Monitoring Market Research Report MONITORING REPORT Prepared For Regional Cycle Monitoring Working Group (Co-ordinated by Auckland Regional Transport Authority) MANUAL CYCLE MONITORING IN THE AUCKLAND REGION March 2010 Auckland City Prepared by Gravitas Research and Strategy Limited FINAL VERSION 28th May 2010 TABLE OF CONTENTS 1. AUCKLAND CITY SUMMARY OF RESULTS ..................................................................... 1 1.1 Introduction ................................................................................................................. 1 1.2 Methodology ................................................................................................................ 3 1.3 Summary Of Results ................................................................................................. 12 1.4 Morning Peak Summary Results ............................................................................... 13 1.5 Evening Peak Summary Results ............................................................................... 20 1.6 Aggregated Total Summary Results .......................................................................... 29 1.7 Average Annual Daily Traffic (AADT) Estimate .......................................................... 34 1.8 School Bike Shed Count Summary ............................................................................ 36 2. VICTORIA STREET/WELLESLEY STREET/HALSEY STREET (SITE 1) ......................... 37 2.1 Morning Peak ............................................................................................................ 38 2.2 Evening Peak ............................................................................................................ 41 3. PONSONBY/KARANGAHAPE/ NEWTON/GREAT NORTH ROAD, NEWTON (SITE 2) .. 44 3.1 Morning Peak ............................................................................................................ 45 3.2 Evening Peak ............................................................................................................ 48 4. GREAT NORTH/CARRINGTON/POINT CHEVALIER ROAD, POINT CHEVALIER (SITE 3) ....................................................................................................................................... 51 4.1 Morning Peak ............................................................................................................ 52 4.2 Evening Peak ............................................................................................................ 55 5. PATIKI/ROSEBANK ROAD, AVONDALE (SITE 4) .......................................................... 58 5.1 Morning Peak ............................................................................................................ 59 5.2 Evening Peak ............................................................................................................ 62 6. DOMINION/BALMORAL ROAD, BALMORAL (SITE 5) ................................................... 65 6.1 Morning Peak ............................................................................................................ 66 6.2 Evening Peak ............................................................................................................ 69 7. NORTH WESTERN CYCLEWAY/GREAT NORTH ROAD, WATERVIEW, (SITE 6) ......... 72 7.1 Morning Peak ............................................................................................................ 73 7.2 Evening Peak ............................................................................................................ 76 8. NORTH WESTERN CYCLEWAY/ST LUKES ROAD, WESTERN SPRINGS (SITE 7) ..... 79 8.1 Morning Peak ............................................................................................................ 80 8.2 Evening Peak ............................................................................................................ 84 9. SYMONDS/KARANGAHAPE/ GRAFTON ROAD, GRAFTON (SITE 8) ........................... 88 9.1 Morning Peak ............................................................................................................ 89 9.2 Evening Peak ............................................................................................................ 92 10. KARANGAHAPE ROAD/QUEEN STREET, AUCKLAND CENTRAL (SITE 9) ................. 95 10.1 Morning Peak ............................................................................................................ 96 10.2 Evening Peak ............................................................................................................ 99 11. TAMAKI DRIVE/THE STRAND, PARNELL (SITE 10) .................................................... 102 11.1 Morning Peak .......................................................................................................... 103 11.2 Evening Peak .......................................................................................................... 106 12. REMUERA/ORAKEI/ASCOT ROAD, REMUERA (SITE 11) ........................................... 109 12.1 Morning Peak .......................................................................................................... 110 12.2 Evening Peak .......................................................................................................... 113 13. MANUKAU/GREENLANE ROAD, EPSOM (SITE 12) ..................................................... 116 13.1 Morning Peak .......................................................................................................... 117 13.2 Evening Peak .......................................................................................................... 120 14. IAN MCKINNON DRIVE/NEWTON ROAD, NEWTON (SITE 13) .................................... 123 14.1 Morning Peak .......................................................................................................... 124 14.2 Evening Peak .......................................................................................................... 127 15. MOUNT ALBERT/NEW NORTH/ CARRINGTON ROAD, MT ALBERT (SITE 14) .......... 130 15.1 Morning Peak .......................................................................................................... 131 15.2 Evening Peak .......................................................................................................... 134 16. RICHARDSON ROAD/MAIORO STREET, MT ROSKILL (SITE 15) ............................... 137 16.1 Morning Peak .......................................................................................................... 138 16.2 Evening Peak .......................................................................................................... 141 17. JERVOIS ROAD/WALLACE STREET, HERNE BAY (SITE 16) ..................................... 144 17.1 Morning Peak .......................................................................................................... 145 17.2 Evening Peak .......................................................................................................... 147 18. ONEHUNGA HARBOUR ROAD, ONEHUNGA (SITE 17) ............................................... 150 18.1 Morning Peak .......................................................................................................... 151 18.2 Evening Peak .......................................................................................................... 154 19. GREAT SOUTH ROAD/HIGH STREET/ATKINSON AVENUE, OTAHUHU (SITE 18) .... 157 19.1 Morning Peak .......................................................................................................... 158 19.2 Evening Peak .......................................................................................................... 161 20. ELLERSLIE PANMURE HIGHWAY/LUNN AVENUE, PANMURE (SITE 19) .................. 164 20.1 Morning Peak .......................................................................................................... 165 20.2 Evening Peak .......................................................................................................... 168 21. ST HELIERS BAY ROAD/WEST TAMAKI ROAD, GLEN INNES (SITE 20) ................... 171 21.1 Morning Peak .......................................................................................................... 172 21.2 Evening Peak .......................................................................................................... 175 22. GREAT SOUTH ROAD/CAMPBELL ROAD/MAIN HIGHWAY, GREENLANE (SITE 21) 178 22.1 Morning Peak .......................................................................................................... 179 22.2 Evening Peak .......................................................................................................... 182 23. FERRY TERMINAL, AUCKLAND CENTRAL (SITE 22) ................................................. 185 23.1 Morning Peak .......................................................................................................... 186 23.2 Evening Peak .......................................................................................................... 190 23.3 Ferry Terminal – Count of Parked Cycles ................................................................ 193 24. BLOCKHOUSE BAY/GREAT NORTH ROAD, AVONDALE (SITE 73) ........................... 194 24.1 Morning Peak .......................................................................................................... 195 24.2 Evening Peak .......................................................................................................... 198 25. APIRANA AVENUE/PILKINGTON
Recommended publications
  • Released Under the Official Information
    Attachment E crassi RELEASED UNDER THE OFFICIALNZ Transport INFORMATION Agency and Auckland ACT Transport East West Connections Project Ecological Assessment to Support Option Selection November 2014 RELEASED UNDER THE OFFICIAL INFORMATION ACT GHD | Report for NZ Transport Agency and Auckland Transport - East West Connections Project, 51/326513/202 | i Table of contents 1. Introduction..................................................................................................................................... 1 1.1 Project Description ............................................................................................................... 1 1.2 Limitations ............................................................................................................................ 4 1.3 Assumptions ........................................................................................................................ 5 2. Assessment Methodology .............................................................................................................. 6 3. Background Information - Existing Environment ............................................................................ 7 4. Key Design Assumptions ............................................................................................................... 8 5. Assessment of Options ................................................................................................................ 10 5.1 Potential Environmental Effects ........................................................................................
    [Show full text]
  • Download Original Attachment
    Attachment D East West Connections Report Options shortlisting – preliminary groundwater assessment Prepared for NZTA and Auckland Transport THE ACT Prepared by Beca Ltd UNDER INFORMATION RELEASED OFFICIAL THE ACT UNDER INFORMATION RELEASED OFFICIAL [Document title] Executive Summary The East West Connections project is a joint NZ Transport Agency and Auckland Transport programme to improve freight efficiency, commuter travel, public transport and walking and cycling options over the next 30 years in the area between Onehunga, Penrose, East Tamaki and Auckland Airport. Six options were short- listed for the Onehunga-Penrose connection (a description of each is held in the Detailed Business Case): Option A (Long List Option 1): Existing route upgrade Option B (Long List Option 2): Upgrade with South Eastern Highway Ramp Option C (Long List Option 5): Upgrade with new Galway Street and inland connections Option D (Long List Option 8): Upgrade with Gloucester Park interchange and new Galway St and inland connections Option E (Long List Option 13): New foreshore connection Option F (Long List Option 14): New foreshore and inland connection. This report provides a high level assessment of the effects of the each of the six options on groundwater levels and flow. Groundwater quality is addressed in a separate assessment.THE ACT Existing groundwater levels and flow may be influenced by the project if there are changes to surface water flows and infiltration, where earthworks and subsurface construction require drainage or take place below
    [Show full text]
  • 6 NZ Cycling Conference, 2 November 2007 Diagonal Cycle
    6th NZ Cycling Conference, 2 November 2007 Diagonal cycle crossing for signalised intersection Axel Wilke, Matthew Hinton and Daniel Newcombe Abstract Auckland City Council has developed an innovative cycling proposal to resolve a difficult continuity problem on a significant cycleway currently under construction. The planned State Highway 20 (Mt Roskill) cycleway will run in parallel with the motorway corridor but at its western end the off-road cycleway finishes at a large signalised intersection. Cyclists wishing to continue westwards are presented with the difficult situation of attempting to cross the large and complicated intersection diagonally. This would normally require cyclists to dismount and use two pedestrian phases to reach the desired side of the intersection. Designers ViaStrada and Maunsell have developed an innovative concept, which proposes a diagonal cycle phase to run concurrently with opposing right-turning traffic (i.e. during the ‘single diamond phase’). This is believed to be the first of its kind in NZ, and whilst the concept is described in the Dutch CROW manual, it appears that it has not been tried before in The Netherlands either. This paper will present the concept, and discuss its benefits and risks. This paper has been co-authored by Axel Wilke (ViaStrada), Matthew Hinton (Maunsell) and. Daniel Newcombe (Auckland CC) Contents 1. Introduction.....................................................................................................1 2. Background ....................................................................................................1
    [Show full text]
  • Submission of the Campaign for Better Transport on Waterview Connection Project
    Environmental Protection Authority Waterview Connection project PO Box 10720 The Terrace Wellington 6143 Submission of the Campaign for Better Transport on Waterview Connection Project 1. Introduction: The Campaign for Better Transport (CBT) is a non-politically aligned group that advocates for sustainable transport policies and projects throughout Auckland and the rest of New Zealand. The CBT regularly advocates for better alignment between land- use planning and its effects on the transport network, better public transport and better walking and cycling facilities. 2. Summary of Submission: The CBT generally opposes the Waterview Connection project. This is for a number of reasons that will be further detailed in this submission. In short: - It is questionable whether the project will achieve the objectives that NZTA have highlighted. - The proposed bus shoulder lanes along State Highway 16 are an inadequate gesture to provide high quality “Quality Transit Network” standard public transport along this route. Suggestions to improve the quality of the lanes are detailed further in the submission. - Further public transport improvements on local arterial roads must form part of this project package, to ensure that the traffic benefits of the project are “locked in” and not lost to induced demand. - Extensions and improvements to the proposed cycle paths are required to ensure the project contributes to multi-modal transport benefits. - The widening of State Highway 16 must be questioned and reassessed, as the documentation accompanying the application states it will not bring any congestion relief benefits – but will cause significant environmental effects. It is also noted that the State Highway 16 works have been “snuck into” this application – which is generally presented as only the Waterview Connection.
    [Show full text]
  • AGM and Annual Report 30 September 2010
    AGM and Annual Report 30 September 2010 Cycle Action Auckland is an incorporated registered charity with the objective of promoting cycling as a non-congesting, non-polluting, energy-efficient and health-promoting form of transport for the Auckland region. Cycle Action is affiliated to Cycling Advocates’ Network (CAN), a national voice for cyclists. 5 2 Hepburn St, Freemans Bay PO Box 91-301, Auckland www.caa.org.nz It has been another busy and productive year for Cycle Action. I invite you to spend some time going through the summary of activities and achievements listed below. I can guarantee that you, a family member or a colleague is already enjoying the benefits of the work undertaken by Cycle Action. The name of the organisation has never been a better fit. There has been a whole lot of action going on. And this is just the tip of the iceberg. A lot of the projects that Cycle Action has been involved in this year are long term and on-going projects. The benefits of these projects are yet to be realised but will be coming on stream in the near future. The establishment and building of relationships with a wide variety of people and organisations is also starting to pay huge dividends. More and more, we are seeing cycling becoming mainstream. It's what ordinary people do. There may be an item on the list that particularly catches your eye or maybe you see a glaring omission. Cycle Action is a voluntary group that relies on the skills and efforts of a bunch of enthusiastic individuals.
    [Show full text]
  • Before a Board of Inquiry East West Link Proposal
    BEFORE A BOARD OF INQUIRY EAST WEST LINK PROPOSAL Under the Resource Management Act 1991 In the matter of a Board of Inquiry appointed under s149J of the Resource Management Act 1991 to consider notices of requirement and applications for resource consent made by the New Zealand Transport Agency in relation to the East West Link roading proposal in Auckland Statement of Evidence in Chief of Kathryn King on behalf of Auckland Transport dated 10 May 2017 BARRISTERS AND SOLICITORS A J L BEATSON SOLICITOR FOR THE SUBMITTER AUCKLAND LEVEL 22, VERO CENTRE, 48 SHORTLAND STREET PO BOX 4199, AUCKLAND 1140, DX CP20509, NEW ZEALAND TEL 64 9 916 8800 FAX 64 9 916 8801 EMAIL [email protected] Introduction 1. My full name is Kathryn King. I hold the role of Walking, Cycling and Safety Manager at Auckland Transport (AT). 2. I hold a Master of Arts (Honours) in Environmental Policy from Kings College, University of London, and a Bachelor of Planning (Honours) from the University of Auckland. I am a Prince 2 Practitioner. 3. I have 13 years’ experience in transport planning, specialising in walking and cycling. In my current role, which I have held since January 2015, I manage the teams which plan, design and implement walking, cycling and safety projects and initiatives across Auckland. 4. Key projects I have been responsible for include the following: (a) Completing AT’s Greenways design guidance in December 2016 which sets out design principles and standards for the design of local walking and cycling networks for Auckland; (b) Franklin Road Local Road Improvement (2015-17).
    [Show full text]
  • Before a Board of Inquiry East West Link Project In
    BEFORE A BOARD OF INQUIRY EAST WEST LINK PROJECT IN THE MATTER OF the Resource Management Act 1991 (RMA) AND IN THE MATTER OF a Board of Inquiry appointed under section 149J of the Resource Management Act 1991 to decide notices of requirement and resource consent applications by the New Zealand Transport Agency for the East West Link Project OPENING STATEMENT ON BEHALF OF THE ONEHUNGA MALL CUL-DE-SAC RESIDENTS SUBMISSIONS 3 July 2017 TABLE OF CONTENTS 1. Introduction 2. Structure of the Submissions 3. Lay Person Representation and Request for Appropriate Resourcing 4. Onehunga Mall Cul-de-sac Neighbourhood Submission (OMCN) - Construction Noise and Vibration 5. Construction Air Quality (OMCN) 6. Construction access and Car parking (OMCN) 7. Construction First Gas Pipeline (OMCN) 8. Operational Noise and Vibration (OMCN) 9. Operational Air Quality (OMCN) 10. Operational Car Parking (OMCN) 11. Operational Crime Prevention through Environmental Design (CPTED) at SH20 pedestrian underpass (OMCN) 12. Operational Loss of Views (OMCN) 13. Personal Submission – Engagement resulting in Misrepresentation and/or Negligence 1. Introduction 1.1 Onehunga Mall Cul-de-sac between Property addresses 31-39 Onehunga Mall has approximately 38 residential homes, ranging from two to six bedrooms. The estimated population of these homes is circa 120 plus residents. There are also other residential homes on the Onehunga Mall Cul-de-sac. 1.2 Additionally next to the homes is the SH20 pedestrian and cycle underpass which is well used by the public to access the old Mangere Bridge, Tamanu Reserve and the Waikaraka Cycleway. 1.3 NZTA is our neighbour and aspires to be a ‘good neighbour’ - The East-West Link Project area and the NZTA road network more generally (SH20) directly borders on our neighbourhood.
    [Show full text]
  • [For Cycle Action Auckland Contact Details, Please See Undersigned] Thursday, 14 October 2010 Section 1 Submission on the Waterv
    [for Cycle Action Auckland contact details, please see undersigned] Thursday, 14 October 2010 Section 1 Submission on the Waterview Connection Proposal This document forms the “attached information” part of Cycle Action Auckland's submission, as referred to on pages 6 and 7 of our submission form. Our submission applies to the entire proposal, which we oppose in part. This reflects the complexity of the proposal, the lack of adequate time to thoroughly review the extensive documentation, and the fact that our submission spans all sector areas of the proposal. However, to assist the Board of Inquiry with the hearings process, including pre-hearing discussion, we note that we are: Particularly interested in the following aspects of the proposal: • Cycling and walking • Public transport • Landscaping and urban design Neutral on most other aspects, including being neutral on: • Works and structures not directly related to transport (vent buildings, drainage and outfall structures and similar) • Temporary works or structures (except where they may negatively impact on existing cycling provision) • Discharge / contamination / emissions issues • Marine / coastal / foreshore issues • Stormwater / groundwater issues Our focus on cycling (and related issues, including public transport) is due to our specific role as an advocacy group, as set out in the following Section 2 of the submission. Section 3 discusses our overarching submission matters, while Section 4 covers specific matters by project sector. Both contain highlighted paragraphs summarising what we would like the Board of Inquiry to modify regarding the Waterview Connection Proposal. Cycle Action Auckland is an incorporated registered charity with the objective of promoting cycling as a non-congesting, non-polluting, energy-efficient and health-promoting form of transport for the Auckland region.
    [Show full text]
  • Before a Board of Inquiry East West Link Project
    BEFORE A BOARD OF INQUIRY EAST WEST LINK PROJECT UNDER the Resource Management Act 1991 (the RMA) AND IN THE MATTER OF Notices of requirement for designation and resource consent applications by the NEW ZEALAND TRANSPORT AGENCY for the East West Link Project STATEMENT OF PRIMARY EVIDENCE OF ANDREW PETER MURRAY ON BEHALF OF THE NEW ZEALAND TRANSPORT AGENCY Traffic and Transportation Dated: 12 April 2017 Barristers and Solicitors Auckland Solicitor Acting: Pat Mulligan Email: [email protected] Tel 64 9 358 2555 Fax 64 9 358 2055 PO Box 1433 DX CP24024 Auckland 1140 CONTENTS 1. SUMMARY OF EVIDENCE 1 2. INTRODUCTION 4 3. CODE OF CONDUCT 5 4. SCOPE OF EVIDENCE 5 PART A: PROJECT DEVELOPMENT AND ASSESSMENT OF ALTERNATIVES 6 5. OVERVIEW OF THE PROJECT AND MY ROLE 6 6. ASSESSMENT OF ALTERNATIVES 12 7. CONSULTATION AND MITIGATION BY DESIGN 17 PART B: ASSESSMENT OF EFFECTS 19 8. ASSESSMENT METHODOLOGY 19 9. EXISTING AND FUTURE TRANSPORT ENVIRONMENT 25 10. ASSESSMENT OF EFFECTS ON TRAVEL TIMES, TRAVEL TIME RELIABILITY AND TRAFFIC FLOWS 35 11. EFFECTS ON ACCESS 44 12. IMPACT ON PARKING 48 13. IMPACT ON THE RAIL NETWORK 50 14. ASSESSMENT OF WALKING AND CYCLING EFFECTS 52 15. ASSESSMENT OF PUBLIC TRANSPORT EFFECTS (BUS) 52 16. SAFETY PERFORMANCE 53 PART C: RESPONSES 54 17. RESPONSE TO AUCKLAND COUNCIL'S 149 ISSUES REPORT/OTHER REPORTS 54 18. RESPONSE TO SUBMISSIONS 55 19. KEY ISSUES 55 20. SPECIFIC SUBMISSIONS 71 21. COMMENT ON CONDITIONS 87 22. CONCLUSION 87 ANNEXURE 1 89 ANNEXURE 2 93 ANNEXURE 3 94 ANNEXURE 4 95 ANNEXURE 5 97 ANNEXURE 6 101 ANNEXURE 7 106 ANNEXURE 8 108 BF\56816011\9 1.
    [Show full text]
  • (The RMA) and in the MATTER of Notices O
    BEFORE A BOARD OF INQUIRY EAST WEST LINK PROJECT UNDER the Resource Management Act 1991 (the RMA) AND IN THE MATTER OF Notices of requirement for designation and resource consent applications by the NEW ZEALAND TRANSPORT AGENCY for the East West Link Project STATEMENT OF PRIMARY EVIDENCE OF ANDREW PETER MURRAY ON BEHALF OF THE NEW ZEALAND TRANSPORT AGENCY Walking and Cycling Dated: 12th April 2017 Barristers and Solicitors Auckland Solicitor Acting: Pat Mulligan Email: [email protected] Tel 64 9 358 2555 Fax 64 9 358 2055 PO Box 1433 DX CP24024 Auckland 1140 CONTENTS 1. SUMMARY OF EVIDENCE 1 2. INTRODUCTION 3 3. CODE OF CONDUCT 3 4. SCOPE OF EVIDENCE 3 PART A: PROJECT DEVELOPMENT AND DESCRIPTION 4 5. OVERVIEW OF THE PROJECT AND MY ROLE 4 PART B: ASSESSMENT OF EFFECTS ON THE ENVIRONMENT 11 6. ASSESSMENT METHODOLOGY 11 7. EXISTING ENVIRONMENT 11 8. ASSESSMENT OF EFFECTS AND PROPOSED MITIGATION 12 PART C: RESPONSES 32 9. RESPONSE TO AUCKLAND COUNCIL'S 149 ISSUES REPORT/OTHER REPORTS 32 10. RESPONSE TO SUBMISSIONS 32 11. SUMMARY 37 12. CONCLUSION 39 ATTACHMENT 1 40 ATTACHMENT 2 42 BF\56832919\1 Page 1 1. SUMMARY OF EVIDENCE 1.1 This statement describes the development of the walking and cycling elements of the Project, the existing network issues and the outcomes and effects of the Project in relation to walking and cycling. It addresses how the Project meets the key Project Objective 2: To improve safety and accessibility for cycling and walking between Māngere Bridge, Onehunga and Sylvia Park, and accessing Ōtāhuhu East: 1.2 The walking and cycling elements were developed in an iterative way, in coordination with the other elements of the Project design.