Second Jharkhand State Road Project: Environmental Monitoring Report
Total Page:16
File Type:pdf, Size:1020Kb
Environmental Monitoring Report Project Number: 49125-001 December 2018 Period: January 2017 – December 2017 IND: Second Jharkhand State Road Project Submitted by Project Management Unit, State Highways Authority of Jharkhand, Ranchi This report has been submitted to ADB by the Project Management Unit, State Highways Authority of Jharkhand, Ranchi and is made publicly available in accordance with ADB’s Public Communications Policy (2011). It does not necessarily reflect the views of ADB. This environmental monitoring report is a document of the borrower. The views expressed herein do not necessarily represent those of ADB's Board of Directors, Management, or staff, and may be preliminary in nature. In preparing any country program or strategy, financing any project, or by making any designation of or reference to a particular territory or geographic area in this document, the Asian Development Bank does not intend to make any judgments as to the legal or other status of any territory or area. lW Ranchi/Dat "d 5.t8 f V f STATE HIGHWAYS AUTHORITY OF JHARKHAND (SHAJ) PHASE-II PROJECTS Second Jharkhand State Road Project (SJSRP) ADB LOAN NO.: 3276-IND Annual Environmental Monitoring Report January 2017 to December 2017 STATE HIGHWAYS AUTHORITY OF JHARKHAND (SHAJ) TPF GETINSA EUROESTUDIOS S.L. Joint Venture with RODIC CONSULTANTS PVT LTD In Association with EUROESTUDIOS INDIA Pvt. Ltd. Improvement / Upgrading / Widening of: Package – 1 RD:01- Dumka-Hansdiha, 44.221Km, Ashoka Buildcon Limited. Package – 2 RD:02- Pachamba-Jamua-Sarwan, 45.175Km, GKC Projects Limited. Package – 3 RD:03- Govindpur-Tundi-Giridih, 43.550Km, Ashoka Buildcon Limited. Package – 4 RD:04- Khunti-Tamar, 43.697km, YFC Projects Limited. TPF GETINSA EUROESTUDIOS S.L. in Joint Venture with RODIC CONSULTANTS PVT LTD In Association with EUROESTUDIOS INDIA Pvt. Ltd. Page 1 of 178 STATE HIGHWAYS AUTHORITY OF JHARKHAND (SHAJ) PHASE-II PROJECTS TABLE OF CONTENTS Sl. Description Page No. 1 Introduction & Project Progress 4 Compliance status with National /State /Local statutory 2 8 environmental requirements Compliance status with the environmental covenants as 3 12 stipulated in the Loan Agreement Compliance status with environmental management and monitoring plans and environmental assessment and review 4 16 framework/procedures as stipulated in the environmental documentation as agreed with ADB Monitoring of environmental receptors/ attributes (e.g. ambient 5 air, surface water, ground water, land, ecological aspects, noise, 144 hazardous/toxic wastes, etc.) Any other environmental aspects, impacts observed during 6 155 implementation which were not covered earlier Details of Grievance Redress Committee and complaints 7 155 received from public and actions taken thereof to resolve 8 Public consultation during project implementation 155 9 Institutional set-up for EMP implementation 156 10 Follow-up actions and conclusions 159 List of Table: Table-01 Project Road Details 4 Table-02 Silent Feature and Progress as on December 2017 6 Table-03(a) Section wise forest detail in Package-II 7 Table-03(b) Section wise forest detail in Package-III 7 Table-04 Status of Statutory Compliances 9 Table-05 Compliance Status of Environmental Loan Covenants 12 Table-06 EMP Compliance of Package-I 16 Table-07 EMP Compliance of Package-II 47 Table-08 EMP Compliance of Package-III 77 Table-09 EMP Compliance of Package-IV 114 Table-10 ADB approved Environmental Monitoring Plan 144 Table- 11 Environmental Monitoring data 149 Table-12 Public Consultation carried out f till December 2017 156 Table-13 SJSRP Environmental Management Cell 159 List of Figure: Figure-1 Location Map of Project Road 5 Figure-2 Organization Chart for SJSRP 159 TPF GETINSA EUROESTUDIOS S.L. in Joint Venture with RODIC CONSULTANTS PVT LTD In Association with EUROESTUDIOS INDIA Pvt. Ltd. Page 2 of 178 STATE HIGHWAYS AUTHORITY OF JHARKHAND (SHAJ) PHASE-II PROJECTS List of Appendix: Appendix-1 Sample Public Consultation Record 160 Appendix-2 Sample HIV AIDS & Free Health Camp 165 Appendix-3 Photographs of EHS Orientation & Trainings 166 Appendix-4 Constitution of GRC at PIU Level 167 Appendix-5 Constitution of GRC at State / SHAJ Level 169 Appendix-6 Tree Cutting Permission 171 Appendix 7 Sample Environmental Monitoring Test Reports 176 TPF GETINSA EUROESTUDIOS S.L. in Joint Venture with RODIC CONSULTANTS PVT LTD In Association with EUROESTUDIOS INDIA Pvt. Ltd. Page 3 of 178 STATE HIGHWAYS AUTHORITY OF JHARKHAND (SHAJ) PHASE-II PROJECTS 1.0 INTRODUCTION 1. The Government of Jharkhand has planned a consistent upgrading of its road network through State Highways Authority of Jharkhand (SHAJ). The Second Jharkhand State Road Project (SJSRP) has been conceptualized to improve state highways connectivity in the State of Jharkhand which came into existence at the initiative by the Government of Jharkhand after the implementation of the JSRP projects. 2. The Detailed Project Reports (DPR) was prepared in 20014-15 by the DPR consultants based on that, a loan component US$200 Million has been provided to SHAJ. Further for implementing development of 4 selected priority State Highways under the external funding concept of Government of India the Government of Jharkhand has granted Loan under ID No. 3276 (INDIA). 3. The SHAJ projects have conceded into 4 separate contract packages as Package-1 to Package-4 under BOQ modality of financial loan assistance from the Asian Development Bank. All the four contract packages have been awarded to separate Contractors for development of respective sections of State Highways and Construction Supervision Consultant’s Services entrusted to M/s TPF GETINSA EUROESTUDIOS S.L. in Joint Venture with RODIC CONSULTANTS PVT LTD In Association with EUROESTUDIOS INDIA Pvt. Ltd. for all four contract packages. 4. The Second Jharkhand State Road Project (SJSRP) project includes widening and improvement of three exiting State Highways and one Major District Roads totalling 176.643 km located in Dumka, Godda, Giridih, Dhanbad, Khunti and Ranchi districts of Jharkhand State. The Project Details are given in Table-1 and the Location Map in Fig-1. Table-1: Project Road Details Pkg Road ID SH/MDR Description Length (KM) District Contractor Name I RD 01 SH-17 Dumka to Hansdiha 44.221 Dumka, Godda, Ashoka Buildcon Ltd. MDR-86 & II RD 02 Pachamba-Jamua- Sarwan 45.175 Giridih GKC Projects Ltd. 83 III RD 03 SH-13 Govindpur-Tundi- Giridih 43.550 Dhanbad, Giridih Ashoka Buildcon Ltd. IV RD 04 SH-3 Khunti to Tamar 43.697 Khunti, Ranchi YFC Projects Ltd. Total 176.643 TPF GETINSA EUROESTUDIOS S.L. in Joint Venture with RODIC CONSULTANTS PVT LTD In Association with EUROESTUDIOS INDIA Pvt. Ltd. Page 4 of 178 STATE HIGHWAYS AUTHORITY OF JHARKHAND (SHAJ) PHASE-II PROJECTS Fig-1: Location Map of Project Roads 5. The Annual Environmental Monitoring Report (EMR) has been prepared to ensure the supervision and monitoring of the Contractors obligations is being carried out in accordance with the Contractors Contract Agreement and to apprise Employer and Asian Development Bank about the Contractors EMP implementation at each Contract Project sites. 6. The EMR covers the implementation of various parameters of Environmental Management Plan (EMP), and Construction safety during the Project Implementation for the Period January 2017 to December 2017. 7. As per ADB’s Safeguard Policy Statement (2009) and the Environmental assessment guidelines 2003 all the four packages have been categorised as Category-“B”. 8. The salient feature and progress as on December 2017 is given in Table-2. TPF GETINSA EUROESTUDIOS S.L. in Joint Venture with RODIC CONSULTANTS PVT LTD In Association with EUROESTUDIOS INDIA Pvt. Ltd. Page 5 of 178 STATE HIGHWAYS AUTHORITY OF JHARKHAND (SHAJ) PHASE-II PROJECTS Table-2: Salient Feature and Progress as on December 2017 Package 2 Package 3 S/ Status of Package 1 Dumka- Package 4 Pachamba- Gobindpur-Tundi- N Road Projects Hansdiha Khunti-Tamar Jamua-Sarwan Giridih Total Length 1 44.221 45.175 43.55 43.697 (km) Ashoka Buildcon 2 Contractor Ashoka Buildcon Ltd. GKC Projects Ltd YFC Projects Ltd Ltd. Contract Sign 3 11.03.2016 11.04.2016 11.03.2016 03.05.2016 Date Commenceme 4 01.08.2016 15.09.2016 01.08.2016 12.09.2016 nt date Scheduled 5 date of 01.08.2019 14.09.2019 01.08.2019 11.09.2019 completion Contract 6 2,114,905,455.00 1,701,015,184.00 1,901,047,663.00 1,514,296,367.00 Amount (Rs.) Village- Tikha Village- Tarbandha Village- Lodharia Village- Simbukel Magha at Km at Km 17+000, at Km 17+000, at Km 03+420, 37+300, Installation Installation of Installation of Installation of 7 Camp Details of Base Camp and Base Camp and Base Camp and Base Camp and Labour Camp is in Labour Camp is in Labour Camp is in Labour Camp is in Progress. Progress. Progress. Progress. Major Bridge: 01 Major Bridge: 02 Major Bridge: 03 Major Bridge: Nil Minor Bridge: 05 Minor Bridge: 04 Minor Bridge: 06 Minor Bridge: 09 Pipe Culvert: 82 Pipe Culvert: 15 Pipe Culvert: 29 Pipe Culvert: 15 Major Project Box Culvert: 81 Box Culvert: 32 Box Culvert: 33 Box Culvert: 57 8 Features Slab Culvert: Nil Slab Culvert: Nil Bypass: Nil Slab Culvert: 02 Bypass: Nil Bypass: Jamua Bypass: Nil (2.03 Kms) New scope1 Physical Progress Physical Progress Physical Progress Physical Progress Physical (Highway and (Highway and (Highway and (Highway and 9 Progress Structure) is 39.09% Structure) is Structure) is Structure) is 18.32% 40.37% 30.59% Crusher Plant at Crusher Plant, Crusher Plant at Crusher Plant at Maouza- Hot Mix Plant, Gorga, Km 17+000 Saedba at Km Chorbatiya Km WMM Plant & (RHS) about 22 Km. 11+000 (LHS) 45+000 (RHS) - Batch Mix Plant at Hot Mix Plant, about 2 Kms. 10 Plant Details about 3.00 Km Km 17+000 (Base WMM Plant & Batch Hot Mix Plant, Hot Mix Plant, WMM Camp) Mix Plant at Km WMM Plant & Plant & Batch Mix 37+300 (Base Batch Mix Plant at Plant at Km 17+000 Camp) Km 03+420 (Base (Base Camp) Camp) Section wise Section wise Forest Forest details is 11 Forest Details Nil details is given in Nil given in Table- Table-3(b) 3(a) 1 Addendum to the ADB approved IEE report is being prepared.