Written Submission from Mémoire de

G. Bruce Edwards G. Bruce Edwards

In the Matter of À l’égard de

Ontario Power Generation Inc. Inc.

Proposed Environmental Impact Statement Étude proposée pour l’énoncé des incidences for OPG’s Deep Geological Repository environnementales pour l’Installation de (DGR) Project for Low and Intermediate stockage de déchets radioactifs à faible et Level Waste moyenne activité dans des couches géologiques profondes

Joint Review Panel Commission d’examen conjoint

September 16 to October 12, 2013 16 septembre au 12 octobre 2013

JOINT REVIEW PANEL

SECRETARIAT – DGR C/O CANADIAN NUCLEAR SAFETY COMMISSION P.O. Box 1046, Station B 280 Slater Street, Ottawa, ON K1P 5S9 123-456-7890

July 28 2013 G. Bruce Edwards (see Attached Contact information)

Dear Secretariat – DGR,

I appreciate that you will be listening to public input.

Summary of my input;

I have complete support for the Nuclear Waste Management Organization (NWMO) and I feel completely safe with this organization doing this on the Bruce site in Tiverton Ontario Canada, They are the best trained, educated, equipped and I trust this organizations more than anyone else In the world! I would feel safe being in my backyard that having a transfer anywhere else.

Deep Geologic Repository Joint Review Panel Public Hearing:

Written-Only Submission G. Bruce Edwards

My background;

My nuclear power started in 1976 in NPD Rolphton,Ontario plus I also there as a summer student doing a Service Maintainer where I started knowing about Contamination and Waste. After the ongoing years of working different jobs Ontario Hydro and then I spent time at several stations from NPD, Darlington and Bruce Site ;Bruce A&B, Heavy water, Central Site,Centeral Maintenance and WNTC. I have Green Badge in all of the sites and I have taken all radiation protection courses and level one Systems at NPD. I was always impressed with public and staff safety was always number one. With the job within safety system I reviewed all maintenance on safety system and modifications I reported to the regulation Departments.

I have had to wear plastics I work in the boiler room. While working in the planning section I scheduled all maintenance and safety system tests this again gave me the respect for the design of Candu reactor. With the business section time I worked on budgets cost reporting and financial reporting.

I provide a employee perspective of the way these sites at look at waste and treated with respect.

I also feel very comfortable living in this area withe my three children and 4 grandchildren.

Sincerely yours,

G. Bruce Edwards