009 and Environment Impact Assessment Notification of GoI (2006), extensive consultations and public participations are continuously being made by the SHAJ & CSC until the time of report writing. Consultations have been undertaken with project beneficiaries, local/ government officials, community leaders, non- government organizations (NGO’s), stakeholders in the corridor of impact and people likely to be effected due to the project on various issues affecting them. Various measures have been incorporated pertaining to environmental issues based on the responses from the people. Objectives of Consultations 25. The process of public participation/ consultations was taken up as an integral part of the project in accordance with environmental assessment requirements. The objectives of these consultations are:

• To inform and educate the common public, especially potentially impacted communities/ individuals and stakeholders about the proposed project activities; • To familiarize the people with technical, environmental, social and economic issues of the project for better understanding; • To solicit the opinion of the affected communities/ individuals on environmental issues and assess the significance of impacts due to the proposed development; • To foster cooperation among officers of SHAJ, the contractors, the communities and the stakeholders to achieve a cordial working relationship for smooth implementation of the project; • To identify the environmental issues relating to the road, bridge and approach roads construction work; • Assess the views of the beneficiary communities and their willingness to participate in the project in a bottom up planning and decision making process; • To secure people’s inputs in respect of project planning, selection of mitigation measures and monitoring strategies; • To inculcate the sense of belongingness among the public about the project.

Methodology used for Consultations 26. The informal modes of consultations were used in the public consultation process for the project. In addition, focused ground discussions (FGDs) and personal discussions with officials, on-site discussion with project affected stakeholders, and reconnaissance visits have also been made to the project area. Attempts were made to encourage participation in the consultation process of the government officials from different departments that have relevance to the project. Same way, local people from different socioeconomic backgrounds in the villages as well as urban areas along the proposed approach road alignment, women, and residents near the proposed alignment, local commuters, and other concerned were also consulted. 27. The Public Consultation during the reporting period of this report during implementation between January to December 2017 have been carried out and some details of the same are given in Table 12. The details of public consultation such as sample attendance sheet and photographs are also given in Appendix-1. The public consultation shall be done at regular intervals and the details for all packages are being maintained in office records.

TPF GETINSA EUROESTUDIOS S.L. in Joint Venture with RODIC CONSULTANTS PVT LTD In Association with EUROESTUDIOS INDIA Pvt. Ltd.

Page 156 of 178

STATE HIGHWAYS AUTHORITY OF JHARKHAND (SHAJ) PHASE-II PROJECTS

Table 12: Public consultation carried during reporting period January-December 2017 Date Location Issues discussed Outcomes of public Consultation 13.02.2017 Tundi Relocation of Mahaveer Temple, Peoples are ready to Devi Sthan and Kali Sthan relocate the temple Dust generation during earth work

15.02.017 Kanhaidih Land records updated in 2013. Micro Plan prepared for the People are in possession. So, Affected Families. treated as affected family and Contractor instructed to Lachchuraidih micro plan prepared for them. strengthen safety measures. Safety measures, barricading and caution boards. Maharajganj 25.02.2017 Kapastand Land records updated in 2013. Micro Plan prepared for the People are in possession. So, Affected Families. treated as affected family and Contractor given appropriate micro plan prepared for them. instructions Involvement of locals in project.

22.02.2017 Behra Land records updated in 2013. Micro Plan prepared for the People are in possession. So, Affected Families. treated as affected family and Contractor given appropriate micro plan prepared for them. instructions Need of safety measures. Cleanliness. 03.03.2017 Tundi Relocation of Tundi Mahaveer Village Level Committee Temple formed. The committee agreed to relocate the temple to another place 07.04.2017 Kolher Relocation of Mahaveer Temple. Boundary wall affected. Safety measures Ready to rebuild the wall.

10.04.2017 Lodhariya Land records updated in 2013. Micro Plan prepared for the People are in possession. So, Affected Families. treated as affected family and micro plan prepared for them Mahtodih 12.05.2017 Chatro Relocation of Mahaveer temple of Issue resolved, ready for Chatro relocation

06.06.2017 Jiyajori Regarding land acquisition and Committee formed. payment of compensation Contractor instructed for Safety issues. improving safety

Dhadhkitand

TPF GETINSA EUROESTUDIOS S.L. in Joint Venture with RODIC CONSULTANTS PVT LTD In Association with EUROESTUDIOS INDIA Pvt. Ltd.

Page 157 of 178

STATE HIGHWAYS AUTHORITY OF JHARKHAND (SHAJ) PHASE-II PROJECTS

20.06.2017 Kolhar Project related issues like dumping Issues resolved. Contractor of debris and construction waste given appropriate Safety and precaution relation instructions. issues. 04.07.2017 Bhagnahir Land records updated in 2013. Micro Plan prepared for the People are in possession. So, Affected Families. treated as affected family and micro plan prepared for them Bhursabank 02.11.2017 Rajpura Formation of Village Level Village Level committee Committee for TH formed Regarding Awareness for Villagers became acquainted Safeguard and R&R policy of R&R policy. Explained about the assistance amount and procedure. 13.11.2017 Nawadih Formation of Village Level Village Level committee Committee for TH formed Regarding Awareness for Villagers became acquainted Safeguard and R&R policy of R&R policy 17.11.2017 Pariyana Formation of Village Level Village Level committee Committee for TH formed Regarding Awareness for Villagers became Safeguard and R&R policy acquainted of R&R policy 24.11.2014 Qazi Magha Villagers became acquitted Construction of Jamua Bypass about proposed bypass Tree Cutting and RR issues benefits 05.12.2017 Ranidih Village Level committee Formation of Village Level formed Committee for TH Villagers became Regarding Awareness for R&R acquainted of R&R policy policy

14.12.2017 Dharchachi Formation of Village Level Village Level committee Committee for TH formed Regarding Awareness for R&R Villagers became acquainted policy of R&R policy 19.12.2017 Khawa Formation of Village Level Village Level committee Committee for TH formed Regarding Awareness for R&R Villagers became acquainted policy of R&R policy 28. HIV/AIDS awareness and health checking campaign organised with the aim to reduce transmission risk of HIV infection among the construction workers and population living along the project roads by all the Contractors. Contractors of Package-3 organised such programmes at their construction camp sites through designated agencies during reporting period. Date and location of conducted HIV/AIDS awareness program and photographs of campaigns are provided in Annexure-II.

TPF GETINSA EUROESTUDIOS S.L. in Joint Venture with RODIC CONSULTANTS PVT LTD In Association with EUROESTUDIOS INDIA Pvt. Ltd.

Page 158 of 178

STATE HIGHWAYS AUTHORITY OF JHARKHAND (SHAJ) PHASE-II PROJECTS

10.0 Institutional set-up for EMP implementation

29. To enhance the effective implementation of proposed mitigation measures and monitoring the resultant effects, the Environmental Management Cell as established for SJSRP is depicted in Figure No.-2 and Table-13.

Figure No.-2: Organisation Chart for EMP Implementation

Table-13: SJSRP, Environmental Management Cell EHS Personal Name Designation Date of joining SHAJ Mr. V.K. Jha DGM (Env & Safety) Since Inception of Project SHAJ Mr. Ashwin Pawan Kujur Manager (Env & Safety) Since August 2017 PIU, Pkg-I Mr. Kundan Kumar Pandey Manager (Env & Safety) - PIU, Pkg-II & III Mr. Kumud Bandhu Poddar Manager (Env & Safety) - PIU, Pkg-IV Mr. Subodh Kumar Manager (Env & Safety) - September 2017 (Joined as CSC - TL Office Mr. Sakib N Qadri Environment Specialist replacement of Mr Manish Kumar) CSC - TL Office Dr. Alok Pandey Wild Life Expert April 2016 to March 2017 Contractor- Package 1 Md. Mutaque Ali HSE Engineer 2016 Contractor- Package 2 Mr. Priya Ranjan Sahoo HSE Engineer 2016 Contractor - Package 3 Mr. Shashi Kumar HSE Engineer Nov 2017 Contractor- Package 4 Mr. Vikas Tripathi HSE Engineer Mar 2017

TPF GETINSA EUROESTUDIOS S.L. in Joint Venture with RODIC CONSULTANTS PVT LTD In Association with EUROESTUDIOS INDIA Pvt. Ltd.

Page 159 of 178

STATE HIGHWAYS AUTHORITY OF JHARKHAND (SHAJ) PHASE-II PROJECTS

Sample Public Consultation Record Appendix 1

TPF GETINSA EUROESTUDIOS S.L. in Joint Venture with RODIC CONSULTANTS PVT LTD In Association with EUROESTUDIOS INDIA Pvt. Ltd.

Page 160 of 178

STATE HIGHWAYS AUTHORITY OF JHARKHAND (SHAJ) PHASE-II PROJECTS

Photographs of public consultation

Consultation with community at Bagodi Consultation with community at Bagodi

Consultation with community Consultation with community at Village Qazi Magha

TPF GETINSA EUROESTUDIOS S.L. in Joint Venture with RODIC CONSULTANTS PVT LTD In Association with EUROESTUDIOS INDIA Pvt. Ltd.

Page 161 of 178

STATE HIGHWAYS AUTHORITY OF JHARKHAND (SHAJ) PHASE-II PROJECTS

Community Consultation at Ranidih Community Consultation at Rajpiura

Community Consultation at Nawadih Community Consultation at Pariyana

TPF GETINSA EUROESTUDIOS S.L. in Joint Venture with RODIC CONSULTANTS PVT LTD In Association with EUROESTUDIOS INDIA Pvt. Ltd.

Page 162 of 178

STATE HIGHWAYS AUTHORITY OF JHARKHAND (SHAJ) PHASE-II PROJECTS

Community consultation at Gangapur (Giridih)

Public Consultation Meeting Mahobani, Durgadih and Tundi

TPF GETINSA EUROESTUDIOS S.L. in Joint Venture with RODIC CONSULTANTS PVT LTD In Association with EUROESTUDIOS INDIA Pvt. Ltd.

Page 163 of 178

STATE HIGHWAYS AUTHORITY OF JHARKHAND (SHAJ) PHASE-II PROJECTS

Sample Public Consultation Record

TPF GETINSA EUROESTUDIOS S.L. in Joint Venture with RODIC CONSULTANTS PVT LTD In Association with EUROESTUDIOS INDIA Pvt. Ltd.

Page 164 of 178

STATE HIGHWAYS AUTHORITY OF JHARKHAND (SHAJ) PHASE-II PROJECTS

Appendix-2 HIV AIDS & FREE HEALTH CAMP Package 3 Govinpur-Tundi-Giridih, Raod Project 05.06.2017

TPF GETINSA EUROESTUDIOS S.L. in Joint Venture with RODIC CONSULTANTS PVT LTD In Association with EUROESTUDIOS INDIA Pvt. Ltd.

Page 165 of 178

STATE HIGHWAYS AUTHORITY OF JHARKHAND (SHAJ) PHASE-II PROJECTS

Appendix-3 PHOTOGRAPHS OF EHS ORIENTATION & TRAININGS

EHS Orientation / Training at Package 3 EHS Orientation / Training at Package 3

EHS Orientation / Training at Package 4 EHS Orientation / Training at Package 4

Orientation/Training on PPE at site Orientation/Training on PPE at site

Appendix-4

TPF GETINSA EUROESTUDIOS S.L. in Joint Venture with RODIC CONSULTANTS PVT LTD In Association with EUROESTUDIOS INDIA Pvt. Ltd.

Page 166 of 178

STATE HIGHWAYS AUTHORITY OF JHARKHAND (SHAJ) PHASE-II PROJECTS

GRC Constitution at PIU level

TPF GETINSA EUROESTUDIOS S.L. in Joint Venture with RODIC CONSULTANTS PVT LTD In Association with EUROESTUDIOS INDIA Pvt. Ltd.

Page 167 of 178

STATE HIGHWAYS AUTHORITY OF JHARKHAND (SHAJ) PHASE-II PROJECTS

TPF GETINSA EUROESTUDIOS S.L. in Joint Venture with RODIC CONSULTANTS PVT LTD In Association with EUROESTUDIOS INDIA Pvt. Ltd.

Page 168 of 178

STATE HIGHWAYS AUTHORITY OF JHARKHAND (SHAJ) PHASE-II PROJECTS

Appendix-5 GRC Constitution at State /SHAJ level

TPF GETINSA EUROESTUDIOS S.L. in Joint Venture with RODIC CONSULTANTS PVT LTD In Association with EUROESTUDIOS INDIA Pvt. Ltd.

Page 169 of 178

STATE HIGHWAYS AUTHORITY OF JHARKHAND (SHAJ) PHASE-II PROJECTS

TPF GETINSA EUROESTUDIOS S.L. in Joint Venture with RODIC CONSULTANTS PVT LTD In Association with EUROESTUDIOS INDIA Pvt. Ltd.

Page 170 of 178

STATE HIGHWAYS AUTHORITY OF JHARKHAND (SHAJ) PHASE-II PROJECTS

Tree Cutting permission Appendix-6

TPF GETINSA EUROESTUDIOS S.L. in Joint Venture with RODIC CONSULTANTS PVT LTD In Association with EUROESTUDIOS INDIA Pvt. Ltd.

Page 171 of 178

STATE HIGHWAYS AUTHORITY OF JHARKHAND (SHAJ) PHASE-II PROJECTS

TPF GETINSA EUROESTUDIOS S.L. in Joint Venture with RODIC CONSULTANTS PVT LTD In Association with EUROESTUDIOS INDIA Pvt. Ltd.

Page 172 of 178

STATE HIGHWAYS AUTHORITY OF JHARKHAND (SHAJ) PHASE-II PROJECTS

TPF GETINSA EUROESTUDIOS S.L. in Joint Venture with RODIC CONSULTANTS PVT LTD In Association with EUROESTUDIOS INDIA Pvt. Ltd.

Page 173 of 178

STATE HIGHWAYS AUTHORITY OF JHARKHAND (SHAJ) PHASE-II PROJECTS

TPF GETINSA EUROESTUDIOS S.L. in Joint Venture with RODIC CONSULTANTS PVT LTD In Association with EUROESTUDIOS INDIA Pvt. Ltd.

Page 174 of 178

STATE HIGHWAYS AUTHORITY OF JHARKHAND (SHAJ) PHASE-II PROJECTS

TPF GETINSA EUROESTUDIOS S.L. in Joint Venture with RODIC CONSULTANTS PVT LTD In Association with EUROESTUDIOS INDIA Pvt. Ltd.

Page 175 of 178

STATE HIGHWAYS AUTHORITY OF JHARKHAND (SHAJ) PHASE-II PROJECTS

Sample Environmental Monitoring Test Reports Appendix -7

TPF GETINSA EUROESTUDIOS S.L. in Joint Venture with RODIC CONSULTANTS PVT LTD In Association with EUROESTUDIOS INDIA Pvt. Ltd.

Page 176 of 178

STATE HIGHWAYS AUTHORITY OF JHARKHAND (SHAJ) PHASE-II PROJECTS

TPF GETINSA EUROESTUDIOS S.L. in Joint Venture with RODIC CONSULTANTS PVT LTD In Association with EUROESTUDIOS INDIA Pvt. Ltd.

Page 177 of 178

STATE HIGHWAYS AUTHORITY OF JHARKHAND (SHAJ) PHASE-II PROJECTS

TPF GETINSA EUROESTUDIOS S.L. in Joint Venture with RODIC CONSULTANTS PVT LTD In Association with EUROESTUDIOS INDIA Pvt. Ltd.

Page 178 of 178